By designing an automatic tunnel settlement monitoring device including monitoring blocks, electric sliders and carriages, the problem of difficulty in time monitoring of small settlements and false alarms in the prior art is solved, and high accuracy and reliability of tunnel settlement conditions are achieved automatic monitoring of sex.

CN119437161AActive Publication Date: 2025-02-14GUIYANG ELECTRIC CONTROL EQUIP
View PDF 20 Cites 0 Cited by

Patent Information

Application Number
CN202510045762.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-13
Publication Date
2025-02-14
Estimated Expiration
2045-01-13

AI Technical Summary

Technical Problem

The existing tunnel settlement deformation monitoring system is difficult to monitor the problem of small settlement and false alarms caused by impurities in a timely manner.

Method used

An automatic settlement monitoring device including a monitoring block, an electric slider and a carriage is designed. By monitoring the rollers and the tunnel top wall, the tiny displacement is amplified by using gears and rack structures, and alarms are triggered through conductive columns and resistors. The device performs automatic monitoring and alarm. At the same time, use brushes and spray heads to remove impurities to ensure monitoring accuracy.

Benefits of technology

Automatic monitoring of settlement conditions at different locations of the tunnel is realized, small settlement can be detected in a timely manner and false alarms can be reduced, improving the accuracy and reliability of monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119437161A_ABST
    Figure CN119437161A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tunnel monitoring, in particular to an automatic settlement monitoring device for tunnel engineering, which comprises a monitoring block, an electric sliding block and a sliding frame, the top wall of the monitoring block is fixedly connected with a rectangular block in a penetrating manner, the inner wall of the rectangular block is provided with a cavity, and the top wall of the cavity is slidably connected with a U-shaped plate in a penetrating manner; a monitoring mechanism is arranged on the U-shaped plate; the monitoring mechanism comprises a monitoring roller rotationally connected to the inner side wall of the U-shaped plate, a first gear is rotationally connected to the side wall of the U-shaped plate, a first through hole and a second through hole are formed in the inner wall of the cavity, a first rack is fixedly connected to the inner wall of the first through hole, and a second rack is fixedly connected to the inner wall of the second through hole. By arranging the sliding frame, the electric sliding block, the monitoring mechanism and other structures, the sliding frame can move in the moving direction of the tunnel, the electric sliding block drives the monitoring mechanism to reciprocate in the horizontal direction along the sliding frame, and then the settlement conditions of different positions of the tunnel are automatically monitored.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel monitoring, and in particular to an automatic settlement monitoring device for tunnel engineering. Background Art

[0002] A tunnel project is a structure built underground, underwater or in a mountain to lay railways or build roads for motor vehicles to pass through.

[0003] After searching, the patent document with announcement number CN116399293B is as follows: A system and method for monitoring the settlement and deformation of an operating tunnel, including an arched slide rail, a symmetrical L-shaped slider slidingly arranged on the upper crossbeam of the arched slide rail, and a support box is arranged on the top surface of the symmetrical L-shaped slider, and a support bar is slidably inserted inside the support box, and a sliding plate is connected to the lower surface of the symmetrical support bar, and a contact roller is rotatably arranged between the upper end surfaces of the symmetrical support bar, and a pin column is installed on the lower surface of the sliding plate, and the pin column slides out to the lower surface of the support box, and a contact pressure plate is arranged on the upper surface of the upper crossbeam of the arched slide rail, and the upper surface of the contact pressure plate contacts the lower end surface of the pin column, and a pressure sensor is arranged between the lower surface of the contact pressure plate and the mounting groove; the monitoring personnel of the present invention judge the settlement and deformation monitoring of a certain or local surrounding rock based on the data transmitted by the pressure sensor, so as to facilitate the construction personnel to repair the settlement position of the tunnel arch top surface in time. However, there are also some shortcomings: For example, if the settlement is judged only by the displacement of the contact roller to squeeze the contact pressure plate, it is difficult to monitor and warn in time when a slight settlement occurs on the top wall of the tunnel. Moreover, if impurities such as mud adhere to the top wall of the tunnel, it will affect the accuracy of monitoring and lead to false alarms.

