Coal mine roof aquifer drainage drilling equipment and using method thereof
By designing a coal mine roof aquifer drainage drilling equipment that uses a base and Vientiane rollers, the flexible adjustment of the drilling position and angle is achieved using the level and motor cylinder system, the inconvenience of existing equipment in positioning and changing positions is solved, and the drilling efficiency and stability are improved.
Patent Information
- Application Number
- CN202411601860.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-11
- Publication Date
- 2025-03-28
AI Technical Summary
The existing coal mine roof aquifer drainage drilling equipment has inconvenience when positioning the drilling holes and replacing the drilling holes, poor stability, and difficult to adapt to uneven ground situations, and low drilling efficiency.
A coal mine roof aquifer drainage drilling equipment is designed, using a design that combines the base with the Vientiane roller. The base height is adjusted through a level, and the motor and cylinder system are used to achieve flexible adjustment of the drilling position and angle, supporting multi-position and multi-angle drilling operations.
The equipment can drill holes in different locations without repositioning each drilling. It is suitable for scenes of uneven grounds and can adjust the drilling angle, improving drilling efficiency and stability.
Smart Images

Figure CN119711927A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mining, and in particular relates to a coal mine roof aquifer drainage drilling device and a use method thereof. Background Art
[0002] At present, many mines have gradually entered the deep mining stage. The practice of deep mining shows that compared with shallow mining water hazards, deep mining presents two major characteristics: "high pressure and weak water-rich" and "delayed large-scale water inrush". It is of great theoretical and practical significance to study the characteristics of water occurrence in deep mines, deepen the technical methods of water hazard prediction and evaluation, and clarify the key directions of deep mine water hazard exploration and implement integrated exploration technology for precise investigation and treatment of water hazards on this basis. When mining coal seams under deep high-pressure aquifers, when the overburden mining cracks affect the aquifer, the water inflow from the working face increases instantly. In severe cases, water inrush accidents may occur, resulting in equipment damage and even casualties, causing huge economic losses. How to effectively drain the "high-pressure and weak water-rich roof aquifer" is the key to preventing and controlling roof water hazards.
[0003] The existing traditional drilling devices for coal mine roof aquifer drainage can basically meet people's use needs, but there are still problems such as inconvenience in positioning the drilling equipment for drilling, poor stability, and easy deviation during drilling operations. In addition, the drilling equipment needs to be moved again every time a drilling position is changed, the labor intensity of workers is high, the drilling efficiency is low, and there is also the problem of inconvenience in disassembling and replacing the drill bit. The existing patent number: CN217106817U proposes a drilling device for coal mine roof aquifer drainage, which solves the problems of inconvenience in positioning the drilling equipment and inconvenience in replacing drill bits of different sizes. However, each time the equipment is moved and placed, it can only drill holes at fixed positions and fixed angles, which has certain limitations. In order to solve the above problems, a coal mine roof aquifer drainage drilling device and a method for using the same are proposed. Summary of the invention
[0004] In order to solve the problems raised in the above background technology, the present invention provides a coal mine roof aquifer drainage drilling device and a use method thereof.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: A coal mine roof aquifer drainage drilling equipment, comprising a base, the bottom of the base is fixedly connected with four universal rollers, the top of the base is fixedly connected with two support plates, one of the support plates is fixedly connected with a control switch, the tops of the two support plates are fixedly connected with mounting frames, the bottom of the mounting frame is provided with a first mounting groove, the side of the mounting frame is fixedly connected with a first motor through a flange, the driving end of the first motor is fixedly connected with a screw through the side wall of the mounting frame, the other end of the screw is arranged in the first mounting groove through a bearing, a first movable block is arranged in the mounting groove, the screw is threadedly connected to the first movable block, the top of the base is provided with a second mounting groove, the second mounting groove is fixedly connected with a guide rod, the second mounting groove is provided with a second movable block, the guide rod passes through the second movable block, a movable frame is fixedly connected between the first movable block and the second movable block, two support slide rods are fixedly connected in the movable frame, and the movable frame is fixedly connected with a first movable block. A first cylinder is connected, the telescopic end of the first cylinder is fixedly connected to a lifting frame, the two supporting slide bars are inserted in the lifting frame, the back of the lifting frame is fixedly connected to a second motor through a flange, the driving end of the second motor is fixedly connected to a connecting shaft, the connecting shaft is inserted in the lifting frame, the front end of the connecting shaft is fixedly connected to a rotating frame, a third motor is fixedly connected in the rotating frame, the driving end of the third motor is fixedly connected to a fixing sleeve through a bearing and a rotating shaft arranged at the bottom of the rotating frame, both sides of the fixing sleeve are threadedly connected with locking bolts, a drill bit is inserted in the fixing sleeve, and both sides of the drill bit are provided with card holes corresponding to the locking bolts, four mounting holes are opened on the base, each of the mounting holes is fixedly connected with a sliding sleeve, and each of the sliding sleeves is penetrated with a connecting column, four second cylinders are fixedly connected to the top of the base through a flange, the driving end of each of the second cylinders is fixedly connected to a corresponding connecting column, the bottom end of each of the connecting columns is fixedly connected to a support seat, and a level is arranged on the top of the base.
