Telescopic scaffold for culvert construction
By designing a telescopic scaffold and using the combination of connecting pipes and telescopic drive parts, the problem of time-consuming and low efficiency in the construction and disassembly of traditional scaffolds is solved, and flexible adjustment of scaffold length and significant improvement in working efficiency are achieved.
Patent Information
- Application Number
- CN202411831155.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-12
- Publication Date
- 2025-02-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction and disassembly of traditional scaffolding, due to its tight structure, it consumes too long time and is inefficient.
A telescopic scaffolding for culvert construction is designed, and the scaffolding length is flexibly adjusted by the telescopic adjustment of the first connecting pipe and the second connecting pipe. The scaffolding includes a first fixing pipe, a second fixing pipe, a first cavity, a second cavity, a first connecting pipe, a second connecting pipe, a first telescopic drive member and a second telescopic drive member, and a transmission member is used to achieve the connection Synchronous telescopicity of the tube.
Through telescopic adjustment, the construction and disassembly process is simplified, the work efficiency is significantly improved, the labor and time consumption is reduced, and a more efficient and stable support solution is provided for culvert construction.
Smart Images

Figure CN119466278A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of scaffolds, and in particular relates to a telescopic scaffold for culvert construction. Background Art
[0002] Scaffolding plays a vital role in the fields of construction and engineering. As a temporary support structure, it is mainly used to provide workers with a safe working platform for various construction, maintenance or decoration operations. The construction of scaffolding ensures the safety of high-altitude operations. At the same time, it can effectively support and fix building materials, ensuring the stability and accuracy of the construction process. In addition, scaffolding can also serve as a transportation channel to facilitate the movement of workers and materials inside and outside the building, greatly improving construction efficiency.
[0003] In the process of culvert construction, before pouring the cover slab concrete, in order to ensure the stability of the structure and facilitate construction, a full-floor scaffolding and a cover slab bottom formwork are usually set up first. However, the erection and splicing of traditional scaffolding formwork are relatively dense, and the disassembly process is often cumbersome due to the tight structure, which is not only time-consuming but also inefficient. Therefore, a telescopic scaffolding for culvert construction is proposed. Summary of the invention
[0004] In view of the problems existing in the prior art, the present invention provides a telescopic scaffold for culvert construction, which has the advantage of being telescopic and solves the problems existing in the prior art.
[0005] The present invention is implemented as follows: a telescopic scaffold for culvert construction comprises a first fixed pipe and a second fixed pipe, wherein a first cavity is formed in the first fixed pipe, and a second cavity is formed in the second fixed pipe; A first connecting pipe and a second connecting pipe are slidably connected in the first cavity and the second cavity respectively; One end of the first connecting tube and the second connecting tube is fixedly connected to a first vertical pole, and one end of the first fixing tube and the second fixing tube is fixedly connected to a second vertical pole; A first telescopic driving member and a second telescopic driving member are installed in the first cavity and the second cavity respectively; A transmission member is installed on one side of the first telescopic driving member and the second telescopic driving member.
[0006] As a preferred embodiment of the present invention, the first telescopic driving member includes a first rack, and the first rack is installed in the first cavity; A first gear is meshed on one side of the first rack, and the first gear is located on one side of the first connecting pipe; The axial center of the first gear is fixedly connected with a first rotating shaft, the first rotating shaft can extend to the outside of the first fixed tube, and the first connecting tube is installed on the first rotating shaft at a side close to the first gear.
[0007] As a preferred embodiment of the present invention, the second telescopic driving member includes a second rack, and the second rack is installed in the second cavity; A second gear is meshed on one side of the second rack, and the second gear is located on one side of the second connecting pipe; The axial center of the second gear is fixedly connected with a second rotating shaft, the second rotating shaft can extend to the outside of the second fixed tube, and the second connecting tube is installed on the second rotating shaft at a side close to the second gear.
[0008] As a preferred embodiment of the present invention, one end of the first vertical pole and the second vertical pole are fixedly connected to a scaffolding board support frame, a scaffolding board is installed in one of the scaffolding board support frames, a third cavity is opened in the scaffolding board, a scaffolding connecting plate is slidably connected in the third cavity, one side of the scaffolding connecting plate is located in the third cavity, and the other side is located in another scaffolding board support frame, and a first connecting plate is installed between the second connecting pipe and the scaffolding connecting plate.
