High-frequency line test tower for computing power server and test method of high-frequency line test tower
By designing a high-frequency line test tower for computing power servers, the problems of inconvenient installation, single detection method and unstable voltage are solved, and the equipment is stable installation, multi-stage detection and voltage stability are achieved, and the detection accuracy and convenience are improved.
Patent Information
- Application Number
- CN202411706074.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-26
- Publication Date
- 2025-03-07
AI Technical Summary
In the prior art, high-frequency line experimental testing equipment is not convenient for modular installation and use, resulting in poor wind resistance and convenient mobility; a single detection method reduces detection accuracy; the voltage of the test equipment is unstable, affecting the detection results.
A high-frequency line test tower for computing power servers is designed, including distribution box, experimental installation base, experimental installation box, line testing box, test box connection plate and other components. It is installed vertically through multiple test box installation bolts, and the equipment is stable and conveniently installed using hinges and electric slide rails; it is equipped with a high-frequency spark tester, ultra-high frequency laser vibrator, industrial frequency line parameter tester and electromagnetic high-frequency vibration tester for multi-stage inspection; it is equipped with an air circuit breaker, leakage protection switch and surge protector to ensure the stability of the voltage.
It improves the wind resistance and movement convenience of high-frequency line detection equipment, enhances detection accuracy, ensures voltage stability, and avoids detection failure.
Smart Images

Figure CN119575163A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of high-frequency line testing, and in particular to a high-frequency line testing tower for a computing power server and a testing method thereof. Background Art
[0002] High-frequency line is a connecting line for high-frequency signal transmission. It is widely used. Common cable TV line is a kind of high-frequency line. High-frequency line is generally used for data transmission of computing power server. However, when using high-frequency line, it is necessary to test the high-frequency line to ensure the stability of high-frequency line in data docking of computing power server. For this reason, a high-frequency line test tower and its test method for computing power server are proposed. However, in the process of realizing the present invention, the inventor found that at least the following problems in the prior art have not been solved: 1. It is inconvenient to modularly install and use the equipment part of high-frequency line experimental detection, thereby reducing the wind resistance stability of high-frequency line experimental detection equipment and the convenient movement of test equipment; 2. It is inconvenient to perform multi-level detection and testing on high-frequency line, and the experimental method of high-frequency line is single, thereby reducing the accuracy of high-frequency line detection; 3. It is inconvenient to use stable voltage for test equipment. When multiple high-frequency line test equipment are used, voltage instability occurs, thereby reducing the voltage stability of high-frequency line detection. For this reason, the present invention designs a high-frequency line test tower and its test method for computing power server. Summary of the invention
[0003] The purpose of the present invention is to solve the shortcomings existing in the prior art, such as: it is inconvenient to modularly install and use the equipment part of the high-frequency line experimental detection, thereby reducing the wind resistance stability of the high-frequency line experimental detection equipment and the convenient movement of the test equipment, and it is also inconvenient to perform multi-stage detection tests on high-frequency lines. The experimental method for high-frequency lines is single, thereby reducing the accuracy of high-frequency line detection, and it is inconvenient to use stable voltage for the test equipment. When multiple high-frequency line test equipment is used, voltage instability occurs, thereby reducing the voltage stability used for high-frequency line detection. To this end, the present invention designs a high-frequency line test tower and a test method thereof for a computing power server.
[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a high-frequency line test tower for a computing power server, comprising a distribution box, a test installation base is fixedly installed on one side of the distribution box, a test installation box is movably installed on the top of the test installation base, a wire detection box is installed through one side of the test installation box, and wire detection holes are provided through both ends of the wire detection box, test box connecting plates are fixedly installed on both ends of the test installation box, test box mounting bolts are threadedly installed on the inside of the test box connecting plates, test box fastening gaskets are threadedly installed on the outside of the test box mounting bolts, and test box fastening nuts are threadedly installed on the bottom of the test box fastening gaskets, a test box door is movably installed on the other side of the test installation box through a hinge, a test box handle is fixedly installed on the other side of the test box door, and test box threading holes are provided through the inside of the test box door;
[0005] An electromagnetic high-frequency vibration tester is movably installed inside the experimental installation box, a power frequency line parameter tester is movably installed on the top of the electromagnetic high-frequency vibration tester, an ultra-high frequency laser vibrometer is movably installed on the top of the power frequency line parameter tester, and a high-frequency spark tester is movably installed on the top of the ultra-high frequency laser vibrometer;
[0006] A distribution wiring hole is provided on one side of the distribution box, a distribution door is movably installed on the other side of the distribution box through a hinge, a distribution handle is fixedly installed on the other side of the distribution door, a distribution mounting frame is fixedly installed inside the distribution box, an air circuit breaker is fixedly installed on the other side of the distribution mounting frame, a leakage protection switch is fixedly installed on the bottom of the air circuit breaker, and a surge protector is fixedly installed on the bottom of the leakage protection switch.