[0004] Therefore, we proposed an automatic settlement monitoring device for tunnel engineering. Summary of the invention

[0005] The purpose of the present invention is to solve the problems existing in the prior art and to propose an automatic settlement monitoring device for tunnel engineering.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions: An automatic settlement monitoring device for tunnel engineering, comprising a monitoring block, an electric slider and a sliding frame, wherein a rectangular block is fixedly connected to the top wall of the monitoring block, a cavity is formed in the inner wall of the rectangular block, a C-shaped plate is slidably connected to the top wall of the cavity, and a monitoring mechanism is arranged on the C-shaped plate; The monitoring mechanism includes a monitoring roller rotatably connected to the inner wall of the U-shaped plate, the side wall of the U-shaped plate is rotatably connected to a first gear, the inner wall of the cavity is provided with a first through hole and a second through hole, the inner wall of the first through hole is fixedly connected to a first rack, the inner wall of the second through hole is fixedly connected to a second rack, the inner wall of the cavity is slidably connected to a first long block, the side wall of the first long block is fixedly connected to a third rack, the side wall of the first long block is rotatably connected to a second gear, the inner wall of the cavity is slidably connected to a second long block, the side wall of the second long block is fixedly connected to a fourth rack, the side wall of the second long block is fixedly connected to a conductive column, the side wall of the cavity is fixedly connected to a resistor, and an alarm is installed on the side wall of the monitoring block.

[0007] Preferably, the rectangular block is provided with a lifting mechanism for improving monitoring accuracy, the lifting mechanism includes a rectangular frame fixedly connected to the top wall of the rectangular block, the inner wall of the rectangular frame is symmetrically provided with sliding grooves, each inner wall of the sliding groove is sealingly and slidably connected with a slide, the top wall of the slide is fixedly connected with a support column, the end of the support column away from the slide is fixedly connected with a brush, the side wall of the support column is fixedly installed with a nozzle, the inner wall of the second long strip block is provided with a sliding cavity, the inner wall of the sliding cavity is sealingly and slidably connected with a sliding plug, the side wall of the sliding plug is fixedly connected with a connecting rod, and the end of the connecting rod away from the sliding plug passes through the inner wall of the sliding cavity and is fixedly connected to the C-shaped plate.

[0008] Preferably, the side wall of the monitoring block is fixedly connected to a liquid storage tank, and the inner wall of the sliding cavity is penetrated and fixedly connected with a one-way liquid inlet pipe and two one-way liquid outlet pipes, the other end of the one-way liquid inlet pipe penetrates the inner wall of the sliding cavity and is fixedly connected to the liquid storage tank, the other end of the one-way liquid outlet pipe penetrates the inner wall of the sliding cavity and is fixedly connected to a corresponding inner wall of a slide groove, the inner wall of the slide groove is fixedly connected to the nozzle through a connecting pipe, and the slide plate is elastically connected to the inner wall of the slide groove through a reset spring.

[0009] Preferably, the lifting mechanism also includes a rectangular groove opened on the top wall of the monitoring block, the inner wall of the rectangular groove is slidably connected with a sliding rack, the top of the sliding rack is fixedly connected with a scraper, the bottom end of the sliding rack is elastically connected to the inner wall of the rectangular groove through a tension spring, a wedge block is slidably connected through the side wall of the rectangular groove, the other end of the wedge block extends into the sliding cavity, a wedge-shaped hole is opened on the side wall of the other end of the wedge block, and a slot is opened on the side wall of the sliding rack.

[0010] Preferably, a wedge-shaped plate is fixedly connected to the bottom wall of the second long strip block, the wedge-shaped plate and the inner wall of the wedge-shaped hole are embedded and slidably matched, and one end of the wedge-shaped block is inserted into the slot.

[0011] Preferably, a T-shaped groove connected to the inner wall of the rectangular groove is formed on the inner wall of the monitoring block, a spur rack is slidably connected to the inner wall of the T-shaped groove, a transmission gear is rotatably connected to the inner wall of the T-shaped groove, the transmission gear and the sliding rack are meshingly connected, the transmission rack and the spur rack are meshingly connected, a rubber sleeve is fixedly connected to the bottom wall of the spur rack, an L-shaped frame is fixedly connected to the side wall of the monitoring block, a support plate is rotatably connected to the inner wall of the L-shaped frame, an end of the rubber sleeve away from the spur rack is fixedly connected to the rubber sleeve, and the rubber sleeve is filled with electrorheological fluid.

