Electric power engineering construction safety management method, equipment, medium and product

Through an intelligent monitoring sensor network, holographic data from the power project construction site is collected and multi-dimensional safety monitoring and analysis is carried out, which solves the problem of insufficient safety management accuracy in the existing technology, and accurately monitors and responds to the construction environment and significantly reduces the occurrence of safety accidents.

CN119831275AInactive Publication Date: 2025-04-15BEIJING SONGDAO RYODEN POWER ENG CO LTD

Patent Information

Application Number
CN202411937012.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-26
Publication Date
2025-04-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology relies on human monitoring and post-processing in power engineering construction, which leads to the accuracy of safety management being affected by the energy and experience of monitoring personnel, making it difficult to accurately identify and deal with safety hazards and potential risks in the construction environment.

Method used

Through an intelligent monitoring sensor network, holographic data at the construction site, including construction environment data, equipment status data and worker behavior data, conduct multi-dimensional safety monitoring and analysis, automatically identify safety hazards and potential risks, and send safety emergency control information.

Benefits of technology

It has achieved more accurate and objective safety monitoring of the power engineering construction environment, and can quickly identify and respond to safety hazards and potential risks, reduce the occurrence of safety accidents, and ensure the safe and smooth progress of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119831275A_ABST
    Figure CN119831275A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of safety monitoring, in particular to an electric power engineering construction safety management method and device, a medium and a product, and the method comprises the steps: carrying out the multi-dimensional safety monitoring analysis based on the holographic data of a construction site, and determining a safety monitoring analysis result, the multi-dimensional safety monitoring analysis comprises construction environment monitoring, equipment operation monitoring and worker behavior monitoring. And performing safety measure analysis based on the safety monitoring analysis result, determining safety emergency regulation and control information, and sending the safety emergency regulation and control information to the target terminal. In the electric power engineering construction safety monitoring process, safety monitoring is carried out on the electric power engineering construction environment from the three aspects of the construction environment, equipment operation and worker behaviors, potential safety hazards and potential risks existing in the electric power construction environment are automatically recognized, safety accidents can be reduced, and it is guaranteed that electric power engineering construction is carried out safely and smoothly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of safety monitoring, and in particular to a method, equipment, medium and product for safety management of power engineering construction. Background Art

[0002] With the rapid development of global electrification, electric energy has become an indispensable resource in modern life and work. As the basis of electric energy transmission and distribution, safety management in the construction and maintenance of power engineering is particularly important. Power engineering not only involves complex electrical systems and equipment, but also often requires operations in various complex and changeable construction environments, such as high-altitude operations, underground operations, operations under severe weather conditions, etc., which increase the safety risks in the construction process.

[0003] In the process of power engineering construction, the implementation of safety management methods can effectively protect the safety of personnel and power facilities. In related technologies, the safety management of power engineering construction mainly relies on human monitoring and post-processing mechanisms, using regular inspections and safety accident reports to conduct risk assessment and response. However, the accuracy of safety management methods in related technologies is affected by the energy and experience of monitoring personnel, and there are often problems with inaccurate identification and handling of safety hazards.

[0004] Therefore, how to solve the above technical defects is an urgent problem to be solved by those skilled in the art. Summary of the invention

[0005] The purpose of this application is to provide a method, equipment, medium and product for safety management of power engineering construction, which are used to solve at least one of the above technical problems.

[0006] The above invention objectives of the present application are achieved through the following technical solutions: In the first aspect, the present application provides a method for safety management of electric power engineering construction, which adopts the following technical solution: A method for safety management of electric power engineering construction, comprising: Acquire the construction site holographic data collected by the intelligent monitoring sensor network, wherein the construction site holographic data includes: construction environment data, equipment status data and worker behavior data; Based on the construction site holographic data, a multi-dimensional safety monitoring and analysis is performed to determine the safety monitoring and analysis results, wherein the multi-dimensional safety monitoring and analysis includes: construction environment monitoring, equipment operation monitoring, and worker behavior monitoring; Based on the safety monitoring analysis results, safety measures analysis is performed to determine safety emergency regulation information, and the safety emergency regulation information is sent to the target terminal, which helps to timely discover safety hazards and potential risks in power engineering construction.

[0007] By adopting the above technical solution, the holographic data of the construction site collected by the intelligent monitoring sensor network is obtained, wherein the holographic data of the construction site includes: construction environment data, equipment status data and worker behavior data. Then, a multi-dimensional safety monitoring analysis is performed based on the holographic data of the construction site to determine the safety monitoring analysis results, wherein the multi-dimensional safety monitoring analysis includes: construction environment monitoring, equipment operation monitoring, and worker behavior monitoring. Finally, a safety measure analysis is performed based on the safety monitoring analysis results, the safety emergency control information is determined, and the safety emergency control information is sent to the target terminal, which helps to timely discover safety hazards and potential risks in the construction of power projects. In the process of safety monitoring of power project construction, the power project construction environment is safely monitored from three aspects: construction environment, equipment operation and worker behavior, and the safety hazards and potential risks in the power construction environment are automatically identified. The automated safety monitoring method can more accurately and objectively identify the safety hazards and potential risks in the power project construction environment, and the automated emergency dispatch method can more quickly and effectively adopt emergency control plans, which helps to reduce the occurrence of safety accidents and ensure the safe and smooth progress of power project construction.

[0008] In a preferred example, the present application may be further configured as follows: performing multi-dimensional safety monitoring analysis based on the construction site holographic data to determine the safety monitoring analysis results includes: Acquire environmental monitoring standards, perform construction environment monitoring based on the environmental monitoring standards and the construction environment data in the construction site holographic data, and determine construction environment monitoring results; Acquire an equipment operation monitoring model, and use the equipment operation monitoring model to monitor and analyze the equipment status data in the construction site holographic data to determine an equipment operation monitoring result; Worker behavior monitoring is performed based on the worker behavior data in the construction site holographic data to determine worker behavior monitoring results, wherein the worker behavior monitoring results include: worker violation monitoring results, worker fall monitoring results, worker collision monitoring results and worker electric shock monitoring results.

[0009] In a preferred example, the present application may be further configured as follows: the worker behavior monitoring is performed based on the worker behavior data in the construction site holographic data, and the worker behavior monitoring result is determined, including: Obtaining a power construction authority zoning map, performing violation analysis based on the worker behavior data and the power construction authority zoning map, and determining worker violation monitoring results; Performing human body model screening based on the posture data in the worker behavior data, determining a fall risk assessment model corresponding to the posture data, and performing fall analysis based on the fall risk assessment model and the posture data to determine a worker fall monitoring result; Acquire power equipment distribution information, perform distance calculation and collision analysis based on the worker behavior data and the power equipment distribution information, and determine worker collision monitoring results; The distribution information of live equipment is obtained, and electric shock analysis is performed based on the worker behavior data and the distribution information of live equipment to determine the worker electric shock monitoring results.

