Dynamic tunnel construction stability monitoring device and method

Through the design of the dynamic tunnel construction stability monitoring device, the dynamic adjustment of the monitoring components is achieved by using rotating components, which solves the problem that monitoring equipment in the prior art cannot assist in correcting the uncertainty of data acquisition, and improves the data accuracy and stability of tunnel construction monitoring.

CN119555159AInactive Publication Date: 2025-03-04SINOHYDRO BUREAU 5
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510112082.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-24
Publication Date
2025-03-04
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing tunnel construction monitoring equipment cannot achieve auxiliary monitoring, resulting in the inability to provide assistance when data collection is uncertain or inaccurate, and staff need to make manual corrections.

Method used

A dynamic tunnel construction stability monitoring device is designed, including a base assembly, a moving assembly and a monitoring assembly. Through the cooperation of the first rotating assembly and the second rotating assembly, the 360-degree circular motion of the moving assembly and the lateral adjustment of the monitoring assembly are realized, thereby enhancing the accuracy of the monitoring data.

Benefits of technology

By dynamically adjusting the position of the monitoring components, the coordinated monitoring of the same target location by multiple monitoring components is achieved, improving the accuracy and stability of data acquisition and reducing manual intervention.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119555159A_ABST
    Figure CN119555159A_ABST
Patent Text Reader

Abstract

The invention discloses a dynamic tunnel construction stability monitoring device and method, and relates to the technical field of tunnel construction monitoring. Comprising a base assembly, a moving assembly and a monitoring assembly arranged at the top of the moving assembly, a first rotating assembly used for rotating the moving assembly is arranged between the base assembly and the moving assembly, a second rotating assembly used for rotating the monitoring assembly is arranged between the monitoring assembly and the moving assembly, and the base assembly comprises a base body; the first rotating assembly comprises a first driving motor fixed to the bottom of the base body. The position adjusting effect on the monitoring assembly is achieved, the monitoring assembly and the moving assembly are connected through the second rotating assembly, the second rotating assembly adjusts the specific position of each monitoring instrument in the monitoring assembly, and the monitoring accuracy is enhanced; the effect that two or more monitoring assemblies monitor the same target position together at the same time is achieved by adjusting the positions of the monitoring assemblies, and the accuracy of data acquisition is improved as much as possible.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnel construction monitoring, and in particular to a dynamic tunnel construction stability monitoring device and method. Background Art

[0002] In the field of engineering and construction, a tunnel usually refers to a long and narrow passage through underground or in a mountain. It is often used for transportation, such as the travel of cars and trains, or for water supply, gas supply, and electricity transmission. It is necessary to consider multiple factors such as geological conditions, ventilation, and drainage. Tunnel construction refers to the process of digging and building a tunnel underground or in a mountain. It is necessary to conduct geological surveys of the construction area to understand the properties of the soil and rock, the groundwater level, etc., and then design the tunnel and evaluate the impact of tunnel construction on the surrounding environment. During the construction process, it is necessary to monitor the stability of the tunnel construction to ensure construction safety and long-term structural stability of the tunnel.

[0003] A tunnel construction monitoring device with patent publication number CN115656443A, by setting a first drive block and a second drive block, can pull the first drive block and the second drive block at different positions during the launch process as the pull rope is tightened, thereby driving the sampling and detection mechanism to perform two samplings at different heights. By setting a lower-layer sampling and detection mechanism, it can automatically perform sampling and detection after landing. Through the setting of the above-mentioned mechanism, sampling and detection of three positions in the middle layer, high layer and lower layer of the tunnel can be realized, the detection range is improved, and multiple vacuum cylinders can sample gases in different directions.

[0004] In the process of tunnel construction, when monitoring work is required, the above-mentioned and similar technical solutions usually deploy monitoring equipment at different locations to conduct real-time monitoring of key factors such as soil, structure, groundwater around the tunnel to collect data, including displacement, stress, strain, temperature, humidity, etc. However, the locations of the monitoring equipment are mostly fixed, and there is no mutual assistance function between the monitoring equipment, and the effect of auxiliary monitoring cannot be achieved. When the monitoring equipment arranged at one location cannot complete accurate data collection, or the collected data is uncertain, the remaining monitoring equipment cannot provide auxiliary functions, and the staff needs to take the initiative to go to the target location for manual determination. Summary of the invention

