Device and method for integrally assembling radiator of power transformer

By assembling the power transformer radiator on the ground, using fixed plates, climbing and other components, the assembly process of the confluent oil pipeline is simplified, and the problems of long high-altitude operation time and low working efficiency in the existing technology are solved, and a more efficient and safer assembly process is achieved.

CN119811874AActive Publication Date: 2025-04-11BAODING TIANWEI BAOBIAN ELECTRICAL
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411895375.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-21
Publication Date
2025-04-11
Estimated Expiration
2044-12-21

AI Technical Summary

Technical Problem

The assembly process of existing power transformer radiators has problems such as long working time at high altitudes, long-term occupation of sky trains, and low working efficiency.

Method used

A device and method for the overall assembly of power transformer radiator is adopted, and the assembly process is simplified and efficiency is improved by assembling the confluent oil pipeline through the ground, and the fixing plate, climbing, vertical support pipeline, I-steel and other components are used.

Benefits of technology

It greatly reduces the risk of high-altitude operations, improves assembly efficiency, simplifies assembly processes, and ensures the safety of staff.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119811874A_ABST
    Figure CN119811874A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power transformer radiator pipeline machining, in particular to a device and method for overall assembly of a power transformer radiator. According to the technical scheme, the device and method for overall assembly of the power transformer radiator comprise a first upper confluence oil pipeline, a second upper confluence oil pipeline, a first lower confluence oil pipeline, a second lower confluence oil pipeline, a fixing plate, lifting pieces, vertical supporting pipelines, I-shaped steel, confluence oil pipeline pipe joints and vertical supporting pipeline pipe joints. Compared with the prior art that a traditional finned radiator is installed on a confluence oil pipeline led out of a transformer oil tank, the assembling and manufacturing process has the problems that the high-altitude operation time is long, a crown block is occupied for a long time, and the working efficiency is low, the device for overall assembling of the power transformer radiator is assembled on the ground; and the risk of high-altitude operation is greatly reduced, the safety of workers is guaranteed, the assembling process is simpler and more efficient, and therefore the efficiency of assembling work is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of power transformer radiator pipeline processing, and in particular to a device and method for integrally assembling a power transformer radiator. Background Art

[0002] When a large oil-immersed power transformer is in operation, it is generally necessary to install an external plate radiator to dissipate the heat from the transformer oil inside the transformer to reduce the operating temperature and ensure safe operation of the transformer.

[0003] The existing plate radiator is installed on the oil collecting pipe leading out from the outside of the transformer oil tank. The traditional assembly and manufacturing process of the collecting pipe is to assemble the lower collecting pipe, the supporting pipe, the upper collecting pipe, etc. from bottom to top with the transformer oil tank interface. This assembly and manufacturing process has the problems of long high-altitude working time, long-term occupation of the overhead crane, and low work efficiency.

[0004] In view of the problems of long aerial work time and long-term occupation of overhead crane and low work efficiency in the existing assembly and production process, the device for overall assembly of power transformer radiator is assembled on the ground, which greatly reduces the risk of aerial work and ensures the safety of workers. At the same time, assembly on the ground platform can more conveniently perform alignment, adjustment of spacing, diagonal size, straightness, verticality and other parameters, and can more efficiently perform welding and lifting operations, simplifying the assembly process of the converging oil pipeline, making the assembly process simpler and more efficient, thereby improving the efficiency of assembly work. Summary of the invention

[0005] In order to overcome the problem that the existing plate radiator is installed on the oil collecting pipe leading out from the outside of the transformer oil tank, the traditional assembly and manufacturing process of the collecting pipe is to assemble the lower collecting pipe, the supporting pipe, the upper collecting pipe, etc. from bottom to top with the transformer oil tank interface. This assembly and manufacturing process has the problems of long high-altitude working time, long-term occupation of the overhead crane, and low work efficiency.

