Soil sample box and soil sample turnover management method

Through the design of soil sample boxes and corresponding turnover management methods, the problem of difficulty in maintaining the original state of geotechnical samples during engineering surveys is solved, the sample quality and test efficiency are improved, and the accuracy of test data is ensured.

CN119660121APending Publication Date: 2025-03-21BEIJING INST OF ENG GEOLOGY
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411937839.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-26
Publication Date
2025-03-21

AI Technical Summary

Technical Problem

In engineering survey, it is difficult to maintain the original state of geotechnical samples during sampling, transportation, storage and test preparation. The sample quality is poor, the turnover process is cumbersome and the storage time is too long affecting the accuracy of the test data.

Method used

A soil sample box is designed, including a base platform, a pallet, a box shell, a buffer mechanism and a connecting mechanism. The buffer mechanism shocks the geotechnical samples in the horizontal and vertical directions. The connecting mechanism separates the base platform from the box shell, which facilitates test preparation. At the same time, electronic tags are used for information management, monitoring the environment and sample status, and ensuring sample quality.

Benefits of technology

It improves the safety and test efficiency of geotechnical samples during transportation and storage, reduces sample disturbance, ensures sample quality, and avoids distortion of test data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119660121A_ABST
    Figure CN119660121A_ABST
Patent Text Reader

Abstract

The invention provides a soil sample box and a soil sample turnover management method, and relates to the technical field of engineering investigation sampling. The soil sample box provided by the invention comprises a base platform, the trays are mounted on the upper surface of the base platform, and each tray is used for bearing a corresponding rock-soil sample; a cavity is formed by the box body shell and the base platform; the box body shell is connected with the edge of the base platform through the connecting mechanism; the buffering mechanism is arranged in the box shell and / or on the base platform. According to the device, the rock-soil sample is damped and buffered in the horizontal direction and the vertical direction through the buffering mechanism, disturbance of the rock-soil sample is reduced, and the shockproof, shock insulation and buffering effects are improved. During testing, the base platform is separated from the box shell through the connecting mechanism, only the base platform and the tray installed on the upper surface of the base platform are reserved, it is not needed to take time to select, take out and place the rock-soil sample, the working process is simpler and smoother, and the testing efficiency of the rock-soil sample is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of engineering survey sampling, and in particular to a soil sample box and a soil sample turnover management method. Background Art

[0002] At present, the original soil samples taken from drilling holes in engineering surveys are generally cylindrical and packaged in iron tubes. After each geotechnical sample is sealed, a paper label is filled on the surface of each iron tube with relevant information of the soil sample. When transporting geotechnical samples, special soil sample boxes are used for packaging, and soft cushioning materials are filled between the samples. According to the "Standard for Geotechnical Test Methods" GB / T50123, after the soil samples are sent to the test unit for acceptance and registration, the soil samples shall be properly stored in order. The original soil samples and disturbed soil samples that maintain the natural moisture content shall be placed in a cool place to prevent disturbance and water evaporation as much as possible. The time from the date of sampling to the start of the test should not exceed 3 weeks.

[0003] At present, in engineering survey work, after drilling and obtaining rock and soil samples in the field, there are a series of turnover links from packaging, labeling, transportation, handling, indoor storage to sample placement and preparation before testing, such as the difficulty in maintaining the original state of rock and soil samples, poor sample quality, repeated and cumbersome sample turnover process, and long storage time affecting the accuracy of test data. Specifically, there are at least the following problems:

[0004] During engineering surveys, each rock and soil sample taken from a drilling hole needs to be sealed in a tin tube and then filled with a paper label. This operation is inefficient and can easily cause unclear writing during transportation and storage. Paper labels, as a medium for circulating rock and soil sample information, are also prone to damage or loss during the circulation process.

[0005] In the existing soil sample box packaging and transportation process, spring parts are mainly used for cushioning to prevent the soil samples from being disturbed during transportation. However, if the spring length is set to be short, the cushioning effect is not obvious, and if the spring length is set to be too long, the use of the space in the box is limited.

[0006] In the existing turnover management of rock and soil samples, there is a lack of monitoring measures for the storage status and storage time of rock and soil samples. The test data is distorted due to changes in sample quality caused by too low or too high temperature and humidity, or because the samples are stored for too long after being collected in the field.

[0007] At present, after the rock and soil samples collected in the field are transported to the laboratory, laboratory personnel need to spend a lot of time selecting and placing them in order for storage. Before conducting the test, the rock and soil samples need to be placed one by one on the test bench in order and numbered to make preparations before the test, and the process efficiency is low. Summary of the invention

[0008] Based on this, the present application provides a soil sample box and a soil sample turnover management method, which can improve the testing efficiency of rock and soil samples and the safety during transportation.

