Ground rapid drilling, plugging and recycling integrated device for large-section water inrush channel and operation method of ground rapid drilling, plugging and recycling integrated device
By adopting integrated equipment for rapid drilling, sealing and recycling of large-section water inrush water channels in mine water inrush treatment, the problems of low success rate and poor stability of grouting water blocking in the existing technology are solved, and efficient and stable water damage prevention and control are achieved.
Patent Information
- Application Number
- CN202411827674.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-12
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2044-12-12
AI Technical Summary
When the prior art faces high water pressure, large flow rate, and large channel water flow, the success rate of grouting water blocking is low and the stability is poor. The traditional drilling filler is easily flushed and not easily condensed, resulting in a long treatment period and high cost.
The integrated device for rapid drilling, sealing and recycling of the ground in large-section water inrush passage is adopted. The device includes a fast integrated drill bit, an adaptive sealing device, a detachable drill rod and an operating system. The fixing and recycling of the sealed airbag is achieved through pneumatic control scissors and folding telescopic rod.
It improves the success rate and stability of grouting water blocking, simplifies the operation process, reduces the management period and cost, and is suitable for rapid grouting and blocking of high water pressure, large flow, and large channels.
Smart Images

Figure CN119616362A_ABST
Abstract
Description
Technical Field
[0001] The present invention is mainly used for the treatment of large-channel, large-flow, and high-pressure water hazards generated in the production process of mines, railways, roads, and water conservancy projects, and specifically relates to an integrated device for rapid ground drilling, blocking, and recovery of large-section water inrush channels and an operating method. Background Art
[0002] Mine flooding is one of the five major safety hazards in the process of mine construction and production, especially mine water inrush, which often causes huge casualties and property losses. Mine water inrush often causes mass deaths and injuries. For coal mine water inrush accidents, the commonly used solution in my country is to implement mine drainage and grouting water blocking at the same time. Grouting water blocking is generally divided into two phases. The first phase is to block the water-passing tunnel first, change the water to static water, and the second phase is to treat the water-passing tunnel to completely eradicate the flood. In the first phase of blocking the water-passing tunnel, it is usually to drill holes directly on the ground to the water-passing tunnel, and then put aggregates and other auxiliary materials to fill the water-passing tunnel, change the flow state of groundwater in the tunnel from pipeline flow to infiltration flow, and then carry out grouting consolidation treatment. When facing a water-passing tunnel with a high water flow velocity, directly drilling and filling in aggregates is very easy to be dispersed, not easy to condense, and the success rate is low. In addition, the entire treatment process needs to be changed to seepage flow first, and then grouting is carried out. The project volume is large and the treatment period is long. There is no limit on the grouting range during grouting, which easily wastes the grouting fluid. Therefore, the traditional grouting water blocking technology has poor stability, low blocking success rate and poor stability when facing high water pressure, large flow and large channel water flow.
[0003] In response to the above problems, a new method was introduced in "Zhu Mingcheng, Key Technology and Equipment for Efficient Sealing of Water-Inrush Drilling Holes in Large Water-Moving Channels by Controlled Grouting [J], Coalfield Geology and Exploration, 2015, 43(4): 55-58". The method uses a specific controlled grouting drill to deliver a grout bag into the water-passing tunnel, and then grouting the grout bag in the water-passing tunnel. The pressure generated by the grouting separates the grout bag from the controlled grouting drill and leaves it in the water-passing tunnel. Compared with the above methods, this method avoids the situation where the slurry is dispersed before solidification, and improves the success rate to a certain extent. However, for high water pressure, large flow, and large-channel water movement, this method also has the same problem of high-speed water flow washing away the grout bag, and still does not fundamentally solve the above problems.
[0004] The patent number CN202022290244.1 of the large dynamic water channel water burst drilling grid, airbag, grouting integrated plugging device also has problems such as the bracket cannot adapt to irregular water burst tunnels, cannot achieve drilling and plugging integration, and cannot achieve the recovery of the plugging device. In view of the above problems, it is imperative to develop a large-section water burst channel ground rapid drilling, plugging, and recovery integrated device and operation method. Summary of the invention
[0005] The purpose of the present invention is to provide an integrated device and operation method for rapid ground drilling, plugging and recovery of large-section water inrush channels. The device can quickly control high water pressure, large flow and large-channel dynamic water within the local range of the water inrush channel, providing a new idea and method for water hazard prevention and control in coal mines and underground projects.
