Steel structure house and construction method thereof

By adopting a combination design of column beams, horizontal beams, vertical beams and honeycomb structure walls in steel structure houses, combined with snake-shaped liquid reservoirs, solar panels, refrigerators and heat collectors, the shortcomings of existing steel structure houses in low temperature resistance, sound insulation and moisture resistance are solved, and the structure is lightweight and efficient, and energy consumption is reduced.

CN119640940APending Publication Date: 2025-03-18SHANDONG ZAOKUANG ZHONGXING STEEL STRUCTURE CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202510163711.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-14
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

The existing steel structure houses have shortcomings in low temperature resistance, sound insulation and moisture resistance, and the insulation and temperature adjustment effects are average and are not energy-saving enough.

Method used

The base consisting of column beams, horizontal beams, vertical beams and honeycomb structure walls is combined with serpentine reservoirs, solar panels, refrigerators and heat collectors. Through the high space utilization and mechanical efficiency of honeycomb structure walls, the structure is lightweight and efficient, and through the combination of solar energy and soil insulation, intelligent temperature regulation is achieved.

Benefits of technology

It significantly improves the structural stability and living comfort of steel structure houses, realizes lightweight and efficient building structures, reduces energy consumption, and improves thermal insulation effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119640940A_ABST
    Figure CN119640940A_ABST
Patent Text Reader

Abstract

The invention discloses a steel structure house and a construction method thereof.The steel structure house comprises four stand column beams, and the four stand column beams are arranged at the four corners of the same rectangle respectively; the two horizontal beams and the two vertical beams are arranged on the four sides of the rectangle respectively. The invention discloses a construction method of a steel structure house. The construction method comprises the following steps: S1, fixing a foundation structure and a beam body; s2, damp-proof plate installation; s3, the snakelike liquid storage pipe and a floor are installed; s4, the steel plate with the door and the honeycomb structure wall body are installed; and S5, ceiling and energy supply. By arranging the stand column beams, the horizontal beams, the vertical beams, the honeycomb structure wall bodies and the like and by referring to a honeycomb structure, the strength and stability of the structure are greatly improved while the weight of the structure is reduced, light weight and high efficiency of the building structure are achieved, meanwhile, intelligent adjustment of the indoor temperature is achieved, and the living comfort is effectively improved; meanwhile, natural resources are fully utilized, energy consumption is reduced, and the energy-saving and environment-friendly concept is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of steel structure houses, and in particular to a steel structure house and a construction method thereof. Background Art

[0002] Steel structure buildings are buildings that use construction steel to form a load-bearing structure. Usually, the load-bearing structure is composed of beams, columns, trusses and other components made of steel and steel plates. Together with the enclosure structures such as roofs, floors and walls, they form the entire building. Advantages of steel structure houses: high steel strength, light weight, good heat resistance, simple production, short construction period, no environmental impact, good sealing, and can be customized according to the needs of different owners; Disadvantages of steel structures: poor low temperature resistance, poor sound insulation, and poor moisture resistance.

[0003] In response to the above problems, a Chinese patent with publication number "CN114182983A" discloses a steel structure house and a construction method thereof, including a foundation, walls and a roof; the four corners of the foundation are provided with columns for installing H-steel; the walls include inner and outer steel plates, which are fixed by H-steel at both ends, and doors are provided on the walls; the roof includes triangular supports at both ends, and a triangular roof fixed on the triangular supports. The columns are cement steel columns, and protrusions are provided on the two mounting surfaces of the columns. Although the above scheme improves stability compared to traditional prefabricated houses, and thermal insulation and waterproof materials are provided to insulate the house from moisture, for steel structures, the structural stability can be further optimized by changing the structural shape, and the above scheme does not make reasonable use of natural resources and temperature changes, so the insulation and temperature regulation effects are general and not energy-efficient enough. Summary of the invention