[0006] The technical scheme of the present invention is: a device for integrally assembling a radiator of a power transformer, comprising a first upper confluence oil pipeline, a second upper confluence oil pipeline, a first lower confluence oil pipeline, a second lower confluence oil pipeline, a fixing plate, a hanging climb, a vertical support pipeline, an I-beam, a confluence oil pipeline pipe joint and a vertical support pipeline pipe joint, one side of the first upper confluence oil pipeline is welded with the second upper confluence oil pipeline, a first lower confluence oil pipeline is arranged below the first upper confluence oil pipeline, one side of the first lower confluence oil pipeline is welded with the second lower confluence oil pipeline, and the first upper confluence oil pipeline is welded with the second lower confluence oil pipeline. A plurality of groups of vertical support pipelines are arranged between the first upper oil confluence pipeline and the first lower oil confluence pipeline, and vertical support pipeline pipe joints are arranged at both ends of the vertical support pipelines. A fixing plate is arranged on one side of the first upper oil confluence pipeline and the first lower oil confluence pipeline, and a plurality of fixing plates are arranged. A hanging hook is arranged between the first upper oil confluence pipeline and the first lower oil confluence pipeline, and a plurality of hanging hooks are arranged. I-beams are arranged at both ends of the hanging hook. An oil confluence pipeline pipe joint is arranged on the other side of the first upper oil confluence pipeline and the first lower oil confluence pipeline, and a plurality of oil confluence pipeline pipe joints are arranged.

[0007] Preferably, the first upper confluence oil pipeline, the second upper confluence oil pipeline, the first lower confluence oil pipeline and the second lower confluence oil pipeline are each formed by welding on the platform.

[0008] Preferably, one end of the fixing plate is welded to one side of the I-beam, and the spacing of the fixing plates is the same as the spacing of the radiator pipe joints on the manifold.

[0009] A method for integrally assembling a power transformer radiator comprises the following methods:

[0010] S11: First, prepare and inspect the various parts used for the overall assembly of the power transformer radiator;

[0011] S12: welding and aligning the confluence pipeline;

[0012] S13: Installing and assembling the tooling device;

[0013] S14: Assemble and confirm the supporting pipeline;

[0014] S15: Perform base welding and marking on the weld;

[0015] S16: Lift and assemble the overall frame of the confluence pipeline.

[0016] Preferably, the preparation and layout include the following steps:

[0017] S21: Prepare the required oil confluence pipeline components, including upper confluence pipeline, lower confluence pipeline, support pipe, fixing plate, I-beam, hanging rope, etc.;

[0018] S22: Arrange these components on the ground platform to ensure that there is enough space for operation;

[0019] S23: Check the integrity of all parts to confirm that there is no damage or missing parts.

[0020] Preferably, when welding and aligning the conduit, the following steps are included:

[0021] S31: welding the upper oil confluence pipeline on the same side of the transformer on the platform;

[0022] S32: The lower oil confluence pipeline is also welded on the platform;

[0023] S33: Align the welded conduit and adjust parameters such as spacing, diagonal size, straightness and verticality to ensure that they meet the requirements.

[0024] Preferably, when installing the tooling device, the following steps are included:

[0025] S41: Installing a tooling device consisting of an I-beam, a fixing plate, and a hanging ladder at the position of the converging oil pipeline joint;

[0026] S42: The spacing between the fixing plates should match the spacing of the fin-type radiator joints to be installed;

[0027] S43: Make sure the fixing plate and the pipe fitting flange are the same size for easy installation.

[0028] Preferably, when assembling the support pipeline, the following steps are included:

[0029] S51: Assemble the support tube between the two manifolds, and ensure that the connection between the support tube and the manifold is in a spot welding state;

[0030] S52: Check the assembled support pipeline to confirm its firmness.

[0031] Preferably, when performing welding base welding and marking, the following steps are included:

[0032] S61: Perform base welding on all welds to be welded to ensure the firmness of the welds;

[0033] S62: Make post-assembly markings to facilitate subsequent installation and inspection.

[0034] Preferably, the lifting and overall assembly process includes the following steps:

[0035] S71: Lift the overall frame of the oil pipeline to ensure stability and safety during the lifting process;

[0036] S72: Assemble the hoisted oil confluence pipeline frame and the transformer oil tank interface as a whole;

[0037] S73: Check and debug the installed radiator to ensure it works properly.

