A marine mooring pile anchor, its construction structure and construction method

By combining the umbrella-shaped structure with the spiral blades and working in tandem with high-pressure water jetting and pile hammer, the problems of difficult installation and insufficient durability of spiral pile anchors in deep-sea environments have been solved, enabling efficient and stable mooring system construction.

CN120364067BActive Publication Date: 2026-11-17INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202510834719.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-06-20
Publication Date
2026-11-17
Estimated Expiration
2045-06-20

AI Technical Summary

Technical Problem

Existing helical pile anchors are difficult to install in complex marine environments, especially in deep-sea conditions where they cannot provide sufficient driving force. Furthermore, they lack durability and stability during long-term service and face problems such as fatigue damage, corrosion, and changes in seabed sediments.

Method used

The design combines an umbrella-shaped structure with spiral blades, and integrates the combined effects of high-pressure water jetting and pile hammer power to optimize the stress distribution during penetration. Furthermore, long-term stability is enhanced through rock-filling protection measures.

Benefits of technology

It improves penetration accuracy and construction stability, enhances scour resistance, ensures the long-term service stability and structural load-bearing capacity of the mooring system, and adapts to complex seabed environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120364067B_ABST
    Figure CN120364067B_ABST
Patent Text Reader

Abstract

This invention discloses a marine mooring pile anchor, its construction structure, and construction method. The marine mooring pile anchor includes: a pile anchor body, which is tubular in shape and has fins on its outer outer wall; and an umbrella cap, which is a thin-walled shell with an inverted frustum shape. The umbrella cap's cross-section tapers linearly along the axial direction, forming an overall conical curved surface structure that is larger at the top and smaller at the bottom. The umbrella cap is fixedly mounted at one end of the pile anchor body, with the larger frustum-shaped end of the umbrella cap facing the pile anchor body. The outer diameter of the fins is smaller than the diameter of the larger frustum-shaped end of the umbrella cap. A construction method for the marine mooring pile anchor, used to install the aforementioned marine mooring pile anchor using the above-mentioned construction structure, includes: S1, preparatory work; S2, hoisting operation; S3, pile driving operation; and S4, sequentially retracting the accompanying pile, guide pipe, and jetting device, and tightening the anchor chain using a winch.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This field relates to the technology of marine wind power and photovoltaic technology, specifically to a marine mooring pile anchor and its construction structure and construction method. Background Technology

[0002] Offshore photovoltaic (PV) power generation, as an important component of clean energy, plays a crucial role in promoting energy structure transformation, reducing carbon emissions, and enhancing energy security. Compared to terrestrial PV, offshore PV makes full use of marine resources, alleviating land resource constraints, and can be deeply integrated with offshore wind power, hydrogen production, and fisheries to form a synergistic energy system. However, most offshore PV farms currently use fixed pile foundations, which are suitable for shallow water areas but have limited adaptability in deep water or complex seabed environments. Therefore, floating PV platforms and their associated mooring systems have become an important direction for deep-sea PV development, and anchoring systems are one of the key technologies to ensure the long-term safe operation of floating PV platforms. Floating PV platforms operate in complex marine environments with wind, waves, and currents for extended periods. Their anchoring systems not only need sufficient pull-out resistance, capsizing resistance, and slippage resistance, but also need to maintain stability during long-term service to prevent platform drift, collision, or failure.

