Water conservancy dam drainage device and drainage method
By designing a water conservancy dam hydrophobic device including lifting and flipping mechanisms, the problem of inconvenient cleaning of garbage and debris in the dam hydrophobic device is solved, and efficient garbage disposal and stable operation of water conservancy facilities is achieved.
Patent Information
- Application Number
- CN202411871165.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-18
- Publication Date
- 2025-02-18
AI Technical Summary
In the existing water conservancy dam water repellent devices, it is difficult to clean up garbage and debris accumulated in the filter device, which affects the hydrophobic effect.
A water conservancy dam water drainage device is designed, and the filter device includes the first and second filter mechanisms. Through the lifting mechanism and the flip mechanism, the automatic interception, collection and cleaning of garbage and debris are realized.
The efficiency of garbage and debris cleaning in the filter device at the sluice gate is improved, and the normal operation of the hydrophobic device and the stability of water conservancy facilities are ensured.
Smart Images

Figure CN119465878A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of water conservancy engineering, and in particular to a water conservancy dam drainage device and a drainage method. Background Art
[0002] At present, common water conservancy projects include dams, reservoirs, channels, water diversion projects, drainage projects, hydropower stations, irrigation projects, etc. Water conservancy projects are of great significance to the sustainable development and survival of human society. The drainage devices of water conservancy projects are generally used to control the flow and discharge of water bodies to prevent blockage and damage to water conservancy facilities. Common drainage devices include gates, spillways, overflow weirs, etc. Among them, the gate is a door-type structure that can be opened or closed. The water level and flow can be adjusted by controlling the opening of the gate; the drainage device plays an important role in water conservancy projects and can help maintain the stability and safety of water conservancy facilities; There will be some man-made garbage and debris, such as discarded water bottles, in small rivers and lakes near cities. Therefore, filtering devices will be installed at the sluice gates of water conservancy projects in these places to filter and collect garbage and debris; However, after the filter device filters the garbage and debris, the garbage and debris are accumulated in the filter device, which makes it difficult to salvage the garbage and debris out of the water, resulting in inconvenience in cleaning the filter device and affecting the hydrophobic effect. Therefore, further improvements can be made. Summary of the invention
[0003] In order to improve the cleaning efficiency of garbage and debris in the filtering device at the sluice, the present application provides a water conservancy dam drainage device and a drainage method.
[0004] In the first aspect, the present application provides a water conservancy dam drainage device adopts the following technical solution: A water conservancy dam drainage device comprises a dam foundation, wherein the dam foundation has two groups and is symmetrically arranged on both sides of a river channel, a water gate for controlling water storage or drainage of the river is arranged between the two groups of the dam foundation, and a first lifting mechanism for driving the water gate to perform lifting and lowering actions is arranged on the dam foundation; A filtering device is provided on the side of the sluice gate close to the flow direction of the river, and the filtering device includes a first filtering mechanism and a second filtering mechanism, the first filtering mechanism is located on the side close to the sluice gate, and the second filtering mechanism is located on the side of the first filtering mechanism away from the sluice gate, and a second lifting mechanism for driving the first filtering mechanism to perform lifting and lowering actions is provided on the dam infrastructure, and the second filtering mechanism and the first filtering mechanism perform synchronous lifting and lowering actions; The bottoms of the first filter mechanism and the second filter mechanism are located on the same horizontal line. The first filter mechanism and the second filter mechanism are hinged to each other. The second filter mechanism is tilted clockwise near one side of the first filter mechanism, so that a pouring port is formed between the bottom of the second filter mechanism and the bottom of the first filter mechanism for staff to collect using tools.
[0005] By adopting the above technical scheme, the sluice gate is lifted by the first lifting mechanism, so as to realize drainage of the river channel. During the drainage process, the filter device intercepts garbage and debris in the river channel, so that the garbage is located in the first filter mechanism and the second filter mechanism. After the drainage is completed, the sluice gate is lowered by the first lifting mechanism, so as to realize water storage in the river channel. Then, the second lifting mechanism is started to drive the first filter mechanism and the second filter mechanism to be lifted from the river channel to the river channel. Then, the staff uses tools to wait for the second filter mechanism to flip over at the dumping port, so that the garbage and debris are poured out from the dumping port, thereby improving the cleaning efficiency of the garbage and debris in the filter device at the sluice.
[0006] Optionally, the first filtering mechanism includes a first filtering vertical plate, a first filtering horizontal plate and a first intercepting plate, the first filtering horizontal plate is horizontally arranged between two groups of dam infrastructure, the first filtering vertical plate and the first filtering horizontal plate are perpendicularly arranged to each other, and the first filtering vertical plate is located on the top of the first filtering horizontal plate, the first intercepting plate is vertically arranged on both sides of the first filtering horizontal plate along its length direction, and a U-shaped intercepting space is formed between the first intercepting plate and the first filtering vertical plate; The first filter vertical plate and the first filter horizontal plate are both provided with a plurality of first filter holes which are arranged through-through.
[0007] By adopting the above technical solution, a U-shaped interception space is formed between the first interception plate and the first filter vertical plate, thereby intercepting garbage and debris, and water flows out from the first filter hole.
