Drilling machining equipment for ice and snow equipment assembly
Through the combination of lifting gantry and tubular cutting head, the problems of burrs, deformation and waste chip splashing on the ice bucket of the drilling equipment are solved, and efficient and precise drilling processing is achieved.
Patent Information
- Application Number
- CN202510906205.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-02
- Publication Date
- 2025-08-01
- Estimated Expiration
- 2045-07-02
AI Technical Summary
Existing drilling equipment is prone to burrs, deformation, waste splash and imprecise drilling problems in ice buckets, resulting in low efficiency and poor quality.
The liftable gantry and hanging frame system are adopted, combined with the tubular cutting head and pad structure to ensure that the drill bit is perpendicular to the drilling position, the tubular cutting head collects waste chips, and provide stable support through the spring and extrusion plate structure to prevent deformation and adjust the drill bit position to ensure accuracy.
Effectively prevent drill bit offset, ensure drilling quality and efficiency, reduce waste chip splash, prevent ice-making bucket deformation, and improve drilling accuracy and overall quality.
Smart Images

Figure CN120394942A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of drilling equipment, and specifically provides a drilling processing equipment for ice and snow equipment components. Background Art
[0002] An ice maker is a common ice and snow equipment, which includes components such as a housing, an evaporator, a condenser, an ice making bucket, and a bracket. The ice making bucket is usually made of food-grade plastics, stainless steel, glass and other materials. Among them, stainless steel is a relatively common material for ice making buckets on the market. To facilitate the water inlet, drainage of the ice making bucket, and the installation of an ice full sensor or other related devices, it is usually necessary to drill holes on the surface of the ice making bucket. The following problems will occur during drilling: 1. On the side where the drill bit enters the metal, small burrs will be generated in the vertical direction, and on the side where the drill bit exits the metal, large flanging burrs will be generated. Since a large number of burrs are located inside the ice making bucket, it will be more troublesome to grind and process the burrs.
[0003] 2. When drilling, it is usually necessary to squeeze forcefully from one side to make the drill bit penetrate the ice making bucket. Therefore, it is also easy to cause the drilling area to face the non-force direction, which will cause deformation on the surface of the ice making bucket.
[0004] 3. Due to the long-term rotational wear of the drill bit during use and the instability during rotation, the diameter of the drilled hole will also be inaccurate.
[0005] 4. A large amount of waste chips will splash during the drilling process, which is easy to cause accidental injuries to the ice making bucket itself and the staff.
[0006] 5. When the drill bit starts to drill on the convex surface, the contact point between the drill bit and the convex surface is an arc-shaped edge. Therefore, the drill bit is easy to slide on the convex surface and it is difficult to accurately locate at the position where the hole is to be drilled.
[0007] As a result, it indirectly leads to the problems of low drilling processing efficiency and poor quality. Summary of the Invention
[0008] In order to solve the above problems, the present invention provides a drilling processing equipment for ice and snow equipment components to solve the problems mentioned in the above background art.
[0009] To achieve the above object, the present invention adopts the following technical solutions: An ice and snow equipment component drilling and processing device for drilling holes on the surface of an ice bucket of an ice maker, comprising a liftable gantry. A hanger that can move along the truss is assembled on the truss of the gantry. A drill bit for drilling and a power device for driving the drill bit to rotate are assembled on the surface of the hanger. The hanger places the drill bit and the power device inside the ice bucket, facilitating the positioning of the drill bit at the drilling position. A tubular cutting head is sleeved at intervals on the surface of the drill bit, enabling the waste chips generated by drilling to enter the interval to prevent the waste chips from splashing everywhere. One end inner wall of the tubular cutting head is provided in an inclined shape to reduce the thickness of this end of the tubular cutting head, facilitating the cutting of the drilling position to form a smooth round hole, and using the inclined surface to guide the cut waste chips into the interval. The working end of the drill bit extends outside the tubular cutting head, enabling the drill bit and the tubular cutting head to drill and cut the ice bucket in sequence. The tubular cutting head is assembled on the surface of the power device of the drill bit through an installation component; an arc-shaped backing plate one for supporting the ice bucket is assembled at the position corresponding to the drill bit outside the ice bucket; a pushing component is assembled on the surface of the gantry for pushing the power device to move along the axial direction of the drill bit.
