Rail transit equipment fault rapid processing method and system

By establishing a professional relationship between equipment failure and management in the rail transit system, automatic fault information transmission and maintenance task allocation are achieved, the problem of inefficient equipment failure management in urban rail transit is solved, and the efficiency of fault handling is significantly improved.

CN119568240AInactive Publication Date: 2025-03-07NANJING NARI INTELLIGENT TRANSPORTATION TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411758667.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-03
Publication Date
2025-03-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing station equipment fault management in urban rail transit has problems such as delayed message transmission and low management efficiency, which leads to inconsistent or loss of fault information during the transmission process, and the relevant preparation cannot be made in advance, and the management process of each link of the fault cannot be traced and analyzed.

Method used

The rapid handling of rail transit equipment faults based on the integration of comprehensive subway monitoring and information technology is adopted. By establishing a mapping relationship between the monitoring points of each equipment in the comprehensive monitoring system and the equipment in the equipment operation and maintenance system, an association relationship between equipment failures, management and maintenance work templates is established to realize automated fault information transmission and maintenance task dispatch.

Benefits of technology

It realizes the rapid identification and transmission of fault information, notifies maintenance personnel to prepare in advance, automatically determine the fault type according to the impact range, match the operation templates of different management majors, and automatically assign maintenance tasks, which greatly improves the efficiency of equipment fault handling and reduces the working pressure of operation scheduling and supervision coordination.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119568240A_ABST
    Figure CN119568240A_ABST
Patent Text Reader

Abstract

The invention discloses a rail transit equipment fault rapid processing method and system. The method comprises the following steps: firstly, establishing a mapping relation between each equipment monitoring point location in a comprehensive monitoring system and each equipment in an equipment operation and maintenance system; establishing an association relationship between the monitoring point of each device and the professional management classification of each device and the maintenance work order; and when monitoring point location fault alarm, determining corresponding equipment through the mapping relation, sending fault information to a maintenance work order through the association relation, distributing the maintenance work order to a maintenance worker closest to the fault position, and enabling the maintenance worker to arrive at the fault position for maintenance. According to the invention, the whole-process processing links of fault source monitoring, early warning and alarming, fault positioning, influence analysis, maintenance scheme, task assignment, field maintenance and the like are optimized, and equipment faults are quickly handled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to equipment failure processing technology, in particular to a method and system for quickly handling rail transit equipment failures. Background Art

[0002] The existing station equipment fault management in urban rail transit has problems such as delayed message transmission and low management efficiency. Fault information is easily inconsistent or lost during the transmission process, and solutions can only be found on site without making relevant preparations in advance. The management process of each link of the fault cannot be traced back and analyzed afterwards. The safe operation of station equipment is related to the normal operation of the subway line. Some faults require staff to repair and restore operation as quickly as possible, otherwise it will cause poor station operation or interruption of operation. Summary of the invention

[0003] Purpose of the invention: The purpose of the present invention is to provide a method and system for quickly handling rail transit equipment faults based on the integration of subway comprehensive monitoring and informatization, to solve the problems of poor connection of fault reporting and handling processes, untimely personnel dispatch, low efficiency, etc., to realize the integration of station equipment monitoring automation and informatization management, to simplify the business handling process, and to improve equipment operation safety and efficient management.

[0004] Technical solution: The method for quickly handling rail transit equipment failures of the present invention is characterized by comprising the following steps:

[0005] Establish a mapping relationship between each equipment monitoring point in the integrated monitoring system and each equipment in the equipment operation and maintenance system; establish a first association relationship between equipment failure, management specialty and maintenance operation template, and establish a second association relationship between the management classification and shift handover;

[0006] When a fault alarm occurs at a monitoring point, the corresponding equipment will be determined through the mapping relationship, the fault information will be sent to the maintenance work order under the corresponding management profession through the first association relationship, the scope of maintenance personnel will be determined through the second association relationship, and the maintenance work order will be dispatched to the maintenance personnel closest to the fault location. The maintenance personnel will arrive at the fault location to perform maintenance.

[0007] Furthermore, the fault information includes fault time, fault location, fault phenomenon and fault level.

[0008] Furthermore, the method also includes establishing a third association relationship between equipment failure and fault handling process, matching different fault handling processes according to the importance of the equipment and the fault impact level, and the fault handling process includes a normal handling process and an emergency handling process.