[0006] In order to achieve the above technical objectives, the technical solution adopted by the present invention is as follows:
[0007] An integrated device for rapid ground drilling, plugging and recovery of a large-section water bursting channel comprises a rapid integrated drill bit, an adaptive plugging device, a detachable drill rod, a three-channel drilling device and an operating system; one end of the detachable drill rod is snap-connected to the rapid integrated drill bit, and the other end is threadedly connected to the three-channel drill rod device; the adaptive plugging device is located inside the detachable drill rod, one end of which is threadedly connected to the rapid integrated drill bit, and the other end is snap-connected to the detachable drill rod; when drilling reaches the water bursting channel position, the detachable drill rod is lifted up by rotation to be detached from the rapid integrated drill bit, so that the adaptive plugging device is exposed outside the detachable drill rod, and the adaptive plugging device is controlled by the operating system to quickly plug the irregular water bursting channel; after the plugging is completed, the detachable drill rod is connected to the rapid integrated drill bit by descending and rotating under the control of the operating system, so that the rapid integrated drill bit and the adaptive plugging device are recovered.
[0008] Preferably, the adaptive plugging device includes a device fixing tube connected to the quick integrated drill bit at one end, a pneumatically controlled scissors located in the device fixing tube, a plugging airbag, a pneumatically controlled folding telescopic rod base, a pneumatically controlled folding telescopic rod located on the pneumatically controlled folding telescopic rod base, a control air pump, a flexible grouting pipe and a flexible inflation and exhaust pipe connected to the plugging gas, and a flexible sealing power pipe; the three-channel drilling device includes a three-channel drill rod, a wind-controlled power pipe, a grouting pipe, and an inflation and exhaust pipe located in the three-channel drill rod; the grouting pipe, the inflation and exhaust pipe, and the wind-controlled power pipe pass through the device fixing tube and can be detached The drill rod is connected to the grouting pipeline, the inflation and exhaust pipeline, and the wind control power pipeline respectively; the operating system controls the air pump through the wind control power pipeline and the wind control power tube, so that the pneumatically controlled folding telescopic rod extends out of the device fixed tube to form a protection rod; the operating system inflates the plugging airbag through the inflation and exhaust pipeline and the inflation and exhaust pipe, and then grouts the plugging airbag through the grouting pipeline and the grouting pipe; after the grouting is completed, the air pump is controlled to control the pneumatically controlled scissors to detach the plugging airbag; the pneumatically controlled folding telescopic rod is controlled to return to the device fixed tube, and the detachable drill rod is controlled to be connected with the quick integrated drill bit.
[0009] Preferably, the quick integrated drill bit includes a drill bit body and a slot arranged on the drill bit body, and a connecting block is arranged on the detachable drill rod. The quick integrated drill bit and the detachable drill rod are detachably connected through the cooperation of the slot and the connecting block.
[0010] Preferably, the slot is an L-shaped slot, which can ensure easy separation and stable connection between the detachable drill rod and the quick integrated drill bit during drilling and recovery.
[0011] Preferably, the adaptive plugging device further comprises a limiter arranged at the other end of the device fixing tube, and the limiter ensures that the adaptive plugging device and the detachable drill rod will not be detached when the drill is returned and the rod is lifted.
[0012] Preferably, a three-channel drill rod is formed by opening a wind control power pipeline, a grouting pipeline, and an inflation and exhaust pipeline inside the solid drill rod.
[0013] Preferably, the surface of the detachable drill rod is provided with a detachable drill rod external thread, through which external-discharge drilling can be achieved.
[0014] Based on the above device, the present invention also provides an operation method of an integrated device for rapid ground drilling, plugging and recovery of a large-section water inrush channel using the above device, comprising the following steps:
[0015] S1. Drill the above device to the location of the water bursting channel through ground drilling;
[0016] S2. Open the L-shaped slot to separate the detachable drill rod from the adaptive plugging device, and then drill back and lift the rod until it contacts the stopper at the end of the adaptive plugging device to expose the adaptive plugging device.
