Power grid operation task management and control method, device and equipment and storage medium
By conducting qualification verification and operation risk management for power grid operators, combined with the standard risk value of operation tasks, it determines whether the operators can participate in the task, solves the accident problems caused by personnel qualifications and fatigue in power grid operations, and improves operation safety.
Patent Information
- Application Number
- CN202411492503.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2025-03-07
AI Technical Summary
In power grid operation tasks, the proportion of incidents caused by the lack of qualifications of the operator and fatigue of the operator accounts for a high proportion of events. It is crucial to reduce the proportion of human factors.
By obtaining and analyzing the power grid task allocation information, determining the job task list and the job personnel list, calculating the job saturation and current job risk values based on historical job information, performing job qualification verification, and determining whether the job personnel can participate in the task based on the standard risk values of the job tasks.
It effectively reduces the accident rate of power grid operation tasks, improves safety during power grid operation, and reduces the impact of human factors by scientifically managing the qualifications and risks of operators.
Smart Images

Figure CN119578746A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power grid technology, and in particular to a method, device, equipment and storage medium for controlling power grid operation tasks. Background Art
[0002] Operation tasks within the power grid system, such as secondary professional operations, have complex situations such as a wide operation scope, multiple operation types, a large span of risks of different operations, complex operating personnel, high requirements for the professional level of operating personnel, and a high degree of dependence on the mental state of the operating personnel.
[0003] According to the analysis of power grid operation accidents that have occurred in the power grid system in recent years, it can be seen that accidents caused by human factors account for a high proportion, among which unqualified personnel and fatigue work are important influencing factors. Therefore, how to reduce the above two influencing factors is crucial to reducing the proportion of human factors in power grid operation accidents. Summary of the invention
[0004] The present invention provides a method, device, equipment and storage medium for controlling power grid operation tasks, so as to reduce the accident rate of power grid operation tasks.
[0005] According to one aspect of the present invention, a method for controlling power grid operation tasks is provided, the method comprising:
[0006] Obtain and parse the power grid task allocation information, and determine the list of work tasks to be assigned to the workers and the list of workers who will participate in the work tasks according to the coupling relationship between the worker table and the work task table in the power grid task allocation information;
[0007] Determine the operation saturation and current operation risk value of the operator based on the historical operation information of the operator;
[0008] Based on the standard operator database, the operator qualifications in the operator list are verified to determine the target operator;
[0009] According to the current operation risk value of the target operator and the standard operation risk value corresponding to the operation task that the target operator will participate in, it is determined whether the target operator can participate in the operation task.
[0010] According to another aspect of the present invention, a control device for power grid operation tasks is provided, the device comprising:
[0011] The task parsing module is used to obtain and parse the power grid task allocation information, and determine the list of work tasks to be assigned to the operators and the list of operators who will participate in the work tasks according to the coupling relationship between the operator table and the work task table in the power grid task allocation information;
[0012] A risk value module, used to determine the operation saturation and current operation risk value of the operator based on the historical operation information of the operator;
[0013] A qualification verification module is used to verify the operating qualifications of the operators in the operator list based on the standard operator database to determine the target operator;
[0014] The task control module is used to determine whether the target operator can participate in the operation task based on the current operation risk value of the target operator and the standard operation risk value corresponding to the operation task that the target operator will participate in.
[0015] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:
[0016] at least one processor; and
[0017] a memory communicatively connected to the at least one processor; wherein,
[0018] The memory stores a computer program that can be executed by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the method for controlling power grid operation tasks described in any embodiment of the present invention.
[0019] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for controlling power grid operation tasks described in any embodiment of the present invention when executed.
[0020] According to another aspect of the present invention, a computer program product is provided. The computer program product includes a computer program. When the computer program is processed by a processor, the computer program implements the method for controlling power grid operation tasks described in any embodiment of the present invention.