[0004] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a steel structure house and a construction method thereof.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions: A steel structure house, comprising: Four column beams, the four column beams are arranged at the four corners of the same rectangle; Two horizontal beams and two vertical beams are respectively arranged at the four sides of the rectangle; Two sets of steel plates with doors, the steel plates with doors are located at the upper ends of the vertical beams; Two groups of honeycomb structure walls, the honeycomb structure walls are located above the horizontal beam, and the upper ends of the two groups of honeycomb structure walls are provided with multiple groups of diamond-shaped structural steels, and the surface of each group of diamond-shaped structural steels is installed with solar panels; A moisture-proof board, wherein the four corners of the moisture-proof board are provided with sixth bolt holes and fixed with fixing pins, the horizontal edges of the moisture-proof board are provided with seventh bolt holes, the vertical edges are provided with eighth bolt holes, and the upper end of the moisture-proof board is fixedly installed with a serpentine liquid storage pipe; A floor, wherein pin holes are provided at four corners of the lower end of the floor; The refrigerator and the collector are respectively fixedly installed on the surfaces of two column beams, and both realize cooling and heating functions through solar panels. Both are connected to the serpentine liquid storage pipe pipeline, and valves are arranged in the pipeline.

[0006] Preferably, the column beam is composed of a first longitudinal beam, a second longitudinal beam and an L-shaped fixing piece, the first longitudinal beam and the second longitudinal beam are fixed in a degree, and are respectively provided with a first longitudinal beam hole and a second longitudinal beam hole, the L-shaped fixing piece is fixedly arranged at the lower end of the column beam and is provided with a first bolt hole; the horizontal beam is composed of a cross beam, a cross-bend fixing piece and a bottom transverse fixing piece, a pair of the cross-bend fixing pieces are located on both sides of the cross beam and are both provided with a second bolt hole, the bottom transverse fixing piece is located at the bottom of the cross beam and is fixed in degree with it and is both provided with a third bolt hole; the vertical beam is composed of a vertical beam, a vertical bend fixing piece and a bottom vertical fixing piece, a pair of the vertical bend fixing pieces are located on both sides of the vertical beam and are both provided with a fourth bolt hole, the bottom vertical fixing piece is located at the bottom of the vertical beam and is fixed in degree with it and is both provided with a fifth bolt hole.

[0007] Preferably, the first longitudinal beam hole and the second bolt hole cooperate with each other and a fastening bolt is threadedly connected therebetween for fixing the column beam and the horizontal beam.

[0008] Preferably, the second longitudinal beam hole and the fourth bolt hole cooperate with each other and are threadedly connected by a fastening bolt to fix the column beam and the vertical beam.

[0009] Preferably, the first bolt hole and the sixth bolt hole cooperate with each other and a fastening bolt is threadedly connected therebetween for fixing the column beam and the moisture-proof board.

[0010] Preferably, the third bolt hole and the seventh bolt hole cooperate with each other and a fastening bolt is threadedly connected therebetween to fix the horizontal beam and the moisture-proof board.

[0011] Preferably, the fifth bolt hole and the eighth bolt hole cooperate with each other and a fastening bolt is threadedly connected therebetween to fix the vertical beam and the moisture-proof board.

[0012] Preferably, the fixing pin and the pin hole are interference fit to fix the floor and the moisture-proof board.

[0013] Preferably, the honeycomb structure wall is formed by welding a plurality of regular hexagonal steel structure components, and light-transmitting glass is installed in the gaps of the honeycomb structure wall.