[0017] S3. Using the control system, through the wind control power pipeline and the wind control power tube, the control air pump is operated to open the pneumatically controlled folding telescopic rod so that it extends out of the device fixed tube to form a bracket in the water burst channel;
[0018] S4. Using the operating system, inflate the blocking airbag through the inflation and exhaust pipe and the inflation and exhaust pipe, open the blocking airbag, and expand it to match the cross section of the water burst channel, so as to form a water burst channel blocking airbag attached to the bracket;
[0019] S5. Use the grouting pipe and grouting tube to inject cement mortar into the plugging airbag to displace the gas in the plugging airbag, wait for the cement mortar to solidify into stone solid, and finally form a filling body to plug the water bursting channel, so as to control the large-section water bursting within a local range;
[0020] S6. Use pneumatically controlled scissors to separate the blocking airbag from the adaptive blocking device, manipulate the pneumatically controlled folding telescopic rod to return to the device fixing tube, drill back to the connection block that can be detached from the drill rod and connect to the L-shaped slot of the quick integrated drill bit to recover the device.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] (1) The device uses a bracket to fix the plugging airbag in the water burst channel to prevent the plugging airbag from being washed away by high-pressure water after grouting, thereby improving the success rate of grouting water plugging and improving the stability of the device;
[0023] (2) The device uses a connecting pin to connect the plugging device to the drill rod, which prevents soil or rock from entering the plugging device through the outlet of the pneumatically controlled folding telescopic rod during the drilling process, affecting the normal use of the plugging device;
[0024] (3) The device first uses the inflation and exhaust pipes to inflate the plugging airbag so that the plugging airbag matches the cross section of the water bursting channel, and then replaces the gas with cement mortar through the grouting pipes and grouting pipes so that the plugging airbag after grouting can also match the cross section of the water bursting channel, so that the water in the water bursting channel can be completely blocked at one time, thereby improving the success rate of grouting and water blocking, and completing it in one time, simplifying the operation;
[0025] (4) The device uses the drill pipe surface to be detached from the drill pipe external thread to achieve external drainage drilling, so that after the device drills to the location of the water inrush channel, it can directly perform grouting and plugging after drilling back a part, thus achieving drilling-plugging integration, improving the efficiency of grouting and water plugging engineering, and simplifying the operation;
[0026] (5) The device uses pneumatically controlled scissors to separate the plugging airbag from the adaptive plugging device, recover the adaptive plugging device, and save the cost of grouting plugging engineering;
[0027] (6) This method is simple to operate, has a high success rate of grouting and water plugging, and is highly flexible. It is suitable for rapid grouting and plugging of large water channels with high water pressure, large flow, and large dynamic water. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The present invention can be further illustrated by the non-limiting examples given in the accompanying drawings;
[0029] Figure 1 This is a schematic diagram of the structure of the present invention during rapid drilling;
[0030] Figure 2 It is a schematic diagram of the structure of the detachable drill rod of the present invention when it is detached from the quick integrated drill bit;
[0031] Figure 3 It is a schematic diagram of the structure of the adaptive blocking device of the present invention when it is deployed;
[0032] Figure 4 This is a schematic diagram of the structure of the quick integrated drill bit of the present invention;
[0033] Figure 5 It is a three-dimensional schematic diagram of the connecting block and the L-shaped slot structure of the present invention;
[0034] Figure 6It is a schematic diagram of the structure of the connecting block and the L-shaped slot of the present invention;
[0035] Figure 7 It is a schematic diagram of the structure of the adaptive blocking device of the present invention;
[0036] Figure 8 is a top view of the adaptive blocking device of the present invention;
[0037] Fig. 9 It is a schematic diagram of the working state structure of the pneumatic telescopic rod umbrella-shaped protection bracket of the present invention;
[0038] Fig.10 It is a schematic diagram of the structure of the pneumatic telescopic umbrella-shaped protective support in the retracted state of the present invention;
[0039] Fig.11 It is a schematic diagram of the detachable drill rod structure of the present invention;
[0040] Fig.12 It is a schematic diagram of the connection structure between the hose of the present invention and the pipe inside the three-channel drill pipe;
[0041] Fig.13 It is a schematic diagram of the structure of the three-channel drilling device of the present invention;
[0042] Fig.14 is a cross-sectional view of a three-channel drilling device of the present invention;
[0043] Fig.15 It is a schematic diagram of the pull ring switch structure of the present invention.
