Permeation promoting structure for soft soil foundation and construction method thereof

By designing a seepage-promoting structure for soft soil foundations, including the main drainage pipe, side drainage pipe and sand and gravel seepage-promoting trough, the problem of rainwater accumulation caused by poor water permeability of soft soil is solved, deep penetration of water accumulation is achieved, and the stability of the building is improved.

CN119553767APending Publication Date: 2025-03-04SOUTHWEST JIAOTONG UNIV +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411582336.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-07
Publication Date
2025-03-04

AI Technical Summary

Technical Problem

Poor water permeability of soft soil causes rainwater to accumulate in the shallow layer of the soft soil foundation, affecting the stability of the building.

Method used

A seepage-promoting structure is designed, including the main drainage pipe, side drainage pipe and sand and gravel seepage trough. Through the cooperation of the sliding pipe and the telescopic protective sleeve, the main drainage pipe and the side drainage pipe can be stably inserted into the depths of the soft soil foundation and promote water penetration.

Benefits of technology

Effectively share the pressure of the main drainage pipe, promote the penetration of accumulated water into the deep soft soil foundation, avoid excessive accumulation of water in the shallow layer of soft soil foundation, improve building stability, and reduce resistance and damage to the equipment during use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119553767A_ABST
    Figure CN119553767A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of constructional engineering, and discloses a permeation promoting structure for a soft soil foundation and a construction method thereof.The permeation promoting structure comprises a permeation promoting mechanism, the permeation promoting mechanism further comprises a main drainage pipe, a side drainage pipe is slidably connected to the inner wall of the main drainage pipe, and when the main drainage pipe is inserted downwards, a sliding pipe firstly makes contact with the bottom face of a hole; then, the main drainage pipe slides downwards along with the outer surface of the sliding pipe, the telescopic protection sleeve and the telescopic spring are contracted at the same time, and it is avoided that the main drainage pipe slides downwards due to the fact that surrounding soil and broken stone influence the main drainage pipe, and when the main drainage pipe faces downwards, the conical head makes contact with the side drainage pipe and reversely pushes the side drainage pipe to stretch out and be inserted into the deep position of the soft soil foundation; pressure is shared by the main drainage pipe, accumulated water in the main drainage pipe permeates to the periphery of the deep position of the soft soil foundation, and the situation that due to too much rainwater and too large pressure of the main drainage pipe, accumulated water in the main drainage pipe cannot be drained to the bottom in time, accumulated water in the shallow position of the soft soil foundation is too much, and buildings on the soft soil foundation are affected is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering equipment, in particular to a seepage-promoting structure for soft soil foundation and a construction method thereof. Background Art

[0002] Soft soil refers to fine-grained soil deposited in coastal areas, lakes, valleys, and riverbanks with high natural water content, large porosity, high compressibility, and low shear strength. It has the characteristics of high natural water content, large natural porosity, high compressibility, low shear strength, small consolidation coefficient, long consolidation time, high sensitivity, high disturbance, poor permeability, complex layered distribution of soil layers, and large differences in physical and mechanical properties between layers.

[0003] Since soft soil has the characteristic of poor water permeability, in rainy weather, rainwater tends to accumulate in the shallow layer of the soft soil foundation and is not easy to diffuse into the deep layer of the soft soil foundation, thereby increasing the porosity and compressibility of the soft soil, affecting the stability of the buildings on the soft soil foundation. In response to the above problems, the following solutions are proposed. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a seepage promotion structure for soft soil foundation, including a seepage promotion mechanism, the seepage promotion mechanism also includes a main drainage pipe, a side drainage pipe is slidably connected to the inner wall of the main drainage pipe, and a sand and gravel seepage promotion groove is fixedly connected to the top of the main drainage pipe;

[0005] The anti-blocking mechanism includes a hydraulic groove 1 provided on the inner wall of the side drain pipe, a clamping spring fixedly connected to the inner wall of the main drain pipe, and a sliding block slidably connected to the inner wall of the main drain pipe;

[0006] The stirring mechanism comprises two hydraulic grooves arranged on the inner wall of the side drainage pipe, a fixed block is fixedly connected to the inner wall of the main drainage pipe, and a push rod is fixedly connected to the outer wall of the fixed block.

[0007] Preferably, the infiltration promoting mechanism also includes a telescopic protective sleeve fixedly connected to the outer wall of the main drain pipe, a sliding tube is slidably connected to the inner wall of the main drain pipe, the outer wall of the sliding tube is fixedly connected to the inner wall of the telescopic protective sleeve, a telescopic spring is fixedly connected to the outer wall of the sliding tube, and the outer wall of the telescopic spring is fixedly connected to the bottom of the main drain pipe. The telescopic protective sleeve can prevent the main drain pipe from sliding downward with the sliding pipe, thereby preventing the soil and gravel around the hole from adhering to the outer surface of the sliding pipe and affecting the downward sliding of the main drain pipe. The telescopic spring ensures that the main drain pipe will continue to move downward when the sliding pipe touches the bottom, and will squeeze the side drain pipe to extend outward, thereby preventing the side drain pipe from extending outward prematurely due to gravel protrusions in the middle of the downward movement, so that the device cannot reach the designated position, thereby affecting the normal use of the equipment.