[0010] In a preferred example, the present application can be further configured as follows: the violation analysis is performed based on the worker behavior data and the power construction authority zoning map to determine the worker violation monitoring results, including: Obtaining compliance standards corresponding to each zone in the power construction authority zone map, wherein the zone types in the power construction authority zone map include: open area, semi-open area and restricted area; Performing access authority analysis based on the worker behavior data, the target power construction area and the target compliance standard to determine the authority analysis result, wherein the target power construction area is the area corresponding to the worker in the power construction authority zoning map; the target compliance standard is the compliance standard corresponding to the target power construction area; When the authority analysis result is that entry is allowed, operational normative monitoring is performed based on the worker behavior data, the target power construction area and the target compliance standard to determine the worker violation monitoring result.

[0011] In a preferred example, the present application can be further configured as follows: Building a design model based on the design information and engineering requirements of the electric power engineering construction to obtain the electric power engineering design model, and sending the electric power engineering design model to the construction party terminal and the supervision party terminal; When it is detected that the construction party has uploaded a first parameter instruction according to the power engineering design model, the construction party performs instruction parsing based on the first parameter upload instruction to determine the construction forming parameters; When detecting that the supervisor has uploaded a second parameter instruction according to the power engineering design model, performing instruction parsing based on the second parameter upload instruction to determine the construction approval parameter; Intelligent supervision is performed based on the construction forming parameters and the construction approval parameters to determine the construction supervision results.

[0012] In a preferred example, the present application can be further configured as follows: A three-dimensional model of the construction site is obtained, and a virtual scene is created for the three-dimensional model of the construction site using holographic projection technology to obtain a virtual reality scene, wherein the virtual reality scene is used for safety education and regular drills for workers before construction to enhance the workers' risk awareness.

[0013] In a second aspect, the present application provides an electronic device, which adopts the following technical solution: at least one processor; Memory; At least one application, wherein the at least one application is stored in a memory and configured to be executed by at least one processor, and the at least one application is configured to: execute the above-mentioned power engineering construction safety management method.

[0014] In a third aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution: A computer-readable storage medium stores a computer program, which, when executed in a computer, causes the computer to execute the above-mentioned power engineering construction safety management method.

[0015] In a fourth aspect, the present application provides a computer program product, which adopts the following technical solution: A computer program product includes a computer program, and when the computer program is executed by a processor, the above-mentioned power engineering construction safety management method is implemented.

[0016] In summary, the present application includes at least one of the following beneficial technical effects: The holographic data of the construction site collected by the intelligent monitoring sensor network is obtained, wherein the holographic data of the construction site includes: construction environment data, equipment status data and worker behavior data. Then, a multi-dimensional safety monitoring analysis is performed based on the holographic data of the construction site to determine the results of the safety monitoring analysis, wherein the multi-dimensional safety monitoring analysis includes: construction environment monitoring, equipment operation monitoring and worker behavior monitoring. Finally, a safety measure analysis is performed based on the results of the safety monitoring analysis, the safety emergency control information is determined, and the safety emergency control information is sent to the target terminal, which helps to timely discover the safety hazards and potential risks in the construction of power projects. In the process of safety monitoring of power project construction, the construction environment of the power project is safely monitored from three aspects: construction environment, equipment operation and worker behavior, and the safety hazards and potential risks in the power construction environment are automatically identified. The automated safety monitoring method can more accurately and objectively identify the safety hazards and potential risks in the construction environment of the power project, and the automated emergency dispatch method can more quickly and effectively adopt emergency control plans, which helps to reduce the occurrence of safety accidents and ensure the safe and smooth progress of the construction of the power project.

[0017] In order to timely discover and prevent existing safety hazards from causing harm to workers' health, a multi-faceted and systematic worker behavior monitoring system is formed by monitoring workers' risk behaviors such as illegal operations, falls, collisions and electric shocks, which can significantly reduce the incidence of construction accidents and ensure the safety of workers' lives. Therefore, based on the worker behavior data and the power construction authority zoning map, violation analysis is performed to determine the worker violation monitoring results. Furthermore, based on the posture data in the worker behavior data, human body model screening is performed to determine the fall risk assessment model corresponding to the posture data, and a fall analysis is performed based on the fall risk assessment model and posture data to determine the worker fall monitoring results. At the same time, distance calculation and collision analysis are performed based on the worker behavior data and the distribution information of power equipment to determine the worker collision monitoring results. Finally, electric shock analysis is performed based on the worker behavior data and the distribution information of live equipment to determine the worker electric shock monitoring results. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a flowchart of a power engineering construction safety management method according to one embodiment of the present application; Figure 2 This is a schematic diagram of the structure of a power engineering construction safety management system according to one embodiment of the present application; Figure 3 It is a structural schematic diagram of an electronic device according to one embodiment of the present application. DETAILED DESCRIPTION

[0019] The following combination Figures 1 to 3 This application is described in further detail.

[0020] This specific embodiment is merely an explanation of the present application and is not a limitation of the present application. After reading this specification, a person skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by the patent law as long as they are within the scope of the present application.

[0021] In order to make the purpose, technical scheme and advantages of the embodiment of the present application clearer, the technical scheme in the embodiment of the present application will be clearly and completely described in conjunction with the drawings in the embodiment of the present application. Obviously, the described embodiment is a part of the embodiment of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application. It should be noted that in the optional embodiments of the present application, the object information and other related data involved, when the embodiments in the present application are applied to specific products or technologies, need to obtain the permission or consent of the object, and the collection, use and processing of the relevant data need to comply with the relevant laws, regulations and standards of the relevant countries and regions. In other words, if the data related to the object is involved in the embodiment of the present application, it needs to be obtained through the authorization and consent of the object, the authorization and consent of the relevant departments, and in accordance with the relevant laws, regulations and standards of the country and region. If personal information is involved in the embodiment, the acquisition of all personal information needs to obtain the consent of the individual. If sensitive information is involved, the separate consent of the information subject needs to be obtained, and the embodiment also needs to be implemented with the authorization and consent of the object.

[0022] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.

[0023] The embodiments of the present application are further described in detail below in conjunction with the drawings in the specification.

[0024] The embodiment of the present application provides a method for safety management of electric power engineering construction, which is executed by an electronic device, which can be a server or a terminal device, wherein the server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services. The terminal device can be a smart phone, a tablet computer, a laptop computer, a desktop computer, etc., but is not limited thereto. The terminal device and the server can be directly or indirectly connected via wired or wireless communication, which is not limited in the embodiment of the present application. Figure 1 As shown, the method includes step S101, step S102 and step S103, wherein: Step S101: Acquire the construction site holographic data collected by the intelligent monitoring sensor network, wherein the construction site holographic data includes: construction environment data, equipment status data and worker behavior data.

