Factory pipeline drainage power generation system
By designing a factory pipeline drainage power generation system, using the leaky shell and gear system to drive sewage power generation, and increasing the flow rate through the spiral pipe in the water diversion main pipe, the problem of low sewage water energy utilization in the existing technology is solved, and efficient sewage power generation efficiency is achieved.
Patent Information
- Application Number
- CN202411460518.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2025-03-04
AI Technical Summary
The existing sewage discharge power generation devices have a low utilization rate of water energy and a small amount of power generation. How to improve the utilization rate of sewage hydraulic power and power generation efficiency is a key issue.
A factory pipeline drainage power generation system is designed, including sewage pipes, water storage charging devices, water diversion main pipes, first generators and second generators. The sewage drives the gear system to rotate through the leaky shell, driving the generator to generate electricity. The spiral pipe in the water diversion main pipe increases the sewage flow rate and improves power generation efficiency.
By improving the hydraulic utilization rate of sewage, the power generation efficiency is significantly improved and the efficient utilization of sewage resources is achieved.
Smart Images

Figure CN119554175A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hydropower generation, and in particular to a factory pipeline drainage power generation system. Background Art
[0002] As the world's energy problems escalate dramatically and environmental pollution becomes increasingly serious, hydropower generation has received increasing attention for its environmental protection reasons.
[0003] The wastewater discharged by the factory must meet the discharge requirements before it can be discharged. Converting the factory wastewater hydropower into electrical energy can realize the reuse of water resources, which is conducive to the sustainable development of energy. The sewage discharge power generation device in the existing technology has a low water energy utilization rate and a small power generation capacity. It is particularly important to improve the hydraulic utilization rate of sewage and improve the power generation efficiency. Summary of the invention
[0004] The invention provides a factory pipeline drainage power generation system.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A factory pipeline drainage power generation system, comprising a sewage pipeline, a water storage charging device, a water diversion main, a first generator, a second generator, and a drainage main, wherein a water storage charging device is arranged at the bottom of the sewage pipeline, wherein the water storage charging device comprises a water storage tank, wherein the water storage tank is provided with a first slide rail, wherein the water storage tank is provided with a second slide rail, wherein the first slide rail is slidably connected to a water leakage shell, wherein the second slide rail is slidably connected to the water leakage shell, wherein the water leakage shell is hinged with a water baffle, wherein a first straight rod is fixed to one side of the water leakage shell, wherein a second straight rod is fixed to the other side of the water leakage shell, wherein a first rack is fixed to the first straight rod, wherein a second rack is fixed to the second straight rod, wherein a first rack is rotatably connected to the first rack in the water storage tank. A power generation gear, a second power generation gear is rotatably connected in the water storage tank, a third generator is fixed to the water storage tank, a fourth generator is fixed to the water storage tank, the rotating shaft of the third generator is fixedly connected to the first power generation gear, the rotating shaft of the fourth generator is fixedly connected to the second power generation gear, the first rack meshes with the first power generation gear, the second rack meshes with the second power generation gear, a support rod 1 is fixed to the water storage tank, a support rod 2 is fixed to the water storage tank, a first spring is fixed in the support rod 1, a second spring is fixed in the support rod 2, a support rod 3 is slidably connected to the support rod 1, a support rod 2 is slidably connected to the support rod 4, a water collecting oblique ring is fixed between the support rod 3 and the support rod 4, and the water storage tank is fixed with The support, a sensor is fixed in the water storage tank, the second straight rod is fixed with an induction gasket, the induction gasket triggers the sensor, the sensor transmits a signal, and the electric valve receives the signal to close or open, a water diversion main pipe is arranged at the bottom of the water storage tank, the water diversion main pipe is connected to the water storage tank, a first spiral pipe is fixed in the water diversion main pipe, a spiral groove is arranged in the first spiral pipe in a spiral shape, and the spiral groove can increase the flow rate of sewage in the first spiral pipe, a first generator is fixed in the water diversion main pipe, a power generation shell is fixed in the water diversion main pipe, one end of the first spiral pipe is connected to the inclined leakage plate, and the other end of the first spiral pipe is connected to the power generation shell, a spiral water transport plate is arranged in the power generation shell, and the power generation shell The first generator is rotatably connected to the first power generation blade, the rotating shaft of the first generator is fixedly connected to the first power generation blade, a second generator is fixed in the water diversion main pipe, a second spiral tube is arranged in the water diversion main pipe, a spiral groove is spirally arranged in the second spiral tube, and the spiral groove can increase the flow rate of sewage in the second spiral tube, a power generation shell two is fixed in the water diversion main pipe, a spiral water transport plate two is arranged in the second power generation shell, the second power generation shell is rotatably connected to the second power generation blade, the rotating shaft of the second generator is fixedly connected to the second power generation blade, one end of the second spiral tube is connected to the first power generation shell, and the other end of the second spiral tube is connected to the second power generation shell, and a drainage main pipe is fixed in the second power generation shell.
