Distributed photovoltaic electricity charge analysis method and system, storage medium and electronic equipment
Through the automated distributed photovoltaic electricity bill analysis method, the problem of inefficient manual data acquisition and processing in the existing technology is solved, efficient and accurate electricity bill analysis is achieved, and human errors and professional knowledge dependence is reduced.
Patent Information
- Application Number
- CN202411479943.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-03-11
AI Technical Summary
The existing distributed photovoltaic electricity bill statistical analysis methods rely on manual data collection and offline table processing, resulting in inefficiency, error-prone, inaccurate data and reliance on personal expertise, increasing the complexity and uncertainty of data analysis.
A distributed photovoltaic electricity bill analysis method is proposed, which realizes an automated electricity bill analysis process by automatically obtaining electricity consumption information, generating and reviewing meter reading information, calculating the interval electricity and electricity consumption, calculating and settlement electricity prices and electricity bills receivables, and generating electricity bill settlement statements.
It improves the efficiency and accuracy of electricity bill analysis, reduces human errors, reduces dependence on professional knowledge, simplifies data comparison and anomaly detection, and improves data reliability and consistency.
Smart Images

Figure CN119599742A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of photovoltaic power generation, and in particular relates to a distributed photovoltaic electricity fee analysis method, system, storage medium and electronic equipment. Background Art
[0002] The grid-connected operation modes of distributed photovoltaic assets are mainly divided into three categories: "self-generation for self-use, surplus power to the grid", "full grid-connection" and "off-grid mode". In the two modes of "self-generation for self-use, surplus power to the grid" and "off-grid mode", the asset holder needs to charge electricity fees to users. The existing electricity fee statistical analysis mainly adopts manual data collection and offline Excel spreadsheet production, and the spreadsheet needs to be repeated every month. The specific process is: first, offline meter reading is carried out to record the power generation data, and then the user signs and confirms the meter reading data, and then the power and electricity price data are manually integrated, and then the electricity bill settlement sheet is produced offline, and the electricity bill settlement sheet is sent to the user for confirmation, and finally the settlement process is promoted. Different tables need to be made for different electricity price charging modes. One charging mode is to distinguish between peak and valley electricity prices for charging, and the other is to implement a single electricity price for charging.
[0003] There are many problems with the existing methods. First, in the process of manual data collection, the data collection time span is long and the efficiency is low due to the wide distribution and dispersion of power stations. In addition, when collecting data, relevant personnel need to carefully match the corresponding meters to ensure the accuracy of the data. However, this process is prone to human matching errors, resulting in inaccurate data. Secondly, in the process of manual integration of electricity volume and electricity price, offline tables are usually used for operation. These tables often lack inheritance relationships, making it difficult for users to compare data. In this way, it is difficult for users to discover abnormal changes in the data in time, thus affecting the accuracy and reliability of the data. Finally, since different departments or personnel may use different Excel tables for calculations, this requires relevant personnel to have corresponding professional knowledge and experience to ensure the correct use of the tables. However, this practice of relying on personal professional knowledge and experience not only has human resource limitations, but also brings the risk of subjective judgment. For example, different personnel may have different understandings and operation methods when processing data, resulting in inconsistent data processing results.
[0004] In general, the existing technologies and methods face problems such as human resource limitations, low efficiency, and proneness to errors when analyzing electricity bill data. These problems not only affect the efficiency and accuracy of data processing, but also increase the complexity and uncertainty of data analysis. Summary of the invention
[0005] In view of the above problems, the present invention proposes a distributed photovoltaic electricity cost analysis method, system, storage medium and electronic device.
[0006] A distributed photovoltaic electricity cost analysis method of the present invention comprises:
[0007] Obtain current electricity consumption information, generate and review and confirm current meter reading information;
[0008] Obtain the meter reading information of the previous period, and calculate the peak, flat, valley and total interval electricity in the power generation meter and the online meter respectively according to the electricity consumption information in the previous period and the electricity consumption information and the meter multiplier in the current period;
[0009] Calculate the peak, peak, flat, valley and total interval power consumption according to the peak, peak, flat, valley and total interval power consumption in the power generation meter and the grid-connected meter;
[0010] Obtain and calculate the settlement electricity prices for peak, peak, flat and valley periods based on the electricity sales prices and power station contract discount information;
[0011] According to the peak, peak, flat and valley interval consumption electricity and the peak, peak, flat and valley settlement electricity prices, calculate and summarize the peak, peak, flat and valley electricity charges to obtain the total electricity charges receivable;
[0012] The adjusted electricity fee is obtained, and the settlement electricity fee is calculated based on the total electricity fee receivable and the adjusted electricity fee.
