Maintenance-free type laterite tennis court construction method

Through the maintenance-free red clay tennis court construction method, the multi-layer structure and special materials are used to solve the problems of high cost, difficult construction and complex maintenance of traditional red clay tennis courts, which has achieved the beauty, durability and simple maintenance of red clay tennis courts, and expanded its development space.

CN119615700APending Publication Date: 2025-03-14HAINAN HUAMENG RED CLAY MATERIAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411870052.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-18
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

The traditional clay tennis court has high cost, high construction difficulty and complex maintenance, which limits its promotion and development, especially the difficulty in building clay tennis courts on the upper floor or on the basis of hard fields.

Method used

The maintenance-free red clay tennis court construction method is adopted, including foundation treatment, artificial grass construction, red clay base and surface construction, sliding layer laying and long-term line production. It uses cement self-leveling, silicon PU materials, artificial grass, crushed gravel, red clay, clay brick powder and other materials to build a durable and beautiful red clay tennis court through the combination of multi-layer structure and special materials.

Benefits of technology

It has achieved the beauty, comfort, durability and simple maintenance of the clay tennis court. It has overcome the problems of high cost and difficult construction of the traditional clay tennis court, expanded the development space of the clay tennis court, suitable for indoor and outdoor venues, and suitable for use in rainy areas.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to a maintenance-free laterite tennis court construction method, which comprises the steps of foundation treatment, artificial grass construction, laterite bottom layer construction, laterite surface layer construction, sliding step layer construction and construction of a maintenance-free laterite tennis court, wherein the bottom layer material comprises 40% of crushed gravels, 30% of laterite, 20% of clear sand and 10% of lime, the laterite surface layer material comprises 40% of pure laterite, 20% of red conversion powder, 30% of machine-made red sand and 10% of limestone powder, and the sliding step layer is constructed. The sliding step layer is composed of 65% of argil brick powder and 35% of red sand, and manufacturing a long-term line, so that site manufacturing is completed; the built laterite sport field is good in using effect and easy to maintain, the defects that a laterite tennis court is high in manufacturing cost and large in construction difficulty are overcome, the problem that the laterite field is built on a hard field is solved, the building method is suitable for indoor and outdoor tennis court building at the same time, and the development space of the laterite tennis court is expanded; the field is attractive, comfortable, durable and resistant to rainwater, can be used half an hour after rain stops, is suitable for rainy conditions in the south, and is free of peeling and cracking, and the flatness meets the requirement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of clay tennis court construction, and in particular to a maintenance-free clay tennis court construction method. Background Art

[0002] Tennis has been introduced to my country for more than 100 years. Tennis courts can be divided into three types: hard courts (acrylic courts such as the US Open and Australian Open), grass courts (such as Wimbledon), and clay courts including sandy courts (such as the French Open). Clay tennis courts are deeply loved by tennis enthusiasts because of their comfort and less harm to human joints, and have become one of the four major international tennis open events.

[0003] Traditional clay tennis courts are expensive, difficult to construct, and complex to maintain, which has caused people to stay away from them during their promotion and use, and has been greatly restricted in their promotion and development. Therefore, how to build a clay court on the upper floor or on the basis of the original hard court (including: cement floor, asphalt floor, original hard court) to broaden the development space of clay tennis courts, and how to make the court have good use effect and simple maintenance is an urgent problem to be solved. Summary of the invention

[0004] The purpose of the present invention is to provide a maintenance-free clay tennis court construction method, which can build a clay tennis court on an upper floor or on the basis of an original hard court, breaking through the inherent concept that a clay tennis court cannot be built on an upper floor. The court is beautiful, comfortable, durable, and easy to maintain, thus expanding the development space of the clay tennis court.