[0014] A method for constructing a steel structure house comprises the following steps: S1. The foundation structure is fixed to the beam body. A rectangular foundation pit is dug on the ground. Two horizontal beams and two vertical beams are placed in the foundation pit in a rectangular shape. Space for the installation of column beams is reserved. Four column beams are inserted into the reserved space. Fastening bolts are driven into the first longitudinal beam hole and the second bolt hole, and the second longitudinal beam hole and the fourth bolt hole, respectively, so that the column beams, horizontal beams and vertical beams are fixed as one, and then the foundation pit is filled; S2. Install the moisture-proof board. Lift the moisture-proof board above the beam body and slowly lower it until it contacts the L-shaped fixing piece, the bottom horizontal fixing piece and the bottom vertical fixing piece. Drive the fastening bolts into the first bolt hole and the sixth bolt hole, the third bolt hole and the seventh bolt hole, and the fifth bolt hole and the eighth bolt hole respectively, so that the moisture-proof board is fixed to the beam body; S3, installation of serpentine liquid storage pipe and floor, laying serpentine liquid storage pipe above the moisture-proof board, filling the pipe with water, then hoisting the floor above the moisture-proof board, aligning the fixing pin with the pin hole and inserting it to complete the fixing of the floor; S4, installing the steel plate with door and the honeycomb structure wall, welding the steel plate with door between a pair of second longitudinal beams, and welding and combining regular hexagonal steel structure components between a pair of first longitudinal beams to form a honeycomb structure wall; S5, ceiling and energy supply, evenly lay a corresponding number of diamond-shaped structural steels along the concave shape on the upper ends of the two groups of honeycomb structure walls, then install solar panels obliquely along the surface of the diamond-shaped structural steels, connect the solar panels with the refrigerator and the collector, and install pipes with valves between the refrigerator, the collector and the serpentine liquid storage pipe.

[0015] The present invention has the following beneficial effects: 1. The present invention sets column beams, horizontal beams, vertical beams and honeycomb structure walls. First, the base composed of three beams ensures the basic stability of the house as a whole. Secondly, the honeycomb structure wall draws on the honeycomb structure. The hexagonal unit arrangement has extremely high space utilization and mechanical efficiency. This structural principle is applied to the design of floor slabs or walls of steel structure houses. By manufacturing hexagonal steel component assemblies and splicing them in an orderly manner, a structural layer with bionic characteristics is formed, which greatly improves the strength and stability of the structure while reducing the weight of the structure, thereby achieving lightweight and high efficiency of the building structure. 2. The present invention places the serpentine liquid storage pipe on a moisture-proof board and buries it inside the foundation pit in coordination with the floor, and uses the heat preservation ability of the soil itself to achieve the effect of the serpentine liquid storage pipe of keeping warm in winter and cool in summer. Secondly, the solar panel can collect and convert solar energy, and cooperate with the cooling and heating effects of the refrigerator and the collector to generate corresponding heat exchange with the serpentine liquid storage pipe when the temperature is high or low, so as to ensure that the liquid in the serpentine liquid storage pipe has a good temperature regulation function, thereby improving the living comfort of the house; 3. The present invention utilizes moisture-proof plates and fixing pins to lift the floor and isolate it from the foundation pit, and leaves a certain space barrier between the moisture-proof plates and the floor. This design not only effectively prevents the invasion of underground moisture, but also buffers the impact of small displacements caused by ground settlement, and avoids cracking and deformation of the floor due to foundation changes. The space barrier can also play a certain heat-insulating role, blocking the upward conduction of ground heat in summer and reducing indoor cooling energy consumption; reducing indoor heat loss in winter and improving indoor thermal insulation effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A structural schematic diagram of a steel structure house proposed by the present invention; Figure 2 A schematic diagram of the connection between the beam and floor structure of a steel structure house proposed by the present invention; Figure 3 A schematic diagram of the connection between the beam and moisture-proof board structure of a steel structure house proposed by the present invention; Figure 4 A schematic diagram of the structure of a column beam of a steel structure house proposed by the present invention; Figure 5 A schematic diagram of the structure of a horizontal beam of a steel structure house proposed by the present invention; Figure 6 A schematic diagram of the structure of a vertical beam of a steel structure house proposed by the present invention; Figure 7 A schematic diagram of the beam structure connection of a steel structure house proposed by the present invention; Figure 8 The present invention provides a schematic structural diagram of a steel structure assembly of a steel structure house.