[0008] Preferably, the infiltration promoting mechanism also includes a flow slot 1 provided on the outer wall of the sliding tube, a conical head is fixedly connected to the top of the sliding tube, and a flow slot 2 is provided on the outer wall of the conical head. The sliding tube contacts the bottom when the main drain pipe is inserted downward, and the side drain pipe is pushed upward to extend outward by its reaction force. A hole is first drilled in advance at the position where the main drain pipe needs to be inserted, and then the main drain pipe is inserted into the pre-drilled hole. When the main drain pipe is inserted downward, the sliding tube at the bottom of the main drain pipe first contacts the bottom surface of the hole, and then the main drain pipe slides downward along with the outer surface of the sliding tube. At this time, the telescopic protective cover and the telescopic spring contract at the same time to prevent the surrounding soil and gravel from affecting the downward sliding of the main drain pipe. When the main drain pipe is downward The conical head on the top of the sliding pipe contacts the bottom of the side drain pipe, and then the side drain pipe is pushed back to extend outward and inserted into the deep of the soft soil foundation, so that it can share a certain pressure for the main drain pipe in the rainy season, and the accumulated water in the main drain pipe can penetrate to the surrounding areas deep in the soft soil foundation, avoiding excessive pressure on the main drain pipe due to excessive rain, resulting in the failure of the accumulated water inside the main drain pipe to be discharged to the bottom in time, thereby causing excessive water accumulation in the shallow layer of the soft soil foundation, which has a certain impact on the buildings on the soft soil foundation. At the same time, the side drain pipe is extended outward from the bottom of the hole, avoiding the bending or damage of the side drain pipe due to the protruding gravel and debris inside the hole when the side drain pipe is inserted downward into the main drain pipe, thereby affecting the overall use effect.

[0009] Preferably, the anti-clogging mechanism also includes a sliding plate slidably connected to the inner wall of the side drain pipe, the top of the sliding plate is slidably connected to the inner wall of the main drain pipe, the bottom of the clamping spring is fixedly connected to the top of the sliding block, and the bottom of the sliding block is slidably connected to the top of the side drain pipe. When the side drain pipe extends outward to the maximum value, the sliding block pops up downward to push the sliding plate, and an L-shaped partition is provided. When the side drain pipe extends outward to the point where the sliding block is in full contact with the sliding plate, the sliding block is acted upon by the clamping spring to pop up downward and squeeze the sliding plate. Downward, the hydraulic oil inside the hydraulic groove is squeezed downward, and in turn pushes the piston plate 1 upward. When the piston plate 1 moves upward, it pushes the L-shaped partition on its top to extend outward. After the upper and lower L-shaped partitions extend outward, the originally closed water outlet holes on the outside of the side drain pipe open, so that the side drain pipe can operate normally, and the infiltration of accumulated water is promoted, which avoids the blockage of the inner wall of the side drain pipe due to the surrounding soil when the side drain pipe is extended outward, thereby affecting the effect of the side drain pipe to drain water outward, and reducing the infiltration efficiency of the overall pipeline.

[0010] Preferably, the anti-clogging mechanism also includes a piston plate slidably connected to the inner wall of the side drain pipe, an L-shaped partition is slidably connected to the inner wall of the side drain pipe, the outer wall of the L-shaped partition is fixedly connected to the top of the piston plate 1, and the top of the L-shaped partition is slidably connected to the inner wall of the main drain pipe. Utilizing the above-mentioned characteristics that the side drain pipe and the L-shaped partition are forced to extend outward, when the main drain pipe is inserted downward, the side drain pipe slides along the outer surface of the sliding pipe, so that the conical head at the top of the sliding pipe pushes it upward to extend outward, and the L-shaped partition is a sliding block that pops out downward to squeeze the sliding plate, so that the hydraulic oil in the hydraulic groove 1 is pushed through the piston plate 1 It extends outward, and after the side drainage pipe and the L-shaped baffle extend outward, they will be inserted into the deep part of the soft soil foundation. Compared with the shallow part of the soft soil foundation, the deep part of the soft soil foundation has a higher degree of consolidation, lower compressibility and permeability, stronger shear strength and more stable engineering properties. After the side drainage pipe and the L-shaped baffle are inserted outward into the deep part of the soft soil foundation, the entire infiltration promotion device will be more firmly inserted into the soft soil foundation at a set position, avoiding the shifting and tilting of the position of the entire device due to the looseness of the middle and shallow parts of the soft soil foundation with long-term use, affecting its normal use and reducing the infiltration promotion efficiency.