[0009] As a preferred embodiment of the present invention, a first slideway is fixedly connected to one side of the first fixed pipe, and a second slideway is fixedly connected to one side of the second fixed pipe; A plurality of sliding support rods are slidably connected between the first slideway and the second slideway, and a first telescopic rod is fixedly connected between the sliding support rods; A second connecting plate is fixedly connected between the first connecting tube and the second connecting tube, and a second telescopic rod is fixedly connected between the second connecting plate and one of the sliding support rods.
[0010] As a preferred embodiment of the present invention, the transmission member includes a first sprocket and a second sprocket, the first sprocket is fixedly connected to the outer surface of the first rotating shaft, the first sprocket is located on the outside of the first fixed tube, the second sprocket is fixedly connected to the outer surface of the second rotating shaft, the second sprocket is located on the outside of the second fixed tube, and chains are installed on the outer surfaces of the first sprocket and the second sprocket.
[0011] As a preferred embodiment of the present invention, two symmetrical grooves are provided in each of the first fixed tube and the second fixed tube, a plurality of rotating rods are installed in each of the grooves, and pulleys are fixedly connected to the outer surfaces of the rotating rods.
[0012] As a preferred embodiment of the present invention, one end of each of the first vertical pole and the second vertical pole is fixedly connected with a supporting foot.
[0013] As a preferred embodiment of the present invention, a third connecting plate is rotatably connected between the first rotating shaft and the second rotating shaft, a connecting frame is fixedly connected to the third connecting plate, and one end of the connecting frame is respectively inserted into a plurality of sliding support rods.
[0014] Compared with the prior art, the present invention has the following beneficial effects: In the preparation stage before pouring the cover slab concrete for culvert construction, the scaffolding must first be moved to the designated position. Subsequently, the first telescopic drive member is started to ensure its rotation, thereby driving the first connecting pipe to slide in the first cavity. At the same time, the action will be transmitted to the second telescopic drive member via the transmission member, prompting the second telescopic drive member to rotate synchronously, driving the second connecting pipe to slide in the second cavity. As the first connecting pipe and the second connecting pipe are extended synchronously, the first upright pole of the scaffolding will extend accordingly, thereby achieving effective adjustment of the length of the first fixed pipe and the second fixed pipe.
[0015] It aims to effectively solve the problem of long time consumption and low efficiency caused by tight structure in the process of erection and disassembly of traditional scaffolding. Through the telescopic adjustment of the first connecting pipe and the second connecting pipe, the length of the scaffolding can be flexibly adjusted to meet the actual needs of different construction environments. It not only simplifies the erection and disassembly process, but also significantly improves work efficiency, effectively reduces the consumption of manpower and time, and provides a more efficient and stable support solution for culvert construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of a three-dimensional structure from a first perspective of Example 1 of a telescopic scaffold for culvert construction provided by an embodiment of the present invention; Figure 2 The invention provides a telescopic scaffold for culvert construction. Figure 1 Part A in the middle is a partial enlarged schematic diagram of the three-dimensional structure; Figure 3 It is a schematic diagram of the stereoscopic structure of a telescopic scaffold for culvert construction provided by an embodiment of the present invention from a second viewing angle; Figure 4 It is a schematic diagram of the internal cross-sectional plan structure of a telescopic scaffold for culvert construction provided by an embodiment of the present invention from a left-side perspective; Figure 5 The invention provides a telescopic scaffold for culvert construction. Figure 4 The partially enlarged planar structure diagram of part C in the middle; Figure 6 It is a schematic diagram of the internal cross-sectional three-dimensional structure of a telescopic scaffold for culvert construction provided by an embodiment of the present invention from a third perspective; Figure 7 The invention provides a telescopic scaffold for culvert construction. Figure 6 The D part in the middle is a partially enlarged schematic diagram of the three-dimensional structure; Figure 8 The invention provides a telescopic scaffold for culvert construction. Figure 6 Part E in the middle is a partially enlarged schematic diagram of the three-dimensional structure; Fig. 9 It is a schematic diagram of a three-dimensional structure from a first perspective of Example 2 of a telescopic scaffold for culvert construction provided by an embodiment of the present invention; Fig.10 The invention provides a telescopic scaffold for culvert construction. Fig. 9 Schematic diagram of the three-dimensional structure of the partial enlargement of part G in the middle.