[0025] For the embodiments of the present application, the safety of the power engineering construction site is usually affected by many factors. Only single-dimensional data for power engineering construction safety monitoring cannot fully and accurately reflect the safety status of the power engineering construction site, affecting the accuracy of construction safety monitoring. In order to achieve accurate judgment of the safety of power engineering construction and reduce false alarms and then missed alarms, in the embodiments of the present application, an intelligent monitoring sensor network is used to collect holographic data of the construction site, and comprehensive collection of construction site data is achieved, so as to more accurately monitor the safety status of the power engineering construction site, timely discover current faults and potential faults at the power engineering construction site, and improve the accuracy of construction safety monitoring.

[0026] Specifically, a variety of different types of sensors are pre-deployed at the construction site of the power project, and all sensors are interconnected to form an intelligent monitoring sensor network, that is, sensors of appropriate models and precision are deployed at key locations on the construction site to ensure the accuracy and reliability of the collected data, and each sensor can be connected to the electronic equipment by wireless transmission to ensure that the data collected by the sensor can be transmitted to the power equipment in real time. Therefore, the construction site holographic data collected by the intelligent monitoring sensor network is obtained, wherein the construction site holographic data includes: construction environment data, equipment status data and worker behavior data. For construction environment data, it includes but is not limited to: temperature, humidity, air pressure, light intensity, and concentration of harmful gases; for equipment environment data, it includes but is not limited to: vibration data, temperature data, current and voltage data, speed and load data, oil quality data, etc.; for worker behavior data, it includes but is not limited to: position data, posture data, biometric data, sound data, etc.

[0027] Step S102: Perform multi-dimensional safety monitoring and analysis based on the construction site holographic data to determine the safety monitoring and analysis results, wherein the multi-dimensional safety monitoring and analysis includes: construction environment monitoring, equipment operation monitoring, and worker behavior monitoring.

[0028] For the embodiments of the present application, in the process of safety monitoring of the power engineering construction, the power engineering construction environment is safety monitored from three aspects: construction environment, equipment operation and worker behavior, and the safety hazards and potential risks in the power construction environment are automatically identified. Compared with the safety management methods that rely on manual judgment and decision-making in related technologies, the automated safety monitoring method provided by the embodiments of the present application can more accurately and objectively identify the safety hazards and potential risks in the power engineering construction environment; the automated emergency dispatch method can more quickly and effectively adopt emergency control plans, which helps to reduce the occurrence of safety accidents and ensure the safe and smooth progress of power engineering construction.

[0029] Therefore, a multi-dimensional safety monitoring and analysis is performed based on the holographic data of the construction site to determine the safety monitoring and analysis results, wherein the multi-dimensional safety monitoring and analysis includes: construction environment monitoring, equipment operation monitoring, and worker behavior monitoring; the safety monitoring and analysis results include: current safety analysis results and predicted safety analysis results, which can not only reflect the safety status of the construction site in real time, but also predict the safety risks that may occur in the future, which is helpful to formulate preventive measures in advance and optimize safety management strategies, thereby significantly reducing the probability of safety accidents. There are many specific implementation methods for multi-dimensional safety monitoring and analysis, which are no longer limited in the embodiments of the present application. In an achievable method, an environmental monitoring standard is obtained, and the construction environment monitoring is performed based on the environmental monitoring standard and the construction environment data in the holographic data of the construction site to determine the construction environment monitoring results; an equipment operation monitoring model is obtained, and the equipment status data in the holographic data of the construction site is monitored and analyzed using the equipment operation monitoring model to determine the equipment operation monitoring results; worker behavior monitoring is performed based on the worker behavior data in the holographic data of the construction site to determine the worker behavior monitoring results, wherein the worker behavior monitoring results include: worker violation monitoring results, worker fall monitoring results, worker collision monitoring results, and worker electric shock monitoring results.

[0030] Step S103: Perform safety measures analysis based on the safety monitoring analysis results, determine safety emergency regulation information, and send the safety emergency regulation information to the target terminal, which helps to timely discover safety hazards and potential risks in power engineering construction.

[0031] For the embodiment of the present application, the emergency correspondence relationship between each abnormal safety situation and the emergency regulation is pre-stored in the electronic device. Therefore, based on the emergency correspondence relationship and the safety monitoring analysis results, the safety measures analysis is performed, the safety emergency regulation information matching the current status of the power engineering construction is determined, and the safety emergency regulation information is sent to the target terminal. The target terminal is an alarm terminal matching the safety emergency regulation information. The user can select it according to the actual situation, and the embodiment of the present application is no longer limited.

[0032] For the safety emergency control information, it includes but is not limited to: shutdown and evacuation, emergency ventilation, shutdown and isolation, activation of standby equipment, fault repair, correction and prevention of illegal behavior, emergency handling of accidents, etc.; for the target terminal, the equipment that responds to the safety emergency control information, for example, when the safety emergency control information is shutdown and evacuation, the target terminal selects a combination of one or more devices such as the broadcasting system, alarm, and intercom; when the safety emergency control information is emergency ventilation, the target terminal selects automatic exhaust devices, etc.; when the safety emergency control information is shutdown and isolation, the target terminal selects abnormal power engineering equipment; when the safety emergency control information is fault repair, the target terminal selects remote monitoring and diagnosis equipment, maintenance personnel mobile terminals, etc.

[0033] It can be seen that in the embodiment of the present application, the construction site holographic data collected by the intelligent monitoring sensor network is obtained, wherein the construction site holographic data includes: construction environment data, equipment status data and worker behavior data. Then, a multi-dimensional safety monitoring analysis is performed based on the construction site holographic data to determine the safety monitoring analysis results, wherein the multi-dimensional safety monitoring analysis includes: construction environment monitoring, equipment operation monitoring, and worker behavior monitoring. Finally, a safety measure analysis is performed based on the safety monitoring analysis results, the safety emergency regulation information is determined, and the safety emergency regulation information is sent to the target terminal, which helps to timely discover the safety hazards and potential risks in the construction of power engineering. In the process of safety monitoring of power engineering construction, the power engineering construction environment is safely monitored from the three aspects of construction environment, equipment operation and worker behavior, and the safety hazards and potential risks in the power construction environment are automatically identified. The automated safety monitoring method can more accurately and objectively identify the safety hazards and potential risks in the power engineering construction environment, and the automated emergency dispatch method can more quickly and effectively adopt emergency regulation plans, which helps to reduce the occurrence of safety accidents and ensure the safe and smooth progress of power engineering construction.

