Glass production management method and device, electronic equipment and storage medium
By determining the candidate glass production tasks, calculating optimization rate and sorting task execution order in glass production management, the problem of unreasonable production of glass patch orders in the existing technology is solved, and intelligent management and efficiency improvement are achieved.
Patent Information
- Application Number
- CN202411525172.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-29
- Publication Date
- 2025-02-28
AI Technical Summary
The existing glass production management plan cannot effectively handle the order production of glass patch orders, resulting in unreasonable production arrangements and inefficient efficiency.
A glass production management method is proposed. By obtaining glass production tasks and patch task information, candidate glass production tasks are determined, task insertion optimization rate is calculated, target glass production tasks are selected, and task sorting is performed according to processing priority and production optimization rate, and execution order is determined.
The production of glass patch orders has been realized, which has improved the intelligence and efficiency of glass production management, and reduced the loss and production costs of glass raw materials.
Smart Images

Figure CN119539347A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of glass production and processing, and in particular to a glass production management method, device, electronic equipment and storage medium. Background Art
[0002] In the process of glass production and processing, it is inevitable that the glass will be scrapped due to scratches, breakage, etc., and a new piece of glass needs to be produced and processed to replace it. This process is called glass patching.
[0003] In the existing glass production management plan, the situation where temporary orders for glass patches during the glass production process need to be inserted into the production order is not taken into consideration, and it is impossible to reasonably analyze the inserted orders and then make production arrangements. Summary of the invention
[0004] The main purpose of the embodiments of the present application is to propose a glass production management method, device, electronic equipment and storage medium, which can realize the insert order production of glass patch orders, realize intelligent glass production management, and improve the efficiency of glass production management.
[0005] On the one hand, the embodiment of the present application provides a glass production management method, the method comprising the following steps:
[0006] Obtain information on multiple glass production tasks and patch tasks to be inserted;
[0007] According to the patch task information, a number of candidate glass production tasks are determined from the multiple glass production tasks, and the task insertion optimization rate corresponding to each of the candidate glass production tasks is calculated, wherein the task insertion optimization rate is the production optimization rate of the candidate glass production task when the patch task information is inserted into the candidate glass production task;
[0008] According to the task insertion optimization rate corresponding to each of the candidate glass production tasks, a target glass production task is determined from the multiple candidate glass production tasks, and the patch task information is inserted into the target glass production task, wherein the target glass production task is the candidate glass production task with the highest task insertion optimization rate;
[0009] Obtaining the processing priority corresponding to the patch task information;
[0010] Obtaining the production optimization rates corresponding to the remaining glass production tasks, wherein the remaining glass production tasks are the glass production tasks except the target glass production task;
[0011] According to the processing priority corresponding to the patch task information, the task insertion optimization rate corresponding to the target glass production task and the production optimization rates corresponding to the remaining glass production tasks, tasks are sorted, the execution order of glass production tasks is determined, and glass production management is performed according to the execution order of glass production tasks.
[0012] In some embodiments, determining a plurality of candidate glass production tasks from the plurality of glass production tasks according to the patch task information, and calculating the task insertion optimization rate corresponding to each of the candidate glass production tasks specifically includes:
[0013] Determine patch production information corresponding to the glass patch according to the patch task information, wherein the patch production information at least includes a glass cutting area, a glass patch size, a glass type, and a glass thickness;
[0014] Acquire glass production information corresponding to each of the glass production tasks, wherein the glass production information includes glass production type, glass production thickness, glass original sheet area, glass production cutting area, and sizes of several glass production redundant areas;
[0015] Perform patch task insertion matching according to the patch production information and the glass production information corresponding to each of the glass production tasks, and determine a plurality of the candidate glass production tasks from the plurality of the glass production tasks;
[0016] According to the patch production information and the glass production information corresponding to each of the candidate glass production tasks, the task insertion optimization rate corresponding to each of the candidate glass production tasks is calculated, and the task insertion optimization rate is calculated by the following formula:
[0017] Q t =[(S1+S2) / S m ]*100%;
[0018] Among them, Q t is the task insertion optimization rate, S1 is the glass cutting area included in the patch production information, S2 is the glass production cutting area included in the glass production information, S m It is the original glass area included in the glass production information.