[0013] Further,
[0014] The meter reading information includes:
[0015] Electricity usage information, meter attribute information, meter reading time, cycle, approval flow nodes and verification rules;
[0016] The electricity usage information includes: peak reading number, high peak reading number, flat reading number and low valley reading number, a total of four time periods, and a total reading number;
[0017] The meter attribute information includes: meter type, meter number, meter ratio and meter status; the meter type includes power generation meter and online meter.
[0018] Further,
[0019] The peak, flat, valley and total interval electricity in the power generation meter and the grid-connected meter are calculated according to the following formula:
[0020] Peak interval electricity = (peak reading value of this period - peak reading value of the previous period) * meter multiplier;
[0021] Peak interval electricity consumption = (peak reading value of this period - peak reading value of the previous period) * meter multiplier;
[0022] Electricity in flat section = (current flat section reading value - previous flat section reading value) * meter multiplier;
[0023] Electricity in off-peak interval = (low-peak reading value of this period - low-peak reading value of the previous period) * meter multiplier;
[0024] Total interval electricity = (peak reading of this period - total reading of the previous period) * meter multiplier.
[0025] Further,
[0026] The peak, flat, valley and total interval power consumption is calculated according to the following formula:
[0027] Peak interval power consumption = peak interval power consumption of power generation meter - peak interval power consumption of online meter;
[0028] Peak-interval power consumption = peak-interval power consumption of power generation meter - peak-interval power consumption of online meter;
[0029] Electricity consumed in the flat section = Electricity consumed in the flat section by the power generation meter - Electricity consumed in the flat section by the grid-connected meter;
[0030] The amount of electricity consumed in the off-peak period = the amount of electricity consumed in the off-peak period of the power generation meter - the amount of electricity consumed in the off-peak period of the online meter;
[0031] Total interval power consumption = total interval power consumption of power generation meter - total interval power consumption of grid-connected meter.
[0032] Further,
[0033] The total electricity charges receivable are calculated according to the following formula:
[0034] Total electricity charges receivable = electricity consumed in peak period * peak settlement electricity price + electricity consumed in peak period * peak electricity price + electricity consumed in normal period * normal settlement electricity price + electricity consumed in valley period * valley settlement electricity price.
[0035] Further,
[0036] The electricity fee is calculated according to the following formula:
[0037] Settlement electricity charges = total electricity charges receivable + adjusted electricity charges.
[0038] Further,
[0039] Also includes:
[0040] Generate electricity bill.
[0041] The present invention also provides a distributed photovoltaic electricity cost analysis system for implementing the above-mentioned distributed photovoltaic electricity cost analysis method, the system comprising:
[0042] The meter reading information generation module is used to obtain the current electricity consumption information, generate and review and confirm the current meter reading information;
[0043] The interval power calculation module is used to obtain the meter reading information of the previous period, and calculate the peak, flat, valley and total interval power in the power generation meter and the online meter according to the power consumption information in the previous period and the power consumption information and the meter multiplier in the current period;
[0044] An interval power consumption calculation module is used to calculate the peak, peak, flat, valley and total interval power consumption according to the peak, peak, flat, valley and total interval power in the power generation meter and the grid-connected meter;
[0045] The settlement electricity price calculation module is used to obtain and calculate the settlement electricity prices of peak, peak, flat and valley hours according to the electricity sales prices of peak, peak, flat and valley hours and the power station contract discount information;
[0046] A total electricity fee calculation module is used to calculate and summarize the electricity fees receivable during the peak, peak, flat and valley intervals according to the peak, peak, flat and valley intervals of electricity consumption and the settlement electricity prices of the peak, peak, flat and valley intervals to obtain the total electricity fee receivable;
[0047] The settlement electricity fee calculation module is used to obtain the adjusted electricity fee and calculate the settlement electricity fee based on the total electricity fee receivable and the adjusted electricity fee.