[0034] Furthermore, in order to improve the safety of the construction site and improve the construction efficiency and quality, in the embodiment of the present application, a multi-dimensional safety monitoring analysis is performed based on the holographic data of the construction site to determine the safety monitoring analysis results, including: Obtain environmental monitoring standards, conduct construction environment monitoring based on the environmental monitoring standards and the construction environment data in the construction site holographic data, and determine the construction environment monitoring results; Obtain the equipment operation monitoring model, use the equipment operation monitoring model to monitor and analyze the equipment status data in the construction site holographic data, and determine the equipment operation monitoring results; Worker behavior monitoring is performed based on the worker behavior data in the construction site holographic data to determine the worker behavior monitoring results, where the worker behavior monitoring results include: worker violation monitoring results, worker fall monitoring results, worker collision monitoring results and worker electric shock monitoring results.

[0035] For the embodiments of the present application, in order to enhance the safety of the construction site and improve the construction efficiency and quality, a multi-dimensional safety monitoring and analysis is performed from three aspects: the construction environment, the equipment operating status and the worker behavior, so as to realize the monitoring of each link of the construction site, which helps to issue early warning information immediately after discovering abnormal situations, thereby reducing construction interruptions and delays caused by safety accidents.

[0036] The electronic device pre-stores the environmental monitoring standards corresponding to the power engineering construction site. The environmental monitoring standards are usually formulated based on relevant national or local laws, policies and industry standards, including but not limited to: concentration limits of atmospheric pollutants, control standards for noise pollution, temperature and humidity ranges of construction sites, etc., aiming to protect the health of construction workers and reduce the negative impact on the surrounding environment. Then, the construction environment monitoring is performed based on the environmental monitoring standards and the construction environment data in the holographic data of the construction site to determine the construction environment monitoring results, that is, the construction environment monitoring is used to match the construction environment data with the environmental monitoring standards to determine whether the construction environment of the power engineering project meets the safety standards. If the data of each dimension meets the safety standards, the construction environment monitoring result is determined to be a normal environment; otherwise, the construction environment monitoring result is determined to be an abnormal environment, and the construction environment data that exceeds the safety standards is recorded as abnormal environment data.

[0037] The electronic device pre-stores an equipment operation monitoring model, which is a mathematical model or algorithm established based on historical operation data, equipment characteristics, working principles, and failure modes of various types of equipment. The equipment operation monitoring model can reflect the operating status of power equipment, predict equipment failures, and evaluate equipment performance. There are many specific ways to construct an equipment operation monitoring model, which are no longer limited in the embodiments of the present application, as long as a model that can monitor the operating status of power equipment can be built. Furthermore, the equipment status data in the construction site holographic data is pre-processed to ensure the accuracy and reliability of the equipment status data. The pre-processing includes but is not limited to: cleaning, integration, and calibration. Then, the pre-processed equipment status data is input into the equipment operation monitoring model for monitoring and analysis to determine the equipment operation monitoring result. When the equipment operation monitoring model detects that the equipment status data is abnormal, the output equipment operation monitoring result is that the equipment operation is abnormal, and the data detected as abnormal operation data is recorded as abnormal operation data; if the equipment operation monitoring model does not detect that the equipment status data is abnormal, the output equipment operation monitoring result is that the equipment is running normally.

[0038] There are various potential dangers at the construction site of power engineering projects, such as working at heights and operating mechanical equipment. In order to timely discover and prevent existing safety hazards from causing harm to workers' health, it is necessary to monitor workers' risk behaviors such as illegal operations, falls, collisions, and electric shocks, and form a multi-faceted and systematic worker behavior monitoring system, which can significantly reduce the incidence of construction accidents and ensure the safety of workers' lives. Therefore, worker behavior monitoring is performed based on the worker behavior data in the holographic data of the construction site, and the worker behavior monitoring results are determined, wherein the worker behavior monitoring results include: worker violation monitoring results, worker fall monitoring results, worker collision monitoring results, and worker electric shock monitoring results.

[0039] It can be seen that in the embodiments of the present application, in order to improve the safety of the construction site and improve the construction efficiency and quality, a multi-dimensional safety monitoring and analysis is performed from three aspects: the construction environment, the equipment operation status, and the worker behavior, so as to realize the monitoring of each link of the monitoring construction site, which is helpful to issue early warning information immediately after the abnormal situation is found, thereby reducing the construction interruption and delay caused by safety accidents. Therefore, the construction environment monitoring is performed based on the environmental monitoring standards and the construction environment data in the construction site holographic data to determine the construction environment monitoring results, and the equipment operation monitoring model is used to monitor and analyze the equipment status data in the construction site holographic data to determine the equipment operation monitoring results. At the same time, the worker behavior monitoring is performed based on the worker behavior data in the construction site holographic data to determine the worker behavior monitoring results.

[0040] Furthermore, in order to significantly reduce the incidence of construction accidents and ensure the safety of workers, in an embodiment of the present application, worker behavior monitoring is performed based on worker behavior data in the construction site holographic data, and worker behavior monitoring results are determined, including: Obtain the power construction authority zoning map, conduct violation analysis based on worker behavior data and the power construction authority zoning map, and determine the worker violation monitoring results; For the embodiments of the present application, in order to promptly discover and prevent existing safety hazards from causing harm to the workers' health, a multi-faceted and systematic worker behavior monitoring is formed by monitoring the workers' risky behaviors such as illegal operations, falls, collisions and electric shocks, which can significantly reduce the incidence of construction accidents and ensure the safety of workers' lives.

[0041] Specifically, power construction often involves dangerous factors such as high voltage and high current. Workers must strictly abide by construction specifications and safety operating procedures. Therefore, the power construction authority zoning map is obtained, and violation analysis is performed based on the worker behavior data and the power construction authority zoning map to determine the worker violation monitoring results. This violation analysis helps to timely discover whether the worker has entered the prohibited or restricted area and whether unauthorized operations have been performed. Accurate violation monitoring can effectively prevent safety accidents caused by illegal operations. The specific implementation process of violation analysis is as follows: obtain the compliance standard corresponding to each zone in the power construction authority zoning map, where the zone types in the power construction authority zoning map include: open area, semi-open area and restricted area; perform access authority analysis based on worker behavior data, target power construction area and target compliance standard to determine the authority analysis result, where the target power construction area is the area corresponding to the worker in the power construction authority zoning map; the target compliance standard is the compliance standard corresponding to the target power construction area; when the authority analysis result is allowed to enter, perform operation normative monitoring based on the worker behavior data, target power construction area and target compliance standard to determine the worker violation monitoring result.

