Rapid combined steel structure support for bent cap construction

By designing the fast-combined steel structure bracket for cover beam construction, prefabricated assembled beam sheet combination components and guardrails that can be quickly folded and raised, the existing cover beam construction bracket has solved the problems of long splicing cycle, low efficiency and safety hazards, and achieved rapid assembly and improved safety protection.

CN119800843AActive Publication Date: 2025-04-11GUANGZHOU N0 3 MUNICIPAL ENG GRP CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510003597.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-02
Publication Date
2025-04-11
Estimated Expiration
2045-01-02

AI Technical Summary

Technical Problem

The existing steel structure brackets for cover beam construction have a long cycle and low efficiency during the splicing process, resulting in more labor and machinery time, workers have long working time at high altitudes and difficulty in protection, which poses safety hazards.

Method used

A fast-formed steel structure bracket for covering beam construction is designed, using prefabricated assembled beam sheet combination components and a guardrail that can be quickly folded and erected. The beam sheet combination components are quickly lifted and fixed by cranes to shorten the splicing cycle and improve working efficiency.

Benefits of technology

It realizes rapid assembly of bracket beam components, shortens the splicing cycle, improves work efficiency, reduces the workload of workers, and improves workers' safety protection through fast-down and erect guardrails.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119800843A_ABST
    Figure CN119800843A_ABST
Patent Text Reader

Abstract

The invention discloses a rapid combined steel structure support for capping beam construction, and particularly relates to the field of bridge constructions.The rapid combined steel structure support for capping beam construction comprises a pier column, a hoop component and a support beam component, the hoop component comprises two hoop bodies, and the two hoop bodies are both installed on the pier column; the perimeter of the assembled two hoop bodies is smaller than that of a pier column; the support beam component comprises a first beam piece combination component and a second beam piece combination component, the first beam piece combination component and the second beam piece combination component are symmetrically arranged on the hoop body, and guardrail mechanisms are arranged on the first beam piece combination component and the second beam piece combination component. By arranging the prefabricated assembly type beam piece combined part I and the prefabricated assembly type beam piece combined part II, the support beam part can be rapidly assembled during construction, the splicing period is shortened, the working efficiency is improved, and the workload of workers is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridge construction, and more specifically to a quick-type combined steel structure support for cap beam construction. Background Art

[0002] The cap beam, also known as the cap beam, is an important component in bridge engineering. It is mainly used to support the upper structure of the bridge and transfer the load to the lower structure (such as piers or abutments). With the acceleration of urbanization in my country and the continuous expansion of urban scale, the construction of a large number of bridges across rivers and urban cross-line bridges and other infrastructure is stimulating. The steel structure support used in the construction of the cap beam is a temporary support structure used to support the pouring or installation of the cap beam during the bridge construction process. Its main function is to ensure that the cap beam can safely and stably bear its own weight and other construction loads during construction, while ensuring construction quality and safety.

[0003] The steel structure supports used in the cap beam construction process currently use the commonly used construction method of assembling steel platforms from scattered parts at high altitudes, that is, using a crane to lift the components one by one to high altitudes, and then workers assemble them one by one to construct the supports.

[0004] However, the above-mentioned bracket has a long period of splicing the parts and low efficiency, which results in a long time for manual and mechanical work, and workers have to work at height for a long time and it is difficult to protect themselves, which poses certain safety hazards. Summary of the invention

[0005] The invention provides a rapid combined steel structure support for cap beam construction, and aims to solve the following problem: the existing steel structure support for cap beam construction requires the use of a crane to lift the components one by one to a high altitude, and then the workers assemble the components one by one to construct the support. This method has a long splicing cycle and low efficiency, resulting in a long time for manpower and machinery, and the workers have to work at high altitude for a long time and are difficult to protect, which poses certain safety hazards.

[0006] To achieve the above object, the present invention provides the following technical solutions: a cap beam construction rapid combined steel structure support, comprising a pier column, a hoop component and a support beam component, the hoop component comprising two hoop body bodies, both of which are installed on the pier column, and the circumference of the two hoop body bodies after being assembled together is smaller than the circumference of the pier column;

[0007] The support beam component comprises a beam assembly component 1 and a beam assembly component 2, the beam assembly component 1 and the beam assembly component 2 are symmetrically arranged on the hoop body, and guardrail mechanisms are arranged on the beam assembly component 1 and the beam assembly component 2.

