Floor slab pipe ditch structure and construction method thereof
By setting the first and second steel bar truss bearing plates below the floor bearing plates to define the pipe trench, the problems of low construction efficiency and major safety hazards in the prior art are solved, and a more efficient and safe construction method is achieved.
Patent Information
- Application Number
- CN202510266588.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-07
- Publication Date
- 2025-05-02
AI Technical Summary
In the prior art, the pipe trench construction under the floor bearing slab adopts a lifting solution, which is inefficient and has safety hazards, especially in steel structure projects with large spaces.
A floor slab pipe trench structure is proposed, and the first steel bar truss bearing plate is used instead of the bottom plate of the pipe trench. By setting up a second steel bar truss bearing plate opposite to the first steel bar truss bearing plate, the pipe trench is defined, thereby avoiding the use of a hanging mold construction plan.
This method improves construction efficiency and reduces safety risks, especially in steel structure projects with large spaces.
Smart Images

Figure CN119914048A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of housing construction, and in particular to a floor slab pipe trench structure and a construction method thereof. Background Art
[0002] At present, it is necessary to set up a pipe trench under the floor deck in the project. The pipe trench usually adopts a hanging formwork construction scheme, which has low construction efficiency and safety hazards. This problem is particularly prominent in steel structures in large spaces. Summary of the invention
[0003] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a floor slab trench structure, wherein the floor slab trench structure can use a first steel bar truss floor deck to replace the bottom plate of the trench, thereby eliminating the need for a hanging formwork construction scheme, thereby improving construction efficiency and reducing safety hazards.
[0004] According to the floor slab trench structure of the embodiment of the present application, it includes: a plurality of structural beams, the plurality of the structural beams are arranged at intervals; a first steel truss floor deck and a second steel truss floor deck, the first steel truss floor deck and the second steel truss floor deck are both connected to the structural beams, and the first steel truss floor deck and the second steel truss floor deck are spaced apart and arranged relatively to each other; wherein a trench is defined between two adjacent structural beams, the first steel truss floor deck and the second steel truss floor deck.
[0005] According to the floor trench structure of the embodiment of the present application, a second steel truss floor deck is arranged opposite to the first steel truss floor deck, so that a trench is defined between two adjacent structural beams, the first steel truss floor deck and the second steel truss floor deck. In this way, the first steel truss floor deck can be used to replace the bottom plate of the trench, thereby eliminating the need to adopt a hanging formwork construction scheme, which is beneficial to improving construction efficiency and reducing safety hazards.
[0006] According to the floor trench structure of some embodiments of the present application, the structural beam includes an I-beam, and the first steel truss floor deck is connected to the side of the lower wing plates of two adjacent I-beams facing the upper wing plates.
[0007] According to some embodiments of the floor slab trench structure of the present application, the floor slab trench structure further includes: a cast part, which is located in the trench and connected to the web of the I-beam, and a side of the cast part away from the web is formed as a side wall of the trench.
[0008] According to the floor slab trench structure of some embodiments of the present application, the difference between the minimum distance from the cast part to the web and the maximum distance from the upper wing plate to the web is greater than or equal to 50 mm.
[0009] According to the floor trench structure of some embodiments of the present application, the floor trench structure also includes: an electromechanical bracket and a first mounting member, the first mounting member is located in the trench, and the first mounting member is arranged on the first steel truss floor deck and / or the second steel truss floor deck, and the electromechanical bracket is connected to the first mounting member.
[0010] According to some embodiments of the floor pipe trench structure of the present application, the floor pipe trench structure also includes a cover plate, the second steel truss floor deck is provided with an opening, the opening is connected to the pipe trench, and the cover plate is connected to the second steel truss floor deck and is used to seal the opening.
[0011] According to some embodiments of the present application, the floor pipe trench structure further includes: a second mounting member, wherein the second mounting member is arranged on the second steel bar truss floor deck, and the cover plate is connected to the second mounting member.
[0012] According to the floor pipe trench structure of some embodiments of the present application, the second steel bar truss floor decking plate is provided with an eaves at one end facing the opening, and the second mounting member is provided on the eaves.
[0013] According to the floor trench structure of some embodiments of the present application, the second steel truss floor deck is connected to a side of the upper wing plate of the I-beam facing away from the lower wing plate.