[0003] In existing technologies, the installation of helical piles primarily relies on rotating equipment to provide torque drive, enabling the piles to penetrate the seabed. However, in complex marine environments, especially deep-sea conditions, existing technologies still face numerous challenges during installation. While some helical pile foundations improve pile penetration through helical blades, the torque requirements in hard or high-density soil layers are too high, and existing rotating equipment struggles to provide sufficient driving force, limiting construction. Furthermore, in deep-sea environments, increased water depth restricts installation equipment, and traditional torque transmission methods may suffer from energy loss and shaft torsional deformation, impacting construction efficiency and hindering the helical piles from reaching the target depth. On the other hand, the durability of helical piles remains affected by the harsh marine environment during long-term service, particularly under strong currents and alternating loads, where fatigue damage and corrosion are significant. Some helical pile foundations, while improving load-bearing capacity through optimized blade design, may still experience fatigue cracking of the pile material under long-term seawater erosion and dynamic loads, affecting the overall structural stability. Especially in deep-sea environments, the interaction between the helical blades and the surrounding soil is highly uncertain, and local instability may occur due to changes in seabed sediments during long-term service. Furthermore, seawater corrosion and marine organism attachment may further reduce the durability of the pile surface, increasing the difficulty of later maintenance and repair. At the same time, the adaptability of existing helical piles in extreme marine environments still needs improvement. For example, in deep-sea soft soil strata or complex geological environments, the bearing capacity distribution of traditional helical blades may be uneven, leading to reduced pile stability. Summary of the Invention

[0004] The purpose of this invention is to provide a marine mooring pile anchor, its construction structure, and construction method. The specific technical solution is as follows: A marine mooring pile anchor includes: a pile anchor body, which is tubular and has fins on its outer side wall; and an umbrella cap, which is a thin-walled shell with an inverted frustum shape. The umbrella cap's cross-section tapers linearly along the axial direction, and it has an overall conical curved surface structure that is larger at the top and smaller at the bottom. The umbrella cap is fixedly mounted on one end of the pile anchor body, with the large frustum-shaped end of the umbrella cap facing the pile anchor body. The outer diameter of the fins is smaller than the diameter of the large frustum-shaped end of the umbrella cap.

[0005] The umbrella cap is fitted onto the pile anchor body. The diameter of one end of the small area of ​​the top of the umbrella cap is equal to the diameter of the pile anchor body. The bottom of the umbrella cap is fixedly connected to the pile anchor body through ribs.

[0006] The pile anchor body is made of hollow steel pipe. An installation sleeve is fixedly installed on the end of the pile anchor body facing away from the umbrella cap. The installation sleeve is fitted onto the pile anchor body to increase the wall thickness at this end of the pile anchor body.

[0007] The anchor body has a connection hole at the end facing away from the umbrella cap, which is used to install the anchor chain.

[0008] The fins are configured as single-turn helical blades evenly distributed on the outer wall of the pile anchor body, or a single helical blade is continuously wound around the outer wall of the pile anchor body in multiple turns.

[0009] A marine mooring pile and anchor construction structure for installing the aforementioned marine mooring piles and anchors includes: a pile and anchor installation vessel for transporting and carrying the installation equipment; accompanying piles installed on the pile and anchor body at the end opposite to the umbrella cap, providing an initial stabilizing structure for the installation of the pile and anchor; a guide pipe clamped to the end of the accompanying pile opposite to the pile and anchor body, with the guide pipe above sea level after installation; and a hammering device mounted on the pile and anchor installation vessel, comprising a winch and a pile hammer, the winch controlling the pile hammer to strike the end of the guide pipe above sea level. It also includes: a jetting device comprising a jetting pipe and a high-pressure water pump, with jetting holes provided on the side wall of the umbrella cap, the high-pressure water pump mounted on the pile and anchor installation vessel, one end of the jetting pipe inserted into the jetting hole, and the other end connected to the high-pressure water pump, for jetting high-pressure water during installation to reduce penetration resistance and improve soil disturbance characteristics.

[0010] A method for constructing marine mooring piles and anchors, using the aforementioned marine mooring pile and anchor construction structure, includes: S1, preparing by starting the facilities, installing the anchor chain, installing the accompanying pile at the end of the anchor body facing away from the umbrella cap, and installing the jet pipe on the outer wall of the anchor body with one end inserted into the jet hole; S2, hoisting the anchor body with the accompanying pile installed using hoisting equipment to a preset position while maintaining a vertical posture with the umbrella cap facing downwards, and installing the guide pipe; S3, driving the pile by starting a high-pressure water pump and jetting high-pressure water to the bottom of the anchor body to disrupt the soil structure at the pile tip and promote local soil liquefaction. Simultaneously, the hammering device is controlled to continuously hammer until the anchor system penetrates to a predetermined depth; S4, sequentially retrieving the accompanying pile, guide pipe, and jetting device, while simultaneously tightening the anchor chain using a winch. Before the driving operation in S3, pre-driving is performed by controlling the hammering device to hammer the end of the guide pipe protruding above sea level until it settles to 1.2-2.5 times the length of the anchor body. After completing step S4, rockfill protection is carried out, with a protection radius of 5-8 times the diameter of the pile anchor body and a protection thickness of 1-1.5 times the diameter of the pile anchor body.