[0008] Optionally, the second filtering mechanism includes a second filtering transverse plate and a second intercepting plate, the second filtering transverse plate is horizontally arranged between the two groups of dam infrastructure, and the upper surfaces of the second filtering transverse plate and the first filtering transverse plate are flush with each other, the second intercepting plate is vertically arranged on both sides of the second filtering transverse plate along its length direction, and a U-shaped intercepting space is formed between the second intercepting plate and the second filtering transverse plate; The second filtering transverse plate is provided with a plurality of second filtering holes which are arranged through-through.
[0009] By adopting the above technical solution, a U-shaped interception space is formed between the second interception plate and the second filter vertical plate, thereby carrying garbage and debris, and water flows out from the second filter holes.
[0010] Optionally, the second lifting mechanism includes a lifting drive mounting seat, the lifting drive mounting seat is H-shaped, the lifting drive mounting seats are respectively fixedly arranged on the top of the two groups of dam infrastructure, the inner side of the dam infrastructure is provided with a lifting groove along its height direction, the lifting groove is located at the bottom of the lifting drive mounting seat close to the first intercepting plate, the lifting groove is provided with a lifting screw and an auxiliary slide rail, the auxiliary slide rails are respectively arranged on both sides of the lifting screw, and the tops of the lifting screw and the auxiliary slide rails both extend into the lifting drive mounting seat; A lifting connection seat is arranged on the top of the first intercepting plate, and a lifting block and an auxiliary sliding block are arranged on the lifting connection seat. The auxiliary sliding blocks are respectively arranged on both sides of the lifting block. The lifting block is threadedly connected to the lifting screw rod, and the auxiliary sliding block can be slidably arranged on the auxiliary slide rail.
[0011] By adopting the above technical solution, the first intercepting plate is connected to the auxiliary slider through the lifting connecting seat, the lifting screw rod and the auxiliary slider. The lifting method using the screw rod has high stability, strong load-bearing capacity and is easy to control, so that the lifting action effect of the filtering device is better.
[0012] Optionally, a first driving member is provided on the side of the lifting drive mounting seat away from the first intercepting plate, a first driving gear is provided on the top of the first driving member, a coupling is provided on the side of the lifting drive mounting seat close to the first intercepting plate, the bottom of the coupling is connected to the top of the lifting screw rod, a first driven gear is provided on the top of the coupling, and the first driving gear and the first driven gear are connected by a chain transmission.
[0013] By adopting the above technical solution, when the second lifting mechanism drives the first filtering mechanism to lift, the first driving member drives the first active gear to rotate, and the first active gear drives the first driven gear to rotate through the chain, thereby causing the lifting screw to rotate, and then causing the first intercepting plate connected to the lifting screw to rise, thereby realizing the lifting of the filtering device.
[0014] Optionally, a first flipping mechanism for flipping the second filter transverse plate is provided between the first intercepting plate and the second filter transverse plate, and a second flipping mechanism for flipping the second filter transverse plate is provided between the first intercepting plate and the second intercepting plate.
[0015] By adopting the above technical solution, the second filtering transverse plate is flipped by using the first flipping mechanism and the second flipping mechanism, so that the second filtering transverse plate is more stable during the flipping process.
[0016] Optionally, the first flipping mechanism includes a flipping drive mounting seat, a second driving member is arranged on the flipping drive mounting seat, a synchronous connecting plate is arranged on the first intercepting plate and the second intercepting plate on the side away from the second filtering transverse plate, two ends of the synchronous connecting plate are respectively located on the first intercepting plate and the second intercepting plate, one end of the synchronous connecting plate is fixedly connected to the first intercepting plate, and the other end of the synchronous connecting plate is hinged to the second intercepting plate, a second driving gear and a second driven gear are respectively arranged on the two ends of the synchronous connecting plate on the side away from the second intercepting plate, the second driving gear is located at the bottom of the flipping drive mounting seat, and the second driving gear is connected to the second driving member, and the second driving gear and the second driven gear are connected through a chain transmission; A flip roller is arranged on one side of the second filter transverse plate close to the first filter transverse plate. The flip roller is inserted into the second filter transverse plate along the length direction of the second filter transverse plate, and both ends of the flip roller extend to both sides and are successively inserted through the second intercepting plate, the synchronous connecting plate and the second driven gear for rotational connection. The second filter transverse plate performs synchronous flipping action with the flip roller as the axis.
[0017] By adopting the above technical solution, when the second filtering transverse plate is flipped, the second driving member drives the second driving gear to rotate, and the second driving gear drives the second driven gear to rotate through the chain, thereby driving the flip roller connected to the second driven gear to flip, so that the second filtering transverse plate with the flip roller as the axis is flipped, thereby realizing the flipping action of the second filtering transverse plate.
[0018] Optionally, the second flipping mechanism includes a third driving member and a limiting rod, and the third driving member and the limiting rod are both located on the side of the first intercepting plate and the second intercepting plate away from the synchronous connecting plate, one end of the limiting rod is fixed on the first intercepting plate, the fixed end of the third driving member is hinged to the first intercepting plate, and the movable end of the third driving member is hinged to the second intercepting plate.
