Building exterior wall coating and construction process thereof
By using building exterior wall paint and base treatment devices with specific ingredients and remote control for exterior wall construction, the safety hazards and low efficiency of suspended hanging basket construction are solved, and stability and construction progress are guaranteed.
Patent Information
- Application Number
- CN202510737686.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-04
- Publication Date
- 2025-09-05
AI Technical Summary
Existing exterior wall paint construction requires workers to work on a hanging basket, which poses safety hazards, has low construction efficiency and is easy to damage the wall, affecting the psychological and physical safety of workers.
It uses building exterior wall paint including slurry and paint mixing components, and is equipped with a base processing device on a hanging basket, including a track module, primer spraying module, putty filling module, oil cleaning module and particle grinding module. Construction is carried out by remote control, and stability and safety are improved by auxiliary stabilization module and adsorption head module.
It reduces the psychological burden on workers when hanging the hanging basket, reduces the risk of the hanging basket hitting the exterior wall, improves construction efficiency and safety, and ensures that the construction progress is not affected by weather.
Smart Images

Figure CN120590820A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of exterior wall construction, in particular to a building exterior wall coating and a construction process thereof. Background Art
[0002] Exterior wall paint construction refers to the process of applying paint to the exterior walls of a building to protect the wall and enhance its beauty and durability. Exterior wall paint construction is an important measure to protect the exterior walls of a building and enhance its beauty. Through standardized construction processes and precautions, the paint effect and durability can be ensured.
[0003] Although the existing exterior wall paint construction technology is relatively mature, it still has certain disadvantages: First, when constructing the existing exterior wall paint, workers are still required to use tools on the hanging basket to do the exterior wall base treatment and paint treatment. When the workers are working, if the safety measures are not taken well, the workers will easily fall and other safety accidents. This can increase the psychological burden of the workers when they are working on the exterior wall on the hanging basket to a certain extent; Second, the existing exterior wall paint construction relies on manual work on the hanging basket, and when the hanging basket is under construction, it is inevitable that there will be a breeze at high altitude that disturbs the hanging basket. When there is a breeze disturbance, the hanging basket The hanging basket will be disturbed, and the hanging basket will swing and may hit the outer facade of the wall, which can easily damage the outer facade of the wall and require additional repairs, increasing project expenses. The hanging basket will also be damaged during the collision, and the damaged hanging basket may not be able to guarantee the life safety of the workers on the hanging basket, posing a certain safety hazard. Thirdly, the existing exterior wall paint construction relies on manual work on the hanging basket. When the sun is strong or it rains lightly, the workers in the basket will be exposed to the sun or rain, which will affect the workers' construction efficiency, thereby extending the project completion time to a certain extent. Summary of the Invention
[0004] The technical problem to be solved by the present invention is to provide a building exterior wall paint and its construction process to solve the problem that the existing exterior wall paint construction requires workers to construct on a hanging basket, the workers have a heavy psychological burden during construction, and when constructing on the hanging basket, the basket as a whole is easily disturbed by a breeze, which can easily cause the hanging basket as a whole to collide with the exterior wall surface, causing damage to the exterior wall surface, requiring additional repairs, and increasing project expenses. At the same time, the hanging basket body is also easily damaged, threatening the personal safety of the workers, posing certain safety hazards, and the workers are easily exposed to sunlight or rain during construction, which can reduce the workers' work efficiency and prolong the project completion time.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0006] A building exterior wall coating, comprising a slurry component and a paint letdown component: the slurry component comprises 20% water, 5% propylene glycol, 2% wetting and dispersing agent, 2% defoaming agent, 2% preservative, 1% amine neutralizer, 8% titanium dioxide, 25% heavy calcium carbonate, 8% talc, and 10% calcined kaolin;
[0007] The paint mix comprises 5% of film-forming agent, 1% of defoaming agent, 1% of preservative, 1% of amine neutralizer, 16% of styrene acrylic emulsion, 4% of thickener, 6% of rheological agent and 3%-5% of water;
[0008] The exterior building wall paint requires pouring and mixing the slurry component and the paint mixing component together, and only after fully mixing them using a stirring mechanism can the paint be constructed according to the construction steps of the exterior building wall paint.
[0009] The present application also provides a construction process for a building exterior wall coating, comprising the following steps:
[0010] S1: Riding tool: Exterior wall paint construction workers ride on the exterior wall construction hanging basket and operate the exterior wall hanging basket to rise to the construction height;
[0011] S2: Protection of objects outside the wall: Exterior wall paint construction workers ride in a hanging basket and use tools such as film to protect objects other than the exterior wall to prevent paint from splashing onto objects other than the exterior wall;
[0012] S3: Exterior wall base treatment: Exterior wall paint construction workers use the exterior wall base treatment device to polish, wash, fill putty and spray primer on the building's exterior wall to complete the building's exterior wall base treatment, facilitating subsequent exterior wall paint construction;
[0013] S4: Exterior wall coating construction: After the exterior wall base construction is completed, the construction workers use the paint spray gun to spray the exterior wall part of the building that has been treated with the base;
[0014] The exterior wall base processing device includes a hanging basket, a processing device base is provided on the top of the hanging basket, an auxiliary stabilization module is provided on the back of the processing device base, an adsorption head module is provided at one end of the auxiliary stabilization module, and a counterweight module, a ceiling module and a track module are provided on the top of the processing device base from front to back, and a primer spraying module, a putty filling module, an oil cleaning module and a particle grinding module are provided on the inner wall of the track module from left to right.
[0015] The auxiliary stabilization module includes a fixing plate, a bolt straight hole is opened on the top of the fixing plate, a fixing plate connecting bolt is provided on the inner wall of the bolt straight hole, the fixing plate is installed with a clamping plate through the fixing plate connecting bolt, the surface of the fixing plate connecting bolt is threadedly connected to a threaded fastening ring, the left side of the fixing plate is fixedly connected to a limited baffle, the left side of the clamping plate is fixedly connected to a magnetic rod, a stabilization module hydraulic press is provided on the back of the clamping plate, the stabilization module hydraulic press is threadedly connected to the clamping plate through the clamping plate bolt, one end of the stabilization module hydraulic press is threadedly connected to a vacuum switch base, a vacuum switch is provided on the back of the vacuum switch base, the vacuum switch is threadedly connected to the vacuum switch base through the vacuum switch bolt, one end of the vacuum switch is threadedly connected to a gas leakage detector, a detector alarm is provided on the top of the gas leakage detector, one end of the gas leakage detector is threadedly connected to a vacuum electric control valve, and one end of the vacuum electric control valve is threadedly connected to an adsorption head module.