[0007] Preferably, a mounting seat connecting plate is fixedly mounted on the top of the experimental mounting base, a supporting base plate is fixedly mounted on the bottom of the experimental mounting base, and a front and rear adjustment frame is fixedly mounted on one side of the experimental mounting base.
[0008] Preferably, a non-slip bottom pad is fixedly installed on the bottom of the supporting base plate, and a slope is fixedly installed on one side of the non-slip bottom pad.
[0009] Preferably, a front and rear electric slide rail is fixedly installed on the other side of the front and rear adjustment frame, a front and rear electric clamp is fixedly installed on the other side of the rotating end of the rotating motor, an upper and lower adjustment frame is fixedly installed on one side of the front and rear adjustment frame, and a lighting mounting frame is fixedly installed on one end of the upper and lower adjustment frame.
[0010] Preferably, upper and lower electric slide rails are fixedly installed on the other side of the upper and lower adjustment frames, an electric push rod is fixedly installed on the other side of the movable end of the upper and lower electric slide rails, and upper and lower electric clamps are fixedly installed on the other side of the telescopic end of the electric push rod, and a wiring harness placement frame is fixedly installed on one side of the upper and lower adjustment frames.
[0011] Preferably, the interior of the lighting mounting frame is threadedly mounted with lighting mounting bolts, and the surface of the lighting mounting frame is fixedly mounted with a lighting lamp.
[0012] Preferably, the inside of the wire harness placement frame is fixedly installed with a wire harness placement partition, the top of the wire harness placement frame is fixedly installed with an equipment storage box, the inside of the equipment storage box is fixedly installed with an equipment partition, the surface of the equipment storage box is movably installed with an equipment box door through a hinge, the surface of the equipment box door is fixedly installed with an equipment handle, and a storage frame is movably installed on one side of the wire harness placement frame.
[0013] Preferably, a control panel is fixedly installed on the top of the equipment storage box, a control computer is fixedly installed on the top of the control panel, a power socket is fixedly installed on one side of the control computer, and a control button is fixedly installed on the top of the power socket.
[0014] Preferably, a storage bottom plate is fixedly mounted on the bottom of the storage frame, and universal wheels are fixedly mounted on the bottom of the storage bottom plate.
[0015] A method for using a high-frequency line test tower for a computing power server comprises the following steps:
[0016] S1. Support the equipment through the support base plate, then use the anti-skid bottom pad to prevent the equipment from slipping, then use the ramp to facilitate the universal wheel to move, then use the top of the mounting seat connecting plate on the top of the experimental installation base and the bottom of the test box connecting plate to install it movably through the test box fastening nut, then use multiple test box installation bolts to thread through the test box connecting plate to install multiple experimental installation boxes vertically, then use the test box fastening gasket and the test box fastening nut to install the bottom thread of the test box installation bolt, then use the test box handle to pull the test box door to open and close it movably, then use the test box threading hole to facilitate the power supply to the inside of the experimental installation box, then use the wire detection box and the wire detection hole to facilitate the high-frequency wire to pass through the detection, then use the high-frequency spark tester to movably install it inside the experimental installation box and the wire detection box, and then use the high-frequency spark tester to conduct conductor defects on the high-frequency wire. The detection of traps without destroying the conductors, and then use the ultra-high frequency laser vibrometer to measure the high-frequency line for frequency vibration detection, and then use the power frequency line parameter tester to test the power frequency parameters of the high-frequency line, and then use the electromagnetic high-frequency vibration tester to perform vibration detection on the high-frequency line, and then use the distribution handle to pull the distribution door to open and close, and then use the distribution wiring hole to connect the distribution equipment and the detection equipment, and then use the distribution installation frame to stably install the distribution equipment, and then use the air circuit breaker to make the high-frequency line detection equipment line and load overload, short circuit, undervoltage, quickly disconnect the circuit for reliable protection, and then use the leakage protection switch to perform current on-off function, overload protection and short circuit protection on the high-frequency line detection equipment, and then use the surge protector to suddenly generate a peak current or voltage on the high-frequency line detection equipment. The surge protector can conduct shunt protection in a very short time;
[0017] S2. Use the moving ends of the upper and lower electric slide rails to drive the electric push rod to move up and down, then use the telescopic ends of the electric push rods to drive the upper and lower electric grippers to telescopically move, then use the upper and lower electric grippers to drive the high-frequency wire to adjust and move up and down, then use the moving ends of the front and rear electric slide rails to drive the rotating motor to move forward and backward, then use the rotating ends of the rotating motor to drive the front and rear electric grippers to rotate the angle, then use the front and rear electric grippers to flexibly clamp the high-frequency wire after detection to facilitate forward and backward movement, then use the lighting frame installation bolts to stably install the lighting mounting frame, then use the lighting lamp to assist in lighting the detection equipment;
[0018] S3. Use the harness placement frame and harness placement partitions to facilitate the flexible placement of high-frequency harnesses. Then use the equipment handle to pull the equipment box door for flexible opening and closing. Then use the equipment storage box and equipment partitions to flexibly store the detection equipment. Then use the control computer to automatically program and run the electrical equipment. Then use the control button to control the electrical equipment to switch on and off. Then use the power jack to provide power to the electrical equipment. Then use the storage frame to store the high-frequency wires after detection. Then use the universal wheels to move the storage frame.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] 1. The present invention enables multiple test box installation boxes to be installed vertically by threading multiple test box installation bolts through the test box connecting plate, and then uses the test box fastening gasket and the test box fastening nut to install the bottom threads of the test box installation bolts, and then uses the test box handle to pull the test box door for movable opening and closing, and then uses the test box threading hole to facilitate power supply to the inside of the test installation box, and then uses the line detection box and the line detection hole to facilitate the passing of high-frequency lines for detection, and can modularly install and use the high-frequency line detection equipment, so that the high-frequency line detection equipment is wind-resistant during installation, thereby improving the stability of the installation of the high-frequency line detection equipment and improving the convenience of moving the high-frequency line detection equipment.