[0044] The main component symbols are described as follows:
[0045] A quick integrated drill bit 1, a wedge drill bit 1-1, a wedge drill bit holder 1-2, an L-shaped slot 1-3, and a connecting inner thread 1-4;
[0046] Adaptive plugging device 2, pneumatically controlled scissors 2-1, plugging airbag 2-2, pneumatically controlled folding telescopic rod 2-3, control air pump 2-4, limiter 2-5, grouting pipe 2-6, inflation and exhaust 2-7, pneumatically controlled folding telescopic rod base 2-8, connecting boss thread 2-9, device fixing pipe 2-10, wind control power pipe 2-11, hose connecting outer thread 2-12;
[0047] A detachable drill pipe 3, a detachable drill pipe external thread 3-1, an external discharge soil discharge trough 3-2, and a connecting block 3-3;
[0048] Three-channel drilling device 4, three-channel drilling rod 4-1, wind control power pipeline 4-2, grouting pipeline 4-3, inflation and exhaust pipeline 4-4, three-channel drilling device external thread 4-5, three-channel drilling device external discharge soil trough 4-6, pull ring switch protrusion 4-7, pull ring switch groove 4-8; pipeline connection internal thread 4-9;
[0049] Operating system 5, grouting device 5-1, gas injection device 5-2, control device 5-3. DETAILED DESCRIPTION
[0050] In order to enable those skilled in the art to better understand the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0051] like Figure 1-15 As shown, the integrated device for rapid ground drilling, plugging and recovery of a large-section water bursting channel includes a rapid integrated drill bit 1, an adaptive plugging device 2, a detachable drill rod 3, a plurality of three-channel drilling devices 4, and a control system 5. The rapid integrated drill bit 1 is connected to one end of the adaptive plugging device 2, and one end of the detachable drill rod 3 is connected to the three-channel drill rod device. During the drilling process, the adaptive plugging device 2 is located inside the detachable drill rod 3, and the other end of the detachable drill rod 3 is connected to the rapid integrated drill bit 1; during the plugging process, the detachable drill rod 3 is controlled to detach from the rapid integrated drill bit 1, so that the adaptive plugging device 1 is exposed outside the detachable drill rod 3, and the plugging of the adaptive plugging device 2 is achieved by controlling the control system 5; after the plugging is completed, the detachable drill rod 3 is controlled to be connected to the rapid integrated drill bit 1, so that the adaptive plugging device 2 is located inside the detachable drill rod 3, and the recovery is completed.
[0052] The specific quick integrated drill bit 1 includes a drill body, an L-shaped slot 1-3, and a connecting inner thread 1-4. The drill body includes a wedge-shaped drill bit 1-1 and a wedge-shaped drill bit holder 1-2. The L-shaped slot 1-3 is arranged on the wedge-shaped drill bit holder 1-2, and the connecting inner thread 1-4 is arranged in the center of the wedge-shaped drill bit holder 1-2.
[0053] The adaptive plugging device 2 includes pneumatically controlled scissors 2-1, a plugging airbag 2-2, a pneumatically controlled folding telescopic rod 2-3, a control air pump 2-4, a stopper 2-5, a grouting pipe 2-6, an air-inflating and exhausting device 2-7, a pneumatically controlled folding telescopic rod base 2-8, a connecting boss thread 2-9, a device fixing pipe 2-10, a wind control power pipe 2-11, and a hose connecting outer thread 2-12. Figure 4 , 5 As shown, the connecting boss thread 2-9 is arranged at one end of the device fixing tube 2-10, and the device fixing tube 2-10 is connected to the connecting inner thread 1-4 arranged on the quick integrated drill bit 1 through the connecting boss thread 2-9. Figure 6 , 7As shown, the pneumatically controlled scissors 2-1, the plugging airbag 2-2, the pneumatically controlled folding telescopic rod 2-3, the controlled air pump 2-4, the grouting pipe 2-6, the inflation and exhaust pipe 2-7, the pneumatically controlled folding telescopic rod base 2-8, and the wind control power pipe 2-11 are all located inside the device fixed pipe 2-10. The limiter 2-5 is set at one end of the device fixed pipe 2-10 to ensure that the adaptive plugging device 2 and the detachable drill rod 3 will not be separated during back drilling. Figure 8 , 9 As shown, the pneumatically controlled foldable telescopic rod 2-3 is arranged on the pneumatically controlled foldable telescopic rod base 2-8. The grouting pipe 2-6, the inflation and exhaust pipe 2-7, and the wind control power pipe 2-11 are all flexible hoses. The wind control power pipe 2-11 is connected to the control air pump 2-4 to provide power to the control air pump. The control air pump 2-4 is connected to the pneumatically controlled foldable telescopic rod 2-3 and the pneumatically controlled scissors 2-1 to control the extension and contraction of the pneumatically controlled foldable telescopic rod 2-3, control the opening and closing of the pneumatically controlled scissors, separate the blocking airbag and the blocking device, and realize the recovery of the adaptive blocking device. The inflation and exhaust pipe 2-7 and the grouting pipe 2-6 are connected to the blocking airbag 2-2.
