Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

1316results about How to "Improve support stability" patented technology

Five-cylinder plunger pump with integral power end structure

The invention discloses a five-cylinder plunger pump with an integral power end structure. According to the five-cylinder plunger pump, an integral welding structure is adopted for a crankshaft box body and a crosshead box body in a five-cylinder plunger pump power end assembly, so that the structural strength of the power end assembly is higher, the supporting stability is better, and the whole pump vibration can be reduced; the cylinder spacing is 13-14 inches, the bearing area of connecting rods, crossheads and bearing bushes is increased, a guarantee is provided for the output of the high-power of the five-cylinder plunger pump, the high-power five-cylinder plunger pump can effectively solve the problem that the shale gas fracturing well site area is narrow and the required fracturingequipment is relatively large, the use of equipment can be reduced, and the wellsite arrangement is facilitated; the 11-inches long-stroke design can better realize large-displacement operation requirements and improve the operation efficiency; and according to the multi-point supporting design of crankcase bodies, crosshead box bodies and the hydraulic end assembly, the supporting strength of thefive-cylinder plunger pump can be improved, the vibration is reduced, the high-load operation is better guaranteed, and the operation is more stable.
Owner:YANTAI JEREH PETROLEUM EQUIP & TECH CO LTD

Pipe end hoop welding and fixing device for automobile pipe

The invention discloses a pipe end hoop welding and fixing device for an automobile pipe, and belongs to the field of automobile pipe end machining equipment. The device comprises a worktable, a pipe head positioning plate and clamps, wherein the pipe head positioning plate and the clamps are fixed to the worktable. The pipe head positioning plate is provided with a pipe limiting groove and a hoop limiting groove. The clamps comprise a hoop clamp, a lateral pushing pipe clamp and an annular hoop pipe clamp, wherein the hoop clamp can press a hoop arranged outside the automobile pipe in a sleeving mode to the interior of the hoop limiting groove; the lateral pushing pipe clamp is used for pushing the automobile pipe to the interior of the automobile pipe limiting groove to be pressed; the annular hoop clamp is used for clamping and positioning the automobile pipe. The positions of the three clamps are adjustable. The automobile pipe limiting groove and the hoop limiting groove form a step type annular groove. By means of the pipe end hoop welding and fixing device, the pipe end of the automobile pipe and the hoop can be precisely positioned, the pipe end and the hoop can not deviate in the machining process, clamping marks can not be generated on the automobile pipe, and the automobile pipe can not be damaged.
Owner:ZIXING YUEXING AUTO PARTS MFG

Construction method of earth cabin back filling and cabin entering operation during earth pressure shielding

ActiveCN102536253AIncrease the permeability coefficientDoes not have air pressure operating conditionsUnderground chambersTunnel liningHigh intensityOperability
The invention discloses a construction method of earth cabin back filling and cabin entering operation during earth pressure shielding. The construction method comprises the following steps: (1) injecting bentonite slurry outside the casing of a shield machine; (2) injecting polyurethane outside the body of a shield to form a seal ring; (3) injecting two-liquid slurry outside a tube piece to form a seal ring; (4) replacing muck in an earth cabin with bentonite, and carrying out muck replacement through the cooperation of the a bentonite injection system and a spiral conveyer; (5) carrying out pressure injecting on low, middle and high-strength cement bentonite mortar slurry, and allowing the bentonite slurry in the earth cabin to form cumulates with certain strength; (6) injecting slurry to a cutting ring of the shield machine and the top of a cutter head; (7) carrying out cabin entering operation by constructors; and (8) closing an earth cabin door after cutter replacement is completed, injecting and back-filling bentonite to the earth cabin to establish an earth pressure balanced mode to restore tunneling. The construction method disclosed the invention breaks through the difficulty of cabin entering operation below a special unstable formation and the difficulty of cabin entering operation under a building during shielding, and has the characteristics of high efficiency, strong operability and the like.
Owner:GUANGZHOU RAIL TRANSIT CONSTR SUPERVISION CO LTD

