Resource processing method and device, computer program product and electronic equipment
By generating the parent order and splitting it into child orders, the problems of resource leasing complexity and payment risks in the prior art are solved, and efficient and secure resource processing and payment settlement are achieved.
Patent Information
- Application Number
- CN202411814536.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-10
- Publication Date
- 2025-03-18
AI Technical Summary
When prior art, when leasing resources online through the Internet, resource requesters and resource providers need to place orders multiple times and manually associate orders, which increases the complexity of resource processing and payment risks and affects user experience.
A resource processing method is proposed. By generating a parent order and splitting it into multiple child orders, the resource requester and resource provider can complete resource processing by placing an order in one place, and use the electronic supervision platform to store payment amounts to ensure payment security and accuracy.
It improves the efficiency and user experience of resource processing, reduces payment risks, and ensures the security of payment amounts and the accuracy of settlement.
Smart Images

Figure CN119648228A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of e-commerce and Internet technology, and more specifically, to a resource processing method, a resource processing device, a computer program product, and an electronic device. Background Art
[0002] With the development of Internet technology, more and more cases are being solved by using information transmission between the Internet to solve resource processing problems. For example, information transmission between the Internet can be used to rent, purchase or use resources. However, currently, online resource leasing through the Internet requires the resource requester to place multiple orders to complete the leasing, and the resource provider also needs to associate the multiple orders to realize the leasing. This not only increases the complexity of resource processing, but also poses a certain risk of insecure payment, affecting the user experience.
[0003] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Summary of the invention
[0004] The purpose of the present disclosure is to provide a resource processing method, a resource processing device, a computer program product and an electronic device, thereby improving resource processing efficiency and reducing payment risks in resource processing.
[0005] Other features and advantages of the present disclosure will become apparent from the following detailed description, or may be learned in part by the practice of the present disclosure.
[0006] According to one aspect of the present disclosure, a resource processing method is provided, including: responding to an order placement request for a target resource, generating a parent order according to the order placement information, the parent order including mutually related first order attribute information and second order attribute information, the first order attribute information and the second order attribute information corresponding to different settlement methods; splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; performing fulfillment processing on the target resource according to the first order, and storing a first payment sub-amount corresponding to the first order in an electronic supervision platform, and performing payment and settlement processing on the second payment sub-amount corresponding to the second order; in response to the target resource entering a fulfillment completion state, performing payment and settlement processing on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information.
[0007] In an exemplary embodiment of the present disclosure, in response to an order request for a target resource, a parent order is generated according to the order information, including: obtaining a correspondence between a preset first order attribute and at least one second order attribute; based on the order information, obtaining first order attribute information and second order attribute information matching the order information from the correspondence; and generating a parent order according to the first order attribute information and the second order attribute information.
[0008] In an exemplary embodiment of the present disclosure, a parent order is split into a first order corresponding to first order attribute information and a second order corresponding to second order attribute information, and also includes: obtaining a total payment amount based on the order information; obtaining a first payment sub-amount corresponding to the first order from the total payment amount based on the first order attribute information, and obtaining a second payment sub-amount corresponding to the second order from the total payment amount based on the second order attribute information.
[0009] In an exemplary embodiment of the present disclosure, before responding to an order request for a target resource and generating a parent order based on the order information, the method also includes: responding to an attribute configuration operation for the target resource, building a corresponding relationship based on the configuration information, wherein different second order attributes have their own corresponding resource leasing detailed descriptions.
[0010] In an exemplary embodiment of the present disclosure, the method also includes: constructing optional function items corresponding to the target resource according to the corresponding relationship; presenting the optional function items on the resource interaction page to respond to touch operations on the target function items in the resource interaction page, and generating order information according to the target function items.
[0011] In an exemplary embodiment of the present disclosure, in response to the target resource entering the fulfillment completion state, the first payment sub-amount in the electronic supervision platform is processed for payment settlement according to the fulfillment completion information, including: if the fulfillment completion information indicates that the target resource after fulfillment satisfies the target resource state, the first payment sub-amount is returned to the resource requester; or, if the fulfillment completion information indicates that the target resource after fulfillment does not satisfy the target resource state, the fulfillment negotiation information is obtained, and the first payment sub-amount is split and sent to the resource requester and the resource supplier according to the performance negotiation information.
[0012] According to one aspect of the present disclosure, another resource processing method is provided, including: obtaining a first order, performing fulfillment processing on a target resource according to the first order, and performing payment settlement processing according to a second payment sub-amount corresponding to the second order, the first payment sub-amount corresponding to the first order being stored in an electronic supervision platform; in response to the target resource entering a fulfillment completion state, performing payment settlement processing on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information; wherein the first order and the second order are obtained by splitting a parent order into a first order corresponding to first order attribute information and a second order corresponding to second order attribute information, the first order attribute information and the second order attribute information correspond to different settlement methods, and the parent order is generated according to the order information of an order placement request for the target resource.
[0013] According to one aspect of the present disclosure, there is provided another resource processing method, including: submitting an order request for a target resource so as to generate a parent order according to the order information, and splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; wherein the parent order includes mutually related first order attribute information and second order attribute information, and the first order attribute information and the second order attribute information correspond to different settlement methods; performing fulfillment processing of the target resource based on the first order, and performing payment settlement processing on the second payment sub-amount corresponding to the second order, and the first payment sub-amount corresponding to the first order is stored in an electronic supervision platform; wherein, if the target resource enters a fulfillment completion state, the first payment sub-amount in the electronic supervision platform will be subjected to payment settlement processing according to the fulfillment completion information.
[0014] According to one aspect of the present disclosure, there is provided a resource processing device, comprising: an order generation module, for responding to an order placement request for a target resource, generating a parent order according to the order placement information, the parent order comprising mutually related first order attribute information and second order attribute information, the first order attribute information and the second order attribute information corresponding to different settlement methods; an order splitting module, for splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; a first fulfillment module, for performing fulfillment processing on the target resource according to the first order, storing the first payment sub-amount corresponding to the first order in an electronic supervision platform, and performing payment and settlement processing on the second payment sub-amount corresponding to the second order; and a second fulfillment module, for responding to the target resource entering a fulfillment completion state, and performing payment and settlement processing on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information.
[0015] According to one aspect of the present disclosure, another resource processing device is provided, including: an order acquisition module, used to acquire a first order, perform fulfillment processing on a target resource according to the first order, and perform payment settlement processing according to a second payment sub-amount corresponding to the second order, the first payment sub-amount corresponding to the first order is stored in an electronic supervision platform; a third fulfillment module, used to respond to the target resource entering a fulfillment completion state, and perform payment settlement processing on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information; wherein the first order and the second order are obtained by splitting a parent order into a first order corresponding to first order attribute information and a second order corresponding to second order attribute information, the first order attribute information and the second order attribute information correspond to different settlement methods, and the parent order is generated according to the order information of an order placement request for the target resource.