[0006] Preferably, the control switch is a PLC controller, and the first motor, the second motor, the third motor, the first cylinder and the second cylinder are connected to the control switch via wires.
[0007] Preferably, a method for using a coal mine roof aquifer drainage drilling device comprises the following steps: Step 1: Move the device to a suitable position, and then adjust the downward extension distance of the four support seats according to the flatness of the ground at the construction site. The level can be used to determine whether the base is in a horizontal state. During adjustment, the four second cylinders are controlled by the control switch to open. Each second cylinder drives the support seat to descend through the connecting column. After the four support seats touch the ground, the base is lifted up by the second cylinder and the flange, so that the universal roller leaves the ground. The corresponding second cylinder is controlled by the control switch to work, and the corresponding support seat is controlled to rise and fall, thereby adjusting the height of the base in different directions until the level is in a horizontal state. Step 2, turn on the first motor by controlling the switch, the first motor drives the screw to rotate forward or reverse, under the action of the thread, the first movable block drives the movable frame to move left or right, thereby driving the drill bit to move left or right, so as to achieve the purpose of adjusting the drilling position, when the movable frame moves, it drives the second movable block to slide left and right synchronously on the guide rod, so as to ensure that the movable frame does not shake when it moves left and right, after the adjustment is appropriate, turn off the first motor; Step 3: Turn on the third motor and the first cylinder through the control switch, the third motor drives the drill bit to rotate through the rotating shaft, and the first cylinder drives the lifting frame to descend, so as to achieve the purpose of adjusting the height of the drill bit, and then perform the drilling operation; Step 4: After completing the drilling operation at the current position, control the first cylinder by the control switch to drive the lifting and lowering to rise, and adjust the drilling position again in the manner of step 2. After the adjustment is appropriate, perform the drilling operation again in the manner of step 3 until the drilling operation at all positions is completed; Step 5. If drilling operations at different angles are required, the second motor is turned on by the control switch, and the second motor drives the rotating frame to work through the connecting shaft, so as to achieve the purpose of adjusting the drill bit angle. Then, the drilling operation is completed in the manner of steps 2, 3 and 4. When the drill bit needs to be replaced, the locking bolt is turned to disengage the locking bolt from the clamping hole. After replacing the drill bit, the locking bolt is turned to enter the clamping hole to fix the drill bit. Step 5. After completing the drilling work, control the third motor to stop working through the control switch, and then control the first cylinder, the second cylinder, the first motor, the second motor and the third motor to work. The first cylinder drives the lifting frame to reset, the second cylinder drives the support seat to reset, the first motor drives the mobile frame to reset, and the second motor drives the rotating frame to reset. At this time, the universal roller support base can move the device.