[0016] Optionally, the adsorption head module includes an adsorption head threaded end, a collision alarm is provided on the top of the adsorption head threaded end, a collision alarm sounder is provided on the front of the collision alarm, a trigger button is provided on the left side of the collision alarm, one end of the adsorption head threaded end is fixedly connected to the inlet and outlet threaded end base, one end of the inlet and outlet threaded end base is provided with a groove, the inner wall of the groove is provided with an inlet and outlet threaded end, the inner wall of the inlet and outlet threaded end is threadedly connected to the inlet and outlet threaded head, one end of the inlet and outlet threaded head is threadedly connected to an isolation screen, one end of the inlet and outlet threaded end base is fixedly connected to a shock-absorbing spring, one end of the shock-absorbing spring is fixedly connected to a front end ring, and the surface of the front end ring is fixedly connected to an impact straight rod.
[0017] Optionally, the counterweight module includes a counterweight base plate, the bottom of the counterweight base plate is fixedly connected to the processing device base, the front of the counterweight base plate is fixedly connected to the counterweight connecting plate, the front of the counterweight connecting plate is fixedly connected to the counterweight bin, the inner wall of the counterweight bin is provided with a counterweight block, the front of the counterweight bin is provided with a closing plate, and the closing plate is threadedly connected to the counterweight bin through a closing plate bolt.
[0018] Optionally, the ceiling module includes a bolt base plate, the bottom of the bolt base plate is provided with a processing device base, the processing device base is threadedly connected to the bolt base plate through ceiling connecting bolts, the top of the bolt base plate is fixedly connected to a column, the top of the column is fixedly connected to the ceiling, the bottom of the ceiling is fixedly connected to a triangular reinforcement plate, and the ceiling is fixedly connected to the column through the triangular reinforcement plate.
[0019] Optionally, the track module includes a left base plate and a right base plate, the back of the left base plate is provided with a left box body, the left box body is threadedly connected to the left base plate through a left box body bolt, the back of the right base plate is provided with a right box body, the right box body is threadedly connected to the right base plate through a right box body bolt, the top of the left box body is provided with a left box body top cover, the left box body top cover is threadedly connected to the left box body through the left box body top cover bolt, the top of the right box body is provided with a right box body top cover, and the right box body top cover is threadedly connected to the right box body through the right box body top cover bolt, the front of the left box body is opened with a left box body rotating shaft hole, the inner wall of the left box body rotating shaft hole is installed with a left box body rotating shaft, and the inner wall of the left box body rotating shaft is provided with a left vertical rotating rod;
[0020] One end of the left vertical rotating rod is provided with a left transverse meshing gear, and the inner wall of the left transverse meshing gear is provided with a left screw rod, one end of the left screw rod is fixedly connected to the left limiting circular plate, the surface of the left screw rod is threadedly connected to the left L-shaped track connector, and the back side of the left L-shaped track connector is fixedly connected to the track. The lower surface of the left transverse meshing gear is provided with a left vertical meshing gear, and the inner wall of one end of the left vertical meshing gear is provided with a left transverse rotating rod, and one end of the left transverse rotating rod is provided with a rotating rod motor, and the rotating rod motor is threadedly connected to the left box body through a rotating rod motor bolt. A rotating rod hole is opened on the left side of the left box body, and the rotating rod hole and the left transverse rotating rod are adapted to each other, and the inner wall of the other end of the left vertical meshing gear is provided with a connecting screw rod;
[0021] One end of the connecting screw rod is provided with a right vertical meshing gear, and the inner wall of one end of the right vertical meshing gear is provided with a right horizontal rotating rod, and one end of the right horizontal rotating rod is provided with a right rotating rod rotating shaft, and the upper surface of the right vertical meshing gear is provided with a right horizontal meshing gear, and the inner wall of one end of the right horizontal meshing gear is provided with a right vertical rotating rod, and one end of the right vertical rotating rod is provided with a right box body rotating shaft, and the inner wall of the other end of the right horizontal meshing gear is provided with a right screw rod. One end of the right screw rod is fixedly connected to the right limiting circular plate, and the surface of the right screw rod is threadedly connected to the right L-shaped track connector, and the right side of the left box body is opened with a left box body connecting screw rod hole, and the left box body connecting screw rod hole and the connecting screw rod are adapted to each other.
[0022] A left screw rod hole is provided on the back side of the left box body, and the left screw rod hole and the left screw rod are adapted to each other. A right box body rotating shaft hole is provided on the front side of the right box body, and the right box body rotating shaft hole and the right box rotating shaft are adapted to each other. A right box body connecting screw rod hole is provided on the left side of the right box body, and the right box connecting screw rod hole and the connecting screw rod are adapted to each other. A right screw rod hole is provided on the back side of the right box body, and the right screw rod and the right screw rod hole are adapted to each other. A right rotating rod rotating shaft hole is provided on the right side of the right box body, and the right rotating rod rotating shaft hole and the right rotating rod rotating shaft are adapted to each other.
[0023] Optionally, the primer spraying module includes a primer spraying electric drive vehicle, the back of the primer spraying electric drive vehicle is fixedly connected to a primer spraying T-plate, the back of the primer spraying T-plate is provided with a sprayer base plate, the sprayer base plate is threadedly connected to the primer spraying T-plate through a sprayer base plate bolt, the back of the sprayer base plate is provided with a sprayer, the back of the sprayer is threadedly connected to a spray nozzle, the left side of the sprayer is provided with a primer box and a primer suction motor from front to back, the left side of the primer box is provided with a primer delivery pipe, the primer box is installed with a primer suction motor through the primer delivery pipe, the top of the primer suction motor is not provided with a top primer delivery pipe, the primer suction motor is installed with a sprayer through the top primer delivery pipe, the right side of the sprayer is provided with a gas tank connecting end, the inner wall of the gas tank connecting end is threadedly connected to the gas tank.