Compound trussed movable overload casting robot

The invention discloses a compound trussed movable overload casting robot. The robot comprises a four-wheeled moving platform, a revolving device, a lifting device, a front moving device, a rear moving device, a counterweighing device, parallel working arms and a tail end executor. According to the robot, by means of four-wheeled driving and four-corner stationary point self-balancing supporting, flexible stable traveling and stable supporting of the four-wheeled moving platform are achieved, and the robot body has six spatial freedoms of motion; revolving, moving front and back and lifting adjustment of the revolving device, the front moving device and the lifting device can be achieved respectively, the counterweighing device moves on the rear moving device, and the number of counterweighing blocks can be increased or decreased; the parallel working arms can conduct posture adjustment on the tail end executor, and the tail end executor can be replaced based on needs. By means of the robot, different operation demands of core assembling, core setting, casting, carrying and the like of a heavy casting are met, the efficiency, quality and safety of core assembling, core setting and casting operation of the heavy casting are improved, the labor intensity of operators is relieved, and the production cost is reduced.
Owner:ANHUI UNIV OF SCI & TECH

Construction method for enabling shallowly buried and darkly excavated tunnel to pass through cottage area

The invention discloses a construction method for enabling a shallowly buried and darkly excavated tunnel to pass through a cottage area. The construction method comprises the following steps: excavating a tunnel hole of the constructed shallowly buried and darkly excavated tunnel from back to front through a step excavation process, and performing preliminary bracing on the tunnel hole formed by excavating from back to front in an excavating process, wherein the tunnel hole consists of an upper guide hole and a lower guide hole positioned right below the upper guide hole, the rear part of the tunnel hole is connected with a vertical well, the preliminary bracing structure of the tunnel hole comprises a plurality of grating steel frameworks for supporting the tunnel hole from back to front, a layer of bar-mat reinforcement suspended on the inner wall of the tunnel hole and a concrete layer jetted on the inner wall of the tunnel hole. The process for excavating the tunnel hole of the shallowly buried and darkly excavated tunnel comprises the following steps: I, excavating the initial segment of the upper guide hole; II, excavating the initial segment of the lower guide hole; III, synchronously excavating the upper and the lower guide holes. The construction method disclosed by the invention is simple in step, reasonable in design, convenient in construction, good in construction effect, capable of simply completing the construction process of the shallowly buried and darkly excavated tunnel that passes through the cottage area, and safe and reliable in a construction process.
Owner:CHINA RAILWAY 20 BUREAU GRP

High-maneuverability building outer wall aerial working platform structure

The invention discloses a high-maneuverability building outer wall aerial working platform structure. The high-maneuverability building outer wall aerial working platform structure comprises a hangingplatform and a suspended hanging platform, and the hanging platform comprises supporting frames, a cable and a counterweight, wherein each supporting frame comprises a crossbeam, a mast and a supporting foot; one end of each crossbeam extends out of an outer wall and is fixed at the upper edge of the outer wall, and the other end of each crossbeam is supported by the corresponding supporting footsupported on the roof surface; each mast is vertically arranged on the corresponding crossbeam, the counterweight is suspended below the corresponding crossbeam, and the counterweight and the corresponding supporting foot are located at the same end of the corresponding crossbeam; the high-maneuverability building outer wall aerial working platform structure further comprises a first track and asecond track, wherein the first track is arranged on the roof surface, a roller is arranged on the lower portion of each supporting foot, and the rollers on the lower portions of the supporting feet are embedded in the first track; and the second track is arranged at the upper edge of the outer wall, a roller is arranged on the lower portion of each crossbeam, and the rollers on the lower portionsof the crossbeams are embedded in the second track. According to the high-maneuverability building outer wall aerial working platform structure, mobile maneuverability of a hanging basket device canbe enhanced, adhesion force of the hanging basket device is also enhanced at the same time, and then stability and safety of the hanging basket device are enhanced accordingly.
Owner:成都华阳建筑股份有限公司

Flat heat pipe with multi-channel sintered supporting structure and manufacturing method thereof

