Forming method of high-strength prestressed low-carbon construction method pile

By using self-concentrated slurry with good flowability and low-carbon I-shaped steel in the working pile forming method, combined with vibration, hole cleaning and support mechanism, the problems of insufficient prestressing and stability of traditional working piles are solved, and high-strength and high-quality low-carbon working pile forming is achieved.

CN119777378APending Publication Date: 2025-04-08NANJING DONGDA GEOTECHNICAL ENG SURVEY & DESIGN INSTIT

Patent Information

Application Number
CN202510032659.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-08
Publication Date
2025-04-08

AI Technical Summary

Technical Problem

The traditional pile forming method has problems with insufficient prestress and stability, and it is difficult to completely eliminate bubbles during the filling of self-condensed slurry, resulting in defects inside the pile body and reducing density and uniformity.

Method used

A high-strength prestressed low-carbon pile forming method is adopted. By making the engineering slag and other raw materials into a self-condensed slurry with good fluidity, the holes are drilled using drilling equipment, and the self-condensed slurry is poured into the holes by using the infusion equipment, and after it solidifies, the low-carbon I-shaped steel is inserted to form an integrated pile body. The method includes using a vibrating mechanism to eliminate air bubbles inside the self-condensed slurry, the hole cleaning mechanism automatically cleans up gravel or soil blocks inside the slurry outlet, and the support mechanism enhances the stability of the grouting cylinder.

Benefits of technology

The low-carbon working piles formed by this method have strong compressive resistance, and bubbles can be completely eliminated during the self-condensed slurry filling process, improving the compactness and uniformity of the pile body, and ensuring the overall quality of high-strength prestressed low-carbon working piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119777378A_ABST
    Figure CN119777378A_ABST
Patent Text Reader

Abstract

The invention discloses a forming method of a high-strength prestressed low-carbon construction method pile, and relates to the technical field of construction method pile forming, S1, engineering residue soil and other required raw materials are treated through a specific processing technology to be converted into a self-compacting slurry state with good fluidity, and then drilling equipment is utilized to form a high-strength prestressed low-carbon construction method pile according to specific engineering requirements; holes with different diameters are drilled in the ground; s2, the prepared flow-state self-compacting slurry is poured into the drilled hole through pouring equipment, and it is ensured that the whole hole can be fully filled with the self-compacting slurry; and S3, the low-carbon I-shaped steel is inserted into the drill holes filled with the self-compacting slurry. The low-carbon construction method pile formed through the method is high in anti-pressure capacity, bubbles in flowing self-compacting slurry are eliminated through pouring equipment, meanwhile, the problem that internal parts are damaged or broken due to vibration is avoided by reinforcing the grouting barrel, and therefore a foundation is laid for forming the high-strength prestress low-carbon construction method pile through the method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of construction pile forming, in particular to a forming method of high-strength prestressed low-carbon construction pile. Background Art

[0002] In construction engineering, construction piles are an important form of foundation structure and are widely used in foundation treatment under various complex geological conditions. However, the traditional construction pile forming method has some inherent problems, especially the lack of prestress and stability.

[0003] The traditional method of forming construction piles is usually through a simple drilling process, and then the steel structure construction piles are directly inserted into the hole. Although this method meets the needs of foundation treatment to a certain extent, there are obvious problems of insufficient prestress and stability. Due to the irregular hole wall and residual impurities in the hole that may be generated during the drilling process, as well as the uneven resistance that the steel structure construction piles may encounter when inserted into the hole, the construction piles may be subjected to uneven stress distribution during subsequent use, thereby affecting their prestressing effect.