[0014] The application also proposes a construction method for a floor slab trench structure.
[0015] According to the construction method of the floor slab trench structure of the embodiment of the present application, which is used for the floor slab trench structure described in any one of the above embodiments, the construction method includes: installing a plurality of the structural beams; connecting the first steel truss floor deck with the plurality of the structural beams; connecting the second steel truss floor deck with the structural beams, so that two adjacent structural beams, the first steel truss floor deck and the second steel truss floor deck define the trench.
[0016] The construction method of the floor slab trench structure has the same advantages as the above-mentioned floor slab trench structure over the prior art, and will not be described in detail here.
[0017] Additional aspects and advantages of the present application will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0019] Figure 1 A schematic diagram of a floor slab trench structure according to some embodiments of the present application;
[0020] Figure 2 Schematic diagram of the construction method of the floor trench structure of some embodiments of the present application.
[0021] Reference numerals:
[0022] Floor trench structure 10;
[0023] First steel truss floor slab 1; first steel truss concrete floor slab 11;
[0024] Second steel truss floor deck 2; opening 201;
[0025] Second steel truss concrete floor 21; eaves 22; building surface layer 23;
[0026] I-beam 3; lower wing plate 31; upper wing plate 32; web plate 33; pipe trench 4; casting 5;
[0027] Electromechanical bracket 6 ; first mounting member 61 ; cover plate 7 ; second mounting member 71 ; bolt 8 . DETAILED DESCRIPTION
[0028] In order to better understand the technical solutions provided by the embodiments of this specification, the technical solutions of the embodiments of this specification are described in detail below through the accompanying drawings and specific embodiments. It should be understood that the embodiments of this specification and the specific features in the embodiments are detailed descriptions of the technical solutions of the embodiments of this specification, rather than limitations on the technical solutions of this specification. In the absence of conflict, the embodiments of this specification and the technical features in the embodiments can be combined with each other.
[0029] In this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that the process, method, article or equipment including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or equipment. In the absence of more restrictions, the elements limited by the statement "comprise one..." do not exclude the existence of other identical elements in the process, method, article or equipment including the elements. The term "more than two" includes two or more than two situations.
[0030] The following is based on the attached Figure 1-2 The floor slab trench structure 10 and the construction method thereof according to the embodiment of the present application are described.
[0031] like Figure 1As shown, the floor slab trench structure 10 according to the embodiment of the present application includes: a plurality of structural beams, a first steel truss floor deck 1 and a second steel truss floor deck 2.
[0032] A plurality of structural beams are arranged at intervals, the first steel truss floor deck 1 and the second steel truss floor deck 2 are both connected to the structural beams, and the first steel truss floor deck 1 and the second steel truss floor deck 2 are spaced apart and arranged opposite to each other; wherein a pipe trench 4 is defined between two adjacent structural beams, the first steel truss floor deck 1 and the second steel truss floor deck 2. The pipe trench 4 includes a groove for laying pipes.
[0033] Therefore, the pipe trench 4 can be defined by using two adjacent structural beams, the first steel truss floor deck 1 and the second steel truss floor deck 2. In this way, the first steel truss floor deck 1 replaces the bottom plate of the pipe trench 4, thereby eliminating the need to adopt a hanging formwork construction plan, which is beneficial to improving construction efficiency and reducing safety hazards.
[0034] For example, the first steel truss floor deck 1 and the second steel truss floor deck 2 can be arranged relative to each other in the height direction, and concrete can be poured on the first steel truss floor deck 1 so that a steel truss floor deck and its floor distribution bars and additional connecting steel bars and concrete form a first steel truss concrete floor 11, and concrete can also be poured on the second steel truss floor deck 2 so that the second steel truss floor deck 2 and its floor distribution bars and additional connecting steel bars and concrete form a second steel truss concrete floor 21, and the second steel truss concrete floor 21 is provided with a building surface layer 23 on the side away from the first steel truss floor deck 1.
[0035] For example Figure 1 As shown, the second steel truss floor deck 2 is located above the first steel truss floor deck 1, and a plurality of structural beams are connected between the first steel truss floor deck 1 and the second steel truss floor deck 2 to support the second steel truss floor deck 2. The structural beams may be connected to the first steel truss floor deck 1 and / or the second steel truss floor deck 2 via bolts 8.