[0011] Preferably, the stirring mechanism also includes a piston plate 2 fixedly connected to the outer wall of the push rod, the outer wall of the piston plate 2 is slidably connected to the inner wall of the side drain pipe, the outer wall of the fixed block is slidably connected to the inner wall of the side drain pipe, the outer wall of the push rod is slidably connected to the inner wall of the side drain pipe, the inner wall of the side drain pipe is rotatably connected with a connecting shaft, the outer wall of the connecting shaft is fixedly connected with rotating teeth, the outer wall of the rotating teeth is rotatably connected to the inner wall of the side drain pipe, the push rod can pull the hydraulic oil inside the hydraulic groove 2 to move through the piston plate 2, and when the hydraulic oil moves, the rotating teeth are squeezed by the hydraulic oil and rotate inside the side drain pipe with the connecting shaft as the axis, thereby providing necessary power support for the operation of subsequent components.

[0012] Preferably, the stirring mechanism also includes a circular partition rotatably connected to the outer wall of the connecting shaft, the outer wall of the circular partition is fixedly connected to the inner wall of the side drain pipe, a belt is sleeved on the outer wall of the connecting shaft, a U-shaped protective sleeve is fixedly connected to the outer wall of the side drain pipe, a stirring column is rotatably connected to the inner wall of the U-shaped protective sleeve, and a belt is sleeved on the outer wall of the stirring column. Utilizing the characteristic that when the side drain pipe moves outward, the push rod pulls the hydraulic oil in the second hydraulic groove, a rotating tooth is provided, and when the side drain pipe moves outward, the push rod pulls the hydraulic oil in the second hydraulic groove through the second piston plate to move, and when the hydraulic oil moves, the rotating gear is driven The movable teeth rotate, thereby driving the connecting shaft to rotate. When the connecting shaft rotates, the stirring column is synchronously driven to rotate through the transmission of the belt, so that when the side drain pipe is extended outward, the stirring column continuously stirs the soil and gravel around the side drain pipe, making the soil and gravel around the side drain pipe looser, thereby reducing the pressure of the side drain pipe when it is extended outward, and also reducing the pressure of the L-shaped partition when it is extended outward, avoiding the soil and gravel around the side drain pipe being too compact, causing excessive resistance when the two are extended, resulting in damage or jamming when extended, thereby affecting the penetration efficiency of the equipment.

[0013] A construction method for a permeability-enhancing structure for a soft soil foundation comprises the following steps:

[0014] S1: First, a hole is drilled in advance at the position where the main drainage pipe is to be inserted, and then the main drainage pipe is inserted into the hole drilled in advance. When the main drainage pipe is inserted downward, the sliding pipe at the bottom of the main drainage pipe first contacts the bottom surface of the hole;

[0015] S2: Then, the main drainage pipe slides downward along the outer surface of the sliding pipe, and the telescopic protective cover and the telescopic spring shrink at the same time to prevent the surrounding soil and gravel from affecting the downward sliding of the main drainage pipe;

[0016] S3: When the main drain pipe is downward, the conical head on the top of the sliding pipe contacts the bottom of the side drain pipe, and then pushes the side drain pipe outward and inserts it into the depth of the soft soil foundation.

[0017] The present invention has the following beneficial effects:

[0018] (1) The present invention utilizes the characteristic that when the main drain pipe is inserted downward, the sliding pipe contacts the bottom and is pushed upward by its reaction force to extend the side drain pipe outward. First, a hole is drilled in advance at the position where the main drain pipe needs to be inserted, and then the main drain pipe is inserted into the pre-drilled hole. When the main drain pipe is inserted downward, the sliding pipe at the bottom of the main drain pipe first contacts the bottom surface of the hole, and then the main drain pipe slides downward along with the outer surface of the sliding pipe. At this time, the telescopic protective sleeve and the telescopic spring are contracted at the same time to prevent the surrounding soil and gravel from affecting the downward sliding of the main drain pipe. When the main drain pipe is downward, the conical head at the top of the sliding pipe contacts the bottom of the side drain pipe, and then pushes back. The side drain pipe extends outward and is inserted deep into the soft soil foundation, so that it can share a certain amount of pressure for the main drain pipe during the rainy season, and the accumulated water in the main drain pipe can penetrate to the surrounding areas deep in the soft soil foundation, to avoid excessive pressure in the main drain pipe due to excessive rain, which can cause the accumulated water inside the main drain pipe to fail to be discharged to the bottom in time, thereby causing excessive accumulation of water in the shallow layer of the soft soil foundation, which has a certain impact on the buildings on the soft soil foundation. At the same time, the side drain pipe extends outward from the bottom of the hole, to avoid the side drain pipe being bent or damaged by the protruding gravel and debris inside the hole when the main drain pipe is inserted downward, thereby affecting the overall use effect.

[0019] (2) The present invention utilizes the characteristic that when the side drain pipe is extended outward to the maximum value, the sliding block pops up downward and pushes the sliding plate, and sets an L-shaped partition. When the side drain pipe is extended outward and extends to the point where the sliding block is in full contact with the sliding plate, the sliding block is acted upon by the clamping spring to pop up downward and squeeze the sliding plate downward, so that the hydraulic oil inside the hydraulic tank 1 is squeezed downward, and in turn pushes the piston plate 1 upward to move upward. When the piston plate 1 moves upward, it pushes the L-shaped partition on its top to extend outward. After the upper and lower L-shaped partitions extend outward, the water outlet holes on the outer side of the side drain pipe that were originally closed open, so that the side drain pipe can operate normally, promoting the infiltration of accumulated water, and avoiding the side drain pipe's inner wall being blocked by the surrounding soil when it is extended outward, thereby affecting the side drain pipe's drainage effect and reducing the overall infiltration efficiency of the pipeline.