[0004] Secondly, in the process of pouring self-compacting slurry through this method, it was found that it is often difficult to completely eliminate bubbles in the self-compacting slurry during the pouring process, resulting in defects inside the pile body, reducing its density and uniformity, thereby affecting the overall quality of the pile body. For this reason, a forming method for high-strength prestressed low-carbon piles is proposed. Summary of the invention

[0005] In order to solve the problems raised by the above background technology, the present invention proposes a molding method of high-strength prestressed low-carbon construction piles.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] A method for forming high-strength prestressed low-carbon construction piles, the specific steps comprising:

[0008] S1. The construction waste soil and other required raw materials are made into a self-compacting slurry with good fluidity. Then, holes with different diameters are drilled on the ground using drilling equipment according to specific engineering requirements;

[0009] S2. Pour the prepared fluid self-compacting slurry into the drilled hole through a pouring device to ensure that the self-compacting slurry can fully fill the entire hole;

[0010] S3. Insert the low-carbon I-shaped steel into the drilled hole after pouring the self-compacting slurry. After the fluid self-compacting slurry solidifies and hardens, it forms an integrated pile body with the low-carbon I-shaped steel.

[0011] As a further preferred embodiment of the present technical solution: the grouting equipment includes a grouting cylinder and a partitioning circular plate fixedly installed inside the grouting cylinder, and also includes

[0012] A vibrating mechanism is arranged inside the grouting cylinder, and the vibrating mechanism includes a rotatable No. 1 connecting disc, on which a plurality of fixed blocks arranged in a ring array are arranged, and each of the fixed blocks is connected to a vibrating rod capable of generating vibration to eliminate bubbles inside the self-compacting slurry through a No. 1 connecting frame and a hinged seat thereon;

[0013] The hole cleaning mechanism is arranged above the vibrating mechanism and is used to clean the gravel and soil blocks inside the grout outlet arranged on the grouting cylinder;

[0014] The supporting mechanism is arranged on the outer wall of the grouting barrel to enhance the stability of the grouting barrel and reduce the risk of damage to the internal components of the grouting barrel caused by vibration.

[0015] As a further preferred embodiment of the present technical solution: the hole cleaning mechanism comprises a fixed seat and guide tubes arranged in an array on the fixed seat, each of the guide tubes is slidably mounted with a hole cleaning rod capable of pushing and pounding out gravel and soil blocks, and the hole cleaning rod is connected to a transmission angle iron via a connecting shaft;

[0016] The hole cleaning mechanism also includes a rotatable No. 2 connecting disc and a plurality of driving angle irons arranged in an array on the No. 2 connecting disc and capable of being used in conjunction with the driving angle iron and pushing the driving angle iron to move through the inclined surface.

[0017] As a further preferred embodiment of the technical solution: a sealing shell capable of blocking the self-compacting slurry is installed above the separating circular plate.

[0018] As a further preferred embodiment of the present technical solution: the supporting mechanism comprises a transmission gear ring rotatably mounted on the outer wall of the grouting barrel, the transmission gear ring is provided with a plurality of execution gears arranged in an array, each of the execution gears is fixedly mounted with a bidirectional screw rod, two sliders are threadedly connected on the bidirectional screw rod, each of the sliders is rotatably mounted with a connecting rod, and a needle seat is rotatably mounted on the connecting rod, and the needle seat is provided with a pin for inserting into the side wall of the hole.

[0019] As a further preferred embodiment of the present technical solution: the grouting equipment also includes a support frame, a lifting mechanism is arranged on the support frame, the lifting mechanism includes a No. 3 driving motor and a threaded rod arranged at the output end of the No. 3 driving motor, a sliding seat capable of sliding up and down is threadedly connected to the threaded rod, and the sliding seat is connected to the top of the grouting barrel through a No. 2 connecting frame.

[0020] As a further preferred embodiment of the present technical solution: a slurry delivery pipe for delivering fluid self-compacting slurry is installed through the grouting barrel, and a delivery pump for pumping the self-compacting slurry is installed at the other end of the slurry delivery pipe.

[0021] As a further preferred embodiment of the technical solution, the fixing seat and the guide tube are arranged in a through-connection manner, and a reset spring for pulling the hole cleaning rod to reset is installed inside the fixing seat.