[0021] 2. The present invention movably installs a high-frequency spark tester inside an experimental installation box and a line detection box, and then uses the high-frequency spark tester to detect conductor defects on the high-frequency line without destroying the conductor, and then uses an ultra-high frequency laser vibrometer to perform frequency vibration measurement and detection on the high-frequency line, and then uses an industrial frequency line parameter tester to test the industrial frequency parameters of the high-frequency line, and then uses an electromagnetic high-frequency vibration tester to perform vibration detection on the high-frequency line. Multi-level detection tests can be performed on the high-frequency line, and the detection methods for the high-frequency line are diversified, thereby improving the accuracy of high-frequency line detection.
[0022] 3. The present invention opens and closes the distribution door by pulling the distribution handle, then uses the distribution wiring hole to connect the distribution equipment and the detection equipment, and then uses the distribution mounting frame to stably install the distribution equipment, and then uses the air circuit breaker to quickly disconnect the circuit for reliable protection when the high-frequency line detection equipment line and load are overloaded, short-circuited, or undervoltage, and then uses the leakage protection switch to perform current on-off functions, overload protection, and short-circuit protection on the high-frequency line detection equipment, and then uses the surge protector to conduct shunt protection in a very short time when the high-frequency line detection equipment suddenly generates a peak current or voltage, thereby improving the stable voltage use of the high-frequency line detection equipment, so that the high-frequency line test equipment will not fail to detect due to unstable voltage during use, thereby improving the voltage stability used for high-frequency line detection. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 A three-dimensional diagram of a high-frequency line test tower for a computing power server proposed by the present invention;
[0024] Figure 2 This is a structural schematic diagram of a high-frequency line test tower for a computing power server proposed by the present invention;
[0025] Figure 3 A schematic diagram of the partial structure of an experimental installation box of a high-frequency line test tower for a computing power server proposed by the present invention;
[0026] Figure 4 A schematic diagram of the partial structure of a distribution box of a high-frequency line test tower for a computing power server proposed by the present invention;
[0027] Figure 5 A partial stereoscopic diagram of the front and rear adjustment frames of a high-frequency line test tower for a computing power server proposed by the present invention;
[0028] Figure 6 A partial stereoscopic diagram of an upper and lower adjustment frame of a high-frequency line test tower for a computing power server proposed by the present invention;
[0029] Figure 7 A partial stereoscopic diagram of a lighting installation frame of a high-frequency line test tower for a computing power server proposed by the present invention;
[0030] Figure 8 A partial stereogram of a control panel of a high-frequency line test tower for a computing power server proposed by the present invention;
[0031] Fig. 9 This is a partial stereoscopic diagram of a storage frame of a high-frequency line test tower for a computing power server proposed by the present invention.