[0011] The technical solution of this invention has the following beneficial effects: Addressing the problems in existing technologies where helical pile anchor structures are easily affected by seabed soil characteristics during penetration, leading to limited construction accuracy, low penetration efficiency, and insufficient long-term stability and scour resistance, this invention innovatively introduces a combination design of an umbrella-shaped structure and helical blades, and combines this with a penetration control strategy that integrates high-pressure water jetting and pile hammer power, optimizing the force distribution and power transmission mechanism during penetration. During construction, the high-pressure water jetting system effectively disrupts the soil structure at the pile tip, reducing penetration resistance, and, in conjunction with precise control of the pile driving guide, ensures the pile anchor maintains a vertical posture, improving penetration accuracy and construction stability. By optimizing burial depth control (ensuring the top of the pile anchor is at least 2-3 meters below the seabed surface) and implementing riprap protection measures, the long-term impact of seabed scour is significantly reduced, enhancing the mooring system's scour resistance and long-term service stability. Compared with traditional pile-anchor schemes, this invention exhibits significant technical advantages in terms of penetration stability, ease of construction, structural bearing capacity, and long-term scour resistance, providing an efficient, safe, and economical anchoring solution for floating photovoltaic and wind power platform mooring systems in complex seabed environments. Attached Figure Description

[0012] Figure 1 This is a schematic diagram of the marine mooring pile anchor structure in this application; Figure 2 This application includes a structural diagram of the installation of marine mooring piles and anchors. Among them: 1-Pile anchor body, 2-Fin, 3-Umbrella cap, 4-Connecting hole, 5-Jet pipe, 6-Accompanying pile, 7-Conduit pipe, 8-Anchor chain, 9-Pile anchor installation vessel, 10-High pressure water pump, 11-Winder, 12-Pile hammer. Detailed Implementation

[0013] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to specific embodiments and the accompanying drawings. It should be understood that these descriptions are merely exemplary and not intended to limit the scope of the invention. Furthermore, descriptions of well-known structures and techniques are omitted in the following description to avoid unnecessarily obscuring the concept of the invention.

[0014] A marine mooring pile anchor includes: a pile anchor body 1, which is tubular, with fins 2 on its outer side wall; and an umbrella cap 3, which is frustum-shaped, with one side of the smaller frustum-shaped end of the umbrella cap 3 fixed to one end of the pile anchor body 1. The outer diameter of the fins 2 is smaller than the bottom diameter of the larger frustum-shaped end of the umbrella cap 3. In practical use, the pile anchor body 1 uses hollow steel pipe piles for marine engineering, with a commonly used pipe diameter range of 500~1500 mm (e.g., 500 mm, 800 mm, 1200 mm, 1500 mm, and any range between the two endpoints); and a wall thickness range of 10~50 mm (e.g., 10 mm, 30 mm, 50 mm, and any range between the two endpoints). The specific pipe diameter and wall thickness need to be determined through numerical simulation analysis, taking into account the seabed soil characteristics, design penetration depth, and bearing capacity requirements. The fins 2 are made of cold-rolled steel plates, with a ring height of 1 to 1.5 times the diameter of the pile anchor body 1. The inner and outer radii are 1 times and 2 times the radius of the pile anchor body 1, respectively, and are rotated 180° counterclockwise. Multiple blades are evenly distributed along the pile axis and fixed to the pile body. The helical blades can also be designed as continuous blades, and the specific dimensions can be optimized according to the actual engineering requirements.