[0024] Optionally, the putty filling module includes a putty filling electric drive vehicle, the left side of the putty filling electric drive vehicle is fixedly connected to a putty filling electric drive vehicle connecting column, the back of the putty filling electric drive vehicle is fixedly connected to a putty filling T-shaped plate, the back of the putty filling T-shaped plate is provided with a heater, a C-shaped plate and an infrared modeling instrument body from left to right, the left side of the infrared modeling instrument body is provided with an infrared modeling instrument prompter, the right side of the infrared modeling instrument body is provided with an infrared modeling instrument host, the back of the infrared modeling instrument body is provided with an infrared laser head base, the back of the infrared laser head base is threadedly connected with an infrared laser head, the top of the C-shaped plate is provided with a screw motor, the bottom of the screw motor is provided with a vertical screw, and one end of the vertical screw is provided with a vertical screw shaft;
[0025] The top and bottom of the C-shaped plate are respectively provided with a vertical screw rod hole and a vertical screw rod rotating shaft hole, the vertical screw rod hole and the vertical screw rod are adapted to each other, the vertical screw rod rotating shaft hole and the vertical screw rod rotating shaft are adapted to each other, the surface of the vertical screw rod is threadedly connected to the putty filling module hydraulic press base, the back of the putty filling module hydraulic press base is provided with a putty filling module hydraulic press, the putty filling module hydraulic press is threadedly connected to the putty filling module hydraulic press base through a putty filling module hydraulic press bolt, one end of the putty filling module hydraulic press is fixedly connected to an extrusion plate, the back of the putty filling module hydraulic press is provided with a putty barrel straight rod, the putty barrel straight rod is threadedly connected to the putty filling module hydraulic press through a putty barrel straight rod bolt, and the inner wall of the putty barrel straight rod is fixedly connected to the putty barrel;
[0026] The left side surface of the putty bucket is fixedly connected to a left L-shaped plate, the surface of the left L-shaped plate is provided with a scraper, and the scraper is threadedly connected to the left L-shaped plate through a scraper bolt. The right side surface of the putty bucket is fixedly connected to the right L-shaped plate, the surface of the right L-shaped plate is provided with a miniature camera, and the miniature camera is threadedly connected to the right L-shaped plate through a miniature camera bolt.
[0027] Optionally, the oil cleaning module includes an oil cleaning electric drive vehicle, the left side of the oil cleaning electric drive vehicle is fixedly connected to an oil cleaning electric drive vehicle connecting column, the back of the oil cleaning electric drive vehicle is fixedly connected to an oil cleaning T-shaped plate, the back of the oil cleaning T-shaped plate is sequentially provided with a cleaning liquid motor, a scrubbing motor and a clean water motor from left to right, a cleaning liquid delivery pipe is provided on the left side of the cleaning liquid motor, a cleaning liquid storage tank is installed on the cleaning liquid motor through the cleaning liquid delivery pipe, a cleaning liquid injection end is fixedly connected to the top of the cleaning liquid storage tank, and a cleaning liquid threaded cover is threadedly connected to the surface of the cleaning liquid injection end;
[0028] A cleaning liquid spray head is provided on the back of the cleaning liquid motor, a washing brush rotating rod is provided on the back of the washing brush motor, one end of the washing brush rotating rod is threadedly connected to a washing brush handle, a clean water delivery pipe is provided on the left side of the clean water motor, and a clean water storage tank is installed on the clean water motor through the clean water delivery pipe. A clean water injection end is fixedly connected to the top of the clean water storage tank, and a clean water cover is threadedly connected to the surface of the clean water injection end. A clean water spray head is provided on the back of the clean water motor.
[0029] Optionally, the particle grinding module includes a particle grinding electric drive vehicle, the left side of the particle grinding electric drive vehicle is fixedly connected to a particle grinding electric drive vehicle connecting column, the back of the particle grinding electric drive vehicle is fixedly connected to a particle grinding T-shaped plate, the back of the particle grinding T-shaped plate is provided with a grinder base plate, the back of the grinder base plate is fixedly connected to a grinder connecting threaded end, the inner wall of the grinder connecting threaded end is threadedly connected to the grinder, one end of the grinder is provided with a grinding rotating rod, one end of the grinding rotating rod is fixedly connected to a grinding plate limiting disc, one end of the grinding plate limiting disc is fixedly connected to a threaded column, the surface of the threaded column is provided with a grinding plate chassis, one end of the grinding plate chassis is provided with a grinding plate, and the surface of the threaded column is threadedly connected to an installation fastening ring.
[0030] Compared with the prior art, the present invention has at least the following beneficial effects:
[0031] In the above scheme, by setting up a track module, a primer spraying module, a putty filling module, an oil cleaning module and a particle grinding module, the device can be used to perform base treatment on the exterior wall of the building by remote control. Compared with the existing method of manually processing the base of the exterior wall of the building, the device does not require manual risk to perform base treatment on the exterior wall of the building, which to a certain extent reduces the psychological burden of workers taking risks in construction on the hanging basket.
[0032] By setting up an auxiliary stabilization module and an adsorption head module, after the device reaches the construction location, the auxiliary stabilization module and the adsorption head module can be used in conjunction with each other. The vacuum adsorption technology can be used to temporarily adsorb the hanging basket and the entire device onto the exterior wall of the building, thereby reducing the damage to the facade caused by the hanging basket due to breeze disturbances and reducing the additional engineering expenses required to repair the facade. At the same time, because the hanging basket is relatively stable at high altitudes, this also ensures the personal safety of workers to a certain extent and reduces safety hazards.
[0033] By setting up a roof module, the device can continue to operate as usual under strong sun and light rain, because the roof module can provide shade and shelter for workers under strong sun and light rain. This ensures the normal progress of construction to a certain extent, and also ensures that the project can be completed as scheduled to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The accompanying drawings, which are incorporated herein and constitute a part of the specification, illustrate embodiments of the invention and, together with the description, further serve to explain the principles of the invention and to enable one skilled in the art to make and use the invention.