[0005] The object of the present invention is to provide a dynamic tunnel construction stability monitoring device and method to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a dynamic tunnel construction stability monitoring device and method, comprising a base assembly, a moving assembly, and a monitoring assembly arranged on the top of the moving assembly, a first rotating assembly for rotating the moving assembly is arranged between the base assembly and the moving assembly, and a second rotating assembly for rotating the monitoring assembly is arranged between the monitoring assembly and the moving assembly, the base assembly comprises a base body, the first rotating assembly comprises a first driving motor fixed at the bottom of the base body, the moving assembly comprises a moving seat, the first driving motor drives the first rotating assembly to rotate and drives the moving seat to rotate, so that the moving seat performs a circular motion around the base body; The top of the movable seat is provided with a screw assembly, a movable disk is provided on the screw assembly, the monitoring assembly is connected to the movable disk, and the screw assembly drives the monitoring assembly and the movable disk to reciprocate laterally on the movable seat, so that the position of the monitoring assembly can be adjusted; The monitoring component includes a monitoring disk, and a monitoring unit composed of multiple monitoring devices is arranged on the top of the monitoring disk. The multiple monitoring devices are distributed at different positions. The second rotating component includes a second driving motor fixed to the bottom of the movable disk. When the second driving motor drives the second rotating component to rotate and drives the monitoring disk to rotate, the positions of the monitoring devices at different positions can be adjusted and changed, and the target positions can be monitored in a targeted manner. In conjunction with the circular motion of the moving seat and the lateral reciprocating motion of the monitoring component, the targeted change effect of the monitoring devices at different positions can be achieved again.

[0007] Furthermore, the monitoring unit includes a temperature sensor, a laser sensor, a humidity sensor, a high-definition camera and a control terminal. The temperature sensor, the laser sensor, the humidity sensor and the high-definition camera are respectively arranged at four positions of the monitoring panel and are electrically connected to the control terminal.

[0008] Furthermore, the screw assembly includes a threaded rod, which is rotatably connected to the top of the moving seat. Both ends of the moving seat are fixedly connected to a moving motor, which is connected to the threaded rod. A moving block in contact with the threaded rod is fixed at the bottom of the moving disk.

[0009] Furthermore, a battery assembly for power supply is fixed at the bottom of the mobile seat, and the battery assembly includes a battery panel, which is fixed to the bottom of the mobile seat. A first power flashlight is fixedly connected to the bottom of the mobile seat, and the battery panel is electrically connected to the first power flashlight and the second drive motor. A second power flashlight is fixedly connected to the top of the control terminal, and a connecting wire is rotatably plugged into the top of the second power flashlight, which is fixed to the first power flashlight. The battery panel supplies power to the first power flashlight and the second drive motor respectively, and under the action of the connecting wire, power is transmitted to the second power flashlight and the control terminal, and the control terminal diverts and transmits the power.

[0010] Furthermore, the outer wall of the base body is provided with a support assembly for supporting the movable seat, and the support assembly includes a support block fixed at the bottom of the movable seat and a rotating ring arranged on the outer wall of the base body, a support rod is fixedly connected between the support block and the rotating ring, a plurality of balls are rotatably connected to the circumferential inner wall of the rotating ring, and a rotating groove adapted to the balls is opened on the outer wall of the base body.

[0011] Furthermore, a dynamic tunnel construction stability monitoring method, using the above-mentioned dynamic tunnel construction stability monitoring device, comprises: Equipment layout: through the layout method, at least two target points are selected in the tunnel as layout points, and the base assembly, the first rotating assembly, the support assembly, the mobile assembly, the monitoring assembly, the battery assembly and the second rotating assembly are arranged based on the layout points to obtain a monitoring point set, which includes at least two monitoring points, and the monitoring data are obtained respectively to obtain a monitoring data set; Data judgment: Set a judgment threshold and judge the monitoring data set based on the judgment threshold. When the monitoring data of a monitoring point in the monitoring data set exceeds the judgment threshold, the monitoring points other than the target monitoring point are mobilized as response points through the mobilization method to assist the target monitoring point in obtaining monitoring data and improve the accuracy of data monitoring. Collaborative adjustment: Adjust monitoring components through adjustment methods to improve the targeted acquisition of monitoring data; The mobilization method includes: Step 1: Range determination: take the target monitoring point as the initial point, set the acquisition range, obtain the number of monitoring points within the acquisition range based on the target monitoring point and the acquisition range, and obtain the required monitoring point set; Step 2: Determine the demand, set the demand threshold, and screen the demand monitoring point set based on the demand threshold to obtain a screened demand set; Step 3: Direction determination: Based on the positional relationship between the screening demand set and the target monitoring point, the adjustment direction of the demand point in the demand point set is determined to obtain an adjustment direction set, which corresponds to the screening demand set respectively; Step 4: Position adjustment, filter the demand set based on the adjustment direction set, adjust the direction and position of the monitoring point as the demand point, obtain multiple response points, and assist the target monitoring point to jointly obtain monitoring data.