[0009] Furthermore, dispatching the maintenance work order to the maintenance personnel closest to the fault location also includes: selecting the maintenance personnel closest to the fault location based on attendance information and location information of the maintenance personnel's handheld terminal.

[0010] Furthermore, the field model of each equipment monitoring point in the comprehensive monitoring system includes line, specialty, system, equipment label, equipment name, location and precise location, and the field model of each equipment in the equipment operation and maintenance system includes line, specialty, equipment code, equipment name, equipment alias, equipment classification and installation area;

[0011] According to the field model of each equipment monitoring point and each equipment field model, a many-to-one mapping relationship between monitoring points and equipment is established.

[0012] Furthermore, when a fault alarm is triggered at a monitoring point, the fault information is transmitted from the integrated monitoring system to the equipment operation and maintenance system according to the standard REST transmission protocol. The equipment operation system matches the corresponding equipment information according to the fault information, obtains the corresponding maintenance work order according to the professional management classification of the equipment, and writes the fault information into the maintenance work order.

[0013] The rail transit equipment fault rapid handling system of the present invention comprises:

[0014] A mapping relationship and association relationship establishment unit is used to establish a mapping relationship between each equipment monitoring point in the comprehensive monitoring system and each equipment in the equipment operation and maintenance system; establish a first association relationship between equipment failure, management specialty and maintenance operation template, and establish a second association relationship between the management classification and shift handover;

[0015] The rapid fault handling unit is used to determine the corresponding equipment through the mapping relationship when a fault alarm is triggered at the monitoring point, send the fault information to the maintenance work order under the corresponding management profession through the first association relationship, determine the scope of maintenance personnel through the second association relationship, and dispatch the maintenance work order to the maintenance personnel closest to the fault location, and the maintenance personnel will arrive at the fault location to perform maintenance.

[0016] Furthermore, the mapping relationship and association relationship establishing unit also includes establishing a third association relationship between the equipment failure and the fault handling process, matching different fault handling processes according to the importance of the equipment and the fault impact level, and the fault handling process includes a general handling process and an emergency handling process;

[0017] The rapid fault handling unit also includes: selecting the maintenance personnel closest to the fault location based on attendance information and the maintenance personnel's handheld terminal positioning information; in the rapid fault handling unit, the fault information includes fault time, fault location, fault phenomenon and fault level.

[0018] The electronic device described in the present invention includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the computer program is loaded into the processor, the method for quickly handling rail transit equipment faults is implemented.

[0019] The computer-readable storage medium of the present invention stores a computer program, and when the computer program is executed by a processor, the method for quickly handling rail transit equipment failures is implemented.

[0020] Beneficial effects: Compared with the prior art, the advantages of the present invention are: the present invention can quickly identify the location, phenomenon, level and other information of the fault, notify the maintenance personnel to prepare in advance, and automatically judge whether it is a common equipment or an emergency fault according to the scope of influence to trigger different responses. The maintenance activities for different equipment will automatically match the operation templates of different management professions, and the generated maintenance operation tasks will be automatically assigned to the on-duty personnel closest to the fault point to rush to the scene for processing. The present invention optimizes the whole process processing links from fault source monitoring, early warning alarm, fault location, impact analysis, maintenance plan, task assignment, on-site maintenance, etc., to achieve rapid handling of equipment failures, greatly improve the efficiency of equipment failure handling, and also reduce the work pressure of supervision and coordination of roles such as operation dispatch, duty stationmaster, and team leader. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a flow chart of the method for quickly handling rail transit equipment failures of the present invention;

[0022] Figure 2 This is a schematic diagram of the mapping relationship between the ISCS system and the MMS system in an embodiment of the present invention;

[0023] Figure 3 It is a complete data model relationship diagram for rapid handling of rail transit equipment faults in an embodiment of the present invention. DETAILED DESCRIPTION

[0024] The technical solution of the present invention is further described below in conjunction with the accompanying drawings.

[0025] like Figure 1 As shown, the rail transit equipment fault rapid handling method comprises the following steps:

[0026] Step S1: Sort out the relationship between the equipment points of the integrated monitoring system (ISCS) and the equipment ledger managed by the equipment operation and maintenance system (MMS). ISCS usually takes different points on the equipment as management objects, which is convenient for refined alarm monitoring; while MMS usually defines a single device as a management object, which is convenient for daily inspections, repairs and maintenance; therefore, MMS and ISCS are usually a one-to-n relationship, that is, one device contains multiple monitoring points.