[0022] As a further preferred embodiment of the technical solution: a plurality of slurry outlets are also installed on the grouting barrel, and the plurality of hole cleaning rods are arranged in one-to-one correspondence with the slurry outlets.

[0023] As a further preferred embodiment of the present technical solution: a driving mechanism is also installed inside the grouting barrel for driving the No. 1 connecting disc and the No. 2 connecting disc to rotate.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] 1. In the present invention, the low-carbon construction pile formed by this method has strong compressive resistance, and the flowing self-compacting slurry is poured into the hole through the pouring equipment, which can not only eliminate bubbles, but also avoid the problem of damage or breakage of internal parts caused by vibration by reinforcing the grouting tube in the process of eliminating bubbles, thus laying a foundation for the formation of high-strength prestressed low-carbon construction piles by this method.

[0026] 2. In the present invention, a plurality of vibrating rods are driven to rotate by a driving mechanism, and the vibration generated by the vibrating rods can fully contact and eliminate the bubbles inside the self-compacting slurry, thereby avoiding the negative impact of the bubbles on the strength of the pile body, improving the density and uniformity of the pile body, and thus ensuring the overall quality of the high-strength prestressed low-carbon construction method piles.

[0027] 3. In the present invention, in the process of the grouting tube going deeper into the hole, the hole cleaning mechanism can automatically clean up the gravel or soil inside the slurry outlet, avoiding the problem of these debris blocking the self-compacting slurry outlet and causing the fluid slurry to flow poorly, ensuring the stability of the injection rate, and reducing the risk of self-compacting slurry solidification caused by long-term injection, providing a strong guarantee for the smooth insertion of low-carbon I-shaped steel in the later stage.

[0028] 4. In the present invention, the stability of the grouting tube during the pouring process is effectively enhanced through the support of the supporting mechanism, and the stability of the grouting tube can be enhanced in the process of eliminating bubbles through high-frequency vibration of the vibrating mechanism, thereby reducing the risk of damage to components due to vibration and extending the service life of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the three-dimensional structure of the perfusion device in the present invention;

[0030] Figure 2 for Figure 1 Partial structural section view;

[0031] Figure 3 for Figure 1 Schematic diagram of the local three-dimensional structure Figure 1 ;

[0032] Figure 4 for Figure 3 The enlarged schematic diagram at A in the middle;

[0033] Figure 5 for Figure 1 Schematic diagram of the local three-dimensional structure Figure 2 ;

[0034] Figure 6 for Figure 1 Schematic diagram of the local three-dimensional structure Figure 3 ;

[0035] Figure 7 for Figure 1 Schematic diagram of the local three-dimensional structure Figure 4 ;

[0036] Figure 8 for Figure 7 The enlarged schematic diagram of point B in the middle;

[0037] Fig. 9 for Figure 1 Schematic diagram of the local three-dimensional structure Figure 5 .

[0038] Legend: 1. Grouting cylinder; 11. No. 1 chute; 12. Slurry outlet; 13. Slurry delivery pipe; 2. Partitioning circular plate; 3. Driving mechanism; 31. No. 1 driving motor; 32. No. 1 driving gear; 33. Driven gear; 34. Transmission shaft; 4. Vibrating mechanism; 41. No. 1 connecting disc; 42. Fixed block; 43. No. 1 connecting frame; 44. Articulated seat; 45. Vibrating rod; 5. Hole cleaning mechanism; 51. No. 2 connecting disc; 52. Driving angle iron; 53. Guide tube; 531. No. 2 Slide groove; 54, hole cleaning rod; 55, reset spring; 56, fixed seat; 57, connecting shaft; 58, transmission angle iron; 6, sealing shell; 7, supporting mechanism; 71, protective shell; 72, No. 2 driving motor; 73, No. 2 driving gear; 74, transmission gear ring; 75, execution gear; 76, two-way screw rod; 77, slider; 78, connecting rod; 79, needle seat; 710, plug pin; 8, supporting frame; 81, No. 3 slide groove; 82, No. 3 driving motor; 83, sliding seat; 84, No. 2 connecting frame. DETAILED DESCRIPTION