[0012] Furthermore, the method for obtaining the screening requirement set includes: S1: Sorting of monitoring points: obtaining the distance data between the required monitoring point set and the target monitoring point, obtaining the required distance set, and sorting the required distance set to obtain the distance sorting set; S2: Demand screening: Based on the demand threshold and the distance sorting set, select the priority demand monitoring points in the distance sorting set corresponding to the demand threshold to obtain the screened demand set.

[0013] Furthermore, the method for acquiring the adjustment direction set includes: X1: Path determination. Based on the positional relationship between the screening demand set and the target monitoring point, the position connection line between the screening demand point and the target monitoring point is determined to obtain a path set, which corresponds to the screening demand point set respectively; X2: Direction calculation, taking the screening demand points as feature points and the paths corresponding to the screening demand points as feature directions, respectively obtain the adjustment directions of the screening demand points and obtain the adjustment direction set.

[0014] Furthermore, the layout method includes: acquiring the length data of the target tunnel to obtain a target length item, setting a division threshold, dividing the target length item based on the division threshold to obtain a plurality of target division items, and selecting target points as layout points based on the target division items.

[0015] Furthermore, the adjustment method includes: taking the target monitoring point as the benchmark point, obtaining the distance data between each monitoring device in the monitoring unit as the response point and the benchmark point, obtaining the benchmark distance item, obtaining the monitoring data exceeding the judgment threshold in the target monitoring point, obtaining the benchmark data item, and based on the benchmark data item, adjusting the benchmark distance item corresponding to the benchmark data item so that the benchmark distance item is in the shortest state, thereby completing the adjustment of the monitoring component.

[0016] Compared with the prior art, the present invention has the following beneficial effects: The dynamic tunnel construction stability monitoring device and method, by setting a first rotating component and a second rotating component, under the action of the first rotating component, can make the mobile component perform a 360-degree circular motion based on the base component, and while the mobile component rotates, the monitoring component mounted on the mobile seat can move laterally based on the mobile component, thereby achieving the effect of adjusting the position of the monitoring component. The monitoring component and the mobile component are connected by the second rotating component. Under the action of the second rotating component, the specific position of each monitoring device in the monitoring component can be adjusted, thereby enhancing the accuracy of monitoring, and by adjusting the position of the monitoring component, the effect of two or even more monitoring components simultaneously monitoring the same target position can be achieved, thereby maximizing the accuracy of data acquisition.

[0017] At the same time, according to the actual situation of the target tunnel, monitoring points are arranged in the tunnel, and the monitoring data of the monitoring points are judged according to the actual data obtained by the monitoring points. According to the results of the judgment, monitoring points other than the target monitoring points are mobilized as response points to assist the target monitoring points in jointly obtaining monitoring data, thereby improving the accuracy of data monitoring. At the same time, the directions of temperature sensors, laser sensors, high-definition cameras and humidity sensors in the response points are adjusted according to the monitoring data exceeding the judgment threshold, thereby realizing targeted assisted monitoring of the monitoring data exceeding the judgment threshold. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a bottom view structural schematic diagram of the present invention; Figure 3 It is a schematic structural diagram of the first rotating assembly of the present invention; Figure 4 It is a schematic diagram of the ball structure of the present invention; Figure 5 It is a schematic diagram of the structure of the mobile component and the monitoring component of the present invention; Figure 6 It is a schematic structural diagram of the second rotating assembly of the present invention; Figure 7 It is a schematic diagram of the bottom structure of the movable plate of the present invention; Figure 8 It is a schematic diagram of demand monitoring points of the present invention; Fig. 9 It is a schematic diagram of the screening requirement set of the present invention; Fig.10 A schematic diagram of the relationship between the screening requirement set and the distance data of the present invention; Fig.11 It is a schematic diagram of the position relationship of the response points of the present invention; Fig.12 It is a schematic diagram of the response point adjustment structure of the present invention.