[0032] In the figure: 1. Support base plate; 101. Anti-skid bottom pad; 103. Slope; 2. Distribution box; 201. Distribution door; 202. Distribution handle; 203. Distribution wiring hole; 204. Distribution mounting frame; 205. Air circuit breaker; 206. Leakage protection switch; 207. Surge protector; 3. Experimental installation base; 301. Mounting base connecting plate; 4. Experimental installation box; 401. Test box connecting plate; 402. Test box mounting bolts; 403. Test box fastening gasket; 404. Test box fastening nut; 405. Test box door; 406. Test box handle; 407. Test box threading hole; 408. Wire detection box; 409. Wire detection hole; 5. Front and rear adjustment frame; 501. Front and rear electric slide rails; 502. Rotating motor; 503, front and rear electric grippers; 6, harness placement frame; 601, harness placement partition; 7, equipment storage box; 701, equipment partition; 702, equipment box door; 703, equipment handle; 8, control panel; 801, control computer; 802, power jack; 803, control button; 9, storage frame; 901, storage bottom plate; 902, universal wheel; 10, upper and lower adjustment frame; 1001, upper and lower electric slide rails; 1002, electric push rod; 1003, upper and lower electric grippers; 11, lighting mounting frame; 1101, lighting frame mounting bolts; 1102, lighting lamp; 12, electromagnetic high-frequency vibration testing machine; 1201, power frequency line parameter tester; 1202, ultra-high frequency laser vibrometer; 1203, high-frequency spark testing machine. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] like Figure 1-Figure 9As shown, the present invention provides a high-frequency line test tower for a computing power server and a test method thereof, comprising a distribution box 2, a test installation base 3 is fixedly installed on one side of the distribution box 2, a test installation box 4 is movably installed on the top of the test installation base 3, a wire detection box 408 is installed through one side of the test installation box 4, and wire detection holes 409 are provided through both ends of the wire detection box 408, a test box connecting plate 401 is fixedly installed on both ends of the test installation box 4, a test box mounting bolt 402 is threadedly installed inside the test box connecting plate 401, a test box fastening gasket 403 is threadedly installed outside the test box mounting bolt 402, a test box fastening nut 404 is threadedly installed on the bottom of the test box fastening gasket 403, a test box door 405 is movably installed on the other side of the test installation box 4 through a hinge, a test box handle 406 is fixedly installed on the other side of the test box door 405, and a test box threading hole 407 is provided through the inside of the test box door 405;
[0035] An electromagnetic high-frequency vibration tester 12 is movably installed inside the experimental installation box 4, a power frequency line parameter tester 1201 is movably installed on the top of the electromagnetic high-frequency vibration tester 12, an ultra-high frequency laser vibrometer 1202 is movably installed on the top of the power frequency line parameter tester 1201, and a high-frequency spark tester 1203 is movably installed on the top of the ultra-high frequency laser vibrometer 1202;
[0036] A distribution wiring hole 203 is provided on one side of the distribution box 2, and a distribution door 201 is installed on the other side of the distribution box 2 through a hinge, and a distribution handle 202 is fixedly installed on the other side of the distribution door 201. A distribution mounting frame 204 is fixedly installed inside the distribution box 2, and an air circuit breaker 205 is fixedly installed on the other side of the distribution mounting frame 204. A leakage protection switch 206 is fixedly installed on the bottom of the air circuit breaker 205, and a surge protector 207 is fixedly installed on the bottom of the leakage protection switch 206.
[0037] When the device is working, multiple test box installation bolts 402 are threaded through the test box connecting plate 401 to enable multiple test installation boxes 4 to be installed vertically, and then the test box fastening gasket 403 and the test box fastening nut 404 are used to thread and install on the bottom of the test box installation bolt 402, and then the test box handle 406 is used to pull the test box door 405 for movable opening and closing, and then the test box threading hole 407 is used to facilitate power supply to the inside of the test installation box 4, and then the line detection box 408 and the line detection hole 409 are used to facilitate the passing detection of high-frequency lines, and the high-frequency line detection equipment can be installed and used in a modular manner, so that the high-frequency line detection equipment can be wind-resistant during installation, thereby improving the stability of the installation of the high-frequency line detection equipment and improving the convenience of moving the high-frequency line detection equipment.