[0019] In some embodiments, performing patch task insertion matching according to the patch production information and the glass production information corresponding to each of the glass production tasks, and determining a plurality of the candidate glass production tasks from the plurality of the glass production tasks, specifically includes:
[0020] For each of the glass production tasks, when the glass type contained in the patch production information is consistent with the glass production type contained in the glass production information and the glass thickness contained in the patch production information is consistent with the glass production thickness contained in the glass production information, the glass production task is determined as a pre-selected glass production task;
[0021] For each of the pre-selected glass production tasks, when the glass patch size included in the patch production information is smaller than the size of any of the glass production redundant areas included in the glass production information, the pre-selected glass production task is determined as the candidate glass production task.
[0022] In some embodiments, obtaining the production optimization rate corresponding to each of the remaining glass production tasks specifically includes:
[0023] The glass production information corresponding to each of the glass production tasks is obtained, and the production optimization rate corresponding to each of the glass production tasks is calculated according to the glass original sheet area and the glass production cutting area contained in the glass production information, wherein the production optimization rate is calculated by the following formula:
[0024] Q m =(S2 / S m )*100%;
[0025] Among them, Q m is the production optimization rate, S2 is the glass production cutting area contained in the glass production information, S m It is the original glass area included in the glass production information.
[0026] In some embodiments, when performing the step of determining a target glass production task from a plurality of the candidate glass production tasks according to the task insertion optimization rate corresponding to each of the candidate glass production tasks, and inserting the patch task information into the target glass production task, the step further includes:
[0027] When the task insertion optimization rate of the target glass production task is less than a given optimization rate specified threshold, a glass patch task is generated according to the patch production information, the glass patch task is determined as the target glass production task, and the patch production optimization rate corresponding to the glass patch task is determined as the task insertion optimization rate corresponding to the target glass production task, wherein the patch production optimization rate is calculated by the following formula:
[0028] Q p =(S1 / S p )*100%;
[0029] Among them, Q pis the patch production optimization rate, S1 is the glass cutting area included in the patch production information, S p The glass patch size is included in the patch production information.
[0030] In some embodiments, the obtaining of the processing priority corresponding to the patch task information specifically includes:
[0031] Obtaining an urgency level indicator corresponding to the patch task information, and determining the processing priority level according to the urgency level indicator;
[0032] When the urgency level indicates that the patch task needs to be processed urgently, the processing priority is determined as the first priority; otherwise, the processing priority is determined as the second priority.
[0033] In some embodiments, the processing priority corresponding to the patch task information, the task insertion optimization rate corresponding to the target glass production task, and the production optimization rates corresponding to the remaining glass production tasks are used to sort the tasks, determine the execution order of the glass production tasks, and perform glass production management according to the execution order of the glass production tasks, specifically including:
[0034] When the processing priority is the first priority, the target glass production task is determined as the glass production task to be processed first, and the tasks are sorted according to the production optimization rates corresponding to the remaining glass production tasks to determine the task execution order corresponding to the remaining glass production tasks;
[0035] When the processing priority is the second priority, tasks are sorted according to the task insertion optimization rate corresponding to the target glass production task and the production optimization rates corresponding to the remaining glass production tasks, to determine the task execution order corresponding to the target glass production task and the task execution order corresponding to the remaining glass production tasks.