[0019] By adopting the above technical solution, when the second filter horizontal plate is flipped under the action of the second driving member, since the two ends of the third driving member are respectively hinged to the first intercepting plate and the second intercepting plate, the fixed end of the third driving member swings downward and the movable end of the third driving member contracts, thereby assisting in driving the second filter horizontal plate to flip.
[0020] Optionally, the height of the second interception plate is smaller than the height of the first interception plate.
[0021] By adopting the above technical solution, when the second interception plate follows the second filtering transverse plate to flip, since the height of the second interception plate is smaller than that of the first interception plate, the second interception plate is prevented from colliding with the first interception plate during the flipping process.
[0022] In a second aspect, the present application provides a method for draining water from a water conservancy dam, including the following specific methods: S1: Open the sluice gate, start the first lifting mechanism, and use the first lifting mechanism to lift the sluice gate between the two groups of dam infrastructure, so as to drain the water in the river; S2: Filtering garbage and debris. After the sluice gate is opened, water flows out from the bottom of the sluice gate. The filtering device located on one side of the sluice gate intercepts and collects the garbage and debris brought by the water flow. S3: closing the sluice gate, starting the first lifting mechanism, and using the first lifting mechanism to lower the sluice gate between the two groups of dam infrastructure, so that water is stored in the river channel; S4: garbage and debris cleaning, start the second lifting mechanism, use the second lifting mechanism to lift the first filter mechanism on one side of the sluice gate, and the second filter mechanism is lifted synchronously with the first filter mechanism, so that the garbage and debris in the first filter mechanism and the second filter mechanism are lifted out of the water together, and then the staff uses the tool to wait for the second filter mechanism to flip over at the dumping port. After the second filter mechanism is flipped, some garbage and debris enter the tool from the dumping port, and other staff can use cleaning tools to clean the garbage and debris that have not been poured out from the first filter mechanism and the second filter mechanism to the dumping port, and pour it into the tool from the dumping port, thereby realizing the cleaning of garbage and debris.
[0023] In summary, the present application includes at least one of the following beneficial technical effects: 1. The sluice gate is lifted by the first lifting mechanism to drain the river. During the drainage process, the filter device intercepts the garbage and debris in the river, so that the garbage is located in the first filter mechanism and the second filter mechanism. After the drainage is completed, the sluice gate is lowered by the first lifting mechanism to store water in the river. Then, the second lifting mechanism is started to lift the first filter mechanism and the second filter mechanism from the river to the river. Then, the staff uses tools to wait for the second filter mechanism to flip at the dumping port, so that the garbage and debris are dumped out from the dumping port, thereby improving the cleaning efficiency of the garbage and debris in the filter device at the sluice; 2. When the second lifting mechanism drives the first filtering mechanism to be lifted, the first driving member drives the first driving gear to rotate, and the first driving gear drives the first driven gear to rotate through the chain, so that the lifting screw rod rotates, and then the first intercepting plate connected to the lifting screw rod is lifted, thereby realizing the lifting of the filtering device; 3. When the second filter horizontal plate is flipped under the action of the second driving member, since the two ends of the third driving member are respectively hinged to the first intercepting plate and the second intercepting plate, the fixed end of the third driving member swings downward and the movable end of the third driving member contracts, thereby assisting in driving the second filter horizontal plate to flip. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the overall structure in the embodiment of the present application.
[0025] Figure 2 It is a schematic diagram of the operation of the filtering device without a set of dam infrastructure in the embodiment of the present application.
[0026] Figure 3 It is a schematic diagram of the operation of the filtering device in the overall structure in the embodiment of the present application.
[0027] Figure 4 This is a schematic diagram of an embodiment of the present application in which a set of dam infrastructure is removed and the filtering device is not in operation.
[0028] Figure 5 It is a partial cross-sectional view of the overall structure in the embodiment of the present application.
[0029] Figure 6 In the embodiment of this application Figure 5 Enlarged view of part A.
[0030] Description of reference numerals: 1. Dam infrastructure; 11. Lifting trough; 12. Avoidance trough; 2. Sluice gate; 3. Filter device; 31. First filtering mechanism; 311. First filtering vertical plate; 312. First filtering horizontal plate; 313. First intercepting plate; 32. Second filtering mechanism; 321. Second filtering horizontal plate; 322. Second intercepting plate; 4. First lifting mechanism; 41. Fourth driving member; 42. Wire wheel; 43. Support rod; 44. Fixed pulley; 45. Lifting ring; 46. Lifting rope; 5. Second lifting mechanism; 51. Lifting Lowering drive mounting seat; 52, lifting screw rod; 53, auxiliary slide rail; 54, first driving member; 55, first driving gear; 56, first driven gear; 57, lifting connection seat; 58, lifting block; 59, auxiliary slide block; 6, pouring mouth; 7, first flipping mechanism; 71, flipping drive mounting seat; 72, second driving member; 73, synchronous connecting plate; 74, second driving gear; 75, second driven gear; 76, flip roller; 8, second flipping mechanism; 81, third driving member; 82, limit rod. DETAILED DESCRIPTION
[0031] The following is combined with Figure 1-6 This application is described in further detail.