[0036] Among them, a plurality of structural beams can be arranged at intervals along the length direction and / or width direction of the second steel bar truss floor deck 2, so that a pipe trench 4 is defined between two adjacent structural beams, the first steel bar truss floor deck 1 and the second steel bar truss floor deck 2. In this way, the design of the pipe trench 4 does not need to adopt a construction scheme of a hanging formwork, which is conducive to improving construction efficiency and reducing safety hazards.
[0037] According to the floor slab trench structure 10 of the embodiment of the present application, the first steel truss floor deck 1 and the second steel truss floor deck 2 are arranged opposite to each other; the structural beam is connected between the first steel truss floor deck 1 and the second steel truss floor deck 2, and a plurality of structural beams are arranged at intervals; wherein, a trench 4 is defined between two adjacent structural beams, the first steel truss floor deck 1 and the second steel truss floor deck 2, so that the first steel truss floor deck 1 can be used to replace the bottom plate of the trench 4, thereby eliminating the need to adopt a hanging formwork construction scheme, which is beneficial to improving construction efficiency and reducing safety hazards.
[0038] In some embodiments, Figure 1 As shown, the structural beam includes an I-beam 3 , and the first steel bar truss floor deck 1 is connected to the lower wing plates 31 of two adjacent I-beams 3 on one side facing the upper wing plates 32 .
[0039] Therefore, the lower wing plate 31 of the I-beam 3 can support the first steel truss floor deck 1 to enhance the structural stability of the first steel truss floor deck 1 and reduce the difficulty of connecting the first steel truss floor deck 1 with the I-beam 3.
[0040] In some embodiments, Figure 1 As shown, the floor trench structure 10 further includes a casting 5 , which is located in the trench 4 and connected to the web 33 of the I-beam 3 , and the side of the casting 5 facing away from the web 33 forms a side wall of the trench 4 .
[0041] It is understandable that the casting 5 can be formed by casting concrete on site, and thus, the casting 5 can be used to form the side wall of the trench 4, so that the side wall of the trench 4 is relatively flat, which is conducive to reducing the difficulty of routing the pipeline and can play a certain sealing role on the trench 4.
[0042] In some embodiments, the difference between the minimum distance from the casting 5 to the web 33 and the maximum distance from the upper wing 32 to the web 33 is greater than or equal to 50 mm. Figure 1 As shown, the difference between the minimum distance between the casting 5 and the web 33 and the maximum distance between the upper wing plate 32 and the web 33 is L, and L≥50mm. For example, L=50mm, or L=52mm, or L=55mm, or L=56mm, or L=60mm, that is, the value of L meets the above value range, so that the wall thickness of the side wall of the pipe trench 4 can be guaranteed to be within a reasonable range, avoiding damage caused by too small wall thickness of the side wall of the pipe trench 4.
[0043] In some embodiments, Figure 1As shown, the floor slab trench structure 10 further includes: an electromechanical bracket 6 and a first mounting member 61, the electromechanical bracket 6 is used to fix the electromechanical equipment, the first mounting member 61 is located in the trench 4, and the first mounting member 61 is provided on the first steel truss floor deck 1 and / or the second steel truss floor deck 2, and the electromechanical bracket 6 is connected to the first mounting member 61. Thus, the electromechanical bracket 6 can be fixed in the trench 4 by the first mounting member 61, so as to reduce the difficulty of setting the electromechanical bracket 6.
[0044] In some implementations, the first mounting member 61 may be pre-buried on the surface of the first steel bar truss floor deck 1 facing the pipe trench 4 (eg, Figure 1 The upper surface of the first steel truss floor deck 1 in the embodiment of the present invention), and / or the first mounting member 61 can be pre-buried in the surface of the second steel truss floor deck 2 facing the pipe trench 4 (such as Figure 1 In this way, the first mounting member 61 is provided in a pre-embedded manner to reduce the difficulty of providing the first mounting member 61, and the electromechanical support 6 can be directly fixed to the first mounting member 61, thereby reducing the difficulty of providing the electromechanical support 6.
[0045] In some embodiments, Figure 1 As shown, the floor slab trench structure 10 further includes a cover plate 7 , the second steel truss floor deck 2 is provided with an opening 201 , the opening 201 is communicated with the trench 4 , and the cover plate 7 is connected to the second steel truss floor deck 2 and is used to block the opening 201 .