The invention discloses a flat heat pipe with a multi-channel sintered supporting structure and a manufacturing method thereof. The flat heat pipe comprises an upper metal cover plate and a lower metal cover plate, wherein a sealed cavity is formed between the upper metal cover plate and the lower metal cover plate through welding sealing; the cavity is filled with a liquid working medium; the inner surface of the cavity is divided into an evaporation surface and a condensation surface; thin-layer porous liquid absorption core structures formed through sintering metal powder particles are laid on the evaporation surface and the condensation surface; support pillars arranged in an array are formed on the evaporation surface through sintering; cylindrical holes which are matched with cylindrical bosses at the top ends of the support pillars are processed in the condensation surface; and the cylindrical bosses and the cylindrical holes are matched in an embedded manner to form working medium reflux channels. According to the flat heat pipe, the capillary pressure is improved, axial channels formed in the sintered support pillars provide the good working medium reflux channels, the liquid reflux resistance is reduced, the working medium reflux speed is remarkably increased, the separation of gas and liquid phases is achieved, the heat transfer performance is improved, and the support pillars can effectively prevent the problems that the flat heat pipe collapses and deforms, and the like.
Owner:广东省惠州市质量计量监督检测所 +1

Ancient building restoration bracket

The invention relates to the field of ancient building restoration technical equipment, in particular to an ancient building restoration bracket which comprises a plurality of stairs composed of stair telescopic rods and stair rods, a plurality of perpendicular telescopic rods, a hydraulic controller and a base. The hydraulic controller is arranged on the upper surface of the base. The side face of the hydraulic controller is provided with an elongation control button and a shortening control button. The top of the hydraulic controller is provided with a plurality of hydraulic pipes, and the other ends of the hydraulic pipes communicate with hydraulic rods. The perpendicular telescopic rods are arranged on the upper surface of the base. The upper potions and the lower portions of the perpendicular telescopic rods are symmetrically provided with the hydraulic rods. The outer ends of the hydraulic rods are connected with fastening plates which are internally provided with correction plates in a clamped mode. The lower portions of the stair telescopic rods are provided with connecting racks. Adjustment telescopic rods are connected and arranged between the connecting racks and the perpendicular telescopic rods. First connecting shafts are symmetrically arranged on the inner sides of the tops of the stair telescopic rods. The stair telescopic rods and the perpendicular telescopic rods are connected through the first connecting rods. The ancient building restoration bracket is good in supporting effect and convenient to carry and use.
Owner:泛联尼塔生态环境建设股份有限公司 +4

High-temperature furnace roller for CSP (Compact Strip Production) heating furnace

The invention discloses a high-temperature furnace roller for a CSP (Compact Strip Production) heating furnace. The high-temperature furnace roller comprises a tubular roller body steel shaft, wherein the outer wall of the roller body steel shaft is provided with roller rings at intervals; the outer wall of the roller body steel shaft between adjacent roller rings is provided with a heat-insulating lining; a water-cooling pipe is arranged in the roller body steel shaft; one end of the water-cooling pipe is provided with a water-cooling pipe supporting clamp seat; a roller body end head baffleplate which is hermetically connected with the inner wall of the roller body steel shaft is arranged outside the end part of the water-cooling pipe supporting clamp seat; a first cavity is formed between the roller body steel shaft and the water-cooling pipe; the pipe wall of the water-cooling pipe close to the water-cooling pipe supporting clamp seat is provided with water outlet through holes which are uniformly distributed along circumference; and the water outlet through holes are communicated with a water inlet end in the water-cooling pipe and the first cavity to form a closed water path. The high-temperature furnace roller has the advantages of simple structure, convenience and quickness in manufacturing, convenience in use and maintenance, low cost, application temperature reaching up to 1,300 DEG C and suitability for being widely applied to the technical field of thermal equipment of industrial furnaces.
Owner:武汉钢铁有限公司

Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation

The invention discloses a ground fracture crushed zone passing construction method for shallow-buried tunnel excavation. A constructed shallow-buried excavation tunnel comprises a left line tunnel and a right line tunnel which are communicated through a transverse channel. During construction of the constructed shallow-buried excavation tunnel, the method comprises the steps that 1, transverse channel construction is performed; 2, tunnel construction is performed, wherein the two tunnel sections of the left line tunnel and the right line tunnel are constructed through the transverse channel, the construction is performed in the mode of multiple tunnel sections in the longitudinal extending direction of the tunnel from back to from during construction of any one tunnel section, and the construction of any one tunnel section includes the processes of ground fracture judgement, tunnel excavation and synchronous preliminary bracing construction, concrete protection layer construction, post-cast strip retention judgement, secondary tunnel lining construction and post-cast strip construction. The method includes simple steps and is reasonable in design, convenient to construct, good in construction effect, capable of simply and conveniently completing the shallow-buried tunnel excavation construction process of a ground fracture crushed zone and safe and reliable in construction process.
Owner:中铁二十局集团第五工程有限公司