[0012] Preferably, the first rack is meshed and connected with the first gear, the third rack is meshed and connected with the first gear, the second rack is meshed and connected with the second gear, and the fourth rack is meshed and connected with the second gear.

[0013] Preferably, the conductive column, the resistor and the alarm are electrically connected, the slide frame is in an inverted cross-shaped structure, and a plurality of electric pulleys are symmetrically fixedly connected to the bottom wall of the slide frame.

[0014] Preferably, the electric slider is slidably fitted on the side wall of the sliding frame, the electric slider is fixedly connected to the monitoring block, a tension spring is sleeved and fixed on the side wall of the U-shaped plate, and the other end of the tension spring is fixedly connected to the inner wall of the cavity.

[0015] Compared with the prior art, the present invention has the following advantages: 1. By setting up structures such as a sliding frame, an electric slider and a monitoring mechanism, the sliding frame can move a certain distance along the direction of the tunnel each time, and then the electric slider drives the monitoring mechanism to move back and forth in the horizontal direction along the sliding frame, thereby automatically monitoring the settlement conditions at different positions of the tunnel; 2. When monitoring the settlement of the top wall inside the tunnel, the electric slider drives the monitoring block to move rightward on the slide frame, and the monitoring roller rotates in contact with the top wall inside the tunnel. When the top wall inside the tunnel may settle, the monitoring roller will move downward for a short distance. By setting structures such as a U-shaped plate, multiple gears and multiple racks, the small displacement of the monitoring roller moving downward is amplified multiple times to avoid the monitoring mechanism from finding the small settlement in time. The conductive column will slide downward against the side wall of the resistor, so that the alarm reaches the working voltage, generates an alarm and automatically records the possible tunnel settlement here; 3. False alarms may also occur when impurities such as mud adhere to the top wall of the tunnel or impurities adhere to the roller of the monitoring roller. In the above process, the U-shaped plate and the second long strip are moving downward. Since the second long strip moves faster, the distance between the U-shaped plate and the second long strip will continue to increase. By setting structures such as sliding plugs, connecting rods and brushes, the brush and the roller of the monitoring roller are in contact with each other, and the surface of the monitoring roller is brushed to remove impurities. Then, the cleaning liquid will be sprayed from the nozzle through the connecting pipe to wash the surface of the monitoring roller, so as to avoid false alarms of the settlement of the top wall of the tunnel caused by impurities adhering to the monitoring roller; 4. When the monitoring roller moves downward for a long distance, the wedge plate drives the wedge block to slide to the right for a distance through the wedge hole and disengages from the slot. Under the action of the tension spring, the sliding rack slides upward for a distance, and then the sliding rack drives the scraper to contact the top wall inside the tunnel. Then the electric slider drives the scraper to move left and right repeatedly on the top wall inside the tunnel through the monitoring block and other structures, so that the scraper scrapes against the top wall inside the tunnel. If there are impurities such as mud on the top wall inside the tunnel, they can be scraped off, and then the monitoring roller is re-monitored; 5. If the top wall of the tunnel is not a false alarm caused by impurities such as soil, then the top wall of the tunnel has experienced a large settlement. At this time, there is a safety hazard at the settlement of the top wall of the tunnel. During the upward movement of the sliding rack, the bottom end of the support plate is in contact with the ground inside the tunnel by setting structures such as transmission gears, spur racks and support plates, and the electrorheological fluid inside the rubber sleeve is energized. The electrorheological fluid changes from liquid to solid, and then forms a hard body inside the rubber sleeve, forming a stable triangular structure with the support plate, which can partially support the top wall of the tunnel for subsequent maintenance personnel to perform inspection and maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the appearance structure of an automatic settlement monitoring device for tunnel engineering proposed by the present invention; Figure 2 This is a schematic diagram of the connection relationship between the electric slider and the monitoring block in the automatic settlement monitoring device for tunnel engineering proposed by the present invention; Figure 3 This is a schematic diagram of the internal structure of the cavity, rectangular groove and T-shaped groove of an automatic settlement monitoring device for tunnel engineering proposed by the present invention; Figure 4 for Figure 3 A magnified schematic diagram of the structure of part A; Figure 5 This is a schematic diagram of the structure of a monitoring roller in an automatic settlement monitoring device for tunnel engineering proposed by the present invention after it moves downward for a certain distance when detecting settlement; Figure 6This is a schematic diagram of the structure inside the chute of an automatic settlement monitoring device for tunnel engineering proposed by the present invention; Figure 7 This is a schematic diagram of the structure inside the slideway in an automatic settlement monitoring device for tunnel engineering proposed by the present invention; Figure 8 The present invention is a schematic diagram of the connection relationship between the tension spring and the C-shaped plate in an automatic settlement monitoring device for tunnel engineering proposed by the present invention.