[0032] The embodiment of the present application discloses a water conservancy dam drainage device.
[0033] Reference Figure 1 , 2 A water conservancy dam drainage device comprises two groups of dam infrastructure 1 symmetrically arranged on both sides of a river channel, a sluice gate 2 and a filtering device 3 are arranged between the two groups of dam infrastructure 1, the filtering device 3 is located on the side of the sluice gate 2 close to the flow direction of the water flow, and the filtering device 3 is used to filter and intercept garbage and debris in the water flow flowing toward the sluice gate 2; Specifically, the tops of the two groups of dam infrastructure 1 are respectively provided with a first lifting mechanism 4, the first lifting mechanism 4 includes a fourth driving member 41, the fourth driving member 41 is fixedly arranged on the top of the dam infrastructure 1, a wire wheel 42 is rotatably arranged on the movable end of the fourth driving member 41, a support rod 43 is arranged on the side of the fourth driving member 41 close to the sluice gate 2, the support rod 43 is fixedly arranged on the top of the dam infrastructure 1 in a vertical state, a rotatable fixed pulley 44 is arranged on the top of the support rod 43, lifting rings 45 are respectively arranged on both ends of the top of the sluice gate 2, a lifting rope 46 is wound inside the wire wheel 42, and the other end of the lifting rope 46 is fixedly connected to the lifting ring 45 through the fixed pulley 44, so that the sluice gate 2 can drive the wire wheel 42 to rotate under the action of the fourth driving member 41, and then the lifting rope 46 passes through the fixed pulley 44, so that the sluice gate 2 is lifted and lowered by the lifting rope 46.
[0034] In actual use, the sluice gate 2 is lifted by the first lifting mechanism 4 to achieve drainage of the river. After the drainage is completed, the sluice gate 2 is lowered by the first lifting mechanism 4 to achieve water storage in the river.
[0035] Reference Figure 1-3 Specifically, in this embodiment, the filtering device 3 includes a first filtering mechanism 31 and a second filtering mechanism 32. The first filtering mechanism 31 is located close to the side of the sluice gate 2, and the second filtering mechanism 32 is located on the side of the first filtering mechanism 31 away from the sluice gate 2. The tops of the two groups of dam infrastructure 1 are respectively provided with second lifting mechanisms 5. The second lifting mechanisms 5 are connected to the first filtering mechanism 31 to drive the first filtering mechanism 31 to perform lifting actions. The second filtering mechanism 32 can perform synchronous actions with the first filtering mechanism 31, so that the second filtering mechanism 32 also performs lifting actions; The first filtering mechanism 31 and the second filtering mechanism 32 are horizontally arranged between the two groups of dam infrastructure 1, and the bottoms of the first filtering mechanism 31 and the second filtering mechanism 32 are located on the same horizontal line. The first filtering mechanism 31 and the second filtering mechanism 32 are hingedly arranged to each other, so that a dumping port 6 is formed between the bottom of the second filtering mechanism 32 and the bottom of the first filtering mechanism 31 for the staff to collect using tools.
[0036] In actual use, the sluice gate 2 is lifted by the first lifting mechanism 4 to achieve drainage of the river. During the drainage process, the filter device 3 intercepts garbage and debris in the river, so that the garbage is located in the first filter mechanism 31 and the second filter mechanism 32. After the drainage is completed, the sluice gate 2 is lowered by the first lifting mechanism 4 to achieve water storage in the river. Then, the second lifting mechanism 5 is started to drive the first filter mechanism 31 and the second filter mechanism 32 to be lifted from the river to the river. Then, the staff uses tools to wait for the second filter mechanism 32 to flip over at the dumping port 6, so that the garbage and debris are poured out from the dumping port 6, thereby improving the cleaning efficiency of the garbage and debris in the filter device 3 at the sluice.
[0037] Reference Figure 1 , 2 Specifically, in the present embodiment, the first filter mechanism 31 comprises a rectangular first filter vertical plate 311, a first filter horizontal plate 312 and a first intercepting plate 313. The first filter vertical plate 311 and the first filter horizontal plate 312 are provided with a plurality of first filter holes which are arranged through the first filter horizontal plate 312. The first filter horizontal plate 312 is arranged in a horizontal state. The first filter vertical plate 311 is vertically arranged at the top of the first filter horizontal plate 312 near the side of the sluice gate 2. There are two first intercepting plates 313. The two first intercepting plates 313 are respectively fixedly arranged at both sides of the first filter horizontal plate 312 along its length direction, and the two first intercepting plates 313 are also located at both sides of the first filter vertical plate 311, so that a U-shaped intercepting space is formed between the first intercepting plate 313 and the first filter vertical plate 311 for intercepting garbage and debris in the flow direction of the river, and the water flows out from the first filter holes.