[0009] The soil sample box provided in this application includes:

[0010] Base platform;

[0011] A plurality of trays are installed on the upper surface of the base platform, and each tray is used to carry a corresponding rock and soil sample;

[0012] The box shell and the base platform form a cavity;

[0013] A connecting mechanism connects the box shell to the edge of the base platform;

[0014] The buffer mechanism is arranged inside the box shell and / or the base platform, and is used to protect the rock and soil samples.

[0015] Optionally, each tray comprises:

[0016] The tray body is fixed to the upper surface of the base platform, and the tray body is provided with a bearing groove for placing the rock and soil samples in the bearing groove;

[0017] The elastic friction ring is installed in the bearing groove, and the inner ring of the elastic friction ring acts on the surface of the rock and soil sample to limit the rock and soil sample;

[0018] The fixing ring is pressed on the top of the elastic friction ring and is used to limit the elastic friction ring and press it between the fixing ring and the tray body.

[0019] Optionally, a driving movement cavity is provided in the base platform, one end of the driving movement cavity is communicated with the outer side of the base platform, the box shell is provided with a bayonet corresponding to the position of the driving movement cavity, and the connection mechanism includes:

[0020] A drive assembly is located in the drive moving cavity;

[0021] The engaging member has one end connected to the driving assembly and the other end driven by the driving assembly to move in a direction close to or away from the bayonet.

[0022] Optionally, the drive assembly includes:

[0023] A driving gear meshes with the engaging member and is located in the driving moving cavity;

[0024] A connecting rod is connected to the driving gear, and one end of the connecting rod extends to the outside of the base platform;

[0025] The connecting knob is connected to one end of the connecting rod extending to the outer side of the base platform.

[0026] Optionally, the engaging member comprises:

[0027] A clamping member body, one end of which is provided with a meshing tooth meshing with the driving gear;

[0028] The limiting flange is connected to the engaging member body as a whole, and the surface of the limiting flange matches the inner wall of the driving moving cavity.

[0029] Optionally, the buffer mechanism includes a buffer support, and the buffer support includes:

[0030] The shock absorbing core, located between the base platform and the tray, includes:

[0031] Elastic sheet;

[0032] The metal sheet is stacked with the elastic sheet and interlaced with the elastic sheet;

[0033] Sealing plates are arranged at the upper and lower ends of the shock absorbing core and are connected to the base platform and the tray;

[0034] The protective layer is coated on the surface of the shock absorbing core and is used to protect the shock absorbing core.

[0035] Optionally, the buffer mechanism includes a buffer frame, and the buffer frame includes:

[0036] A slide bar is fixed to the inner wall of the box shell;

[0037] A first sliding frame, one end of which is connected to the box shell and the other end of which is slidably arranged on the sliding rod;

[0038] A second sliding frame, one end of which is connected to the box shell, and the other end of which is slidably arranged on the sliding rod so as to move closer to or away from the first sliding frame;

[0039] The limiting block is fixed to the sliding rod and is located between the first sliding frame and the second sliding frame.

[0040] Optionally, the first sliding frame and the second sliding frame both include:

[0041] A push rod is slidably connected with the slide rod through a sleeve, and the push rod is provided with a connecting tube;

[0042] A locking knob is threadedly connected to the connecting tube and is located outside the housing;

[0043] The shock-absorbing locking part is connected with the push rod and slides along the slide rod driven by the push rod.

[0044] Optionally, the shock-absorbing locking portion includes:

[0045] The shock-absorbing locking part body has a plurality of locking grooves matched with the rock and soil sample, and the locking grooves are arc-shaped;

[0046] A clamping block is fixed to the inner wall of the locking groove, and a clamping groove is formed between two adjacent clamping blocks;

[0047] The elastic pad is fixed in the locking groove and is clamped with the shock-absorbing locking part body through the clamping block and the clamping groove.

[0048] Optionally, the box housing comprises:

[0049] The box body, the bottom is connected with the base platform;

[0050] The box cover is installed on the top of the box body;

[0051] A buckle body, one end of which is connected to the box cover and the other end of which is buckled to the box body, and is used to connect the box cover to the box body;

[0052] The handle is installed on at least one of the box body and the box lid.

[0053] Optionally, the soil sample box further comprises a storage management module, which is disposed on the base platform or the box shell and is used to monitor and record the environmental status in the cavity and the status of the rock and soil samples.

[0054] Optionally, the soil sample box further comprises:

[0055] The electronic tag is arranged on at least one of the base platform and the box shell, and is used to input, modify or read the information corresponding to the rock and soil sample.