[0017] In the figure: 1, column beam; 101, first longitudinal beam; 102, second longitudinal beam; 103, first longitudinal beam hole; 104, second longitudinal beam hole; 105, L-shaped fixing piece; 106, first bolt hole; 2, horizontal beam; 201, cross beam; 202, cross bend fixing piece; 203, second bolt hole; 204, bottom cross bend fixing piece; 205, third bolt hole; 3, vertical beam; 301, vertical beam; 302, vertical bend fixing piece; 30 3. Fourth bolt hole; 304. Bottom vertical fixing piece; 305. Fifth bolt hole; 4. Steel plate with door; 5. Honeycomb structure wall; 501. Steel structure component; 6. Diamond structural steel; 7. Solar panel; 8. Refrigerator; 9. Collector; 10. Floor; 11. Moisture-proof board; 1101. Sixth bolt hole; 1102. Seventh bolt hole; 1103. Eighth bolt hole; 1104. Fixing pin; 12. Serpentine liquid storage pipe. DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0019] Reference Figure 1-8 , a steel structure house, comprising: Four column beams 1, the four column beams 1 are arranged at the four corners of the same rectangle, the column beam 1 is composed of a first longitudinal beam 101, a second longitudinal beam 102 and an L-shaped fixing piece 105, the first longitudinal beam 101 and the second longitudinal beam 102 are fixed at 90 degrees, and are respectively provided with a first longitudinal beam hole 103 and a second longitudinal beam hole 104, the L-shaped fixing piece 105 is fixedly arranged at the lower end of the column beam 1 and is provided with a first bolt hole 106; Two horizontal beams 2 are arranged at the four sides of the rectangle. The horizontal beam 2 is composed of a cross beam 201, a cross-bend fixing piece 202 and a bottom transverse fixing piece 204. A pair of cross-bend fixing pieces 202 are located on both sides of the cross beam 201 and are each provided with a second bolt hole 203. The bottom transverse fixing piece 204 is located at the bottom of the cross beam 201 and is fixed at 90 degrees thereto and is each provided with a third bolt hole 205. The first longitudinal beam hole 103 and the second bolt hole 203 cooperate with each other and a fastening bolt is threadedly connected between the two for fixing the column beam 1 and the horizontal beam 2.

[0020] Two vertical beams 3, the vertical beam 3 consists of a vertical beam 301, a vertical bending fixing piece 302 and a bottom vertical fixing piece 304, a pair of vertical bending fixing pieces 302 are located on both sides of the vertical beam 301 and are each provided with a fourth bolt hole 303, the bottom vertical fixing piece 304 is located at the bottom of the vertical beam 301 and is fixed thereto at 90 degrees and is each provided with a fifth bolt hole 305; the second longitudinal beam hole 104 and the fourth bolt hole 303 cooperate with each other and the two are threadedly connected by a tightening bolt, which is used to fix the column beam 1 and the vertical beam 3.

[0021] Two sets of steel plates 4 with doors, the steel plates 4 with doors are located between the upper end of the vertical beam 3 and a pair of adjacent second longitudinal beams 102; There are two groups of honeycomb structure wall bodies 5, and the honeycomb structure wall bodies 5 are located above the horizontal beam 2 and between a pair of adjacent first longitudinal beams 101. A plurality of groups of rhombus structure steels 6 are provided at the upper ends of the two groups of honeycomb structure wall bodies 5, and a solar panel 7 is installed on the surface of each group of rhombus structure steels 6; the honeycomb structure wall bodies 5 are welded and assembled by a plurality of regular hexagonal steel structure components 501, and light-transmitting glass is installed in the gaps of the honeycomb structure wall bodies 5.

[0022] The moisture-proof board 11 has six bolt holes 1101 and fixing pins 1104 at four corners thereof, the horizontal edges of the moisture-proof board have seventh bolt holes 1102, the vertical edges have eighth bolt holes 1103, and a serpentine liquid storage tube 12 is fixedly installed at the upper end of the moisture-proof board 11; the first bolt hole 106 cooperates with the sixth bolt hole 1101 and a fastening bolt is threadedly connected therebetween to fix the column beam 1 and the moisture-proof board 11; the third bolt hole 205 cooperates with the seventh bolt hole 1102 and a fastening bolt is threadedly connected therebetween to fix the horizontal beam 2 and the moisture-proof board 11; the fifth bolt hole 305 cooperates with the eighth bolt hole 1103 and a fastening bolt is threadedly connected therebetween to fix the vertical beam 3 and the moisture-proof board 11.