[0035] Figure 1It is a three-dimensional structural diagram of building exterior wall coating and its construction process;
[0036] Figure 2 It is a schematic diagram of the three-dimensional structure of building exterior wall coatings and their construction process;
[0037] Figure 3 This is a schematic diagram of the auxiliary stabilization module for building exterior wall coatings and their construction process;
[0038] Figure 4 for Figure 3 Enlarged schematic diagram of local structure;
[0039] Figure 5 Schematic diagram of the adsorption head module for building exterior wall coatings and their construction process;
[0040] Figure 6 This is a schematic diagram of the weight module of building exterior wall coating and its construction process;
[0041] Figure 7 It is a schematic diagram of the ceiling module of the building exterior wall coating and its construction process;
[0042] Figure 8 This is a schematic diagram of the track module of building exterior wall coating and its construction process;
[0043] Figure 9 This is a schematic diagram of the primer spraying module for building exterior wall coatings and their construction process;
[0044] Figure 10 This is a schematic diagram of the putty filling module for building exterior wall coatings and their construction process;
[0045] Figure 11 for Figure 10 Enlarged schematic diagram of local structure;
[0046] Figure 12 This is a schematic diagram of the oil cleaning module for building exterior wall paint and its construction process;
[0047] Figure 13 Schematic diagram of the particle grinding module for building exterior wall coatings and their construction process.
[0048] Reference numerals:
[0049] 1. Suspension basket; 2. Processing device base; 3. Auxiliary stabilization module; 301. Fixing plate; 302. Fixing plate connecting bolt; 303. Clamp; 304. Threaded fastening ring; 305. Limit baffle; 306. Magnetic rod; 307. Stabilization module hydraulic press; 308. Vacuum switch base; 309. Vacuum switch; 310. Leak detector; 311. Detector alarm; 312. Vacuum electric control valve; 4. Adsorption head module; 401. Adsorption head thread end; 402. Collision alarm; 403. Collision alarm sounder; 404. Trigger button; 405. Inlet and outlet thread end base; 406. Inlet and outlet thread end; 407. Inlet and outlet thread head; 408. Isolation screen; 409. Shock-absorbing spring; 4 10. Front end ring; 411. Impact straight rod; 5. Counterweight module; 501. Counterweight base plate; 502. Counterweight connecting plate; 503. Counterweight bin; 504. Counterweight block; 505. Closing plate; 6. Roof module; 601. Bolt base plate; 602. Column; 603. Roof; 604. Triangular reinforcement plate; 7. Track module; 701. Left base plate; 702. Right base plate; 703. Left box; 704. Right box; 705. Left box top cover; 706. Right box top cover; 707. Left box shaft; 708. Left vertical rotating rod; 709. Left horizontal meshing gear; 710. Left screw; 711. Left limit circular plate; 712. Left L-shaped track connector; 713. Track ; 714, left vertical meshing gear; 715, left horizontal rotating rod; 716, rotating rod motor; 717, connecting screw; 718, right vertical meshing gear; 719, right horizontal rotating rod; 720, right rotating rod shaft; 721, right horizontal meshing gear; 722, right vertical rotating rod; 723, right box shaft; 724, right screw; 725, right limiting circular plate; 726, right L-shaped track connector; 8, primer spraying module; 801, primer spraying electric drive vehicle; 802, primer spraying T-shaped plate; 803, sprayer base plate; 804, sprayer; 805, spray nozzle; 806, primer box; 807, primer suction motor; 808, primer delivery pipe; 809, top primer delivery pipe; 810 , gas tank connection end; 811, gas tank; 9, putty filling module; 901, putty filling electric drive vehicle; 902, putty filling electric drive vehicle connection column; 903, putty filling T-shaped plate; 904, heater; 905, C-shaped plate; 906, infrared modeling instrument body; 907, infrared modeling instrument prompter; 908, infrared modeling instrument host; 909, infrared laser head base; 910, infrared laser head; 911, lead screw motor; 912, vertical lead screw; 913, vertical lead screw shaft; 914, putty filling module hydraulic press base; 915, putty filling module hydraulic press; 916, extrusion plate; 917, putty bucket straight rod; 918, putty bucket; 919, left L-shaped plate; 920, scraper; 921, right L-shaped plate;922. Mini camera; 10. Oil cleaning module; 1001. Oil cleaning electric drive vehicle; 1002. Oil cleaning electric drive vehicle connecting column; 1003. Oil cleaning T-shaped plate; 1004. Cleaning liquid motor; 1005. Scrubbing motor; 1006. Clean water motor; 1007. Cleaning liquid delivery pipe; 1008. Cleaning liquid storage tank; 1009. Cleaning liquid injection port; 1010. Cleaning liquid threaded cap; 1011. Cleaning liquid spray head; 1012. Scrubbing rod; 1013. Scrubbing handle; 1014. Clean water delivery pipe; 1015. Cleaning Water storage tank; 1016, clean water injection port; 1017, clean water cap; 1018, clean water spray head; 11, particle grinding module; 1101, particle grinding electric drive vehicle; 1102, particle grinding electric drive vehicle connecting column; 1103, particle grinding T-shaped plate; 1104, grinder base plate; 1105, grinder connection threaded end; 1106, grinder; 1107, grinding shaft; 1108, grinding disc limit disc; 1109, threaded column; 1110, grinding disc chassis; 1111, grinding disc; 1112, mounting fastening ring.
[0050] As shown in the figure, in order to clearly implement the structure of the embodiment of the present invention, specific structures and devices are marked in the figure, but this is only for illustrative purposes and is not intended to limit the present invention to the specific structure, device and environment. According to specific needs, ordinary technicians in this field can adjust or modify these devices and environments. DETAILED DESCRIPTION
[0051] The following describes in detail a building exterior wall coating and its application process provided by the present invention, with reference to the accompanying drawings and specific embodiments. It is also noted that, for the sake of completeness, the following embodiments are best and preferred embodiments, and those skilled in the art may employ alternative implementations for known techniques. Furthermore, the accompanying drawings are intended only to provide a more detailed description of the embodiments and are not intended to limit the present invention.
[0052] It should be noted that references in the specification to "one embodiment," "an embodiment," "an exemplary embodiment," "some embodiments," etc. indicate that the described embodiments may include specific features, structures, or characteristics, but not every embodiment necessarily includes such specific features, structures, or characteristics. In addition, when specific features, structures, or characteristics are described in conjunction with an embodiment, it is within the knowledge of persons skilled in the relevant art to implement such features, structures, or characteristics in conjunction with other embodiments (whether or not explicitly described).