[0007] Furthermore, the sewage pipe is provided with an electric valve.
[0008] Furthermore, an inclined leakage plate is fixed inside the water diversion main pipe.
[0009] Furthermore, a drainage valve is provided on the drainage main pipe, and the drainage main pipe is connected to the second power generation shell.
[0010] Furthermore, the sensor transmits a signal and the electric valve receives the signal for the first time to close the sewage pipe and stop discharging sewage. The electric valve receives the signal for the second time to open the sewage pipe and continue discharging sewage.
[0011] Beneficial effects:
[0012] The present invention has a simple structure. The water storage and charging device, the first generator and the second generator improve the hydraulic utilization rate of sewage. The sewage pipe discharges sewage into the leaking shell. When the weight of the sewage in the leaking shell is greater than the spring force of the first spring and the second spring, the leaking shell begins to descend. When the weight of the sewage in the leaking shell is less than the spring force of the first spring and the second spring, the leaking shell begins to rise and reset. The descent or rise of the leaking shell drives the first rack and the second rack to synchronously descend or rise. The first rack engages with the first power generation gear to rotate, and the second rack engages with the second power generation gear to rotate. The rotation of the first power generation gear drives the third generator to generate electricity, and the rotation of the second power generation gear drives the fourth generator to generate electricity.
[0013] A spiral groove is spirally arranged in the first spiral tube, and the spiral groove can increase the flow rate of sewage in the first spiral tube. When the power generating fan blade rotates, the first generator starts to generate electricity. A spiral groove is spirally arranged in the second spiral tube, and the spiral groove can increase the flow rate of sewage in the first spiral tube. When the power generating fan blade rotates, the second generator starts to generate electricity. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The main view of the present invention is a schematic diagram of the full cross-section structure Figure 1 ;
[0015] Figure 2 The main view of the present invention is a schematic diagram of the full cross-section structure Figure 2 ;
[0016] Figure 3 For the present invention Figure 1 The main cross-section structure diagram of the medium water storage charging device Figure 1 ;
[0017] Figure 4 For the present invention Figure 1 The main cross-section structure diagram of the medium water storage charging device Figure 2 ;
[0018] Figure 5 For the present invention Figure 2 A schematic diagram of the top view of the full cross-section structure of the middle power generation shell;
[0019] Figure 6 For the present invention Figure 2Schematic diagram of the top view of the full cross-section structure of the middle power generation shell 2.