[0017] In the figure: 1, monitoring block; 2, electric slider; 3, sliding frame; 4, rectangular block; 5, cavity; 6, shaped plate; 7, monitoring roller; 8, first gear; 9, first through hole; 10, first rack; 11, first strip block; 12, third rack; 13, wedge plate; 14, second through hole; 15, second rack; 16, second strip block; 17, fourth rack; 18, conductive column; 19, alarm; 20, wedge block; 21, wedge hole; 22, rectangular slot; 23, tension spring; 24, sliding rack; 25. Scraper; 26. Sliding cavity; 27. Sliding plug; 28. Connecting rod; 29. ​​One-way liquid inlet pipe; 30. One-way liquid outlet pipe; 31. Second gear; 32. Sliding groove; 33. Slide plate; 34. Return spring; 35. Connecting pipe; 36. Support column; 37. Nozzle; 38. Brush; 39. T-slot; 40. Transmission gear; 41. Straight rack; 42. Rubber sleeve; 43. L-shaped frame; 44. Support plate; 45. Liquid storage tank; 46. Slot; 47. Resistor; 48. Rectangular frame; 49. Electric pulley. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] Reference Figure 1 - Figure 8 A settlement automatic monitoring device for tunnel engineering includes a monitoring block 1, an electric slider 2 and a sliding frame 3. The top wall of the monitoring block 1 is fixedly connected with a rectangular block 4. The inner wall of the rectangular block 4 is provided with a cavity 5. The top wall of the cavity 5 is slidably connected with a U-shaped plate 6 (such as Figure 3 As shown), a monitoring mechanism is provided on the U-shaped plate 6; The monitoring mechanism includes a monitoring roller 7 rotatably connected to the inner wall of the U-shaped plate 6, the side wall of the U-shaped plate 6 is rotatably connected to a first gear 8, the inner wall of the cavity 5 is provided with a first through hole 9 and a second through hole 14, the inner wall of the first through hole 9 is fixedly connected to a first rack 10, the inner wall of the second through hole 14 is fixedly connected to a second rack 15, the inner wall of the cavity 5 is slidably connected to a first long block 11, the side wall of the first long block 11 is fixedly connected to a third rack 12, the side wall of the first long block 11 is rotatably connected to a second gear 31, the inner wall of the cavity 5 is slidably connected to a second long block 16, the side wall of the second long block 16 is fixedly connected to a fourth rack 17, the side wall of the second long block 16 is fixedly connected to a conductive column 18, the side wall of the cavity 5 is fixedly connected to a resistor 47, and the side wall of the monitoring block 1 is installed with an alarm 19.

[0020] The rectangular block 4 is provided with a lifting mechanism for improving the monitoring accuracy, and the lifting mechanism includes a rectangular frame 48 fixedly connected to the top wall of the rectangular block 4, and the inner wall of the rectangular frame 48 is symmetrically provided with slide grooves 32, and the inner wall of each slide groove 32 is sealed and slidably connected with a slide plate 33, and the top wall of the slide plate 33 is fixedly connected with a support column 36, and the end of the support column 36 away from the slide plate 33 is fixedly connected with a brush 38, and the side wall of the support column 36 is fixedly installed with a nozzle 37, and the inner wall of the second long strip block 16 is provided with a sliding cavity 26, and the inner wall of the sliding cavity 26 is sealed and slidably connected with a sliding plug 27, and the side wall of the sliding plug 27 is fixedly connected with a connecting rod 28, and the end of the connecting rod 28 away from the sliding plug 27 passes through the inner wall of the second long strip block 16 and is fixedly connected to the U-shaped plate 6.