[0027] Step S2: Based on the sorted relationships, an intermediate mapping relationship is established to integrate the point attributes of the ISCS system monitoring dimension with the equipment attributes of the MMS system daily operation and maintenance management dimension to achieve underlying data model matching. When the equipment point alarm occurs, the system can clearly locate the faulty equipment and describe the fault phenomenon to ensure the accuracy and effectiveness of data flow.

[0028] like Figure 2 As shown in the figure, taking the No. 1 sliding door of the up platform of the subway station as an example, the comprehensive monitoring points include manual and automatic status, door closing and locking, DCU failure, motor failure, door opening encountering resistance 3 times, etc. For equipment operation and maintenance management, the No. 1 sliding door is taken as the management object for maintenance work, so it is necessary to sort out and establish a one-to-n mapping relationship.

[0029] The mapping table uses the equipment point label as the primary key to uniquely identify the alarm point. The ISCS point label can be automatically associated with the MMS system equipment ledger. The ISCS field model includes: line, specialty, system, equipment label, equipment name, location, precise location, etc.; the MMS system includes fields such as line, specialty, equipment code, equipment name, equipment alias, equipment classification, installation area, etc. For example, after the ISCS dig.tyz.sxzthdm1.dcugz point alarm, the mapping relationship is used to quickly retrieve and match the No. 1 sliding door of the uplink platform coded as 0201030001 in the MMS system to achieve the transmission and interoperability of the underlying data, as shown in Table 1.

[0030] Table 1 Mapping relationship of sliding door No. 1 on the up platform

[0031]

[0032]

[0033] Step S3: Establish an association between equipment failure and fault handling process, match different fault handling processes according to the importance of the equipment and the fault impact level. The fault handling process includes ordinary handling process and emergency handling process. When important equipment failure endangers driving or operational safety, such as the sliding door cannot be closed, the emergency handling process is automatically started; when an ordinary equipment failure alarm occurs, it is quickly handled according to the ordinary handling process.

[0034] Step S4: Establish the relationship between equipment failure, management profession and maintenance operation template. According to the ownership relationship of equipment management, determine which profession is responsible for the management of each operating equipment when a failure occurs, and automatically match the corresponding maintenance operation template. The management professions of comprehensive monitoring equipment in subway stations include electromechanical, door and ladder, automation, AFC and other professions. The electromechanical profession is further divided into environmental control, water supply and drainage, low-voltage power distribution and other minor professions. In order to clarify the automatic matching of maintenance operations with accurate management professions, a management affiliation model of management profession classification and equipment classification is established through the parent-child nodes of the tree structure, for example:

[0035] {"F_CODE":"01","F_NAME":"Station Management","F_PARENT_CODE":"","F_PARENT_NAME":"",F_LV:1},{"F_CODE":"0101","F_NAME":"Mechanical and Electrical Engineering","F_PARENT_CODE":"01","F_PARENT_NAME":"Station Management",F_LV:2},{"F_CODE":"010103","F_NAME":"Low Voltage Power Distribution", "F_PARENT_CODE":"0101","F_PARENT_NAME":"Mechanical and electrical engineering",F_LV:3},{"F_CODE":"01010303","F_NAME":"Lighting distribution box","F_PARENT_CODE":"010103","F_PARENT_NAME":"Low voltage power distribution",F_LV:4},{"F_CODE":"0101030301","F_NAME":"Lighting distribution box 01","F_PARE NT_CODE":"01010303","F_PARENT_NAME":"Lighting distribution box",F_LV:5}。

[0036] When a specific device (Lv5) fails, it will automatically match which equipment category (Lv4) the device belongs to, and then further determine the minor (Lv3) and major (Lv2) that manage the device, and finally determine which station (Lv1) will manage it, so as to establish the association between equipment maintenance operations and management professions, as shown in Table 2 below.

[0037] Table 2 Classification of professional management of equipment

[0038] Lv1 Lv2 Lv3 Lv4 Lv5 Station Management Mechanical and Electrical Engineering Environmental Control Water supply and drainage Low voltage power distribution Ventilation and air conditioning electric control cabinet Power distribution box Lighting distribution box Lighting distribution box 01 Lighting distribution box 02 ... Door and ladder professional Automation ...