[0038] The high-frequency spark tester 1203 is installed movably inside the experimental installation box 4 and the line detection box 408, and then the high-frequency spark tester 1203 is used to detect the conductor defects of the high-frequency line without destroying the conductor, and then the ultra-high frequency laser vibrometer 1202 is used to measure the frequency vibration of the high-frequency line, and then the power frequency line parameter tester 1201 is used to test the power frequency parameters of the high-frequency line, and then the electromagnetic high-frequency vibration tester 12 is used to perform vibration detection on the high-frequency line. It can perform multi-level detection tests on the high-frequency line, and the detection methods of the high-frequency line are diversified, thereby improving the accuracy of the high-frequency line detection. The high-frequency spark tester 1203 is mainly used for online detection of broken skin, pinholes, exposed copper, and poor insulation faults of various types of wires such as communication cables, plastic cables, power cables, optical cables, and cloth wires. It uses the LC oscillation principle to generate a fixed frequency test voltage, which can quickly detect conductor defects without destroying the conductor. The ultra-high frequency laser vibrometer 1202 is based on the laser Doppler principle. It is used for high-frequency vibration measurement, providing a reliable and accurate measurement method, and is suitable for high-frequency vibration measurement of radio frequency micro-electromechanical systems, nano-electromechanical systems, ultrasonic motors, etc. The power frequency line parameter tester 1201 is used for traditional power transmission line power frequency parameter testing, and provides test power through three-phase autotransformer and large-capacity isolation transformer, uses CT and PT for power metering for electrical signal conversion, and finally calculates the power frequency parameter test results of the transmission line. The electromagnetic high-frequency vibration tester 12 adopts modern advanced technology and special processes, and can complete three-axis sinusoidal vibration tests and broadband random vibration tests. It is suitable for vibration tests of various products. The electromagnetic high-frequency vibration tester 12 is electrically connected to the control computer 801 through a wire, the power frequency line parameter tester 1201 is electrically connected to the control computer 801 through a wire, the ultra-high frequency laser vibrometer 1202 is electrically connected to the control computer 801 through a wire, and the high-frequency spark tester 1203 is electrically connected to the control computer 801 through a wire;
[0039] The distribution door 201 is opened and closed by pulling the distribution handle 202, and then the distribution equipment and the detection equipment are connected by using the distribution wiring hole 203, and then the distribution equipment is stably installed by using the distribution mounting frame 204, and then the air circuit breaker 205 is used to quickly disconnect the circuit for reliable protection when the high-frequency line detection equipment line and load are overloaded, short-circuited, or undervoltage, and then the leakage protection switch 206 is used to perform current on-off function, overload protection, and short-circuit protection on the high-frequency line detection equipment, and then the surge protector 207 is used to conduct shunt protection in a very short time when the high-frequency line detection equipment suddenly generates a peak current or voltage, thereby improving the stable voltage use of the high-frequency line detection equipment and making the high-frequency line detection equipment more stable. The line test equipment will not fail to detect due to unstable voltage when in use, thereby improving the voltage stability used in high-frequency line detection. The air circuit breaker 205 is connected, disconnected and carries the rated working current and fault current such as short circuit and overload in the circuit, and can quickly disconnect the circuit and provide reliable protection when the line and load are overloaded, short-circuited, undervoltage, etc. The dynamic and static contacts and contact rods of the circuit breaker are designed in various styles, but improving the breaking capacity of the circuit breaker is the main purpose. The current limiting principle of the peak value of the short-circuit current during disconnection is used by using a certain contact structure. The LH in the leakage protection switch 206 is a zero-sequence current transformer, which is composed of an iron core made of permalloy and a secondary coil wound on the annular iron core to form a detection element. The power phase line and the neutral line pass through the circular The hole becomes the primary coil of the zero sequence mutual inductor, and the rear outlet of the mutual inductor is the protection range. The surge protector 207 is an electronic device that provides safety protection for various electronic equipment, instruments and meters, and communication lines. When a peak current or voltage suddenly occurs in an electrical circuit or communication line due to external interference, the surge protector 207 can conduct and shunt in a very short time, thereby avoiding the damage of the surge to other equipment in the circuit. The electromagnetic high-frequency vibration tester 12 is electrically connected to the air circuit breaker 205 through a wire, the power frequency line parameter tester 1201 is electrically connected to the air circuit breaker 205 through a wire, the ultra-high frequency laser vibrometer 1202 is electrically connected to the air circuit breaker 205 through a wire, and the high-frequency spark tester 1203 The electromagnetic high-frequency vibration tester 12 is electrically connected to the air circuit breaker 205 through a wire, the electromagnetic high-frequency vibration tester 12 is electrically connected to the leakage protection switch 206 through a wire, the power frequency line parameter tester 1201 is electrically connected to the leakage protection switch 206 through a wire, the ultra-high frequency laser vibrometer 1202 is electrically connected to the leakage protection switch 206 through a wire, the high-frequency spark tester 1203 is electrically connected to the leakage protection switch 206 through a wire, the electromagnetic high-frequency vibration tester 12 is electrically connected to the surge protector 207 through a wire, the power frequency line parameter tester 1201 is electrically connected to the surge protector 207 through a wire, and the ultra-high frequency laser vibrometer 1202 is electrically connected to the surge protector 207 through a wire.The high frequency spark tester 1203 is electrically connected to the surge protector 207 through a wire;
[0040] Among them, a mounting seat connecting plate 301 is fixedly installed on the top of the experimental mounting base 3, a supporting base plate 1 is fixedly installed on the bottom of the experimental mounting base 3, and a front and rear adjustment frame 5 is fixedly installed on one side of the experimental mounting base 3;
[0041] It should be noted that when the device is working, the top of the mounting seat connecting plate 301 on the top of the experimental installation base 3 and the bottom of the test box connecting plate 401 can be movably installed through the test box fastening nut 404, thereby improving the installation stability of the experimental installation box 4;
[0042] Among them, a non-slip bottom pad 101 is fixedly installed at the bottom of the supporting base plate 1, and a slope 103 is fixedly installed on one side of the non-slip bottom pad 101;
[0043] It should be noted that the device is supported by the support base 1, and then the anti-skid bottom pad 101 is used to prevent the device from slipping, and then the ramp 103 is used to facilitate the movement of the universal wheel 902, thereby improving the stability of the device.