[0054] The two sides of the device fixing tube 2-10 are also provided with outlets of the pneumatically controlled foldable telescopic rod 2-3, and the front side is provided with an outlet of the blocking airbag 2-2. When the detachable drill rod 3 is separated from the fast integrated drill bit 1, the control air pump 2-4 applies air pressure to push the pneumatically controlled foldable telescopic rod 2-3 out of the outlets on both sides to form an umbrella-shaped protective bracket. The card slot is provided on the pneumatically controlled foldable telescopic rod base 2-8, and is used to fix the umbrella-shaped protective bracket when the umbrella-shaped protective bracket extends out of the device fixing tube 2-10. In this embodiment, the end of the pneumatically controlled foldable telescopic rod 2-3 is arrow-shaped, and the pneumatically controlled foldable telescopic rod can be fixed to the channel surface. When the pneumatically controlled foldable telescopic rod is opened, the blocking airbag 2-2 is inflated by controlling the inflation and exhaust pipe 2-7, so that it is opened from the front outlet and expanded to match the cross-section of the water burst channel, forming an inflatable blocking airbag attached to the pneumatically controlled foldable telescopic rod 2-3. The inflatable blocking airbag 2-2 replaces the gas therein with cement mortar under the grouting of the grouting pipe and the exhaust of the inflation and exhaust pipe.
[0055] The detachable drill rod 3 is provided with a detachable drill rod external thread 3-1, an external discharge soil discharge groove 3-2, and a connecting block 3-3. The detachable drill rod external thread 3-1 can realize external discharge drilling, such as Figure 4 , 5 As shown, during the drilling process, the detachable drill rod 3 is connected to the L-shaped slot 1-3 through the connecting block 3. Figure 2As shown, after drilling to a suitable position, the drill is pulled back to separate the connecting block 3-3 from the L-shaped slot 1-3, so that the detachable drill rod 3 is separated from the quick integrated drill bit. Due to the presence of the stopper 2-5, it can be ensured that the detachable drill rod will not be separated from the adaptive plugging device 2. After the plugging is completed, the detachable drill rod 3 is controlled to connect the connecting block 3 to the L-shaped slot 1-3.
[0056] The three-channel drilling device 4 includes a three-channel drill rod 4-1, a wind control power pipeline 4-2, a grouting pipeline 4-3, and an air-inflating and exhausting pipeline 4-4 located inside the three-channel drill rod 4-1, an external thread 4-5 of the three-channel drilling device, an external soil discharge groove 4-6 of the three-channel drilling device, a pull ring switch protrusion 4-7, and a pull ring switch groove 4-8. In this embodiment, the three-channel drill rod 4-1 is formed by opening a wind control power pipeline 4-2, a grouting pipeline 4-3, and an air-inflating and exhausting pipeline 4-4 inside a solid drill rod. The three pipelines are all provided with a pipeline connection inner thread 4-9, and the grouting pipe 2-6, the air-inflating and exhausting pipe 2-7, and the sealing control power pipe 2-11 are all provided with a matching hose connection outer thread 2-12, and the three pipelines are connected to the three hoses one by one through the pipeline connection inner thread 4-9 and the hose connection outer thread 2-12. The detachable drill rod 3 is connected to the three-channel drill rod 4-1 by threaded connection, and the other two adjacent three-channel drill rods 4-1 are connected by matching the pull ring switch protrusion 4-7 and the pull ring switch groove 4-8.