[0021] A liquid storage tank 45 is fixedly connected to the side wall of the monitoring block 1, and the liquid storage tank 45 is filled with cleaning liquid. A one-way liquid inlet pipe 29 and two one-way liquid outlet pipes 30 are fixedly connected to the inner wall of the sliding cavity 26. The other end of the one-way liquid inlet pipe 29 passes through the inner wall of the rectangular block 4 and is fixedly connected to the liquid storage tank 45. The other end of the one-way liquid outlet pipe 30 passes through the inner wall of the rectangular block 4 and is fixedly connected to the inner wall of a corresponding slide groove 32. The one-way liquid inlet pipe 29 only allows the cleaning liquid inside the liquid storage tank 45 to enter the sliding cavity 26. The one-way liquid outlet pipe 30 only allows the cleaning liquid inside the sliding cavity 26 to enter the corresponding slide groove 32. The upper inner wall of the slide groove 32 is fixedly connected to the nozzle 37 through the connecting pipe 35. When the slide plate 33 slides upward for a distance, the cleaning liquid can enter the nozzle 37 through the connecting pipe 35 and be sprayed out. The slide plate 33 is elastically connected to the inner wall of the slide groove 32 through the return spring 34.

[0022] The lifting mechanism also includes a rectangular groove 22 opened on the top wall of the monitoring block 1, a sliding rack 24 is slidably connected to the inner wall of the rectangular groove 22, a scraper 25 is fixedly connected to the top of the sliding rack 24, the bottom end of the sliding rack 24 is elastically connected to the inner wall of the rectangular groove 22 through a tension spring 23, a wedge block 20 is slidably connected to the side wall of the rectangular groove 22, the other end of the wedge block 20 extends into the interior of the cavity 5, a wedge hole 21 is opened on the side wall of the other end of the wedge block 20, and a slot 46 is opened on the side wall of the sliding rack 24.

[0023] The bottom wall of the second long strip 16 is fixedly connected to the wedge plate 13 , and the wedge plate 13 and the inner wall of the wedge hole 21 are inserted and slidably matched with each other without separation, and one end of the wedge block 20 is inserted into the slot 46 .

[0024] The inner wall of the monitoring block 1 is provided with a T-shaped groove 39 connected to the inner wall of the rectangular groove 22, and the inner wall of the T-shaped groove 39 is slidably connected with a straight rack 41, and the inner wall of the T-shaped groove 39 is rotatably connected with a transmission gear 40, the transmission gear 40 is meshed with the sliding rack 24, the transmission gear 40 is meshed with the straight rack 41, and the bottom wall of the straight rack 41 is fixedly connected with a rubber sleeve 42, and the side wall of the monitoring block 1 is fixedly connected with an L-shaped frame 43, and the inner wall of the L-shaped frame 43 is rotatably connected with a support plate 44, and one end of the rubber sleeve 42 away from the straight rack 41 is fixedly connected to the support plate 44, and the inner wall of the rubber sleeve 42 is fixedly connected with the support plate 44. The electrorheological fluid is filled with electrorheological fluid, which is composed of solid particles with high dielectric constant and silicone oil with low dielectric constant. It can transform from liquid to solid under the action of electric field. When the external electric field strength is much lower than a certain critical value, the electrorheological fluid is liquid; when the electric field strength is much higher than this critical value, it becomes solid; electrorheological fluid can produce obvious electrorheological effect under the action of electric field, that is, it can quickly and reversibly transform between liquid and quasi-solid state, or between fluid state (quasi-liquid state) and solid state, and maintain continuous viscosity. This transformation is extremely rapid, instantaneous and controllable, with extremely low energy consumption, and can achieve real-time control.

[0025] The first rack 10 is meshed and connected with the first gear 8 , the third rack 12 is meshed and connected with the first gear 8 , the second rack 15 is meshed and connected with the second gear 31 , and the fourth rack 17 is meshed and connected with the second gear 31 .