[0038] The second filtering mechanism 32 includes a rectangular second filtering transverse plate 321 and a second intercepting plate 322. The second filtering transverse plate 321 is provided with a plurality of second filtering holes which are arranged through the second filtering transverse plate 321. The second filtering transverse plate 321 is arranged in a horizontal state. There are two groups of second intercepting plates 322. The two groups of second intercepting plates 322 are respectively fixedly arranged on both sides of the second filtering transverse plate 321 along its length direction, so that a U-shaped intercepting space is formed between the second intercepting plate 322 and the second filtering transverse plate 321, so that when the second filtering transverse plate 321 rises, garbage and debris can be intercepted, and water flows out from the second filtering holes.
[0039] In addition, a gap is reserved between the second interception plate 322 and the first interception plate 313, and the height of the second interception plate 322 is smaller than that of the first interception plate 313. When the second interception plate 322 follows the second filter cross plate 321 to flip, since the height of the second interception plate 322 is smaller than that of the first interception plate 313, the second interception plate 322 is prevented from colliding with the first interception plate 313 during the flipping process.
[0040] Reference Figure 1 , 4 Specifically, in the present embodiment, the second lifting mechanism 5 comprises an H-shaped lifting drive mounting seat 51, and there are two groups of lifting drive mounting seats 51, and the two groups of lifting drive mounting seats 51 are respectively fixedly arranged on the tops of the two groups of dam infrastructure 1, and a lifting groove 11 is opened from top to bottom on the top of the dam infrastructure 1 near the filtering device 3, and the top of the lifting groove 11 is connected with the side of the lifting drive mounting seat 51 near the first intercepting plate 313, and a lifting screw rod 52 and an auxiliary slide rail 53 are arranged in parallel in the lifting groove 11, and there are two groups of auxiliary slide rails 53, and the two groups of auxiliary slide rails 53 are respectively arranged on both sides of the lifting screw rod 52, and the tops of the lifting screw rod 52 and the auxiliary slide rail 53 extend into the lifting drive mounting seat 51; A first driving member 54 is fixedly arranged on the side of the lifting drive mounting seat 51 away from the first intercepting plate 313, and a first driving gear 55 is arranged on the top movable end of the first driving member 54. A coupling is arranged on the side of the lifting drive mounting seat 51 close to the first intercepting plate 313, and the bottom of the coupling is connected to the top of the lifting screw rod 52. A first driven gear 56 is arranged on the top of the coupling, and the first driving gear 55 and the first driven gear 56 are connected by chain transmission.
[0041] In order to lift the first filtering cross plate 312, a rectangular lifting connection seat 57 is arranged on the top of the first intercepting plate 313. A lifting block 58 and an auxiliary slider 59 are arranged on the side of the lifting connection seat 57 close to the dam infrastructure 1. There are two groups of auxiliary sliders 59, and the two groups of auxiliary sliders 59 are respectively arranged on both sides of the lifting block 58. The lifting block 58 is penetrated and threadedly connected to the lifting screw rod 52, and the auxiliary slider 59 can be slidably set on the auxiliary slide rail 53.
[0042] During actual use, when the second lifting mechanism 5 drives the first filtering mechanism 31 to lift, the first driving member 54 drives the first driving gear 55 to rotate, and the first driving gear 55 drives the first driven gear 56 to rotate through the chain, thereby causing the lifting screw rod 52 to rotate, and then causing the first intercepting plate 313 connected to the lifting screw rod 52 to rise, thereby realizing the lifting of the filtering device 3.
[0043] Reference Figure 2 , 4, 5. Specifically, in the present embodiment, a first flipping mechanism 7 is arranged between the first intercepting plate 313 and the second filtering transverse plate 321 away from the first filtering transverse plate 312. At the same time, since the first intercepting plate 313 and the second filtering transverse plate 321 will both be lifted up and down between the two groups of dam infrastructure 1, a through avoidance groove 12 is provided on the inner side of the dam infrastructure 1 along its height direction, so that the first flipping mechanism 7 can follow the filtering device 3 to be lifted and lowered; the first flipping mechanism 7 includes a rectangular flipping drive mounting seat 71, one end of the flipping drive mounting seat 71 is fixedly arranged on the first intercepting plate 313 in a vertical state, and a second driving member 72 is arranged at the bottom of the flipping drive mounting seat 71. The first intercepting plate 313 and the second intercepting plate 322 are away from the second filtering transverse plate 321. A synchronous connecting plate 73 is provided on the side. When the first filtering transverse plate 312 is lifted and lowered by the first lifting mechanism 4, the synchronous connecting plate 73 is used to drive the second filtering transverse plate 321 to be lifted and lowered synchronously. The two ends of the synchronous connecting plate 73 are respectively located on the first intercepting plate 313 and the second intercepting plate 322. One end of the synchronous connecting plate 73 is fixedly connected to the first intercepting plate 313, and the other end of the synchronous connecting plate 73 is hinged to the second intercepting plate 322. The two ends of the synchronous connecting plate 73 away from the second intercepting plate 322 are respectively provided with a second driving gear 74 and a second driven gear 75. The second driving gear 74 is located at the bottom of the flip driving mounting seat 71, and the second driving gear 74 is connected to the second driving member 72. The second driving gear 74 and the second driven gear 75 are connected through a chain transmission. A flip roller 76 is provided on one side of the second filter transverse plate 321 close to the first filter transverse plate 312. The flip roller 76 is penetrated in the second filter transverse plate 321 along the length direction of the second filter transverse plate 321, and both ends of the flip roller 76 extend to both sides and penetrate the second intercepting plate 322, the synchronous connecting plate 73 and the second driven gear 75 in sequence for rotational connection. The second filter transverse plate 321 performs a synchronous flipping action with the flip roller 76 as the axis.