[0020] (3) The present invention utilizes the above-mentioned characteristics that the side drain pipe and the L-shaped partition are forced to extend outward. When the main drain pipe is inserted downward, the side drain pipe slides along with the outer surface of the sliding pipe, so that the conical head on the top of the sliding pipe pushes it upward to extend outward, and the L-shaped partition is a sliding block that pops out downward to squeeze the sliding plate, so that the hydraulic oil inside the hydraulic tank is pushed outward through the piston plate. After the side drain pipe and the L-shaped partition are extended outward, they will be inserted into the deep part of the soft soil foundation. Compared with the shallow part of the soft soil foundation, the deep part of the soft soil foundation has a higher degree of consolidation, lower compressibility and permeability, stronger shear strength and more stable engineering properties. After the side drain pipe and the L-shaped partition are inserted outward into the deep part of the soft soil foundation, the entire infiltration enhancement device will be more firmly inserted into the soft soil foundation at a set position, avoiding the displacement and tilting of the position of the entire device due to the looseness of the middle and shallow parts of the soft soil foundation with long-term use, affecting its normal use and reducing the infiltration enhancement efficiency.

[0021] (4) The present invention utilizes the characteristic that when the side drain pipe moves outward, the push rod pulls the hydraulic oil in the second hydraulic groove to set a rotating tooth. When the side drain pipe moves outward, the push rod pulls the hydraulic oil in the second hydraulic groove through the second piston plate to move. When the hydraulic oil moves, the rotating tooth is driven to rotate, and then the connecting shaft is driven to rotate. When the connecting shaft rotates, the stirring column is synchronously driven to rotate through the transmission of the belt, so that when the side drain pipe is extended outward, the stirring column continuously stirs the soil and gravel around the side drain pipe, making the soil and gravel around the side drain pipe looser, thereby reducing the pressure of the side drain pipe when it is extended outward, and also reducing the pressure of the L-shaped partition when it is extended outward, avoiding the soil and gravel around the side drain pipe being too compact, resulting in excessive resistance when the two are extended, resulting in damage or jamming when extended, thereby affecting the penetration efficiency of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0023] Figure 1 It is a schematic diagram of the internal components of the overall structure of the present invention;

[0024] Figure 2 It is a schematic diagram of the penetration-enhancing mechanism of the present invention;

[0025] Figure 3 It is a schematic diagram of the internal components of the penetration-enhancing mechanism of the present invention;

[0026] Figure 4For the present invention Figure 3 A is an enlarged schematic diagram;

[0027] Figure 5 This is a schematic diagram of the internal components of the anti-blocking mechanism of the present invention;

[0028] Figure 6 For the present invention Figure 5 A magnified schematic diagram of B;

[0029] Figure 7 It is a schematic diagram of the internal components of the stirring mechanism of the present invention;

[0030] Figure 8 For the present invention Figure 7 A magnified schematic diagram of middle C;

[0031] Fig. 9 It is a schematic diagram of the working process of the present invention.

[0032] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0033] In the figure: 1. infiltration promoting mechanism; 101. main drainage pipe; 102. side drainage pipe; 103. sand and gravel infiltration promoting groove; 104. telescopic protective cover; 105. sliding tube; 106. telescopic spring; 107. circulation slot one; 108. conical head; 109. circulation slot two; 2. anti-blocking mechanism; 201. hydraulic slot one; 202. clamping spring; 203. sliding block; 204. sliding plate; 205. piston plate one; 206. L-shaped partition; 3. stirring mechanism; 301. hydraulic slot two; 302. fixed block; 303. push rod; 304. piston plate two; 305. connecting shaft; 306. rotating teeth; 307. circular partition; 308. belt; 309. U-shaped protective cover; 310. stirring column. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] For example, see Figure 1 - Figure 4 The present invention is a seepage-promoting structure for soft soil foundation, comprising a seepage-promoting mechanism 1, wherein the seepage-promoting mechanism 1 further comprises a main drainage pipe 101, a side drainage pipe 102 is slidably connected to the inner wall of the main drainage pipe 101, and a sandstone seepage-promoting groove 103 is fixedly connected to the top of the main drainage pipe 101;

[0036] The anti-blocking mechanism 2 includes a hydraulic groove 201 provided on the inner wall of the side drain pipe 102, a clamping spring 202 is fixedly connected to the inner wall of the main drain pipe 101, and a sliding block 203 is slidably connected to the inner wall of the main drain pipe 101;

[0037] The stirring mechanism 3 includes a hydraulic groove 301 provided on the inner wall of the side drain pipe 102 , a fixing block 302 is fixedly connected to the inner wall of the main drain pipe 101 , and a push rod 303 is fixedly connected to the outer wall of the fixing block 302 .