[0053] In general, terms can be understood, at least in part, from their use in context. For example, depending at least in part on the context, the term "one or more" as used herein can be used to describe any feature, structure, or characteristic in the singular sense, or can be used to describe a combination of features, structures, or characteristics in the plural sense. Additionally, the term "based on" can be understood as not necessarily intended to convey an exclusive set of factors, but can instead, depending at least in part on the context, allow for the presence of other factors that are not necessarily explicitly described.
[0054] It will be understood that the meanings of “on,” “over,” and “above” in the present invention should be interpreted in the broadest manner, so that “on” means not only “directly on” something but also includes the meaning of being “on” something with intervening features or layers, and “on” or “above” means not only “on” or “above” something but also includes the meaning of being “on” or “above” something with no intervening features or layers.
[0055] Additionally, spatially relative terms such as "below," "beneath," "lower," "above," and "upper" may be used herein for descriptive convenience to describe the relationship of one element or feature to another element or features, as illustrated in the accompanying drawings. Spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the accompanying drawings. The device may be oriented in other ways, and the spatially relative descriptors used herein should be similarly interpreted accordingly.
[0056] like Figure 1 and Figure 2 As shown, an embodiment of the present invention provides a building exterior wall coating and a construction process thereof, comprising a slurry component and a paint mix component: the slurry component comprises 20% water, 5% propylene glycol, 2% wetting and dispersing agent, 2% defoaming agent, 2% preservative, 1% amine neutralizer, 8% titanium dioxide, 25% heavy calcium carbonate, 8% talc, and 10% calcined kaolin;
[0057] The paint mix comprises 5% of film-forming agent, 1% of defoaming agent, 1% of preservative, 1% of amine neutralizer, 16% of styrene acrylic emulsion, 4% of thickener, 6% of rheological agent and 3%-5% of water;
[0058] The exterior building wall paint requires pouring and mixing the slurry component and the paint mixing component together, and only after fully mixing them using a stirring mechanism can the paint be constructed according to the construction steps of the exterior building wall paint.
[0059] The present application also provides a construction process for a building exterior wall coating, comprising the following steps:
[0060] S1: Riding tool: Exterior wall paint construction workers ride on the exterior wall construction hanging basket and operate the exterior wall hanging basket to rise to the construction height;
[0061] S2: Protection of objects outside the wall: Exterior wall paint construction workers ride in a hanging basket and use tools such as film to protect objects other than the exterior wall to prevent paint from splashing onto objects other than the exterior wall;
[0062] S3: Exterior wall base treatment: Exterior wall paint construction workers use the exterior wall base treatment device to polish, wash, fill putty and spray primer on the building's exterior wall to complete the building's exterior wall base treatment, facilitating subsequent exterior wall paint construction;
[0063] S4: Exterior wall coating construction: After the exterior wall base construction is completed, the construction workers use the paint spray gun to spray the exterior wall part of the building that has been treated with the base;
[0064] The exterior wall base processing device includes a hanging basket 1, a processing device base 2 is provided on the top of the hanging basket 1, an auxiliary stabilization module 3 is provided on the back of the processing device base 2, an adsorption head module 4 is provided at one end of the auxiliary stabilization module 3, and a counterweight module 5, a ceiling module 6 and a track module 7 are provided on the top of the processing device base 2 from front to back, and a primer spraying module 8, a putty filling module 9, an oil cleaning module 10 and a particle grinding module 11 are provided on the inner wall of the track module 7 from left to right.
[0065] Install the processing device base 2 on the hanging basket 1, install the adsorption head module 4 on the auxiliary stabilization module 3, and then install the assembled auxiliary stabilization module 3 on the processing device base 2, and install the counterweight module 5, ceiling module 6 and track module 7 in sequence from front to back on the top of the processing device base 2, weld the primer spraying module 8 to the putty filling module 9, weld the putty filling module 9 to the oil cleaning module 10, weld the oil cleaning module 10 to the particle grinding module 11, and then install the primer spraying module 8, putty filling module 9, oil cleaning module 10 and particle grinding module 11 in sequence into the track module 7 to complete the assembly.
[0066] During use, workers enter the hanging basket 1 and then control the hanging basket 1 to rise to the construction position. Then the workers need to control the auxiliary stabilization module 3 so that the auxiliary stabilization module 3 can cooperate with the adsorption head module 4 to press down on the outer wall of the building. Then, the vacuum negative pressure is used to adsorb the hanging basket 1 onto the outer wall of the building, so that the hanging basket 1 and the device as a whole can maintain a relatively stable state. The ceiling module 6 can provide shade and shelter for the workers when the sun is exposed to a large degree or it rains. Start the track module 7 to push the track 713 to the construction position, and then control the primer spraying module 8, putty filling module 9, oil cleaning module 10 and particle grinding module 11 in turn to perform base treatment on the outer wall of the building to complete the operation.
[0067] By setting up a track module 7, a primer spraying module 8, a putty filling module 9, an oil cleaning module 10 and a particle grinding module 11, the device can be used to perform base treatment on the exterior wall of a building by remote control. Compared with the existing method of manually processing the base of the exterior wall of a building, the device does not require manual risk to perform base treatment on the exterior wall of the building, which to a certain extent reduces the psychological burden of workers taking risks in construction on the hanging basket 1.
[0068] like Figures 3 to 5 As shown, the auxiliary stabilization module 3 includes a fixing plate 301, a bolt hole is opened on the top of the fixing plate 301, a fixing plate connecting bolt 302 is provided on the inner wall of the bolt hole, a clamping plate 303 is installed on the fixing plate 301 through the fixing plate connecting bolt 302, a threaded fastening ring 304 is threadedly connected to the surface of the fixing plate connecting bolt 302, a limited baffle 305 is fixedly connected to the left side of the clamping plate 301, a magnetic rod 306 is fixedly connected to the left side of the clamping plate 303, and a stabilization module hydraulic press 307 is provided on the back of the clamping plate 303, and the stabilization module hydraulic press 307 is screwed to the clamping plate bolt The thread is connected with a splint 303, one end of the stabilizing module hydraulic press 307 is threadedly connected to the vacuum switch base 308, a vacuum switch 309 is provided on the back of the vacuum switch base 308, the vacuum switch 309 is threadedly connected to the vacuum switch base 308 through a vacuum switch bolt, one end of the vacuum switch 309 is threadedly connected to the leakage detector 310, the top of the leakage detector 310 is provided with a detector alarm 311, one end of the leakage detector 310 is threadedly connected to the vacuum electric control valve 312, and one end of the vacuum electric control valve 312 is threadedly connected to the adsorption head module 4.