[0048] The present invention also provides a computer-readable storage medium storing a program or instruction. When the program or instruction is executed on a computer, the computer executes the aforementioned distributed photovoltaic electricity cost analysis method.
[0049] The present invention also provides an electronic device, comprising a processor coupled to a memory; the processor is used to read and execute a computer program stored in the memory to implement the aforementioned distributed photovoltaic electricity cost analysis method.
[0050] Compared with the prior art, the present invention has the following beneficial effects:
[0051] By automatically acquiring the electricity consumption information of distributed photovoltaics and using predetermined rules to process the above information, it is easy to operate and makes the entire electricity fee analysis process efficient and accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0053] Figure 1 This is a flow chart of the distributed photovoltaic electricity fee analysis method of the present invention;
[0054] Figure 2 It is a structural schematic diagram of the distributed photovoltaic electricity fee analysis system of the present invention;
[0055] Figure 3 It is a schematic diagram of the structure of the electronic device of the present invention.
[0056] Description of reference numerals:
[0057] 201 - meter reading information generation module, 202 - interval power calculation module, 203 - interval power consumption calculation module, 204 - settlement electricity price calculation module, 205 - total electricity fee receivable calculation module, 206 - settlement electricity fee calculation module, 301 - processor, 302 - memory. DETAILED DESCRIPTION
[0058] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0059] Figure 1 : is a flow chart of a distributed photovoltaic analysis method provided by an embodiment of the present invention. In one embodiment, the method specifically includes the following steps:
[0060] S101: Obtain current electricity consumption information, generate and review and confirm current meter reading information.
[0061] The system automatically obtains the current period's electricity consumption information at a preset frequency. The electricity consumption information includes the reading numbers for four time periods, namely, peak (abbreviated as "peak"), high (abbreviated as "peak"), flat (abbreviated as "flat") and low (abbreviated as "valley"), and also includes the total reading number, which is the sum of the reading numbers for the four time periods: peak, flat and valley.
[0062] The system automatically completes the meter attribute information, meter reading time, cycle, approval flow node and verification rules, and generates the meter reading information for this period in a unified manner based on the current electricity consumption information. The meter attribute information includes meter type, meter number, meter multiplier and meter status; the meter types include power generation meters and online meters; the verification rule is that the reading numbers of the peak, flat, valley and total of this period shall not be lower than the reading numbers of the peak, flat, valley and total of the previous period.
[0063] After generating the current meter reading information, the user reviews and confirms the meter reading information. If the user has any objection to the meter reading information, the meter reading information will be rejected, and the staff will revise the meter reading information and then submit it to the user for review again; if the user has no objection to the meter reading information, the meter reading information generated by the system will be used as the data basis for executing step S102.
[0064] S102: Obtain the meter reading information of the previous period, and calculate the peak, flat, valley and total interval electricity in the power generation meter and the online meter according to the electricity consumption information in the previous period and the electricity consumption information and the meter multiplier in the current period.
[0065] According to the electricity consumption information in the previous meter reading information and the electricity consumption information and meter multiplier in the current meter reading information, the interval electricity consumption in the four periods of peak, peak, flat and valley in the power generation meter and the online meter are calculated respectively, and the calculation formula of the interval electricity consumption of the power generation meter and the online meter is the same, as follows:
[0066] Peak interval electricity = (peak reading value of this period - peak reading value of the previous period) * meter multiplier;
[0067] Peak interval electricity consumption = (peak reading value of this period - peak reading value of the previous period) * meter multiplier;
[0068] Electricity in flat section = (current flat section reading value - previous flat section reading value) * meter multiplier;
[0069] Electricity in off-peak interval = (low-peak reading value of this period - low-peak reading value of the previous period) * meter multiplier;
[0070] Total interval electricity = (total reading of this period - total reading of the previous period) * meter multiplier.