[0038] The infiltration promoting mechanism 1 also includes a telescopic protective sleeve 104 fixedly connected to the outer wall of the main drainage pipe 101, a sliding tube 105 is slidably connected to the inner wall of the main drainage pipe 101, the outer wall of the sliding tube 105 is fixedly connected to the inner wall of the telescopic protective sleeve 104, and a telescopic spring 106 is fixedly connected to the outer wall of the sliding tube 105, and the outer wall of the telescopic spring 106 is fixedly connected to the bottom of the main drainage pipe 101. The telescopic protective sleeve 104 prevents the main drainage pipe 101 from sliding downward with the sliding tube 105 due to the adhesion of soil and gravel around the hole to the outer surface of the sliding tube 105, thereby affecting the downward sliding of the main drainage pipe 101. The telescopic spring 106 ensures that when the sliding tube 105 touches the bottom, the main drainage pipe 101 continues to move downward to squeeze the side drainage pipe 102 to extend outward, thereby preventing the side drainage pipe 102 from extending outward prematurely due to gravel protrusions in the middle of the downward movement, so that the device cannot reach the specified position, thereby affecting the normal use of the equipment.

[0039] The infiltration promoting mechanism 1 also includes a flow slot 107 provided on the outer wall of the sliding tube 105, a conical head 108 is fixedly connected to the top of the sliding tube 105, and a flow slot 2 109 is provided on the outer wall of the conical head 108. When the main drainage pipe 101 is inserted downward, the sliding tube 105 contacts the bottom, and the side drainage pipe 102 is pushed upward to extend outward by its reaction force. First, a hole is drilled in advance at the position where the main drainage pipe 101 needs to be inserted, and then the main drainage pipe 101 is inserted into the pre-drilled hole. When the main drainage pipe 101 is inserted downward, the sliding tube 105 at the bottom of the main drainage pipe 101 first contacts the bottom surface of the hole, and then the main drainage pipe 101 slides downward along with the outer surface of the sliding tube 105. At this time, the telescopic protective cover 104 and the telescopic spring 106 shrink at the same time to prevent the surrounding soil and gravel from affecting the downward sliding of the main drainage pipe 101. When the main drain pipe 101 is downward, the conical head 108 on the top of the sliding pipe 105 contacts the bottom of the side drain pipe 102, and then pushes the side drain pipe 102 outward and inserts it into the deep of the soft soil foundation, so that it can share a certain pressure for the main drain pipe 101 in the rainy season, and the accumulated water in the main drain pipe 101 penetrates to the surrounding areas of the deep soft soil foundation, avoiding excessive pressure in the main drain pipe 101 due to excessive rainwater, resulting in the failure of the accumulated water inside the main drain pipe 101 to be discharged to the bottom in time, thereby causing excessive water accumulation in the shallow layer of the soft soil foundation, which has a certain impact on the buildings on the soft soil foundation. At the same time, the side drain pipe 102 is extended outward at the bottom of the hole, avoiding the side drain pipe 102 from being bent or damaged due to the protruding gravel and debris inside the hole when the main drain pipe 101 is inserted downward, thereby affecting the overall use effect.

[0040] For example 2, please refer to Figure 5 - Fig. 9The present invention is a seepage-promoting structure for soft soil foundation. On the basis of the first embodiment, the anti-blocking mechanism 2 also includes a sliding plate 204 slidably connected to the inner wall of the side drainage pipe 102. The top of the sliding plate 204 is slidably connected to the inner wall of the main drainage pipe 101. The bottom of the clamping spring 202 is fixedly connected to the top of the sliding block 203. The bottom of the sliding block 203 is slidably connected to the top of the side drainage pipe 102. When the side drainage pipe 102 extends outward to the maximum value, the sliding block 203 pops up downward to push the sliding plate 204. An L-shaped partition 206 is set. When the side drainage pipe 102 extends outward and extends to the point where the sliding block 203 is completely in contact with the sliding plate 204, the sliding block 203 is Due to the action of the clamping spring 202, it pops up downward and squeezes the sliding plate 204 downward, so that the hydraulic oil inside the hydraulic groove 201 is squeezed downward, and in turn pushes the piston plate 205 upward to move upward. When the piston plate 205 moves upward, it pushes the L-shaped partition 206 on its top to extend outward. After the upper and lower L-shaped partitions 206 extend outward, the originally closed water outlet holes on the outside of the side drain pipe 102 open, so that the side drain pipe 102 can operate normally, and the infiltration of accumulated water is promoted, which avoids the side drain pipe 102 from being blocked by the surrounding soil when it is extended outward, thereby affecting the effect of the side drain pipe 102 to drain water outward, and reducing the infiltration efficiency of the overall pipeline.