[0017] In the figure: 1. first fixed tube; 11. second fixed tube; 12. first cavity; 13. second cavity; 14. first connecting tube; 15. second connecting tube; 2. first rack; 21. first gear; 22. first rotating shaft; 3. second rack; 31. second gear; 32. second rotating shaft; 4. scaffolding support frame; 41. scaffolding; 42. third cavity; 43. scaffolding connecting plate; 44. first connecting plate; 5. sliding support rod; 51. first telescopic rod; 52. second connecting plate; 53. second telescopic rod; 6. first sprocket; 61. second sprocket; 62. chain; 8. rotating rod; 81. pulley; 9. supporting foot; 91. third connecting plate; 92. connecting frame. DETAILED DESCRIPTION
[0018] In order to further understand the content, features and effects of the present invention, the following embodiments are given as examples and described in detail with reference to the accompanying drawings.
[0019] The structure of the present invention is described in detail below in conjunction with the accompanying drawings.
[0020] See also Figures 1 to 8 A telescopic scaffold for culvert construction provided by an embodiment of the present invention comprises a first fixed tube 1 and a second fixed tube 11, wherein a first cavity 12 is defined in the first fixed tube 1, and a second cavity 13 is defined in the second fixed tube 11; a first connecting tube 14 and a second connecting tube 15 are slidably connected in the first cavity 12 and the second cavity 13, respectively; a first vertical pole is fixedly connected to one end of the first connecting tube 14 and the second connecting tube 15, and a second vertical pole is fixedly connected to one end of the first fixed tube 1 and the second fixed tube 11; a first telescopic driving member and a second telescopic driving member are respectively installed in the first cavity 12 and the second cavity 13; a transmission member is installed on one side of the first telescopic driving member and the second telescopic driving member.
[0021] The above scheme is adopted: when in use, when building a scaffold before pouring cover slab concrete during culvert construction, the scaffold is first moved to the designated position, and then, the first telescopic drive member is rotated to drive the first connecting pipe 14 to slide in the first cavity 12. At the same time, this action will drive the second telescopic drive member through the transmission member to rotate the second telescopic drive member, thereby driving the second connecting pipe 15 to slide in the second cavity 13. As the first connecting pipe 14 and the second connecting pipe 15 are extended synchronously, the first vertical pole will also be extended accordingly, thereby increasing the length of the first fixed pipe 1 and the second fixed pipe 11 of the scaffold, effectively solving the problem of long time consumption and low efficiency caused by the tight structure during the construction and disassembly of traditional scaffolding, and through the telescopic adjustment of the first connecting pipe 14 and the second connecting pipe 15, the length of the scaffold can be easily adjusted to adapt to different construction requirements, simplifying the construction and disassembly process, improving work efficiency, and reducing manpower and time consumption.
[0022] It should be noted that the lengths of the first connecting tube 14 and the second connecting tube 15 can be adjusted according to actual needs.
[0023] Furthermore, the first telescopic driving member includes a first rack 2, which is installed in the first cavity 12; a first gear 21 is meshed on one side of the first rack 2, and the first gear 21 is located on one side of the first connecting tube 14; the axial part of the first gear 21 is fixedly connected with a first rotating shaft 22, and the first rotating shaft 22 can extend to the outside of the first fixed tube 1, and the first connecting tube 14 is installed on the first rotating shaft 22 on one side close to the first gear 21.
[0024] The above scheme is adopted: when it is needed to extend the overall length of the first fixed tube 1, the first rotating shaft 22 is rotated to drive the first gear 21 to mesh with the first rack 2. During the meshing process, the rotation of the first gear 21 is converted into linear displacement, thereby pushing the first connecting tube 14 to move in the specified direction inside the first cavity 12. As the first connecting tube 14 is gradually extended, part of the first connecting tube 14 will be separated from the first cavity 12, thereby increasing the overall length of the first fixed tube 1, increasing the flexibility and practicality of the first connecting tube 14, and at the same time, when the first connecting tube 14 moves, it can drive the first upright pole to produce displacement, further expanding the working range of the scaffolding and improving the efficiency of the staff when building the scaffolding.