[0008] Compared with the prior art, the present invention has the following beneficial effects: The coal mine roof aquifer drainage drilling equipment proposed in the present invention can not only locate the drilling position, but also perform drilling operations at different positions without the need to reposition the drilling each time. It is suitable for scenes with uneven ground and can adjust the drilling angle, thereby better meeting market demand. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings: Figure 1 It is a schematic structural diagram of a front cross-section of the present invention; Figure 2 It is a structural schematic diagram of the present invention; Figure 3 It is a schematic diagram of the structure of the rear cross section of the present invention; Figure 4 It is a schematic diagram of the structure of the present invention from the rear; Figure 5 For the present invention Figure 1 The structural diagram at A in the middle; In the figure: 1. base; 2. second mounting groove; 3. second movable block; 4. guide rod; 5. support seat; 6. universal roller; 7. second cylinder; 8. third motor; 9. lifting frame; 10. support plate; 11. mobile frame; 12. mounting frame; 13. screw rod; 14. first mounting groove; 15. first movable block; 16. first cylinder; 17. support slide rod; 18. first motor; 19. control switch; 20. rotating frame; 21. drill bit; 22. fixing sleeve; 23. locking bolt; 24. connecting column; 25. connecting shaft; 26. sliding sleeve; 27. mounting hole; 28. second motor; 29. clamping hole; 30. level. DETAILED DESCRIPTION
[0010] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example
[0011] See also Figure 1-5The present invention provides the following technical solutions: A coal mine roof aquifer drainage drilling device, comprising a base 1, the bottom of the base 1 is fixedly connected with four universal rollers 6, the top of the base 1 is fixedly connected with two support plates 10, one of the support plates 10 is fixedly connected with a control switch 19, the tops of the two support plates 10 are fixedly connected with a mounting frame 12, the bottom of the mounting frame 12 is provided with a first mounting groove 14, the side of the mounting frame 12 is fixedly connected with a first motor 18 through a flange, the driving end of the first motor 18 is fixedly connected with a screw 13 through the side wall of the mounting frame 12, the The other end of the screw rod 13 is arranged in the first mounting groove 14 through a bearing, and a first movable block 15 is arranged in the mounting groove. The screw rod 13 is threadedly connected to the first movable block 15. A second mounting groove 2 is opened on the top of the base 1, and a guide rod 4 is fixedly connected in the second mounting groove 2. A second movable block 3 is arranged in the second mounting groove 2, and the guide rod 4 passes through the second movable block 3. A movable frame 11 is fixedly connected between the first movable block 15 and the second movable block 3, and two supporting slide bars 17 are fixedly connected in the movable frame 11. A first cylinder 16 is fixedly connected in the movable frame 11 The telescopic end of the first cylinder 16 is fixedly connected to the lifting frame 9, the two supporting slide bars 17 are inserted into the lifting frame 9, the back of the lifting frame 9 is fixedly connected to the second motor 28 through a flange, the driving end of the second motor 28 is fixedly connected to the connecting shaft 25, the connecting shaft 25 is inserted into the lifting frame 9, the forward end of the connecting shaft 25 is fixedly connected to the rotating frame 20, the rotating frame 20 is fixedly connected with the third motor 8, the driving end of the third motor 8 is fixedly connected to the fixing sleeve 22 through the bearing and the rotating shaft arranged at the bottom of the rotating frame 20, and both sides of the fixing sleeve 22 are threaded A locking bolt 23 is connected, a drill bit 21 is inserted into the fixing sleeve 22, and clamping holes 29 corresponding to the locking bolts 23 are provided on both sides of the drill bit 21. Four mounting holes 27 are provided on the base 1, and a sliding sleeve 26 is fixedly connected to each of the mounting holes 27, and a connecting column 24 is passed through each of the sliding sleeves 26. Four second cylinders 7 are fixedly connected to the top of the base 1 through a flange, and a driving end of each of the second cylinders 7 is fixedly connected to a corresponding connecting column 24, and a support seat 5 is fixedly connected to the bottom end of each of the connecting columns 24. A level 30 is provided on the top of the base 1.
[0012] Specifically, the control switch 19 is a PLC controller, and the first motor 18 , the second motor 28 , the third motor 8 , the first cylinder 16 , and the second cylinder 7 are connected to the control switch 19 via wires.