[0010] Preferably, the pushing component includes an installation frame for installing the power device. One side of the installation frame is provided in an inclined shape. A push rod one that can move along the truss and can be lifted is assembled on the surface of the gantry. An extrusion block with inclined surfaces on both sides is assembled at the end of the push rod one. The side of the extrusion block abuts against the surface of the installation frame; the push rod one is assembled on the surface of the gantry through a moving frame, and a locking rod for fixing the position is assembled on the surface of the moving frame.
[0011] Preferably, a through-round groove is opened on the surface of the backing plate one. The inner diameter of the round groove is larger than the inner diameter of the required drill hole, and the center of the circle coincides with the axis of the drill bit; a liftable support frame is assembled on the side wall of the gantry, and a push rod two for pushing the backing plate one to move along the axial direction of the drill bit is assembled on the surface of the support frame.
[0012] Preferably, extrusion plates one are arranged at intervals on the surface of the backing plate one and are assembled at the end of the push rod two. A guide rod for guiding the movement of the extrusion plate one is assembled between the extrusion plate one and the backing plate one. A spring one for support is assembled on the surface of the guide rod, and both ends of the spring one abut between the extrusion plate one and the backing plate one respectively.
[0013] Preferably, a backing plate two of the same size as the backing plate one is sleeved on the surface of the tubular cutting head. The backing plate two abuts against the inner wall of the ice bucket and is at the same height as the backing plate one, providing a supporting force for the drilling area.
[0014] Preferably, the installation component includes a connecting plate integrally formed with the tubular cutting head. A plurality of installation rods are assembled on the surface of the connecting plate. The surface of the drill bit is assembled with an installation plate through a bearing, and the installation rods are assembled on the surface of the installation plate.
[0015] Preferably, the mounting rod is assembled on the surface of the second backing plate. One end of the mounting rod movably penetrates through the connecting plate. A second pressing plate is provided between the connecting plate and the second backing plate. The second pressing plate is assembled on the surface of the connecting plate. A second spring is sleeved on the surface of the mounting rod, and the two ends of the second spring are respectively mounted on the surfaces of the second backing plate and the second pressing plate.
[0016] Preferably, an adjusting assembly is assembled on the surface of the mounting plate for adjusting the position of the end of the drill bit.
[0017] Preferably, the adjusting assembly includes a plurality of moving blocks sleeved on the surface of the mounting rod. A connecting assembly is assembled between the moving block and the connecting plate. A threaded rod is assembled on the surface of the moving block through a bearing, and one end of the threaded rod threadedly penetrates through the mounting plate.
[0018] Preferably, the connecting assembly is a third spring sleeved on the surface of the mounting rod, and the two ends of the third spring respectively abut against the surfaces of the moving block and the connecting plate.
[0019] The above technical solution has the following advantages or beneficial effects: 1. The present invention provides a drilling processing device for ice and snow equipment components. By setting a gantry, a hanging frame, a mounting frame and a pressing block, the drill bit is placed inside the ice making bucket by the cooperation of the hanging frame and the gantry. When the drill bit drills, the drill bit needs to be perpendicular to the drilling position. Therefore, it can be ensured that the drilling point is in a concave position. When an external force pushes the drill bit to move, the left and right offset of the drill bit can be avoided as much as possible, ensuring the stability of the drilling position and indirectly ensuring the quality and efficiency of drilling.