[0016] According to one aspect of the present disclosure, there is provided another resource processing device, including: an order request module, used to submit an order request for a target resource, so as to generate a parent order according to the order information, and split the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; wherein the parent order includes mutually related first order attribute information and second order attribute information, and the first order attribute information and the second order attribute information correspond to different settlement methods; a fourth fulfillment module, used to perform fulfillment processing of the target resource based on the first order, and perform payment settlement processing on the second payment sub-amount corresponding to the second order, and the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform; wherein, if the target resource enters the fulfillment completion state, the first payment sub-amount in the electronic supervision platform will be paid and settled according to the fulfillment completion information.
[0017] According to one aspect of the present disclosure, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, any one of the above methods is implemented.
[0018] According to one aspect of the present disclosure, an electronic device is provided, comprising: a processor; and a memory for storing executable instructions of the processor; wherein the processor is configured to perform any one of the above methods by executing the executable instructions.
[0019] The resource processing method in the exemplary embodiment of the present disclosure, on the one hand, responds to an order request for a target resource, generates a parent order according to the order information, the parent order includes first order attribute information and second order attribute information that are mutually related, the first order attribute information and the second order attribute information correspond to different settlement methods, and then splits the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information. In the resource processing process, the resource requester only needs to place an order once to complete the orders of two different order attributes for the target resource at the same time, and the resource provider does not need to manually associate the orders of two different order attributes for the target resource. For both the resource requester and the resource provider, the resource processing efficiency is improved, and the user experience is high. On the other hand, the target resource is fulfilled according to the first order, and the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform, and the second payment sub-amount corresponding to the second order is paid and settled, and then the target resource is responded to enter the fulfillment completion state, and the first payment sub-amount in the electronic supervision platform is paid and settled according to the fulfillment completion information. This process divides the payment amount during resource processing into payment sub-amounts corresponding to different orders, and only the second payment sub-amount corresponding to the second order is settled, while the first payment sub-amount corresponding to the first order enters the electronic supervision platform. The first payment sub-amount is settled only after the performance of the target resource is completed, avoiding the risk of the first payment sub-amount being maliciously processed during the performance process and improving the security of this part of the payment amount. At the same time, the first payment sub-amount needs to be paid and settled according to the performance completion information, so that the settlement result of the first payment sub-amount is more in line with the performance of the target resource, thereby improving the accuracy of payment settlement.
[0020] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The above and other objects, features and advantages of the exemplary embodiments of the present disclosure will become readily understood by reading the detailed description below with reference to the accompanying drawings. In the accompanying drawings, several embodiments of the present disclosure are shown in an exemplary and non-limiting manner, in which:
[0022] Figure 1 A system architecture diagram of resource processing according to an exemplary embodiment of the present disclosure is shown;
[0023] Figure 2 A flow chart of a resource processing method according to an exemplary embodiment of the present disclosure is shown;
[0024] Figure 3 A schematic diagram of a parent order according to an exemplary embodiment of the present disclosure is shown;
[0025] Figure 4 A flowchart of an implementation method for generating a parent order according to an exemplary embodiment of the present disclosure is shown;
[0026] Figure 5 A schematic diagram showing a corresponding relationship between a deposit and a rent according to an exemplary embodiment of the present disclosure;
[0027] Figure 6 A schematic diagram showing an interactive interface for generating order information on an electronic trading platform according to an exemplary embodiment of the present disclosure is shown;
[0028] Figure 7 A flowchart showing a completion of resource processing according to an exemplary embodiment of the present disclosure is shown;
[0029] Figure 8 A flowchart showing another resource processing method according to an exemplary embodiment of the present disclosure is shown;
[0030] Fig. 9 A flowchart of another resource processing method according to an exemplary embodiment of the present disclosure is shown;
[0031] Fig.10 A schematic diagram showing the composition of a resource processing device according to an exemplary embodiment of the present disclosure is shown;
[0032] Fig.11 A schematic diagram showing the composition of another resource processing device according to an exemplary embodiment of the present disclosure is shown;
[0033] Fig.12 A schematic diagram showing the composition of yet another resource processing device according to an exemplary embodiment of the present disclosure is shown;
[0034] Fig.13 A schematic diagram of an electronic device according to an exemplary embodiment of the present disclosure is shown.
[0035] In the drawings, the same or corresponding reference numerals represent the same or corresponding parts. DETAILED DESCRIPTION
[0036] The exemplary embodiments will now be described more fully with reference to the accompanying drawings. However, the exemplary embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that the present disclosure will be more comprehensive and complete and the concepts of the exemplary embodiments will be fully conveyed to those skilled in the art. The same reference numerals in the figures represent the same or similar structures, and thus their detailed description will be omitted.
[0037] In addition, the described features, structures or characteristics may be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present disclosure. However, those skilled in the art will appreciate that the technical solutions of the present disclosure may be practiced without one or more of the specific details, or other methods, components, devices, steps, etc. may be adopted. In other cases, known structures, methods, devices, implementations or operations are not shown or described in detail to avoid blurring the various aspects of the present disclosure.
[0038] The block diagrams shown in the accompanying drawings are merely functional entities and do not necessarily correspond to physically independent entities. That is, these functional entities may be implemented in software form, or these functional entities or parts of functional entities may be implemented in one or more software hardened modules, or these functional entities may be implemented in different networks and / or processor devices and / or microcontroller devices.
[0039] It should be noted that in the technical solution disclosed herein, the collection / collection, updating, analysis, use, transmission, storage and other aspects of user personal information involved are in compliance with the provisions of relevant laws and regulations, are used for legal and reasonable purposes, are not shared, leaked or sold outside of these legal uses, and are subject to supervision and management by national regulatory authorities. Necessary measures should be taken for user personal information to selectively block the use or access to personal information data to prevent illegal access to such personal information data, ensure that persons who have access to personal information data comply with the provisions of relevant laws and regulations, and ensure the security of user personal information. In addition, once these user personal information data are no longer needed, the risks should be minimized by limiting or even prohibiting data collection and / or deleting data.
[0040] With the development of Internet technology, there are more and more cases where information transmission between the Internet is used to solve resource processing problems. For example, information transmission between the Internet can be used to rent, purchase or use resources. Taking rehabilitation aids and rehabilitation equipment as an example, from the perspective of product attributes, rehabilitation aids and rehabilitation equipment are high-priced, short-term urgent items (such as: fractures require a wheelchair for a period of time, fetal heart monitoring during pregnancy, and breast pumps during lactation). The user acquisition cost is high, and after short-term use, it will be idle. Therefore, efficient resource processing can be achieved through online leasing.
[0041] It should be noted that the resources mentioned in the embodiments of the present disclosure may be other resources that can be rented online, such as vehicles (cars, bicycles), books, and audio-visual materials, in addition to rehabilitation aids and rehabilitation equipment, and there is no specific limitation on this. The embodiments of the present disclosure are described by taking rehabilitation aids and rehabilitation equipment as an example.
[0042] However, the current offline rental process for rehabilitation aids and rehabilitation equipment is as follows: the user goes to the store to select rehabilitation equipment, pays a deposit and rent, returns the rehabilitation equipment after the expiration date, and the merchant returns the deposit, and the rental ends. However, offline leasing is time-consuming and labor-intensive, and it is difficult to meet user demands. At present, online resource leasing through the Internet requires the resource requester to place multiple orders (orders with different order attributes for the target resource, such as rental orders and deposit orders) to complete the lease, and also requires the resource provider to associate multiple orders to realize the lease, which not only increases the complexity of resource processing, but also poses a certain degree of payment insecurity risk, affecting the user experience.
