Intelligent scheduling system for tunnel construction operation objects

Through the real-time data monitoring and automated scheduling algorithm of the intelligent scheduling system, the problems of slow response, insufficient safety management and unreasonable resource allocation in tunnel construction are solved, and efficient and safe construction management is achieved.

CN119647827APending Publication Date: 2025-03-18CCCC SECOND HIGHWAY ENG CO LTD +1
0 Cites 2 Cited by

Patent Information

Application Number
CN202411579742.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-07
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

The existing tunnel construction scheduling technology has problems such as slow response and inefficiency, insufficient safety management, and unreasonable resource allocation, especially in complex and emergency situations, which increases the risk and cost of accidents.

Method used

Develop an intelligent scheduling system, including data acquisition module, data processing module, scheduling decision module, execution and feedback module and user interface module. Through real-time data monitoring and automated scheduling algorithms, rapid response and optimization of resource allocation are achieved, and risk assessment and accident prevention mechanisms are integrated.

Benefits of technology

It significantly improves the scheduling response speed and efficiency, enhances safety management capabilities, optimizes resource allocation, reduces accident rates and costs, and improves overall construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses an intelligent scheduling system for tunnel construction operation objects, and the system is characterized in that the construction system comprises a data collection module, a data processing module, a scheduling decision module, an execution and feedback module, and a user interface module; through highly integrated data acquisition, processing and decision making modules, the system can respond to the change of a construction site in real time and optimize scheduling decisions, so that the construction efficiency and the resource utilization rate are remarkably improved. Through the real-time monitoring and dynamic adjustment functions of the execution and feedback module, the scheduling system can respond to onsite emergencies in time, project delay and overhigh cost are reduced, and the construction progress and quality are guaranteed. The user interface module provides a visual and easy-to-operate interaction platform, so that a dispatcher can effectively monitor and manage the whole construction process, and the operation convenience and the decision accuracy are improved. The risk assessment and management function of the system strengthens the construction safety, and by predicting and preventing potential risks, the accident rate is obviously reduced, and the safety of personnel and equipment is guaranteed.