[0026] The conductive column 18, the resistor 47 and the alarm 19 are electrically connected. The slide frame 3 is an inverted cross structure. The bottom wall of the slide frame 3 is symmetrically fixedly connected with an electric pulley 49. The electric pulley 49 and the electric slider 2 are both existing technologies and will not be described in detail here.

[0027] The electric slider 2 is slidably fitted on the side wall of the slide frame 3, the electric slider 2 is fixedly connected to the monitoring block 1, and a tension spring (such as Figure 8 As shown), the other end of the tension spring is fixedly connected to the inner wall of the cavity 5.

[0028] In the present invention, the frame track at the top of the slide frame 3 is consistent with the track of the top wall inside the tunnel. The electric slider 2 can reciprocate horizontally along the slide frame 3, and the electric pulley 49 can drive the slide frame 3 to move a certain distance along the direction of the tunnel each time, thereby automatically monitoring the settlement conditions at different positions of the tunnel.

[0029] When monitoring the settlement of the top wall inside the tunnel, the electric slider 2 is turned on, and the electric slider 2 drives the monitoring block 1 to move to the right on the slide frame 3. Since the roller portion of the monitoring roller 7 is in contact with the top wall inside the tunnel, the monitoring roller 7 will rotate in contact with the top wall inside the tunnel during the movement with the monitoring block 1. When the top wall inside the tunnel may settle, the monitoring roller 7 will move downward for a short distance, and the monitoring roller 7 will drive the C-shaped plate 6 to move downward for a short distance, and the C-shaped plate 6 will drive the first gear 8 to move. Since the first gear 8 is respectively meshed with the first rack 10 and the third rack 12, the third rack 12 will drive the third rack 12 to move. A long strip block 11 moves downward at a double stroke, and under the action of the second gear 31 and the second rack 15, the second gear 31 drives the second long strip block 16 to move downward at a double stroke through the fourth rack 17, thereby amplifying the tiny displacement of the monitoring roller 7 downward by multiple times, so as to avoid the monitoring mechanism from having difficulty in timely detecting tiny settlements. Then, the conductive column 18 fixedly connected to the side wall of the second long strip block 16 will slide downward against the side wall of the resistor 47, so that the resistance in the circuit formed by the resistor 47, the conductive column 18 and the alarm 19 will continue to decrease until the alarm 19 reaches the working voltage, generates an alarm and automatically records the possible tunnel settlement here.

[0030] When there are impurities such as mud adhering to the top wall of the tunnel or impurities adhering to the roller part of the monitoring roller 7, false alarms may occur. In the above process, the U-shaped plate 6 and the second long block 16 move downward. Since the second long block 16 moves faster, the distance between the U-shaped plate 6 and the second long block 16 will continue to increase. Then the connecting rod 28 fixedly connected to the inner wall of the U-shaped plate 6 will drive the sliding plug 27 to slide in the sliding cavity 26 through the one-way liquid outlet pipe 30. The cleaning liquid squeezed into the two chutes 32 will push the slide plate 33 to slide upward for a certain distance, and the slide plate 33 will drive the support column 36 to move upward for a certain distance, so that the brush 38 and the roller part of the monitoring roller 7 are in contact with each other, and the surface of the monitoring roller 7 is brushed to remove impurities. Then the cleaning liquid will be sprayed out from the nozzle 37 through the connecting pipe 35 to rinse the surface of the monitoring roller 7, so as to avoid the impurities adhering to the monitoring roller 7 and causing false alarm of the settlement of the top wall inside the tunnel.

[0031] When the monitoring roller 7 moves downward for a long distance, it indicates that the possible settlement is serious and there is a safety hazard. It is necessary to eliminate other false alarms. Then, the second long block 16 moves downward for a long distance and drives the wedge plate 13 to move synchronously, so that the wedge plate 13 drives the wedge block 20 to slide to the right for a distance (such as 20) through the wedge hole 21. Figure 3 and Figure 4 As shown), the wedge block 20 can be released from the limit release state from the slot 46, and the sliding rack 24 can slide upward for a distance under the action of the tension spring 23, so that the sliding rack 24 will drive the scraper 25 to contact the top wall inside the tunnel. Then the electric slider 2 drives the scraper 25 to move left and right repeatedly on the top wall inside the tunnel through the monitoring block 1 and other structures, so that the scraper 25 scrapes the top wall inside the tunnel. If there are impurities such as soil on the top wall inside the tunnel, they can be scraped off, and then the monitoring roller 7 is ordered to re-monitor.