[0056] The present application also provides a soil sample turnover management method using the soil sample box, comprising:

[0057] Place each packaged rock and soil sample on a tray at a corresponding position;

[0058] The box shell is connected and fixed to the base platform so that the encapsulated rock and soil sample is sealed in the cavity;

[0059] The buffer mechanism is made to act on the rock and soil sample to fix or protect the rock and soil sample;

[0060] Monitor the environment in the soil sample box and the status of rock and soil samples;

[0061] Transport the soil sample boxes to the predetermined location and sort the test sequence of the soil sample boxes according to the environment in the soil sample boxes and the state of the rock and soil samples;

[0062] The base platform is separated from the box shell by a connecting mechanism to remove the box shell, and only the base platform and the rock and soil samples are left, so as to test the rock and soil samples.

[0063] Optionally, the soil sample turnover management method using the soil sample box further includes:

[0064] Enter at least one of the information of each rock and soil sample, the whole box engineering information of the soil sample box, and the test results into the electronic tag at the corresponding position;

[0065] When testing rock and soil samples, read and register the electronic tags at the corresponding positions.

[0066] Optionally, monitoring the environment in the soil sample box and the state of the rock and soil sample includes:

[0067] Record at least one of the temperature, humidity and storage time of the soil sample in the soil sample box;

[0068] When the value is not within the preset range, an alarm is issued.

[0069] The soil sample box and soil sample turnover management method provided in the present application use a buffer mechanism inside the box shell and between the base platform and the tray to dampen and buffer the rock and soil samples in the horizontal and vertical directions, thereby reducing disturbance of the rock and soil samples and improving the effects of shockproofing, seismic isolation and buffering.

[0070] The base platform is separated from the box shell by a connecting mechanism between the edge of the base platform and the box shell, leaving only the base platform and the tray installed on the upper surface of the base platform. There is no need to spend time selecting and taking out the rock and soil samples, making the work process simpler and smoother, and improving the test efficiency of the rock and soil samples. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without exceeding the scope of protection required by the present application.

[0072] Figure 1 is a schematic top view of the structure of the soil sample box provided in this application;

[0073] Figure 2 It is a schematic front view and cross-sectional view of the structure of the soil sample box provided in the present application;

[0074] Figure 3 is a schematic cross-sectional view of the structure of the tray in the soil sample box provided in the present application;

[0075] Figure 4 It is a schematic top view of the structure of the connection mechanism in the soil sample box provided in the present application;

[0076] Figure 5 It is a schematic front view and cross-sectional view of the structure of the connection mechanism in the soil sample box provided in the present application;

[0077] Figure 6 It is a schematic front view and cross-sectional view of the structure of the buffer support in the soil sample box provided in the present application;

[0078] Figure 7 It is a schematic top view of the structure of the buffer rack in the soil sample box provided in the present application;

[0079] Figure 8 It is a schematic structural disassembly diagram of the buffer rack in the soil sample box provided in this application;

[0080] Fig. 9 It is a structural schematic diagram of the shock-absorbing locking part in the soil sample box provided by the present application;

[0081] Fig.10 It is a schematic diagram of the structure of the box shell in the soil sample box provided in this application;

[0082] Fig.11 It is a flow chart of the soil sample turnover management method provided in this application;

[0083] Fig.12 It is a flow chart of step S105 in the soil sample box and soil sample turnover management method provided in this application.

[0084] Description of reference numerals: 1, base platform; 2, tray; 21, tray body; 211, bearing groove; 22, elastic friction ring; 23, fixing ring; 3, box shell; 31, box body; 32, box cover; 33, buckle body; 34, handle; 4, buffer mechanism; 41, buffer support; 411, shock absorbing core; 4111, metal sheet; 4112, elastic sheet; 412, sealing plate; 413, protective layer; 42, buffer frame; 421, slide rod; 422, first slide frame; 423, second slide frame; 424, limit block; 42 01. Push rod; 4202. Locking knob; 4203. Shock-absorbing locking part; 4204. Sleeve; 4205. Connecting tube; 4031. Shock-absorbing locking part body; 4032. Block; 4033. Elastic pad; 4034. Locking groove; 4035. Slot; 5. Connecting mechanism; 51. Driving assembly; 511. Driving gear; 512. Connecting rod; 513. Connecting knob; 52. Engaging part; 521. Engaging part body; 522. Limiting flange; 523. Engaging teeth; 6. Storage management module; 7. Electronic tag. DETAILED DESCRIPTION

[0085] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.

[0086] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present application, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0087] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or mutual communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0088] In the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0089] refer to Figure 1 and Figure 2The soil sample box provided in the present application includes a base platform 1, a tray 2, a box shell 3, a buffer mechanism 4 and a connecting mechanism 5. There are multiple trays 2, and the trays 2 are installed on the upper surface of the base platform 1. Each tray 2 is used to carry a corresponding rock and soil sample. The box shell 3 and the base platform 1 form a cavity, and the bottom of the box shell 3 is connected to the edge of the base platform 1 through the connecting mechanism 5. The buffer mechanism 4 is arranged inside the box shell 3 and / or the base platform 1 to protect the rock and soil samples.