[0036] On the other hand, an embodiment of the present application provides a glass production management device, the device comprising:
[0037] The first module is used to obtain information on multiple glass production tasks and patch tasks to be inserted;
[0038] The second module is used to determine a number of candidate glass production tasks from the multiple glass production tasks according to the patch task information, and calculate the task insertion optimization rate corresponding to each of the candidate glass production tasks, wherein the task insertion optimization rate is the production optimization rate of the candidate glass production task when the patch task information is inserted into the candidate glass production task;
[0039] The third module is used to determine a target glass production task from the plurality of candidate glass production tasks according to the task insertion optimization rate corresponding to each of the candidate glass production tasks, and insert the patch task information into the target glass production task, wherein the target glass production task is the candidate glass production task with the highest task insertion optimization rate;
[0040] The fourth module is used to obtain the processing priority corresponding to the patch task information;
[0041] A fifth module is used to obtain the production optimization rate corresponding to each of the remaining glass production tasks, wherein the remaining glass production tasks are each of the glass production tasks except the target glass production task;
[0042] The sixth module is used to sort tasks according to the processing priority corresponding to the patch task information, the task insertion optimization rate corresponding to the target glass production task and the production optimization rates corresponding to the remaining glass production tasks, determine the execution order of glass production tasks, and manage glass production according to the execution order of the glass production tasks.
[0043] On the other hand, an embodiment of the present application provides an electronic device, which includes a memory and a processor, wherein the memory stores a computer program, and the processor implements the glass production management method described above when executing the computer program.
[0044] On the other hand, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the glass production management method described above is implemented.
[0045] The embodiments of the present application include at least the following beneficial effects: the present application provides a glass production management method, device, electronic device and storage medium, which determines a number of candidate glass production tasks from a plurality of glass production tasks according to patch task information, determines a target glass production task from a plurality of candidate glass production tasks according to the task insertion optimization rate corresponding to each candidate glass production task, sorts tasks according to the processing priority corresponding to the patch task information, the task insertion optimization rate corresponding to the target glass production task and the production optimization rate corresponding to the remaining glass production tasks, determines the execution order of the glass production tasks, and manages glass production according to the execution order of the glass production tasks. The present application can realize the insertion order production of glass patch orders, realize intelligent glass production management, improve the efficiency of glass production management, reduce the loss of glass raw materials, and reduce the cost of glass production. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1is a flow chart of a glass production management method provided in an embodiment of the present application;
[0047] Figure 2 is a schematic diagram of inserting a patch task into a candidate glass production task in an embodiment of the present application;
[0048] Figure 3 It is a structural schematic diagram of a glass production management device provided in an embodiment of the present application;
[0049] Figure 4 It is a schematic diagram of the hardware structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0050] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0051] It should be noted that, although the functional modules are divided in the device schematic diagram and the logical order is shown in the flowchart, in some cases, the steps shown or described may be performed in a different order than the module division in the device or the order in the flowchart. The terms "first", "second", etc. in the specification, claims and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.
[0052] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein are only for the purpose of describing the embodiments of this application and are not intended to limit this application.
[0053] The existing solution for glass patching is manual operation, and the process is: manually fill in the patch information (glass type, size, etc.) and apply for the patch - issue a patch task order - manually find a qualified position in the layout of the existing order, and add the patch size to the original layout - after selection, the patch is produced on a non-automated production line to complete the patch.
[0054] The existing glass patch solution has the following disadvantages:
[0055] 1) Glass patches are of many sizes and few quantities. The patching process is manually operated and cannot be automated. The timeliness is poor, the patching efficiency is low, and the patches cannot be produced in time;
[0056] 2) The glass cutting rate is low. When selecting the layout, manual labor is often unable to quickly grab the order layout with the highest matching degree, resulting in waste of glass.
[0057] Based on this, the embodiments of the present application propose a glass production management method, device, electronic device and storage medium, which can realize the insert order production of glass patch orders, realize automated and intelligent glass production management, and improve the efficiency of glass production management.
[0058] Reference Figure 1 , Figure 1 This is an optional flow chart of a glass production management method provided in an embodiment of the present application. The method may include but is not limited to steps S101 to S106:
[0059] Step S101, obtaining information on multiple glass production tasks and patch tasks to be inserted;
[0060] Step S102, determining a number of candidate glass production tasks from a plurality of glass production tasks according to the patch task information, and calculating the task insertion optimization rate corresponding to each candidate glass production task, wherein the task insertion optimization rate is the production optimization rate of the candidate glass production task when the patch task information is inserted into the candidate glass production task;
[0061] Step S103, determining a target glass production task from multiple candidate glass production tasks according to the task insertion optimization rate corresponding to each candidate glass production task, and inserting the patch task information into the target glass production task, wherein the target glass production task is the candidate glass production task with the highest task insertion optimization rate;
[0062] Step S104, obtaining the processing priority corresponding to the patch task information;
[0063] Step S105, obtaining the production optimization rate corresponding to the remaining glass production tasks, wherein the remaining glass production tasks are the glass production tasks except the target glass production task;
[0064] Step S106, sort the tasks according to the processing priority corresponding to the patch task information, the task insertion optimization rate corresponding to the target glass production task and the production optimization rates corresponding to the remaining glass production tasks, determine the execution order of the glass production tasks, and manage the glass production according to the execution order of the glass production tasks.