[0071] The difference in meter types results in different meter multipliers. Therefore, when calculating according to the above formula, the meter multipliers need to be distinguished according to the meter type.
[0072] After calculating the interval electricity consumption of the peak, peak, flat and valley periods and the total interval electricity consumption in the power generation meter and the online meter, check whether the above calculated data meets the requirements according to the following formula. The calculation formula is: peak interval electricity consumption + high peak interval electricity consumption + flat interval electricity consumption + valley interval electricity consumption - total interval electricity consumption. Obtain the calculation result and check whether the calculation result is less than or equal to 0.04. If it meets the requirements, save the interval electricity consumption of the peak, peak, flat and valley periods and the total interval electricity consumption in the power generation meter and the online meter. If it does not meet the requirements, the staff will check whether the meter readings are entered incorrectly. After checking, calculate the interval electricity consumption of the peak, peak, flat and valley periods and the total interval electricity consumption in the power generation meter and the online meter according to the above method, and check until it meets the requirements.
[0073] S103: Calculate the peak, peak, flat, valley and total interval power consumption according to the peak, peak, flat, valley and total interval power consumption in the power generation meter and the grid-connected meter.
[0074] According to the peak, peak, flat, valley and total interval electricity in the power generation meter and the grid-connected meter, the peak, peak, flat, valley and total interval consumption electricity are calculated by the following formula, as follows:
[0075] Peak interval power consumption = peak interval power consumption of power generation meter - peak interval power consumption of online meter;
[0076] Peak-interval power consumption = peak-interval power consumption of power generation meter - peak-interval power consumption of online meter;
[0077] Electricity consumed in the flat section = Electricity consumed in the flat section by the power generation meter - Electricity consumed in the flat section by the grid-connected meter;
[0078] The amount of electricity consumed in the off-peak period = the amount of electricity consumed in the off-peak period of the power generation meter - the amount of electricity consumed in the off-peak period of the online meter;
[0079] Total interval power consumption = total interval power consumption of power generation meter - total interval power consumption of grid-connected meter.
[0080] S104: Obtain and calculate the settlement electricity prices for peak, peak, flat and valley periods according to the peak, peak, flat and valley electricity sales prices and power station contract discount information.
[0081] The peak, on-peak, flat and valley electricity selling prices are maintained by the staff after reviewing the meter reading information. Specifically: for power stations that distinguish between peak, on-peak, flat and valley electricity prices, the peak, on-peak, flat and valley electricity selling prices in the market for that month are maintained respectively; for power stations with a unified electricity price, only a single electricity selling price in the market for that month is maintained.
[0082] Power station contract discount information is maintained by staff.
[0083] After obtaining the above-mentioned peak, on-peak, flat and off-peak electricity sales prices and power station contract discount information, calculate the peak, on-peak, flat and off-peak settlement electricity prices.
[0084] S105: Calculate and summarize the electricity charges receivable during the peak, peak, flat and valley periods according to the peak, peak, flat and valley period consumption and the settlement electricity prices during the peak, peak, flat and valley periods to obtain the total electricity charges receivable.
[0085] According to the peak, peak, flat and valley interval consumption and the peak, peak, flat and valley settlement electricity prices, calculate and summarize the peak, peak, flat and valley electricity charges to obtain the total electricity charges receivable, as follows:
[0086] Total electricity charges receivable = electricity consumed in peak period * peak settlement electricity price + electricity consumed in peak period * peak electricity price + electricity consumed in normal period * normal settlement electricity price + electricity consumed in valley period * valley settlement electricity price.
[0087] S106: Obtain the adjusted electricity fee, and calculate the settlement electricity fee based on the total electricity fee to be receivable and the adjusted electricity fee.
[0088] The electricity fee adjustment is maintained by the staff according to the actual collection and payment needs. After obtaining the adjusted electricity fee, the settlement electricity fee is calculated based on the total electricity fee receivable and the adjusted electricity fee. The calculation formula is as follows:
[0089] Settlement electricity charges = total electricity charges receivable + adjusted electricity charges.