[0008] In a preferred embodiment, the hoop component includes reinforcing ribs, a wing plate is provided on the hoop body, the reinforcing ribs are fixedly arranged on the wing plate, an ear plate is fixedly arranged on the hoop body, a platform plate is fixedly arranged on the ear plate, and a bolt group is fixedly arranged between the two hoop body bodies.

[0009] In a preferred embodiment, a rubber pad is fixedly provided on the hoop body. After the hoop body is installed on the pier column, the rubber pad fits the pier column, and the thickness of the rubber pad is 1 cm.

[0010] In a preferred embodiment, beam-piece assembly component 1 and beam-piece assembly component 2 both include longitudinal beam 1, which is fixedly arranged on the platform plate, on which a cross beam is fixedly arranged, on which longitudinal beam 2 is fixedly arranged, and on which the corresponding two longitudinal beams 2 are fixedly arranged the same connecting plate.

[0011] In a preferred embodiment, the support beam component further includes a guardrail mechanism, the guardrail mechanism includes a guardrail, a fixing plate is fixedly provided on the crossbeam, and the guardrail is provided on the fixing plate.

[0012] In a preferred embodiment, a railing base is fixedly provided on the fixed plate, a through hole is provided on the railing base, a hinge 2 is movably provided in the through hole, the guardrail is rotatably provided on the hinge 2, positioning holes are provided on the railing base and the guardrail, and a hinge 1 is movably installed in the positioning hole.

[0013] A construction method for a cap beam construction rapid combined steel structure support comprises the following steps:

[0014] Step 1: Install the two hoop bodies at the specified height position of the pier;

[0015] Step 2: Assemble the beam assembly component 1 and the beam assembly component 2 respectively, weld the longitudinal beam 1, the longitudinal beam 2 and the cross beam, and weld the fixing plate to the railing base;

[0016] Step 3: Weld the fixing plate to the crossbeam, keep the guardrail mechanism in the downed state, and use a crane to hoist the beam assembly component 1 and the beam assembly component 2 to the hoop body and fix them;

[0017] Step 4: The longitudinal beam 1 is placed on the wing plate for installation, and the connecting plate is placed on the platform plate for installation, and then the beam assembly component 1 and the beam assembly component 2 are fixed by the connecting plate;

[0018] Step 5: Stand up the guardrail mechanism, insert hinge 1 into the positioning hole, and position the guardrail mechanism through hinge 1.

[0019] A fast combined steel structure support processing equipment for cap beam construction, including a box body, a support platform is arranged in the box body, a workpiece 1 is placed on the support platform, a positioning component is arranged on the support platform, the positioning component includes a support seat, an electric heating wire is fixedly arranged on the support seat, the support seat is used to support the workpiece 1, a positioner is arranged in the box body, a workpiece 2 is clamped on the positioner, a welding mechanism is arranged in the box body, the welding mechanism includes a welding gun, and the welding gun is used to weld the contact position between the workpiece 1 and the workpiece 2.

[0020] A fast combined steel structure support processing equipment for cap beam construction, the positioning component includes a support frame, the support frame is fixedly arranged on a support platform, a sliding seat is slidably arranged on the support frame, the support seat is fixedly arranged on the sliding seat, a gear 1 is rotatably arranged on the support frame, a guide hole is opened on the gear 1, a connecting shaft is fixedly arranged on the sliding seat, the connecting shaft is slidably arranged on the guide hole, and a gear 2 is rotatably arranged on the support frame, and the gear 2 is meshed with the gear 1.

[0021] A fast combined steel structure support processing equipment for cap beam construction, the welding mechanism includes a fixed seat one, the fixed seat one is fixedly arranged on the top inner wall of a box body, an adjusting seat one is slidably arranged inside the fixed seat one, a fixed seat two is fixedly arranged on the adjusting seat one, an adjusting seat two is slidably arranged on the fixed seat two, and a welding gun is fixedly arranged on the adjusting seat two.

[0022] The beneficial effects of the present invention are:

[0023] 1. The present invention provides prefabricated assembled beam-piece assembly component 1 and beam-piece assembly component 2, so that the support beam components can be quickly assembled during construction, thereby shortening the splicing cycle, improving work efficiency, and reducing the workload of the staff.