[0044] Among them, the other side of the front and rear adjustment frame 5 is fixedly installed with a front and rear electric slide rail 501, the other side of the moving end of the front and rear electric slide rail 501 is fixedly installed with a rotating motor 502, and the other side of the rotating end is fixedly installed with a front and rear electric gripper 503, one side of the front and rear adjustment frame 5 is fixedly installed with an up and down adjustment frame 10, and one end of the up and down adjustment frame 10 is fixedly installed with a lighting installation frame 11;
[0045] It should be noted that the rotating motor 502 is driven to move forward and backward by the moving end of the front and rear electric slide rails 501, and then the rotating end of the rotating motor 502 is used to drive the front and rear electric grippers 503 to rotate at an angle, and then the front and rear electric grippers 503 are used to clamp the high-frequency wire after detection to facilitate the forward and backward movement, thereby conveniently driving the high-frequency wire to move. The front and rear electric grippers 503 are a device that realizes the clamping and releasing functions through electric drive, and its interior is usually composed of a motor, a reducer and gripper fingers. When the motor receives an instruction, the power is transmitted to the gripper fingers through the reducer, thereby realizing accurate clamping and releasing operations. This working principle not only ensures the efficient operation of the gripper, but also ensures its accuracy and stability. The front and rear electric slide rails 501 are electrically connected to the control computer 801 through wires, the rotating motor 502 is electrically connected to the control computer 801 through wires, and the front and rear electric grippers 503 are electrically connected to the control computer 801 through wires;
[0046] Among them, the other side of the upper and lower adjustment frame 10 is fixedly installed with an upper and lower electric slide rail 1001, the other side of the moving end of the upper and lower electric slide rail 1001 is fixedly installed with an electric push rod 1002, the other side of the telescopic end of the electric push rod 1002 is fixedly installed with an upper and lower electric clamp 1003, and one side of the upper and lower adjustment frame 10 is fixedly installed with a harness placement frame 6;
[0047] It should be noted that the moving end of the upper and lower electric slide rails 1001 drives the electric push rod 1002 to move up and down, and then the telescopic end of the electric push rod 1002 drives the upper and lower electric grippers 1003 to telescopically move, and then the upper and lower electric grippers 1003 drive the high-frequency line to adjust and move up and down, thereby improving the convenience of high-frequency line detection. The upper and lower electric grippers 1003 are a device that realizes the clamping and releasing functions through electric drive, and its interior is usually composed of a motor, a reducer and gripper fingers. When the motor receives an instruction, the power is transmitted to the gripper fingers through the reducer, thereby realizing accurate clamping and releasing operations. This working principle not only ensures the efficient operation of the gripper, but also ensures its accuracy and stability. The upper and lower electric slide rails 1001 are electrically connected to the control computer 801 through wires, the electric push rod 1002 is electrically connected to the control computer 801 through wires, and the upper and lower electric grippers 1003 are electrically connected to the control computer 801 through wires;
[0048] The interior of the lighting mounting frame 11 is threadedly mounted with lighting mounting bolts 1101, and the surface of the lighting mounting frame 11 is fixedly mounted with a lighting lamp 1102;
[0049] It should be noted that the lighting mounting frame 11 is stably installed by means of the lighting mounting bolts 1101, and then the lighting lamp 1102 is used to assist in lighting the detection equipment, thereby facilitating the staff to observe the detection situation, and the lighting lamp 1102 is electrically connected to the control computer 801 through a wire.
[0050] Among them, the inside of the harness placement frame 6 is fixedly installed with a harness placement partition 601, the top of the harness placement frame 6 is fixedly installed with an equipment storage box 7, the inside of the equipment storage box 7 is fixedly installed with an equipment partition 701, the surface of the equipment storage box 7 is movably installed with an equipment box door 702 through a hinge, the surface of the equipment box door 702 is fixedly installed with an equipment handle 703, and a storage frame 9 is movably installed on one side of the harness placement frame 6;
[0051] It should be noted that the high-frequency wire harness is conveniently placed by means of the wire harness placement frame 6 and the wire harness placement partition 601, and then the equipment handle 703 is used to pull the equipment box door 702 for movability opening and closing, and then the equipment storage box 7 and the equipment partition 701 are used to movably store the detection equipment, thereby improving the convenience of equipment storage.
[0052] Among them, a control panel 8 is fixedly installed on the top of the equipment storage box 7, a control computer 801 is fixedly installed on the top of the control panel 8, a power socket 802 is fixedly installed on one side of the control computer 801, and a control button 803 is fixedly installed on the top of the power socket 802.