[0021] The technical solution of the embodiment of the present invention, by verifying the qualifications of power grid operators and incorporating the operational risks of power grid operators into operational risk management, combines the risks of operational tasks with the risks of operators, and can effectively reveal the risk situation of operating tasks performed by operators in the power grid, facilitate targeted risk management of operating tasks, effectively reduce the accident rate of power grid operating tasks, and improve the safety of the power grid operation process.
[0022] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0024] Figure 1 This is a flow chart of a method for controlling power grid operation tasks provided according to Embodiment 1 of the present invention;
[0025] Figure 2 This is a flow chart of a method for controlling power grid operation tasks provided according to Embodiment 2 of the present invention;
[0026] Figure 3 This is a schematic diagram of the structure of a control device for power grid operation tasks provided in accordance with Embodiment 3 of the present invention;
[0027] Figure 4 It is a structural schematic diagram of an electronic device for implementing the method for controlling power grid operation tasks according to an embodiment of the present invention. DETAILED DESCRIPTION
[0028] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0029] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0030] Embodiment 1
[0031] Figure 1 A flowchart of a method for controlling power grid operation tasks is provided for the first embodiment of the present invention. This embodiment is applicable to the case of assigning power grid operation tasks to operators. The method can be executed by a method for controlling power grid operation tasks. The method for controlling power grid operation tasks can be implemented in the form of hardware and / or software. The method for controlling power grid operation tasks can be configured in various general-purpose computing devices. Figure 1 As shown, the method includes:
[0032] S110, obtaining and parsing the power grid task allocation information, and determining the list of work tasks to be allocated to the workers and the list of workers who will participate in the work tasks according to the coupling relationship between the worker table and the work task table in the power grid task allocation information.
[0033] The power grid task allocation information may include the type information of the task to be performed, the operator information of the task to be performed, the operation time information of the task, and the operation location information of the task. Optionally, the power grid task allocation information may be obtained from a power grid operation task database, which stores different operation information tables for recording power grid task allocation information. It should be noted that the coupling relationship may refer to the table connection relationship between different data tables in the database.
[0034] Specifically, a connection can be established with the power grid operation task database to obtain the operator table and the operation task table in the power grid operation task database, and the table connection relationship between the operator table and the operation task table can be analyzed to determine the list of operation tasks to be assigned to the operators and the list of operators who will participate in the operation tasks.
[0035] S120. Determine the operation saturation and current operation risk value of the operator based on the operator's historical operation information.
[0036] The historical operation information may include the operator's daily workload information and historical operation duration information. Optionally, the historical operation information may be obtained from a historical operation database. The historical operation database records the operator's daily operation information. Whenever an operator's operation information is generated, when the operator completes the operation task of the day, a historical operation information record corresponding to the operator will be generated in the historical operation database.
[0037] The operation saturation can be used to indicate the operation intensity of the operator in the operation cycle. The greater the value of the operation saturation, the greater the operation intensity of the operator in the operation cycle. The current operation risk value can be used to indicate the degree of operation risk of the operator in the next operation task. The higher the current operation risk value, the greater the degree of operation risk. Optionally, the operation cycle can be adaptively set according to those skilled in the art.
[0038] Specifically, the historical operation information of the operator can be obtained from the historical operation database, so as to determine the operation saturation and current operation risk value of the operator according to the obtained historical operation information.
[0039] S130. Based on the standard operator database, verify the operator qualifications in the operator list to determine the target operator.
[0040] Among them, the standard operator database records the staff who can participate in the power grid operation tasks. It should be noted that the operators stored in the standard operator database have personal information that meets the preset completeness threshold and have power grid operation qualifications. Optionally, the completeness threshold can be adaptively set according to technical personnel in this field.
[0041] In the embodiment of the present invention, if the operator wants to be recorded in the standard operator database, the operator must register in the power grid operation system, and must provide a certain degree of complete personal information during registration, such as whether the operator has passed the safety test, etc. After the power grid operation system completes the review of the personal information uploaded by the operator, the power grid operation system needs to confirm whether the operator has the relevant power grid operation qualifications, and divide the operators with power grid operation qualifications according to the type of operation tasks, such as wiring qualification personnel, 110kv commissioning qualification personnel, and 220kv commissioning qualification personnel. Only operators with the corresponding operation task type qualifications can perform the corresponding operation.