[0090] After the rock and soil samples collected from the field during the engineering survey are packaged, each packaged rock and soil sample is placed in a tray 2 on the base platform 1 in the cavity. During transportation, the rock and soil samples are damped and buffered in the horizontal and vertical directions by the buffer mechanism 4 arranged inside the box shell 3 and on the base platform 1, respectively, to reduce the disturbance of the rock and soil samples and improve the shockproof, seismic isolation and buffering effects. After the rock and soil samples are transported to the designated location through the soil sample box, the base platform 1 is separated from the box shell 3 by the connecting mechanism 5 between the edge of the base platform 1 and the box shell 3, leaving only the base platform 1 and the tray 2 installed on the upper surface of the base platform 1. There is no need to spend time selecting and taking out the rock and soil samples, which makes the work process simpler and smoother and improves the test efficiency of the rock and soil samples.

[0091] In some embodiments, placement marks are provided on the surface of the base platform 1, and the placement order of the rock and soil samples in the soil sample box is guided by the placement marks.

[0092] refer to Figure 3 As an optional embodiment, each tray 2 includes a tray body 21, an elastic friction ring 22 and a fixing ring 23. The tray body 21 is fixed to the upper surface of the base platform 1, and the tray body 21 is provided with a bearing groove 211 for placing the rock and soil sample in the bearing groove 211. The elastic friction ring 22 is installed in the bearing groove 211, and the inner ring of the elastic friction ring 22 acts on the surface of the rock and soil sample to limit the position of the rock and soil sample. The fixing ring 23 is pressed on the top of the elastic friction ring 22, and is used to limit the elastic friction ring 22 and press it between the fixing ring 23 and the tray body 21.

[0093] In some embodiments, the elastic friction ring 22 is made of rubber material.

[0094] The rock and soil sample is accommodated and positioned by the bearing groove 211, and the inner wall of the tray body 21 may be provided with a ring groove for embedding the elastic friction ring 22 so that the elastic friction ring 22 is installed in the bearing groove 211. The inner wall of the tray body 21 may also be provided with an internal thread, and the fixing ring 23 is screwed with the inner wall of the tray body 21 through the thread, so that the elastic friction ring 22 is pressed against the tray body 21. The elastic friction ring 22 acts on the surface of the rock and soil sample, and fixes the rock and soil sample through the elastic force and friction force of the elastic friction ring 22.

[0095] refer to Figure 4 and Figure 6 As an optional embodiment, a driving movement cavity is provided in the base platform 1, one end of which is connected to the outside of the base platform 1, and the box shell 3 is provided with a bayonet corresponding to the position of the driving movement cavity, and the connecting mechanism 5 includes a driving component 51 and a clamping member 52. Among them, the driving component 51 is located in the driving movement cavity. One end of the clamping member 52 is connected to the driving component 51, and the other end moves in a direction close to or away from the bayonet under the drive of the driving component 51.

[0096] As an optional embodiment, the driving assembly 51 includes a driving gear 511, a connecting rod 512 and a connecting knob 513. The driving gear 511 is meshed with the engaging member 52 and is located in the driving moving cavity. The connecting rod 512 is connected to the driving gear 511, and one end of the connecting rod 512 extends to the outside of the base platform 1. The connecting knob 513 is connected to one end of the connecting rod 512 extending to the outside of the base platform 1.

[0097] As an optional embodiment, the engaging member 52 includes an engaging member body 521 and a limiting flange 522. One end of the engaging member body 521 is provided with a meshing tooth 523 meshing with the driving gear 511. The limiting flange 522 is connected to the engaging member body 521 as a whole, and the surface of the limiting flange 522 matches the inner wall of the driving moving cavity.

[0098] When the connection knob 513 is turned, the connection rod 512 and the driving gear 511 rotate synchronously with the connection knob 513, and the driving gear 511 meshes with the engaging member 52 through the meshing teeth 523 of the engaging member 52. The engaging member 52 is driven to move by the rotation of the driving gear 511. When one end of the engaging member 52 extends into the bayonet of the box shell 3 driven by the driving gear 511, the base platform 1 is connected to the box shell 3. When one end of the engaging member 52 is separated from the bayonet of the box shell 3 driven by the driving gear 511, the base platform 1 is separated from the box shell 3, so as to facilitate the placement or use of the rock and soil sample. The limiting flange 522 is used to limit the engaging member 52 when it moves along the driving moving cavity.

