Work order flight table display method and system based on intelligent debugging large screen
By adopting a work ticket flight table display system based on smart debugging large screens in nuclear power debugging, the problem of difficulty in information integration and insufficient basis for real-time monitoring and management decision-making is solved, real-time integration and efficient transmission of information are achieved, and the safety and efficiency of debugging work are improved.
Patent Information
- Application Number
- CN202411697836.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-26
- Publication Date
- 2025-03-28
AI Technical Summary
The existing nuclear power debugging information management methods have problems such as difficulty in integrating information and insufficient basis for real-time monitoring and management decision-making, which has affected debugging efficiency and security.
The work ticket flight table display system based on smart debugging large screen is adopted. The work ticket data is collected and debugged by the building module, and the monitoring and feedback modules monitor the progress of debugging activities in real time. The data analysis module analyzes the data and generates statistical reports. The information display module displays the debugging data to realize information integration and real-time monitoring.
It improves the efficiency of information transmission, ensures that management can obtain the required information as soon as possible, reduces the probability of information distortion caused by human errors, enhances the scientific nature of management decisions, and improves the safety and efficiency of debugging work.
Smart Images

Figure CN119721555A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of nuclear power engineering, and in particular to a work order flight list display method and system based on a smart debugging large screen. Background Art
[0002] Nuclear power commissioning is a crucial link in the construction and operation of nuclear power units, which directly affects the safety, reliability and economy of the units. The main purpose of commissioning is to ensure that all systems, equipment and devices of nuclear power units can operate normally in accordance with design requirements and industry standards through a series of systematic and standardized tests. In the nuclear power industry, commissioning is not only a technical job, but also a highly complex management job.
[0003] The process of nuclear power commissioning involves the collaboration of multiple disciplines and systems. The commissioning of a nuclear power unit usually requires the participation of dozens of professional teams at the same time, including experts in various fields such as mechanics, electrical engineering, instrumentation and control, chemistry, and radiation protection. Close cooperation is required between various disciplines to ensure that the commissioning work is carried out in an orderly manner. This cross-disciplinary coordination increases the complexity of the commissioning work and also places higher requirements on management.
[0004] Nuclear power commissioning has clear goals and strict time nodes. The commissioning time is usually closely related to the commercial operation of the unit, and any delay may lead to economic losses. Therefore, the commissioning team must shorten the commissioning cycle as much as possible while ensuring safety and quality. This strict control of time requires refined management of commissioning work in terms of planning, resource allocation, and progress control.
[0005] Nuclear power commissioning involves a wide variety of systems and equipment, and the complex commissioning process and regulatory requirements make commissioning work challenging. Each commissioning activity requires detailed planning and preparation to ensure smooth commissioning.
[0006] Although the importance of nuclear power commissioning is self-evident, the existing commissioning information management methods face many shortcomings, which directly affect the commissioning efficiency and safety. The main problems are as follows:
[0007] Difficulty in information integration: Existing debugging information management methods are often scattered in different systems and documents, and various types of data and information lack effective integration. This dispersion makes it difficult for management to obtain global information when making decisions, and it is impossible to conduct a comprehensive and timely analysis of the debugging progress. This problem is particularly prominent in cross-disciplinary collaboration. The information barriers between disciplines lead to insufficient decision-making basis and reduce debugging efficiency.
[0008] Lack of real-time monitoring: Traditional information management methods provide poor real-time data monitoring, which easily leads to missed opportunities for quick response to problems, increasing potential safety risks.
[0009] Insufficient basis for management decision-making: During the commissioning process, management needs to make accurate decisions to cope with the ever-changing on-site conditions. However, the existing information management methods provide insufficient data support and lack scientific data analysis tools, making it impossible for managers to effectively evaluate the progress and risks of commissioning work. Summary of the invention
[0010] The technical problem to be solved by the present invention is to provide a work order flight table display method and system based on a smart debugging large screen, which can monitor the progress of debugging activities, improve information accuracy, realize information integration, and enhance the scientific nature of management decisions.