[0013] Specifically, a method for using a coal mine roof aquifer drainage drilling device comprises the following steps: Step 1, move the device to a suitable position, and then adjust the downward extension distance of the four support seats 5 according to the flatness of the ground at the construction site. The level meter 30 can be used to determine whether the base 1 is in a horizontal state. During adjustment, the four second cylinders 7 are controlled to be turned on by the control switch 19. Each second cylinder 7 drives the support seat 5 to descend through the connecting column 24. After the four support seats 5 touch the ground, the base 1 is lifted up by the second cylinder 7 and the flange, so that the universal roller 6 leaves the ground. The corresponding second cylinder 7 is controlled to work by the control switch 19 to control the corresponding support seat 5 to rise and fall, thereby adjusting the height of the base 1 in different directions until the level meter 30 is in a horizontal state; Step 2, turn on the first motor 18 by controlling the switch 19, the first motor 18 drives the screw 13 to rotate forward or reverse, under the action of the thread, the first movable block 15 drives the movable frame 11 to move left or right, thereby driving the drill bit 21 to move left or right, so as to achieve the purpose of adjusting the drilling position, when the movable frame 11 moves, it drives the second movable block 3 to slide left and right synchronously on the guide rod 4, so as to ensure that the movable frame 11 does not shake when it moves left and right, after the adjustment is appropriate, turn off the first motor 18; Step 3: Turn on the third motor 8 and the first cylinder 16 by controlling the switch 19. The third motor 8 drives the drill bit 21 to rotate through the rotating shaft, and the first cylinder 16 drives the lifting frame 9 to descend, thereby achieving the purpose of adjusting the height of the drill bit 21, and then performing the drilling operation; Step 4: After completing the drilling operation at the current position, the first cylinder 16 is controlled by the control switch 19 to drive the lifting and lowering to rise, and the drilling position is adjusted again in the manner of step 2. After the adjustment is appropriate, the drilling operation is performed again in the manner of step 3 until the drilling operation at all positions is completed; Step 5. If drilling operations at different angles are required, the second motor 28 is turned on by the control switch 19. The second motor 28 drives the rotating frame 20 to work through the connecting shaft 25, so as to adjust the angle of the drill bit 21. Then, the drilling operation is completed in accordance with the methods in steps 2, 3 and 4. When the drill bit 21 needs to be replaced, the locking bolt 23 is rotated to disengage the locking bolt 23 from the clamping hole 29. After replacing the drill bit 21, the locking bolt 23 is rotated to enter the clamping hole 29 to fix the drill bit 21. Step 5. After the drilling work is completed, the third motor 8 is controlled to stop working by controlling the switch 19, and then the first cylinder 16, the second cylinder 7, the first motor 18, the second motor 28 and the third motor 8 are controlled to work. The first cylinder 16 drives the lifting frame 9 to reset, and the second cylinder drives the supporting seat 5 to reset. The first motor 18 drives the moving frame 11 to reset, and the second motor 28 drives the rotating frame 20 to reset. At this time, the universal roller 6 supports the base 1, and then the device can be moved.
[0014] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A coal mine roof aquifer drainage drilling device, comprising a base (1), characterized in that: The bottom of the base (1) is fixedly connected to four universal rollers (6); the top of the base (1) is fixedly connected to two support plates (10), one of the support plates (10) is fixedly connected to a control switch (19); the tops of the two support plates (10) are fixedly connected to a mounting frame (12); a first mounting groove (14) is provided at the bottom of the mounting frame (12); a first motor (18) is fixedly connected to the side of the mounting frame (12) via a flange; a driving end of the first motor (18) passes through the side wall of the mounting frame (12) and is fixedly connected to a screw rod (13); the other end of the screw rod (13) is arranged in the first mounting groove (14) via a bearing; A first movable block (15) is arranged in the mounting groove, the screw rod (13) is threadedly connected to the first movable block (15), a second mounting groove (2) is opened on the top of the base (1), a guide rod (4) is fixedly connected in the second mounting groove (2), a second movable block (3) is arranged in the second mounting groove (2), the guide rod (4) passes through the second movable block (3), a movable frame (11) is fixedly connected between the first movable block (15) and the second movable block (3), two supporting sliding rods (17) are fixedly connected in the movable frame (11), a first cylinder (16) is fixedly connected in the movable frame (11), and a lifting cylinder (16) is fixedly connected at the telescopic end of the first cylinder (16) The lifting frame (9) comprises two support slide bars (17) which are inserted into the lifting frame (9); a second motor (28) is fixedly connected to the back of the lifting frame (9) via a flange; a driving end of the second motor (28) is fixedly connected to a connecting shaft (25); the connecting shaft (25) is inserted into the lifting frame (9); a forward end of the connecting shaft (25) is fixedly connected to a rotating frame (20); a third motor (8) is fixedly connected to the rotating frame (20); a driving end of the third motor (8) is fixedly connected to a fixing sleeve (22) via a bearing and a rotating shaft arranged at the bottom of the rotating frame (20); locking bolts (23) are threadedly connected to both sides of the fixing sleeve (22); A drill bit (21) is inserted into the fixing sleeve (22), and clamping holes (29) corresponding to the locking bolts (23) are provided on both sides of the drill bit (21). Four mounting holes (27) are provided on the base (1), and a sliding sleeve (26) is fixedly connected to each mounting hole (27). A connecting column (24) is passed through each sliding sleeve (26). Four second cylinders (7) are fixedly connected to the top of the base (1) via a flange, and a driving end of each second cylinder (7) is fixedly connected to a corresponding connecting column (24). A supporting seat (5) is fixedly connected to the bottom end of each connecting column (24). A level (30) is provided on the top of the base (1).