[0023] The floor 10 has pin holes at the four corners of the lower end of the floor 10 , and the fixing pins 1104 are interference fit with the pin holes to fix the floor 10 and the moisture-proof board 11 .

[0024] The refrigerator 8 and the collector 9 are fixedly mounted on the surfaces of the two column beams 1, respectively, and both realize the cooling and heating functions through the solar panel 7. Both are connected to the serpentine liquid storage pipe 12 pipeline, and a valve is arranged in the pipeline. The specific electric control technology adopts the control technology connected with the temperature sensor and the controller. When the temperature is high, the temperature sensor transmits the indoor high temperature information of the steel structure house to the controller to control the solar panel to power the refrigerator 8. The valve in the pipeline connecting the refrigerator 8 and the serpentine liquid storage pipe 12 is opened to generate heat exchange, and the water in the serpentine liquid storage pipe 12 is cooled, so as to ensure that the temperature in the house is relatively cool; when the temperature is low, the temperature sensor transmits the low temperature information to the controller to control the collector 9 to collect the heat energy converted by the solar panel 7, and the valve in the pipeline connecting the refrigerator 8 and the serpentine liquid storage pipe 12 is opened to generate heat exchange, and the water in the serpentine liquid storage pipe 12 is heated, so that the house maintains a warm environment. The above-mentioned electric control and sensing technologies are mature existing technologies, which can be easily realized by those skilled in the art, and will not be elaborated here.

[0025] A method for constructing a steel structure house comprises the following steps: S1. The foundation structure is fixed to the beam body. A rectangular foundation pit is dug on the ground. Two horizontal beams 2 and two vertical beams 3 are placed in the foundation pit in a rectangular shape. An installation space for the column beam 1 is reserved. Four column beams 1 are inserted into the reserved space. Fastening bolts are driven into the first longitudinal beam hole 103 and the second bolt hole 203, and the second longitudinal beam hole 104 and the fourth bolt hole 303, respectively, so that the column beam 1, the horizontal beam 2 and the vertical beam 3 are fixed as one, and then the foundation pit is filled; S2, install the moisture-proof board 11, lift the moisture-proof board 11 above the beam body, slowly lower it until it contacts the L-shaped fixing piece 105, the bottom horizontal fixing piece 204 and the bottom vertical fixing piece 304, and drive the fastening bolts into the first bolt hole 106 and the sixth bolt hole 1101, the third bolt hole 205 and the seventh bolt hole 1102, and the fifth bolt hole 305 and the eighth bolt hole 1103, respectively, so that the moisture-proof board 11 is fixed to the beam body; S3, the serpentine liquid storage pipe 12 is installed on the floor 10, the serpentine liquid storage pipe 12 is laid above the moisture-proof board 11, the pipe is filled with water, and then the floor 10 is hoisted above the moisture-proof board 11, and the fixing pin 1104 is aligned with the pin hole and inserted to complete the fixing of the floor 10; S4, the steel plate with door 4 is installed with the honeycomb structure wall 5, the steel plate with door 4 is welded between a pair of second longitudinal beams 102, and the regular hexagonal steel structure assembly 501 is welded and assembled between a pair of first longitudinal beams 101 to form the honeycomb structure wall 5; S5, ceiling and energy supply. A corresponding number of diamond-shaped structural steels 6 are evenly laid along the concave shape of the upper ends of the two groups of honeycomb structure walls 5. Then, the solar panels 7 are installed obliquely along the surface of the diamond-shaped structural steels 6. The solar panels 7 are connected to the refrigerator 8 and the collector 9. The refrigerator 8 and the collector 9 are fixed on the column beam 1 by fastening bolts. The two are electrically connected to the solar panels 7 using cables, and pipes with valves are installed between the refrigerator 8, the collector 9 and the serpentine liquid storage pipe 12.

[0026] The steel structure house proposed by the present invention has a basic frame constructed by column beams 1, horizontal beams 2 and vertical beams 3, which lays a foundation for the overall stability of the house. The honeycomb structure wall 5 is welded with regular hexagonal steel structure components 501, imitating the honeycomb structure, greatly improving the space utilization and mechanical efficiency, significantly enhancing the structural strength while reducing the weight of the structure, achieving lightweight and high efficiency of the building structure, and improving safety and practicality.