[0011] The present invention provides a work order flight table display system based on a smart debugging large screen, comprising:
[0012] Construction module, used to collect all relevant commissioning work order data and build the commissioning activity plan for nuclear power units;
[0013] The monitoring and feedback module is used to monitor the progress of debugging activities in real time, collect data of various debugging activities, and feed it back to the data analysis module and information display module;
[0014] The data analysis module is used to analyze the collected data, calculate the completion rate of debugging activities and obtain the progress performance of debugging activities, and finally form a statistical report;
[0015] Information display module, used to display various debugging data.
[0016] In a specific embodiment of the present invention, the construction module includes a database, and the work order data of all debugging activities are collected from the nuclear power safety production management system and stored in the database, or the work order data of all debugging activities are manually entered and stored in the database;
[0017] Load the human resources required for each debugging activity, then convert the work order data and the matching human resource data information into specific planned activities, set the start and end time of each planned activity, and finally form a complete and executable debugging plan;
[0018] Dynamically adjust the specific content of the debugging plan in real time according to actual needs.
[0019] In a specific embodiment of the present invention, the work order data includes the work order number, task content, responsible person, planned start time, planned end time, actual start time, actual end time, work order status and related personnel.
[0020] In a specific embodiment of the present invention, the monitoring and feedback module receives a debugging activity progress update or a resource adjustment requirement, automatically updates the actual human resource usage of the debugging activity in the current plan, and determines whether the human resources corresponding to the debugging activity in the original debugging plan need to be adjusted;
[0021] When it is found that the resources of the same plan item in the current debugging plan do not match those in the original debugging plan, the original debugging plan is automatically corrected to ensure the rationality of resource allocation;
[0022] The monitoring results are sent to the information display module for display.
[0023] In a specific embodiment of the present invention, the data collected by the monitoring and feedback module for various debugging activities include manually input data and data sent by the nuclear power safety production management system;
[0024] Manually entered data include actual human resource usage and critical path diagrams for handover status commissioning;
[0025] The data sent by the nuclear power safety production management system include the number of commissioning activities, the number of reports, the safety risk list, the number and status of changes, the number and status of commissioning quality control points, the commissioning document release rate, and the number and status of defects and clarifications.
[0026] In a specific embodiment of the present invention, the information display module presents the number of debugging activities, the number of reports, the list of security risks, the number and status of changes, the number and status of debugging quality control points, the number and status of defects and clarifications transmitted by the monitoring and feedback module, as well as the completion rate of debugging file activities and debugging progress performance data transmitted by the data analysis module in the form of graphics, icons or dashboards.
[0027] In a specific embodiment of the present invention, the information display module is provided with an interactive interface;
[0028] With a visual design, users can quickly identify the work order status and important information of the current debugging activity through a graphical interface.
[0029] The present invention also provides a method for displaying a work order flight table based on a smart debugging large screen, comprising the following steps:
[0030] Step 1: Before executing the commissioning activities, collect the work order data of all commissioning activities and store them in the database, match the human resources required for each commissioning activity, and form a commissioning activity plan for the nuclear power unit;
[0031] Step 2: During the execution of the debugging activity, the execution status of the debugging activity is monitored in real time, the work order data of each debugging activity is dynamically updated, and displayed on the information display module;
[0032] At the same time, it monitors the security risks in debugging activities and displays them on the information display module;
[0033] Step 3: After the debugging activity is completed, the collected debugging activity data is analyzed and a statistical report is automatically generated.
[0034] In a specific embodiment of the present invention, the work order data is derived from a nuclear power safety production management system or is manually entered, and the work order data includes: work order number, task content, responsible person, planned start time, planned end time, actual start time, actual end time, work order status and multiple fields of related personnel.
[0035] In a specific embodiment of the present invention, the step 1 further comprises:
[0036] The commissioning plan of the nuclear power unit is sent to the information display module for display.
[0037] The display method adopts a visual design to quickly identify the status and important information of the work order of the current debugging activity through a graphical interface.