[0020] 2. The present invention provides a drilling processing device for ice and snow equipment components. By setting a tubular cutting head on the surface of the drill bit and leaving a gap between the tubular cutting head and the drill bit, when the drill bit drills, the generated flying chips will enter the inside of the tubular cutting head to protect the staff and the ice making bucket itself. And since the inner diameter of the pre-treatment hole itself is close to the inner diameter of the required round hole, when the tubular cutting head moves to cut this position, due to the very thin cutting thickness, the tubular cutting head can easily cut out the required round hole, and at the same time remove the burrs attached to the surface of the thin wall. Since drilling and cutting are almost carried out simultaneously, the efficiency of drilling is not affected, and the quality during drilling is ensured.
[0021] 3. The present invention provides a drilling processing device for ice and snow equipment components. By setting a first backing plate, a first spring, a first extrusion plate, and a second push rod, the first backing plate is abutted against the surface of the ice-making bucket. During the drilling process of the drill bit, the second push rod is used to drive the movement of the first extrusion plate, thereby squeezing the first spring. Indirectly, the first backing plate is supported by the extrusion force of the first spring. As the deformation distance of the first spring increases, the elastic force of the first spring also increases, and then the supporting force applied to the surface of the first backing plate will gradually increase to prevent the ice-making bucket itself from deforming due to excessive extrusion force during the drilling process, indirectly ensuring the quality of drilling.
[0022] 4. The present invention provides a drilling processing device for ice and snow equipment components. By setting a threaded rod, a mounting plate, a moving block, and a connecting plate, the distance between the moving block and the mounting plate is adjusted by rotating the threaded rod, and the end of the drill bit is adjusted to be located inside the tubular cutting head. As the drill bit moves further, the tubular cutting head first makes a mark on the surface of the ice-making bucket until it is partially embedded in the ice-making bucket. At this time, the position of the drill bit can be limited to prevent the end of the drill bit from shifting during rotation, ensuring the accuracy of the drilling position. As the embedding depth increases, the resistance of the ice-making bucket to the tubular cutting head will gradually increase until the tubular cutting head is difficult to move. At this time, the drill bit continues to move to drill the ice-making bucket.
[0023] 5. The present invention provides a drilling processing device for ice and snow equipment components. By setting a drill bit, a tubular cutting head, and a first backing plate, during the drilling process of the drill bit, the tubular cutting head will cut the position drilled by the drill bit to remove the generated burrs, so as to reduce the subsequent grinding operation. During the drilling and cutting process, the first backing plate provides an increasingly large supporting force for this drilling position to prevent the drilling position from deforming greatly, and overall, it can ensure the quality and efficiency of drilling. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] By reading the detailed description of the non-restrictive embodiments with reference to the following drawings, the present invention, its features, shape, and advantages will become more obvious. The same reference numerals indicate the same parts in all the drawings, and the drawings are not deliberately drawn to scale. The emphasis is on showing the gist of the present invention.
[0025] Figure 1 FIG. 1 is a schematic three-dimensional structure diagram of a drilling processing device for ice and snow equipment components provided by the present invention.
[0026] Figure 2 FIG. 2 is a schematic state structure diagram of the power equipment of the drill bit assembled on the hanger.
[0027] Figure 3 FIG. 3 is a schematic state structure diagram when the extrusion block squeezes and pushes the mounting frame to move.
[0028] Figure 4It is a schematic diagram of the three-dimensional structure of the drill bit surface.
[0029] Figure 5 It is a schematic diagram of the three-dimensional structure of the end position of the tubular cutting head.
[0030] Figure 6 yes Figure 4 Schematic diagram of the partially disassembled three-dimensional structure.
[0031] Figure 7 This is a schematic diagram of the three-dimensional structure of a portion of a pad used for external support of an ice bucket.