[0005] In order to achieve the above object, the present invention provides the following technical solutions: A method for constructing a maintenance-free clay tennis court comprises the following steps: S1. Foundation treatment: On the original hard ground foundation, use cement self-leveling or silicon PU material to make the foundation flat; S2. Artificial grass construction: Customize artificial grass equal to the area of ​​the site, build granite stone edge protection around the site, bond the artificial grass as a whole into a whole piece, and then firmly bond the four sides of the artificial grass and the granite stone; S3. Construction of red soil base: The base material is composed of 40% crushed gravel, 30% red soil, 20% clean water sand and 10% lime. After repeatedly mixing the above materials, fill them into the artificial grass, and the molding thickness is controlled at 2cm; S4. Construction of red soil surface layer: The surface layer material is composed of 40% pure red soil, 20% red soil powder, 30% machine-made red sand and 10% limestone powder. After the above materials are fully mixed, they are filled on the red soil bottom layer material; after the artificial grass is fully covered, it is leveled and compacted. The molding thickness of the red soil surface layer material is controlled at 2cm, and the molding height of the venue exceeds the artificial grass by 1-2cm; S5. Construction of sliding layer: The sliding layer is composed of 65% clay brick powder and 35% red sand. The prepared sliding layer material is evenly spread on the red clay surface material. The thickness of the sliding layer is controlled at 2mm. Use a special support for red clay venues to support it evenly. S6. Production of long-term lines: accurately locate the position of the site lines according to the site specifications; make edge guards according to the width of the site lines. The edge guards should be straight and stable, and a wire groove should be formed inside the edge guards; nail iron nails are nailed every 10 cm in the wire grooves, and the nails should be close to the edge guards to form two rows. The nails are connected with No. 18 iron wire to form a woven mesh to enhance the strength and stability of the long-term lines; pour the processed PU material in the wire grooves, and pay attention to maintaining the flatness when pouring the material; after the PU material solidifies and takes shape after 24 hours, perform maintenance, sorting, and cleaning to keep the straightness and beauty of the long-term lines; use the line drawing paint that matches the PU material to draw the lines.

[0006] Preferably, in step S2, the artificial grass has a height of 3 cm and a density of not less than 48,000 needles per square meter.

[0007] Preferably, the particle size of the crushed gravel in step S3 is 4 mm.

[0008] Preferably, in step S5, the machine-made clay brick powder and red sand are 20-80 mesh, wherein 40-80 mesh is used for indoor venues and 20-40 mesh is used for outdoor venues.

[0009] Preferably, in step S6, the edge protection includes a bottom line and other lines, the bottom line is 10 cm wide, and the other lines are 5 cm wide.

[0010] In summary, the beneficial effects of the present invention are as follows: the red clay sports field constructed by the present invention has good use effect and simple maintenance, overcomes the disadvantages of high cost and great construction difficulty of red clay tennis courts, solves the problem of building a red clay court on a hard ground, and this construction method is applicable to the construction of indoor and outdoor tennis courts, expanding the development space of red clay tennis courts; the venue is beautiful and comfortable, durable, and not afraid of rain. The venue can be used half an hour after the rain stops, which is suitable for the rainy conditions in the south. The venue does not peel or crack, and the flatness meets the requirements. DETAILED DESCRIPTION

[0011] The present invention is described below with reference to specific examples. It will be appreciated by those skilled in the art that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention in any way.

[0012] The embodiment of the present application discloses a maintenance-free clay tennis court construction method, which is aimed at converting a hard court foundation into a clay court, and has good court use effect and simple maintenance, overcomes the disadvantages of high cost and great construction difficulty of clay tennis courts, solves the problem of building a clay court on a hard court, and the method is applicable to both indoor and outdoor tennis court construction, expanding the development space of clay tennis courts.

[0013] Construction method: 1. Site structure and construction The site structure includes five parts: foundation treatment, artificial turf construction, red soil base layer, red soil surface layer, and sliding layer.

[0014] Specific steps: 1. Basic processing On the original hard ground foundation (including cement ground, asphalt ground, various hard grounds), use cement self-leveling or silicon PU material to make the foundation flat; 2. Artificial grass construction Customize artificial grass equal to the area of ​​the venue, with a height of 3cm and a density of no less than 48,000 needles / square meter; build granite stone edges around the venue, bond the artificial grass as a whole into a whole piece, and then firmly bond the four sides of the artificial grass to the granite stone; 3. Construction of laterite base materials The bottom layer material consists of: 40% crushed gravel (about 4mm in diameter); 30% red soil; 20% clean water sand; 10% lime; the above materials need to be repeatedly mixed and evenly filled into the artificial grass, and the molding thickness should be controlled at 2cm; 4. Construction of red soil surface materials The surface material composition: pure red soil 40%; red soil powder 20%; machine-made red sand 30%; limestone powder 10%; the above materials need to be fully mixed and evenly filled on the red soil bottom material. After the artificial grass is fully covered, it is leveled and compacted. The thickness of the red soil surface material is about 2cm, and the height of the venue exceeds the artificial grass by 1cm-2cm; 5. Sliding layer construction The sliding layer is composed of 20-80 mesh machine-made clay brick powder and red sand, of which clay brick powder is 65%; red sand is 35%. The prepared sliding layer material is evenly spread on the red clay surface material (40-80 mesh is used for indoor venues, and 20-40 mesh is used for outdoor venues). The thickness of the sliding layer is controlled at about 2mm. Use a special support for red clay venues to support it evenly.