[0024] 2. The present invention provides a guardrail that can be quickly lowered and raised, thereby avoiding interference caused by the guardrail during hoisting and providing safety protection for workers.

[0025] 3. The present invention provides a positioning component to support and limit the position of workpiece 1 when welding workpiece 1 and workpiece 2, thereby avoiding deformation caused by changes in the internal response due to local high temperature of workpiece 1 during welding. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the three-dimensional structure of the pier column of the present invention.

[0027] Figure 2 It is a schematic diagram of the structure of the beam-piece assembly component 1 and the beam-piece assembly component 2 viewed from above according to the present invention.

[0028] Figure 3 It is a schematic diagram of the three-dimensional structure of the hoop body of the present invention.

[0029] Figure 4 It is a schematic diagram of the three-dimensional structure of the beam-sheet combination component 1 of the present invention.

[0030] Figure 5 It is a structural schematic diagram of the pier column of the present invention from the front view.

[0031] Figure 6 It is a structural schematic diagram of the front view of the crossbeam of the present invention.

[0032] Figure 7 It is a schematic diagram of the three-dimensional structure of the guardrail of the present invention.

[0033] Figure 8 For the present invention Figure 7 Schematic diagram of the structure when the middle guardrail is folded down.

[0034] Fig. 9 It is a schematic diagram of the three-dimensional structure of the railing base of the present invention.

[0035] Fig.10 It is a three-dimensional structural schematic diagram of the box body of the present invention.

[0036] Fig.11 It is a structural schematic diagram of the front view of the box body of the present invention.

[0037] Fig.12 It is a schematic diagram of the three-dimensional structure of the fixing seat 1 of the present invention.

[0038] Fig.13 It is a schematic diagram of the three-dimensional structure of the support base of the present invention.

[0039] Fig.14 It is a schematic diagram of the construction method of the present invention.

[0040] The reference numerals are: 1, pier column; 2, hoop component; 21, hoop body; 22, reinforcing rib; 23, ear plate; 24, platform plate; 25, bolt group; 3, bracket beam component; 31, beam assembly component 1; 311, longitudinal beam 1; 312, longitudinal beam 2; 313, cross beam; 314, connecting plate; 32, beam assembly component 2; 33, guardrail mechanism; 331, guardrail; 332, fixing plate; 333, fence Rod base; 334, hinge one; 335, hinge two; 4, box; 5, welding mechanism; 51, welding gun; 52, fixed seat one; 53, rotating driver one; 54, adjusting seat one; 55, fixed seat two; 56, adjusting seat two; 6, positioning component; 61, support frame; 62, sliding seat; 63, support seat; 64, gear one; 641, guide hole; 65, connecting shaft; 66, gear two; 7, positioner. DETAILED DESCRIPTION

[0041] The present application is further described in detail below in conjunction with the accompanying drawings. It is necessary to point out here that the following specific implementation methods are only used to further illustrate the present application and cannot be understood as limiting the scope of protection of the present application. Technical personnel in this field can make some non-essential improvements and adjustments to the present application based on the above application content.

[0042] Refer to the instruction manual Figures 1 to 9 A fast-type combined steel structure support for cap beam construction includes a pier 1, a hoop component 2 and a support beam component 3. The hoop component 2 includes two hoop body bodies 21, and the two hoop body bodies 21 are both installed on the pier 1. The circumference of the two hoop body bodies 21 after being assembled together is smaller than the circumference of the pier 1; the support beam component 3 includes a beam piece combination component 1 31 and a beam piece combination component 2 32, and the beam piece combination component 1 31 and the beam piece combination component 2 32 are symmetrically arranged on the hoop body body 21, and guardrail mechanisms 33 are arranged on the beam piece combination component 1 31 and the beam piece combination component 2 32.

[0043] The specific implementation scenario is: the hoop body 21 is set on the pier 1, the circumference of the two hoop body bodies 21 installed on the pier 1 is smaller than the circumference of the pier 1, and the hoop body body 21 can be stably fixed on the pier 1 during installation, and then the beam assembly component 1 31 and the beam assembly component 2 32 are respectively hoisted to the hoop body 21, and the beam assembly component 1 31 and the beam assembly component 2 32 are supported by the hoop body 21. Compared with the existing method of using a crane to hoist the components one by one to a high altitude and then assembling them, the construction efficiency is improved and the workload of the staff is reduced.