[0043] For example, taking the rental of a blood pressure monitor in the online rental of rehabilitation aids and rehabilitation equipment scenario as an example, the resource provider provides different purchase links for different order attributes of the blood pressure monitor (such as rental and deposit), that is, the rental SKU (Stock Keeping Unit) and deposit SKU of the blood pressure monitor are treated as two independent SKUs. The resource requester needs to take pictures of the rental SKU and deposit SKU according to the two different purchase links of the blood pressure monitor respectively to obtain two orders, and the resource provider needs to manually associate the two orders. In this resource processing process, for users, users need to place orders multiple times to complete the rental of the blood pressure monitor. For merchants, different orders of the user for the same blood pressure monitor need to be associated (such as associating order numbers) to ensure the normal rental of the blood pressure monitor. For both resource providers and resource requesters, there are problems of high complexity and low efficiency in resource processing.
[0044] Furthermore, after the resource requester completes the payment for the two orders of the blood pressure monitor, the resource provider will receive the deposit and the rent at the same time, and the payment amount will be fully deposited into the resource provider's account. The funds are not subject to supervision, and there is a greater risk (such as the resource provider collects the deposit but fails to perform the contract), which to a certain extent affects the resource requester's willingness to place an order. On the contrary, if no deposit is collected, the resource provider needs to bear the risk of the resource being damaged or not returned, which to a certain extent affects the widespread application of online resource processing.
[0045] From the above, it can be seen that the current resource processing method has the problems of low resource processing efficiency and risk of resources or payment amounts.
[0046] In view of this, the present disclosure provides a resource processing method, such as Figure 1 A system architecture diagram of resource processing is shown, such as Figure 1As shown, the resource provider 101 enters the electronic trading platform 102 and provides resources on the electronic trading platform 102. The resource requester 103 browses the resources on the electronic interactive platform 102 and submits an order request for the target resource as needed. The electronic trading platform 102 generates a parent order based on the order information, and processes resources based on the parent order. The resource provider 101 provides resources to the resource requester 103. After the expiration, the resource requester 103 returns the resources and performs payment settlement. Among them, the electronic trading platform 103 stores a part of the payment sub-amount to the electronic supervision platform 104 for settlement processing after the fulfillment of the resource is completed.
[0047] Among them, the electronic trading platform 102 can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or it can be multiple cloud servers in cloud service technology that provide cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN, as well as big data and artificial intelligence platforms and other basic cloud computing services; the functions of the electronic trading platform can be implemented by one or more cloud servers, and can also be implemented by one or more cloud server clusters, etc.
[0048] The terminal devices corresponding to the resource requester 103 and the resource provider 101 can be mobile terminals, fixed terminals or portable terminals, such as mobile phones, sites, units, devices, multimedia computers, multimedia tablets, Internet nodes, desktop computers, laptop computers, notebook computers, netbook computers, tablet computers, personal communication system (PCS) devices, personal digital assistants (PDAs), or any combination thereof.
[0049] It should be noted that Figure 1 The architecture diagram shown is only an example, and the embodiments of the present disclosure do not impose any specific restrictions on the architecture involved in resource processing.
[0050] refer to Figure 2 As shown, a flowchart of a resource processing method is provided, which is applied to an electronic trading platform, such as Figure 2 The resource processing method of the embodiment of the present disclosure may include steps S210 to S240:
[0051] In step S210, in response to an order request for a target resource, a parent order is generated according to the order information, the parent order including first order attribute information and second order attribute information that are interrelated, the first order attribute information and the second order attribute information corresponding to different settlement methods.
[0052] In the exemplary embodiments of the present disclosure, the target resource refers to the resource to be processed, such as rehabilitation aids and rehabilitation equipment, transportation tools, books and audio-visual materials, etc., without limitation. The target resource is presented on the resource interaction page of the electronic trading platform so that the resource requester can browse and choose to place an order.
[0053] Among them, the function items to be selected corresponding to the target resource can be presented on the resource interaction page, so as to respond to the touch operation on the target function item and generate order information according to the target function item. The function items to be selected can be obtained based on the configuration operation of the resource provider on the target resource. The resource requester initiates an order request for the target resource through a touch operation on the target function item. The order information refers to the resource information corresponding to the function items to be selected, which is used to indicate the specific information of the target resource requested by the resource requester, such as category label (such as brand), model specification, at least two order attributes (such as deposit attribute, rental attribute) and the payment amount and time information corresponding to each order attribute.
[0054] At least two order attributes correspond to different settlement methods, and the settlement methods may include pre-performance settlement and post-performance settlement. Pre-performance settlement means that the order can be paid and settled before the target resource is processed for performance. Correspondingly, post-performance settlement means that payment and settlement can be made after the target resource is processed for performance. Among them, payment settlement means paying the payment amount provided by the resource requester to the resource provider and / or the electronic trading platform according to the preset settlement method. For example, for rent, the electronic trading platform may deduct 5% of the platform commission and pay the remaining rent to the resource provider.
[0055] A parent order is generated according to the order information of the order request. The parent order refers to the processing voucher for the target resource, which records the details of the processing of the target resource by the resource requester and the resource provider in accordance with the agreed processing method, including but not limited to the first order attribute information and the second order attribute information that are mutually related. Among them, mutual association means that the first order attribute information and the second order attribute information belong to different order attributes for the same target resource, and the two are used in association.
[0056] Among them, the first order attribute information records the details of the processing of the target resource by the resource requester and the resource provider in accordance with the agreed processing method under the first order attribute, and the second order attribute information records the details of the processing of the target resource by the resource requester and the resource provider in accordance with the agreed processing method under the second order attribute. The first order attribute information and the second order attribute information correspond to different settlement methods, that is, different order attributes correspond to different settlement methods. For example, the settlement method of the first order attribute is the settlement after performance, such as a deposit. After the resource provider and the resource requester complete the performance of the target resource, the deposit is paid and settled. Correspondingly, the settlement method of the second order attribute is the settlement before performance, such as rent. The payment and settlement can be carried out before the resource provider and the resource requester perform the performance of the target resource. Of course, the settlement method can also be other settlement methods that distinguish between before performance or after performance, including but not limited to the above-mentioned settlement methods of rent and deposit.
[0057] As an example, Figure 3 A schematic diagram of a parent order is shown schematically, such as Figure 3 As shown, the parent order includes first order attribute information 310 and second order attribute information 320. Based on the parent order, the resource processing method for the target resource can be clearly defined. Figure 3 This is merely an example of a parent order. The embodiments of the present disclosure may enrich the content of the parent order or include more fine-grained description information according to actual needs, and no specific limitation is imposed on this.
[0058] In step S220, the parent order is split into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information.
[0059] In an exemplary embodiment of the present disclosure, the parent order can be split into two sub-orders, namely the first order and the second order, according to the first order attribute information and the second order attribute, and the two orders can enter different resource processing flows respectively. Based on this, although the resource requester has only submitted one order, the order is split and processed separately through the electronic trading platform, that is, the order requirements for two order attributes of the target resource are realized by submitting an order once.