[0039] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] Embodiment 1:

[0041] The present application provides a method for forming high-strength prestressed low-carbon construction piles, the specific steps of which include:

[0042] S1. Processing the construction waste soil and other required raw materials through a specific processing technology to convert them into a self-compacting slurry state with good fluidity. Subsequently, using a drilling device, according to specific engineering requirements, holes with different diameters are drilled on the ground, wherein the composition and processing technology of the self-compacting slurry are implemented in accordance with the contents disclosed in the invention patent publication number CN112707685A;

[0043] S2. Pour the prepared fluid self-compacting slurry into the drilled hole through a pouring device to ensure that the self-compacting slurry can fully fill the entire hole;

[0044] S3. Insert the low-carbon I-shaped steel into the drilled hole after pouring the self-compacting slurry. After the fluid self-compacting slurry solidifies and hardens, it forms an integrated pile body with the low-carbon I-shaped steel.

[0045] Embodiment 2:

[0046] Based on Example 1, please refer to Figure 1-Figure 9 The grouting equipment includes a grouting cylinder 1, a partitioning circular plate 2 is fixedly connected to the inside of the grouting cylinder 1, a driving mechanism 3 is arranged on the partitioning circular plate 2, a hole cleaning mechanism 5 is installed on the driving mechanism 3, the hole cleaning mechanism 5 includes a second connecting disc 51 and a fixing seat 56 arranged above the second connecting disc 51, the second connecting disc 51 is provided with driving angle irons 52 arranged in a circular array, the fixing seat 56 is fixedly installed with guide tubes 53 arranged in a circular array, and a hole cleaning rod 54 is slidably installed inside the guide tube 53, A reset spring 55 is provided between the fixed seat 56 and the hole cleaning rod 54 for resetting the hole cleaning rod 54. A connecting shaft 57 is fixedly installed on the lower end of each hole cleaning rod 54. A transmission angle iron 58 used in conjunction with the driving angle iron 52 is fixedly installed on the lower ends of the multiple connecting shafts 57. The directions of the inclined surfaces of the driving angle iron 52 and the transmission angle iron 58 are opposite. A No. 2 slide groove 531 is opened on each of the guide tubes 53, and the multiple connecting shafts 57 slide in the No. 2 slide groove 531 respectively.

[0047] Specifically, the second connecting disc 51 is driven to rotate by the driving mechanism 3, and the rotation of the second connecting disc 51 drives the multiple driving angle irons 52 thereon to rotate. The inclined surface of the driving angle iron 52 can squeeze the inclined surface of the transmission angle iron 58 closest to it, thereby pushing the transmission angle iron 58 to move, and the transmission angle iron 58 drives the connecting shaft 57 to move. Because the connecting shaft 57 is inside the second slide groove 531, the second slide groove 531 plays a role of linear guidance, thereby pushing the hole cleaning rod 54 to slide outside the guide tube 53, and the hole cleaning rod 54 moves. The grouting tube 1 is re-inserted into the slurry outlet 12 arranged on the grouting tube 1. Therefore, it is prevented that during the process of pushing the grouting tube 1 deeper into the hole, stone debris or soil in the hole accidentally falls into one or more of the slurry outlets 12, blocking the slurry outlets 12, resulting in the fluid slurry being unable to flow out from the inside of these slurry outlets 12, thereby resulting in a smaller flow rate of the fluid slurry, which affects the injection rate, not only wasting time, but also long-term injection is likely to cause the self-compacting slurry to solidify, which is not conducive to the later insertion of low-carbon I-shaped steel.

[0048] In this embodiment, the driving mechanism 3 includes a No. 1 driving motor 31 fixedly mounted on the bottom surface of the partition circular plate 2, a No. 1 driving gear 32 fixedly mounted on the output end of the No. 1 driving motor 31, the No. 1 driving gear 32 is meshingly connected with a driven gear 33, a transmission shaft 34 is fixedly mounted on the driven gear 33 and rotatably mounted, and the transmission shaft 34 is rotatably mounted on the partition circular plate 2, and the No. 2 connecting disc 51 is fixedly mounted on the upper end of the transmission shaft 34.