[0044] Refer to the instruction manual Figures 1 to 3 The hoop component 2 includes a reinforcing rib 22, a wing plate is arranged on the hoop body 21, the reinforcing rib 22 is fixedly arranged on the wing plate, an ear plate 23 is fixedly arranged on the hoop body 21, a platform plate 24 is fixedly arranged on the ear plate 23, and the two hoop body bodies 21 are fixedly arranged by bolts.

[0045] It should be noted that bolt holes are provided on the wing plates, and bolts are installed in the bolt holes, and the two hoop bodies 21 are fixed together by the bolt group 25 .

[0046] Refer to the instruction manual Figures 1 to 3 In order to improve the friction between the pier column 1 and the hoop body 21, specifically, a rubber pad is fixedly provided on the hoop body 21. After the hoop body 21 is installed on the pier column 1, the rubber pad fits the pier column 1, and the thickness of the rubber pad is 1 cm.

[0047] It should be noted that rubber has a certain surface roughness, which helps to increase the friction between the contact surface. When two surfaces are in contact, the actual contact area is much smaller than the apparent contact area, and the micro-roughness of rubber can increase the number of actual contact points, thereby increasing friction.

[0048] Refer to the instruction manual Figures 1 to 9 The beam assembly component 1 31 and the beam assembly component 2 32 both include a longitudinal beam 1 311, which is fixedly arranged on the platform plate 24, a transverse beam 313 is fixedly arranged on the longitudinal beam 1 311, a longitudinal beam 2 312 is fixedly arranged on the transverse beam 313, and a corresponding connecting plate 314 is fixedly arranged on the two longitudinal beams 2 312. The support beam component 3 also includes a guardrail mechanism 33, which includes a guardrail 331, a fixed plate 332 is fixedly arranged on the transverse beam 313, and the guardrail 331 is arranged on the fixed plate 332.

[0049] It should be noted that after the beam assembly component 1 31 and the beam assembly component 2 32 are respectively hoisted onto the hoop body 21, the beam assembly component 1 31 and the beam assembly component 2 32 are connected by the connecting plate 314, so that the beam assembly component 1 31 and the beam assembly component 2 32 can be quickly assembled to reduce the workload of the staff.

[0050] It should also be noted that the provision of the fixing plate 332 facilitates the installation of the guardrail 331 .

[0051] Refer to the instruction manual Figures 1 to 9 In order to ensure the safety of the workers during construction, specifically, a railing base 333 is fixedly provided on the fixing plate 332, a through hole is opened on the railing base 333, a hinge 2 335 is movably provided in the through hole, the guardrail 331 is rotatably provided on the hinge 2 335, and positioning holes are opened on the railing base 333 and the guardrail 331, a hinge 1 334 is movably installed in the positioning hole.

[0052] It should be noted that after the beam assembly component 1 31 and the beam assembly component 2 32 are hoisted, the default state of the guardrail mechanism 33 is the laid-down state, which is convenient for the staff to be located on the beam assembly component 1 31 and the beam assembly component 2 32, and then the guardrail 331 is limited by the hinge 1 334 so that the guardrail 331 is in a vertical state, and the staff on the beam assembly component 1 31 and the beam assembly component 2 32 are protected by the guardrail 331.

[0053] Refer to the instruction manual Fig.14 The construction method of the cap beam construction rapid combined steel structure support comprises the following steps:

[0054] Step 1: Install two hoop bodies 21 at a specified height position of the pier 1;

[0055] Step 2: Assemble the beam assembly component 1 31 and the beam assembly component 2 32 respectively, weld the longitudinal beam 1 311, the longitudinal beam 2 312 and the cross beam 313, and weld the fixing plate 332 to the railing base 333;

[0056] Step 3: Weld the fixing plate 332 to the crossbeam 313, keep the guardrail mechanism 33 in a laid-down state, and use a crane to hoist the beam assembly component 1 31 and the beam assembly component 2 32 to the hoop body 21 and fix them;

[0057] Step 4: The longitudinal beam 1 311 falls on the wing plate for installation, and the connecting plate 314 falls on the platform plate 24 for installation, and then the beam-piece assembly component 1 31 and the beam-piece assembly component 2 32 are fixed by the connecting plate 314;

[0058] Step 5: Stand up the guardrail mechanism 33, insert the hinge 1 334 into the positioning hole, and position the guardrail mechanism 33 through the hinge 1 334.