[0020] In the figure: 1 sewage pipe, 2 water storage charging device, 3 water diversion main pipe, 4 first generator, 5 second generator, 6 electric valve, 7 drainage main pipe, 8 drainage valve, 9 inclined leakage plate, 10 first spiral pipe, 11 power generation shell 1, 12 spiral water transport plate 1, 13 power generation fan blade 1, 14 second spiral pipe, 15 power generation shell 2, 16 spiral water transport plate 2, 17 power generation fan blade 2, 18 spiral groove;
[0021] 201 water storage tank, 202 first slide rail, 203 second slide rail, 204 water leakage shell, 205 water retaining plate, 206 first straight rod, 207 second straight rod, 208 first rack, 209 second rack, 210 first power generation gear, 211 second power generation gear, 212 third generator, 213 fourth generator, 214 support rod one, 215 support rod two, 216 first spring, 217 second spring, 218 support rod three, 219 support rod four, 220 water collecting oblique ring, 221 pillar, 222 sensor, 223 induction gasket. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0023] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0024] Reference Figure 1-6As shown, a factory pipeline drainage power generation system includes a sewage pipe 1, an electric valve 6, a water storage charging device 2, a water diversion main pipe 3, a first generator 4, a second generator 5, a drainage main pipe 7, and a drainage valve 8. The sewage pipe 1 is provided with a water storage charging device 2 at the bottom, and the sewage pipe 1 is provided with an electric valve 6. The water storage charging device 2 includes a water storage tank 201, and the water storage tank 201 is provided with a first slide rail 202. The water storage tank 201 is provided with a second slide rail 203. The positions of the first slide rail 202 and the second slide rail 203 are symmetrical about the vertical center line of the water storage tank 201. The first slide rail 202 is slidably connected to the leaking shell 204, and the second slide rail 203 is slidably connected to the leaking shell 204. The leaking shell 2 04 is hinged with a water baffle 205, a first straight rod 206 is fixed on one side of the water leakage shell 204, and a second straight rod 207 is fixed on the other side of the water leakage shell 204, the first straight rod 206 is fixed with a first rack 208, and the second straight rod 207 is fixed with a second rack 209, a first power generation gear 210 is rotatably connected in the water storage tank 201, and a second power generation gear 211 is rotatably connected in the water storage tank 201, a third generator 212 is fixed to the water storage tank 201, and a fourth generator 213 is fixed to the water storage tank 201, the rotating shaft of the third generator 212 is fixedly connected to the first power generation gear 210, and the rotating shaft of the fourth generator 213 is fixedly connected to the second power generation gear 211, and the first rack 208 meshes with the third power generation gear 210. A power generation gear 210, a second rack 209 meshes with a second power generation gear 211, a support rod 1 214 is fixed to the water storage tank 201, a support rod 2 215 is fixed to the water storage tank 201, a first spring 216 is fixed in the support rod 1 214, a second spring 217 is fixed in the support rod 2 215, the support rod 1 214 is slidably connected to a support rod 3 218, the support rod 2 215 is slidably connected to a support rod 4 219, a water collecting oblique ring 220 is fixed between the support rod 3 218 and the support rod 4 219, a pillar 221 is fixed to the water storage tank 201, a sensor 222 is fixed in the water storage tank 201, the second straight rod 207 is fixed to a sensing gasket 223, the sensing gasket 223 triggers the sensor 222, the sensor 222 transmits a signal. The electric valve 6 receives the signal for the first time to close the sewage pipe 1 and stop discharging sewage. The electric valve 6 receives the signal for the second time to open the sewage pipe 1 and continue to discharge sewage. A water diversion main pipe 3 is arranged at the bottom of the water storage tank 201. The water diversion main pipe 3 is connected to the water storage tank 201. An inclined leakage plate 9 is fixed in the water diversion main pipe 3. A first spiral tube 10 is fixed in the water diversion main pipe 3. A spiral groove 18 is spirally arranged in the first spiral tube 10. The spiral groove 18 can increase the flow rate of sewage in the first spiral tube 10. A first generator 4 is fixed in the water diversion main pipe 3. A power generation shell 11 is fixed in the water diversion main pipe 3. One end of the first spiral tube 10 is connected to the inclined leakage plate 9, and the other end of the first spiral tube 10 is connected to the power generation shell 11.The power generation housing 11 is provided with a spiral water transport plate 12, the power generation housing 11 is rotatably connected with a power generation blade 13, the rotating shaft of the first generator 4 is fixedly connected with the power generation blade 13, the second generator 5 is fixed in the water diversion main pipe 3, the second spiral pipe 14 is provided in the water diversion main pipe 3, the second spiral pipe 14 is spirally provided with a spiral groove 18, the spiral groove 18 can increase the flow rate of sewage in the second spiral pipe 14, the power generation housing 2 15 is fixed in the water diversion main pipe 3, the power generation housing 2 15 is provided with a spiral water transport plate 2 16, the power generation housing 2 15 is rotatably connected with a power generation blade 2 17, the rotating shaft of the second generator 5 is fixedly connected with the power generation blade 2 17, one end of the second spiral pipe 14 is connected with the first power generation pipe, and the other end of the second spiral pipe 14 is connected with the power generation housing 2 15, the water diversion main pipe 3 is fixed with a drainage main pipe 7, the drainage main pipe 7 is provided with a drainage valve 8, and the drainage main pipe 7 is connected with the power generation housing 2 15.