[0025] It should be noted that: first, when the first gear 21 needs to rotate, the staff can rotate the first rotating shaft 22 to drive the first gear 21 to mesh with the first rack 2, so that the first gear 21 can rotate. Second, if the first gear 21 is no longer needed to rotate, multiple pin holes can be opened on the surface of the first gear 21 and the inner wall of the first connecting tube 14, and a pin can be passed through two aligned pin holes, so as to fix the first gear 21 and stop it from rotating.
[0026] Furthermore, the second telescopic driving member includes a second rack 3, which is installed in the second cavity 13; a second gear 31 is meshed on one side of the second rack 3, and the second gear 31 is located on one side of the second connecting tube 15; the axial part of the second gear 31 is fixedly connected with a second rotating shaft 32, and the second rotating shaft 32 can extend to the outside of the second fixed tube 11, and the second connecting tube 15 is installed on the second rotating shaft 32 on one side close to the second gear 31.
[0027] In the above scheme, when the length of the second fixed tube 11 needs to be extended, the first rotating shaft 22 rotates first, driving the transmission member to rotate. Then, the rotation is transmitted to the second gear 31 through the second rotating shaft 32, causing it to start rotating. During the rotation, the second gear 31 meshes with the second rack 3, and the rotation of the second gear 31 is converted into a linear sliding motion.
[0028] Therefore, the second connecting tube 15 will gradually move in the specified direction inside the second cavity 13. As the movement continues, part of the second connecting tube 15 will gradually extend out of the second cavity 13, thereby increasing the length of the entire second fixed tube 11. This not only enhances the flexibility of the second connecting tube 15, but also improves its practicality.
[0029] At the same time, when the second connecting pipe 15 moves, the second connecting pipe 15 can also push the first upright pole to move, thereby further expanding the working range of the scaffolding, so that the workers can be more efficient and convenient when building the scaffolding.
[0030] It should be noted that: first, the first gear 21 and the second gear 31 rotate synchronously. Second, since the first gear 21 and the second gear 31 rotate synchronously, they respectively push the first connecting tube 14 and the second connecting tube 15 to move synchronously.
[0031] Furthermore, one end of each of the first vertical pole and the second vertical pole is fixedly connected to a scaffolding board support frame 4, a scaffolding board 41 is installed in one of the scaffolding board support frames 4, a third cavity 42 is defined in the scaffolding board 41, a scaffolding connecting plate 43 is slidably connected in the third cavity 42, one side of the scaffolding connecting plate 43 is located in the third cavity 42, and the other side is located in another of the scaffolding board support frames 4, a first connecting plate 44 is installed between the second connecting pipe 15 and the scaffolding connecting plate 43.
[0032] The above solution is adopted: when the length of the scaffolding board 41 needs to be adjusted during use, the first connecting plate 44 is immediately driven by moving the second connecting pipe 15, so that the scaffolding connecting plate 43 slides in the preset third cavity 42. Since one side of the scaffolding connecting plate 43 is fixed in the scaffolding board support frame 4, as it slides, the scaffolding board support frame 4 will also move accordingly, thereby realizing the adjustability of the length of the scaffolding board 41, which not only saves the time of installation and disassembly, but also improves the work efficiency, and also ensures the safety of construction.
[0033] The above scheme has the following effects: First, when the scaffolding board 41 needs to be installed in the scaffolding board support frame 4, if the above-mentioned scheme is not set, at this time, the staff is required to place the scaffolding board 41 in the scaffolding board support frame 4. Due to the influence of the scaffolding height, it will be more laborious for the staff to lift the scaffolding board 41, and it will also be laborious to remove the scaffolding board 41. By setting the above-mentioned scheme, when the scaffolding board 41 is placed in the scaffolding board support frame 4, the scaffolding connecting plate 43 can be retracted to extend the length of the scaffolding board 41, thereby improving the adaptability of the scaffolding board 41 and reducing the number of times the scaffolding board 41 is installed and removed.
[0034] Second, as the scaffolding is extended or retracted, the above solution allows the scaffolding board 41 to adjust its own length according to the length of the scaffolding after extension or retraction.
[0035] It should be noted that: first, one side of the scaffolding board 41 and the scaffolding connecting board 43 are both provided with hooks, and are hooked on the scaffolding board support frame 4 to improve the stability of the scaffolding board 41 and the scaffolding connecting board 43. Second, one side of the first connecting board 44 is fixed to the second connecting pipe 15, and the other side is movably mounted on the scaffolding connecting board 43, so that the scaffolding board 41 and the scaffolding connecting board 43 can be easily disassembled.