[0057] The operating system 5 specifically includes a grouting device 5-1, a gas injection device 5-2, and a control device 5-3. The grouting device 5-1 is connected to the grouting pipeline 4-3 to control the grouting process. The gas injection device 5-2 is connected to the inflation and exhaust pipeline 4-4 to control the inflation and exhaust processes. The control device 5-1 is connected to the wind control power pipeline 4-2 to provide air pressures of different pressures to control the air pump 2-4.
[0058] The present invention also provides an operation method of an integrated device for rapid ground drilling, plugging and recovery of a large-section water bursting channel, comprising the following steps:
[0059] S1. Drill the above device to the water inrush channel through ground drilling. At this time, the drill rod 3 can be detached from the fast integrated drill bit 1, and the adaptive plugging device 2 is located inside it. This will not affect the drilling process and can protect the adaptive plugging device.
[0060] S2, S2, open the L-shaped slot 1-3, separate the detachable drill rod and the adaptive plugging device, and drill back and lift the rod until it contacts the stopper at the end of the adaptive plugging device to expose the adaptive plugging device;
[0061] S3, using the control system 5, through the wind control power pipeline 4-2 and the wind control power tube 2-11, the control air pump 2-4 is controlled to open the pneumatically controlled folding telescopic rod 2-3, so that it extends out of the device fixing tube 2-10 to form a protective bracket in the water burst channel;
[0062] S4, using the control system to inflate the blocking airbag 2-2 through the inflation and exhaust pipe 4-4 and the inflation and exhaust pipe 2-7, and open the blocking airbag 2-2 to expand it to match the cross section of the water burst channel, so as to form the water burst channel blocking airbag 2-2 attached to the bracket;
[0063] S5, using the grouting pipe 4-3 and the grouting pipe 2-6 to inject cement mortar into the plugging airbag 2-2 to displace the gas in the plugging airbag 2-2, and wait for the cement mortar to solidify into stone solid, and finally form a filling body to plug the water burst channel, so as to control the large-section water burst within a local range;
[0064] S6. After the plugging is completed, the pneumatically controlled scissors are used to cut off the airbag under the action of air pressure to separate the airbag from the drill pipe, and the pneumatically controlled folding telescopic rod is controlled to return to the fixed tube of the device, and the drill is returned to the connection block that can be detached from the drill pipe and connected to the card slot of the quick integrated drill bit to recover the device.
[0065] S6. Use the pneumatically controlled scissors 2-1 to separate the blocking airbag 2-2 from the adaptive blocking device 2, manipulate the pneumatically controlled folding telescopic rod 2-3 to return to the device fixing tube 2-10, and drill back to the connection block 3-3 that can be detached from the drill rod 3 and connected to the L-shaped slot 1-3 of the quick integrated drill bit 1 to recover the device.
[0066] When inflating the plugging airbag 2-2, first open the grouting pipe and the inflation and exhaust pipe, inflate the plugging airbag, and the plugging airbag opens through the airbag outlet under the action of air pressure; when the plugging airbag expands to match the cross-section of the water burst channel, use the grouting pipe to inject grout into the plugging airbag, and use the inflation and exhaust pipe as an exhaust pipe to replace the gas in the plugging airbag; when slurry is discharged from the inflation and exhaust pipe, stop grouting.
[0067] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0068] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. An integrated device for rapid ground drilling, plugging and recovery of large-section water inrush channels, characterized by: It includes a fast integrated drill bit, an adaptive plugging device, a detachable drill rod, a three-channel drilling device, and a control system, wherein the fast integrated drill bit is connected to one end of the adaptive plugging device, and one end of the detachable drill rod is connected to the three-channel drilling rod device; During the drilling process, the adaptive plugging device is located inside the detachable drill rod, and the other end of the detachable drill rod is connected to the quick integrated drill bit; during the plugging process, the detachable drill rod is controlled to be detached from the quick integrated drill bit, and the adaptive plugging device is exposed outside the detachable drill rod, and the blocking of the adaptive plugging device is achieved by controlling the operating system; after the blocking is completed, the detachable drill rod is controlled to be connected to the quick integrated drill bit, so that the adaptive plugging device is located inside the detachable drill rod, and the drill is lifted to complete the recovery.