Multi-cam self-adaptive multi-gear automatic transmission

The invention discloses a multi-cam self-adaptive multi-gear automatic transmission. The transmission comprises a box body, a power input shaft, a power output shaft, a self-adaptive variable-speed high gear assembly, a first gear assembly and a self-adaptive variable-speed n-gear assembly, wherein the output revolving speed of the n-gear assembly is lower than that of the high gear assembly and higher than the first gear assembly, and the n-gear assembly comprises a second gear, a third gear......and an nth gear. The multi-cam self-adaptive multi-gear automatic transmission has all the advantages of an existing cam self-adaptive automatic transmission, and is of a multi-cam multi-gear structure, therefore, sensitivity in the gear shifting process is ensured, jerking and jam during gear shifting are eliminated, driving comfort is improved, furthermore, energy is saved and consumption is reduced; the dynamic property, economical efficiency, driving safety and driving comfort of a vehicle are greatly improved. In addition, by means of the power output shaft, cams and the cooperative relationships among the cams, a cone clutch is locked after separation, elimination of the transmission gaps among transmission components is facilitated, transmission precision and efficiency are improved, and drive energy is saved.
Owner:CHONGQING ACADEMY OF SCI & TECH +1

Passion fruit linear type filling machine

The invention discloses a passion fruit linear type filling machine. The passion fruit linear type filling machine comprises a conveying mechanism, a stirrer, a filling mechanism and metering cylinders. The conveying mechanism is installed on the transverse front side of the upper end of a base, and a bottle opening limiting mechanism and the filling mechanism are installed on the front side and the rear side of the middle of the conveying mechanism. The filling mechanism is connected to the discharging ends of the metering cylinders through pipelines, and the feeding ends of the metering cylinders are connected to the bottom of the stirrer. The stirrer is fixedly connected to the rear side of the base through a supporting frame, piston rods of the metering cylinders are connected with a metering adjusting mechanism, and the metering adjusting mechanism is installed on the base. The metering adjusting mechanism in the passion fruit linear type filling machine adjusts the stir uniform feeding of the stirrer and the discharging operation of the metering cylinders and controls the feeding operation of the metering cylinders, and after the metering cylinders are filled with passion fruit juice, the filling mechanism is controlled to multiple filling bottles conveyed by the conveying mechanism to conduct discharging and filling operation. The bottle opening limiting mechanism is adopted to conduct automatic quick limiting, the bottles are pushed to the filling positions to be subjected to quick filling, and therefore the bottle output waiting time is shortened, and the production efficiency is improved.
Owner:GUIZHOU UNIV

Double-point elastic supporting cylinder vortex induced vibration fluid kinetic energy conversion device

The invention provides a double-point elastic supporting cylinder vortex induced vibration fluid kinetic energy conversion device, relates to a fluid kinetic energy conversion device, and aims at solving problems that existing wave energy power generation devices are complex in structure, narrow in power generation frequency band, inflexible in power generation mode and low in float energy efficiency. The double-point elastic supporting cylinder vortex induced vibration fluid kinetic energy conversion device comprises a vibration excitation beam and two vibration exciters. The two vibration excitation power generators are arranged at the two ends of the vibration excitation beam in parallel. Each vibration excitation power generator comprises a connecting plate, a sealing cover, a guide column, a pedestal, two vibration columns, two vibration excitation permanent magnets, two vibrated permanent magnets, two cantilever beam piezoelectric float energy devices and four springs. The guide column is arranged on the pedestal. A cavity is formed between the lower end surface of the guide column and the upper end surface of the pedestal. The two ends of the vibration excitation beam are respectively connected with the two connecting plates. The double-point elastic supporting cylinder vortex induced vibration fluid kinetic energy conversion device is used for power generation.
Owner:HARBIN INST OF TECH

Building construction formwork surface cleaning device based on multi-layer reciprocating brushing mechanism