[0099] refer to Figure 6 As an optional embodiment, the buffer mechanism 4 includes a buffer support 41, and the buffer support 41 includes a shock absorbing core 411, a sealing plate 412 and a protective layer 413. The shock absorbing core 411 is located between the base platform 1 and the tray 2, and the shock absorbing core 411 includes an elastic sheet 4112 and a metal sheet 4111, and the metal sheet 4111 and the elastic sheet 4112 are stacked, and the metal sheet 4111 and the elastic sheet 4112 are interlaced with each other. The sealing plate 412 is arranged at the upper and lower ends of the shock absorbing core 411, and is connected to the base platform 1 and the tray 2. The protective layer 413 is coated on the surface of the shock absorbing core 411, and is used to protect the shock absorbing core 411.

[0100] The buffer support 41 vertically damps and cushions the rock and soil samples in the tray 2. The metal sheet 4111 and the elastic sheet 4112 are stacked to form a shock-absorbing core 411, so as to reduce the space occupied by the buffer support 41 in the soil sample box while satisfying the buffering effect, thereby improving the utilization rate of the space in the cavity of the soil sample box.

[0101] In some embodiments, the elastic sheet 4112 and the protective layer 413 are made of rubber material.

[0102] refer to Figure 7 As an optional embodiment, the buffer mechanism 4 includes a buffer frame 42. The buffer frame 42 includes a slide bar 421, a first slide frame 422, a second slide frame 423 and a stop block 424. The slide bar 421 is fixed to the inner wall of the box shell 3. One end of the first slide frame 422 is connected to the box shell 3, and the other end of the first slide frame 422 is slidably set on the slide bar 421. One end of the second slide frame 423 is connected to the box shell 3, and the other end of the second slide frame 423 is slidably set on the slide bar 421, so that it is close to or away from the first slide frame 422. The stop block 424 is fixed to the slide bar 421 and is located between the first slide frame 422 and the second slide frame 423.

[0103] The buffer rack 42 performs shock absorption and buffering on the rock and soil samples in the horizontal direction to reduce the disturbance of the rock and soil samples during transportation. After placing the rock and soil samples on the tray 2 and connecting the box shell 3 to the base platform 1, the first sliding rack 422 and the second sliding rack 423 are relatively moved along the slide bar 421, and the distance between the first sliding rack 422 and the second sliding rack 423 is reduced until the first sliding rack 422 and the second sliding rack 423 contact the limit block 424. At this time, the first sliding rack 422 and the second sliding rack 423 jointly clamp and fix the rock and soil samples. After the rock and soil samples are transported to the designated location, the first sliding rack 422 and the second sliding rack 423 are moved back to back along the slide bar 421, and the distance between the first sliding rack 422 and the second sliding rack 423 is increased and opened, and then separated from the rock and soil samples, and then the box shell 3 is separated from the base platform 1 and the box shell 3 is removed, and the rock and soil samples can be tested.

[0104] refer to Figure 8 As an optional embodiment, the first sliding frame 422 and the second sliding frame 423 each include a push rod 4201, a locking knob 4202 and a shock-absorbing locking portion 4203. The push rod 4201 is slidably connected to the sliding rod 421 through a sleeve 4204, and the push rod 4201 is provided with a connecting tube 4205. The locking knob 4202 is threadedly connected to the inner wall of the connecting tube 4205 and is located outside the box shell 3. The shock-absorbing locking portion 4203 is connected to the push rod 4201 and slides along the sliding rod 421 driven by the push rod 4201.

[0105] When the first sliding frame 422 and the second sliding frame 423 are driven to move along the sliding rod 421, the locking knob 4202 is rotated, and the locking knob 4202 is threadedly connected with the connecting tube 4205, thereby driving the connecting tube 4205 and the push rod 4201 to move. During the movement, since the sleeve 4204 is sleeved on the sliding rod 421, the moving direction of the push rod 4201 is limited, so that it moves back and forth along the direction of the sliding rod 421, avoiding the position misalignment of the shock-absorbing locking part 4203 and the rock and soil sample, and improving the effectiveness of clamping.

[0106] refer to Fig. 9 As an optional embodiment, the shock-absorbing locking part 4203 includes a shock-absorbing locking part body 4031, a clamping block 4032, and an elastic pad 4033. The shock-absorbing locking part body 4031 has a plurality of locking grooves 4034 that match the rock sample, and the locking grooves 4034 are semicircular. The clamping block 4032 is fixed to the inner wall of the locking groove 4034, and a clamping groove 4035 is formed between two adjacent clamping blocks 4032. The elastic pad 4033 is fixed in the locking groove 4034, and is clamped with the shock-absorbing locking part body 4031 through the clamping block 4032 and the clamping groove 4035.

[0107] When the buffer frame 42 fixes the rock and soil sample in the horizontal direction, the rock and soil sample is confined in the locking groove 4034, and the elastic pad 4033 provides buffering for the rock and soil sample in the horizontal direction.

[0108] In some embodiments, the elastic pad 4033 is a rubber material.