[0019] In the figure: 1, base assembly; 101, base body; 102, fixing ear; 2, first rotating assembly; 201, first driving motor; 202, first auxiliary gear plate; 203, first main gear plate; 204, first protective plate; 205, first rotating disk; 3, supporting assembly; 301, supporting block; 302, supporting rod; 303, rotating ring; 304, ball bearing; 305, rotating groove; 4, moving assembly; 401, moving seat; 402, threaded rod; 403, moving motor; 404, Moving disk; 405, moving block; 5, monitoring component; 501, monitoring disk; 502, temperature sensor; 503, laser sensor; 504, control terminal; 505, humidity sensor; 506, high-definition camera; 6, battery component; 601, battery panel; 602, first flashlight; 603, connecting wire; 604, second flashlight; 7, second rotating component; 701, second drive motor; 702, second main gear disc; 703, second auxiliary gear disc; 704, second protective plate. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] When using monitoring equipment to obtain relevant monitoring data in the tunnel, such as using a temperature sensor to obtain temperature data, using a humidity sensor to obtain humidity data in the tunnel, etc., when using these monitoring devices, since the monitoring devices need to be installed at fixed points, the position of the monitoring devices cannot be freely adjusted. When there is uncertainty in the data obtained by one of the monitoring devices, the obtained data cannot be verified, resulting in the accuracy of the information obtained by the monitoring device to be verified, and subsequent verification steps are required to verify the accuracy. In the technical solution provided by the present application, the monitoring device consists of a base component and a mobile component. The base component can be fixed at any position, and the base component and the mobile component can be fixed at any position. The components are connected by a first rotating component. Under the action of the first rotating component, the mobile component can perform a 360-degree circular motion based on the base component, and while the mobile component rotates, the monitoring component mounted on the mobile seat can move laterally based on the mobile component, thereby achieving a position adjustment effect on the monitoring component. The monitoring component and the mobile component are connected by a second rotating component. Under the action of the second rotating component, the specific position of each monitoring device in the monitoring component can be adjusted, thereby enhancing the accuracy of monitoring. By adjusting the position of the monitoring component, the effect of two or even more monitoring components simultaneously monitoring the same target position can be achieved, thereby maximizing the accuracy of data acquisition.

[0022] like Figure 1-Figure 7 As shown, the present invention provides a technical solution: a dynamic tunnel construction stability monitoring device and method, comprising a base component 1, a moving component 4, and a monitoring component 5 arranged on the top of the moving component 4, a first rotating component 2 for rotating the moving component 4 is arranged between the base component 1 and the moving component 4, a second rotating component 7 for rotating the monitoring component 5 is arranged between the monitoring component 5 and the moving component 4, the base component 1 comprises a base body 101, the first rotating component 2 comprises a first driving motor 201 fixed at the bottom of the base body 101, the moving component 4 comprises a moving seat 401, a first main toothed disc 203 and a first auxiliary toothed disc 202, the first main toothed disc 203 and the first auxiliary toothed disc 202 The first auxiliary toothed disc 202 is meshed, and a first protective plate 204 for protecting the first main toothed disc 203 and the first auxiliary toothed disc 202 is fixedly connected to the top of the first auxiliary toothed disc 202, and a first rotating disc 205 is fixedly connected to the top of the first auxiliary toothed disc 202. The movable seat 401 is fixed to the top of the first rotating disc 205. The first driving motor 201 is connected to the first main toothed disc 203. When the first driving motor 201 drives the first main toothed disc 203 to rotate, it can also drive the meshed first auxiliary toothed disc 202 to rotate. The first driving motor 201 drives the first rotating assembly 2 to rotate and drives the movable seat 401 to rotate, so that the movable seat 401 performs a circular motion around the base body 101; a screw assembly is arranged on the top of the movable seat 401 , a moving disk 404 is arranged on the screw assembly, the monitoring assembly 5 is connected to the moving disk 404, the screw assembly drives the monitoring assembly 5 and the moving disk 404 to reciprocate laterally on the moving seat 401, and the position of the monitoring assembly 5 can be adjusted; the monitoring assembly 5 includes a monitoring disk 501, and a monitoring unit composed of multiple monitoring devices is arranged on the top of the monitoring disk 501, and the multiple monitoring devices are distributed in different positions. The second rotating assembly 7 includes a second driving motor 701 fixed to the bottom of the moving disk 404, and the second rotating assembly 7 includes a second main toothed disk 702 and a second auxiliary toothed disk 703, the second main toothed disk 702 and the second auxiliary toothed disk 703 are meshed, and the top of the second auxiliary toothed disk 703 is fixedly connected with a second main toothed disk 702. The second protective plate 704 protects the disk 702 and the second auxiliary toothed disk 703, the monitoring disk 501 is fixed on the top of the second auxiliary toothed disk 703, the second driving motor 701 is connected to the second main toothed disk 702, and the second driving motor 701 can simultaneously drive the meshing second auxiliary toothed disk 703 to rotate when driving the second main toothed disk 702 to rotate. When the second driving motor 701 drives the second rotating component 7 to rotate and drives the monitoring disk 501 to rotate, the position of the monitoring equipment at different positions can be adjusted and changed, and the target position can be targetedly monitored. In conjunction with the circular motion of the moving seat 401 and the lateral reciprocating motion of the monitoring component 5, the targeted change effect of the monitoring equipment at different positions can be achieved again.