The invention relates to the technical field of building construction, in particular to a building construction formwork surface cleaning device based on a multi-layer reciprocating brushing mechanism. The device comprises a building formwork and a surface cleaning mechanism at the outer side of the building formwork; the surface cleaning mechanism at least comprises a supporting device, a clamping device, and a brushing device; the brushing device comprises a cleaning frame; the clamping device is located in the cleaning frame; a conveying screw is rotationally arranged at the top of an inner cavity of the cleaning frame; the outer wall of the conveying screw is in threaded connection with a reciprocating block; a supporting plate is arranged at the bottom of the reciprocating block; an electric push rod is embedded in the bottom of the supporting plate; a connecting plate is fixedly connected with the push rod end of the electric push rod; two symmetrical fixed brush plates are arranged at the bottom edge of the connecting plate; a plurality of static brushes are arranged at the bottoms of the fixed brush plates; a rotating brush plate is rotationally arranged in the center of the bottom of the connecting plate; and a plurality of rotating brushes are arranged at the bottom of the rotating brush plate. According to the building construction formwork surface cleaning device based on the multi-layer reciprocating brushing mechanism, impurities on the surface of a building formwork can be conveniently brushed away, and the building formwork can be accurately clamped and fixed.
Owner:潘章林

Early-detaching combined template system

The invention discloses an early-detaching combined template system, comprising a plurality of support pillars and a template assembly. An early-detaching mechanism is arranged on each support pillar, and a top plate and a bracket of the early-detaching mechanism are both in right angle quadrilateral shapes. The brackets of a plurality of early-detaching mechanisms support the template assembly, and the top plates of the plurality of early-detaching mechanisms and the template assembly form a lower support mould of a pouring body. The template assembly comprises a plurality of rectangular beam components and plurality of rectangular template components, wherein the beam components are supported on the brackets, and cross convex-concave lap joint and matching structures are formed between the beam components and the brackets. The plurality of beam components form at least one right angle quadrilateral frame through the brackets, and the template components are positioned in the right angle quadrilateral frame formed by the beam components. A convex-concave matching and lap joint structure is formed between the end part of each template component and the side part of each beam component. The early-detaching combined template system has the beneficial effects that for building and detaching the templates, labor intensity is low, the efficiency is high, the supporting stability is good, use is safe, and force for transition and transport is saved.
Owner:西安西航集团铝业有限公司

Tabletop hoisting type sink

The invention discloses a tabletop hoisting type sink. The tabletop hoisting type sink comprises a sink body and a platform plate, wherein the sink body is provided with a tabletop and the sink body arranged below the tabletop; a water discharging opening and a water discharging pipe are arranged at the bottom of the sink body; the edge of the top of the water discharging opening is connected witha water receiving sleeve which is hollow and is provided with a top opening; the inner part of the water receiving sleeve is communicated with the water discharging opening; a peripheral wall of theplatform plate is in sealed fitting with an inner side wall of the sink body; the platform plate is provided with a water leakage hole; the water leakage hole is internally and movably connected witha plunger piston; the lower end of the plunger piston stretches out of the bottom part of the platform plate and an elastic part sleeves the lower end of the plunger piston; the elastic part is used for closing the waster leakage hole by the upper end of the plunger piston under a normal state; when the platform plate is hoisted to the bottom of the sink body, the top of the water receiving sleeveis used for upward jacking the lower end of the plunger piston so that the water leakage hole is opened and the water leakage hole is communicated with the inner part of the water receiving sleeve. The tabletop hoisting type sink disclosed by the invention has a washing function and also can be used as the tabletop, so that more kitchen space can be obtained and functions are diversified.
Owner:NINGBO MEIGAO KITCHENWARE CO LTD

Magnetic gear

The invention discloses a magnetic gear. According to the invention, the front end cover is fixedly arranged on a motor housing. The internal rotor and the magnetism-adjusting support plate are connected to the front end cover and the motor rotor in a rotation manner through a fourth bearing and a third bearing respectively. The magnetism-adjusting support plate is connected with the front end cover through a magnetism-adjusting iron core. The back rack and the front rack are connected to the front end cover and the motor rotor in a rotation manner through a second bearing and a first bearing; and the front rack and the back rack are fixedly connected with the two end faces of the external rotor. The first press ring and the second press ring are fixedly arranged on the back rack and the front end cover respectively; and the second press ring and the first press ring abut against the inner ring and the outer ring of the second bearing respectively. The brake component is sleeved on the motor rotor and is located inside the internal rotor. The magnetic gear of the invention has a reasonably designed structure, and the support performances of the various components are good; the installation space for the various components is reduced; and therefore, the overall structure of the magnetic gear is reduced.
Owner:SHENZHEN HOR TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products