[0032] If the top wall of the tunnel is not a false alarm caused by impurities such as soil, then the top wall of the tunnel has a large settlement. At this time, there is a safety hazard at the settlement of the top wall of the tunnel. During the upward movement of the sliding rack 24 (such as Figure 3 As shown in the figure, the sliding rack 24 will drive the transmission gear 40 meshing with it to rotate, and the transmission gear 40 will drive the spur rack 41 meshing with it to move downward for a distance, then the spur rack 41 will drive the rubber sleeve 42 to move downward, and since the other end of the rubber sleeve 42 is fixedly connected to the support plate 44, the user can pull the support plate 44 to rotate it (as shown in the figure). Figure 2 As shown), until the bottom end of the support plate 44 contacts the ground inside the tunnel, at which time the rubber sleeve 42 will be stretched and deformed, and then the electrorheological fluid inside the rubber sleeve 42 is energized, and the electrorheological fluid changes from liquid to solid, thereby forming a hard body inside the rubber sleeve 42, and forming a stable triangular structure with the support plate 44, thereby partially supporting the top wall inside the tunnel, waiting for subsequent maintenance personnel to perform maintenance.

[0033] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An automatic settlement monitoring device for tunnel engineering, comprising a monitoring block (1), an electric slider (2) and a sliding frame (3), characterized in that: A rectangular block (4) is fixedly connected to the top wall of the monitoring block (1), a cavity (5) is provided on the inner wall of the rectangular block (4), a C-shaped plate (6) is slidably connected to the top wall of the cavity (5), and a monitoring mechanism is provided on the C-shaped plate (6); The monitoring mechanism comprises a monitoring roller (7) rotatably connected to the inner wall of the U-shaped plate (6); the side wall of the U-shaped plate (6) is rotatably connected to a first gear (8); the inner wall of the cavity (5) is provided with a first through hole (9) and a second through hole (14); the inner wall of the first through hole (9) is fixedly connected to a first rack (10); the inner wall of the second through hole (14) is fixedly connected to a second rack (15); the inner wall of the cavity (5) is slidably connected to a first long strip (11); the first long strip (11) is slidably connected to the inner wall of the cavity (5); 11) A third rack (12) is fixedly connected to the side wall, the side wall of the first long strip block (11) is rotatably connected to a second gear (31), the inner wall of the cavity (5) is slidably connected to a second long strip block (16), the side wall of the second long strip block (16) is fixedly connected to a fourth rack (17), the side wall of the second long strip block (16) is fixedly connected to a conductive column (18), the side wall of the cavity (5) is fixedly connected to a resistor (47), and the side wall of the monitoring block (1) is equipped with an alarm (19).

2. The automatic settlement monitoring device for tunnel engineering according to claim 1, characterized in that: The rectangular block (4) is provided with a lifting mechanism for improving monitoring accuracy, the lifting mechanism comprising a rectangular frame (48) fixedly connected to the top wall of the rectangular block (4), the inner wall of the rectangular frame (48) symmetrically provided with slide grooves (32), the inner wall of each of the slide grooves (32) being sealed and slidably connected to a slide plate (33), the top wall of the slide plate (33) being fixedly connected with a support column (36), the end of the support column (36) away from the slide plate (33) being fixedly connected with a brush (38), the side wall of the support column (36) being fixedly mounted with a nozzle (37), the inner wall of the second long strip block (16) being provided with a sliding cavity (26), the inner wall of the sliding cavity (26) being sealed and slidably connected with a sliding plug (27), the side wall of the sliding plug (27) being fixedly connected with a connecting rod (28), the end of the connecting rod (28) away from the sliding plug (27) passing through the inner wall of the second long strip block (16) and then being fixedly connected to the U-shaped plate (6).