[0023] like Figure 5As shown, the monitoring unit includes a temperature sensor 502, a laser sensor 503, a humidity sensor 505, a high-definition camera 506 and a control terminal 504. The temperature sensor 502, the laser sensor 503, the humidity sensor 505 and the high-definition camera 506 are respectively arranged at four positions of the monitoring disk 501, and are all electrically connected to the control terminal 504. The temperature sensor 502 can be used to monitor the temperature data in the tunnel, the laser sensor 503 and the high-definition camera 506 can be used to monitor the deformation in the tunnel, and the humidity sensor 505 can be used to monitor the humidity data in the tunnel, and the monitored data is continuously sent to the control terminal 504.

[0024] like Figure 5 As shown, the screw assembly includes a threaded rod 402, which is rotatably connected to the top of a moving seat 401, and both ends of the moving seat 401 are fixedly connected to a moving motor 403, which is connected to the threaded rod 402, and a moving block 405 in threaded contact with the threaded rod 402 is fixed at the bottom of the moving disk 404. When the moving motor 403 drives the threaded rod 402 to rotate, the moving block 405 sleeved on the outer wall of the threaded rod 402 can move horizontally, and drive the moving disk 404 to move horizontally.

[0025] like Figure 2 As shown, a battery assembly 6 for power supply is fixed at the bottom of the movable seat 401, and the battery assembly 6 includes a battery panel 601, which is fixed at the bottom of the movable seat 401, and a first power connection torch 602 is fixedly connected to the bottom of the movable plate 404, and the battery panel 601 is electrically connected to the first power connection torch 602 and the second drive motor 701, and a second power connection torch 604 is fixedly connected to the top of the control terminal 504, and a connection wire 603 is rotatably plugged into the top of the second power connection torch 604, and the connection wire 603 is fixed to the first power connection torch 602, and the battery panel 601 supplies power to the first power connection torch 602 and the second drive motor 701 respectively, and under the action of the connection wire 603, the power is transmitted to the second power connection torch 604 and the control terminal 504, and the control terminal 504 shunts the power for transmission.

[0026] like Figure 2-Figure 4As shown, the outer wall of the base body 101 is provided with a support assembly 3 for supporting the moving seat 401, and the support assembly 3 includes a support block 301 fixed at the bottom of the moving seat 401 and a rotating ring 303 arranged on the outer wall of the base body 101, a support rod 302 is fixedly connected between the support block 301 and the rotating ring 303, a plurality of balls 304 are rotatably connected to the circumferential inner wall of the rotating ring 303, and a rotating groove 305 adapted to the balls 304 is opened on the outer wall of the base body 101. During the rotation of the moving seat 401, the support rod 302 can provide a supporting effect for the support block 301, and the rotating ring 303 rotates on the outer wall of the base body 101 as the moving seat 401 rotates, and the balls 304 rotate in the rotating groove 305, thereby reducing the friction between the rotating ring 303 and the base body 101.

[0027] It should be noted that a plurality of fixing ears 102 are fixed to the bottom of the base body 101 , which can be used to fix the base body 101 .

[0028] A dynamic tunnel construction stability monitoring method uses the above-mentioned dynamic tunnel construction stability monitoring device, including: equipment layout: through the layout method, at least two target points are selected in the tunnel as layout points, and the base component 1, the first rotating component 2, the support component 3, the mobile component 4, the monitoring component 5, the battery component 6 and the second rotating component 7 are arranged based on the layout points to obtain a monitoring point set, and the monitoring point set includes at least two monitoring points, and monitoring data are obtained respectively to obtain a monitoring data set; data judgment: setting a judgment threshold, judging the monitoring data set based on the judgment threshold, when the monitoring data of the monitoring point in the monitoring data set exceeds the judgment threshold, the monitoring points other than the target monitoring points are mobilized as response points through the mobilization method, and the target monitoring points are assisted to jointly obtain monitoring data, so as to improve the accuracy of data monitoring; collaborative adjustment: through The adjustment method adjusts the monitoring component 5 to improve the targeted acquisition of monitoring data; the mobilization method includes: step one: range determination, taking the target monitoring point as the initial point, setting the acquisition range, obtaining the number of monitoring points within the acquisition range based on the target monitoring point and the acquisition range, and obtaining the demand monitoring point set; step two: demand determination, setting the demand threshold, screening the demand monitoring point set based on the demand threshold, and obtaining the screened demand set; step three: direction determination, based on the positional relationship between the screened demand set and the target monitoring point, determining the adjustment direction of the demand point in the demand point set, and obtaining the adjustment direction set, the adjustment direction set corresponds to the screened demand set respectively; step four: position adjustment, the screened demand set is based on the adjustment direction set, and the direction and position of the monitoring point as the demand point are adjusted respectively, to obtain multiple response points, to assist the target monitoring point in jointly obtaining monitoring data.