[0060] Continue to see Figure 3 As shown, the parent order is split into a first order D1 corresponding to the first order attribute information 310 and a first order D2 corresponding to the second order attribute information 320.
[0061] It should be understood that in the embodiment of the present disclosure, the quantity of the first order may be one or more, and the quantity of the second order may also be one or more, thereby enabling the resource requester to submit an order to realize ordering requirements for multiple order attributes of the target resource.
[0062] In step S230, the target resources are fulfilled according to the first order, and the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform, and the second payment sub-amount corresponding to the second order is paid and settled.
[0063] In an exemplary embodiment of the present disclosure, the target resource is fulfilled according to the first order, so that the resource provider can provide the target resource to the resource requester based on the first order, for example, the rehabilitation aids and rehabilitation equipment are sent to the resource requester so that the resource requester can use the rehabilitation aids and rehabilitation equipment. Among them, as an electronic trading platform, the first order can be sent to the resource provider to guide the resource provider to perform the contract on the target resource.
[0064] The electronic supervision platform refers to a platform that manages and uses funds for specific purposes in designated accounts, such as entrusting a third-party supervision platform or a bank as an electronic supervision platform to manage the first payment sub-amount corresponding to the first order. Compared with the existing resource processing method, the payment amount of the resource requester is paid directly to the resource provider, which can reduce the payment risk in resource processing.
[0065] Payment settlement processing of the second payment sub-amount corresponding to the second order refers to settling the second payment sub-amount, for example, paying the second payment sub-amount to the resource provider, or deducting the commission of the electronic trading platform (such as deducting 5% of the second payment sub-amount) from the second payment sub-amount and paying it to the resource provider. The specific method of payment settlement processing of the second payment sub-amount can be processed according to the allocation method pre-set by the electronic trading platform and the resource provider, and there is no specific restriction on this.
[0066] It should be understood that the payment settlement mentioned above may be sending the corresponding payment amount to the corresponding account of the corresponding party (provider, requester), which will not be elaborated herein.
[0067] In step S240, in response to the target resource entering the fulfillment completion state, the first payment sub-amount in the electronic supervision platform is processed for payment settlement according to the fulfillment completion information.
[0068] In an exemplary embodiment of the present disclosure, the target resource fulfillment completion status means that the resource requester returns the target resource to the resource provider at the agreed time, and the resource provider confirms receipt of the target resource. Among them, the fulfillment completion information refers to the information obtained by the target resource during the fulfillment period, including but not limited to the usage status and fulfillment time of the target resource. Based on the fulfillment completion information, it can be determined whether there is any non-compliance during the fulfillment period of the target resource (such as 1 month, 3 months, etc.), such as whether the target resource is damaged and the degree of damage.
[0069] According to the fulfillment completion information, the first payment sub-amount in the electronic supervision platform is paid and settled, which means that the first payment sub-amount is settled, for example, the first payment sub-amount is paid to the resource provider, or the first payment sub-amount can be deducted from a part (payment damage) and then paid to the resource provider. The specific method of payment settlement of the first payment sub-amount can be processed according to the pre-set allocation method between the electronic transaction platform, the resource provider, and the resource requester, and there is no specific restriction on this. For example, the first payment sub-amount can be paid in full to the resource provider, and if the target resource is damaged during the performance period, the remaining part of the first payment sub-amount can be returned to the resource requester after deducting the amount of damages to the resource provider.
[0070] Optionally, if the target resources are damaged during the performance period, arbitration can be intervened through the electronic trading platform, so that the first payment sub-amount can be paid and settled according to the arbitration results. There is no specific restriction on this.
[0071] The resource processing method in the exemplary embodiment of the present disclosure, on the one hand, responds to an order request for a target resource, generates a parent order according to the order information, the parent order includes first order attribute information and second order attribute information that are mutually related, the first order attribute information and the second order attribute information correspond to different settlement methods, and then splits the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information. In the resource processing process, the resource requester only needs to place an order once to complete the orders of two different order attributes for the target resource at the same time, and the resource provider does not need to manually associate the orders of two different order attributes for the target resource. For both the resource requester and the resource provider, the resource processing efficiency is improved, and the user experience is high. On the other hand, the target resource is fulfilled according to the first order, and the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform, and the second payment sub-amount corresponding to the second order is paid and settled, and then the target resource is responded to enter the fulfillment completion state, and the first payment sub-amount in the electronic supervision platform is paid and settled according to the fulfillment completion information. This process divides the payment amount during resource processing into payment sub-amounts corresponding to different orders, and only the second payment sub-amount corresponding to the second order is settled, while the first payment sub-amount corresponding to the first order enters the electronic supervision platform. The first payment sub-amount is settled only after the performance of the target resource is completed, avoiding the risk of the first payment sub-amount being maliciously processed during the performance process and improving the security of this part of the payment amount. At the same time, the first payment sub-amount needs to be paid and settled according to the performance completion information, so that the settlement result of the first payment sub-amount is more in line with the performance of the target resource, thereby improving the accuracy of payment settlement.
[0072] In an exemplary embodiment, a method for generating a parent order is provided. Figure 4 As shown, in response to an order request for a target resource, generating a parent order according to order information may include:
[0073] Step S410: Obtain a correspondence between a preset first order attribute and at least one second order attribute.
[0074] The correspondence between the preset first order attribute and at least one second order attribute is preset by the resource provider. Specifically, before responding to an order placement request for the target resource and generating a parent order according to the order placement information, it is also possible to: respond to the attribute configuration operation for the target resource and build a correspondence according to the configuration information, wherein different second order attributes have their own corresponding resource leasing detailed descriptions. For example, the rent is 100 yuan / month and the lease period is 1 month. For another example, the rent is 250 yuan / 3 units and the lease period is 3 months.
[0075] The attribute configuration operation is triggered by the resource provider, and the target resource can be configured with the attribute through the graphical interactive interface to respond to the attribute configuration operation and build a corresponding relationship based on the configuration information. The detailed description of resource leasing may include the leasing price, leasing duration and other leasing information, which is not specifically limited.
[0076] For example, the merchant may pre-set a corresponding relationship between a deposit (first order attribute) and at least one rental (second order attribute). Figure 5 A schematic diagram of the correspondence between a deposit and rent is shown. Merchants can set the correspondence between the rent SKU identifier and the deposit SKU identifier in the operation background, and one-to-many mapping is supported between the two (that is, a target resource can have a correspondence between one deposit and multiple lease periods).
[0077] As an example, still taking the rental of rehabilitation equipment as an example, merchants with rental qualifications can be marked as rental service providers. The rental service providers can create deposit SKUs and rental SKUs for rehabilitation equipment according to actual needs, and associate the deposit SKU identifier with the rental SKU identifier to obtain a correspondence between the deposit (first order attribute) and at least one rent (second order attribute).
[0078] For example, Table 1 shows a deposit SKU for a rehabilitation device created by a rental service provider. As shown in Table 1, by creating a deposit SKU, detailed information such as attribute parameters, brand, and price of the target resource (rehabilitation device) can be maintained.