[0046] Therefore, by setting the opening 201, it is convenient to inspect the pipeline in the trench 4 through the opening 201, which is helpful to reduce the difficulty of pipeline inspection, and by setting the cover plate 7, the cover plate 7 can be movably connected to the second steel truss floor deck 2, so that the opening 201 can be opened or closed through the cover plate 7.
[0047] In some embodiments, Figure 1 As shown, the floor slab trench structure 10 further includes: a second mounting member 71, the second mounting member 71 is arranged on the second steel bar truss floor deck 2, and the cover plate 7 is connected to the second mounting member 71. Therefore, the cover plate 7 can be fixed to the second steel bar truss floor deck 2 by the second mounting member 71, so as to reduce the difficulty of setting the cover plate 7.
[0048] In some implementations, the second mounting member 71 may be pre-buried on the surface of the second steel bar truss floor deck 2 facing the pipe trench 4 (eg, Figure 1 In this way, the second mounting member 71 is arranged in a pre-embedded manner to reduce the difficulty of setting the second mounting member 71, and the cover plate 7 can be directly fixed to the second mounting member 71, thereby reducing the difficulty of setting the cover plate 7.
[0049] In some embodiments, Figure 1 As shown, the second steel bar truss floor deck 2 is provided with a return eave 22 at one end facing the opening 201, and the second mounting member 71 is provided at the return eave 22. For example, the second mounting member 71 can be pre-buried in the return eave 22, thereby providing a mounting platform for the second mounting member 71 by providing the return eave 22, thereby reducing the difficulty of installing the second mounting member 71.
[0050] In some embodiments, Figure 1 As shown, the second steel truss floor deck 2 is connected to the side of the upper wing plate 32 of the I-beam 3 that is away from the lower wing plate 31. Therefore, the upper wing plate 32 of the I-beam 3 can be used to support the second steel truss floor deck 2, and it is convenient to use the bolts 8 to achieve the connection between the upper wing plate 32 and the second steel truss floor deck 2.
[0051] The application also proposes a construction method for a floor slab trench structure.
[0052] According to the construction method of the floor slab trench structure of the embodiment of the present application, the floor slab trench structure 10 of any of the above embodiments is used, such as Figure 2 As shown, the construction method includes:
[0053] S10: installing a plurality of the structural beams;
[0054] S20: Connecting the first steel bar truss floor deck 1 to a plurality of structural beams.
[0055] S30: Connect the second steel truss floor deck 2 to the structural beam, so that the two adjacent structural beams, the first steel truss floor deck 1 and the second steel truss floor deck 2 define a pipe trench 4.
[0056] Therefore, the pipe trench 4 can be defined by two adjacent structural beams, the first steel truss floor deck 1 and the second steel truss floor deck 2. In this way, the first steel truss floor deck 1 can be used to replace the bottom plate of the pipe trench 4, thereby eliminating the need to adopt a hanging formwork construction plan, which is beneficial to improving construction efficiency and reducing safety hazards.
[0057] In some specific embodiments, the floor trench structure 10 of the present application includes: a first steel truss floor deck 1, a second steel truss floor deck 2, an I-beam 3, a cast part 5, an electromechanical bracket 6, a first mounting part 61, a cover plate 7, a second mounting part 71, and a bolt 8.
[0058] The specific construction method for the floor slab trench structure 10 is as follows:
[0059] Install the first steel bar truss floor deck 1 in place;
[0060] Install the first steel truss floor deck 1 to the upper surface of the lower wing plate 31 of the I-beam 3 and fix it with bolts 8;
[0061] Tie the distribution steel bars and additional steel bars of the first steel truss floor deck 1;
[0062] A first mounting member 61 is provided on the upper surface of the first steel bar truss floor deck 1;
[0063] Tie the side wall reinforcement of the trench 4;
[0064] Concrete is poured to form a casting 5 at the web 33 of the I-beam 3, the casting 5 serving as the side wall of the trench 4, and the distance between the side wall of the trench 4 and the I-beam 3 is not less than 50 mm;
[0065] Install the second steel truss floor deck 2 onto the upper surface of the upper wing plate 32 of the I-beam 3 and fix it with bolts 8;
[0066] An opening 201 is provided at a position corresponding to the second steel bar truss floor deck 2 and the pipe trench 4;
[0067] Tie the distribution steel bars and additional steel bars of the second steel bar truss floor deck 2, and set the eaves steel bars to form the eaves 22;
[0068] A first mounting member 61 is provided on the lower surface of the second steel bar truss floor deck 2;
[0069] A second mounting member 71 is provided on the return eaves 22;
[0070] pouring concrete;
[0071] Install the electromechanical bracket 6;
[0072] Install the cover 7.