[0025] Reference Figure 1-6As shown, a factory pipeline drainage power generation system, when sewage is discharged, the sewage formed by the factory production flows into the leaking shell 204 through the sewage pipe 1, when the weight of the sewage in the leaking shell 204 is greater than the spring force of the first spring 216 and the second spring 217, the leaking shell 204 begins to descend, and the leaking shell 204 moves on the first slide rail 202 and the second slide rail 203, and the leaking shell 204 moves downward to drive the first straight rod 206 and the second straight rod 207 to move downward synchronously, the first straight rod 206 moves downward, the first rack 208 moves to mesh with the first power generation gear 210 and rotates, the second straight rod 207 moves downward, the second rack 209 moves to mesh with the second power generation gear 211 and rotates, and the first power generation gear 210 rotates The third generator 212 is driven to generate electricity, and the second generating gear 211 rotates to drive the fourth generator 213 to generate electricity. The leaking shell 204 moves downward, and the induction gasket 223 contacts the sensor 222 for the first time. The sensor 222 triggers the transmission signal, and the electric valve 6 receives the signal for the first time to close the sewage pipe 1 and stop discharging sewage into the water storage charging device 2. When the leaking shell 204 moves downward, the water baffle 205 contacts the support 221, and the water baffle 205 swings upward. The sewage in the leaking shell 204 flows into the water collecting oblique ring 220, and the water collecting oblique ring 220 is used to collect sewage. After the sewage in the leaking shell 204 is discharged, the weight of the leaking shell 204 is less than the common spring force of the first spring 216 and the second spring 217. 218 moves upward and resets under the action of the first spring 216, and the support rod four 219 moves upward and resets under the action of the second spring 217. The support rod three 218 and the support rod four 219 drive the leaking shell 204 to reset upward, and the leaking shell 204 drives the induction gasket 223 to contact the sensor 222 for the second time. The sensor transmits a signal, and the electric valve 6 receives the signal for the second time and opens, and the sewage pipe 1 continues to discharge sewage into the water storage charging device 2. The sewage in the water collecting oblique ring 220 flows into the water diversion main pipe 3. The sewage entering the water diversion main pipe 3 is guided by the oblique leakage plate 9 to the first spiral tube 10. The first spiral tube 10 is spirally provided with a spiral groove 18. The spiral groove 18 can increase the flow rate of the sewage in the first spiral tube 10. The rapidly flowing sewage in the spiral tube 10 enters the power generation shell 11, and the sewage in the power generation shell 11 pushes the power generation blade 13 to rotate along the spiral water transport plate 12, and the power generation blade 13 rotates the first generator 4 to start generating electricity, and the sewage in the power generation shell 11 enters the second spiral tube 14, and the second spiral tube 14 is spirally provided with a spiral groove 18, and the spiral groove 18 can increase the flow rate of the sewage in the first spiral tube 10, and the sewage in the second spiral tube 14 enters the power generation shell 15, and the sewage in the power generation shell 15 pushes the power generation blade 17 to rotate along the spiral water transport plate 16, and the power generation blade 17 rotates the second generator 5 to start generating electricity, and the drain valve 8 opens the sewage in the power generation shell 15 and is discharged through the main drainage pipe 7.