[0039] According to different management professional contents, the corresponding maintenance work order template is automatically matched. When an alarm occurs at the equipment monitoring point, the fault point information, fault time, fault location, fault phenomenon and other information are transmitted from the ISCS system to the MMS system through the establishment of a standard REST transmission protocol; the MMS system parses and converts the incoming JSON data through the monitoring point and equipment mapping relationship established in step S2; finally, the work order template class Map is used in the system background<string,Object> This information is automatically captured and filled into the corresponding maintenance work order. After the maintenance personnel receive the order, they can arrange the corresponding preparation work in advance based on the details of the equipment failure.

[0040] Step S5: According to the equipment management specialty specified in step S4, the team shifts and shift handover personnel information of the specialty for the day are determined, and combined with OA attendance and handheld terminal positioning for analysis, the current on-duty and nearest on-duty personnel are determined. After a series of screening strategies, the maintenance work order is automatically assigned to the team member most suitable for on-site maintenance.

[0041] According to the equipment management specialty specified in step S4, all teams under the management specialty are retrieved, and the data structure is as follows:

[0042] {"F_MAJOR":"010103","F_TEAMS":[{"F_TEAM_ID":"010103yb","F_TEAM_NAME":"Low Voltage Distribution Class B"}]}.

[0043] The subway maintenance team generally follows the "day and night rest" shift rule to change shifts. The current shift changeover team is determined using the shift changeover rule. The data structure is as follows:

[0044] {"F_MAJOR":010103","F_GIVE_TEAM_ID":"010103jb","F_GIVE_TEAM_NAME":"Low Voltage Distribution Class A","F_GIVE_TEAM_MEMBER":[{"F_PERSON_ID":"4600013","F_PERSO N_NAME":"Maintenance Personnel A"},{"F_PERSON_ID":"4600054","F_PERSON_NAME":"Maintenance Personnel B"}],"F_RECEIVE_TEAM_ID":"010103yb","F_RECEIVE_TEAM_NAME":"Low Voltage Distribution Class B","F_RECEIVE_TEAM_MEMBER":[{"F_PERSON_ID":"4600027","F_PERSON_NAME":"Maintenance Personnel B"}] E":"Maintenance Personnel C"},{"F_PERSON_ID":"4600042","F_PERSON_NAME":"Maintenance Personnel D"}]}.

[0045] According to the OA attendance punch-in information and the F_PERSON_ID of the team members, all the team members on duty in the current profession are screened. Combined with the handheld terminal positioning function, the location information of the on-duty personnel and the fault location are obtained in real time for spatial distance analysis, so as to determine the person closest to the fault point.

[0046] Step S6: Maintenance personnel receive maintenance work orders for equipment failure alarms under this management profession, plan routes in advance, and prepare maintenance tools and other materials for on-site disposal. Finally, when an alarm is triggered at an equipment point under comprehensive monitoring, the system automatically starts the most suitable disposal process after analysis and judgment, and pushes the fault information to the most suitable team member on site with the most suitable operation template. The entire fault handling link automatically matches fast options, reduces the time for manual judgment and coordination in the middle links, enhances the response speed of fault handling, and ensures operational safety. The complete rail transit equipment fault rapid disposal data model relationship diagram is shown below: Figure 3 shown.

[0047] The rail transit equipment fault rapid handling system of the present invention comprises:

[0048] A mapping relationship and association relationship establishment unit is used to establish a mapping relationship between each equipment monitoring point in the comprehensive monitoring system and each equipment in the equipment operation and maintenance system; establish a first association relationship between equipment failure, management specialty and maintenance operation template, and establish a second association relationship between the management classification and shift handover;

[0049] The rapid fault handling unit is used to determine the corresponding equipment through the mapping relationship when a fault alarm is triggered at the monitoring point, send the fault information to the maintenance work order under the corresponding management profession through the first association relationship, determine the scope of maintenance personnel through the second association relationship, and dispatch the maintenance work order to the maintenance personnel closest to the fault location, and the maintenance personnel will arrive at the fault location to perform maintenance.

[0050] The electronic device described in the present invention includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the computer program is loaded into the processor, the method for quickly handling rail transit equipment faults is implemented.

[0051] The computer-readable storage medium of the present invention stores a computer program, and when the computer program is executed by a processor, the method for quickly handling rail transit equipment failures is implemented.

[0052] The computer-readable storage media may include RAM, ROM, EEPROM, CD-ROM or other optical disk storage, magnetic disk storage or other magnetic storage devices, flash memory, or any other medium that can be used to store program code in the form of instructions or data structures and that can be accessed by a computer.