[0049] Specifically, by starting the No. 1 driving motor 31 to drive the No. 1 driving gear 32 to rotate, the No. 1 driving gear 32 drives the driven gear 33 to rotate, and the driven gear 33 drives the transmission shaft 34 to rotate. The rotation of the transmission shaft 34 can drive the upper hole cleaning mechanism 5 to clean the gravel or soil inside the slurry outlet 12, and can also drive the vibrating mechanism 4 at the lower end of the transmission shaft 34 to completely eliminate the bubbles generated by the self-compacting slurry inside the hole.

[0050] In this embodiment, a sealing shell 6 is installed on the separating circular plate 2 to seal the area of ​​the hole cleaning mechanism 5, and the plurality of hole cleaning rods 54 are slidably and sealingly connected to the sealing shell 6. The sealing shell 6 is used to prevent the self-compacting slurry from penetrating into the area of ​​the hole cleaning mechanism 5 to prevent the self-compacting slurry from flowing onto the components and solidifying, thereby damaging the components.

[0051] Embodiment three:

[0052] On the basis of the second embodiment, a vibrating mechanism 4 is further installed at the lower end of the driving mechanism 3, and the vibrating mechanism 4 includes a No. 1 connecting disc 41 fixedly installed at the lower end of the transmission shaft 34, and the No. 1 connecting disc 41 is installed with fixed blocks 42 arranged in a ring array, and each of the fixed blocks 42 is installed with a No. 1 connecting frame 43 for connecting the hinge seat 44, and each of the hinge seats 44 is connected to a vibrating rod 45. It should be noted that the vibrating rod 45 is an existing technology and can generate vibration.

[0053] Specifically, the driving mechanism 3 drives the connecting disc No. 1 41 to rotate, the connecting disc No. 1 41 drives the multiple fixed blocks 42 to rotate, each fixed block 42 drives the connecting frame No. 1 43 thereon to rotate, the connecting frame No. 1 43 drives the hinge seat 44 to rotate, the hinge seat 44 drives the vibrating rod 45 thereon to rotate at a uniform speed, and the vibrating rod 45 can generate vibration by itself. At this point, through the uniform rotation of multiple vibrating rods 45, it can be ensured that the self-compacting slurry within the same height range is fully contacted, and the bubbles inside the self-compacting slurry are eliminated through the vibration of the vibrating rod 45, so as to avoid the poor solidification effect with the I-shaped steel and the risk of cracking.

[0054] Embodiment 4:

[0055] On the basis of the third embodiment, a support mechanism 7 is further installed on the outer wall of the grouting tube 1, and the support mechanism 7 includes a protective shell 71 fixedly installed on the side wall of the grouting tube 1. The protective shell 71 protects the internal No. 2 drive motor 72 to prevent falling gravel or soil from hitting the internal No. 2 drive motor 72. The protective shell 71 is installed with the No. 2 drive motor 72, and the output end of the No. 2 drive motor 72 is fixedly installed with a No. 2 driving gear 73, and the No. 2 driving gear 73 is meshed and connected with a transmission gear ring 74, and the transmission gear ring 74 is rotatably connected to the grouting tube 1, and the transmission gear ring 74 is arranged through the protective shell 71. The outer side of the transmission gear ring 74 is also meshed with a plurality of execution gears 75 arranged in a ring array, a bidirectional screw rod 76 is fixedly mounted on the execution gear 75, and the bidirectional screw rod 76 is rotatably mounted on a fixed seat 56 arranged on the side wall of the grouting cylinder 1, and a slider 77 is threadedly connected to the two sections of the bidirectional screw rod 76 that are arranged in opposite directions, and the slider 77 is slidably connected to the inside of the No. 1 slide groove 11 opened on the grouting cylinder 1, a connecting rod 78 is rotatably mounted on the slider 77, and the end of the connecting rod 78 away from the slider 77 is rotatably connected to a needle seat 79, and a pin 710 is fixedly mounted on the needle seat 79.