[0044] In actual use, when the second filtering transverse plate 321 is flipped, the second driving member 72 drives the second driving gear 74 to rotate, and the second driving gear 74 drives the second driven gear 75 to rotate through the chain, thereby driving the flip roller 76 connected to the second driven gear 75 to flip, so that the second filtering transverse plate 321 with the flip roller 76 as the axis is flipped, thereby realizing the flipping action of the second filtering transverse plate 321.
[0045] Reference Figure 2 , 4Specifically, in this embodiment, a second flip mechanism 8 is disposed between the first intercepting plate 313 and the second intercepting plate 322. The second flip mechanism 8 includes a third driving member 81 and a limiting rod 82. There are two limiting rods 82. The third driving member 81 and the limiting rod 82 are both located on the side of the first intercepting plate 313 and the second intercepting plate 322 away from the synchronous connecting plate 73. One end of the limiting rod 82 is fixedly disposed on the first intercepting plate 313 and located at the top of the middle section of the third driving member 81. The fixed end of the third driving member 81 is hingedly disposed with the first intercepting plate 313, and the movable end of the third driving member 81 is hingedly disposed with the second intercepting plate 322. In this embodiment, the third driving member 81 uses a telescopic cylinder as a driving member.
[0046] During actual use, when the second filter horizontal plate is flipped under the action of the second drive member 72, since the two ends of the third drive member 81 are respectively hinged to the first intercepting plate 313 and the second intercepting plate 322, the fixed end of the third drive member 81 swings downward and the movable end of the third drive member 81 contracts, thereby assisting in driving the second filter horizontal plate 321 to flip.
[0047] Reference Figure 5 , 6 The filter element 312 is provided at the bottom of the filter housing 310 , and the filter element 312 is provided at the bottom of the filter housing 310 .
[0048] The implementation principle of a water conservancy dam drainage device in the embodiment of the present application is: On the one hand, the sluice gate 2 is lifted by the first lifting mechanism 4 to achieve drainage of the river channel. After the drainage is completed, the sluice gate 2 is lowered by the first lifting mechanism 4 to achieve water storage in the river channel.
[0049] On the other hand, during the drainage process, the filter device 3 intercepts garbage and debris in the river channel, and a U-shaped interception space is formed between the first interception plate 313 and the first filter vertical plate 311 to intercept garbage and debris in the flow direction of the river, and the water flows out from the first filter hole, so that the garbage carrier is located in the first filter mechanism 31 and the second filter mechanism 32, and the sluice gate 2 is lowered and closed. Under the action of the first driving member 54, the first driving member 54 drives the first driving gear 55 to rotate, and the first driving gear 55 drives the first driven gear 56 to rotate through the chain, so that the lifting screw rod 52 rotates, and then the first interception plate 313 connected to the lifting screw rod 52 is lifted, thereby realizing the lifting of the filter device 3. During the lifting process, a U-shaped interception space is formed between the second interception plate 322 and the second filter horizontal plate 321 to intercept garbage and debris when the second filter horizontal plate 321 is lifted, and the water flows out from the second filter hole. The second filter mechanism 321 is then turned around by the second driving gear 74, and the second driving gear 74 drives the second driven gear 75 to rotate through the chain, thereby driving the turning roller 76 connected to the second driven gear 75 to turn over, so that the second filter transverse plate 321 with the turning roller 76 as the axis turns over. At the same time, since the two ends of the third driving member 81 are respectively hinged to the first intercepting plate 313 and the second intercepting plate 322, the fixed end of the third driving member 81 swings downward, and the movable end of the third driving member 81 contracts, thereby assisting in driving the second filter transverse plate 321 to turn over, thereby realizing the turning action of the second filter transverse plate 321, so that a dumping port 6 is generated between the second filter transverse plate 321 and the first filter transverse plate 312. The staff uses a tool to wait for the second filter mechanism 32 to turn over at the dumping port 6 position, so that the garbage and debris are poured out from the dumping port 6, thereby improving the cleaning efficiency of the garbage and debris in the filter device 3 at the sluice.
[0050] The embodiment of the present application also discloses a method for draining water from a water conservancy dam.