[0079] Table 1
[0080] Sku Category Product Information Physical / Virtual price Is the foreground visible? Deposit Sku A xxx fetal heart rate monitor Physical 6000 NTD yes
[0081] Correspondingly, Table 2 shows a rental SKU for rehabilitation equipment created by a rental service provider. As shown in Table 2, by creating a rental SKU, multiple rental SKU categories (the second order attribute) and detailed descriptions of resource leasing corresponding to each category (such as price, lease period information, etc.) can be maintained.
[0082] Table 2
[0083]
[0084]
[0085] Table 1 and Table 2 are only examples of configuration information. The configuration information of the embodiment of the present disclosure may be set to be more complex or include more fine-grained configurations according to actual conditions, and there is no limitation on this.
[0086] After obtaining the configuration information, the corresponding relationship between the rental SKU identifier and the deposit SKU identifier can be determined according to the configuration information, such as Figure 5 This correspondence can be used to guide the subsequent process of generating parent orders.
[0087] Step S420: Based on the order information, first order attribute information and second order attribute information matching the order information are obtained from the corresponding relationship.
[0088] As can be seen from the above, the order information is used to indicate the specific information of the target resource requested by the resource requester, such as brand, model specification, at least two order attributes (such as deposit attribute, rental attribute) and the payment amount and time information corresponding to each order attribute. After obtaining the order information, the order information can be used as an input parameter to obtain the first order attribute information and the second order attribute information matching the order information from the corresponding relationship, such as the deposit amount, rental amount, lease term and other attribute information.
[0089] Step S430: Generate a parent order according to the first order attribute information and the second order attribute information.
[0090] After obtaining the first order attribute information and the second order attribute information, a parent order may be generated to perform fulfillment processing on the target resources based on the parent order.
[0091] The disclosed embodiment can generate a parent order based on the corresponding relationship by acquiring the first order attribute information and the second order attribute information according to the order information of the resource requester. That is, the resource requester only needs to place an order once to simultaneously realize the order requirements of two different order attributes for the target resource. Since a parent order is generated, the resource provider does not need to manually associate the orders of the two different order attributes for the target resource. Compared with the current situation in which the resource requester needs to place orders separately for different order attributes during online resource leasing, and the resource provider needs to manually associate different orders belonging to the same resource, the method of the disclosed embodiment improves the resource processing efficiency for both the resource requester and the resource provider.
[0092] Based on the aforementioned exemplary embodiment, splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information further includes:
[0093] First, the total payment amount is obtained according to the order information, and then the first payment sub-amount corresponding to the first order is obtained from the total payment amount based on the first order attribute information, and the second payment sub-amount corresponding to the second order is obtained from the total payment amount according to the second order attribute information.
[0094] Among them, the total payment amount is the total amount paid by the resource requester when placing an order for the target resource. The first order attribute information records the amount to be paid corresponding to the first order, and the second order attribute information records the amount to be paid corresponding to the second order. For example, the first order attribute information records that the deposit of "xxx fetal heart rate monitor" is 500, and the second order attribute information records that the rental of "xxx fetal heart rate monitor" is 100 yuan / month. Based on this, the total payment amount can be allocated to the first payment sub-amount and the second payment sub-amount. Provide information basis for subsequent payment settlement for the first order and the second order respectively.
[0095] In the disclosed embodiment, the resource requester only needs to place an order once and complete a payment once, that is, complete an order process, which actually realizes the payment of orders with different order attributes, thereby improving the user experience. In addition, the resource provider does not need to associate orders with different attributes, which reduces the difficulty of resource processing for the resource provider, thereby reducing operating costs.
[0096] In an exemplary embodiment, a method for obtaining order information is also provided, and the method may include:
[0097] First, the function items to be selected corresponding to the target resource are constructed according to the corresponding relationship, and then the function items to be selected are presented on the resource interaction page to respond to the touch operation on the target function item in the resource interaction page, and the order information is generated according to the target function item.
[0098] Among them, the function items to be selected refer to the function items that users can choose to determine the resource processing method, such as the "deposit + rent 100 / month" function item, the "deposit + rent 250 / 3 months" function item, etc., which are constructed based on the corresponding relationship set by the resource provider, so as to facilitate the resource requester to select the resource processing method that meets the needs.
[0099] Specifically, the electronic trading platform generates order information in response to a human touch operation. That is, the touch operation on the target function item in the resource interaction page is implemented based on human operation, and different order information can be generated according to different resource processing requirements. Specifically, the electronic trading platform can respond to the touch operation on the target function item in the resource interaction page and generate order information according to the target function item.
[0100] Figure 6 A schematic diagram of an interactive interface for generating order information on an electronic trading platform according to an embodiment of the present disclosure is shown, which can be used, for example, Figure 6 The interactive interface is used to place orders. It should be noted that all adjustable parameters can be configured in the interactive interface and can be viewed and modified by means of a slider. Figure 6 The possible configuration modes of the interactive interface are only illustrated for exemplary purposes, and the embodiments of the present disclosure do not limit this.
[0101] For example, the front-end system of the electronic trading platform can obtain the corresponding relationship between the deposit SKU and the rental SKU, traverse all the rental SKUs corresponding to the deposit SKU, and calculate the average rental amount of each rental SKU per day, thereby generating a detail page of the target resource based on the deposit SKU, the rental SKU, and the average rental amount of each rental SKU per day to present it on the resource interaction interface. In addition, the basic parameter information, rental time, etc. of the target resource can also be presented, without limitation.
[0102] Compared with the current resource leasing method, it is not intuitive to see specific leasing information on the item details page. The disclosed embodiment can provide the resource requester with a clear visual experience, facilitate quick selection of resource processing solutions and place orders, and eliminate the need to place multiple orders for different order attributes of the target resource, thereby improving resource processing efficiency.
[0103] In an exemplary embodiment, a method for implementing payment settlement processing of a first payment sub-amount is provided, that is, in response to a target resource entering a fulfillment completion state, payment settlement processing of the first payment sub-amount in an electronic supervision platform according to fulfillment completion information may include:
[0104] If the performance completion information indicates that the target resource after performance meets the target resource status, the first payment sub-amount is returned to the resource requester; or, if the performance completion information indicates that the target resource after performance does not meet the target resource status, the performance negotiation information is obtained, and the first payment sub-amount is split and sent to the resource requester and the resource supplier according to the performance negotiation information.
[0105] Among them, at the beginning of the lease, the status of the target resource should be checked and a detailed list should be made, including but not limited to the name, model, quantity and any existing damage or defects of the target resource. The list will be used to compare the current status of the target resource at the end of the lease (the target resource enters the fulfillment completion state) to ensure that the returned target resource is consistent with the beginning of the lease. The fulfillment completion information includes the actual status information of the target resource after the fulfillment. The target resource status can be the actual status of the target resource, which can be recorded through a detailed list, etc., and whether the target resource is damaged can be determined by comparing whether the fulfillment completion information meets the target resource status.