[0053] It should be noted that the electrical equipment is automatically programmed and operated by controlling the computer 801, and then the control button 803 is used to control the electrical equipment to turn on and off, and then the power socket 802 is used to provide power to the electrical equipment, thereby improving the stability of the use of the electrical equipment. The control computer 801 is electrically connected to the control button 803 through a wire, the control button 803 is electrically connected to the power socket 802 through a wire, and the power socket 802 is electrically connected to an external power source through a wire.
[0054] A storage bottom plate 901 is fixedly installed at the bottom of the storage frame 9 , and universal wheels 902 are fixedly installed at the bottom of the storage bottom plate 901 .
[0055] It should be noted that the detected high-frequency wires are stored by the storage frame 9, and then the storage frame 9 is moved by the universal wheels 902, thereby improving the convenience of storing and moving the high-frequency wires.
[0056] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A high-frequency line test tower for a computing power server, comprising a distribution box (2), characterized in that: An experimental installation base (3) is fixedly installed on one side of the distribution box (2), and an experimental installation box (4) is movably installed on the top of the experimental installation base (3). A wire detection box (408) is installed through one side of the experimental installation box (4), and wire detection holes (409) are provided through both ends of the wire detection box (408). A test box connecting plate (401) is fixedly installed on both ends of the experimental installation box (4), and the interior of the test box connecting plate (401) is threadedly installed with a test box installation bolt ( 402), the outer part of the test box installation bolt (402) is threadedly installed with a test box fastening gasket (403), the bottom of the test box fastening gasket (403) is threadedly installed with a test box fastening nut (404), the other side of the experimental installation box (4) is movably installed with a test box door (405) through a hinge, the other side of the test box door (405) is fixedly installed with a test box handle (406), and the interior of the test box door (405) is penetrated by a test box threading hole (407); An electromagnetic high-frequency vibration tester (12) is movably installed inside the experimental installation box (4); a power frequency line parameter tester (1201) is movably installed on the top of the electromagnetic high-frequency vibration tester (12); an ultra-high frequency laser vibrometer (1202) is movably installed on the top of the power frequency line parameter tester (1201); and a high-frequency spark tester (1203) is movably installed on the top of the ultra-high frequency laser vibrometer (1202); A power distribution wiring hole (203) is provided through one side of the power distribution box (2); a power distribution door (201) is movably mounted on the other side of the power distribution box (2) via a hinge; a power distribution handle (202) is fixedly mounted on the other side of the power distribution door (201); a power distribution mounting frame (204) is fixedly mounted inside the power distribution box (2); an air circuit breaker (205) is fixedly mounted on the other side of the power distribution mounting frame (204); a leakage protection switch (206) is fixedly mounted on the bottom of the air circuit breaker (205); and a surge protector (207) is fixedly mounted on the bottom of the leakage protection switch (206).
2. A high-frequency line test tower for a computing power server according to claim 1, characterized in that: A mounting seat connecting plate (301) is fixedly mounted on the top of the experimental mounting base (3), a supporting base plate (1) is fixedly mounted on the bottom of the experimental mounting base (3), and a front and rear adjustment frame (5) is fixedly mounted on one side of the experimental mounting base (3).
3. A high-frequency line test tower for a computing power server according to claim 2, characterized in that: An anti-skid bottom pad (101) is fixedly installed at the bottom of the supporting bottom plate (1), and a slope (103) is fixedly installed on one side of the anti-skid bottom pad (101).
4. A high-frequency line test tower for a computing power server according to claim 2, characterized in that: A front and rear electric slide rail (501) is fixedly mounted on the other side of the front and rear adjustment frame (5), a rotating motor (502) is fixedly mounted on the other side of the moving end of the front and rear electric slide rail (501), and a front and rear electric gripper (503) is fixedly mounted on the other side of the rotating end. An upper and lower adjustment frame (10) is fixedly mounted on one side of the front and rear adjustment frame (5), and a lighting installation frame (11) is fixedly mounted on one end of the upper and lower adjustment frame (10).
5. A high-frequency line test tower for a computing power server according to claim 4, characterized in that: An upper and lower electric slide rail (1001) is fixedly mounted on the other side of the upper and lower adjustment frame (10), an electric push rod (1002) is fixedly mounted on the other side of the movable end of the upper and lower electric slide rail (1001), an upper and lower electric gripper (1003) is fixedly mounted on the other side of the telescopic end of the electric push rod (1002), and a wire harness placement frame (6) is fixedly mounted on one side of the upper and lower adjustment frame (10).
6. A high frequency line test tower for a computing power server according to claim 4, characterized in that: The interior of the lighting installation frame (11) is threadedly mounted with lighting frame mounting bolts (1101), and a lighting lamp (1102) is fixedly mounted on the surface of the lighting installation frame (11).