[0059] The hoop body 21 is a semicircular structure. When in use, the two hoop body bodies 21 are installed on the pier 1. The connecting plate 314 is supported by the platform plate 24 on the hoop body 21. Therefore, the connection between the platform plate 24 and the hoop body 21 needs to be very firm, that is, the ear plate 23 needs to be welded to the hoop body 21, the platform plate 24 is welded to the ear plate 23, and the ear plate 23 is welded to the hoop body 21. During the welding process, the hoop body 21 is first positioned, and then the ear plate 23 is placed at the specified position of the hoop body 21, and then the contact position between the hoop body 21 and the ear plate 23 is welded. However, when the hoop body 21 and the ear plate 23 are welded, the metal in the weld area and its vicinity is heated to a very high temperature, which will cause thermal expansion of this part of the metal, and the metal in the welding area will produce internal stresses. These stresses are caused by the expansion of the metal when heated and the inability to shrink freely when cooled. When these stresses exceed the yield strength of the material, plastic deformation will occur, that is, after the ear plate 23 is welded to the hoop body 21, the hoop body 21 will be deformed, making it impossible to be installed on the pier 1. In order to avoid the above situation, the hoop body 21 needs to be adjusted when welding the ear plate 23 on the hoop body 21. Refer to the attached manual. Figures 10 to 13Specifically, a kind of rapid combined steel structure support processing equipment for cap beam construction, the processing equipment is used for rapid combined steel structure support for cap beam construction, including a box body 4, a support platform is arranged in the box body 4, a workpiece 1 is placed on the support platform, a positioning component 6 is arranged on the support platform, the positioning component 6 includes a support seat 63, an electric heating wire is fixedly arranged on the support seat 63, the support seat 63 is used to support the workpiece 1, a positioner 7 is arranged in the box body 4, the positioner 7 clamps the workpiece 2, a welding mechanism 5 is arranged in the box body 4, the welding mechanism 5 includes a welding gun 51, and the welding gun 51 is used to weld the contact position between the workpiece 1 and the workpiece 2.

[0060] It should be noted that workpiece 1 is the hoop body 21, workpiece 2 is the ear plate 23, a linear drive is fixedly provided on the support platform, a positioning seat is fixedly provided on the output shaft of the linear drive, the linear drive is configured as a cylinder, after workpiece 1 is placed on the support platform, the output shaft of the cylinder moves toward workpiece 1 to position workpiece 1, the positioner 7 is configured as a robotic arm, a negative pressure suction nozzle is fixedly provided on the end effector of the robotic arm, an air pump is fixedly connected to the negative pressure suction nozzle, and negative pressure suction is generated on the negative pressure suction nozzle after the air pump is started. The negative pressure suction nozzle, the air pump and the robotic arm are mature existing technologies and are not described in detail here. A lifter is also provided in the pier 1, the lifter is vertically provided in the pier 1, the placement platform is fixedly provided on the output shaft of the lifter, the lifter is used to adjust the height of the support platform in the pier 1, and the lifter is configured as a linear motor.

[0061] It should also be explained that workpiece 1 is placed on the support table, and the support seat 63 supports the curved surface of workpiece 1. Then, workpiece 1 is positioned by a linear drive so that workpiece 1 fits tightly with the support seat 63. Then, the electric heating wire is turned on to preheat workpiece 1 and increase the temperature of workpiece 1. By adjusting the height of the support table, the end effector of the positioner 7 positions workpiece 2, and workpiece 1 and workpiece 2 are fit together. Then, the fitting area is welded by the welding gun 51. Since the temperature of workpiece 1 is increased before welding, workpiece 1 will not generate local high temperature during welding. The overall slow drop in temperature of workpiece 1 can avoid deformation caused by stress changes. In addition, workpiece 1 is fixed to the support seat 63, and the support seat 63 can support workpiece 1 to further prevent deformation of workpiece 1.

[0062] Refer to the instruction manual Figures 10 to 13Since the specifications of the pier 1 are different, that is, the circumference of the pier 1 is different, the circumference of the workpiece 1 that matches the pier 1 is also different. In order to adapt to the circumference of different workpieces, the support seat 63 can stably support and limit the workpiece 1 to prevent the welding deformation of the workpiece 1. Specifically, the positioning component 6 includes a support frame 61, the support frame 61 is fixedly arranged on the support platform, a sliding seat 62 is slidably arranged on the support frame 61, the support seat 63 is fixedly arranged on the sliding seat 62, a gear 1 64 is rotatably arranged on the support frame 61, a guide hole 641 is opened on the gear 1 64, a connecting shaft 65 is fixedly arranged on the sliding seat 62, and the connecting shaft 65 is slidably arranged on the guide hole 641. A gear 2 66 is rotatably arranged on the support frame 61, and the gear 2 66 is meshed with the gear 1 64.