2. The integrated device for rapid ground drilling, plugging and recovery of large-section water inrush channels according to claim 1 is characterized in that: The adaptive plugging device includes a device fixing tube connected to the quick integrated drill bit at one end, a pneumatically controlled scissors, a plugging airbag, a pneumatically controlled folding telescopic rod base located in the device fixing tube, a pneumatically controlled folding telescopic rod located on the pneumatically controlled folding telescopic rod base, a control air pump, a flexible grouting pipe and a flexible inflation and exhaust pipe connected to the plugging airbag, and a flexible sealing power pipe; the three-channel drilling device includes a three-channel drill rod, a wind-controlled power pipeline, a grouting pipeline, and an inflation and exhaust pipeline located in the three-channel drill rod; the grouting pipe, the inflation and exhaust pipe, and the wind-controlled power pipe pass through the device fixing tube and can be detached from the drill rod and the grouting pipe , inflation and exhaust pipes, and wind control power pipes are respectively connected accordingly; the operating system is operated to control the control air pump through the wind control power pipe and the wind control power pipe, so that the pneumatically controlled folding and telescopic rod extends out of the device fixed tube to form a protection rod; the operating system is operated to inflate the plugging airbag through the inflation and exhaust pipes and the inflation and exhaust pipes, and then grout the plugging airbag through the grouting pipe and the grouting pipe; after the grouting is completed, the control air pump is controlled to control the pneumatically controlled scissors to detach the plugging airbag; the pneumatically controlled folding and telescopic rod is controlled to return to the device fixed tube, and the detachable drill rod is controlled to be connected with the quick integrated drill bit.
3. The integrated device for rapid ground drilling, plugging and recovery of large-section water inrush channels according to claim 2 is characterized by: The quick integrated drill bit comprises a drill bit body and a slot arranged on the drill bit body, and a connecting block is arranged on the detachable drill rod. The quick integrated drill bit and the detachable drill rod are detachably connected through the cooperation of the slot and the connecting block.
4. The integrated device for rapid ground drilling, plugging and recovery of large-section water inrush channels according to claim 2 is characterized by: The card slot is an L-shaped card slot.
5. The integrated device for rapid ground drilling, plugging and recovery of large-section water inrush channels according to claim 2 is characterized in that: The adaptive blocking device also includes a stopper arranged at the other end of the device fixing tube.
6. The integrated device for rapid ground drilling, plugging and recovery of large-section water inrush channels according to claim 2, characterized in that: The surface of the detachable drill rod is provided with a detachable drill rod external thread.
7. An operating method of a large-section water bursting channel ground rapid drilling, plugging, and recovery integrated device, according to any one of claims 1 to 6, characterized in that: The steps include: S1. Drill the above device to the location of the water bursting channel through ground drilling; S2. Open the L-shaped slot to separate the detachable drill rod from the adaptive plugging device, and then drill back and lift the rod until it contacts the stopper at the end of the adaptive plugging device to expose the adaptive plugging device. S3. Using the control system, through the wind control power pipeline and the wind control power tube, the control air pump is operated to open the pneumatically controlled folding telescopic rod so that it extends out of the device fixed tube to form a bracket in the water burst channel; S4. Using the operating system, inflate the blocking airbag through the inflation and exhaust pipe and the inflation and exhaust pipe, open the blocking airbag, and expand it to match the cross section of the water burst channel, so as to form a water burst channel blocking airbag attached to the bracket; S5. Use the grouting pipe and grouting tube to inject cement mortar into the plugging airbag to displace the gas in the plugging airbag, wait for the cement mortar to solidify into stone solid, and finally form a filling body to plug the water bursting channel, so as to control the large-section water bursting within a local range; S6. Use pneumatically controlled scissors to separate the blocking airbag from the adaptive blocking device, manipulate the pneumatically controlled folding telescopic rod to return to the device fixing tube, drill back to the connection block that can be detached from the drill rod and connect to the L-shaped slot of the quick integrated drill bit to recover the device.
Citation Information
Patent Citations
Moving water large-channel water inrush drilling net rack, air bag and grouting integrated plugging device
CN212642762U
Air bag type curtain leakage plugging device and method
CN111997073A
Flowing water large-channel water inrush drill hole net rack, air bag and grouting integrated plugging device and method
CN112177638A
Air bag hole sealing type cloth bag grouting method
CN113047264A
Tubular pile post-grouting device for blocking tubular pile through air bag and grouting method of tubular pile post-grouting device
CN117230801A