[0038] Beneficial effects of the present invention:

[0039] 1. Through ground assembly, the risk of high-altitude operations is greatly reduced and the safety of workers is guaranteed. At the same time, assembly on the ground platform can more conveniently perform alignment, adjustment of spacing, diagonal size, straightness, verticality and other parameters, and welding and lifting operations can be performed more efficiently, simplifying the assembly process of the confluence oil pipeline, making the assembly process simpler and more efficient, thereby improving the efficiency of the assembly work. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 Shown is a first three-dimensional structural schematic diagram of a device for integrally assembling a power transformer radiator of the present invention;

[0041] Figure 2 Shown is a second three-dimensional structural schematic diagram of a device for integrally assembling a power transformer radiator of the present invention;

[0042] Figure 3 Shown is a schematic plan view of a device for integrally assembling a power transformer radiator according to the present invention;

[0043] Figure 4 What is shown is a rough schematic diagram of the workflow of a method for integrally assembling a heat sink for a power transformer according to the present invention;

[0044] Explanation of the accompanying drawings: 1. First upper confluence oil pipeline; 2. Second upper confluence oil pipeline; 3. First lower confluence oil pipeline; 4. Second lower confluence oil pipeline; 5. Fixed plate; 6. Lifting plate; 7. Vertical support pipeline; 8. I-beam; 9. Confluence oil pipeline pipe joint; 10. Vertical support pipeline pipe joint. DETAILED DESCRIPTION

[0045] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0046] See also Figure 1-Figure 3The present invention provides an embodiment: a device for integrally assembling a power transformer radiator, comprising a first upper confluence oil pipeline 1, a second upper confluence oil pipeline 2, a first lower confluence oil pipeline 3, a second lower confluence oil pipeline 4, a fixing plate 5, a hanging climb 6, a vertical support pipeline 7, an I-beam 8, a confluence oil pipeline pipe joint 9 and a vertical support pipeline pipe joint 10, one side of the first upper confluence oil pipeline 1 is welded with the second upper confluence oil pipeline 2, a first lower confluence oil pipeline 3 is arranged below the first upper confluence oil pipeline 1, one side of the first lower confluence oil pipeline 3 is welded with the second lower confluence oil pipeline 4, and the first upper confluence oil pipeline 1 is welded with the second upper confluence oil pipeline 2. A plurality of groups of vertical support pipelines 7 are arranged between the upper confluence oil pipeline 1 and the first lower confluence oil pipeline 3, and vertical support pipeline pipe joints 10 are arranged at both ends of the vertical support pipeline 7, a fixing plate 5 is arranged on one side of the first upper confluence oil pipeline 1 and the first lower confluence oil pipeline 3, and a plurality of fixing plates 5 are arranged, a hanging climb 6 is arranged between the first upper confluence oil pipeline 1 and the first lower confluence oil pipeline 3, and a plurality of hanging climbs 6 are arranged, and I-beams 8 are arranged at both ends of the hanging climb 6, and a confluence oil pipeline pipe joint 9 is arranged on the other side of the first upper confluence oil pipeline 1 and the first lower confluence oil pipeline 3, and a plurality of confluence oil pipeline pipe joints 9 are arranged.

[0047] Preferably, the first upper confluence oil pipeline 1, the second upper confluence oil pipeline 2, the first lower confluence oil pipeline 3 and the second lower confluence oil pipeline 4 are respectively welded and formed on the platform.

[0048] Preferably, one end of the fixing plate 5 is welded to one side of the I-beam 8, and the spacing of the fixing plates 5 is the same as the spacing of the radiator pipe joints on the manifold.

[0049] See also Figure 4 , a method for assembling a heat sink for a power transformer, comprising the following methods:

[0050] S11: First, prepare and inspect the various parts used for the overall assembly of the power transformer radiator;

[0051] S12: welding and aligning the confluence pipeline;

[0052] S13: Installing and assembling the tooling device;

[0053] S14: Assemble and confirm the supporting pipeline;

[0054] S15: Perform base welding and marking on the weld;

[0055] S16: Lift and assemble the overall frame of the confluence pipeline.

[0056] Preferably, the preparation and layout include the following steps:

[0057] S21: Prepare the required oil confluence pipeline components, including upper confluence pipeline, lower confluence pipeline, support pipe, fixing plate, I-beam, hanging rope, etc.;

[0058] S22: Arrange these components on the ground platform to ensure that there is enough space for operation;

[0059] S23: Check the integrity of all parts to confirm that there is no damage or missing parts.