[0090] Optionally, the adjusted electricity fee can be empty, that is, the staff can choose not to maintain the adjusted electricity fee. If the adjusted electricity fee is not maintained, it is also calculated according to the formula of settlement electricity fee = total electricity fee receivable + adjusted electricity fee, but in the actual calculation, the adjusted electricity fee = 0.
[0091] After executing the above steps S101-S106, the system will generate an electricity bill settlement sheet according to the information generated during the execution of the above steps. The information in the electricity bill settlement sheet includes: settlement sheet period, basic information of the power station, meter reading time, meter type, meter number, meter multiplier, interval electricity consumption, interval consumption electricity, electricity sales price, settlement electricity price, electricity charges receivable, adjusted electricity charges and settlement electricity charges.
[0092] The embodiment of the present invention also provides a distributed photovoltaic electricity fee analysis system, such as Figure 2 As shown, including:
[0093] The meter reading information generation module 201 is used to obtain the electricity consumption information of this period, generate and review and confirm the meter reading information of this period.
[0094] The interval power calculation module 202 is used to obtain the meter reading information of the previous period, and calculate the peak, flat, valley and total interval power in the power generation meter and the online meter according to the power consumption information in the previous period and the power consumption information and meter multiplier in the current period.
[0095] The interval power consumption calculation module 203 is used to calculate the peak, peak, flat, valley and total interval power consumption according to the peak, peak, flat, valley and total interval power in the power generation meter and the grid-connected meter.
[0096] The settlement electricity price calculation module 204 is used to obtain and calculate the settlement electricity prices of peak, peak, flat and valley hours according to the peak, peak, flat and valley electricity sales prices and power station contract discount information.
[0097] The total electricity charges receivable calculation module 205 is used to calculate and summarize the electricity charges receivable during peak, peak, flat and valley periods according to the peak, peak, flat and valley interval consumption electricity consumption and the peak, peak, flat and valley settlement electricity prices to obtain the total electricity charges receivable.
[0098] The settlement electricity fee calculation module 206 is used to obtain the adjusted electricity fee and calculate the settlement electricity fee based on the total electricity fee to be collected and the adjusted electricity fee.
[0099] It should be noted here that the above-mentioned meter reading information generation module 201, interval electricity calculation module 202, interval consumption electricity calculation module 203, settlement electricity price calculation module 204, total electricity charge receivable calculation module 205 and settlement electricity charge calculation module 206 correspond to steps S101 to S106 in the embodiment of the distributed photovoltaic electricity charge analysis method, and the examples and application scenarios implemented by the above-mentioned modules and corresponding steps are the same, but are not limited to the contents disclosed in the above-mentioned embodiments.
[0100] The distributed photovoltaic electricity fee analysis system also includes an electricity fee settlement sheet generation module for generating an electricity fee settlement sheet.
[0101] An embodiment of the present invention further provides a computer-readable storage medium storing a program or instruction. When the program or instruction is executed on a computer, the computer executes the distributed photovoltaic electricity cost analysis method as described in the above method embodiment.
[0102] like Figure 3 As shown, an embodiment of the present invention further provides an electronic device, including: a processor 301, the processor 301 is coupled to a memory 302, and the processor 301 is used to read and execute a computer program stored in the memory 302 to implement the distributed photovoltaic electricity cost analysis method as described in the above method embodiment.
[0103] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein; and these modifications or substitutions do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A distributed photovoltaic electricity cost analysis method, characterized in that: include: Obtain current electricity consumption information, generate and review and confirm current meter reading information; Obtain the meter reading information of the previous period, and calculate the peak, flat, valley and total interval electricity in the power generation meter and the online meter respectively according to the electricity consumption information in the previous period and the electricity consumption information and the meter multiplier in the current period; Calculate the peak, peak, flat, valley and total interval consumption electricity according to the peak, peak, flat, valley and total interval electricity in the power generation meter and the grid-connected meter; Obtain and calculate the settlement electricity prices for peak, peak, flat and valley periods based on the electricity sales prices and power station contract discount information; According to the peak, peak, flat and valley interval consumption electricity and the peak, peak, flat and valley settlement electricity prices, calculate and summarize the peak, peak, flat and valley electricity charges to obtain the total electricity charges receivable; The adjusted electricity fee is obtained, and the settlement electricity fee is calculated based on the total electricity fee receivable and the adjusted electricity fee.