[0042] Optionally, the operating qualifications of the operators in the operator list are verified to determine the target operators, including: using the operator's personal information as an identifier, matching each operator in the operator list with the operators in the standard operator database; if the match is successful, the operator is the target operator. If the match is unsuccessful, it indicates that the operator does not have the relevant grid operating qualifications, and the operator is not allowed to perform any operating tasks. It should be noted that the identification information can be adaptively set according to technical personnel in this field, for example, it can be the operator's work number information, etc.
[0043] The above method can greatly reduce the possibility of power grid operation accidents caused by insufficient qualifications of operators.
[0044] S140. Determine whether the target operator can participate in the operation task based on the current operation risk value of the target operator and the standard operation risk value corresponding to the operation task that the target operator will participate in.
[0045] Among them, the standard operation risk value is used to determine whether the operator is allowed to perform the operator's indicators. Optionally, the standard operation risk value can be obtained from a standard operation risk database, which records the operation risk value corresponding to each type of operation task, and the standard operation risk database will be dynamically updated in real time according to different operation environments every day. For example, if the real-time environmental data of the operation environment is different, it will affect the operation risk value of the operation task performed in the operation environment.
[0046] Optionally, based on the target operator's current operation risk value and the standard operation risk value corresponding to the operation task in which the target operator will participate, determine whether the target operator can participate in the operation task, including: if the target operator's current operation risk value is less than the standard operation risk value corresponding to the operation task in which the target operator will participate, then determine that the target operator is allowed to participate in the operation task.
[0047] Specifically, the standard operation risk value corresponding to the operation task that the target operator is going to participate in can be obtained from the standard operation risk database. If the current operation risk value of the target operator is less than the standard operation risk value corresponding to the operation task that the target operator is going to participate in, it indicates that the target operator has a lower risk of theoretically performing the operation, and the target operator is determined to be allowed to participate in the operation task. If the current operation risk value of the target operator is greater than or equal to the standard operation risk value corresponding to the operation task that the target operator is going to participate in, it indicates that the target operator has a higher risk of theoretically performing the operation, and the target operator is determined not to be allowed to participate in the operation task.
[0048] By combining the standard operating risk of the operating task with the operating risk of the target operator, the operating risk of the power grid operating task can be effectively monitored to control the operating personnel in executing the operating task.
[0049] The technical solution of the embodiment of the present invention, by verifying the qualifications of power grid operators and incorporating the operational risks of power grid operators into operational risk management, combines the risks of operational tasks with the risks of operators, and can effectively reveal the risk situation of operating tasks performed by operators in the power grid, facilitate targeted risk management of operating tasks, effectively reduce the accident rate of power grid operating tasks, and improve the safety of the power grid operation process.
[0050] Embodiment 2
[0051] Figure 2 This is a flowchart of a method for controlling power grid operation tasks provided in the second embodiment of the present invention. This embodiment further refines the above embodiment and provides specific steps for determining the operation saturation and current operation risk value of operators based on the historical operation information of operators. It should be noted that for the undetailed parts of the embodiments of the present invention, please refer to the relevant descriptions of other embodiments, which will not be repeated here. Figure 2 As shown, the method includes:
[0052] S210, obtaining and parsing the power grid task allocation information, and determining the list of work tasks to be assigned to the workers and the list of workers who will participate in the work tasks according to the coupling relationship between the worker table and the work task table in the power grid task allocation information.
[0053] S220. Determine the ratio of consecutive working days, the ratio of accumulated workload, and the average work intensity of the operating personnel in the operating cycle according to the historical operating information of the operating personnel in the operating cycle.
[0054] The historical operation information of the operator during the operation cycle may include the operator's continuous working days information, cumulative workload information and actual daily workload information during the operation cycle.