[0106] If the fulfillment completion information indicates that the target resource after fulfillment meets the target resource status, indicating that the target resource is not damaged, the first payment sub-amount can be returned to the resource requester, that is, the account corresponding to the resource requester. On the contrary, if the fulfillment completion information indicates that the target resource after fulfillment does not meet the target resource status, it means that the target resource is damaged. In this case, it is necessary to obtain the negotiation information of the resource provider and the resource requester on this situation, or obtain the agreed information of the two parties at the beginning of the lease to determine the fulfillment negotiation information, that is, the compensation plan for the damage.
[0107] Furthermore, the first payment sub-amount can be split and sent to the resource requester and the resource supplier according to the performance negotiation information, part of the first payment sub-amount can be deducted from the resource supplier, and the remaining first payment sub-amount can be returned to the resource requester, thereby protecting the interests of the resource supplier and preventing the resource requester from not returning or damaging the target resource. It should be understood that the specific performance negotiation information should be based on the negotiation results of the two parties during actual implementation, and the embodiments of the present disclosure do not limit this.
[0108] Figure 7 A resource processing completion flow chart is shown below. Figure 7 , taking the rental of rehabilitation equipment as an example, the resource processing method of the embodiment of the present disclosure is explained.
[0109] Step S710: The resource provider enters the electronic trading platform.
[0110] Step S720: The electronic transaction platform responds to the attribute configuration operation for the target rehabilitation device and constructs the corresponding relationship according to the configuration information.
[0111] Step S730, constructing the optional function items corresponding to the target rehabilitation equipment according to the corresponding relationship, and presenting the optional function items on the resource interaction page, in response to the resource requester's touch operation on the target function item in the resource interaction page, and generating order information according to the target function item.
[0112] Step S740: the electronic trading platform responds to the order request for the target resource and generates a parent order according to the order information.
[0113] Step S750: The electronic trading platform splits the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information.
[0114] The electronic trading platform synchronizes the first order to the resource provider, so as to perform contract fulfillment processing on the target resource according to the first order. The resource provider provides the target rehabilitation equipment to the resource requester according to the first order.
[0115] Among them, the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform, and the second payment sub-amount corresponding to the second order is processed for payment settlement.
[0116] Step S760: In response to the target rehabilitation device entering the fulfillment completion state, the first payment sub-amount in the electronic supervision platform is processed for payment settlement according to the fulfillment completion information.
[0117] Among them, after the lease expires, the resource requester returns the target rehabilitation equipment to the resource provider, and the resource provider inspects the target rehabilitation equipment to obtain the fulfillment completion information, and then processes the payment settlement of the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information.
[0118] It should be noted that the specific contents of step S710 to step S760 have been recorded in the above exemplary embodiments and will not be repeated here.
[0119] The resource processing method in the exemplary embodiment of the present disclosure, on the one hand, responds to an order request for a target resource, generates a parent order according to the order information, the parent order includes first order attribute information and second order attribute information that are mutually related, the first order attribute information and the second order attribute information correspond to different settlement methods, and then splits the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information. In the resource processing process, the resource requester only needs to place an order once to complete the orders of two different order attributes for the target resource at the same time, and the resource provider does not need to manually associate the orders of two different order attributes for the target resource. For both the resource requester and the resource provider, the resource processing efficiency is improved, and the user experience is high. On the other hand, the target resource is fulfilled according to the first order, and the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform, and the second payment sub-amount corresponding to the second order is paid and settled, and then the target resource is responded to enter the fulfillment completion state, and the first payment sub-amount in the electronic supervision platform is paid and settled according to the fulfillment completion information. This process divides the payment amount during resource processing into payment sub-amounts corresponding to different orders, and only the second payment sub-amount corresponding to the second order is settled, while the first payment sub-amount corresponding to the first order enters the electronic supervision platform. The first payment sub-amount is settled only after the performance of the target resource is completed, avoiding the risk of the first payment sub-amount being maliciously processed during the performance process and improving the security of this part of the payment amount. At the same time, the first payment sub-amount needs to be paid and settled according to the performance completion information, so that the settlement result of the first payment sub-amount is more in line with the performance of the target resource, thereby improving the accuracy of payment settlement.
[0120] See also Figure 8 In an exemplary embodiment of the present disclosure, a resource processing method is also provided. The resource processing method can be applied to a resource provider. Specifically, the resource processing method may include:
[0121] Step S810: Acquire the first order, perform fulfillment processing on the target resources according to the first order, and perform payment settlement processing according to the second payment sub-amount corresponding to the second order. The first payment sub-amount corresponding to the first order is stored in the electronic supervision platform.
[0122] Step S820: In response to the target resource entering the fulfillment completion state, payment settlement processing is performed on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information.
[0123] Among them, the first order and the second order are obtained by splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information. The first order attribute information and the second order attribute information correspond to different settlement methods. The parent order is generated based on the order information of the order request for the target resource.
[0124] It should be noted that the specific details involved in step S810 and step S820 have been recorded in the above-mentioned exemplary embodiment of the resource processing method applied to the electronic transaction platform, and will not be repeated here.
[0125] For further information, see Fig. 9 In an exemplary embodiment of the present disclosure, a resource processing method is also provided. The resource processing method can be applied to a resource requester. Specifically, the resource processing method may include:
[0126] Step S910: Submit an order request for the target resource to generate a parent order based on the order information, and split the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; wherein the parent order includes mutually related first order attribute information and second order attribute information, and the first order attribute information and the second order attribute information correspond to different settlement methods.
[0127] Step S920: Perform fulfillment processing of the target resources based on the first order, and perform payment settlement processing on the second payment sub-amount corresponding to the second order. The first payment sub-amount corresponding to the first order is stored in the electronic supervision platform.
[0128] Among them, if the target resource enters the fulfillment completion state, the first payment sub-amount in the electronic supervision platform will be paid and settled according to the fulfillment completion information.
[0129] It should be noted that the specific details involved in step S910 and step S920 have been recorded in the above-mentioned exemplary embodiment of the resource processing method applied to the electronic transaction platform, and will not be repeated here.
[0130] Furthermore, the embodiment of the present disclosure also provides a resource processing device, which is applied to an electronic trading platform, such as Fig.10 As shown, the resource processing device 1000 may include:
[0131] An order generation module 1010 is used to respond to an order placement request for a target resource, and generate a parent order according to the order placement information, wherein the parent order includes first order attribute information and second order attribute information that are interrelated, and the first order attribute information and the second order attribute information correspond to different settlement methods; an order splitting module 1020 is used to split the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; a first fulfillment module 1030 is used to perform fulfillment processing on the target resource according to the first order, and store the first payment sub-amount corresponding to the first order in the electronic supervision platform, and perform payment and settlement processing on the second payment sub-amount corresponding to the second order; a second fulfillment module 1040 is used to respond to the target resource entering a fulfillment completion state, and perform payment and settlement processing on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information.
[0132] In an exemplary embodiment of the present disclosure, the order generation module 1010 is configured to execute: obtaining the correspondence between a preset first order attribute and at least one second order attribute; based on the order information, obtaining first order attribute information and second order attribute information matching the order information from the correspondence; and generating a parent order according to the first order attribute information and the second order attribute information.