[0042] Based on the posture data in the worker behavior data, a human body model is screened to determine the fall risk assessment model corresponding to the posture data, and a fall analysis is performed based on the fall risk assessment model and the posture data to determine the worker fall monitoring result; For the embodiment of the present application, during the power construction process, workers often need to work at heights, such as installing wires, repairing equipment, etc. Falling is one of the common safety accidents in power construction. Therefore, based on the posture data in the worker behavior data, the human body model is screened, the fall risk assessment model corresponding to the posture data is determined, and the fall analysis is performed based on the fall risk assessment model and the posture data to determine the worker fall monitoring results. Performing the fall analysis operation helps to assess the worker's fall risk in real time and issue an early warning when necessary, thereby effectively reducing the occurrence of fall accidents. Specifically, since there are many postures of workers working at heights during the construction of power projects, the fall risk calculation risks involved in different postures are different. Therefore, a fall risk assessment model is pre-set for each posture data in the electronic device. The fall risk assessment model is obtained by training the neural network model based on a large amount of sample data including fall and no fall situations, so that the fall risk assessment model can be used to calculate whether the worker has a fall risk under the current posture data. Furthermore, the worker posture data collected in real time is input into the fall risk assessment model for fall analysis. The fall risk assessment model will evaluate the worker's fall risk based on the input worker posture data and the learned features. If the fall risk is higher than the fall risk threshold, the worker fall monitoring result is output as there is a fall risk; otherwise, the worker fall monitoring result is output as no fall risk.

[0043] Obtain power equipment distribution information, perform distance calculation and collision analysis based on worker behavior data and power equipment distribution information, and determine worker collision monitoring results; For the embodiment of the present application, at the construction site of a power project, power equipment is densely distributed, and there are often dangerous factors such as high voltage and high temperature. If a worker collides with the power equipment during the construction process, it may not only cause damage to the equipment, but also cause serious consequences such as electric shock and explosion. Therefore, by obtaining the distribution information of power equipment and combining the worker behavior data for distance calculation and collision analysis, potential collision risks can be discovered in time and corresponding preventive measures can be taken.

[0044] Specifically, in the process of performing distance calculation, the real-time distance between the worker and the power equipment is calculated based on the power equipment distribution information and the worker behavior data, that is, the commonly used distance calculation methods such as Euclidean distance and Manhattan distance can be used. In the process of distance calculation, the shape and size of the power equipment, as well as the worker's moving speed and direction should be taken into account. If the distance between the worker and the power equipment is less than the collision detection threshold, a collision analysis operation is performed, that is, the worker and the power equipment are modeled, the worker is regarded as a moving particle or rigid body, and the power equipment is regarded as a static rigid body or complex shape, and the collision detection algorithm is used to determine in real time whether the worker collides with the power equipment or there is a risk of collision. If there is a risk of collision between the worker and the power equipment, the worker collision monitoring result is determined to be a risk of collision; otherwise, the worker collision monitoring result is determined to be no risk of collision.

[0045] Obtain the distribution information of energized equipment, conduct electric shock analysis based on worker behavior data and the distribution information of energized equipment, and determine the worker electric shock monitoring results.

[0046] For the embodiment of the present application, electric shock is one of the most serious safety accidents in power construction. In order to effectively avoid the occurrence of electric shock accidents, electric shock analysis is performed based on worker behavior data and live equipment distribution information to determine the worker electric shock monitoring results, which helps to evaluate the worker's electric shock risk in real time and issue an early warning when necessary, thereby effectively reducing the occurrence of worker handling accidents. The specific electric shock analysis process is as follows: obtain live equipment distribution information, which records the accurate location, voltage level, safety distance standard and other information of each live equipment, and then perform real-time distance calculation based on the worker behavior data and the live equipment location in the live equipment distribution information to determine the distance between the worker and the live equipment. Furthermore, obtain the safety distance standard under the voltage level of the live equipment, compare the distance between the distance and the safety standard distance standard, and if the actual distance between the distance is less than the safety distance standard, determine that the worker's electric shock monitoring result is that there is a risk of electric shock; otherwise, determine that the worker's electric shock monitoring result is that there is no risk of electric shock.

[0047] It can be seen that in the embodiment of the present application, in order to timely discover and prevent the existing safety hazards from causing harm to the health of workers, by monitoring the risk behaviors such as illegal operations, falls, collisions and electric shocks of workers, a multi-faceted and systematic worker behavior monitoring is formed, which can significantly reduce the incidence of construction accidents and ensure the life safety of workers. Therefore, based on the worker behavior data and the power construction authority zoning map, a violation analysis is performed to determine the worker violation monitoring results. Furthermore, based on the posture data in the worker behavior data, a human body model is screened to determine the fall risk assessment model corresponding to the posture data, and a fall analysis is performed based on the fall risk assessment model and the posture data to determine the worker fall monitoring results. At the same time, distance calculation and collision analysis are performed based on the worker behavior data and the distribution information of the power equipment to determine the worker collision monitoring results. Finally, an electric shock analysis is performed based on the worker behavior data and the distribution information of the energized equipment to determine the worker electric shock monitoring results.

[0048] Furthermore, in order to ensure the standardization and safety of the power engineering construction process and to help timely discover and correct irregular operations during the construction process, in an embodiment of the present application, violation analysis is performed based on worker behavior data and a power construction authority zoning map to determine worker violation monitoring results; including: Obtaining compliance standards corresponding to each zone in the power construction authority zone map, wherein the zone types in the power construction authority zone map include: open area, semi-open area and restricted area; Based on the worker behavior data, the target power construction area and the target compliance standard, the access permission analysis is performed to determine the permission analysis result, wherein the target power construction area is the area corresponding to the worker in the power construction permission zoning map; the target compliance standard is the compliance standard corresponding to the target power construction area; When the result of the authority analysis is that entry is allowed, operational compliance monitoring is performed based on the worker behavior data, target power construction area, and target compliance standards to determine the worker violation monitoring results.

[0049] For the embodiments of the present application, the construction of power engineering projects is highly professional and dangerous, and each link in the construction process needs to be strictly controlled. By dividing the power engineering construction site into different construction areas and formulating corresponding authority and monitoring standards, the standardization and safety of the power engineering construction process can be ensured, which helps to promptly discover and correct irregular operations during the construction process, and ensure the stability and reliability of construction quality.

[0050] Specifically, the electronic device pre-stores a map of power construction authority zoning, which is formulated by construction monitoring personnel based on multiple factors such as the safety of the power system, the risk of construction activities, and environmental protection. The types of zoning in the map include: open areas, semi-open areas, and restricted areas. Among them, open areas usually refer to those areas with fewer power facilities, lower construction activity risks, and less impact on the operation of the power system; semi-open areas refer to those areas with relatively more power facilities, higher construction activity risks, but controllable impact on the operation of the power system; restricted areas usually refer to those areas with dense power facilities, extremely high construction activity risks, and serious impact on the operation of the power system. At the same time, the electronic device also pre-stores compliance standards corresponding to different zoning types, which stipulate the authority of personnel entering the area and the compliance standards of operations.