[0056] The second driving gear 73 drives the transmission gear ring 74 to rotate, and the transmission gear ring 74 drives multiple execution gears 75 meshing with it to rotate, and each execution gear 75 drives the bidirectional screw rod 76 thereon to rotate, and the rotation of the bidirectional screw rod 76 causes the two sliders 77 thereon to move in opposite directions, thereby enabling the connecting rod 78 to rotate, and the lateral distance can be changed, thereby driving the needle seat 79 thereon to move in the horizontal direction, and the needle seat 79 drives the insertion pin 710 to be inserted into the soil on the inner wall of the hole. At this point, when the vibrating mechanism 4 vibrates to eliminate bubbles, the grouting tube 1 is reinforced and fixed by the supporting mechanism 7, thereby reducing the risk of the grouting tube 1 swinging due to the high-frequency vibration of the vibrating rod 45, causing damage or breakage of components, and extending the service life of the equipment.

[0057] Embodiment five:

[0058] On the basis of the fourth embodiment, the grouting equipment also includes a support frame 8 for supporting the grouting tube 1, and a No. 3 driving motor 82 is installed on the support frame 8. A threaded rod is fixedly installed on the output end of the No. 3 driving motor 82, and the threaded rod is rotatably installed with the support frame 8. A sliding seat 83 is threadedly connected on the threaded rod, and a guide shaft is fixedly installed on the support frame 8. The sliding seat 83 is slidably installed with the guide shaft. A No. 2 connecting frame 84 is fixedly installed at the lower end of the sliding seat 83, and the No. 2 connecting frame 84 is The lower end is fixedly installed on the top surface of the grouting tube 1. Specifically, by starting the No. 3 driving motor 82 to drive the threaded rod to rotate, and then drive the sliding seat 83 to move up and down along the guide shaft, the sliding seat 83 drives the grouting tube 1 through the No. 2 connecting frame 84 to penetrate into the interior of the hole, thereby changing the original grouting method that requires manual or mechanical pouring of self-compacting slurry from the hole mouth into the hole. The construction speed is relatively slow, resulting in a long contact time between the self-compacting slurry and the cold air during the process of flowing into the hole, and the self-compacting slurry has solidified before being inserted into the steel part.

[0059] In this embodiment, a slurry delivery pipe 13 is installed through the top of the grouting cylinder 1 for connecting to a delivery pump of the self-compacting slurry to deliver the self-compacting slurry to the interior of the grouting cylinder 1 and spray it out through the slurry outlet 12 .

[0060] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A method for forming high-strength prestressed low-carbon piles, characterized in that: The specific steps include: S1. The construction waste soil and other required raw materials are made into a self-compacting slurry with good fluidity. Then, holes with different diameters are drilled on the ground using drilling equipment according to specific engineering requirements; S2. Pour the prepared fluid self-compacting slurry into the drilled hole through a pouring device to ensure that the self-compacting slurry can fully fill the entire hole; S3. Insert the low-carbon I-shaped steel into the drilled hole after pouring the self-compacting slurry. After the fluid self-compacting slurry solidifies and hardens, it forms an integrated pile body with the low-carbon I-shaped steel.

2. The method for forming a high-strength prestressed low-carbon construction pile according to claim 1, characterized in that: The grouting equipment comprises a grouting cylinder (1) and a partitioning circular plate (2) fixedly installed inside the grouting cylinder (1), and also comprises A vibrating mechanism (4) is arranged inside the grouting cylinder (1), the vibrating mechanism (4) comprising a rotatable No. 1 connecting disc (41), a plurality of fixing blocks (42) arranged in a ring array are arranged on the No. 1 connecting disc (41), and each of the fixing blocks (42) is connected to a vibrating rod (45) capable of generating vibration to eliminate bubbles inside the self-compacting slurry via a No. 1 connecting frame (43) and a hinge seat (44) thereon; A hole cleaning mechanism (5) is arranged above the vibrating mechanism (4) and is used to clean the broken stones and soil blocks inside the grout outlet (12) arranged on the grouting tube (1); The support mechanism (7) is arranged on the outer wall of the grouting tube (1) and is used to enhance the stability of the grouting tube (1) and reduce the risk of damage to internal components of the grouting tube (1) caused by vibration.