[0038] In a specific embodiment of the present invention, in step 2, upon receiving a debugging activity progress update or a resource adjustment requirement, the actual human resource usage of the debugging activity in the current plan is automatically updated, and it is determined whether the human resources corresponding to the debugging activity in the original debugging plan need to be adjusted;
[0039] When it is found that the resources of the same plan item in the current debugging plan do not match those in the original debugging plan, the original debugging plan is automatically corrected to ensure the rationality of resource allocation.
[0040] Compared with the prior art, the work order flight table display method and system based on the intelligent debugging large screen of the present invention has the following beneficial effects:
[0041] (1) All debugging information is concentrated on a visual platform, which can provide real-time data feedback at the debugging site, greatly improving the efficiency of information transmission and ensuring that relevant personnel can obtain the required information in the first time.
[0042] (2) The system reduces the manual input process through automated data collection and processing, and reduces the probability of information distortion caused by human error. At the same time, the system's data comes from all aspects of nuclear power commissioning, ensuring that the source of information is reliable and improving data accuracy.
[0043] (3) Debugging managers can monitor the status of various debugging activities in real time, identify potential problems in a timely manner and respond quickly. The system supports multi-dimensional data display and analysis, helping management to grasp the key dynamics of the debugging process in real time and ensure the safety of debugging work. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 A schematic diagram showing the structure of a work order flight list display system based on a smart debugging large screen;
[0045] Figure 2 A flowchart showing a method for displaying a work order flight table based on a smart debugging screen. DETAILED DESCRIPTION
[0046] In order to further understand the present invention, the embodiments of the present invention are described below in conjunction with examples, but it should be understood that these descriptions are only for further illustrating the features and advantages of the present invention, rather than limiting the present invention.
[0047] The embodiment of the present invention discloses a work order flight table display system based on a smart debugging large screen, such as Figure 1 As shown, including:
[0048] Construction module, used to collect all relevant commissioning work order data and build the commissioning activity plan for nuclear power units;
[0049] The construction module includes a database, and the work order data of all debugging activities are collected from the nuclear power safety production management system and stored in the database, or the work order data of all debugging activities are manually entered and stored in the database;
[0050] Load the human resources required for each debugging activity, then convert the work order data and the matching human resource data information into specific planned activities, set the start and end time of each planned activity, and finally form a complete and executable debugging plan;
[0051] The work order data includes the work order number, task content, responsible person, planned start time, planned end time, actual start time, actual end time, work order status and related personnel.
[0052] The human resource data information is extracted from a human resource database, and includes resource information of commissioning engineers, test leaders, testers, and various professionals.
[0053] Dynamically adjust the specific content of the debugging plan in real time according to actual needs.
[0054] The monitoring and feedback module is used to monitor the progress of debugging activities in real time, collect data of various debugging activities, and feed it back to the data analysis module and information display module;
[0055] The monitoring and feedback module collects data of various debugging activities including manually input data and data sent by the nuclear power safety production management system;
[0056] Manually entered data include actual human resource usage and critical path diagrams for handover status commissioning;
[0057] The data sent by the nuclear power safety production management system include the number of commissioning activities, the number of reports, the safety risk list, the number and status of changes, the number and status of commissioning quality control points, the commissioning document release rate, and the number and status of defects and clarifications.
[0058] The monitoring and feedback module receives the debugging activity progress update or resource adjustment requirement, automatically updates the actual human resource usage of the debugging activity in the current plan, and determines whether the human resources corresponding to the debugging activity in the original debugging plan need to be adjusted;
[0059] When it is found that the resources of the same plan item in the current debugging plan do not match those in the original debugging plan, the original debugging plan is automatically corrected to ensure the rationality of resource allocation;
[0060] The monitoring results are sent to the information display module for display.
[0061] The data analysis module is used to analyze the collected data, calculate the completion rate of debugging activities and obtain the progress performance of debugging activities, and finally form a statistical report;
[0062] The analysis includes the completion status of debugging activities, the execution efficiency of debugging activities, and the matching human resources.