[0051] Then, based on the worker behavior data, the target power construction area and the target compliance standard, the access permission analysis is performed to determine the permission analysis result, that is, based on the location data in the worker behavior data, it is determined that the worker is in the target power construction area in the power construction permission zoning map, and based on the target compliance standard corresponding to the target power construction area, the permission analysis is performed with the biometric data in the worker behavior data to determine the permission analysis result. If the permission analysis result is to deny entry, an alarm operation is performed to remind the worker to leave the work area without permission to ensure the safety of the worker. If the permission analysis result is to allow entry, the operation normative monitoring is performed based on the worker behavior data, the target power construction area and the target compliance standard to determine the worker violation monitoring result. For the operation normative monitoring, the posture data in the worker behavior data is matched with the target compliance standard. If the worker has a violation, the worker violation monitoring result is determined to be a violation operation; otherwise, the worker violation monitoring result is determined to be no violation operation.

[0052] It can be seen that in the embodiment of the present application, the construction of power engineering is highly professional and dangerous, and each link in the construction process needs to be strictly controlled. By dividing the power engineering construction site into different construction areas and formulating corresponding authority and monitoring standards, the standardization and safety of the power engineering construction process can be ensured, which helps to timely discover and correct irregular operations in the construction process, and ensure the stability and reliability of construction quality. Therefore, the compliance standards corresponding to each partition in the power construction authority partition map are obtained, and the access authority analysis is performed based on the worker behavior data, the target power construction area and the target compliance standards to determine the authority analysis results. Furthermore, when the authority analysis result is to allow entry, the operation standardization monitoring is performed based on the worker behavior data, the target power construction area and the target compliance standards to determine the worker violation monitoring results.

[0053] Furthermore, in order to achieve real-time monitoring and data analysis of the construction process and ensure that the project quality meets the project requirements, in the embodiment of the present application, it also includes: A design model is constructed based on the design information and engineering requirements of the electric power engineering construction to obtain the electric power engineering design model, and the electric power engineering design model is sent to the construction party terminal and the supervision party terminal; When it is detected that the construction party has uploaded a first parameter instruction according to the power engineering design model, the instruction is parsed based on the first parameter upload instruction to determine the construction forming parameters; When detecting that the supervisor has uploaded a second parameter upload instruction according to the power engineering design model, the supervisor parses the instruction based on the second parameter upload instruction to determine the construction approval parameter; Intelligent supervision is carried out based on construction forming parameters and construction approval parameters to determine the construction supervision results.

[0054] For the embodiment of the present application, the construction process of the power engineering project is complex and involves multiple links. In order to ensure that the quality, timeliness and other indicators of the power engineering construction meet the preset design information and engineering requirements, intelligent supervision operations are introduced to realize real-time monitoring and data analysis of the construction process to ensure that the project quality meets the engineering requirements.

[0055] Specifically, the design information and engineering requirements of the power engineering construction uploaded by the construction party are obtained. The design information includes design drawings, engineering parameters, etc. The design drawings can be two-dimensional drawings or three-dimensional drawings. The engineering parameters include the design dimensions of each section of the project and the personnel and material configuration, etc. Among them, the engineering parameters are expressed in intervals, allowing the construction party to have reasonable errors during construction, so the engineering parameters include the engineering parameter range. The engineering requirements clarify the specific requirements for the construction of power engineering, including but not limited to: construction scope, construction period, quality standards, safety specifications, etc. Then, based on the design information and engineering requirements of the power engineering construction, the design model is built to obtain the power engineering design model. The power engineering design model should include key elements such as power lines, substations, distribution equipment, and grounding systems, and accurately reflect the spatial relationship and connection relationship between the elements, and the power engineering design model conforms to the design information and engineering requirements of the power engineering construction. Then, the power engineering design model is sent to the construction party terminal and the supervision party terminal so that the construction party and the supervision party can view the power engineering construction standards. Moreover, after the construction of a certain section is completed, the construction party uploads the current measured parameters, and the supervision party also uploads the corresponding approval parameters to evaluate whether the construction party's project quality and progress meet the project requirements.

[0056] When the construction party completes the construction operation of a certain section, it will directly measure the various construction parameters of the engineering section and upload them to the corresponding section in the power engineering design model. Therefore, when it is detected that the construction party uploads the first parameter upload instruction according to the power engineering design model, the instruction is parsed based on the first parameter upload instruction to determine the construction parameters. After the construction party completes the construction operation of a certain section and uploads the construction parameters, the supervision party will approve the construction operation of the section. Therefore, the supervision party will go to the power engineering construction site to approve the construction parameters and upload the approved construction approval parameters to the corresponding section in the power engineering design model. Furthermore, when it is detected that the supervision party uploads the second parameter upload instruction according to the power engineering design model, the instruction is parsed based on the second parameter upload instruction to determine the construction approval parameters. Ultimately, intelligent supervision judgment is made based on the construction parameters, construction approval parameters and project requirements. If the difference between the construction parameters and the construction approval parameters is within an acceptable range, the construction is judged to meet the design requirements and the construction supervision result is qualified; if there is a significant difference between the construction parameters and the construction approval parameters or they do not meet the design requirements, it is judged that there are problems with the construction and the construction supervision result is unqualified.

[0057] It can be seen that in the embodiment of the present application, in order to ensure that the quality, timeliness and other indicators of the power engineering construction meet the preset design information and engineering requirements, intelligent supervision operations are introduced to realize real-time monitoring and data analysis of the construction process, so as to ensure that the quality of the project meets the engineering requirements. Therefore, a design model is built based on the design information and engineering requirements of the power engineering construction to obtain the power engineering design model. When it is detected that the construction party uploads the first parameter upload instruction according to the power engineering design model, the instruction is parsed based on the first parameter upload instruction to determine the construction forming parameters; when it is detected that the supervision party uploads the second parameter upload instruction according to the power engineering design model, the instruction is parsed based on the second parameter upload instruction to determine the construction approval parameters. Finally, intelligent supervision is carried out based on the construction forming parameters and the construction approval parameters to determine the construction supervision results.

[0058] Furthermore, in order to enable workers to intuitively understand the safety risks and countermeasures during the construction process and improve their safety awareness and skill level, in the embodiment of the present application, it also includes: A three-dimensional model of the construction site is obtained, and a virtual scene is created for the three-dimensional model of the construction site using holographic projection technology to obtain a virtual reality scene. The virtual reality scene is used to provide safety education and regular drills to workers before construction to enhance their risk awareness.