[0015] The umbrella cap 3 is fitted onto the pile anchor body 1. The diameter of the small-area end of the frustum-shaped top of the umbrella cap 3 is equal to the diameter of the pile anchor body 1. The frustum-shaped bottom of the umbrella cap 3 is fixedly connected to the pile anchor body 1 via ribs. The umbrella cap 3 is fixed to the end of the pile anchor body 1 by welding; the radius of the large-area end of the frustum-shaped bottom of the umbrella cap 3 is 2 to 2.5 times the radius of the pile anchor body 1. Multiple ribs, generally 4 to 8, are evenly arranged inside the umbrella cap 3 and fixedly connected to the pile body to enhance structural strength. The angle between the umbrella cap 3 and the pile anchor body 1 must be less than 45° - φ / 2 (φ is the internal friction angle of the soil) to reduce the resistance to penetration and improve penetration stability.

[0016] The pile anchor body 1 is a hollow steel pipe. An installation sleeve is fixedly installed at the end of the pile anchor body 1 facing away from the umbrella cap 3. The installation sleeve is fitted onto the pile anchor body 1 to increase the wall thickness at this end of the pile anchor body 1.

[0017] The anchor body 1 has a connecting hole 4 at the end facing away from the umbrella cap 3. The connecting hole 4 is used to install the anchor chain 8.

[0018] The fins 2 are configured as multiple single-turn spiral blades evenly distributed on the outer wall of the pile anchor body 1, or a single spiral blade is continuously wound around the outer wall of the pile anchor body 1 in multiple turns.

[0019] A marine mooring pile and anchor construction structure for installing the aforementioned marine mooring piles and anchors includes: a pile and anchor installation vessel 9, used for transporting and carrying the installation equipment; an accompanying pile 6, installed at the end of the pile and anchor body 1 facing away from the umbrella cap 3, used to provide an initial stabilizing structure for the installation of the pile and anchor; a guide pipe 7, snapped into the end of the accompanying pile 6 facing away from the pile and anchor body 1, and the guide pipe 7 being above sea level after installation; a hammering device, mounted on the pile and anchor installation vessel 9, the hammering device including a winch 11 and a pile hammer 12, the winch 11 being used to control the pile hammer 12 to hammer the end of the guide pipe 7 that is above sea level. It also includes: a jetting device, including a jetting pipe 5 and a high-pressure water pump 10, with jetting holes provided on the side wall of the umbrella cap 3, the high-pressure water pump 10 being mounted on the pile and anchor installation vessel 9, one end of the jetting pipe 5 being inserted into the jetting hole, and the other end of the jetting pipe 5 being connected to the high-pressure water pump 10, used to jet high-pressure water during installation to reduce penetration resistance and improve soil disturbance characteristics. In practical use, the jet pipe 5 is a hollow steel pipe with an outer diameter typically ranging from 30 to 50 mm (e.g., 30 mm, 40 mm, 50 mm, or any range between its two endpoints) and a wall thickness of 2 to 5 mm (e.g., 2 mm, 3 mm, 4 mm, 5 mm, or any range between its two endpoints). The jet pipe 5 is installed on the outer wall of the pile anchor body 1, with its bottom end penetrating the umbrella cap 3 structure and contacting the seabed. The other end is connected to the high-pressure water pump 10 on the installation vessel. High-pressure water is directly jetted to the bottom of the pile anchor body 1, reducing penetration resistance and improving soil disturbance characteristics.

[0020] A method for constructing marine mooring piles and anchors, used to install the aforementioned marine mooring piles and anchors using the above-mentioned marine mooring pile and anchor construction structure, comprising: S1. Prepare for the operation by starting the equipment, installing the anchor chain 8, installing the accompanying pile 6 on the end of the pile anchor body 1 facing away from the umbrella cap 3, and installing the jet pipe 5 on the outer wall of the pile anchor body 1 and inserting one end into the jet hole.