[0109] refer to Fig.10 As an optional embodiment, the box shell 3 includes a box body 31, a box cover 32, a buckle body 33 and a handle 34. The bottom of the box body 31 is connected to the base platform 1. The box cover 32 is installed on the top of the box body 31. One end of the buckle body 33 is connected to the box cover 32, and the other end of the buckle body 33 is buckled with the box body 31, which is used to connect the box cover 32 to the box body 31. The handle 34 is installed on at least one of the box body 31 and the box cover 32, and is used to lift the soil sample box. For example, the handle 34 is fixed to both sides of the box body 31, or the handle 34 is fixed to the top of the box cover 32. The box cover 32 is detachably connected to the box body 31 through the buckle body 33, and is used to open the box cover 32 to quickly confirm the status of the rock and soil samples in the box when there is no need to take out the rock and soil samples.

[0110] refer to Fig.10As an optional implementation, the soil sample box also includes a storage management module 6, which is arranged on the base platform 1 or the box shell 3, and is used to monitor and record the environmental status in the cavity and the status of the rock and soil samples. The storage management module 6 includes a timer, a temperature sensor, a humidity sensor, a display screen, a warning light and a control switch, wherein the control switch is electrically connected to the timer, the temperature sensor, the humidity sensor, the display screen and the warning light.

[0111] The storage management module 6 monitors the storage status and storage time of the rock and soil samples after collection in real time to ensure the quality of the rock and soil samples and avoid distortion of the test data of the rock and soil samples. The storage time of the rock and soil samples after being taken out from the engineering survey borehole is recorded by the timer in the storage management module 6, the temperature in the management box is recorded by the temperature sensor, the humidity in the management box is recorded by the humidity sensor, and the storage time, temperature and humidity sensed and recorded by the timer, temperature sensor and humidity sensor are displayed on the display screen. Based on the storage time, temperature and humidity data obtained, the storage time of the rock and soil samples is managed to ensure that the soil samples complete the test within the specified time limit, and the storage environment of the rock and soil samples is adjusted by recording and managing the temperature and humidity information in the soil sample box to make it suitable for the storage of rock and soil samples.

[0112] refer to Figure 1 and Fig.10 As an optional implementation, the soil sample box also includes an electronic tag 7, which is set on at least one of the base platform 1 and the box shell 3, and is used to enter, modify or read information corresponding to the rock and soil sample.

[0113] The information of the rock and soil samples is managed electronically through the electronic tag 7. Each electronic tag 7 has a unique serial number and corresponds to the rock and soil sample one by one, which facilitates the circulation and identification of the rock and soil samples in subsequent different test links, avoids the phenomenon of unclear handwriting, damage or loss in the turnover link, and reduces the repeated use of paper identification numbers or repeated sorting processes in the traditional test process. In addition, the electronic tag 7 can be repeatedly modified and entered after all tests on the rock and soil samples are completed.

[0114] For example, a corresponding electronic tag 7 is provided at each tray 2 for recording the information of the rock and soil samples placed in each tray 2, and the rock and soil sample information includes sampling number, sampling depth, field naming of the sample, etc. The electronic tag 7 can also be fixed on the surface of the box shell 3, and the electronic tag 7 fixed on the surface of the box shell 3 is used to record the whole box project information of the soil sample box, and the project information includes project name, sampling location, sampling time, commissioning unit, etc.

[0115] The present application also provides a soil sample turnover management method using the above-mentioned soil sample box, including steps S101-S106.

[0116] In step S101, the rock and soil samples obtained by drilling in the engineering survey are packaged in iron tubes, and each packaged rock and soil sample is placed on a tray 2 at a corresponding position.

[0117] In step S102, after all required rock and soil samples are placed in the tray 2 in sequence, the box shell 3 is connected and fixed to the base platform 1 to achieve box sealing, so that the packaged rock and soil samples are sealed in the cavity.

[0118] In step S103, the buffer mechanism 4 acts on the soil sample to fix or protect the soil sample. The buffer support 41 in the buffer mechanism 4 buffers the soil sample in the vertical direction, and the buffer frame 42 in the buffer mechanism 4 is tightened so that the buffer frame 42 buffers the soil sample in the horizontal direction.

[0119] In step S104, the environment in the soil sample box and the state of the rock and soil samples are monitored.

[0120] The storage management module 6 is turned on by the monitoring switch, so that the timer in the storage management module 6 monitors and records the storage time of the rock and soil samples after they are taken out from the engineering survey borehole, and the temperature sensor and humidity sensor respectively monitor and record the temperature and humidity of the storage environment.

[0121] In step S105, the soil sample box is transported to a predetermined location, and the test sequence of the soil sample box is sorted according to the environment in the soil sample box and the state of the rock and soil samples.

