Intelligent scheduling system for tunnel construction operation objects
Through the real-time data monitoring and automated scheduling algorithm of the intelligent scheduling system, the problems of slow response, insufficient safety management and unreasonable resource allocation in tunnel construction are solved, and efficient and safe construction management is achieved.
Patent Information
- Application Number
- CN202411579742.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-07
- Publication Date
- 2025-03-18
AI Technical Summary
The existing tunnel construction scheduling technology has problems such as slow response and inefficiency, insufficient safety management, and unreasonable resource allocation, especially in complex and emergency situations, which increases the risk and cost of accidents.
Develop an intelligent scheduling system, including data acquisition module, data processing module, scheduling decision module, execution and feedback module and user interface module. Through real-time data monitoring and automated scheduling algorithms, rapid response and optimization of resource allocation are achieved, and risk assessment and accident prevention mechanisms are integrated.
It significantly improves the scheduling response speed and efficiency, enhances safety management capabilities, optimizes resource allocation, reduces accident rates and costs, and improves overall construction efficiency and safety.