[0055] The continuous workload ratio can be used to indicate the continuous work of the operator in the current operation cycle. The cumulative workload ratio can be used to indicate the cumulative workload of the operator in the current operation cycle. The average work intensity can be used to indicate the daily work of the operator in the current operation cycle.
[0056] Optionally, the continuous workload ratio, the cumulative workload ratio and the average workload intensity may be determined by the following formula:
[0057] Continuous workload ratio = continuous working days / operation cycle days;
[0058] Cumulative workload ratio = cumulative workload / set cumulative workload;
[0059] Average work intensity = ∑ (actual daily workload / set daily workload) / number of days in the operation cycle.
[0060] Among them, the number of consecutive working days is the maximum number of consecutive working days in the current operating cycle. The cumulative workload is the cumulative workload of the operating personnel in the current operating cycle. The number of days in the operating cycle is the number of operating days specified in the operating cycle. The set cumulative workload can refer to the workload that needs to be achieved in the operating cycle. The daily set workload can refer to the workload that needs to be achieved in advance every day. It should be noted that the workload weight coefficient corresponding to the operating task is different for different types of operating tasks. For example, the workload of each daily operating task can be the basic workload multiplied by the corresponding weight coefficient.
[0061] S230. Determine the operation saturation of the operator in the operation cycle according to the ratio of consecutive working days, the ratio of cumulative workload and the average work intensity of the operator in the operation cycle.
[0062] Optionally, the job saturation can be determined by the following formula:
[0063] Job saturation = max (continuous workload ratio, cumulative workload ratio) * average work intensity * 100%.
[0064] By setting the number of days in the work cycle, the work saturation of the operators within the calculation cycle can be calculated in real time, thereby realizing dynamic detection of the work saturation of the operators.
[0065] S240. Determine the current operation risk value of the operator according to the operation saturation, and the preset operation task risk parameters and operation task loss parameters.
[0066] Optionally, in an embodiment of the present invention, the standard operation risk database also stores operation task risk parameters and operation task loss parameters corresponding to each type of operation task. The operation task risk parameters can be used to characterize the probability of risk occurring when the operation task is executed, and the operation task loss parameters can be used to characterize the degree of loss caused by the occurrence of risk during the execution of the operation task. It should be noted that, for the operation task risk parameters and operation task loss parameters, those skilled in the art can determine them based on the historical operation data of the operation tasks that have operation risks.
[0067] Optionally, the current operation risk value can be determined according to the following formula:
[0068] Current operation risk value = operation saturation * P * S.
[0069] Wherein, P is the operation risk parameter of the operation task that the operator is about to perform, and S is the operation task loss parameter of the operation task that the operator is about to perform.
[0070] After determining the current operation risk value of the operator, the current operation risk value can be classified into risk levels, for example, according to a pre-established mapping relationship between the risk level and the current operation risk value, the operation risk level of the operator is determined. Optionally, after determining the operation risk level of the operator, it can be compared with the operation risk level corresponding to the standard operation risk value of the operation task.
[0071] By introducing the work saturation of operators, the actual impact of operators on work risks under different fatigue working conditions can be more intuitively reflected.
[0072] S250. Based on the standard operator database, the operator qualifications in the operator list are verified to determine the target operator.
[0073] S260: Determine whether the target operator can participate in the operation task based on the current operation risk value of the target operator and the standard operation risk value corresponding to the operation task that the target operator will participate in.
[0074] The technical solution of the embodiment of the present invention, by introducing the operator's work saturation information in the process of determining the operator's work risk, can more intuitively reflect the actual impact of the operator on the work risk under different fatigue working conditions, and obtain a more accurate work risk value for the operator, laying a data foundation for whether subsequent operators can perform work tasks, thereby reducing the failure rate of work tasks.