[0036] Furthermore, a first slide is fixedly connected to one side of the first fixed tube 1, and a second slide is fixedly connected to one side of the second fixed tube 11; a plurality of sliding support rods 5 are slidably connected between the first slide and the second slide, and a first telescopic rod 51 is fixedly connected between the sliding support rods 5; a second connecting plate 52 is fixedly connected between the first connecting tube 14 and the second connecting tube 15, and a second telescopic rod 53 is fixedly connected between the second connecting plate 52 and one of the sliding support rods 5.
[0037] The above scheme is adopted: when in use, when the first connecting tube 14 and the second connecting tube 15 move, the second connecting plate 52 moves with the movement of the first connecting tube 14, thereby driving the second telescopic rod 53 to extend and retract. When the second telescopic rod 53 is extended to its extreme position, the second telescopic rod 53 pulls the first sliding support rod 5 to slide between the first slideway and the second slideway. This sliding action is further transmitted through the first telescopic rod 51, prompting the second sliding support rod 5 to perform similar movement. This process is carried out in sequence until the first connecting tube 14 reaches the predetermined position, at which time multiple sliding support rods 5 will be evenly distributed on the first fixed tube 1, forming a stable support structure, effectively improving its bearing capacity.
[0038] The above scheme has the following effects: First, if the above-mentioned scheme is not set, when the first connecting tube 14 and the second connecting tube 15 are extended, the uneven distribution of the sliding support rod 5 often leads to insufficient bearing capacity in some parts. By setting the above-mentioned scheme, the sliding support rod 5 will adjust its position according to the change of its extended length, ensuring that a stable supporting force is always maintained between the first fixed tube 1 and the second fixed tube 11.
[0039] Second, if the above scheme is not set up, when the extended part of the scaffolding connecting plate 43 needs to place materials, the gravity generated by the materials will be transmitted to the second connecting tube 15. If the second telescopic rod 53 is not set between the second connecting tube 15 and the first connecting tube 14, the extended part will be borne by the second connecting plate 52 alone. The second connecting plate 52 may be deformed under the action of gravity, resulting in reduced stability of the entire structure. By setting the above scheme, since the two ends of the second telescopic rod 53 are respectively fixed on the second connecting plate 52 and the sliding support rod 5, the first telescopic rod 51 serves as an additional support point, which can help disperse the gravity generated by the materials, thereby enhancing the stability of the entire structure.
[0040] Third, through the above solution, the first telescopic rod 51 and the second telescopic rod 53 can be allowed to be telescopic to a certain extent to adapt to materials of different weights and sizes, thereby increasing the flexibility of the structure.
[0041] Furthermore, the transmission member includes a first sprocket 6 and a second sprocket 61, the first sprocket 6 is fixedly connected to the outer surface of the first rotating shaft 22, the first sprocket 6 is located on the outside of the first fixed tube 1, the second sprocket 61 is fixedly connected to the outer surface of the second rotating shaft 32, the second sprocket 61 is located on the outside of the second fixed tube 11, and chains 62 are installed on the outer surfaces of the first sprocket 6 and the second sprocket 61.
[0042] The above scheme is adopted: when the second rotating shaft 32 needs to rotate, the first rotating shaft 22 is first driven to rotate by the power source, and this rotation is then transmitted to the first sprocket 6 directly connected thereto, so that it rotates synchronously. Subsequently, the chain 62 on the first sprocket 6 starts to move, and the other end of the chain 62 is connected to the second sprocket 61, so the movement of the chain 62 drives the rotation of the second sprocket 61. Finally, the rotation of the second sprocket 61 causes the second rotating shaft 32 connected thereto to rotate accordingly.
[0043] Furthermore, two symmetrical grooves are provided in the first fixed tube 1 and the second fixed tube 11 , and a plurality of rotating rods 8 are installed in the grooves. The outer surfaces of the rotating rods 8 are fixedly connected with pulleys 81 .