[0032] In the figure: 1. Gantry; 2. Hanger; 3. Drill bit; 4. Tubular cutting head; 5. Mounting frame; 6. Push rod 1; 7. Extrusion block; 8. Moving frame; 9. Locking rod; 10. Pad 1; 11. Circular groove; 12. Support frame; 13. Push rod 2; 14. Extrusion plate 1; 15. Guide rod; 16. Spring 1; 17. Pad 2; 18. Connecting plate; 19. Mounting rod; 20. Mounting plate; 21. Extrusion plate 2; 22. Spring 2; 23. Moving block; 24. Threaded rod; 25. Spring 3. DETAILED DESCRIPTION
[0033] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0034] In order to enable those skilled in the art to better understand the present invention, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0035] Figure 1 Disclosed is a drilling processing device for ice and snow equipment components, which is mainly used for drilling holes in ice buckets of ice makers, including stainless steel metal materials or other metal materials. In addition to ice buckets, it can also be used to drill holes in other metal components of ice makers. The use effect of the ice bucket will be better. The traditional drilling method from outside to inside is changed to drilling from inside to outside. When drilling, the drill bit 3 used needs to be perpendicular to the drilling position (see Figure 2 ), at this time, the drill bit 3 is in a recessed position, and the side walls on both sides of the recessed position will limit the drill bit 3 to a certain extent. Therefore, when an external force pushes the drill bit 3 to move, the left and right deviation of the drill bit 3 can be avoided as much as possible, ensuring the stability of the drilling position and indirectly ensuring the quality and efficiency of the drilling.
[0036] like Figure 1 、 Figure 2 andFigure 7 As shown, no matter drilling from the outside to the inside or from the inside to the outside, since it is necessary to use external force to push the drill bit 3 to move, and as the drill bit 3 goes deeper, the resistance of the ice bucket to the drill bit 3 will also become greater, and the required external force also needs to be gradually increased. Therefore, it may cause a certain deformation of the partial area with the drill bit 3 as the center of the circle. Taking this embodiment as an example, it may cause the area around the drill hole to protrude further outward, resulting in poor drilling quality.
[0037] A supporting pad 10 is provided on the outside of the ice bucket. The curvature of the pad 10 is just adapted to the curvature of the surface of the ice bucket. A circular groove 11 with a diameter slightly larger than the required circular hole diameter is provided on the surface of the pad 10 to ensure that the pad 10 does not affect the drilling of the drill bit 3. Similarly, since the pressure applied to the surface of the drill bit 3 needs to be continuously increased, the pressure applied to the surface of the ice bucket is also continuously increased, so the supporting force of the surface of the pad 10 needs to be continuously increased (not providing the maximum supporting force of the pad 10 in the initial state, also to prevent the supporting force of the pad 10 from being too large, which will cause the ice bucket to The support position produces a large range of deformation), four springs 16 and four guide rods 15 are assembled on the surface of the pad 10, and the end of the spring 16 is assembled with the extrusion plate 14. The end of the guide rod 15 is movable through the extrusion plate 14, and the push rod 2 13 is used to drive the movement of the extrusion plate 14, thereby squeezing the spring 16, and indirectly supporting the pad 10 through the extrusion force of the spring 16. As the deformation distance of the spring 16 increases, the elastic force of the spring 16 will also increase, and the supporting force applied to the surface of the pad 10 will gradually increase, and the push rod 2 13 is pushed by electricity.
[0038] like Figures 4 - 6 As shown, when the drill bit 3 is drilling a hole in the ice bucket, due to the continuous rotation of the drill bit 3, when it just enters one side of the ice bucket, small burrs in the vertical direction will be generated on the surface of the ice bucket, and when the drill bit 3 passes through one side of the ice bucket, larger flange burrs will be generated, and a large amount of flying chips will be generated during the drilling process. Therefore, a tubular cutting head 4 that can also be moved is provided on the surface of the drill bit 3. The outer diameter of the tubular cutting head 4 is the required inner diameter of the circular hole. The tubular cutting head 4 is sleeved on the surface of the drill bit 3, and a certain gap is provided between the two so that the flying chips can enter the interior of the tubular cutting head 4. After the drill bit 3 drills a hole in the ice bucket, the tubular cutting head 4 cuts the position of the drill hole. The inner wall of the end of the tubular cutting head 4 is set to be inclined to reduce the thickness of the end of the tubular cutting head 4, which is convenient for cutting the ice bucket.