[0075] Embodiment 3
[0076] Figure 3 This is a schematic diagram of the structure of a control device for power grid operation tasks provided by the third embodiment of the present invention. Figure 3 As shown, the device comprises:
[0077] The task parsing module 310 is used to obtain and parse the power grid task allocation information, and determine the list of work tasks to be allocated to the workers and the list of workers who will participate in the work tasks according to the coupling relationship between the worker table and the work task table in the power grid task allocation information;
[0078] A risk value module 320, for determining the operation saturation and current operation risk value of the operator based on the historical operation information of the operator;
[0079] The qualification verification module 330 is used to verify the operation qualifications of the operators in the operator list based on the standard operator database to determine the target operator;
[0080] The task control module 340 is used to determine whether the target operator can participate in the operation task according to the current operation risk value of the target operator and the standard operation risk value corresponding to the operation task that the target operator will participate in.
[0081] The technical solution of the embodiment of the present invention, by verifying the qualifications of power grid operators and incorporating the operational risks of power grid operators into operational risk management, combines the risks of operational tasks with the risks of operators, and can effectively reveal the risk situation of operating tasks performed by operators in the power grid, facilitate targeted risk management of operating tasks, effectively reduce the accident rate of power grid operating tasks, and improve the safety of the power grid operation process.
[0082] Optionally, the risk value module 320 includes:
[0083] A historical operation information unit, used to determine the ratio of consecutive working days, the ratio of accumulated workload and the average work intensity of the operator in the operation cycle according to the historical operation information of the operator in the operation cycle; wherein the historical operation information includes the information of consecutive working days, accumulated workload and actual workload information of each day of the operator in the operation cycle;
[0084] A saturation determination unit, used to determine the operation saturation of the operator in the operation cycle according to the ratio of consecutive working days, the cumulative workload ratio and the average work intensity of the operator in the operation cycle;
[0085] The risk value determination unit is used to determine the current operation risk value of the operator according to the operation saturation, and preset operation task risk parameters and operation task loss parameters.
[0086] Optionally, the continuous working days ratio is determined according to the working days in the working cycle and the maximum continuous working days of the operator in the working cycle; the cumulative workload ratio is determined according to the cumulative workload of the operator in the working cycle and the set workload of the operator in the working cycle; the average work intensity is determined according to the actual workload of the operator per day in the working cycle, the set workload per day and the working days in the working cycle.
[0087] Optionally, the qualification verification module 330 may be specifically used to: use the personal information of the operator as an identifier to match each operator in the operator list with the operators in the standard operator database; if the match is successful, the operator is the target operator.
[0088] Optionally, the operators stored in the standard operator database have personal information that meets a preset completeness threshold and have power grid operation qualifications.
[0089] Optionally, the task control module 340 may be specifically used to: if the current operation risk value of the target operator is less than the standard operation risk value corresponding to the operation task that the target operator is to participate in, determine that the target operator is allowed to participate in the operation task.
[0090] The control device for power grid operation tasks provided in the embodiment of the present invention can execute the control method for power grid operation tasks provided in any embodiment of the present invention, and has the functional modules and beneficial effects corresponding to the execution method.
[0091] Embodiment 4
[0092] Figure 4 A schematic diagram of an electronic device 410 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0093] like Figure 4 As shown, the electronic device 410 includes at least one processor 411, and a memory connected to the at least one processor 411 in communication, such as a read-only memory (ROM) 412, a random access memory (RAM) 413, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 411 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 412 or the computer program loaded from the storage unit 418 to the random access memory (RAM) 413. In the RAM 413, various programs and data required for the operation of the electronic device 410 can also be stored. The processor 411, the ROM 412, and the RAM 413 are connected to each other via a bus 414. An input / output (I / O) interface 415 is also connected to the bus 414.
[0094] Multiple components in the electronic device 410 are connected to the I / O interface 415, including: an input unit 416, such as a keyboard, a mouse, etc.; an output unit 417, such as various types of displays, speakers, etc.; a storage unit 418, such as a disk, an optical disk, etc.; and a communication unit 419, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 419 allows the electronic device 410 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0095] The processor 411 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 411 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 411 executes the various methods and processes described above, such as a control method for power grid operation tasks.