2. A coal mine roof aquifer drainage drilling equipment according to claim 1, characterized in that: The control switch (19) is a PLC controller, and the first motor (18), the second motor (28), the third motor (8), the first cylinder (16) and the second cylinder (7) are connected to the control switch (19) via wires.
3. The method for using the coal mine roof aquifer drainage drilling equipment according to claim 1, characterized in that: The steps include: Step 1: Move the device to a suitable position, and then adjust the downward extension distance of the four support seats (5) according to the flatness of the ground at the construction site. The level meter (30) can be used to determine whether the base (1) is in a horizontal state. During adjustment, the four second cylinders (7) are controlled to be turned on by the control switch (19). Each second cylinder (7) drives the support seat (5) to descend through the connecting column (24). After the four support seats (5) touch the ground, the base (1) is lifted up by the second cylinder (7) and the flange, so that the universal roller (6) leaves the ground. The corresponding second cylinder (7) is controlled to work by the control switch (19), and the corresponding support seat (5) is controlled to rise and fall, thereby adjusting the height of the base (1) in different directions until the level meter (30) is in a horizontal state. Step 2: Turn on the first motor (18) through the control switch (19), and the first motor (18) drives the screw rod (13) to rotate forward or reverse. Under the action of the screw thread, the first movable block (15) drives the movable frame (11) to move leftward or rightward, thereby driving the drill bit (21) to move leftward or rightward, thereby achieving the purpose of adjusting the drilling position. When the movable frame (11) moves, it drives the second movable block (3) to slide synchronously on the guide rod (4) to the left and right, thereby ensuring that the movable frame (11) does not shake when moving left and right. After the adjustment is appropriate, turn off the first motor (18); Step 3: Turn on the third motor (8) and the first cylinder (16) by controlling the switch (19), so that the third motor (8) drives the drill bit (21) to rotate via the rotating shaft, and the first cylinder (16) drives the lifting frame (9) to descend, thereby achieving the purpose of adjusting the height of the drill bit (21), and then performing the drilling operation; Step 4: After the drilling operation at the current position is completed, the first cylinder (16) is controlled by the control switch (19) to drive the lifting device to rise, and the drilling position is adjusted again in the manner of step 2. After the adjustment is appropriate, the drilling operation is performed again in the manner of step 3 until the drilling operation at all positions is completed; Step 5: If drilling operations at different angles are required, the second motor (28) is turned on by controlling the control switch (19), and the second motor (28) drives the rotating frame (20) to work through the connecting shaft (25), so as to achieve the purpose of adjusting the angle of the drill bit (21). Then, the drilling operation is completed in the manner of steps 2, 3 and 4. When the drill bit (21) needs to be replaced, the locking bolt (23) is rotated to disengage the locking bolt (23) from the clamping hole (29). After the drill bit (21) is replaced, the locking bolt (23) is rotated to enter the clamping hole (29) to fix the drill bit (21); Step 5. After the drilling work is completed, the third motor (8) is controlled to stop working by controlling the control switch (19), and then the first cylinder (16), the second cylinder (7), the first motor (18), the second motor (28) and the third motor (8) are controlled to work. The first cylinder (16) drives the lifting frame (9) to reset, the second cylinder drives the support base (5) to reset, the first motor (18) drives the moving frame (11) to reset, and the second motor (28) drives the rotating frame (20) to reset. At this time, the universal roller (6) supports the base (1), and the device can be moved.