[0073] Of course, in the above-mentioned construction method, the construction sequence is only used for illustration and does not necessarily limit the construction sequence. In some other usage scenarios, the construction sequence can also be adjusted as needed.
[0074] It should be noted that in the above embodiments, the description of each embodiment has its own emphasis, and for parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0075] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.
[0076] Although the preferred embodiments of this specification have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of this specification.
[0077] Obviously, those skilled in the art can make various changes and modifications to this specification without departing from the spirit and scope of this specification. Thus, if these modifications and variations of this specification fall within the scope of the claims of this specification and their equivalents, this specification is also intended to include these modifications and variations.
Claims
1. A floor slab pipe trench structure (10), characterized in that: include: A plurality of structural beams, wherein the plurality of structural beams are arranged at intervals; A first steel truss floor deck (1) and a second steel truss floor deck (2), wherein the first steel truss floor deck (1) and the second steel truss floor deck (2) are both connected to the structural beam, and the first steel truss floor deck (1) and the second steel truss floor deck (2) are spaced apart and arranged opposite to each other; A pipe trench (4) is defined between two adjacent structural beams, the first steel truss floor deck (1) and the second steel truss floor deck (2).
2. The floor slab pipe trench structure (10) according to claim 1, characterized in that: The structural beam comprises an I-beam (3), and the first steel bar truss floor deck (1) is connected to the lower wing plates (31) of two adjacent I-beams (3) on one side facing the upper wing plates (32).
3. The floor slab pipe trench structure (10) according to claim 2, characterized in that: Also includes: A cast part (5), the cast part (5) is located in the pipe trench (4) and connected to the web (33) of the I-beam (3), and a side of the cast part (5) facing away from the web (33) forms a side wall of the pipe trench (4).
4. The floor slab pipe trench structure (10) according to claim 3, characterized in that: The difference between the minimum distance from the casting (5) to the web (33) and the maximum distance from the upper wing plate (32) to the web (33) is greater than or equal to 50 mm.
5. The floor slab pipe trench structure (10) according to claim 1, characterized in that: Also includes: An electromechanical support (6) and a first mounting member (61), wherein the first mounting member (61) is located in the pipe trench (4), and the first mounting member (61) is provided on the first steel truss floor deck (1) and / or the second steel truss floor deck (2), and the electromechanical support (6) is connected to the first mounting member (61).
6. The floor slab pipe trench structure (10) according to claim 1, characterized in that: It also comprises a cover plate (7), the second steel bar truss floor deck (2) is provided with an opening (201), the opening (201) is connected to the pipe trench (4), and the cover plate (7) is connected to the second steel bar truss floor deck (2) and is used to block the opening (201).
7. The floor slab pipe trench structure (10) according to claim 6, characterized in that: Also includes: A second mounting member (71), wherein the second mounting member (71) is arranged on the second steel bar truss floor deck (2), and the cover plate (7) is connected to the second mounting member (71).
8. The floor slab pipe trench structure (10) according to claim 7, characterized in that: An end of the second steel bar truss floor deck (2) facing the opening (201) is provided with a return eave (22), and the second mounting member (71) is provided on the return eave (22).
9. The floor slab pipe trench structure (10) according to claim 2, characterized in that: The second steel bar truss floor deck (2) is connected to a side of the upper wing plate (32) of the I-beam (3) facing away from the lower wing plate (31).
10. A construction method for a floor slab trench structure, used for the floor slab trench structure (10) according to any one of claims 1 to 9, characterized in that: The construction method comprises: installing a plurality of said structural beams; Connecting the first steel bar truss floor deck (1) to the plurality of structural beams; The second steel bar truss floor deck (2) is connected to the structural beam, so that the two adjacent structural beams, the first steel bar truss floor deck (1) and the second steel bar truss floor deck (2) define the pipe trench (4).