[0027] At the same time, the solar panel 7 is used to collect solar energy to supply energy to the refrigerator 8 and the collector 9. In conjunction with the serpentine liquid storage pipe 12 buried in the foundation pit and utilizing the heat preservation capacity of the soil, heat exchange is automatically performed according to changes in ambient temperature to achieve intelligent regulation of the indoor temperature, effectively improving living comfort. At the same time, it makes full use of natural resources, reduces energy consumption, and complies with the concept of energy conservation and environmental protection.

[0028] The floor 10 is lifted up by the moisture-proof plate 11 and the fixing pin 1104, isolated from the foundation pit, and a space barrier is left between them, which effectively blocks underground moisture, prevents the floor 10 from being deformed by moisture, and can also buffer the displacement caused by ground settlement. In addition, the space barrier can block the upward conduction of ground heat in summer, reduce indoor heat loss in winter, reduce cooling and heating energy consumption, improve indoor thermal insulation effect, and extend the service life of the house.

[0029] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A steel structure house, characterized in that: include: Four column beams (1), the four column beams (1) being arranged at four corners of the same rectangle; Two horizontal beams (2) and two vertical beams (3) are respectively arranged at the four sides of the rectangle; Two sets of steel plates with doors (4), wherein the steel plates with doors (4) are located at the upper ends of the vertical beams (3); Two groups of honeycomb structure walls (5), the honeycomb structure walls (5) being located above the horizontal beam (2), and the upper ends of the two groups of honeycomb structure walls (5) are provided with a plurality of groups of rhombus structure steels (6), and a solar panel (7) is installed on the surface of each group of rhombus structure steels (6); A moisture-proof plate (11), wherein the moisture-proof plate (11) is provided with sixth bolt holes (1101) and fixedly provided with fixing pins (1104) at four corners, the moisture-proof plate is provided with seventh bolt holes (1102) at the transverse edges, and eighth bolt holes (1103) at the vertical edges, and a serpentine liquid storage pipe (12) is fixedly installed at the upper end of the moisture-proof plate (11); A floor (10), wherein pin holes are provided at four corners of the lower end of the floor (10); A refrigerator (8) and a heat collector (9), wherein the refrigerator (8) and the heat collector (9) are respectively fixedly mounted on the surfaces of two column beams (1), and both realize cooling and heating functions through solar panels (7), and both are connected to a serpentine liquid storage pipe (12), and a valve is provided in the pipe.

2. A steel structure house according to claim 1, characterized in that: The column beam (1) is composed of a first longitudinal beam (101), a second longitudinal beam (102) and an L-shaped fixing piece (105); the first longitudinal beam (101) and the second longitudinal beam (102) are fixed at 90 degrees and are respectively provided with a first longitudinal beam hole (103) and a second longitudinal beam hole (104); the L-shaped fixing piece (105) is fixedly arranged at the lower end of the column beam (1) and is provided with a first bolt hole (106); the horizontal beam (2) is composed of a cross beam (201), a cross-bend fixing piece (202) and a bottom cross-bend fixing piece (204); the vertical beam (3) is composed of a vertical beam (301), a vertical cross-bend fixing piece (202) and a bottom cross-bend fixing piece (204); The pair of transverse bending fixing members (202) and the bottom vertical fixing member (304) are located on both sides of the transverse beam (201) and are both provided with a second bolt hole (203); the bottom transverse fixing member (204) is located at the bottom of the transverse beam (201) and is fixed thereto at a (90) degree angle and is both provided with a third bolt hole (205); the pair of vertical bending fixing members (302) are located on both sides of the vertical beam (301) and are both provided with a fourth bolt hole (303); the bottom vertical fixing member (304) is located at the bottom of the vertical beam (301) and is fixed thereto at a (90) degree angle and is both provided with a fifth bolt hole (305).