[0060] Preferably, when welding and aligning the conduit, the following steps are included:

[0061] S31: welding the upper oil confluence pipeline on the same side of the transformer on the platform;

[0062] S32: The lower oil confluence pipeline is also welded on the platform;

[0063] S33: Align the welded conduit and adjust parameters such as spacing, diagonal size, straightness and verticality to ensure that they meet the requirements.

[0064] Preferably, when installing the tooling device, the following steps are included:

[0065] S41: Installing a tooling device consisting of an I-beam, a fixing plate, and a hanging ladder at the location of the converging oil pipeline joint;

[0066] S42: The spacing between the fixing plates should match the spacing of the fin-type radiator joints to be installed;

[0067] S43: Make sure the fixing plate and the pipe fitting flange are the same size for easy installation.

[0068] Preferably, when assembling the support pipeline, the following steps are included:

[0069] S51: Assemble the support tube between the two manifolds, and ensure that the connection between the support tube and the manifold is in a spot welding state;

[0070] S52: Check the assembled support pipeline to confirm its firmness.

[0071] Preferably, when performing welding base welding and marking, the following steps are included:

[0072] S61: Perform base welding on all welds to be welded to ensure the firmness of the welds;

[0073] S62: Make post-assembly markings to facilitate subsequent installation and inspection.

[0074] Preferably, the lifting and overall assembly process includes the following steps:

[0075] S71: Lift the overall frame of the oil pipeline to ensure stability and safety during the lifting process;

[0076] S72: Assemble the hoisted oil confluence pipeline frame and the transformer oil tank interface as a whole;

[0077] S73: Check and debug the installed radiator to ensure it works properly.

[0078] Example 1

[0079] When assembling the radiator for power transformer:

[0080] 1. Weld the first upper oil confluence pipeline 1 and the second upper oil confluence pipeline 2 on the same side of the transformer respectively, and then connect and align them on the platform.

[0081] 2. Weld the first lower oil confluence pipeline 3 and the second lower oil confluence pipeline 4 on the same side of the transformer separately, and then connect and install them on the platform for alignment.

[0082] 3. Adjust the first upper confluence oil pipeline 1, the second upper confluence oil pipeline 2 to align with the first lower confluence oil pipeline 3, the second lower confluence oil pipeline 4 on the ground platform, adjust the spacing between the upper and lower confluence oil pipelines and the diagonal size, straightness, verticality and other parameters to meet the requirements, and the vertical support pipeline joint 10 and the confluence oil pipeline are in a spot welding state.

[0083] 4. Install the tooling device consisting of I-beam 8, fixing plate 5 and hanging 6 at the position of the converging oil pipeline joint 9.

[0084] 5. Assemble the vertical support pipeline 7 between the converging oil pipelines, make the assembly mark after assembly, and perform base welding on all welds.

[0085] 6. Lift the overall frame of the oil confluence pipeline and assemble it with the interface of the oil tank.

[0086] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the spirit of the present invention.

Claims

1. A device for integrally assembling a power transformer radiator, characterized in that: The utility model comprises a first upper oil confluence pipeline (1), a second upper oil confluence pipeline (2), a first lower oil confluence pipeline (3), a second lower oil confluence pipeline (4), a fixing plate (5), a hanging climb (6), a vertical support pipeline (7), an I-beam (8), an oil confluence pipeline pipe joint (9) and a vertical support pipeline pipe joint (10); the second upper oil confluence pipeline (2) is welded to one side of the first upper oil confluence pipeline (1); the first lower oil confluence pipeline (3) is arranged below the first upper oil confluence pipeline (1); the second lower oil confluence pipeline (4) is welded to one side of the first lower oil confluence pipeline (3); the first upper oil confluence pipeline (1) and the first lower oil confluence pipeline (1) are connected to the oil confluence pipeline (4); A plurality of groups of vertical support pipelines (7) are arranged between the first upper oil converging pipeline (1) and the first lower oil converging pipeline (3), and vertical support pipeline pipe joints (10) are arranged at both ends of the vertical support pipeline (7). A fixing plate (5) is arranged on one side of the first upper oil converging pipeline (1) and the first lower oil converging pipeline (3), and a plurality of fixing plates (5) are arranged. A hanging hook (6) is arranged between the first upper oil converging pipeline (1) and the first lower oil converging pipeline (3), and a plurality of hanging hooks (6) are arranged. I-beams (8) are arranged at both ends of the hanging hook (6). A converging oil pipeline pipe joint (9) is arranged on the other side of the first upper oil converging pipeline (1) and the first lower oil converging pipeline (3), and a plurality of converging oil pipeline pipe joints (9) are arranged.