[0069] The fixing plate 301 is welded to the back of the processing device base 2, and the bolt straight hole and the fixing plate 301 are integrally formed. The clamping plate 303 is installed on the fixing plate 301, and the two are connected using the fixing plate connecting bolts 302, and then the threaded fastening ring 304 is screwed onto the fixing plate connecting bolts 302. The limit baffle 305 is welded to the fixing plate 301, and the magnetic rod 306 is welded to the clamping plate 303. The stabilizing module hydraulic press 307 is installed to the back of the clamping plate 303 through the clamping plate bolts, the vacuum switch base 308 is screwed onto the hydraulic rod of the stabilizing module hydraulic press 307, and the vacuum switch 309 is installed to the back of the vacuum switch base 308 through the vacuum switch bolts. The gas leakage detector 310 is installed between the vacuum switch 309 and the vacuum electric control valve 312, and the detector alarm 311 and the gas leakage detector 310 are integrally connected. The adsorption head module 4 is screwed onto the vacuum electric control valve 312 to complete the assembly.
[0070] When in use, the worker loosens the threaded fastening ring 304 and then moves the clamping plate 303 so that the other components of the module can be adjusted from horizontal to vertical. When the clamping plate 303 is adjusted from horizontal to vertical, the magnetic rod 306 on the clamping plate 303 will be adsorbed onto the limit baffle 305 of the fixed plate 301, and the limit baffle 305 is fixed on the fixed plate 301, thereby limiting the position of the clamping plate 303. After the clamping plate 303 is adjusted to vertical, the worker remotely controls the hydraulic press 307 of the stabilizing module so that other components such as the vacuum switch base 308 can be moved toward the construction wall, and the adsorption head module 4 hits During wall construction, when an alarm is sounded, the worker remotely shuts down the hydraulic press 307 of the stabilization module, and starts the vacuum switch 309 to completely suck out the air in the adsorption head module 4, so that the device can be adsorbed on the exterior wall to assist in maintaining the stability of the hanging basket 1. During the formal vacuum suction, it is necessary to first use the leak detector 310 to perform air pressure detection on the entire device. By first operating the vacuum switch 309 to make the air pressure work normally, and then close the vacuum electric control valve 312, the leak detector 310 will detect the air pressure at this time. The larger the air pressure value, the more likely there is a leak, which means that the module needs maintenance and processing to complete the operation.
[0071] The adsorption head module 4 includes an adsorption head threaded end 401, a collision alarm 402 is provided on the top of the adsorption head threaded end 401, a collision alarm sounder 403 is provided on the front of the collision alarm 402, and a trigger button 404 is provided on the left side of the collision alarm 402. One end of the adsorption head threaded end 401 is fixedly connected to an air inlet and outlet threaded end base 405, one end of the air inlet and outlet threaded end base 405 is provided with a groove, and the inner wall of the groove is provided with an air inlet and outlet threaded end 406, the inner wall of the air inlet and outlet threaded end 406 is threadedly connected to an air inlet and outlet threaded head 407, one end of the air inlet and outlet threaded head 407 is threadedly connected to an isolation screen 408, one end of the air inlet and outlet threaded end base 405 is fixedly connected to a shock-absorbing spring 409, one end of the shock-absorbing spring 409 is fixedly connected to a front end ring 410, and the surface of the front end ring 410 is fixedly connected to an impact straight rod 411.
[0072] The suction head threaded end 401 and the air inlet and outlet threaded end base 405 are integrally formed, and the collision alarm 402 is welded to the suction head threaded end 401, and the collision alarm sounder 403 and the trigger button 404 collision alarm 402 are integrally formed, and the air inlet and outlet threaded end 406 is welded in the groove of the air inlet and outlet threaded end base 405, screw the air inlet and outlet threaded head 407 into the air inlet and outlet threaded end 406, screw the isolation screen 408 onto the air inlet and outlet threaded head 407, weld the shock-absorbing spring 409 between the air inlet and outlet threaded end base 405 and the front end ring 410, and the impact straight rod 411 is welded to the front end ring 410 to complete the assembly.
[0073] When in use, the auxiliary stabilization module 3 will be attached to the construction wall with the front end ring 410. After colliding with the construction wall, the shock-absorbing spring 409 will filter part of the impact wave. At this time, the shock-absorbing spring 409 will be compressed, thereby driving the front end ring 410 to move toward the collision alarm 402, and then driving the impact straight rod 411 to move toward the collision alarm 402. When the impact straight rod 411 hits the trigger button 404 on the collision alarm 402, the collision alarm sounder 403 on the collision alarm 402 will sound an alarm, prompting the worker to turn off the auxiliary stabilization module 3 and complete the operation.
[0074] By setting up the auxiliary stabilization module 3 and the adsorption head module 4, after the device reaches the construction location, the auxiliary stabilization module 3 and the adsorption head module 4 can be used in conjunction with each other, and the vacuum adsorption technology can be used to temporarily adsorb the hanging basket 1 and the entire device onto the exterior wall of the building, thereby reducing the damage to the facade caused by the hanging basket 1 due to breeze disturbances, and reducing the additional engineering expenses required to repair the facade. At the same time, because the hanging basket 1 is relatively stable at high altitudes, this also ensures the personal safety of workers to a certain extent and reduces safety hazards.
[0075] like Figure 6 As shown, the counterweight module 5 includes a counterweight base plate 501, the bottom of the counterweight base plate 501 is fixedly connected to the processing device base 2, the front of the counterweight base plate 501 is fixedly connected to the counterweight connecting plate 502, the front of the counterweight connecting plate 502 is fixedly connected to the counterweight bin 503, the inner wall of the counterweight bin 503 is provided with a counterweight block 504, the front of the counterweight bin 503 is provided with a closing plate 505, and the closing plate 505 is threadedly connected to the counterweight bin 503 through a closing plate bolt.