3. The method for forming a high-strength prestressed low-carbon construction pile according to claim 2, characterized in that: The hole cleaning mechanism (5) comprises a fixed seat (56) and guide tubes (53) arranged in an array on the fixed seat (56), each of the guide tubes (53) having a hole cleaning rod (54) slidably mounted therein for pushing and pounding out gravel and soil blocks, and the hole cleaning rod (54) is connected to a transmission angle iron (58) via a connecting shaft (57); The hole cleaning mechanism (5) further comprises a second connecting disc (51) capable of rotating, and a plurality of driving angle irons (52) arranged in an array on the second connecting disc (51) and capable of being used in conjunction with the driving angle iron (58) and pushing the driving angle iron (58) to move via an inclined surface.

4. The method for forming a high-strength prestressed low-carbon construction pile according to claim 2, characterized in that: A sealing shell (6) capable of blocking the self-compacting slurry is installed above the separating circular plate (2).

5. The method for forming a high-strength prestressed low-carbon construction pile according to claim 2, characterized in that: The support mechanism (7) comprises a transmission gear ring (74) rotatably mounted on the outer wall of the grouting cylinder (1), the transmission gear ring (74) being provided with a plurality of execution gears (75) arranged in an array, each of the execution gears (75) being fixedly mounted with a bidirectional screw rod (76), two sliders (77) being threadedly connected to the bidirectional screw rod (76), each of the sliders (77) being rotatably mounted with a connecting rod (78), and a needle seat (79) being rotatably mounted on the connecting rod (78), and the needle seat (79) being provided with a pin (710) for inserting into the side wall of the hole.

6. The method for forming a high-strength prestressed low-carbon construction pile according to claim 2, characterized in that: The grouting equipment also includes a support frame (8), and a lifting mechanism is arranged on the support frame (8). The lifting mechanism includes a No. 3 driving motor (82) and a threaded rod arranged at the output end of the No. 3 driving motor (82), and a sliding seat (83) capable of sliding up and down is threadedly connected to the threaded rod, and the sliding seat (83) is connected to the top of the grouting cylinder (1) through a No. 2 connecting frame (84).

7. The method for forming a high-strength prestressed low-carbon construction pile according to claim 2, characterized in that: A slurry delivery pipe (13) for delivering fluid self-compacting slurry is installed through the grouting cylinder (1), and a delivery pump for pumping the self-compacting slurry is installed at the other end of the slurry delivery pipe (13).

8. The method for forming high-strength prestressed low-carbon construction piles according to claim 3, characterized in that: The fixing seat (56) and the guide tube (53) are arranged in a through-connected manner, and a return spring (55) for pulling the hole cleaning rod (54) to return to its original position is installed inside the fixing seat (56).

9. The method for forming a high-strength prestressed low-carbon construction pile according to claim 3, characterized in that: The grouting cylinder (1) is also provided with a plurality of slurry outlets (12), and the plurality of hole cleaning rods (54) are arranged in one-to-one correspondence with the slurry outlets (12).

10. The method for forming high-strength prestressed low-carbon construction piles according to claim 3, characterized in that: A driving mechanism (3) is also installed inside the grouting cylinder (1) for driving the first connecting disc (41) and the second connecting disc (51) to rotate.

Citation Information

Patent Citations

  • Self-compacting concrete and preparation method thereof

    CN112707685A

Cited By

  • Method for forming high-strength prestressed low-carbon soil-mix pile

    WO2026148814A1