[0059] For the embodiments of the present application, traditional safety education methods are often based on theoretical explanations and picture displays, which make it difficult for workers to intuitively feel the complexity and potential risks of the construction site. In order to enable workers to intuitively understand the safety risks and countermeasures in the construction process, virtual reality technology is used to present the three-dimensional model of the construction site in the form of a holographic projection, so that workers seem to be in a real construction environment, so that workers can have a deeper understanding of the safety risks and countermeasures in the construction process, thereby improving workers' safety awareness and skill level.

[0060] Specifically, a three-dimensional model of the construction site is obtained. The three-dimensional model of the construction site is based on a three-dimensional coordinate system and accurately displays the shape, size, and proportion of the construction site in three directions (length, width, and height) according to a certain proportional relationship. The three-dimensional model of the construction site can accurately represent the geometric shape, spatial relationship, and attribute information of the construction site, and provide strong support for the safety management of power engineering construction. Then, the three-dimensional model of the construction site is projected using holographic projection technology to form a virtual reality scene. In the virtual reality scene, various construction scenes and potential risks are simulated. Workers enter the virtual scene through interactive devices to experience operations and learn how to deal with various safety risks. Regular drills are conducted using virtual reality scenes to simulate various emergency response measures and escape routes, so that workers can be familiar with various emergency response measures and escape routes and improve their ability to deal with emergencies.

[0061] It can be seen that in the embodiment of the present application, in order to enable workers to intuitively understand the safety risks and countermeasures in the construction process, virtual reality technology is used to present the three-dimensional model of the construction site in the form of a holographic projection, so that the workers seem to be in a real construction environment, which facilitates the workers to have a deeper understanding of the safety risks and countermeasures in the construction process, thereby improving the workers' safety awareness and skill level.

[0062] The above-mentioned embodiment introduces a power engineering construction safety management method from the perspective of method flow, and the following embodiment introduces a power engineering construction safety management system from the perspective of virtual modules or virtual units. Please refer to the following embodiments for details.

[0063] The present application embodiment provides a power engineering construction safety management system, such as Figure 2 As shown, the power engineering construction safety management system may specifically include: The holographic data acquisition module 210 is used to acquire the construction site holographic data collected by the intelligent monitoring sensor network, wherein the construction site holographic data includes: construction environment data, equipment status data and worker behavior data; The safety monitoring and analysis module 220 is used to perform multi-dimensional safety monitoring and analysis based on the holographic data of the construction site to determine the safety monitoring and analysis results, wherein the multi-dimensional safety monitoring and analysis includes: construction environment monitoring, equipment operation monitoring, and worker behavior monitoring; The safety measures analysis module 230 is used to perform safety measures analysis based on the safety monitoring analysis results, determine safety emergency regulation information, and send the safety emergency regulation information to the target terminal, which helps to timely discover safety hazards and potential risks in power engineering construction.

[0064] In a possible implementation of the embodiment of the present application, the safety monitoring and analysis module 220, when performing multi-dimensional safety monitoring and analysis based on the construction site holographic data and determining the safety monitoring and analysis results, is used to: Obtain environmental monitoring standards, conduct construction environment monitoring based on the environmental monitoring standards and the construction environment data in the construction site holographic data, and determine the construction environment monitoring results; Obtain the equipment operation monitoring model, use the equipment operation monitoring model to monitor and analyze the equipment status data in the construction site holographic data, and determine the equipment operation monitoring results; Worker behavior monitoring is performed based on the worker behavior data in the construction site holographic data to determine the worker behavior monitoring results, where the worker behavior monitoring results include: worker violation monitoring results, worker fall monitoring results, worker collision monitoring results and worker electric shock monitoring results.

[0065] In a possible implementation of the embodiment of the present application, the safety monitoring and analysis module 220, when performing worker behavior monitoring based on worker behavior data in the construction site holographic data and determining worker behavior monitoring results, is used to: Obtain the power construction authority zoning map, conduct violation analysis based on worker behavior data and the power construction authority zoning map, and determine the worker violation monitoring results; Based on the posture data in the worker behavior data, a human body model is screened to determine the fall risk assessment model corresponding to the posture data, and a fall analysis is performed based on the fall risk assessment model and the posture data to determine the worker fall monitoring result; Obtain power equipment distribution information, perform distance calculation and collision analysis based on worker behavior data and power equipment distribution information, and determine worker collision monitoring results; Obtain the distribution information of energized equipment, conduct electric shock analysis based on worker behavior data and the distribution information of energized equipment, and determine the worker electric shock monitoring results.

[0066] In a possible implementation of the embodiment of the present application, the safety monitoring and analysis module 220, when performing violation analysis based on worker behavior data and the power construction authority zoning map to determine the worker violation monitoring results, is used to: Obtaining compliance standards corresponding to each zone in the power construction authority zone map, wherein the zone types in the power construction authority zone map include: open area, semi-open area and restricted area; Based on the worker behavior data, the target power construction area and the target compliance standard, the access permission analysis is performed to determine the permission analysis result, wherein the target power construction area is the area corresponding to the worker in the power construction permission zoning map; the target compliance standard is the compliance standard corresponding to the target power construction area; When the result of the authority analysis is that entry is allowed, operational compliance monitoring is performed based on the worker behavior data, target power construction area, and target compliance standards to determine the worker violation monitoring results.

[0067] A possible implementation of the embodiment of the present application also includes: An intelligent supervision module is used to build a design model based on the design information and engineering requirements of the power engineering construction, obtain the power engineering design model, and send the power engineering design model to the construction party terminal and the supervision party terminal; When it is detected that the construction party has uploaded a first parameter instruction according to the power engineering design model, the instruction is parsed based on the first parameter upload instruction to determine the construction forming parameters; When detecting that the supervisor has uploaded a second parameter upload instruction according to the power engineering design model, the supervisor parses the instruction based on the second parameter upload instruction to determine the construction approval parameter; Intelligent supervision is carried out based on construction forming parameters and construction approval parameters to determine the construction supervision results.

[0068] A possible implementation of the embodiment of the present application also includes: The virtual reality module is used to obtain a three-dimensional model of the construction site and use holographic projection technology to create a virtual scene for the three-dimensional model of the construction site to obtain a virtual reality scene. The virtual reality scene is used to provide safety education and regular drills for workers before construction to enhance workers' risk awareness.

[0069] Technical personnel in the relevant field can clearly understand that, for the convenience and brevity of description, the specific working process of a power engineering construction safety management system described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0070] An electronic device is provided in an embodiment of the present application, such as Figure 3 As shown, Figure 3The electronic device 300 shown includes: a processor 301 and a memory 303. The processor 301 and the memory 303 are connected, such as through a bus 302. Optionally, the electronic device 300 may also include a transceiver 304. It should be noted that in actual applications, the transceiver 304 is not limited to one, and the structure of the electronic device 300 does not constitute a limitation on the embodiments of the present application.