3. The automatic settlement monitoring device for tunnel engineering according to claim 2, characterized in that: The side wall of the monitoring block (1) is fixedly connected to a liquid storage tank (45); the inner wall of the sliding chamber (26) is penetrated and fixedly connected to a one-way liquid inlet pipe (29) and two one-way liquid outlet pipes (30); the other end of the one-way liquid inlet pipe (29) penetrates the inner wall of the rectangular block (4) and is fixedly connected to the liquid storage tank (45); the other end of the one-way liquid outlet pipe (30) penetrates the inner wall of the rectangular block (4) and is fixedly connected to the inner wall of a corresponding slide groove (32); the inner wall of the slide groove (32) is fixedly connected to the nozzle (37) via a connecting pipe (35); and the slide plate (33) is elastically connected to the inner wall of the slide groove (32) via a return spring (34).

4. The automatic settlement monitoring device for tunnel engineering according to claim 3, characterized in that: The lifting mechanism further comprises a rectangular groove (22) formed on the top wall of the monitoring block (1); a sliding rack (24) is slidably connected to the inner wall of the rectangular groove (22); a scraper (25) is fixedly connected to the top of the sliding rack (24); the bottom end of the sliding rack (24) is elastically connected to the inner wall of the rectangular groove (22) via a tension spring (23); a wedge block (20) is slidably connected to the side wall of the rectangular groove (22); the other end of the wedge block (20) extends into the interior of the cavity (5); a wedge hole (21) is formed on the side wall of the other end of the wedge block (20); and a slot (46) is formed on the side wall of the sliding rack (24).

5. The automatic settlement monitoring device for tunnel engineering according to claim 4, characterized in that: The bottom wall of the second long strip (16) is fixedly connected to a wedge-shaped plate (13), the wedge-shaped plate (13) and the inner wall of the wedge-shaped hole (21) are slidably fitted into each other, and one end of the wedge-shaped block (20) is inserted into the slot (46).

6. The automatic settlement monitoring device for tunnel engineering according to claim 4, characterized in that: The inner wall of the monitoring block (1) is provided with a T-shaped groove (39) which is connected to the inner wall of the rectangular groove (22); the inner wall of the T-shaped groove (39) is slidably connected to a spur rack (41); the inner wall of the T-shaped groove (39) is rotatably connected to a transmission gear (40); the transmission gear (40) is meshingly connected to the sliding rack (24); the transmission gear (40) is meshingly connected to the spur rack (41); the bottom wall of the spur rack (41) is fixedly connected to a rubber sleeve (42); the side wall of the monitoring block (1) is fixedly connected to an L-shaped frame (43); the inner wall of the L-shaped frame (43) is rotatably connected to a support plate (44); one end of the rubber sleeve (42) away from the spur rack (41) is fixedly connected to the support plate (44); and the rubber sleeve (42) is filled with an electrorheological fluid.

7. The automatic settlement monitoring device for tunnel engineering according to claim 1, characterized in that: The first rack (10) is meshedly connected to the first gear (8), the third rack (12) is meshedly connected to the first gear (8), the second rack (15) is meshedly connected to the second gear (31), and the fourth rack (17) is meshedly connected to the second gear (31).

8. The automatic settlement monitoring device for tunnel engineering according to claim 1, characterized in that: The conductive column (18), the resistor (47) and the alarm (19) are electrically connected, the slide frame (3) is in an inverted cross-shaped structure, and the bottom wall of the slide frame (3) is symmetrically fixedly connected with an electric pulley (49).

9. The automatic settlement monitoring device for tunnel engineering according to claim 1, characterized in that: The electric slider (2) is slidably engaged with the side wall of the sliding frame (3), the electric slider (2) and the monitoring block (1) are fixedly connected, a tension spring is fixed to the inner wall of the bottom of the U-shaped plate (6), and the other end of the tension spring is fixedly connected to the inner wall of the cavity (5).

Citation Information

Patent Citations

  • A Settlement and Deformation Monitoring System and Method for Operating Tunnels

    CN116399293B

  • Cleaning device for objective lens of level gage used for building monitoring settlement observation

    CN109513662A

  • Water bottom settlement deformation monitoring system and method in tunneling process

    CN112304235A

  • Tunnel deformation monitoring device and use method

    CN112964730A

  • Monitoring device for metro interval tunnel

    CN114216439A