[0021] S2. Perform the hoisting operation. Use hoisting equipment to hoist the anchor body 1, with the accompanying pile 6 installed, to the preset position, maintaining a vertical posture with the umbrella cap 3 pointing downwards, and install the guide pipe 7. Use the hoisting system to hoist the accompanying pile 6 and anchor 1 as a whole to the seabed surface of the designated sea area, ensuring the anchor remains vertical. Next, insert the driving guide pipe 7 onto the top of the accompanying pile 6. The length of the guide pipe 7 must ensure that its top remains above sea level throughout the entire installation process to facilitate pile driving. The preliminary estimation formula for the length of the guide pipe 7 is: Anchor pile penetration depth + Sea area depth - Anchor pile length - Accompanying pile 6 length.

[0022] S3. Begin pre-piling. Use the pile hammer 12 to hammer the top of the pile driving guide 7 3-5 times, causing the penetration system to settle by 1.5-2 times the anchor pile length. During this process, the umbrella cap 3 and fins 2 gradually penetrate the soil layer. In this step, special attention must be paid to keeping the pile body vertically installed to ensure construction accuracy. Perform the pile driving operation. Start the high-pressure water pump 10 to spray high-pressure water to the bottom of the pile anchor body 1 to disrupt the soil structure at the pile end and promote local soil liquefaction. At this time, control the hammering device to continuously hammer until the pile anchor system penetrates to the predetermined depth. The water pressure can be controlled between 0.5 and 1.0 MPa (e.g., 0.5 MPa, 0.7 MPa, 1.0 MPa, and any value between the two endpoints). Then, raise the pile hammer 12 to the design height and continuously hammer the pile driving guide 7 (generally 30-50 times, the specific number adjusted according to the seabed soil conditions) until the pile anchor system penetrates to the predetermined depth. The penetration depth must ensure that the top of the pile anchor is 2-3 meters below the seabed surface to reduce the risk of scour and ensure that the design bearing layer requirements are met. The penetration rate must be strictly controlled, typically not exceeding 100 mm / s, to avoid damage to the fins during penetration. Furthermore, during penetration, the anchor chain 8 remains connected to the top of the pile anchor, and the traction equipment on the installation vessel maintains appropriate tension to prevent pile displacement, thereby improving installation accuracy and stability.

[0023] S4. Sequentially retract the accompanying pile 6, guide pipe 7, and jetting device, while simultaneously tightening the anchor chain 8 using winch 11. Before the pile driving operation in S3, pre-pile driving is performed, controlling the hammering device to hammer the end of guide pipe 7 exposed above sea level until it settles to 1.2-2.5 times the length of the pile anchor body 1. After completing step S4, rockfill protection is implemented, with a protection radius of 5-8 times the diameter of the pile anchor body 1 and a protection thickness of 1-1.5 times the diameter of the pile anchor body 1.

Claims

1. A marine mooring pile anchor, characterized in that, include: The pile anchor body (1) is tubular and has fins (2) on its outer side wall. The umbrella cap (3) is a thin-walled shell. The umbrella cap (3) is in the shape of an inverted frustum. The cross section of the umbrella cap (3) is linearly contracted along the axial direction. The overall structure is a conical curved surface with a larger top and a smaller bottom. The umbrella cap (3) is fixedly installed at one end of the pile anchor body (1). The large area end of the frustum of the umbrella cap (3) faces the pile anchor body (1). The outer diameter of the fin (2) is smaller than the diameter of the large area end of the frustum of the umbrella cap (3). The umbrella cap (3) is fitted onto the pile anchor body (1). The diameter of the small area end of the frustum of the umbrella cap (3) is equal to the diameter of the pile anchor body (1). The bottom of the frustum of the umbrella cap (3) is fixedly connected to the pile anchor body (1) through ribs. The spraying device includes a spray pipe (5), and a spray hole is provided on the side wall of the umbrella cap (3). One end of the spray pipe (5) is inserted into the spray hole and the other end is connected to a high-pressure water pump (10) for spraying high-pressure water during installation to reduce penetration resistance and improve soil disturbance characteristics.