[0044] The above scheme is adopted: when in use, when the first connecting tube 14 moves in the first cavity 12, the pulley 81 in the groove will contact the surface of the first connecting tube 14. If the first connecting tube 14 moves, it will drive the pulley 81 to rotate on the outer surface of the rotating rod 8, so that the pulley 81 can drive the first connecting tube 14, provide mutual transmission, and further improve the smoothness of the movement of the first connecting tube 14.
[0045] It should be noted that: a pulley 81 is also provided in the second cavity 13, and the working mode and the effect produced are the same as above.
[0046] Furthermore, one end of each of the first vertical pole and the second vertical pole is fixedly connected with a supporting foot 9 .
[0047] With the above solution, when the first and second vertical poles are moved to the required positions, the support feet 9 on the first and second vertical poles will be displaced synchronously to ensure that they are always in contact with the ground during the movement. When the first and second vertical poles are moved into place, the support feet 9 will be fixed on the ground, thereby providing a stable support force for the entire scaffolding, significantly improving the stability and safety of the scaffolding.
[0048] It should be noted that: first, a ball bearing can be installed on the support foot 9 to improve the smoothness of the movement of the first and second upright poles. Second, a pin hole can be opened on the support foot 9, and the support foot 9 can be connected to the ground by inserting the pin hole to fix it.
[0049] Different from the first embodiment, the sliding support rod 5 can also be driven in the following manner, see Figures 9 and 10 A third connecting plate 91 is rotatably connected between the first rotating shaft 22 and the second rotating shaft 32 , and a connecting frame 92 is fixedly connected to the third connecting plate 91 , and one end of the connecting frame 92 is respectively inserted into a plurality of sliding support rods 5 .
[0050] The above solution is adopted: when the total length of the scaffold needs to be increased during use, the staff pushes the third connecting plate 91. This thrust is transmitted to the first gear 21 through the first rotating shaft 22, so that the first gear 21 rotates, and then drives the corresponding part of the scaffold to unfold, thereby expanding its overall length. At the same time, as the third connecting plate 91 moves, the third connecting plate 91 will link the multiple sliding support rods 5 through the connecting frame 92, so that the multiple sliding support rods 5 can move synchronously in the specified direction and be distributed on the first fixed pipe 1. At this time, the multiple sliding support rods 5 will provide sufficient support force for the scaffolding board 41.
[0051] It should be noted that: first, since the third connecting plate 91 is connected to the first rotating shaft 22 and the second rotating shaft 32, the third connecting plate 91 will also push the second rotating shaft 32 when moving, further improving the stability of the first rotating shaft 22 and the second rotating shaft 32 when moving. Second, since the first rotating shaft 22 itself can rotate, the first rotating shaft 22 can also be driven to drive the third connecting plate 91 to move synchronously. Third, the length of the first slideway and the second slideway can be adjusted according to actual needs. Fourth, when the sliding support rod 5 continues to move in the specified direction, one of the sliding support rods 5 will be separated from the first slideway and the second slideway and reach between the first connecting tube 14 and the second connecting tube 15. At this time, the sliding support rod 5 is in a suspended state, and then the staff can rotate the two top rods in the sliding support rod 5 to extend the two top rods upward and downward respectively until they are in contact with the first connecting tube 14 and the second connecting tube 15 respectively, further providing support force for the first connecting tube 14 and the second connecting tube 15. Fifth, since the two push rods are both threadedly connected to the sliding support rod 5, if the sliding support rod 5 needs to move in the reverse direction, the above steps can be repeated.
[0052] Working principle of the present invention: The preparatory work before pouring the cover slab concrete for culvert construction involves the construction of scaffolding. First, the scaffolding needs to be moved to the predetermined construction location. Then, the first telescopic drive member is started to rotate. This rotational action will cause the first connecting tube 14 to move linearly inside the first cavity 12. At the same time, due to the connection of the transmission member, this action will also cause the second telescopic drive member to rotate. As the second telescopic drive member rotates, the second connecting tube 15 will perform corresponding linear movement inside the second cavity 13. As the first connecting tube 14 and the second connecting tube 15 extend outward synchronously, the first upright portion of the scaffolding will also extend outward accordingly, thereby achieving the effect of increasing the total length of the first fixed tube 1 and the second fixed tube 11.