[0029] It should be noted that multiple points are selected as layout points in the tunnel, and equipment is arranged at the layout points respectively. The equipment is composed of a base component 1, a first rotating component 2, a supporting component 3, a moving component 4, a monitoring component 5, a battery component 6 and a second rotating component 7 as a whole, as a complete monitoring point, which is used for data monitoring. Since the temperature sensor 502 constituting the monitoring component 5 can be used to monitor the temperature data in the tunnel, the laser sensor 503 and the high-definition camera 506 can be used to monitor the deformation in the tunnel, and the humidity sensor 505 can be used to monitor the humidity data in the tunnel, the judgment threshold is set as the limit fluctuation range of the temperature, humidity and deformation data, which are set as: temperature is 40°C, humidity is 85%, and deformation is 50mm. When the data in the tunnel exceeds the set limit fluctuation range, the equipment in the remaining monitoring points is mobilized to assist in monitoring the monitoring points exceeding the limit fluctuation range. The acquisition range is set as a circular area with a radius of 100m. The set demand threshold is the quantity threshold, which is set to 2, that is, when it is necessary to assist in monitoring the target monitoring point, two monitoring points can be mobilized for assisting monitoring.

[0030] like Figure 8-Figure 9 As shown, in the specific implementation process, four points are selected in a tunnel as layout points, which are arranged in a straight line. A base component 1, a first rotating component 2, a supporting component 3, a mobile component 4, a monitoring component 5, a battery component 6 and a second rotating component 7 are respectively set up to form monitoring points, which are respectively set as monitoring points No. 1, 2, 3, and 4, and the intervals are all 50m. When the monitoring data obtained by monitoring point No. 2 exceeds the judgment threshold, the monitoring points within the acquisition range of monitoring point No. 2 are No. 1, 3, and 4. According to the set demand threshold, two monitoring points are selected as screening demand points to form a screening demand set, namely, a combination of 1 and 3, a combination of 1 and 4, and a combination of 3 and 4. The positional relationship between each combination and monitoring point No. 2 is determined, the adjustment direction of each combination is determined, and the first rotating component 2 and the mobile component 4 of each combination are adjusted to realize the position adjustment of the monitoring component 5 to assist monitoring point No. 2 in jointly obtaining monitoring data.

[0031] The method for obtaining the screening demand set includes: S1: monitoring point sorting, obtaining the distance data between the demand monitoring point set and the target monitoring point, obtaining the demand distance set, sorting the demand distance set, and obtaining the distance sorting set; S2: demand screening, based on the demand threshold and the distance sorting set, selecting the priority demand monitoring point in the distance sorting set corresponding to the demand threshold, and obtaining the screening demand set.

[0032] like Fig.10 As shown, it should be noted that, according to the distance data between the demand monitoring point and the target monitoring point, the demand monitoring point with the closest distance matching the demand threshold is selected as the screening demand point to form a screening demand set.

[0033] The method for obtaining the adjustment direction set includes: X1: path determination, based on the positional relationship between the screening demand set and the target monitoring point, the position connection line between the screening demand point and the target monitoring point is determined to obtain a path set, and the path sets correspond to the screening demand point sets respectively; X2: direction calculation, using the screening demand points as feature points and the paths corresponding to the screening demand points as feature directions, respectively obtaining the adjustment directions of the screening demand points and obtaining the adjustment direction set.

[0034] It should be noted that the positional connection line is determined based on the positional relationship between the screening demand points and the target monitoring points according to the screening demand concentration, and the positional connection line is used as the adjustment direction of the screening demand points.

[0035] In the specific implementation process, three points are selected in a tunnel as layout points, which are arranged in a straight line in the horizontal direction and are set up to form monitoring points. They are set as monitoring points No. 1, 2, and 3 respectively. When monitoring point No. 2 is used as the target monitoring point, monitoring points No. 1 and 3 are used as screening demand points. Since monitoring points No. 1, 2, and 3 are arranged in a straight line in the horizontal direction, the position line connecting the screening demand point and the target monitoring point is a straight line in the horizontal direction. The position line is used as the adjustment direction of monitoring points No. 1 and 3.

[0036] The layout method includes: acquiring the length data of the target tunnel to obtain the target length item, setting a division threshold, dividing the target length item based on the division threshold to obtain multiple target division items, and selecting target points as layout points based on the target division items.

[0037] It should be noted that the division threshold is a set threshold. Based on the working properties of the temperature sensor 502, the laser sensor 503, the high-definition camera 506 and the humidity sensor 505, the division threshold is set to 50m. The target length item is divided based on the division threshold, and the target point is the division point, thereby obtaining the layout point.