[0065] In some embodiments, a patch task insertion judgment is performed based on the patch task information and each glass production task to determine whether the corresponding patch task can be inserted into one of the glass production tasks in the production scheduling pool, so as to avoid waste of glass raw materials and improve glass patch efficiency.
[0066] In some embodiments, step S102 may include, but is not limited to, steps S201 to S204:
[0067] Step S201, determining patch production information corresponding to the glass patch according to the patch task information, where the patch production information at least includes glass cutting area, glass patch size, glass type and glass thickness;
[0068] Step S202, obtaining glass production information corresponding to each glass production task, the glass production information including glass production type, glass production thickness, glass original sheet area, glass production cutting area and sizes of several glass production redundant areas;
[0069] Step S203, performing patch task insertion matching according to the patch production information and the glass production information corresponding to each glass production task, and determining a number of candidate glass production tasks from the multiple glass production tasks;
[0070] Step S204, calculating the task insertion optimization rate corresponding to each candidate glass production task according to the patch production information and the glass production information corresponding to each candidate glass production task.
[0071] In step S203 of some embodiments, optionally, for each glass production task, when the glass type contained in the patch production information is consistent with the glass production type contained in the glass production information and the glass thickness contained in the patch production information is consistent with the glass production thickness contained in the glass production information, the glass production task is determined as a pre-selected glass production task; for each pre-selected glass production task, when the glass patch size contained in the patch production information is smaller than the size of any glass production redundant area contained in the glass production information, the pre-selected glass production task is determined as a candidate glass production task.
[0072] For example, refer to Figure 2 , Figure 2 It is an optional schematic diagram of inserting a patch task into a candidate glass production task in an embodiment of the present application, wherein 1 is the original glass sheet, 2 to 4 are the glass production cutting areas contained in the glass production information in the candidate glass production task, that is, the candidate glass production task cuts out glass sheets 2 to 4 based on the original glass sheet 1, 5 is a glass patch, and areas A and B in the original glass sheet 1 are redundant areas for glass production. According to the glass patch size corresponding to the glass patch 5 and the sizes of areas A and B, it is determined that the size of area A is larger than the glass patch size of glass patch 5 but the size of area B is smaller than the glass patch size of glass patch 5. Therefore, the remaining glass raw materials in area A can be used to cut out the glass patch 5.
[0073] In some embodiments, the optimization rate of the glass production task is the ratio between the area of the cut glass and the area of the original glass sheet. The higher the optimization rate, the smaller the loss of glass raw materials and the higher the resource utilization rate.
[0074] In step S204 of some embodiments, the task insertion optimization rate is calculated by the following formula:
[0075] Q t =[(S1+S2) / S m ]*100%;
[0076] Among them, Q t is the task insertion optimization rate, S1 is the glass cutting area included in the patch production information, S2 is the glass production cutting area included in the glass production information, S m It is the original glass area included in the glass production information.
[0077] In step S105 of some embodiments, specifically, glass production information corresponding to each glass production task is obtained, and the production optimization rate corresponding to each glass production task is calculated according to the glass original sheet area and the glass production cutting area contained in the glass production information, wherein the production optimization rate is calculated by the following formula:
[0078] Q m =(S2 / S m )*100%;
[0079] Among them, Q m is the production optimization rate, S2 is the glass production cutting area contained in the glass production information, S m It is the original glass area included in the glass production information.