[0063] The processing unit in the data analysis module will evaluate the deviation from the original debugging activity plan based on the actual execution of the debugging activities, thereby obtaining the utilization of various debugging human resources. Through this module, managers can quickly understand the overall health of the debugging project, identify potential problems and make timely adjustments.
[0064] Information display module, used to display various debugging data.
[0065] The information display module presents the number of debugging activities, the number of reports, the list of safety risks, the number and status of changes, the number and status of debugging quality control points, the number and status of defects and clarifications transmitted by the monitoring and feedback module, as well as the completion rate of debugging file activities and debugging progress performance data transmitted by the data analysis module in the form of graphics, icons or dashboards.
[0066] The information display module is provided with an interactive interface;
[0067] With a visual design, users can quickly identify the work order status and important information of the current debugging activity through a graphical interface.
[0068] For example, ongoing debugging activities are marked with different colors for quick identification, and the status of debugging activity work orders are "Not Started", "In Progress", "Completed" and "Delayed", etc. Users can easily obtain various information through an interactive interface to make decisions based on real-time data.
[0069] The embodiment of the present invention also discloses a method for displaying a work order flight table based on a smart debugging large screen, such as Figure 2 As shown, the following steps are included:
[0070] Step 1: Before executing the commissioning activities, collect the work order data of all commissioning activities and store them in the database, match the human resources required for each commissioning activity, and form a commissioning plan for the nuclear power unit;
[0071] The work order data originates from the nuclear power safety production management system or is manually entered, and the work order data includes: work order number, task content, responsible person, planned start time, planned end time, actual start time, actual end time, work order status and multiple fields of related personnel.
[0072] The commissioning plan of the nuclear power unit is sent to the information display module for display.
[0073] The display method adopts a visual design to quickly identify the status and important information of the work order of the current debugging activity through a graphical interface.
[0074] Step 2: During the execution of the debugging activity, the execution status of the debugging activity is monitored in real time, the work order data of each debugging activity is dynamically updated, and displayed on the information display module;
[0075] At the same time, it monitors the security risks in debugging activities and displays them on the information display module;
[0076] Upon receiving the debugging activity progress update or resource adjustment request, the actual human resource usage of the debugging activity in the current plan is automatically updated, and it is determined whether the human resources corresponding to the debugging activity in the original debugging plan need to be adjusted;
[0077] When it is found that the resources of the same plan item in the current debugging plan do not match those in the original debugging plan, the original debugging plan is automatically corrected to ensure the rationality of resource allocation.
[0078] Step 3: After the debugging activity is completed, the collected debugging activity data is analyzed and a statistical report is automatically generated.
[0079] The analysis includes: completion of commissioning activities, efficiency of commissioning activities, and matching human resources;
[0080] For example, based on the actual execution of debugging activities, the deviation from the original debugging activity plan is evaluated to obtain the utilization of various types of debugging human resources.
[0081] By reviewing historical data and conducting statistical analysis on debugging activities, managers can summarize lessons learned during debugging and optimize future debugging work. Users can select work orders within a specific time range to view information such as their execution status, resources used, and personnel performance, so as to formulate a more scientific and reasonable debugging activity plan.
[0082] Based on the statistical report, trend charts and data reports can also be generated to help management understand the overall debugging progress and the execution efficiency of various work orders.
[0083] The above embodiments are only used to help understand the method and core idea of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made to the present invention without departing from the principles of the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
[0084] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A work order flight table display system based on a smart debugging large screen, characterized in that: include: Construction module, used to collect all relevant commissioning work order data and build the commissioning activity plan for nuclear power units; The monitoring and feedback module is used to monitor the progress of debugging activities in real time, collect data of various debugging activities, and feed it back to the data analysis module and information display module; The data analysis module is used to analyze the collected data, calculate the completion rate of debugging activities and obtain the progress performance of debugging activities, and finally form a statistical report; Information display module, used to display various debugging data.