[0038] The adjustment method includes: taking the target monitoring point as the benchmark point, obtaining the distance data between each monitoring device in the monitoring unit as the response point and the benchmark point, obtaining the benchmark distance item, obtaining the monitoring data exceeding the judgment threshold in the target monitoring point, obtaining the benchmark data item, and based on the benchmark data item, adjusting the benchmark distance item corresponding to the benchmark data item so that the benchmark distance item is in the shortest state, thereby completing the adjustment of the monitoring component 5.

[0039] like Figure 11-Figure 12As shown, it should be noted that the monitoring data exceeding the judgment threshold in the target monitoring point may be one or more types, namely the temperature monitored by the temperature sensor 502, the deformation data monitored by the laser sensor 503 and the high-definition camera 506, and the humidity data detected by the humidity sensor 505. The directions of the temperature sensor 502, the laser sensor 503, the high-definition camera 506 and the humidity sensor 505 in the response point are adjusted according to the monitoring data exceeding the judgment threshold, so as to realize targeted auxiliary monitoring of the monitoring data exceeding the judgment threshold.

[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is limited by the attached embodiments and their equivalents.

Claims

1. A dynamic tunnel construction stability monitoring device, comprising a base assembly (1), a moving assembly (4), and a monitoring assembly (5) arranged on top of the moving assembly (4), a first rotating assembly (2) for rotating the moving assembly (4) being arranged between the base assembly (1) and the moving assembly (4), and a second rotating assembly (7) for rotating the monitoring assembly (5) being arranged between the monitoring assembly (5) and the moving assembly (4), characterized in that: The base assembly (1) comprises a base body (101), the first rotating assembly (2) comprises a first driving motor (201) fixed to the bottom of the base body (101), the moving assembly (4) comprises a moving seat (401), and the first driving motor (201) drives the first rotating assembly (2) to rotate and drives the moving seat (401) to rotate, so that the moving seat (401) performs a circular motion around the base body (101); A screw assembly is disposed on the top of the movable seat (401), a movable disk (404) is disposed on the screw assembly, the monitoring assembly (5) is connected to the movable disk (404), and the screw assembly drives the monitoring assembly (5) and the movable disk (404) to move laterally back and forth on the movable seat (401), so that the position of the monitoring assembly (5) can be adjusted; The monitoring assembly (5) comprises a monitoring plate (501), a monitoring unit composed of a plurality of monitoring devices is arranged on the top of the monitoring plate (501), and the plurality of monitoring devices are distributed at different positions. The second rotating assembly (7) comprises a second driving motor (701) fixed at the bottom of the movable plate (404), and when the second driving motor (701) drives the second rotating assembly (7) to rotate and drives the monitoring plate (501) to rotate, the positions of the monitoring devices at different positions can be adjusted and changed, and the target position can be monitored in a targeted manner. In combination with the circular motion of the movable seat (401) and the lateral reciprocating motion of the monitoring assembly (5), the targeted change effect of the monitoring devices at different positions can be achieved again.

2. A dynamic tunnel construction stability monitoring device according to claim 1, characterized in that: The monitoring unit comprises a temperature sensor (502), a laser sensor (503), a humidity sensor (505), a high-definition camera (506), and a control terminal (504); the temperature sensor (502), the laser sensor (503), the humidity sensor (505), and the high-definition camera (506) are respectively arranged at four positions of the monitoring panel (501), and are all electrically connected to the control terminal (504).

3. A dynamic tunnel construction stability monitoring device according to claim 1, characterized in that: The screw rod assembly comprises a threaded rod (402), the threaded rod (402) is rotatably connected to the top of a moving seat (401), both ends of the moving seat (401) are fixedly connected to moving motors (403), the moving motor (403) is connected to the threaded rod (402), and a moving block (405) in threaded contact with the threaded rod (402) is fixed at the bottom of the moving disk (404).

4. A dynamic tunnel construction stability monitoring device according to claim 1, characterized in that: A battery assembly (6) for power supply is fixed at the bottom of the movable seat (401), the battery assembly (6) comprising a battery panel (601), the battery panel (601) being fixed at the bottom of the movable seat (401), a first power torch (602) being fixedly connected at the bottom of the movable plate (404), and the battery panel (601) is electrically connected to the first power torch (602) and the second drive motor (701), a second power torch (604) being fixedly connected at the top of the control terminal (504), a connection wire (603) being rotatably plugged at the top of the second power torch (604), the connection wire (603) being fixed to the first power torch (602), the battery panel (601) supplying power to the first power torch (602) and the second drive motor (701), respectively, and under the action of the connection wire (603), power is transmitted to the second power torch (604) and the control terminal (504), and the control terminal (504) conducts diversion and transmission of the power.