[0080] In some embodiments, when executing step S103, step S301 is also included:
[0081] Step S301: when the task insertion optimization rate of the target glass production task is less than a given optimization rate specified threshold, a glass patch task is generated according to the patch production information, the glass patch task is determined as the target glass production task, and the patch production optimization rate corresponding to the glass patch task is determined as the task insertion optimization rate corresponding to the target glass production task, wherein the patch production optimization rate is calculated by the following formula:
[0082] Q p =(S1 / S p )*100%;
[0083] Among them, Q p is the patch production optimization rate, S1 is the glass cutting area included in the patch production information, S p The glass patch size is included in the patch production information.
[0084] In some embodiments, when a candidate glass production task cannot be determined from multiple glass production tasks, that is, the patch task cannot be inserted into any glass production task, or the task insertion optimization rate of the target glass production task is less than a given optimization rate specified threshold, a new glass patch task is generated based on the patch task information, the glass patch task is determined as the target glass production task, and the patch production optimization rate corresponding to the glass patch task is determined as the task insertion optimization rate corresponding to the target glass production task.
[0085] In some embodiments, step S104 may include but is not limited to steps S401 to S402:
[0086] Step S401, obtaining the urgency level identifier corresponding to the patch task information, and determining the processing priority according to the urgency level identifier;
[0087] Step S402: When the urgency level indicates that the patch task needs to be processed urgently, the processing priority is determined to be the first priority; otherwise, the processing priority is determined to be the second priority.
[0088] In some embodiments, an urgency flag is set according to the urgency of the patch task, and the processing priority of the patch task is determined according to the urgency flag, so that the patch task can be prioritized according to the urgency of the patch task, thereby improving the timeliness and efficiency of patch task processing.
[0089] In some embodiments, step S106 may include but is not limited to steps S501 to S502:
[0090] Step S501, when the processing priority is the first priority, the target glass production task is determined as the glass production task to be processed first, and the tasks are sorted according to the production optimization rates corresponding to the remaining glass production tasks to determine the task execution order corresponding to the remaining glass production tasks;
[0091] Step S502, when the processing priority is the second priority, sort the tasks according to the task insertion optimization rate corresponding to the target glass production task and the production optimization rates corresponding to the remaining glass production tasks, and determine the task execution order corresponding to the target glass production task and the task execution order corresponding to the remaining glass production tasks.
[0092] In some embodiments, when the processing priority is the first priority, it means that the patch task needs to be processed first. At this time, the target glass production task is determined as the first glass production task to be processed, and then the remaining glass production tasks are sorted according to the corresponding production optimization rates to determine the task execution order corresponding to the remaining glass production tasks; when the processing priority is the second priority, it means that the patch task does not need to be processed first, and the target glass production task also participates in the task sorting.
[0093] Exemplarily, there is a target glass production task in the production scheduling pool, and its corresponding task insertion optimization rate is 85%. The remaining glass production tasks are glass production tasks 1 to 4, among which the production optimization rate of glass production task 1 is 78%, the production optimization rate of glass production task 2 is 80%, the production optimization rate of glass production task 3 is 90%, and the production optimization rate of glass production task 4 is 68%. When the processing priority of the target glass production task is the first priority, the execution order of the production tasks is: target glass production task-glass production task 3-glass production task 2-glass production task 1-glass production task 4. When the processing priority of the target glass production task is the second priority, the execution order of the production tasks is: glass production task 3-target glass production task-glass production task 2-glass production task 1-glass production task 4.