[0026] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A factory pipeline drainage power generation system, comprising a sewage pipeline (1), a water storage charging device (2), a water diversion main pipe (3), a first generator (4), a second generator (5), and a drainage main pipe (7), characterized in that: A water storage charging device (2) is provided at the bottom of the sewage pipe (1), and the water storage charging device (2) comprises a water storage tank (201), the water storage tank (201) is provided with a first slide rail (202), the water storage tank (201) is provided with a second slide rail (203), the first slide rail (202) is slidably connected to a water leakage shell (204), the second slide rail (203) is slidably connected to the water leakage shell (204), the water leakage shell (204) is hinged with a water baffle (205), a first straight rod (206) is fixed to one side of the water leakage shell (204), a second straight rod (207) is fixed to the other side of the water leakage shell (204), the first straight rod (206) is fixed to a first rack (208), and the second straight rod (2 07) is fixed with a second rack (209), a first power generation gear (210) is rotatably connected in the water storage tank (201), a second power generation gear (211) is rotatably connected in the water storage tank (201), a third generator (212) is fixed in the water storage tank (201), a fourth generator (213) is fixed in the water storage tank (201), the rotating shaft of the third generator (212) is fixedly connected to the first power generation gear (210), the rotating shaft of the fourth generator (213) is fixedly connected to the second power generation gear (211), the first rack (208) is meshed with the first power generation gear (210), the second rack (209) is meshed with the second power generation gear (211), the water storage tank (201) is fixed with a support rod 1 (214), The water storage tank (201) is fixed with a second support rod (215), a first spring (216) is fixed inside the first support rod (214), a second spring (217) is fixed inside the second support rod (215), the first support rod (214) is slidably connected with a third support rod (218), the second support rod (215) is slidably connected with a fourth support rod (219), a water collecting oblique ring (220) is fixed between the third support rod (218) and the fourth support rod (219), the water storage tank (201) is fixed with a pillar (221), a sensor (222) is fixed inside the water storage tank (201), the second straight rod (207) is fixed with a sensing pad (223), the sensing pad (223) triggers the sensor (222), and the sensor (222) emits a signal The electric valve (6) receives a signal to close or open. A water diversion main pipe (3) is provided at the bottom of the water storage tank (201). The water diversion main pipe (3) is connected to the water storage tank (201). A first spiral tube (10) is fixed in the water diversion main pipe (3). A spiral groove (18) is provided in the first spiral tube (10) in a spiral shape. The spiral groove (18) can increase the flow rate of sewage in the first spiral tube (10). A first generator (4) is fixed in the water diversion main pipe (3). A power generation shell (11) is fixed in the water diversion main pipe (3). One end of the first spiral tube (10) is connected to the inclined leakage plate (9). The other end of the first spiral tube (10) is connected to the power generation shell (11). A spiral water transport plate (12) is provided in the power generation shell (11).The power generation housing (11) is rotatably connected to a power generation fan blade (13); the rotation shaft of the first generator (4) is fixedly connected to the power generation fan blade (13); a second generator (5) is fixed in the water diversion main pipe (3); a second spiral tube (14) is arranged in the water diversion main pipe (3); a spiral groove (18) is spirally arranged in the second spiral tube (14); the spiral groove (18) can increase the flow rate of sewage in the second spiral tube (14); a second spiral tube (14) is fixed in the water diversion main pipe (3); A second power generation housing (15), wherein a second spiral water transport plate (16) is arranged inside the second power generation housing (15), the second power generation housing (15) is rotatably connected to a second power generation blade (17), the rotating shaft of the second generator (5) is fixedly connected to the second power generation blade (17), one end of the second spiral tube (14) is connected to the first power generation housing (11), and the other end of the second spiral tube (14) is connected to the second power generation housing (15), and a drainage main pipe (7) is fixed inside the second power generation housing (15).
2. A factory pipeline drainage power generation system according to claim 1, characterized in that: The sewage pipe (1) is provided with an electric valve (6).
3. A factory pipeline drainage power generation system according to claim 1, characterized in that: An inclined leakage plate (9) is fixed inside the water diversion main pipe (3).
4. A factory pipeline drainage power generation system according to claim 1, characterized in that: The main drainage pipe (7) is provided with a drainage valve (8), and the main drainage pipe (7) is connected to the second power generation housing (15).
5. The factory pipeline drainage power generation system according to claim 1, characterized in that: The sensor (222) transmits a signal and the electric valve (6) receives the signal for the first time to close the sewage pipe (1) and stop discharging sewage. The electric valve (6) receives the signal for the second time to open the sewage pipe (1) and continue discharging sewage.