[0063] It should be noted that a motor is fixedly mounted on the support frame 61 , and the second gear 66 is fixedly mounted on the output shaft of the motor.

[0064] It should also be noted that, when the motor is started, the rotation of the motor output shaft drives gear 2 66 to rotate, and gear 2 66 meshes with gear 1 64 to drive gear 1 64 to rotate. The rotation of gear 1 64 drives the connecting shaft 65 to slide, and the sliding seat 62 is driven to slide under the traction of the connecting shaft 65. The sliding of the sliding seat 62 then drives the support seat 63 to move, thereby achieving the effect of adjusting the position distance of the support seat 63, and the support area of ​​the support seat 63 can be adjusted according to the specifications of the workpiece 1.

[0065] Refer to the instruction manual Figures 10 to 13 In order to facilitate driving the welding gun 51 to move, specifically, the welding mechanism 5 includes a fixed seat 52, which is fixedly arranged on the top inner wall of the box body 4, an adjusting seat 54 is slidably arranged in the fixed seat 52, a fixed seat 55 is fixedly arranged on the adjusting seat 54, an adjusting seat 2 56 is slidably arranged on the fixed seat 2 55, and the welding gun 51 is fixedly arranged on the adjusting seat 2 56.

[0066] It should be noted that a rotating driver 53 is fixedly arranged on the fixed seat 52, and the rotating driver 53 is arranged as a motor. A threaded rod is fixedly arranged on the output shaft of the rotating driver 53, and the adjusting seat 54 is threadedly connected to the threaded rod. A motor is also fixedly arranged on the fixed seat 55, and a screw rod is fixedly arranged on the output shaft of the motor, and the adjusting seat 56 is threadedly connected to the screw rod. The rotating driver 53 and the motor on the fixed seat 55 are used to drive the welding gun 51 to move horizontally left and right and horizontally forward and backward.

[0067] The above embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention.

Claims

1. A fast-type combined steel structure support for cap beam construction, characterized in that: It comprises a pier column (1), a hoop component (2) and a support beam component (3), wherein the hoop component (2) comprises two hoop body bodies (21), the two hoop body bodies (21) are both mounted on the pier column (1), and the circumference of the two hoop body bodies (21) after being assembled together is smaller than the circumference of the pier column (1); The support beam component (3) comprises a beam assembly component 1 (31) and a beam assembly component 2 (32), wherein the beam assembly component 1 (31) and the beam assembly component 2 (32) are symmetrically arranged on the hoop body (21), and a guardrail mechanism (33) is arranged on both the beam assembly component 1 (31) and the beam assembly component 2 (32).

2. The rapid combined steel structure support for cap beam construction according to claim 1 is characterized by: The hoop component (2) comprises a reinforcing rib (22), a wing plate is arranged on the hoop body (21), the reinforcing rib (22) is fixedly arranged on the wing plate, an ear plate (23) is fixedly arranged on the hoop body (21), a platform plate (24) is fixedly arranged on the ear plate (23), and a bolt group (25) is fixedly arranged between the two hoop body bodies (21).

3. The rapid combined steel structure support for cap beam construction according to claim 2 is characterized by: A rubber pad is fixedly arranged on the hoop body (21). After the hoop body (21) is installed on the pier (1), the rubber pad fits the pier (1). The thickness of the rubber pad is 1 cm.

4. The rapid combined steel structure support for cap beam construction according to claim 3 is characterized by: The beam-piece assembly component 1 (31) and the beam-piece assembly component 2 (32) both include a longitudinal beam 1 (311), the longitudinal beam 1 (311) being fixedly arranged on the platform plate (24), a cross beam (313) being fixedly arranged on the longitudinal beam 1 (311), a longitudinal beam 2 (312) being fixedly arranged on the cross beam (313), and the corresponding two longitudinal beams 2 (312) being fixedly arranged with the same connecting plate (314).