[0094] Reference Figure 3 , Figure 3 : is an optional structural schematic diagram of a glass production management device provided in an embodiment of the present application, the device is used to implement the above-mentioned glass production management method, and the device may include:
[0095] The first module is used to obtain information on multiple glass production tasks and patch tasks to be inserted;
[0096] The second module is used to determine a number of candidate glass production tasks from a plurality of glass production tasks according to the patch task information, and calculate the task insertion optimization rate corresponding to each candidate glass production task, wherein the task insertion optimization rate is the production optimization rate of the candidate glass production task when the patch task information is inserted into the candidate glass production task;
[0097] The third module is used to determine a target glass production task from multiple candidate glass production tasks according to the task insertion optimization rate corresponding to each candidate glass production task, and insert the patch task information into the target glass production task, wherein the target glass production task is the candidate glass production task with the highest task insertion optimization rate;
[0098] The fourth module is used to obtain the processing priority corresponding to the patch task information;
[0099] The fifth module is used to obtain the production optimization rate corresponding to the remaining glass production tasks, wherein the remaining glass production tasks are the glass production tasks except the target glass production task;
[0100] The sixth module is used to sort tasks according to the processing priority corresponding to the patch task information, the task insertion optimization rate corresponding to the target glass production task and the production optimization rates corresponding to the remaining glass production tasks, determine the execution order of the glass production tasks, and manage glass production according to the execution order of the glass production tasks.
[0101] It can be understood that the contents of the above method embodiments are all applicable to the present device embodiments, the functions specifically implemented by the present device embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0102] The embodiment of the present application also provides an electronic device, the electronic device includes a memory and a processor, the memory stores a computer program, and the processor implements the above glass production management method when executing the computer program. The electronic device can be any smart terminal including a tablet computer.
[0103] It can be understood that the contents of the above method embodiments are all applicable to the present device embodiments, the functions specifically implemented by the present device embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0104] See also Figure 4 , Figure 4 The hardware structure of an electronic device of another embodiment is illustrated, and the electronic device includes:
[0105] The processor 901 may be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application;
[0106] The memory 902 can be implemented in the form of a read-only memory (ROM), a static storage device, a dynamic storage device, or a random access memory (RAM). The memory 902 can store an operating system and other application programs. When the technical solution provided in the embodiment of this specification is implemented by software or firmware, the relevant program code is stored in the memory 902, and the processor 901 calls and executes the glass production management method of the embodiment of this application;
[0107] Input / output interface 903, used to implement information input and output;
[0108] Communication interface 904, used to realize communication interaction between the device and other devices, which can be realized by wired mode (such as USB, network cable, etc.) or wireless mode (such as mobile network, WIFI, Bluetooth, etc.);
[0109] A bus 905 that transmits information between various components of the device (e.g., the processor 901, the memory 902, the input / output interface 903, and the communication interface 904);
[0110] The processor 901 , the memory 902 , the input / output interface 903 and the communication interface 904 are connected to each other in communication within the device via a bus 905 .
[0111] An embodiment of the present application further provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the above-mentioned glass production management method is implemented.
[0112] It can be understood that the contents of the above method embodiments are all applicable to the present storage medium embodiments, the functions specifically implemented by the present storage medium embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0113] The memory, as a non-transient computer-readable storage medium, can be used to store non-transient software programs and non-transient computer executable programs. In addition, the memory may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0114] The embodiments of the present application provide a glass production management method, device, electronic device and storage medium, which determine a number of candidate glass production tasks from a plurality of glass production tasks according to patch task information, determine a target glass production task from a plurality of candidate glass production tasks according to the task insertion optimization rate corresponding to each candidate glass production task, sort tasks according to the processing priority corresponding to the patch task information, the task insertion optimization rate corresponding to the target glass production task and the production optimization rate corresponding to the remaining glass production tasks, determine the execution order of the glass production tasks, and manage glass production according to the execution order of the glass production tasks. The embodiments of the present application can realize the insertion order production of glass patch orders, realize intelligent glass production management, improve the efficiency of glass production management, reduce the loss of glass raw materials, and reduce the cost of glass production.
[0115] The embodiments described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. Those skilled in the art will appreciate that with the evolution of technology and the emergence of new application scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0116] Those skilled in the art will appreciate that the technical solutions shown in the figures do not constitute a limitation on the embodiments of the present application, and may include more or fewer steps than shown in the figures, or a combination of certain steps, or different steps.
[0117] The device embodiments described above are merely illustrative, and the units described as separate components may or may not be physically separated, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0118] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.
[0119] The terms "first", "second", "third", "fourth", etc. (if any) in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0120] It should be understood that in the present application, "at least one (item)" means one or more, and "plurality" means two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.