[0076] The counterweight base plate 501 is welded to the base 2 of the processing device, the counterweight connecting plate 502 is welded to the counterweight base plate 501, the counterweight bin 503 is welded to the front of the counterweight connecting plate 502, the counterweight block 504 is installed in the counterweight bin 503, and finally the closing plate 505 is assembled to the counterweight bin 503 through the closing plate bolts to complete the assembly.
[0077] like Figure 7 As shown, the ceiling module 6 includes a bolt base plate 601, the bottom of the bolt base plate 601 is provided with a processing device base 2, the processing device base 2 is threadedly connected to the bolt base plate 601 through the ceiling connecting bolts, the top of the bolt base plate 601 is fixedly connected to the column 602, the top of the column 602 is fixedly connected to the ceiling 603, the bottom of the ceiling 603 is fixedly connected to the triangular reinforcement plate 604, and the ceiling 603 is fixedly connected to the column 602 through the triangular reinforcement plate 604.
[0078] The bolt base plate 601 is welded to the bottom of the column 602, the ceiling 603 is welded to the top of the column 602, and the triangular reinforcement plate 604 is welded between the column 602 and the ceiling 603. Finally, when necessary, the assembled ceiling module 6 is installed on the processing device base 2 through the ceiling connecting bolts to complete the assembly.
[0079] By providing the roof module 6, the device can operate as usual under strong sun and light rain, because the roof module 6 can provide shade and shelter for workers under strong sun and light rain. This ensures the normal progress of construction to a certain extent, and also ensures that the project can be completed as scheduled to a certain extent.
[0080] like Figure 8As shown, the track module 7 includes a left base plate 701 and a right base plate 702, the back of the left base plate 701 is provided with a left box body 703, and the left box body 703 is threadedly connected to the left base plate 701 through a left box body bolt, the back of the right base plate 702 is provided with a right box body 704, and the right box body 704 is threadedly connected to the right base plate 702 through a right box body bolt, the top of the left box body 703 is provided with a left box body top cover 705, and the left box body top cover 705 is threadedly connected to the left box body 703 through a left box body top cover bolt, the top of the right box body 704 is provided with a right box body top cover 706, and the right box body top cover 706 is threadedly connected to the right box body 704 through a right box body top cover bolt, a left box body rotating shaft hole is opened on the front of the left box body 703, the inner wall of the left box body rotating shaft hole is installed with a left box body rotating shaft 707, and the inner wall of the left box body rotating shaft 707 is provided with a left vertical rotating rod 708;
[0081] The left side of the vertical rotating rod 708 is provided with a left transverse gear 709, and the inner wall of the left transverse gear 709 is provided with a left screw rod 710. One end of the left screw rod 710 is fixedly connected to the left limiting circular plate 711. The surface of the left screw rod 710 is threadedly connected to the left L-shaped track connector 712. The back of the left L-shaped track connector 712 is fixedly connected to the track 713. The lower surface of the left transverse gear 709 is provided with a left vertical gear 714. The inner wall of one end of the left vertical gear 714 is provided with a left transverse rotating rod 715. One end of the left transverse rotating rod 715 is provided with a rotating rod motor 716. The rotating rod motor 716 is threadedly connected to the left box body 703 through a rotating rod motor bolt. A rotating rod hole is opened on the left side of the left box body 703. The rotating rod hole and the left transverse rotating rod 715 are adapted to each other. The inner wall of the other end of the left vertical gear 714 is provided with a connecting screw rod 717.
[0082] One end of the connecting screw rod 717 is provided with a right vertical meshing gear 718, and the inner wall of one end of the right vertical meshing gear 718 is provided with a right horizontal rotating rod 719, and one end of the right horizontal rotating rod 719 is provided with a right rotating rod shaft 720. The upper surface of the right vertical meshing gear 718 is provided with a right horizontal meshing gear 721, and the inner wall of one end of the right horizontal meshing gear 721 is provided with a right vertical rotating rod 722. One end of the right vertical rotating rod 722 is provided with a right box rotating shaft 723, and the inner wall of the other end of the right horizontal meshing gear 721 is provided with a right screw rod 724. One end of the right screw rod 724 is fixedly connected to the right limiting circular plate 725, and the surface of the right screw rod 724 is threadedly connected to the right L-shaped track connector 726. A left box connecting screw rod hole is opened on the right side of the left box 703, and the left box connecting screw rod hole and the connecting screw rod 717 are adapted to each other;
[0083] A left screw hole is provided on the back of the left box body 703, and the left screw hole and the left screw rod 710 are adapted to each other. A right box body shaft hole is provided on the front of the right box body 704, and the right box body shaft hole and the right box body shaft 723 are adapted to each other. A right box body connecting screw hole is provided on the left side of the right box body 704, and the right box body connecting screw hole and the connecting screw rod 717 are adapted to each other. A right screw hole is provided on the back of the right box body 704, and the right screw rod 724 and the right screw hole are adapted to each other. A right rotating rod shaft hole is provided on the right side of the right box body 704, and the right rotating rod shaft hole and the right rotating rod shaft 720 are adapted to each other.
[0084] The left base plate 701 and the right base plate 702 are welded to the base 2 of the processing device, and the left box body 703 and the right box body 704 are respectively installed on the left base plate 701 and the right base plate 702 by the left box body bolts and the right box body bolts. The left vertical rotating rod 708 is inserted into the left box body shaft 707, and then the assembled left box body shaft 707 is installed into the left box body shaft hole of the left box body 703, and then the left horizontal meshing gear 709 is installed. To the upper surface of the left vertical meshing gear 714, then insert the left screw rod 710 into the left horizontal meshing gear 709, then install the two ends of the left horizontal rotating rod 715 into the rotating rod motor 716 and the left vertical meshing gear 714 respectively, then install the two ends of the connecting screw rod 717 into the left vertical meshing gear 714 and the right vertical meshing gear 718, install the left box top cover 705 to the left box body 703 through the left box body top cover bolts, and install the two ends of the right horizontal rotating rod 719 respectively. Install it into the right vertical meshing gear 718 and the right rotating rod shaft 720, then install the right rotating rod shaft 720 into the right rotating rod shaft hole, install the right horizontal meshing gear 721 onto the upper surface of the right vertical meshing gear 718, then install the right vertical rotating rod 722 between the right horizontal meshing gear 721 and the right box shaft 723, install the right box shaft 723 into the right box shaft hole, install the right screw rod 724 into the right horizontal meshing gear 721, and the left limiting circular plate 7 11 is welded to the left screw rod 710, and the right limiting circular plate 725 is welded to the right screw rod 724. The left L-shaped track connector 712 and the right L-shaped track connector 726 are respectively installed on the left screw rod 710 and the right screw rod 724, and the track 713 is welded to the left L-shaped track connector 712 and the right L-shaped track connector 726. Finally, the right box top cover 706 is installed to the top of the right box 704 through the right box top cover bolts to complete the assembly.