5. The rapid combined steel structure support for cap beam construction according to claim 4 is characterized by: The support beam component (3) further comprises a guardrail mechanism (33), the guardrail mechanism (33) comprising a guardrail (331), a fixing plate (332) is fixedly arranged on the crossbeam (313), and the guardrail (331) is arranged on the fixing plate (332).

6. The rapid combined steel structure support for cap beam construction according to claim 5 is characterized by: A railing base (333) is fixedly arranged on the fixing plate (332), a through hole is provided on the railing base (333), a second hinge (335) is movably arranged in the through hole, the guardrail (331) is rotatably arranged on the second hinge (335), and positioning holes are provided on both the railing base (333) and the guardrail (331), a first hinge (334) is movably mounted in the positioning hole.

7. A construction method for a cap beam construction rapid combined steel structure support as claimed in claim 6, characterized in that: The following steps are involved: Step 1: Install two hoop bodies (21) at a specified height position on the pier (1); Step 2: Assemble the beam assembly component 1 (31) and the beam assembly component 2 (32) respectively, weld the longitudinal beam 1 (311), the longitudinal beam 2 (312) and the cross beam (313), and weld the fixing plate (332) and the railing base (333); Step 3: Weld the fixing plate (332) to the crossbeam (313), keep the guardrail mechanism (33) in a laid-down state, and use a crane to respectively hoist the beam assembly component 1 (31) and the beam assembly component 2 (32) to the hoop body (21) and fix them; Step 4: The longitudinal beam 1 (311) is placed on the wing plate for installation, the connecting plate (314) is placed on the platform plate (24) for installation, and then the beam-piece assembly component 1 (31) and the beam-piece assembly component 2 (32) are fixed by the connecting plate (314); Step 5: Stand up the guardrail mechanism (33), insert the hinge 1 (334) into the positioning hole, and position the guardrail mechanism (33) through the hinge 1 (334).

8. A rapid combined steel structure support processing equipment for cap beam construction, characterized in that: The processing equipment is used to process the rapid combined steel structure support for cap beam construction as described in any one of claims 1 to 6, comprising a box body (4), a support platform is arranged in the box body (4), a workpiece 1 is placed on the support platform, a positioning component (6) is arranged on the support platform, the positioning component (6) comprises a support seat (63), an electric heating wire is fixedly arranged on the support seat (63), the support seat (63) is used to support the workpiece 1, a positioner (7) is arranged in the box body (4), the positioner (7) clamps the workpiece 2, a welding mechanism (5) is arranged in the box body (4), the welding mechanism (5) comprises a welding gun (51), and the welding gun (51) is used to weld the contact position between the workpiece 1 and the workpiece 2.

9. The rapid combined steel structure support processing equipment for cap beam construction according to claim 8 is characterized by: The positioning component (6) comprises a support frame (61), the support frame (61) is fixedly arranged on a support platform, a sliding seat (62) is slidably arranged on the support frame (61), the support seat (63) is fixedly arranged on the sliding seat (62), a gear 1 (64) is rotatably arranged on the support frame (61), a guide hole (641) is opened on the gear 1 (64), a connecting shaft (65) is fixedly arranged on the sliding seat (62), the connecting shaft (65) is slidably arranged on the guide hole (641), and a gear 2 (66) is rotatably arranged on the support frame (61), and the gear 2 (66) is meshed with the gear 1 (64).

10. The rapid combined steel structure support processing equipment for cap beam construction according to claim 9 is characterized in that: The welding mechanism (5) comprises a fixed seat 1 (52), the fixed seat 1 (52) being fixedly arranged on the top inner wall of the box body (4), an adjusting seat 1 (54) being slidably arranged inside the fixed seat 1 (52), a fixed seat 2 (55) being fixedly arranged on the adjusting seat 1 (54), an adjusting seat 2 (56) being slidably arranged on the fixed seat 2 (55), and the welding gun (51) being fixedly arranged on the adjusting seat 2 (56).

Citation Information

Patent Citations

  • Circular pier capping beam supporting device

    CN102234982A

  • Template system and method

    CN116324089A

  • Construction process for large-span pier capping beam suspension type formwork platform for bridge disassembly and reconstruction

    CN118390423A

  • Hoisting and dismounting construction structure of capping beam construction platform

    CN218373367U

  • Steel pipe column support construction safety platform device

    CN219080110U