[0071] The processor 301 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the disclosure of this application. The processor 301 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.

[0072] The bus 302 may include a path to transmit information between the above components. The bus 302 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus 302 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 Only one thick line is used in the diagram, but it does not mean that there is only one bus or only one type of bus.

[0073] The memory 303 may be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory) or other optical disk storage, optical disk storage (including compressed optical disk, laser disk, optical disk, digital versatile disk, Blu-ray disk, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto.

[0074] The memory 303 is used to store the application code for executing the solution of the present application, and the execution is controlled by the processor 301. The processor 301 is used to execute the application code stored in the memory 303 to implement the contents shown in the above method embodiment.

[0075] The electronic devices include, but are not limited to, mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), and fixed terminals such as digital TVs, desktop computers, etc. It can also be a server, etc. Figure 3 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0076] An embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored. When the computer-readable storage medium is run on a computer, the computer can execute the corresponding content in the aforementioned method embodiment.

[0077] An embodiment of the present application provides a computer program product, which includes a computer program. When the computer program is executed by a processor, the method in any of the above embodiments is implemented.

[0078] It should be understood that, although the steps in the flowchart of the accompanying drawings are displayed in sequence as indicated by the arrows, these steps are not necessarily executed in sequence in the order indicated by the arrows. Unless otherwise specified herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least a part of the steps in the flowchart of the accompanying drawings may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily sequential, but can be executed in turn or alternately with other steps or at least a part of the sub-steps or stages of other steps.

[0079] The above are only some implementation methods of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A method for safety management of electric power engineering construction, characterized in that: include: Acquire the construction site holographic data collected by the intelligent monitoring sensor network, wherein the construction site holographic data includes: construction environment data, equipment status data and worker behavior data; Based on the construction site holographic data, a multi-dimensional safety monitoring and analysis is performed to determine the safety monitoring and analysis results, wherein the multi-dimensional safety monitoring and analysis includes: construction environment monitoring, equipment operation monitoring, and worker behavior monitoring; Based on the safety monitoring analysis results, safety measures analysis is performed to determine safety emergency regulation information, and the safety emergency regulation information is sent to the target terminal, which helps to timely discover safety hazards and potential risks in power engineering construction.

2. The power engineering construction safety management method according to claim 1, characterized in that: The multi-dimensional safety monitoring and analysis based on the construction site holographic data is performed to determine the safety monitoring and analysis results, including: Acquire environmental monitoring standards, perform construction environment monitoring based on the environmental monitoring standards and the construction environment data in the construction site holographic data, and determine construction environment monitoring results; Acquire an equipment operation monitoring model, and use the equipment operation monitoring model to monitor and analyze the equipment status data in the construction site holographic data to determine an equipment operation monitoring result; Worker behavior monitoring is performed based on the worker behavior data in the construction site holographic data to determine worker behavior monitoring results, wherein the worker behavior monitoring results include: worker violation monitoring results, worker fall monitoring results, worker collision monitoring results and worker electric shock monitoring results.

3. The power engineering construction safety management method according to claim 2, characterized in that: The performing worker behavior monitoring based on the worker behavior data in the construction site holographic data and determining the worker behavior monitoring result includes: Obtaining a power construction authority zoning map, performing violation analysis based on the worker behavior data and the power construction authority zoning map, and determining worker violation monitoring results; Performing human body model screening based on the posture data in the worker behavior data, determining a fall risk assessment model corresponding to the posture data, and performing fall analysis based on the fall risk assessment model and the posture data to determine a worker fall monitoring result; Acquire power equipment distribution information, perform distance calculation and collision analysis based on the worker behavior data and the power equipment distribution information, and determine worker collision monitoring results; The distribution information of live equipment is obtained, and electric shock analysis is performed based on the worker behavior data and the distribution information of live equipment to determine the worker electric shock monitoring results.

4. The power engineering construction safety management method according to claim 3 is characterized in that: The violation analysis based on the worker behavior data and the power construction authority zoning map is performed to determine the worker violation monitoring results, including: Obtaining compliance standards corresponding to each zone in the power construction authority zone map, wherein the zone types in the power construction authority zone map include: open area, semi-open area and restricted area; Performing access authority analysis based on the worker behavior data, the target power construction area and the target compliance standard to determine the authority analysis result, wherein the target power construction area is the area corresponding to the worker in the power construction authority zoning map; the target compliance standard is the compliance standard corresponding to the target power construction area; When the authority analysis result is that entry is allowed, operational compliance monitoring is performed based on the worker behavior data, the target power construction area and the target compliance standard to determine the worker violation monitoring result.

5. The power engineering construction safety management method according to claim 1, characterized in that: Also includes: Building a design model based on the design information and engineering requirements of the electric power engineering construction to obtain the electric power engineering design model, and sending the electric power engineering design model to the construction party terminal and the supervision party terminal; When it is detected that the construction party has uploaded a first parameter instruction according to the power engineering design model, the construction party performs instruction parsing based on the first parameter upload instruction to determine the construction forming parameters; When detecting that the supervisor has uploaded a second parameter instruction according to the power engineering design model, performing instruction parsing based on the second parameter upload instruction to determine the construction approval parameter; Intelligent supervision is performed based on the construction forming parameters and the construction approval parameters to determine the construction supervision results.

6. The power engineering construction safety management method according to claim 1, characterized in that: Also includes: A three-dimensional model of the construction site is obtained, and a virtual scene is created for the three-dimensional model of the construction site using holographic projection technology to obtain a virtual reality scene, wherein the virtual reality scene is used for safety education and regular drills for workers before construction to enhance the workers' risk awareness.

7. An electronic device, characterized in that: include: at least one processor; Memory; At least one application, wherein the at least one application is stored in a memory and configured to be executed by at least one processor, and the at least one application is configured to: execute the power engineering construction safety management method as described in any one of claims 1 to 6.

8. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed in a computer, the computer is caused to execute the power engineering construction safety management method as described in any one of claims 1 to 6.

9. A computer program product, characterized in that The invention comprises a computer program, wherein the computer program is executed by a processor to implement the power engineering construction safety management method as claimed in any one of claims 1 to 6.

Citation Information

Patent Citations

  • Power construction safety management system based on Internet of Things

    CN110620906A

  • Training method and device based on virtual reality

    CN110827605A

  • Behavior analysis method for construction personnel of power substation engineering construction project

    CN112785798A

  • Omnibearing monitoring system for power construction site

    CN115733951A

  • Power construction potential safety risk detection method and system based on Leiyu fusion

    CN116862712A

Cited By

  • Remote safety coordination platform for power construction site

    CN122472499A