[0053] The processor is used to execute the computer program stored in the memory to implement each step of the method involved in the above embodiment.

Claims

1. A method for quickly handling rail transit equipment failures, characterized in that: The steps include: Establish a mapping relationship between each equipment monitoring point in the integrated monitoring system and each equipment in the equipment operation and maintenance system; establish a first association relationship between equipment failure, management specialty and maintenance operation template, and establish a second association relationship between the management classification and shift handover; When a fault alarm occurs at a monitoring point, the corresponding equipment will be determined through the mapping relationship, the fault information will be sent to the maintenance work order under the corresponding management profession through the first association relationship, the scope of maintenance personnel will be determined through the second association relationship, and the maintenance work order will be dispatched to the maintenance personnel closest to the fault location. The maintenance personnel will arrive at the fault location to perform maintenance.

2. The method for rapid handling of rail transit equipment failure according to claim 1, characterized in that: The fault information includes fault time, fault location, fault phenomenon and fault level.

3. The method for rapid handling of rail transit equipment failure according to claim 1, characterized in that: The method further includes establishing a third association relationship between equipment failure and failure handling process, matching different failure handling processes according to the importance of the equipment and the level of failure impact, and the failure handling process includes a common handling process and an emergency handling process.

4. The method for rapid handling of rail transit equipment failure according to claim 1, characterized in that: The step of dispatching the maintenance work order to the maintenance personnel closest to the fault location further includes: selecting the maintenance personnel closest to the fault location based on attendance information and location information of the maintenance personnel's handheld terminal.

5. The rail transit equipment fault rapid handling method according to claim 1, characterized in that: The field model of each equipment monitoring point in the comprehensive monitoring system includes line, specialty, system, equipment label, equipment name, location and precise location; the field model of each equipment in the equipment operation and maintenance system includes line, specialty, equipment code, equipment name, equipment alias, equipment classification and installation area; According to the field model of each equipment monitoring point and each equipment field model, a many-to-one mapping relationship between monitoring points and equipment is established.

6. The method for rapid handling of rail transit equipment failure according to claim 1, characterized in that: When a fault alarm is triggered at a monitoring point, the fault information is transmitted from the integrated monitoring system to the equipment operation and maintenance system according to the standard REST transmission protocol. The equipment operation system matches the corresponding equipment information according to the fault information, obtains the corresponding maintenance work order according to the professional management classification of the equipment, and writes the fault information into the maintenance work order.

7. A rail transit equipment fault rapid handling system, characterized in that: include: A mapping relationship and association relationship establishment unit, used to establish a mapping relationship between each equipment monitoring point in the comprehensive monitoring system and each equipment in the equipment operation and maintenance system; Establishing a first association relationship between equipment failure, management specialty and maintenance operation template, and establishing a second association relationship between the management classification and shift handover; The rapid fault handling unit is used to determine the corresponding equipment through the mapping relationship when a fault alarm is triggered at the monitoring point, send the fault information to the maintenance work order under the corresponding management profession through the first association relationship, determine the scope of maintenance personnel through the second association relationship, and dispatch the maintenance work order to the maintenance personnel closest to the fault location, and the maintenance personnel will arrive at the fault location to perform maintenance.

8. The rail transit equipment fault rapid handling system according to claim 7, characterized in that: The mapping relationship and association relationship establishment unit also includes establishing a third association relationship between equipment failure and fault handling process, matching different fault handling processes according to the importance of the equipment and the fault impact level, and the fault handling process includes a general handling process and an emergency handling process; The fault rapid handling unit also includes: selecting the maintenance personnel closest to the fault location according to the attendance information and the location information of the maintenance personnel's handheld terminal; In the fault rapid handling unit, the fault information includes fault time, fault location, fault phenomenon and fault level.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the computer program is loaded into the processor, the method for quickly handling rail transit equipment failures according to any one of claims 1 to 6 is implemented.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method for quickly handling rail transit equipment failures according to any one of claims 1 to 6 is implemented.

Citation Information

Patent Citations

  • Connection method for equipment state monitoring system and asset management system of rail transit

    CN112862114A

  • Rail transit signal equipment fault processing method, device and system

    CN114492870A

  • Multi-specialty networked operation and maintenance system and method based on urban circle rail transit

    CN116502835A

  • Rail transit intelligent operation and maintenance system and method based on state perception

    CN116957531A

  • Method and system for automatically converting alarm of energy monitoring system into work order

    CN118134452A