[0041] The anti-clogging mechanism 2 also includes a piston plate 205 slidably connected to the inner wall of the side drain pipe 102, an L-shaped partition 206 is slidably connected to the inner wall of the side drain pipe 102, the outer wall of the L-shaped partition 206 is fixedly connected to the top of the piston plate 205, and the top of the L-shaped partition 206 is slidably connected to the inner wall of the main drain pipe 101. By utilizing the above-mentioned characteristics that the side drain pipe 102 and the L-shaped partition 206 are forced to extend outward, when the side drain pipe 102 is inserted downward into the main drain pipe 101, the outer surface of the sliding pipe 105 slides, so that the conical head 108 at the top of the sliding pipe 105 pushes it upward to extend outward, and the L-shaped partition 206 is the sliding block 203 that pops up downward to squeeze the sliding plate 204, so that the liquid The hydraulic oil inside the pressure groove 201 pushes it outward through the piston plate 205. After the side drainage pipe 102 and the L-shaped partition 206 are extended outward, they will be inserted into the deep part of the soft soil foundation. Compared with the shallow part of the soft soil foundation, the deep part of the soft soil foundation has a higher degree of consolidation, lower compressibility and permeability, stronger shear strength and more stable engineering properties. After the side drainage pipe 102 and the L-shaped partition 206 are inserted outward into the deep part of the soft soil foundation, the entire infiltration enhancement device will be more firmly inserted into the soft soil foundation at a set position, avoiding the position of the entire device being shifted and tilted due to the looseness of the middle and shallow parts of the soft soil foundation with long-term use, affecting its normal use and reducing the infiltration enhancement efficiency.

[0042] The stirring mechanism 3 also includes a piston plate 2 304 fixedly connected to the outer wall of the push rod 303, the outer wall of the piston plate 2 304 is slidably connected to the inner wall of the side drain pipe 102, the outer wall of the fixed block 302 is slidably connected to the inner wall of the side drain pipe 102, the outer wall of the push rod 303 is slidably connected to the inner wall of the side drain pipe 102, the inner wall of the side drain pipe 102 is rotatably connected with a connecting shaft 305, the outer wall of the connecting shaft 305 is fixedly connected with a rotating tooth 306, the outer wall of the rotating tooth 306 is rotatably connected to the inner wall of the side drain pipe 102, the push rod 303 can pull the hydraulic oil inside the hydraulic groove 2 301 to move through the piston plate 2 304, when the hydraulic oil moves, the rotating tooth 306 is squeezed by the hydraulic oil, and rotates inside the side drain pipe 102 with the connecting shaft 305 as the axis, thereby providing necessary power support for the operation of subsequent components.

[0043] The stirring mechanism 3 also includes a circular partition 307 rotatably connected to the outer wall of the connecting shaft 305, the outer wall of the circular partition 307 is fixedly connected to the inner wall of the side drain pipe 102, a belt 308 is sleeved on the outer wall of the connecting shaft 305, a U-shaped protective sleeve 309 is fixedly connected to the outer wall of the side drain pipe 102, a stirring column 310 is rotatably connected to the inner wall of the U-shaped protective sleeve 309, and a belt 308 is sleeved on the outer wall of the stirring column 310. When the side drain pipe 102 moves outward, the push rod 303 pulls the hydraulic oil in the hydraulic groove 2 301 through the piston plate 2 304 to move. When the hydraulic oil moves, it drives the rotating gear 306 to rotate, and then drives the connecting shaft 305 to rotate. When the connecting shaft 305 rotates, it drives the stirring column 310 to rotate synchronously through the transmission of the belt 308, so that when the side drain pipe 102 is extended outward, the stirring column 310 continuously stirs the soil and gravel around the side drain pipe 102, making the soil and gravel around the side drain pipe 102 looser, thereby reducing the pressure of the side drain pipe 102 when it is extended outward, and also reducing the pressure of the L-shaped partition 206 when it is extended outward, avoiding the soil and gravel around the side drain pipe 102 being too compact, causing too much resistance when the two are extended, resulting in damage or jamming when extended, thereby affecting the penetration efficiency of the equipment.

[0044] The construction method of the soft soil foundation infiltration promoting device comprises the following steps:

[0045] S1: First, a hole is drilled in advance at the position where the main drainage pipe 101 is to be inserted, and then the main drainage pipe 101 is inserted into the hole drilled in advance. When the main drainage pipe 101 is inserted downward, the sliding pipe 105 at the bottom of the main drainage pipe 101 first contacts the bottom surface of the hole;

[0046] S2: Then, the main drainage pipe 101 slides downward along the outer surface of the sliding pipe 105, and the telescopic protective cover 104 and the telescopic spring 106 shrink at the same time to prevent the surrounding soil and gravel from affecting the downward sliding of the main drainage pipe 101;

[0047] S3: When the main drain pipe 101 is downward, the conical head 108 at the top of the sliding pipe 105 contacts the bottom of the side drain pipe 102, and then pushes the side drain pipe 102 outward and inserts it into the depth of the soft soil foundation.