[0121] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the above units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0122] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0123] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0124] It should be appreciated that embodiments of the present invention may be implemented or enforced by computer hardware, a combination of hardware and software, or by computer instructions stored in a non-transitory computer-readable memory. The method may be implemented in a computer program using standard programming techniques including a non-transitory computer-readable storage medium configured with a computer program, wherein the storage medium so configured causes the computer to operate in a specific and predefined manner - according to the methods and drawings described in the specific embodiments. Each program may be implemented in a high-level procedural or object-oriented programming language to communicate with a computer system. However, if desired, the program may be implemented in an assembly or machine language. In any case, the language may be a compiled or interpreted language. In addition, the program may be run on a programmed ASIC for this purpose.
[0125] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including multiple instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, referred to as ROM), random access memory (Random Access Memory, referred to as RAM), disk or optical disk and other media that can store programs.
[0126] The preferred embodiments of the present application are described above with reference to the accompanying drawings, but the scope of the rights of the present application is not limited thereto. Any modification, equivalent substitution and improvement made by a person skilled in the art without departing from the scope and essence of the present application should be within the scope of the rights of the present application.
Claims
1. A glass production management method, characterized in that: The method comprises the following steps: Obtain information on multiple glass production tasks and patch tasks to be inserted; According to the patch task information, a number of candidate glass production tasks are determined from the multiple glass production tasks, and the task insertion optimization rate corresponding to each of the candidate glass production tasks is calculated, wherein the task insertion optimization rate is the production optimization rate of the candidate glass production task when the patch task information is inserted into the candidate glass production task; According to the task insertion optimization rate corresponding to each of the candidate glass production tasks, a target glass production task is determined from the multiple candidate glass production tasks, and the patch task information is inserted into the target glass production task, wherein the target glass production task is the candidate glass production task with the highest task insertion optimization rate; Obtaining the processing priority corresponding to the patch task information; Obtaining the production optimization rates corresponding to the remaining glass production tasks, wherein the remaining glass production tasks are the glass production tasks except the target glass production task; According to the processing priority corresponding to the patch task information, the task insertion optimization rate corresponding to the target glass production task and the production optimization rates corresponding to the remaining glass production tasks, tasks are sorted, the execution order of glass production tasks is determined, and glass production management is performed according to the execution order of glass production tasks.
2. The glass production management method according to claim 1, characterized in that: The step of determining a plurality of candidate glass production tasks from the plurality of glass production tasks according to the patch task information and calculating the task insertion optimization rate corresponding to each of the candidate glass production tasks specifically includes: Determine patch production information corresponding to the glass patch according to the patch task information, wherein the patch production information at least includes a glass cutting area, a glass patch size, a glass type, and a glass thickness; Acquire glass production information corresponding to each of the glass production tasks, wherein the glass production information includes glass production type, glass production thickness, glass original sheet area, glass production cutting area, and sizes of several glass production redundant areas; Perform patch task insertion matching according to the patch production information and the glass production information corresponding to each of the glass production tasks, and determine a plurality of the candidate glass production tasks from the plurality of the glass production tasks; According to the patch production information and the glass production information corresponding to each of the candidate glass production tasks, the task insertion optimization rate corresponding to each of the candidate glass production tasks is calculated, and the task insertion optimization rate is calculated by the following formula: Q t =[(S1+S2) / S m ]*100%; Among them, Q t is the task insertion optimization rate, S1 is the glass cutting area included in the patch production information, S2 is the glass production cutting area included in the glass production information, S m It is the original glass area included in the glass production information.
3. The glass production management method according to claim 2, characterized in that: The step of performing patch task insertion matching according to the patch production information and the glass production information corresponding to each of the glass production tasks, and determining a plurality of candidate glass production tasks from the plurality of glass production tasks specifically includes: For each of the glass production tasks, when the glass type contained in the patch production information is consistent with the glass production type contained in the glass production information and the glass thickness contained in the patch production information is consistent with the glass production thickness contained in the glass production information, the glass production task is determined as a pre-selected glass production task; For each of the pre-selected glass production tasks, when the glass patch size included in the patch production information is smaller than the size of any of the glass production redundant areas included in the glass production information, the pre-selected glass production task is determined as the candidate glass production task.