[0039] During this process, the drill bit 3 first pre-drills the surface of the ice-making bucket to form a pre-drilled hole with an inner diameter smaller than but close to the inner diameter of the required round hole. The flying chips generated during this process will enter the interior of the tubular cutting head 4 to prevent the waste chips from splashing and protect the staff and the ice-making bucket itself. Since the inner diameter of the pre-drilled hole itself is close to the inner diameter of the required round hole, when the tubular cutting head 4 moves to cut this position, the cutting thickness will be relatively thin. Therefore, the tubular cutting head 4 can easily cut out the required round hole, and at the same time remove the burrs attached to the surface of the thin wall, ensuring the quality during drilling. Since drilling and cutting are almost carried out simultaneously, the drilling efficiency will not be affected either.
[0040] As Figures 1 - 5 shown, similarly, to prevent the excessive supporting force of the first backing plate 10, a second backing plate 17 identical to the first backing plate 10 is provided on the inner side of the ice-making bucket. The second backing plate 17 abuts against the position at the same height as the first backing plate 10. The second backing plate 17 is sleeved on the surface of the tubular cutting head 4. The pipe cutting head 4 is assembled on the surface of the power equipment of the drill bit 3 through an installation component. The installation component includes four installation rods 19 assembled on the surface of the second backing plate 17. A second spring 22 is sleeved on the surface of the installation rod 19. An extrusion plate 21 is sleeved on the surface of the installation rod 19. Both ends of the second spring 22 are fixed on the surfaces of the extrusion plate 21 and the second backing plate 17 respectively. The extrusion plate 21 is sleeved on the surface of the tubular cutting head 4. A connecting plate 18 is integrally formed on the surface of the tubular cutting head 4. The extrusion plate 21 is fixed on the surface of the connecting plate 18 by bolts. For ice-making buckets of different diameters, the second backing plate 17 and the extrusion plate 21 can be replaced by removing the bolts. When the tubular cutting head 4 moves, it can push the extrusion plate 21 to move, and the second backing plate 17 is extruded through the resilience of the second spring 22, so as to generate an increasingly large supporting force on the second backing plate 17 to adapt to the increasingly large supporting force of the first backing plate 10.
[0041] As Figure 4 shown, an adjustment component is assembled on the surface of the mounting plate 18 to adjust the position of the end of the drill bit. The adjustment component includes a moving block 23 sleeved on the surface of the mounting rod 19 and a connecting component. The connecting component includes a third spring 25 sleeved on the surface of the mounting rod 19. Both ends of the third spring 25 are installed on the surfaces of the connecting plate 18 and the moving block 23 respectively. The surface of the drill bit 3 is assembled with a mounting plate 20 through a bearing. The mounting rod 19 movably penetrates through the mounting plate 20. A threaded rod 24 is assembled on the surface of the moving block 23 through a bearing. The end of the threaded rod 24 threadedly penetrates through the surface of the mounting plate 20. The distance between the moving block 23 and the mounting plate 20 can be adjusted by rotating the threaded rod 24, so as to indirectly adjust the depth of the end of the drill bit 3 inside the tubular cutting head 4.
[0042] When the drill bit 3 is inside the tubular cutting head 4, the movement of the drill bit 3 will drive the mounting plate 20 and the moving block 23 to move simultaneously. The moving block 23 pushes the connecting plate 18 to move through the third spring 25. The connecting plate 18 pushes the second pressing plate 21 to move. When the drill bit 3 moves, the tubular cutting head 4 will first abut against the inner wall of the ice-making bucket. As the drill bit 3 moves further, the tubular cutting head 4 will first cause scratches on the surface of the ice-making bucket until it is partially embedded inside the ice-making bucket. As the embedding depth increases, the resistance of the ice-making bucket to the tubular cutting head 4 will gradually increase until the tubular cutting head 4 is difficult to move. At this time, the tubular cutting head 4 can still limit the position of the drill bit 3 to prevent the end of the drill bit 3 from shifting during the rotation process and ensure the accuracy of the drilling position. When an external force increases and pushes the drill bit 3 to move again, it drives the tubular cutting head 4 to cut. The second spring 22 and the third spring 25 are further compressed. The drill bit 3 abuts against the inner wall of the ice-making bucket to drill. When drilling to the deepest cutting position of the tubular cutting head 4 and further drilling inward, the cutting of the ice-making bucket by the tubular cutting head 4 will be easier, thereby ensuring better drilling quality.