[0051] A method for draining water from a water conservancy dam, based on the above-mentioned device for draining water from a water conservancy dam, comprises the following steps: S1: Open the sluice gate 2, start the first lifting mechanism 4, and use the first lifting mechanism 4 to lift the sluice gate 2 between the two groups of dam infrastructure 1, so as to drain the water in the river channel; S2: Filtering garbage and debris. After the sluice gate 2 is opened, water flows out from the bottom of the sluice gate 2. The filtering device 3 located on one side of the sluice gate 2 intercepts and collects the garbage and debris brought by the water flow. S3: closing the sluice gate 2, starting the first lifting mechanism 4, and using the first lifting mechanism 4 to lower the sluice gate 2 between the two groups of dam infrastructure 1, so that water is stored in the river channel; S4: garbage and debris cleaning, start the second lifting mechanism 5, use the second lifting mechanism 5 to lift the first filter mechanism 31 on one side of the sluice gate 2, and the second filter mechanism 32 is synchronously lifted following the first filter mechanism 31, so that the garbage and debris in the first filter mechanism 31 and the second filter mechanism 32 are lifted out of the water together, and then the staff uses the tool to wait for the second filter mechanism 32 to flip over at the dumping port 6. After the second filter mechanism 32 is flipped, some garbage and debris enter the tool from the dumping port 6, and other staff can use cleaning tools to clean the garbage and debris that have not been poured out from the first filter mechanism 31 and the second filter mechanism 32 to the dumping port 6, and pour it into the tool from the dumping port 6, thereby realizing the cleaning of garbage and debris.
[0052] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A water conservancy dam drainage device, characterized in that: The invention comprises a dam infrastructure (1), wherein the dam infrastructure (1) has two groups and is symmetrically arranged on both sides of a river channel, a sluice gate (2) for controlling water storage or drainage in the river is arranged between the two groups of the dam infrastructure (1), and a first lifting mechanism (4) for driving the sluice gate (2) to perform a lifting action is arranged on the dam infrastructure (1); A filtering device (3) is provided on the side of the sluice gate (2) close to the flow direction of the river, and the filtering device (3) comprises a first filtering mechanism (31) and a second filtering mechanism (32), the first filtering mechanism (31) is located on the side close to the sluice gate (2), and the second filtering mechanism (32) is located on the side of the first filtering mechanism (31) away from the sluice gate (2), and a second lifting mechanism (5) for driving the first filtering mechanism (31) to perform lifting and lowering actions is provided on the dam infrastructure (1), and the second filtering mechanism (32) and the first filtering mechanism (31) perform synchronous lifting and lowering actions; The bottoms of the first filter mechanism (31) and the second filter mechanism (32) are both located on the same horizontal line. The first filter mechanism (31) and the second filter mechanism (32) are hinged to each other. The second filter mechanism (32) is tilted and tilted clockwise near one side of the first filter mechanism (31), so that a pouring port (6) is formed between the bottom of the second filter mechanism (32) and the bottom of the first filter mechanism (31) for workers to collect using tools.
2. A water conservancy dam drainage device according to claim 1, characterized in that: The first filtering mechanism (31) comprises a first filtering vertical plate (311), a first filtering horizontal plate (312) and a first intercepting plate (313); the first filtering horizontal plate (312) is horizontally arranged between the two groups of dam infrastructure (1); the first filtering vertical plate (311) and the first filtering horizontal plate (312) are arranged perpendicularly to each other, and the first filtering vertical plate (311) is located on the top of the first filtering horizontal plate (312); the first intercepting plate (313) is vertically arranged on both sides of the first filtering horizontal plate (312) along its length direction; a U-shaped intercepting space is formed between the first intercepting plate (313) and the first filtering vertical plate (311); The first filtering vertical plate (311) and the first filtering horizontal plate (312) are both provided with a plurality of first filtering holes which are arranged through-through.
3. A water conservancy dam drainage device according to claim 2, characterized in that: The second filtering mechanism (32) comprises a second filtering transverse plate (321) and a second intercepting plate (322); the second filtering transverse plate (321) is arranged in a horizontal state between the two groups of dam infrastructure (1); the upper surfaces of the second filtering transverse plate (321) and the first filtering transverse plate (312) are flush with each other; the second intercepting plate (322) is arranged vertically on both sides of the second filtering transverse plate (321) along its length direction; a U-shaped intercepting space is formed between the second intercepting plate (322) and the second filtering transverse plate (321); The second filtering transverse plate (321) is provided with a plurality of second filtering holes which are arranged through-through.
4. A water conservancy dam drainage device according to claim 2, characterized in that: The second lifting mechanism (5) comprises a lifting drive mounting seat (51), the lifting drive mounting seat (51) is H-shaped, the lifting drive mounting seat (51) is respectively fixedly arranged on the top of the two groups of dam infrastructure (1), the inner side of the dam infrastructure (1) is provided with a lifting groove (11) along its height direction, the lifting groove (11) is located at the bottom of the lifting drive mounting seat (51) on the side close to the first intercepting plate (313), the lifting groove (11) is provided with a lifting screw rod (52) and an auxiliary slide rail (53), the auxiliary slide rail (53) is respectively arranged on both sides of the lifting screw rod (52), and the tops of the lifting screw rod (52) and the auxiliary slide rail (53) both extend into the lifting drive mounting seat (51); A lifting connection seat (57) is arranged on the top of the first intercepting plate (313), and a lifting block (58) and an auxiliary sliding block (59) are arranged on the lifting connection seat (57). The auxiliary sliding blocks (59) are respectively arranged on both sides of the lifting block (58). The lifting block (58) is threadedly connected to the lifting screw rod (52), and the auxiliary sliding block (59) can be slidably arranged on the auxiliary slide rail (53).