4. The glass production management method according to claim 2, characterized in that: The obtaining of the production optimization rates corresponding to the remaining glass production tasks specifically includes: The glass production information corresponding to each of the glass production tasks is obtained, and the production optimization rate corresponding to each of the glass production tasks is calculated according to the glass original sheet area and the glass production cutting area contained in the glass production information, wherein the production optimization rate is calculated by the following formula: Q m =(S2 / S m )*100%; Among them, Q m is the production optimization rate, S2 is the glass production cutting area contained in the glass production information, S m It is the original glass area included in the glass production information.
5. The glass production management method according to claim 2, characterized in that: When performing the task insertion optimization rate corresponding to each of the candidate glass production tasks, determining a target glass production task from a plurality of the candidate glass production tasks, and inserting the patch task information into the target glass production task, the step further includes: When the task insertion optimization rate of the target glass production task is less than a given optimization rate specified threshold, a glass patch task is generated according to the patch production information, the glass patch task is determined as the target glass production task, and the patch production optimization rate corresponding to the glass patch task is determined as the task insertion optimization rate corresponding to the target glass production task, wherein the patch production optimization rate is calculated by the following formula: Q p =(S1 / S p )*100%; Among them, Q p is the patch production optimization rate, S1 is the glass cutting area included in the patch production information, S p The glass patch size is included in the patch production information.
6. The glass production management method according to claim 5, characterized in that: The obtaining of the processing priority corresponding to the patch task information specifically includes: Obtaining an urgency level indicator corresponding to the patch task information, and determining the processing priority level according to the urgency level indicator; When the urgency level indicates that the patch task needs to be processed urgently, the processing priority is determined as the first priority; otherwise, the processing priority is determined as the second priority.
7. The glass production management method according to claim 6, characterized in that: The step of sorting tasks according to the processing priority corresponding to the patch task information, the task insertion optimization rate corresponding to the target glass production task, and the production optimization rates corresponding to the remaining glass production tasks, determining the execution order of the glass production tasks, and performing glass production management according to the execution order of the glass production tasks specifically includes: When the processing priority is the first priority, the target glass production task is determined as the glass production task to be processed first, and the tasks are sorted according to the production optimization rates corresponding to the remaining glass production tasks to determine the task execution order corresponding to the remaining glass production tasks; When the processing priority is the second priority, tasks are sorted according to the task insertion optimization rate corresponding to the target glass production task and the production optimization rates corresponding to the remaining glass production tasks, to determine the task execution order corresponding to the target glass production task and the task execution order corresponding to the remaining glass production tasks.
8. A glass production management device, characterized in that: The device comprises: The first module is used to obtain information on multiple glass production tasks and patch tasks to be inserted; The second module is used to determine a number of candidate glass production tasks from the multiple glass production tasks according to the patch task information, and calculate the task insertion optimization rate corresponding to each of the candidate glass production tasks, wherein the task insertion optimization rate is the production optimization rate of the candidate glass production task when the patch task information is inserted into the candidate glass production task; The third module is used to determine a target glass production task from the plurality of candidate glass production tasks according to the task insertion optimization rate corresponding to each of the candidate glass production tasks, and insert the patch task information into the target glass production task, wherein the target glass production task is the candidate glass production task with the highest task insertion optimization rate; The fourth module is used to obtain the processing priority corresponding to the patch task information; A fifth module is used to obtain the production optimization rate corresponding to each of the remaining glass production tasks, wherein the remaining glass production tasks are each of the glass production tasks except the target glass production task; The sixth module is used to sort tasks according to the processing priority corresponding to the patch task information, the task insertion optimization rate corresponding to the target glass production task and the production optimization rates corresponding to the remaining glass production tasks, determine the execution order of glass production tasks, and manage glass production according to the execution order of the glass production tasks.
9. An electronic device, characterized in that: The electronic device comprises a memory and a processor, the memory stores a computer program, and the processor implements the glass production management method according to any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the glass production management method according to any one of claims 1 to 7 is implemented.