7. A high-frequency line test tower for a computing power server according to claim 5, characterized in that: The interior of the harness placement frame (6) is fixedly installed with a harness placement partition (601), the top of the harness placement frame (6) is fixedly installed with an equipment storage box (7), the interior of the equipment storage box (7) is fixedly installed with an equipment partition (701), the surface of the equipment storage box (7) is movably installed with an equipment box door (702) via a hinge, the surface of the equipment box door (702) is fixedly installed with an equipment handle (703), and a storage frame (9) is movably installed on one side of the harness placement frame (6).
8. A high frequency line test tower for a computing power server according to claim 7, characterized in that: A control panel (8) is fixedly mounted on the top of the equipment storage box (7), a control computer (801) is fixedly mounted on the top of the control panel (8), a power socket (802) is fixedly mounted on one side of the control computer (801), and a control button (803) is fixedly mounted on the top of the power socket (802).
9. A high-frequency line test tower for a computing power server according to claim 7, characterized in that: A storage bottom plate (901) is fixedly mounted on the bottom of the storage frame (9), and universal wheels (902) are fixedly mounted on the bottom of the storage bottom plate (901).
10. A method for using a high-frequency line test tower for a computing power server, based on a high-frequency line test tower for a computing power server according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1. The device is supported by a supporting base plate (1), and then the anti-skid bottom pad (101) is used to prevent the device from slipping. Then, the universal wheel (902) is conveniently moved by using a ramp (103). Then, the top of the mounting seat connecting plate (301) at the top of the experimental installation base (3) and the bottom of the test box connecting plate (401) are used to movably install the test box fastening nut (404). Then, multiple test box installation bolts (402) are threaded through the test box connecting plate (401) to vertically install multiple test installation boxes (4). Then, the test box installation bolts (402) are screwed through the test box connecting plate (401). The test box fastening gasket (403) and the test box fastening nut (404) are threadedly installed on the bottom of the test box mounting bolt (402), and then the test box handle (406) is used to pull the test box door (405) to open and close it. Then, the test box threading hole (407) is used to conveniently supply power to the inside of the test installation box (4), and then the wire detection box (408) and the wire detection hole (409) are used to facilitate the high-frequency wire to pass through the detection, and then the high-frequency spark tester (1203) is used to move the inside of the test installation box (4) and the wire detection box (408). Then, a high-frequency spark tester (1203) is used to detect the conductor defects of the high-frequency line without destroying the conductor, and then an ultra-high frequency laser vibrometer (1202) is used to measure the frequency vibration of the high-frequency line. Then, an industrial frequency line parameter tester (1201) is used to test the industrial frequency parameters of the high-frequency line. Then, an electromagnetic high-frequency vibration tester (12) is used to perform vibration detection on the high-frequency line. Then, a distribution handle (202) is used to pull the distribution door (201) to open and close it, and then the distribution equipment and the detection equipment are connected by the distribution wiring hole (203). The power distribution equipment is connected in a row, and then the power distribution installation frame (204) is used to stably install the power distribution equipment, and then the air circuit breaker (205) is used to quickly disconnect the circuit to provide reliable protection when the high-frequency line detection equipment line and load are overloaded, short-circuited, or undervoltage occurs. Then, the leakage protection switch (206) is used to perform current on-off functions, overload protection, and short-circuit protection on the high-frequency line detection equipment. Then, the surge protector (207) is used to conduct shunt protection in a very short time when the high-frequency line detection equipment suddenly generates a peak current or voltage. S2, the electric push rod (1002) is driven to move up and down by the moving ends of the upper and lower electric slide rails (1001), and then the upper and lower electric clamps (1003) are driven to move telescopically by the telescopic ends of the electric push rod (1002), and then the upper and lower electric clamps (1003) are driven to adjust and move up and down by the upper and lower electric clamps, and then the moving ends of the front and rear electric slide rails (501) are driven to move the rotating motor (502) forward and backward, and then the rotating ends of the rotating motor (502) are driven to rotate the front and rear electric clamps (503) at an angle, and then the front and rear electric clamps (503) are used to flexibly clamp the high-frequency wire after detection and facilitate forward and backward movement, and then the lighting frame mounting bolts (1101) are used to stably install the lighting mounting frame (11), and then the lighting lamp (1102) is used to assist in lighting the detection equipment; S3, the high-frequency wire harness is conveniently placed by means of the wire harness placement frame (6) and the wire harness placement partition (601), then the device handle (703) is used to pull the device box door (702) for movably opening and closing, then the device storage box (7) and the device partition (701) are used to movably store the detection equipment, then the control computer (801) is used to automatically program and operate the electrical equipment, then the control button (803) is used to control the electrical equipment to switch on and off, then the power socket (802) is used to provide power to the electrical equipment, then the storage frame (9) is used to store the high-frequency wire after detection, and then the universal wheel (902) is used to make the storage frame (9) move movably.