[0015] 2. Long-term production of the site The long-term line is one of the important links in the production of the venue. The long-term line construction will be carried out after the artificial grass is laid.

[0016] Specific steps: 1. The site accurately locates the position of the line according to the specifications; 2. Make edge protection according to the width of the site line, where: the bottom line is 10cm wide; other lines are 5cm wide; the edge protection should be straight and stable, and a wire groove should be formed inside the edge protection; 3. Nail iron nails every 10cm in the wire trough. The nails should be placed close to the edge guard to form two rows. Use No. 18 iron wire to connect the nails to form a woven net to enhance the strength and stability of the long-term line. 4. Pour the processed PU material into the wire trough, and pay attention to maintaining the flatness when pouring the material; 5. After the PU material solidifies and takes shape after 24 hours, it is maintained, sorted and cleaned to keep the line straight and beautiful for a long time; 6. Site marking: Use marking paint made of PU material for marking.

[0017] The venue is now complete.

[0018] In summary, the present invention provides a maintenance-free clay tennis court construction method. The clay sports field constructed by the method has good use effect and simple maintenance, overcomes the disadvantages of high cost and great construction difficulty of the clay tennis court, solves the problem of building a clay court on a hard ground, and the construction method is applicable to the construction of indoor and outdoor tennis courts, expanding the development space of the clay tennis court; the court is beautiful and comfortable, durable, and not afraid of rain. The court can be used half an hour after the rain stops, which is suitable for the rainy conditions in the south. The court does not peel or crack, and the flatness meets the requirements.

[0019] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0020] The above-mentioned embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A method for constructing a maintenance-free clay tennis court, characterized in that: The steps include: S1. Foundation treatment: On the original hard ground foundation, use cement self-leveling or silicon PU material to make the foundation flat; S2. Artificial grass construction: Customize artificial grass equal to the area of ​​the site, build granite stone edge protection around the site, bond the artificial grass as a whole into a whole piece, and then firmly bond the four sides of the artificial grass and the granite stone; S3. Construction of red soil base: The base material is composed of 40% crushed gravel, 30% red soil, 20% clean water sand and 10% lime. After repeatedly mixing the above materials, fill them into the artificial grass, and the molding thickness is controlled at 2cm; S4. Construction of red soil surface layer: The surface layer material is composed of 40% pure red soil, 20% red soil powder, 30% machine-made red sand and 10% limestone powder. After the above materials are fully mixed, they are filled on the red soil bottom layer material; after the artificial grass is fully covered, it is leveled and compacted. The molding thickness of the red soil surface layer material is controlled at 2cm, and the molding height of the venue exceeds the artificial grass by 1-2cm; S5. Construction of sliding layer: The sliding layer is composed of 65% clay brick powder and 35% red sand. The prepared sliding layer material is evenly spread on the red clay surface material. The thickness of the sliding layer is controlled at 2mm. Use a special support for red clay venues to support it evenly. S6. Production of long-term lines: accurately locate the position of the site lines according to the site specifications; make edge guards according to the width of the site lines. The edge guards should be straight and stable, and a wire groove should be formed inside the edge guards; nail iron nails are nailed every 10 cm in the wire grooves, and the nails should be close to the edge guards to form two rows. The nails are connected with No. 18 iron wire to form a woven mesh to enhance the strength and stability of the long-term lines; pour the processed PU material in the wire grooves, and pay attention to maintaining the flatness when pouring the material; after the PU material solidifies and takes shape after 24 hours, perform maintenance, sorting, and cleaning to keep the straightness and beauty of the long-term lines; use the line drawing paint that matches the PU material to draw the lines.

2. A maintenance-free clay tennis court construction method as claimed in claim 1, characterized in that: In step S2, the height of the artificial grass is 3 cm, and the density is not less than 48,000 needles per square meter.

3. A maintenance-free clay tennis court construction method as claimed in claim 1, characterized in that: The particle size of the crushed gravel in step S3 is 4 mm.

4. A maintenance-free clay tennis court construction method as claimed in claim 1, characterized in that: In step S5, the machine-made clay brick powder and red sand are 20-80 mesh, wherein 40-80 mesh is used for indoor venues and 20-40 mesh is used for outdoor venues.

5. A maintenance-free clay tennis court construction method as claimed in claim 1, characterized in that: In step S6, the edge protection includes a bottom line and other lines, wherein the bottom line is 10 cm wide and the other lines are 5 cm wide.