[0043] As Figures 1 - 3 shown, to facilitate placing the drill bit 3 into the ice-making bucket, a liftable gantry 1 is provided to accommodate ice-making buckets of different heights. A pushing component is arranged outside the ice-making bucket. The pushing component includes a mounting frame 5. A hanging frame 2 is assembled on the truss of the gantry 1. Multiple rollers can be installed on the surface of the hanging frame 2 so that the hanging frame 2 can move along the truss. The mounting frame 5 is assembled at the end of the hanging frame 2. One side of the mounting frame 5 is set as an inclined surface. A power device for driving the rotation of the drill bit 3 is assembled on the surface of the mounting frame 5. When the hanging frame 2 moves, it can push the drill bit 3 to move. A moving frame 8 that moves along the truss is assembled on the surface of the hanging frame 2. The first pushing rod 6 is installed on the moving frame 8. A positioning locking rod 9 is arranged between the moving frame 8 and the truss. Multiple corresponding holes are opened on the truss. The locking rod 9 is pressed to make it stuck inside the holes to achieve positioning. The first pushing rod 6 is pushed by electricity. An extrusion block 7 with inclined surfaces on both sides is assembled at the end of the first pushing rod 6. The inclined surface of the extrusion block 7 is adapted to the inclined surface of the mounting frame 5. During the downward movement of the first pushing rod 6, the extrusion block 7 is driven to move, and the mounting frame 5 is extruded by the inclined surface of the extrusion block 7, thereby indirectly pushing the drill bit 3 to move.
[0044] To facilitate the first cushion plate 10 and the second cushion plate 17 to always be at the same height, a liftable support frame 12 is assembled on the surface of the gantry 1. The second pushing rod 13 is installed on the surface of the support frame 12.
[0045] In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as a limitation on the present invention.
[0046] In the description of the present invention, it should also be noted that unless otherwise clearly specified and defined, the terms "set", "connected", "installed", "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the communication inside two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood through specific situations.
[0047] The preferred embodiments of the present invention have been described above. It should be understood that the present invention is not limited to the above specific embodiments, and the devices and structures not described in detail should be understood to be implemented in a common manner in the art; any person skilled in the art can make many possible changes and modifications without departing from the technical solution of the present invention, or modify it into an equivalent embodiment with equivalent changes, which does not affect the essence of the present invention. Therefore, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still fall within the scope of protection of the technical solution of the present invention.
Claims
1. An ice and snow equipment component drilling and processing device, which is used for drilling holes on the surface of the ice-making bucket of an ice maker, and is characterized in that: It includes a liftable gantry. A hanging bracket that can move along the truss is assembled on the truss of the gantry. A drill bit for drilling and a power device for driving the drill bit to rotate are assembled on the surface of the hanging bracket. The hanging bracket places the drill bit and the power device inside the ice-making bucket, facilitating the positioning of the drill bit at the drilling position. The surface of the drill bit is sleeved with tubular cutting heads at intervals, so that the waste chips generated by drilling enter the intervals to prevent the waste chips from splashing everywhere. One end inner wall of the tubular cutting head is set to be inclined to reduce the thickness of this end of the tubular cutting head, facilitating the cutting of the drilling position to form a smooth round hole, and using the inclined surface to guide the cut waste chips into the intervals. The working end of the drill bit extends outside the tubular cutting head, so that the drill bit and the tubular cutting head drill and cut the ice-making bucket in sequence. The tubular cutting head is assembled on the surface of the power device of the drill bit through an installation component. An arc-shaped backing plate one for supporting the ice-making bucket is assembled outside the ice-making bucket corresponding to the position of the drill bit. A pushing component is assembled on the surface of the gantry to push the power device to move along the axial direction of the drill bit.