2. The marine mooring pile anchor as described in claim 1, characterized in that, The pile anchor body (1) is a hollow steel pipe. An installation sleeve is fixedly installed on the end of the pile anchor body (1) facing away from the umbrella cap (3). The installation sleeve is fitted onto the pile anchor body (1) to increase the wall thickness of this end of the pile anchor body (1).

3. The marine mooring pile anchor as described in claim 1, characterized in that, The anchor body (1) has a connecting hole (4) at the end facing away from the umbrella cap (3), and the connecting hole (4) is used to install the anchor chain (8).

4. The marine mooring pile anchor as described in claim 1, characterized in that, The fins (2) are configured as single-turn spiral blades evenly distributed on the outer wall of the pile anchor body (1) or a single spiral blade is continuously wound around the outer wall of the pile anchor body (1) in multiple turns.

5. A marine mooring pile anchor construction structure, characterized in that, For installing the marine mooring pile anchor of any one of claims 1-4, comprising: A pile anchor installation vessel (9) is used for transporting and carrying installation equipment; Accompanying pile (6), which is installed on the end of the pile anchor body (1) facing away from the umbrella cap (3), is used to provide an initial stable structure for the installation of the pile anchor; The conduit (7) is attached to one end of the accompanying pile (6) facing away from the pile anchor body (1). After installation, the conduit (7) is above sea level. A hammering device is installed on the pile anchor installation vessel (9). The hammering device includes a winch (11) and a pile hammer (12). The winch (11) is used to control the pile hammer (12) to hammer the end of the guide pipe (7) that is exposed above the sea level.

6. The marine mooring pile anchor construction structure as described in claim 5, characterized in that, Also includes: The spraying device includes a spray pipe (5) and a high-pressure water pump (10). The umbrella cap (3) has a spray hole on its side wall. The high-pressure water pump (10) is installed on the pile anchor installation vessel (9). One end of the spray pipe (5) is inserted into the spray hole, and the other end of the spray pipe (5) is connected to the high-pressure water pump (10). It is used to spray high-pressure water during installation to reduce penetration resistance and improve soil disturbance characteristics.

7. A method for constructing marine mooring piles and anchors, characterized in that, For installing any one of the marine mooring pile anchors of claims 1-4 using the marine mooring pile anchor construction structure of claim 6, comprising: S1. Make preparations, start the facilities, install the anchor chain (8), install the accompanying pile (6) on the pile anchor body (1) at the end facing away from the umbrella cap (3), and install the jet pipe (5) on the outer wall of the pile anchor body (1) and insert one end into the jet hole; S2. Carry out hoisting operation, use hoisting equipment to hoist the pile anchor body (1) with the accompanying pile (6) installed to the preset position and keep the umbrella cap (3) in a vertical position with the downward facing, and install the guide tube (7). S3. To carry out pile driving operation, start the high-pressure water pump (10) and spray high-pressure water to the bottom of the pile anchor body (1) to destroy the soil structure at the pile end and promote local soil liquefaction. At this time, control the hammering device to continuously hammer until the pile anchor system penetrates to the predetermined depth. S4. The accompanying pile (6), the guide pipe (7) and the jetting device are retrieved in sequence, and the anchor chain (8) is tightened by the winch (11).

8. The method for constructing marine mooring piles and anchors as described in claim 7, characterized in that, Before carrying out the pile driving operation in S3, pre-pile driving is carried out. The hammering device is controlled to hammer the end of the guide pipe (7) that is exposed above the sea level until it settles to 1.2-2.5 times the length of the pile anchor body (1).

9. The method for constructing marine mooring piles and anchors as described in claim 7, characterized in that, After completing step S4, rock-filling protection is carried out with a protection radius of 5-8 times the diameter of the pile anchor body (1) and a protection thickness of 1-1.5 times the diameter of the pile anchor body (1).

Citation Information

Patent Citations

  • Screw pile type jacket device for offshore booster station and construction method of screw pile type jacket device

    CN118326927A

  • All steel sleeve pipe dado bored concrete pile of high bearing capacity

    CN205501994U

  • Reinforcing pile structure of soft soil foundation

    CN210459178U