3. A steel structure house according to claim 2, characterized in that: The first longitudinal beam hole (103) and the second bolt hole (203) cooperate with each other and a fastening bolt is threadedly connected between the two, and is used to fix the column beam (1) and the horizontal beam (2).

4. The steel structure house according to claim 2, characterized in that: The second longitudinal beam hole (104) and the fourth bolt hole (303) cooperate with each other and are threadedly connected by a fastening bolt, which is used to fix the column beam (1) and the vertical beam (3).

5. The steel structure house according to claim 2, characterized in that: The first bolt hole (106) and the sixth bolt hole (1101) cooperate with each other and a fastening bolt is threadedly connected between the two, for fixing the column beam (1) and the moisture-proof plate (11).

6. The steel structure house according to claim 2, characterized in that: The third bolt hole (205) and the seventh bolt hole (1102) cooperate with each other and a fastening bolt is threadedly connected between the two, which is used to fix the horizontal beam (2) and the moisture-proof plate (11).

7. The steel structure house according to claim 2, characterized in that: The fifth bolt hole (305) and the eighth bolt hole (1103) cooperate with each other and a fastening bolt is threadedly connected between the two, for fixing the vertical beam (3) and the moisture-proof plate (11).

8. The steel structure house according to claim 2, characterized in that The fixing pin (1104) and the pin hole are interference-fitted to fix the floor (10) and the moisture-proof board (11).

9. The steel structure house according to claim 1, characterized in that The honeycomb structure wall (5) is formed by welding a plurality of regular hexagonal steel structure components (501), and light-transmitting glass is installed in the gaps of the honeycomb structure wall (5).

10. A method for constructing a steel structure house according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1, the foundation structure is fixed to the beam body, a rectangular foundation pit is dug on the ground, two horizontal beams (2) and two vertical beams (3) are placed in the foundation pit in a rectangular shape, a space for installing the column beam (1) is reserved, four column beams (1) are inserted into the reserved space, and fastening bolts are driven into the first longitudinal beam hole (103) and the second bolt hole (203), and the second longitudinal beam hole (104) and the fourth bolt hole (303), respectively, so that the column beam (1), the horizontal beam (2) and the vertical beam (3) are fixed as a whole, and then the foundation pit is filled; S2, installing the moisture-proof board (11), hoisting the moisture-proof board (11) above the beam body, slowly lowering it until it contacts the L-shaped fixing piece (105), the bottom horizontal fixing piece (204) and the bottom vertical fixing piece (304), and driving the fastening bolts into the first bolt hole (106) and the sixth bolt hole (1101), the third bolt hole (205) and the seventh bolt hole (1102), and the fifth bolt hole (305) and the eighth bolt hole (1103), respectively, so that the moisture-proof board (11) is fixed to the beam body; S3, installing the serpentine liquid storage pipe (12) and the floor (10), laying the serpentine liquid storage pipe (12) above the moisture-proof board (11), filling the pipe with water, then hoisting the floor (10) above the moisture-proof board (11), aligning the fixing pin (1104) with the pin hole and inserting it, and completing the fixing of the floor (10); S4, installing the steel plate with door (4) and the honeycomb structure wall (5), welding the steel plate with door (4) between a pair of second longitudinal beams (102), and welding a combined regular hexagonal steel structure component (501) between a pair of first longitudinal beams (101) to form the honeycomb structure wall (5); S5, ceiling and energy supply, a corresponding number of rhombus structure steels (6) are evenly laid along the concave shape of the upper ends of the two groups of honeycomb structure walls (5), and then the solar panels (7) are installed obliquely along the surface of the rhombus structure steels (6), the solar panels (7) are connected to the refrigerator (8) and the collector (9), and a pipe with a valve is installed between the refrigerator (8), the collector (9) and the serpentine liquid storage pipe (12).

Citation Information

Patent Citations

  • Steel structure house and construction method thereof

    CN114182983A

  • Dismantled and assembled combination house of honeycomb type wall body

    CN207296004U

  • Ground structure warms up slimly

    CN208088760U

  • Steel structure house with wind-resistant and quakeproof structure

    CN210482624U

  • Heat insulation device for floor heating

    CN211781366U