5. A dynamic tunnel construction stability monitoring device according to claim 1, characterized in that: The outer wall of the base body (101) is provided with a support assembly (3) for supporting the movable seat (401), and the support assembly (3) comprises a support block (301) fixed to the bottom of the movable seat (401) and a rotating ring (303) arranged on the outer wall of the base body (101), a support rod (302) is fixedly connected between the support block (301) and the rotating ring (303), a plurality of balls (304) are rotatably connected to the circumferential inner wall of the rotating ring (303), and a rotating groove (305) adapted to the balls (304) is formed on the outer wall of the base body (101).

6. A dynamic tunnel construction stability monitoring method, characterized in that: A dynamic tunnel construction stability monitoring device according to any one of claims 1 to 5 is used, comprising: Equipment layout: by using a layout method, at least two target points are selected in the tunnel as layout points, and based on the layout points, a base assembly (1), a first rotating assembly (2), a support assembly (3), a mobile assembly (4), a monitoring assembly (5), a battery assembly (6), and a second rotating assembly (7) are respectively arranged to obtain a monitoring point set, wherein the monitoring point set includes at least two monitoring points, and monitoring data are obtained respectively to obtain a monitoring data set; Data judgment: Set a judgment threshold and judge the monitoring data set based on the judgment threshold. When the monitoring data of a monitoring point in the monitoring data set exceeds the judgment threshold, the monitoring points other than the target monitoring point are mobilized as response points through the mobilization method to assist the target monitoring point in obtaining monitoring data and improve the accuracy of data monitoring. Collaborative adjustment: Adjust monitoring components (5) through adjustment methods to improve the targeted acquisition of monitoring data; The mobilization method includes: Step 1: Range determination: take the target monitoring point as the initial point, set the acquisition range, obtain the number of monitoring points within the acquisition range based on the target monitoring point and the acquisition range, and obtain the required monitoring point set; Step 2: Determine the demand, set the demand threshold, and screen the demand monitoring point set based on the demand threshold to obtain a screened demand set; Step 3: Direction determination: Based on the positional relationship between the screening demand set and the target monitoring point, the adjustment direction of the demand point in the demand point set is determined to obtain an adjustment direction set, which corresponds to the screening demand set respectively; Step 4: Position adjustment, filter the demand set based on the adjustment direction set, adjust the direction and position of the monitoring point as the demand point, obtain multiple response points, and assist the target monitoring point to jointly obtain monitoring data.

7. A dynamic tunnel construction stability monitoring method according to claim 6, characterized in that: The method for obtaining the screening requirement set includes: S1: Sorting of monitoring points: obtaining the distance data between the required monitoring point set and the target monitoring point, obtaining the required distance set, and sorting the required distance set to obtain the distance sorting set; S2: Demand screening: Based on the demand threshold and the distance sorting set, select the priority demand monitoring points in the distance sorting set corresponding to the demand threshold to obtain the screened demand set.

8. A dynamic tunnel construction stability monitoring method according to claim 6, characterized in that: The method for acquiring the adjustment direction set includes: X1: Path determination. Based on the positional relationship between the screening demand set and the target monitoring point, the position connection line between the screening demand point and the target monitoring point is determined to obtain a path set, which corresponds to the screening demand point set respectively; X2: Direction calculation, taking the screening demand points as feature points and the paths corresponding to the screening demand points as feature directions, respectively obtain the adjustment directions of the screening demand points and obtain the adjustment direction set.

9. A dynamic tunnel construction stability monitoring method according to claim 6, characterized in that: The layout method includes: acquiring the length data of the target tunnel to obtain a target length item, setting a division threshold, dividing the target length item based on the division threshold to obtain a plurality of target division items, and selecting target points as layout points based on the target division items.

10. A dynamic tunnel construction stability monitoring method according to claim 6, characterized in that: The adjustment method comprises: taking a target monitoring point as a reference point, obtaining distance data between each monitoring device in a monitoring unit as a response point and the reference point, obtaining a reference distance item, obtaining monitoring data exceeding a judgment threshold in the target monitoring point, obtaining a reference data item, and adjusting the reference distance item corresponding to the reference data item based on the reference data item so that the reference distance item is in a shortest state, thereby completing the adjustment of the monitoring component (5).

Citation Information

Patent Citations

  • Tunnel construction monitoring equipment

    CN115656443A

  • Tunnel surrounding rock top displacement continuous monitoring device and method

    CN115451833A

  • Subway shield tunnel construction monitoring sensor

    CN116539809A

  • Tunnel operation monitoring image acquisition device and acquisition vehicle

    CN118590619A

  • Information processing device for power tunnel construction safety assessment

    CN216198297U