5. A water conservancy dam drainage device according to claim 4, characterized in that: A first driving member (54) is arranged on the side of the lifting drive mounting seat (51) away from the first intercepting plate (313), and a first driving gear (55) is arranged on the top of the first driving member (54). A coupling is arranged on the side of the lifting drive mounting seat (51) close to the first intercepting plate (313), and the bottom of the coupling is connected to the top of the lifting screw rod (52), and a first driven gear (56) is arranged on the top of the coupling. The first driving gear (55) and the first driven gear (56) are connected via a chain transmission.
6. A water conservancy dam drainage device according to claim 3, characterized in that: A first flipping mechanism (7) for flipping the second filtering transverse plate (321) is provided between the first intercepting plate (313) and the second filtering transverse plate (321), and a second flipping mechanism (8) for flipping the second filtering transverse plate (321) is provided between the first intercepting plate (313) and the second intercepting plate (322).
7. A water conservancy dam drainage device according to claim 6, characterized in that: The first flip mechanism (7) comprises a flip drive mounting seat (71), a second driving member (72) is arranged on the flip drive mounting seat (71), a synchronous connecting plate (73) is arranged on the side of the first intercepting plate (313) and the second intercepting plate (322) away from the second filtering transverse plate (321), two ends of the synchronous connecting plate (73) are respectively located on the first intercepting plate (313) and the second intercepting plate (322), and one end of the synchronous connecting plate (73) is fixedly connected to the first intercepting plate (313). The other end of the synchronous connecting plate (73) is hinged to the second intercepting plate (322), and the two ends of the synchronous connecting plate (73) away from the second intercepting plate (322) are respectively provided with a second driving gear (74) and a second driven gear (75), the second driving gear (74) is located at the bottom of the flip driving mounting seat (71), and the second driving gear (74) is connected to the second driving member (72), and the second driving gear (74) and the second driven gear (75) are connected through a chain transmission; A turning roller (76) is arranged on one side of the second filtering transverse plate (321) close to the first filtering transverse plate (312); the turning roller (76) is inserted into the second filtering transverse plate (321) along the length direction of the second filtering transverse plate (321); and two ends of the turning roller (76) extend to both sides and are inserted through the second intercepting plate (322), the synchronous connecting plate (73) and the second driven gear (75) in sequence for rotational connection; the second filtering transverse plate (321) performs a synchronous turning action with the turning roller (76) as an axis.
8. A water conservancy dam drainage device according to claim 7, characterized in that: The second flipping mechanism (8) comprises a third driving member (81) and a limiting rod (82), wherein the third driving member (81) and the limiting rod (82) are both located on a side of the first intercepting plate (313) and the second intercepting plate (322) away from the synchronous connecting plate (73), one end of the limiting rod (82) is fixedly arranged on the first intercepting plate (313), the fixed end of the third driving member (81) is hingedly arranged on the first intercepting plate (313), and the movable end of the third driving member (81) is hingedly arranged on the second intercepting plate (322).
9. A water conservancy dam drainage device according to claim 6, characterized in that: The height of the second intercepting plate (322) is smaller than the height of the first intercepting plate (313).
10. A method for draining water from a hydraulic dam, based on the hydraulic dam draining device according to any one of claims 1 to 9, characterized in that: The steps include: S1: opening the sluice gate (2), starting the first lifting mechanism (4), and using the first lifting mechanism (4) to lift the sluice gate (2) between the two groups of dam infrastructure (1), thereby draining the water in the river channel; S2: Filtering garbage and debris. After the sluice gate (2) is opened, water flows out from the bottom of the sluice gate (2), and the filtering device (3) located on one side of the sluice gate (2) intercepts and collects the garbage and debris brought by the water flow; S3: closing the sluice gate (2), starting the first lifting mechanism (4), and using the first lifting mechanism (4) to lower the sluice gate (2) between the two groups of dam infrastructure (1), so that water is stored in the river channel; S4: cleaning of garbage and debris. The second lifting mechanism (5) is started. The first filtering mechanism (31) on one side of the sluice gate (2) is lifted by the second lifting mechanism (5). The second filtering mechanism (32) is lifted synchronously with the first filtering mechanism (31), so that the garbage and debris in the first filtering mechanism (31) and the second filtering mechanism (32) are lifted out of the water surface together. Then, the staff uses a tool to wait for the second filtering mechanism (32) to turn over at the dumping port (6). After the second filtering mechanism (32) turns over, some garbage and debris enter the tool from the dumping port (6). Other staff can use cleaning tools to clean the garbage and debris that have not been dumped out from the first filtering mechanism (31) and the second filtering mechanism (32) to the dumping port (6), and dump them into the tool from the dumping port (6), thereby achieving the cleaning of garbage and debris.