[0122] In step S106, the base platform 1 is separated from the box shell 3 through the connecting mechanism 5. During the separation process of the base platform 1 and the box shell 3, it is necessary to first rotate the locking knob 4202 to separate the buffer rack 42 in the soil sample box to be tested from the rock and soil sample, so as to remove the box shell 3 and leave only the base platform 1 and the rock and soil sample to test the rock and soil sample.

[0123] As an optional implementation, the soil sample turnover management method using the above-mentioned soil sample box also includes steps S107-S108.

[0124] In step S107, at least one of the information of each rock and soil sample, the whole box engineering information of the soil sample box, and the test result is entered into the electronic tag 7 at the corresponding position.

[0125] For example, after placing the packaged rock and soil samples on the tray 2, the handheld reader / writer terminal corresponding to the electronic tag 7 can be used to scan it, and the number, sampling depth, field naming and other information of the rock and soil samples in the tray 2 at the position corresponding to the electronic tag 7 can be entered.

[0126] Or after all the rock and soil samples are placed in the soil sample box and the base platform 1 is connected and sealed with the box shell 3, the electronic tag 7 on the surface of the box shell 3 is scanned using a handheld reader / writer terminal, and the engineering information corresponding to the entire box of the soil sample box, such as the name of the project, sampling location, sampling time, and the entrusting unit, is entered into the electronic tag 7 on the surface of the box shell 3.

[0127] In step S108, when the rock and soil samples are tested, the electronic tags 7 at the corresponding positions are read and registered. That is, when information needs to be read, the corresponding electronic tags 7 are scanned in turn by the handheld reader / writer terminal to read the information recorded therein.

[0128] In some embodiments, when conducting experiments, a handheld terminal can also be used to read the information of the electronic tag 7 corresponding to each rock and soil sample, and copy the information to the container electronic tag of the test container corresponding to the rock and soil sample in the subsequent test link, so as to prepare for the circulation of rock and soil samples in the subsequent test link.

[0129] As an optional implementation, step S105 includes sub-step S151 and sub-step S152.

[0130] In sub-step S151, the value of at least one of the temperature, humidity and storage time of the soil sample in the soil sample box is recorded.

[0131] In sub-step S152, when the value is not within the preset value range, a warning is issued.

[0132] For example, in days, when the recorded storage time exceeds 20 days, or when the environmental conditions do not meet the temperature of about 20 degrees Celsius, or the humidity does not meet the 50%-60% range, the warning light will be turned on to issue a warning, thereby reminding the user to conduct the test as soon as possible or adjust the environmental conditions of the soil sample box in time to avoid water loss or excessive moisture absorption of the rock and soil samples.

[0133] The soil sample turnover management method using the above-mentioned soil sample box provided by this application provides a safe, complete and convenient process for packaging, labeling, boxing and transportation, monitoring of rock and soil samples after they are collected in the field, to indoor registration and storage, and preparation of rock and soil samples before testing. It ensures that the rock and soil samples can continue to be close to their original state in the formation from the time they are drilled in the field to the time they are tested indoors, thereby ensuring the accuracy of the test data, and also improving the work efficiency of the rock and soil samples during the turnover process.

[0134] The embodiments of the present application are described in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and its core idea of ​​the present application. At the same time, changes or deformations made by those skilled in the art based on the ideas of the present application, the specific implementation methods and the scope of application of the present application, all belong to the scope of protection of the present application. In summary, the content of this specification should not be construed as a limitation on the present application.

Claims

1. A soil sample box, characterized in that: include: Base platform; A plurality of trays are mounted on the upper surface of the base platform, each of the trays being used to carry a corresponding rock and soil sample; A box shell and the base platform form a cavity; A connecting mechanism connects the box shell to the edge of the base platform; A buffer mechanism is arranged inside the box shell and / or the base platform, and is used to protect the rock and soil sample.

2. The soil sample box according to claim 1, characterized in that: Each of the trays comprises: A tray body is fixed to the upper surface of the base platform, and the tray body is provided with a bearing groove for placing the rock and soil sample in the bearing groove; An elastic friction ring is installed in the bearing groove, and the inner ring of the elastic friction ring acts on the surface of the rock and soil sample to limit the position of the rock and soil sample; A fixing ring is pressed onto the elastic friction ring to limit the elastic friction ring and press it tightly between the fixing ring and the tray body.

3. The soil sample box according to claim 1, characterized in that: A driving movement cavity is provided in the base platform, one end of the driving movement cavity is communicated with the outer side of the base platform, the box shell is provided with a bayonet corresponding to the position of the driving movement cavity, and the connection mechanism includes: A driving assembly, located in the driving movement cavity; The engaging member has one end connected to the driving assembly and the other end driven by the driving assembly to move in a direction close to or away from the bayonet.