2. The work order flight table display system based on the intelligent debugging large screen according to claim 1 is characterized in that: The construction module includes a database, and the work order data of all debugging activities are collected from the nuclear power safety production management system and stored in the database, or the work order data of all debugging activities are manually entered and stored in the database; Load the human resources required for each debugging activity, then convert the work order data and the matching human resource data information into specific planned activities, set the start and end time of each planned activity, and finally form a complete and executable debugging plan; Dynamically adjust the specific content of the debugging plan in real time according to actual needs.
3. The work order flight table display system based on the intelligent debugging large screen according to claim 2 is characterized in that: The work order data includes the work order number, task content, responsible person, planned start time, planned end time, actual start time, actual end time, work order status and related personnel.
4. The work order and flight table display system based on the intelligent debugging large screen according to claim 1 is characterized in that: The monitoring and feedback module receives the debugging activity progress update or resource adjustment requirement, automatically updates the actual human resource usage of the debugging activity in the current plan, and determines whether the human resources corresponding to the debugging activity in the original debugging plan need to be adjusted; When it is found that the resources of the same plan item in the current debugging plan do not match those in the original debugging plan, the original debugging plan is automatically corrected to ensure the rationality of resource allocation; The monitoring results are sent to the information display module for display.
5. The work order flight table display system based on the intelligent debugging large screen according to claim 1 is characterized in that: The monitoring and feedback module collects data of various debugging activities including manually input data and data sent by the nuclear power safety production management system; Manually entered data include actual human resource usage and critical path diagrams for handover status commissioning; The data sent by the nuclear power safety production management system include the number of commissioning activities, the number of reports, the safety risk list, the number and status of changes, the number and status of commissioning quality control points, the commissioning document release rate, and the number and status of defects and clarifications.
6. The work order and flight list display system based on the intelligent debugging large screen according to claim 5 is characterized in that: The information display module presents the number of debugging activities, the number of reports, the list of safety risks, the number and status of changes, the number and status of debugging quality control points, the number and status of defects and clarifications transmitted by the monitoring and feedback module, as well as the completion rate of debugging file activities and debugging progress performance data transmitted by the data analysis module in the form of graphics, icons or dashboards.
7. The work order and flight list display system based on the intelligent debugging large screen according to claim 1 is characterized in that: The information display module is provided with an interactive interface; With a visual design, users can quickly identify the work order status and important information of the current debugging activity through a graphical interface.
8. A method for displaying a work order flight table based on a smart debugging large screen, characterized in that: The following steps are involved: Step 1: Before executing the commissioning activities, collect the work order data of all commissioning activities and store them in the database, match the human resources required for each commissioning activity, and form a commissioning activity plan for the nuclear power unit; Step 2: During the execution of the debugging activity, the execution status of the debugging activity is monitored in real time, the work order data of each debugging activity is dynamically updated, and displayed on the information display module; At the same time, it monitors the security risks in debugging activities and displays them on the information display module; Step 3: After the debugging activity is completed, the collected debugging activity data is analyzed and a statistical report is automatically generated.
9. The method for displaying a work order flight list based on a smart debugging large screen according to claim 8 is characterized in that: The work order data originates from the nuclear power safety production management system or is manually entered, and the work order data includes: work order number, task content, responsible person, planned start time, planned end time, actual start time, actual end time, work order status and multiple fields of related personnel.
10. The method for displaying a work order flight list based on a smart debugging large screen according to claim 8 is characterized in that: The step 1 also includes: The commissioning plan of the nuclear power unit is sent to the information display module for display. The display method adopts a visual design to quickly identify the status and important information of the work order of the current debugging activity through a graphical interface.
11. The method for displaying a work order flight list based on a smart debugging large screen according to claim 8, characterized in that: In step 2, upon receiving a debugging activity progress update or a resource adjustment requirement, the actual human resource usage of the debugging activity in the current plan is automatically updated, and it is determined whether the human resources corresponding to the debugging activity in the original debugging plan need to be adjusted; When it is found that the resources of the same plan item in the current debugging plan do not match those in the original debugging plan, the original debugging plan is automatically corrected to ensure the rationality of resource allocation.