2. The method according to claim 1, characterized in that The meter reading information includes: Electricity usage information, meter attribute information, meter reading time, cycle, approval flow nodes and verification rules; The electricity usage information includes: peak reading number, high peak reading number, flat reading number and low valley reading number, a total of four time periods, and a total reading number; The meter attribute information includes: meter type, meter number, meter ratio and meter status; the meter type includes power generation meter and online meter.
3. The method according to claim 2, characterized in that The peak, flat, valley and total interval electricity in the power generation meter and the grid-connected meter are calculated according to the following formula: Peak interval electricity = (peak reading value of this period - peak reading value of the previous period) * meter multiplier; Peak interval electricity consumption = (peak reading value of this period - peak reading value of the previous period) * meter multiplier; Electricity in flat section = (current flat section reading value - previous flat section reading value) * meter multiplier; Electricity in off-peak interval = (low-peak reading value of this period - low-peak reading value of the previous period) * meter multiplier; Total interval electricity = (total reading of this period - total reading of the previous period) * meter multiplier.
4. The method according to claim 1 or 3, characterized in that: The peak, flat, valley and total interval power consumption is calculated according to the following formula: Peak interval power consumption = peak interval power consumption of power generation meter - peak interval power consumption of online meter; Peak-interval power consumption = peak-interval power consumption of power generation meter - peak-interval power consumption of online meter; Electricity consumed in the flat section = Electricity consumed in the flat section by the power generation meter - Electricity consumed in the flat section by the grid-connected meter; The amount of electricity consumed in the off-peak period = the amount of electricity consumed in the off-peak period of the power generation meter - the amount of electricity consumed in the off-peak period of the online meter; Total interval power consumption = total interval power consumption of power generation meter - total interval power consumption of grid-connected meter.
5. The method according to claim 1, characterized in that The total electricity charges receivable are calculated according to the following formula: Total electricity charges receivable = electricity consumed in peak period * peak settlement electricity price + electricity consumed in peak period * peak electricity price + electricity consumed in normal period * normal settlement electricity price + electricity consumed in valley period * valley settlement electricity price.
6. The method according to claim 1, characterized in that The electricity fee is calculated according to the following formula: Settlement electricity charges = total electricity charges receivable + adjusted electricity charges.
7. The method according to claim 1, characterized in that Also includes: Generate electricity bill.
8. A distributed photovoltaic electricity fee analysis system, characterized in that: include: The meter reading information generation module is used to obtain the current electricity consumption information, generate and review and confirm the current meter reading information; The interval power calculation module is used to obtain the meter reading information of the previous period, and calculate the peak, flat, valley and total interval power in the power generation meter and the online meter according to the power consumption information in the previous period and the power consumption information and the meter multiplier in the current period; An interval power consumption calculation module is used to calculate the peak, peak, flat, valley and total interval power consumption according to the peak, peak, flat, valley and total interval power in the power generation meter and the grid-connected meter; The settlement electricity price calculation module is used to obtain and calculate the settlement electricity prices of peak, peak, flat and valley hours according to the electricity sales prices of peak, peak, flat and valley hours and the power station contract discount information; A total electricity fee calculation module is used to calculate and summarize the electricity fees receivable during the peak, peak, flat and valley intervals according to the peak, peak, flat and valley intervals of electricity consumption and the settlement electricity prices of the peak, peak, flat and valley intervals to obtain the total electricity fee receivable; The settlement electricity fee calculation module is used to obtain the adjusted electricity fee and calculate the settlement electricity fee based on the total electricity fee receivable and the adjusted electricity fee.
9. A computer-readable storage medium, characterized in that: A program or instruction is stored, and when the program or instruction is executed on a computer, the computer is enabled to execute the distributed photovoltaic electricity cost analysis method as described in any one of claims 1-7.
10. An electronic device, characterized in that: comprising a processor coupled to a memory; The processor is used to read and execute the computer program stored in the memory to implement the distributed photovoltaic electricity cost analysis method according to any one of claims 1-7.