2. The drilling processing equipment for an ice and snow equipment component according to claim 1, characterized in that: The pushing component includes an installation frame for installing the power device. One side of the installation frame is set to be inclined. A push rod one that can move along the truss and can be lifted is assembled on the surface of the gantry. An extrusion block with inclined sides at both ends is assembled at the end of the push rod one, and the side of the extrusion block abuts against the surface of the installation frame. The push rod one is assembled on the surface of the gantry through a moving frame, and a locking rod for fixing the position is assembled on the surface of the moving frame.
3. The drilling and processing equipment for an ice and snow equipment component according to claim 1, wherein: A through-round groove is opened on the surface of the backing plate one. The inner diameter of the round groove is larger than the inner diameter of the required drill hole, and the center of the circle coincides with the axis of the drill bit. A liftable support frame is assembled on the side wall of the gantry. A push rod two for pushing the backing plate one to move along the axial direction of the drill bit is assembled on the surface of the support frame.
4. The drilling processing equipment for an ice and snow equipment component according to claim 3, characterized in that: Extrusion plates one are arranged at intervals on the surface of the backing plate one and are assembled at the end of the push rod two. A guide rod for guiding the movement of the extrusion plate one is assembled between the extrusion plate one and the backing plate one. A spring one for support is assembled on the surface of the guide rod, and both ends of the spring one abut between the extrusion plate one and the backing plate one respectively.
5. The drilling processing equipment for an ice and snow equipment component according to claim 4, characterized in that: A backing plate two of the same size as the backing plate one is sleeved on the surface of the tubular cutting head. The backing plate two abuts against the inner wall of the ice-making bucket and is at the same height as the backing plate one, providing a supporting force for the drilling area.
6. The drilling processing equipment for an ice and snow equipment component according to claim 5, characterized in that: The installation component includes a connecting plate integrally formed with the tubular cutting head. A plurality of installation rods are assembled on the surface of the connecting plate. An installation plate is assembled on the surface of the drill bit through a bearing, and the installation rods are assembled on the surface of the installation plate.
7. An ice and snow equipment component drilling and processing device according to claim 6, characterized in that: The installation rods are assembled on the surface of the backing plate two. One end of the installation rod movably penetrates the connecting plate. An extrusion plate two is arranged between the connecting plate and the backing plate two. The extrusion plate two is assembled on the surface of the connecting plate. A spring two is sleeved on the surface of the installation rod, and both ends of the spring two are respectively installed on the surface of the backing plate two and the extrusion plate two.
8. The drilling processing equipment for an ice and snow equipment component according to claim 7, wherein: An adjustment component is assembled on the surface of the installation plate to adjust the position of the end of the drill bit.
9. The drilling processing equipment for an ice and snow equipment component according to claim 8, characterized in that: The adjusting component includes a plurality of moving blocks sleeved on the surface of the mounting rod. A connecting component is assembled between the moving block and the connecting plate. A threaded rod is assembled on the surface of the moving block through a bearing, and one end of the threaded rod threadedly penetrates through the mounting plate.
10. The drilling processing equipment for an ice and snow equipment component according to claim 9, characterized in that: The connecting component is a third spring sleeved on the surface of the mounting rod, and the two ends of the third spring respectively abut against the surfaces of the moving block and the connecting plate.
Citation Information
Patent Citations
Solar photovoltaic panel installation frame drilled hole cutting device
CN107877259A
Plate punching device for mechanical part manufacturing
CN120205861A
countersink head
DE3038465A1
Hole saw having deburring blade
JP2007021688A
Drilling and deburring apparatus
US4165200A