[0096] In some embodiments, the method for controlling power grid operation tasks may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 418. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 410 via the ROM 412 and / or the communication unit 419. When the computer program is loaded into the RAM 413 and executed by the processor 411, one or more steps of the method for controlling power grid operation tasks described above may be performed. Alternatively, in other embodiments, the processor 411 may be configured to execute the method for controlling power grid operation tasks in any other appropriate manner (e.g., by means of firmware).
[0097] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0098] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0099] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0100] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0101] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0102] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0103] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0104] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for controlling power grid operation tasks, characterized in that: include: Obtain and parse the power grid task allocation information, and determine the list of work tasks to be assigned to the workers and the list of workers who will participate in the work tasks according to the coupling relationship between the worker table and the work task table in the power grid task allocation information; Determine the operation saturation and current operation risk value of the operator based on the historical operation information of the operator; Based on the standard operator database, the operator qualifications in the operator list are verified to determine the target operator; According to the current operation risk value of the target operator and the standard operation risk value corresponding to the operation task that the target operator will participate in, it is determined whether the target operator can participate in the operation task.
2. The method according to claim 1, characterized in that Based on the historical operation information of the operator, the operation saturation and current operation risk value of the operator are determined, including: According to the historical operation information of the operator in the operation cycle, determine the ratio of consecutive working days, the cumulative workload ratio and the average work intensity of the operator in the operation cycle; wherein the historical operation information includes the continuous working days information, the cumulative workload information and the actual workload information of each day of the operator in the operation cycle; Determine the operation saturation of the operator in the operation cycle according to the ratio of consecutive working days, the cumulative workload ratio and the average work intensity of the operator in the operation cycle; The current operation risk value of the operator is determined according to the operation saturation, and the preset operation task risk parameter and operation task loss parameter.
3. The method according to claim 2, characterized in that The continuous working days ratio is determined according to the working days in the working cycle and the maximum continuous working days of the operator in the working cycle. The cumulative workload ratio is determined according to the cumulative workload of the operator in the working cycle and the set workload of the operator in the working cycle. The average work intensity is determined according to the actual workload of the operator every day in the working cycle, the set workload every day and the working days in the working cycle.
4. The method according to claim 1, characterized in that: Verify the operating qualifications of the operators in the operator list to determine the target operators, including: Using the personal information of the operator as an identifier, each operator in the operator list is matched with an operator in the standard operator database; If the match is successful, the operator is the target operator.
5. The method according to claim 1, characterized in that The operators stored in the standard operator database have personal information that meets a preset completeness threshold and have power grid operation qualifications.
6. The method according to claim 1, characterized in that Determining whether the target operator can participate in the operation task according to the current operation risk value of the target operator and the standard operation risk value corresponding to the operation task that the target operator will participate in includes: If the current operation risk value of the target operator is less than the standard operation risk value corresponding to the operation task that the target operator is to participate in, it is determined that the target operator is allowed to participate in the operation task.
7. A control device for power grid operation tasks, characterized in that: include: The task parsing module is used to obtain and parse the power grid task allocation information, and determine the list of work tasks to be assigned to the operators and the list of operators who will participate in the work tasks according to the coupling relationship between the operator table and the work task table in the power grid task allocation information; A risk value module, used to determine the operation saturation and current operation risk value of the operator based on the historical operation information of the operator; A qualification verification module is used to verify the operating qualifications of the operators in the operator list based on the standard operator database to determine the target operator; The task control module is used to determine whether the target operator can participate in the operation task based on the current operation risk value of the target operator and the standard operation risk value corresponding to the operation task that the target operator will participate in.
8. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can perform the method for controlling power grid operation tasks described in any one of claims 1-6.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the method for controlling power grid operation tasks according to any one of claims 1 to 6 when executed.
10. A computer program product, characterized in that It comprises a computer program, which, when executed by a processor, implements the method for controlling the power grid operation task as described in any one of claims 1 to 6.