[0133] In an exemplary embodiment of the present disclosure, the order splitting module 1020 is also configured to execute: obtaining the total payment amount based on the order information; obtaining the first payment sub-amount corresponding to the first order from the total payment amount based on the first order attribute information, and obtaining the second payment sub-amount corresponding to the second order from the total payment amount based on the second order attribute information.
[0134] In an exemplary embodiment of the present disclosure, the order generation module 1010 is further configured to execute: in response to an attribute configuration operation for a target resource, construct a corresponding relationship according to the configuration information, wherein different second order attributes have respective corresponding resource leasing detailed descriptions.
[0135] In an exemplary embodiment of the present disclosure, the order generation module 1010 is configured to perform: constructing the selected function items corresponding to the target resource according to the corresponding relationship; presenting the selected function items on the resource interaction page in response to the touch operation on the target function item in the resource interaction page, and generating order information according to the target function item.
[0136] In an exemplary embodiment of the present disclosure, the second fulfillment module 1040 is configured to execute: if the fulfillment completion information indicates that the target resource after fulfillment satisfies the target resource status, then the first payment sub-amount is returned to the resource requester; or, if the fulfillment completion information indicates that the target resource after fulfillment does not satisfy the target resource status, then the fulfillment negotiation information is obtained, and the first payment sub-amount is split and sent to the resource requester and the resource supplier according to the performance negotiation information.
[0137] Since the functional modules of the resource processing device of the exemplary embodiment of the present disclosure are the same as those in the above-mentioned resource processing method of the invention embodiment, they will not be described in detail here.
[0138] Furthermore, the embodiment of the present disclosure also provides another resource processing device, which is applied to a resource provider, such as Fig.11 As shown, the resource processing device 1100 may include:
[0139] The order acquisition module 1110 is used to obtain the first order, perform fulfillment processing on the target resource according to the first order, and perform payment settlement processing according to the second payment sub-amount corresponding to the second order, and the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform; the third fulfillment module 1120 is used to respond to the target resource entering the fulfillment completion state, and perform payment settlement processing on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information; wherein, the first order and the second order are obtained by splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information, the first order attribute information and the second order attribute information correspond to different settlement methods, and the parent order is generated based on the order information of the order placement request for the target resource.
[0140] Since the functional modules of the resource processing device of the exemplary embodiment of the present disclosure are the same as those in the above-mentioned resource processing method of the invention embodiment, they will not be described in detail here.
[0141] Furthermore, the embodiment of the present disclosure also provides another resource processing device, which is applied to a resource requesting party, such as Fig.12 As shown, the resource processing device 1200 may include:
[0142] An order request module 1210 is used to submit an order request for a target resource so as to generate a parent order according to the order information, and to split the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; wherein the parent order includes mutually related first order attribute information and second order attribute information, and the first order attribute information and the second order attribute information correspond to different settlement methods; a fourth fulfillment module 1220 is used to perform fulfillment processing of the target resource based on the first order, and to perform payment and settlement processing on the second payment sub-amount corresponding to the second order, and the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform; wherein, if the target resource enters the fulfillment completion state, the first payment sub-amount in the electronic supervision platform will be paid and settled according to the fulfillment completion information.
[0143] Since the functional modules of the resource processing device of the exemplary embodiment of the present disclosure are the same as those in the above-mentioned resource processing method of the invention embodiment, they will not be described in detail here.
[0144] It should be noted that although several modules or units of the resource processing device are mentioned in the above detailed description, this division is not mandatory. In fact, according to the embodiments of the present disclosure, the features and functions of two or more modules or units described above can be concretized in one module or unit. Conversely, the features and functions of one module or unit described above can be further divided into multiple modules or units to be concretized.
[0145] The exemplary embodiments of the present disclosure also provide a computer program product, which includes a computer program, and when the computer program is executed by a processor, the resource processing method described above is implemented.
[0146] In one embodiment, the computer program product may be a tangible product containing a computer program, such as a computer-readable storage medium storing a computer program. The readable storage medium may be a storage medium based on electrical, magnetic, optical, electromagnetic, infrared, or other signals, including but not limited to: random access memory (RAM), read-only memory (ROM), magnetic tape, floppy disk, flash memory (Flash), mechanical hard disk (HDD), solid-state drive (SSD), and the like. Exemplarily, the computer program product may be implemented as a non-volatile storage medium storing a computer program, such as a read-only memory, a NAND flash memory, and the like.
[0147] In one embodiment, the computer program product may be an intangible product including a computer program. Exemplarily, the computer program product may be implemented as a virtual digital product, such as a digital file storing an executable file, an installation package, etc. of the computer program.
[0148] The code of the computer program can be written in one or more programming languages. The program code can be executed entirely on the user computing device, or partially on the user computing device, or as a separate software package, or partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server. In the case of a remote computing device, the remote computing device can be connected to the user computing device through any type of network, such as a local area network (LAN), a wide area network (WAN), etc., or can be connected to an external computing device (e.g., an Internet connection provided by an operator).
[0149] The computer program may be carried or transmitted via electrical, magnetic, optical, electromagnetic, infrared, or other signals. The electronic device may convert the signal carrying the computer program into a digital signal, thereby running the computer program. When the computer program is run on an electronic device, its code is used to enable the electronic device to execute (more specifically, the processor of the electronic device may execute) the method steps of various exemplary embodiments of the present disclosure, such as the steps of the resource processing method described above.
[0150] In addition, in an exemplary embodiment of the present disclosure, an electronic device capable of implementing the above method is also provided. It will be appreciated by those skilled in the art that various aspects of the present disclosure may be implemented as a system, method, or program product. Therefore, various aspects of the present disclosure may be specifically implemented in the following forms, namely: a complete hardware embodiment, a complete software embodiment (including firmware, microcode, etc.), or an embodiment combining hardware and software aspects, which may be collectively referred to herein as a "circuit", "module", or "system".
[0151] Refer to the following Fig.13 1300 according to this embodiment of the present disclosure is described. Fig.13 The electronic device 1300 shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.
[0152] like Fig.13 As shown, the electronic device 1300 is in the form of a general computing device. The components of the electronic device 1300 may include, but are not limited to: at least one processing unit 1310, at least one storage unit 1320, a bus 1330 connecting different system components (including the storage unit 1320 and the processing unit 1310), and a display unit 1340.
[0153] The storage unit stores program codes, which can be executed by the processing unit 1310, so that the processing unit 1310 executes the steps according to various exemplary embodiments of the present disclosure described in the above “Exemplary Method” section of this specification.
[0154] The storage unit 1320 may include a readable medium in the form of a volatile storage unit, such as a random access memory unit (RAM) 1321 and / or a cache memory unit 1322 , and may further include a read-only memory unit (ROM) 1323 .
[0155] The storage unit 1320 may also include a program / utility 1324 having a set (at least one) of program modules 1325, such program modules 1325 including but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment.
[0156] Bus 1330 may represent one or more of several types of bus structures, including a memory unit bus or memory unit controller, a peripheral bus, an accelerated graphics port, a processing unit, or a local bus using any of a variety of bus architectures.