[0048] A specific application of this embodiment is as follows: before use, a hole is drilled in advance at the position where the main drain pipe 101 needs to be inserted, and then the main drain pipe 101 is inserted into the pre-drilled hole. When the main drain pipe 101 is inserted downward, the sliding tube 105 at the bottom of the main drain pipe 101 first contacts the bottom surface of the hole, and then the main drain pipe 101 slides downward along the outer surface of the sliding tube 105. At this time, the telescopic protective cover 104 and the telescopic spring 106 are contracted at the same time to prevent the surrounding soil and gravel from affecting the downward sliding of the main drain pipe 101. When the main drain pipe 101 moves downward, the conical head 108 at the top of the sliding tube 105 contacts the bottom of the side drain pipe 102, and then pushes the side drain pipe 102 backward. The side drain pipe 102 extends outward and is inserted deep into the soft soil foundation, so that it can share a certain pressure for the main drain pipe 101 in the rainy season, and the accumulated water in the main drain pipe 101 can penetrate to the surrounding areas deep in the soft soil foundation, so as to avoid excessive pressure in the main drain pipe 101 due to excessive rainwater, resulting in the failure of timely discharge of the accumulated water inside the main drain pipe 101 to the bottom, thereby causing excessive accumulation of water in the shallow layer of the soft soil foundation, which has a certain impact on the buildings on the soft soil foundation. At the same time, the side drain pipe 102 extends outward at the bottom of the hole, so as to avoid the side drain pipe 102 from being bent or damaged due to the protruding gravel and debris inside the hole when the main drain pipe 101 is inserted downward, thereby affecting the overall use effect.

[0049] Taking advantage of the fact that when the side drain pipe 102 extends outward to the maximum, the sliding block 203 pops up downward and pushes the sliding plate 204, an L-shaped partition 206 is provided. When the side drain pipe 102 extends outward to the point where the sliding block 203 is in full contact with the sliding plate 204, the sliding block 203 is acted upon by the clamping spring 202 to pop up downward and squeeze the sliding plate 204 downward, so that the hydraulic oil in the hydraulic tank 201 is squeezed downward, and in turn pushes the piston plate 205 upward to move upward. When the piston plate 205 moves upward, it pushes the L-shaped partition 206 on its top to extend outward. After the upper and lower L-shaped partitions 206 extend outward, the originally closed water outlet holes on the outer side of the side drainage pipe 102 are opened, so that the side drainage pipe 102 can operate normally, promoting the infiltration of accumulated water, and avoiding the blockage of the inner wall of the side drainage pipe 102 due to the surrounding soil when the side drainage pipe 102 is extended outward, thereby affecting the drainage effect of the side drainage pipe 102 and reducing the infiltration efficiency of the entire pipeline. When the main drain pipe 101 is inserted downward, the side drain pipe 102 slides along with the outer surface of the sliding pipe 105, so that the conical head 108 on the top of the sliding pipe 105 pushes it upward to extend outward, and the L-shaped partition 206 is the sliding block 203 that pops up downward to squeeze the sliding plate 204, so that the hydraulic oil inside the hydraulic tank 1 201 pushes it outward through the piston plate 1 205. After the side drain pipe 102 and the L-shaped partition 206 extend outward, they will be inserted into the depth of the soft soil foundation, which is much deeper than the shallow soft soil foundation. The deep part of the soft soil foundation has a higher degree of consolidation, lower compressibility and permeability, stronger shear strength and more stable engineering properties. After the side drainage pipe 102 and the L-shaped partition 206 are inserted outward into the deep part of the soft soil foundation, the entire infiltration enhancement device can be more firmly inserted into the soft soil foundation at a set position, avoiding the looseness of the middle and shallow parts of the soft soil foundation. With long-term use, the position of the entire device is not shifted and tilted, affecting its normal use and reducing the infiltration efficiency.

[0050] Taking advantage of the fact that when the side drain pipe 102 moves outward, the push rod 303 pulls the hydraulic oil in the hydraulic groove 2 301 to move, a rotating tooth 306 is provided. When the side drain pipe 102 moves outward, the push rod 303 pulls the hydraulic oil in the hydraulic groove 2 301 through the piston plate 2 304 to move. When the hydraulic oil moves, the rotating tooth 306 is driven to rotate, thereby driving the connecting shaft 305 to rotate. When the connecting shaft 305 rotates, the agitating column 310 is synchronously driven to rotate through the transmission of the belt 308, so that the side drain pipe 102 moves outward. When the pipe 102 is extended outward, the stirring column 310 continuously stirs the soil and gravel around the side drainage pipe 102, making the soil and gravel around the side drainage pipe 102 looser, thereby reducing the pressure of the side drainage pipe 102 when it is extended outward, and also reducing the pressure of the L-shaped partition 206 when it is extended outward, avoiding the side drainage pipe 102 being damaged or stuck when extended because the soil and gravel around the side drainage pipe 102 are too compact, resulting in excessive resistance when the two are extended, thereby affecting the penetration efficiency of the equipment.