[0053] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0054] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A telescopic scaffold for culvert construction, comprising a first fixed tube (1) and a second fixed tube (11), wherein a first cavity (12) is formed in the first fixed tube (1), and a second cavity (13) is formed in the second fixed tube (11), characterized in that: A first connecting tube (14) and a second connecting tube (15) are slidably connected in the first cavity (12) and the second cavity (13), respectively; One end of the first connecting tube (14) and the second connecting tube (15) is fixedly connected to a first vertical rod, and one end of the first fixing tube (1) and the second fixing tube (11) is fixedly connected to a second vertical rod; A first telescopic driving component and a second telescopic driving component are respectively installed in the first cavity (12) and the second cavity (13); A transmission member is installed on one side of the first telescopic driving member and the second telescopic driving member.
2. A telescopic scaffold for culvert construction as claimed in claim 1, characterized in that: The first telescopic driving member comprises a first rack (2), and the first rack (2) is installed in the first cavity (12); A first gear (21) is meshed with one side of the first rack (2), and the first gear (21) is located on one side of the first connecting pipe (14); The first gear (21) is fixedly connected to a first rotating shaft (22) at its axial center portion. The first rotating shaft (22) can extend to the outside of the first fixed tube (1). The first connecting tube (14) is mounted on the first rotating shaft (22) on a side close to the first gear (21).
3. A telescopic scaffold for culvert construction as claimed in claim 2, characterized in that: The second telescopic driving member comprises a second rack (3), and the second rack (3) is installed in the second cavity (13); A second gear (31) is meshed with one side of the second rack (3), and the second gear (31) is located on one side of the second connecting pipe (15); The axial center portion of the second gear (31) is fixedly connected to a second rotating shaft (32), the second rotating shaft (32) can extend to the outside of the second fixed tube (11), and the second connecting tube (15) is mounted on the second rotating shaft (32) on a side close to the second gear (31).
4. A telescopic scaffold for culvert construction as claimed in claim 1, characterized in that: One end of each of the first upright pole and the second upright pole is fixedly connected to a scaffolding board support frame (4), a scaffolding board (41) is installed in one of the scaffolding board support frames (4), a third cavity (42) is provided in the scaffolding board (41), a scaffolding connecting plate (43) is slidably connected in the third cavity (42), one side of the scaffolding connecting plate (43) is located in the third cavity (42), and the other side is located in the other scaffolding board support frame (4), and a first connecting plate (44) is installed between the second connecting pipe (15) and the scaffolding connecting plate (43).
5. A telescopic scaffold for culvert construction as claimed in claim 1, characterized in that: One side of the first fixed tube (1) is fixedly connected to a first slideway, and one side of the second fixed tube (11) is fixedly connected to a second slideway; A plurality of sliding support rods (5) are slidably connected between the first slideway and the second slideway, and a first telescopic rod (51) is fixedly connected between the sliding support rods (5); A second connecting plate (52) is fixedly connected between the first connecting tube (14) and the second connecting tube (15), and a second telescopic rod (53) is fixedly connected between the second connecting plate (52) and one of the sliding support rods (5).
6. A telescopic scaffold for culvert construction as claimed in claim 3, characterized in that: The transmission member comprises a first sprocket (6) and a second sprocket (61); the first sprocket (6) is fixedly connected to the outer surface of the first rotating shaft (22); the first sprocket (6) is located outside the first fixed tube (1); the second sprocket (61) is fixedly connected to the outer surface of the second rotating shaft (32); the second sprocket (61) is located outside the second fixed tube (11); and chains (62) are mounted on the outer surfaces of the first sprocket (6) and the second sprocket (61).
7. A telescopic scaffold for culvert construction as claimed in claim 1, characterized in that: The first fixed tube (1) and the second fixed tube (11) are each provided with two symmetrical grooves, a plurality of rotating rods (8) are installed in the grooves, and the outer surfaces of the rotating rods (8) are each fixedly connected with pulleys (81).
8. A telescopic scaffold for culvert construction as claimed in claim 1, characterized in that: One end of each of the first upright pole and the second upright pole is fixedly connected to a supporting foot (9).
9. A telescopic scaffold for culvert construction as claimed in claim 2, characterized in that: A third connecting plate (91) is rotatably connected between the first rotating shaft (22) and the second rotating shaft (32), a connecting frame (92) is fixedly connected to the third connecting plate (91), and one end of the connecting frame (92) is respectively inserted into a plurality of sliding support rods (5).