2. The device for integrally assembling a power transformer radiator according to claim 1, characterized in that: The first upper oil confluence pipeline (1), the second upper oil confluence pipeline (2), the first lower oil confluence pipeline (3) and the second lower oil confluence pipeline (4) are each formed by welding on the platform.

3. The device for integrally assembling a power transformer radiator according to claim 2, characterized in that: One end of the fixing plate (5) is welded to one side of the I-beam (8), and the spacing of the fixing plates (5) is the same as the spacing of the radiator pipe joints on the manifold.

4. A method for assembling a heat sink for a power transformer, characterized in that: The following methods are included: S11: First, prepare and inspect the various parts used for the overall assembly of the power transformer radiator; S12: welding and aligning the confluence pipeline; S13: Installing and assembling the tooling device; S14: Assemble and confirm the supporting pipeline; S15: Perform base welding and marking on the weld; S16: Lift and assemble the overall frame of the confluence pipeline.

5. The method for integrally assembling a heat sink for a power transformer according to claim 4, characterized in that: The following steps are included in the preparation and layout: S21: Prepare the required oil confluence pipeline components, including the upper confluence pipeline, the lower confluence pipeline, the support pipe, the fixing plate, the I-beam, and the hanging rope; S22: Arrange these components on the ground platform to ensure that there is enough space for operation; S23: Check the integrity of all parts to confirm that there is no damage or missing parts.

6. The method for integrally assembling a heat sink for a power transformer according to claim 5, characterized in that: When welding and aligning the conduit, the following steps are included: S31: welding the upper oil confluence pipeline on the same side of the transformer on the platform; S32: The lower oil confluence pipeline is also welded on the platform; S33: Align the welded conduit and adjust parameters such as spacing, diagonal size, straightness and verticality to ensure that they meet the requirements.

7. The method for integrally assembling a heat sink for a power transformer according to claim 6, characterized in that: When installing the tooling device, the following steps are included: S41: Installing a tooling device consisting of an I-beam, a fixing plate, and a hanging ladder at the location of the converging oil pipeline joint; S42: The spacing between the fixing plates should match the spacing of the fin-type radiator joints to be installed; S43: Make sure the fixing plate and the pipe fitting flange are the same size for easy installation.

8. The method for integrally assembling a heat sink for a power transformer according to claim 7, characterized in that: When assembling the support pipe, the following steps are included: S51: Assemble the support tube between the two manifolds, and ensure that the connection between the support tube and the manifold is in a spot welding state; S52: Check the assembled support pipeline to confirm its firmness.

9. The method for integrally assembling a heat sink for a power transformer according to claim 8, characterized in that: When performing welding base welding and marking, the following steps are included: S61: Perform base welding on all welds to be welded to ensure the firmness of the welds; S62: Make post-assembly markings to facilitate subsequent installation and inspection.

10. The method for integrally assembling a heat sink for a power transformer according to claim 9, characterized in that: When lifting and overall assembly, the following steps are included: S71: Lift the overall frame of the oil pipeline to ensure stability and safety during the lifting process; S72: Assemble the hoisted oil confluence pipeline frame and the transformer oil tank interface as a whole; S73: Check and debug the installed radiator to ensure it works properly.

Citation Information

Patent Citations

  • Auxiliary mounting device for mounting transformer in oil tank

    CN112151256A

  • Fixing and supporting structure for finned radiator cooling device of transformer

    CN202034170U

  • Transformer cooling device

    CN213070845U

  • Method and device for assembling a transformer

    WO2011120543A1