4. The soil sample box according to claim 3, characterized in that: The drive assembly comprises: A driving gear meshed with the engaging member and located in the driving movable cavity; A connecting rod connected to the driving gear, one end of the connecting rod extending to the outside of the base platform; A connecting knob is connected to one end of the connecting rod extending to the outer side of the base platform.

5. The soil sample box according to claim 4, characterized in that: The engaging member comprises: A clamping member body, one end of which is provided with a meshing tooth meshing with the driving gear; The limiting flange is connected to the engaging member body as a whole, and the surface of the limiting flange matches the inner wall of the driving moving cavity.

6. The soil sample box according to claim 1, characterized in that: The buffer mechanism comprises a buffer support, and the buffer support comprises: A shock absorbing core, located between the base platform and the tray, comprises: Elastic sheet; A metal sheet, stacked with the elastic sheet and interlaced with the elastic sheet; Sealing plates are arranged at the upper and lower ends of the shock absorbing core and are connected to the base platform and the tray; The protective layer is coated on the surface of the shock absorbing core and is used to protect the shock absorbing core.

7. The soil sample box according to claim 1, characterized in that: The buffer mechanism comprises a buffer frame, and the buffer frame comprises: A slide bar, fixed to the inner wall of the box shell; A first sliding frame, one end of which is connected to the box shell and the other end of which is slidably disposed on the sliding rod; A second sliding frame, one end of which is connected to the box shell, and the other end of which is slidably disposed on the sliding rod so as to be close to or away from the first sliding frame; The limiting block is fixed to the sliding rod and is located between the first sliding frame and the second sliding frame.

8. The soil sample box according to claim 7, characterized in that: The first sliding frame and the second sliding frame each include: A push rod, slidably connected to the slide rod through a sleeve, and the push rod is provided with a connecting tube; A locking knob is threadedly connected to the connecting tube and is located outside the box shell; The shock-absorbing locking part is connected with the push rod and slides along the slide rod driven by the push rod.

9. The soil sample box according to claim 8, characterized in that: The shock absorbing locking portion comprises: A shock-absorbing locking part body, wherein the shock-absorbing locking part body has a plurality of locking grooves matched with the rock and soil sample, and the locking grooves are arc-shaped; A clamping block is fixed to the inner wall of the locking groove, and a clamping groove is formed between two adjacent clamping blocks; The elastic pad is fixed in the locking groove and is clamped with the shock-absorbing locking part body through the clamping block and the clamping groove.

10. The soil sample box according to claim 1, characterized in that: The box shell comprises: The box body has a bottom connected to the base platform; A box cover, mounted on the top of the box body; A buckle body, one end of which is connected to the box cover and the other end of which is buckled to the box body, for connecting the box cover to the box body; A handle is installed on at least one of the box body and the box cover.

11. The soil sample box according to claim 1, characterized in that: It also includes a storage management module, which is arranged on the base platform or the box shell and is used to monitor and record the environmental status in the cavity and the status of the rock and soil sample.

12. The soil sample box according to claim 1, characterized in that: Also includes: The electronic tag is arranged on at least one of the base platform and the box shell, and is used for inputting, modifying or reading the information corresponding to the rock and soil sample.

13. A soil sample turnover management method using the soil sample box according to claim 12, characterized in that: include: Placing each of the packaged rock and soil samples on the tray at a corresponding position; Connecting and fixing the box shell to the base platform so that the encapsulated rock and soil sample is sealed in the cavity; Allowing the buffer mechanism to act on the rock and soil sample to fix or protect the rock and soil sample; Monitoring the environment in the soil sample box and the state of the rock and soil samples; The soil sample box is transported to a predetermined location, and the test sequence of the soil sample box is sorted according to the environment in the soil sample box and the state of the rock and soil samples; The base platform is separated from the box shell by the connecting mechanism to remove the box shell, and only the base platform and the rock and soil sample are left, so as to test the rock and soil sample.

14. The method according to claim 13, characterized in that Also includes: Enter at least one of the information of each of the rock and soil samples, the whole box engineering information of the soil sample box, and the test results into the electronic tag at the corresponding position; When the rock and soil samples are tested, the electronic tags at the corresponding positions are read and registered.

15. The method according to claim 13, characterized in that Monitoring the environment in the soil sample box and the state of the rock and soil sample includes: Recording at least one of the temperature and humidity in the soil sample box and the storage time of the rock and soil sample; When the value is not within the preset value range, an alarm is issued.

Citation Information

Patent Citations

  • Building isolation bearing

    CN205088813U

  • Corrugated carton

    CN211686466U

  • Industrial wastewater sample storage box

    CN212023379U

  • Soil sample storage box for rock and soil exploration

    CN216333591U

  • Anti-lodging wood tray

    CN221341601U