[0157] The electronic device 1300 may also communicate with one or more external devices 1400 (e.g., keyboards, pointing devices, Bluetooth devices, etc.), may also communicate with one or more devices that enable a user to interact with the electronic device 1300, and / or communicate with any device that enables the electronic device 1300 to communicate with one or more other computing devices (e.g., routers, modems, etc.). Such communication may be performed via an input / output (I / O) interface 1350. Furthermore, the electronic device 1300 may also communicate with one or more networks (e.g., local area networks (LANs), wide area networks (WANs), and / or public networks, such as the Internet) via a network adapter 1360. As shown, the network adapter 1360 communicates with other modules of the electronic device 1300 via a bus 1330. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the electronic device 1300, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.
[0158] Through the description of the above embodiments, it is easy for those skilled in the art to understand that the example embodiments described here can be implemented by software, or by software combined with necessary hardware. Therefore, the technical solution according to the embodiment of the present disclosure can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, and includes several instructions to enable a computing device (which can be a personal computer, a server, a terminal device, or a network device, etc.) to execute the method according to the embodiment of the present disclosure.
[0159] In addition, the above-mentioned figures are only schematic illustrations of the processes included in the method according to the exemplary embodiments of the present disclosure, and are not intended to be limiting. It is easy to understand that the processes shown in the above-mentioned figures do not indicate or limit the time sequence of these processes. In addition, it is also easy to understand that these processes can be performed synchronously or asynchronously, for example, in multiple modules.
[0160] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the invention disclosed herein. The present disclosure is intended to cover any variations, uses, or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary technical means in the art that are not disclosed in the present disclosure. The description and examples are to be considered exemplary only, and the true scope and spirit of the present disclosure are indicated by the claims.
Claims
1. A resource processing method, characterized in that: include: In response to an order request for a target resource, a parent order is generated according to order information, wherein the parent order includes first order attribute information and second order attribute information that are related to each other, and the first order attribute information and the second order attribute information correspond to different settlement methods; Splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; Perform contract fulfillment processing on the target resource according to the first order, store the first payment sub-amount corresponding to the first order in the electronic supervision platform, and perform payment settlement processing on the second payment sub-amount corresponding to the second order; In response to the target resource entering a fulfillment completion state, payment settlement processing is performed on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information.
2. The method according to claim 1, characterized in that The response is for an order request for a target resource, and a parent order is generated according to order information, including: Obtaining a correspondence between a preset first order attribute and at least one second order attribute; Based on the order information, obtaining first order attribute information and second order attribute information matching the order information from the corresponding relationship; The parent order is generated according to the first order attribute information and the second order attribute information.
3. The method according to claim 1, characterized in that The step of splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information further includes: Obtaining the total payment amount according to the order information; A first payment sub-amount corresponding to the first order is obtained from the total payment amount based on the first order attribute information, and a second payment sub-amount corresponding to the second order is obtained from the total payment amount based on the second order attribute information.
4. The method according to claim 2, characterized in that: Before responding to the order request for the target resource and generating a parent order according to the order information, the method further includes: In response to the attribute configuration operation for the target resource, the corresponding relationship is constructed according to the configuration information, wherein different attributes of the second order have respective corresponding resource leasing detailed descriptions.
5. The method according to claim 4, characterized in that The method further comprises: Constructing a function item to be selected corresponding to the target resource according to the corresponding relationship; The function items to be selected are presented on a resource interaction page in response to a touch operation on a target function item in the resource interaction page, and the order information is generated according to the target function item.
6. The method according to claim 1, characterized in that In response to the target resource entering the fulfillment completion state, performing payment settlement processing on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information, including: If the fulfillment completion information indicates that the target resource after fulfillment satisfies the target resource status, returning the first payment sub-amount to the resource requester; Alternatively, if the fulfillment completion information indicates that the target resource after fulfillment does not satisfy the target resource status, fulfillment negotiation information is obtained, and the first payment sub-amount is split and sent to the resource requester and the resource supplier according to the fulfillment negotiation information.
7. A resource processing method, characterized in that: include: Obtaining a first order, performing contract fulfillment processing on the target resource according to the first order, and performing payment settlement processing according to a second payment sub-amount corresponding to the second order, wherein the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform; In response to the target resource entering a fulfillment completion state, performing payment settlement processing on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information; Among them, the first order and the second order are obtained by splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information, the first order attribute information and the second order attribute information correspond to different settlement methods, and the parent order is generated according to the order information of the order request for the target resource.
8. A resource processing method, characterized in that: include: Submitting an order request for a target resource, so as to generate a parent order according to the order information, and splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; wherein the parent order includes the first order attribute information and the second order attribute information which are related to each other, and the first order attribute information and the second order attribute information correspond to different settlement methods; Performing fulfillment processing of the target resource based on the first order, and performing payment settlement processing on the second payment sub-amount corresponding to the second order, wherein the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform; Among them, if the target resource enters the fulfillment completion state, the first payment sub-amount in the electronic supervision platform will be paid and settled according to the fulfillment completion information.
9. A resource processing device, characterized in that: include: An order generation module, configured to respond to an order placement request for a target resource and generate a parent order according to order placement information, wherein the parent order includes first order attribute information and second order attribute information that are related to each other, wherein the first order attribute information and the second order attribute information correspond to different settlement methods; An order splitting module, used for splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; A first fulfillment module, configured to perform fulfillment processing on the target resource according to the first order, store the first payment sub-amount corresponding to the first order in the electronic supervision platform, and perform payment settlement processing on the second payment sub-amount corresponding to the second order; The second fulfillment module is used to respond to the target resource entering the fulfillment completion state and perform payment settlement processing on the first payment sub-amount in the electronic supervision platform according to the fulfillment completion information.
10. A resource processing device, characterized in that: include: An order acquisition module, used to acquire a first order, perform contract fulfillment processing on a target resource according to the first order, and perform payment settlement processing according to a second payment sub-amount corresponding to the second order, wherein the first payment sub-amount corresponding to the first order is stored in an electronic supervision platform; A third contract fulfillment module, configured to respond to the target resource entering a contract fulfillment completion state and perform payment settlement processing on the first payment sub-amount in the electronic supervision platform according to contract fulfillment completion information; Among them, the first order and the second order are obtained by splitting the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information, the first order attribute information and the second order attribute information correspond to different settlement methods, and the parent order is generated according to the order information of the order request for the target resource.
11. A resource processing device, characterized in that: include: An order request module, used for submitting an order request for a target resource, so as to generate a parent order according to the order information, and split the parent order into a first order corresponding to the first order attribute information and a second order corresponding to the second order attribute information; wherein the parent order includes the first order attribute information and the second order attribute information which are related to each other, and the first order attribute information and the second order attribute information correspond to different settlement methods; a fourth contract fulfillment module, configured to perform contract fulfillment processing of the target resource based on the first order, and perform payment settlement processing on the second payment sub-amount corresponding to the second order, wherein the first payment sub-amount corresponding to the first order is stored in the electronic supervision platform; Among them, if the target resource enters the fulfillment completion state, the first payment sub-amount in the electronic supervision platform will be paid and settled according to the fulfillment completion information.
12. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 8 is implemented.
13. An electronic device, characterized in that: include: processor; as well as A memory, configured to store executable instructions of the processor; The processor is configured to perform the method of any one of claims 1 to 8 by executing the executable instructions.