[0051] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A seepage promotion structure for soft soil foundation, comprising a seepage promotion mechanism (1), wherein the seepage promotion mechanism (1) further comprises a main drainage pipe (101), a side drainage pipe (102) is slidably connected to the inner wall of the main drainage pipe (101), and a sand and gravel seepage promotion groove (103) is fixedly connected to the top of the main drainage pipe (101), characterized in that: Also includes: An anti-blocking mechanism (2), the anti-blocking mechanism (2) comprising a hydraulic groove (201) provided on the inner wall of the side drainage pipe (102), a clamping spring (202) fixedly connected to the inner wall of the main drainage pipe (101), and a sliding block (203) slidably connected to the inner wall of the main drainage pipe (101); The stirring mechanism (3) comprises a hydraulic groove (301) provided on the inner wall of the side drainage pipe (102), a fixing block (302) being fixedly connected to the inner wall of the main drainage pipe (101), and a pushing rod (303) being fixedly connected to the outer wall of the fixing block (302).

2. The infiltration-promoting structure for soft soil foundation according to claim 1, characterized in that: The infiltration promoting mechanism (1) further comprises a telescopic protective sleeve (104) fixedly connected to the outer wall of the main drainage pipe (101); a sliding tube (105) is slidably connected to the inner wall of the main drainage pipe (101); the outer wall of the sliding tube (105) is fixedly connected to the inner wall of the telescopic protective sleeve (104); the outer wall of the sliding tube (105) is fixedly connected to a telescopic spring (106); the outer wall of the telescopic spring (106) is fixedly connected to the bottom of the main drainage pipe (101).

3. The infiltration-promoting structure for soft soil foundation according to claim 2, characterized in that: The permeation promoting mechanism (1) further comprises a first flow slot (107) provided on the outer wall of the sliding tube (105); a conical head (108) is fixedly connected to the top of the sliding tube (105); and a second flow slot (109) is provided on the outer wall of the conical head (108).

4. The infiltration-promoting structure for soft soil foundation according to claim 3, characterized in that: The anti-clogging mechanism (2) further comprises a sliding plate (204) slidably connected to the inner wall of the side drain pipe (102), the top of the sliding plate (204) being slidably connected to the inner wall of the main drain pipe (101), the bottom of the clamping spring (202) being fixedly connected to the top of the sliding block (203), and the bottom of the sliding block (203) being slidably connected to the top of the side drain pipe (102).

5. The infiltration-promoting structure for soft soil foundation according to claim 4, characterized in that: The anti-blocking mechanism (2) also includes a piston plate (205) slidably connected to the inner wall of the side drain pipe (102), an L-shaped partition (206) slidably connected to the inner wall of the side drain pipe (102), the outer wall of the L-shaped partition (206) is fixedly connected to the top of the piston plate (205), and the top of the L-shaped partition (206) is slidably connected to the inner wall of the main drain pipe (101).

6. The infiltration-promoting structure for soft soil foundation according to claim 5, characterized in that: The stirring mechanism (3) also includes a piston plate 2 (304) fixedly connected to the outer wall of the push rod (303); the outer wall of the piston plate 2 (304) is slidably connected to the inner wall of the side drain pipe (102); the outer wall of the fixed block (302) is slidably connected to the inner wall of the side drain pipe (102); the outer wall of the push rod (303) is slidably connected to the inner wall of the side drain pipe (102); the inner wall of the side drain pipe (102) is rotatably connected to a connecting shaft (305); the outer wall of the connecting shaft (305) is fixedly connected to a rotating tooth (306); the outer wall of the rotating tooth (306) is rotatably connected to the inner wall of the side drain pipe (102).

7. The infiltration-promoting structure for soft soil foundation according to claim 6, characterized in that: The stirring mechanism (3) further comprises a circular partition (307) rotatably connected to the outer wall of the connecting shaft (305); the outer wall of the circular partition (307) is fixedly connected to the inner wall of the side drainage pipe (102); a belt (308) is sleeved on the outer wall of the connecting shaft (305); a U-shaped protective sleeve (309) is fixedly connected to the outer wall of the side drainage pipe (102); a stirring column (310) is rotatably connected to the inner wall of the U-shaped protective sleeve (309); and a belt (308) is sleeved on the outer wall of the stirring column (310).

8. A construction method for a permeability-enhancing structure for soft soil foundation, using the device for permeability-enhancing structure for soft soil foundation according to claim 7, characterized in that: The following steps are included: S1: First, a hole is drilled in advance at the position where the main drainage pipe (101) is to be inserted, and then the main drainage pipe (101) is inserted into the hole drilled in advance. When the main drainage pipe (101) is inserted downward, the sliding pipe (105) at the bottom of the main drainage pipe (101) first contacts the bottom surface of the hole; S2: Then, the main drainage pipe (101) slides downward along the outer surface of the sliding pipe (105), and the telescopic protective cover (104) and the telescopic spring (106) shrink at the same time to prevent the surrounding soil and gravel from affecting the downward sliding of the main drainage pipe (101); S3: When the main drain pipe (101) is downward, the conical head (108) at the top of the sliding pipe (105) contacts the bottom of the side drain pipe (102), and then pushes the side drain pipe (102) outward and inserts it into the depth of the soft soil foundation.