[0085] When in use, the worker starts the rotating rod motor 716 to make the left horizontal rotating rod 715 start to rotate, thereby driving the left vertical meshing gear 714 to rotate, and then the left horizontal meshing gear 709 to rotate, thereby driving the left screw rod 710 to rotate, thereby driving the left L-shaped track connector 712 to move toward the outer wall of the building. The rotation of the left vertical meshing gear 714 will drive the connecting screw rod 717 to rotate, and then drive the right vertical meshing gear 718 to rotate, thereby realizing the linkage between the left vertical meshing gear 714 and the right vertical meshing gear 718. After the right vertical meshing gear 718 rotates, it will drive the right horizontal meshing gear 721 to rotate, and then drive the right screw rod 724 to rotate, and then drive the right L-shaped track connector 726 to move toward the outer wall of the building at the same time, thereby realizing the movement of the track 713 toward the outer wall of the building, completing the operation.
[0086] like Figure 9 As shown, the primer spraying module 8 includes a primer spraying electric drive vehicle 801, a primer spraying T-shaped plate 802 is fixedly connected to the back of the primer spraying electric drive vehicle 801, a sprayer base plate 803 is provided on the back of the primer spraying T-shaped plate 802, the sprayer base plate 803 is threadedly connected to the primer spraying T-shaped plate 802 through the sprayer base plate bolts, a sprayer 804 is provided on the back of the sprayer base plate 803, a spray nozzle 805 is threadedly connected to the back of the sprayer 804, and the left side of the sprayer 804 is from the front to the A primer box 806 and a primer suction motor 807 are provided in sequence at the back. A primer delivery pipe 808 is provided on the left side of the primer box 806. The primer box 806 is equipped with a primer suction motor 807 through the primer delivery pipe 808. A top primer delivery pipe 809 is not provided on the top of the primer suction motor 807. The primer suction motor 807 is equipped with a sprayer 804 through the top primer delivery pipe 809. A gas tank connecting end 810 is provided on the right side of the sprayer 804. The inner wall of the gas tank connecting end 810 is threadedly connected to a gas tank 811.
[0087] The primer spraying T-shaped plate 802 is welded to the back of the primer spraying electric drive vehicle 801, the sprayer base plate 803 is installed on the primer spraying T-shaped plate 802 through the sprayer base plate bolts, the sprayer 804 is welded to the sprayer base plate 803, and the primer box 806 and the primer suction motor 807 are both welded to the left side of the sprayer 804, and the primer delivery pipe 808 is connected between the primer box 806 and the primer suction motor 807, and the top primer delivery pipe 809 is connected between the primer suction motor 807 and the sprayer 804, the spray nozzle 805 is installed on the sprayer 804, and the gas tank connecting end 810 is welded to the right side of the sprayer 804, and the gas tank 811 is installed on the gas tank connecting end 810 to complete the assembly.
[0088] During use, the worker remotely controls the primer spraying electric drive vehicle 801, causing the primer spraying electric drive vehicle 801 to move within the track 713, thereby driving the other components of the module to move to the construction site. The worker then starts the primer suction motor 807 to suck the exterior wall primer in the primer box 806 through the primer delivery pipe 808, and then delivers the exterior wall primer to the sprayer 804 through the top primer delivery pipe 809. At the same time as the primer suction motor 807 is started, the gas tank connection end 810 will also open the gas tank 811, allowing the gas to spray the primer in the sprayer 804 through the spray nozzle 805 onto the building construction wall, completing the operation.
[0089] like Figures 10 and 11 As shown, the putty filling module 9 includes a putty filling electric drive vehicle 901, the left side of the putty filling electric drive vehicle 901 is fixedly connected to a putty filling electric drive vehicle connecting column 902, the back of the putty filling electric drive vehicle 901 is fixedly connected to a putty filling T-shaped plate 903, and the back of the putty filling T-shaped plate 903 is provided with a heater 904, a C-shaped plate 905 and an infrared modeling instrument body 906 from left to right, the left side of the infrared modeling instrument body 906 is provided with an infrared modeling instrument prompter 907, the right side of the infrared modeling instrument body 906 is provided with an infrared modeling instrument host 908, the back of the infrared modeling instrument body 906 is provided with an infrared laser head base 909, the back of the infrared laser head base 909 is threadedly connected to an infrared laser head 910, the top of the C-shaped plate 905 is provided with a screw motor 911, the bottom of the screw motor 911 is provided with a vertical screw rod 912, and one end of the vertical screw rod 912 is provided with a vertical screw rod rotating shaft 913;
[0090] A vertical screw hole and a vertical screw shaft hole are respectively provided at the top and bottom of the C-shaped plate 905. The vertical screw hole and the vertical screw 912 are adapted to each other, and the vertical screw shaft hole and the vertical screw shaft 913 are adapted to each other. The surface of the vertical screw 912 is threadedly connected to a putty filling module hydraulic press base 914. A putty filling module hydraulic press 915 is provided on the back of the putty filling module hydraulic press base 914. The putty filling module hydraulic press 915 is threadedly connected to the putty filling module hydraulic press base 914 through a putty filling module hydraulic press bolt. One end of the putty filling module hydraulic press 915 is fixedly connected to an extrusion plate 916. A putty barrel straight rod 917 is provided on the back of the putty filling module hydraulic press 915. The putty barrel straight rod 917 is threadedly connected to the putty filling module hydraulic press 915 through a putty barrel straight rod bolt. The inner wall of the putty barrel straight rod 917 is fixedly connected to a putty barrel 918.
[0091] The left surface of the putty bucket 918 is fixedly connected to a left L-shaped plate 919, and a scraper 920 is provided on the surface of the left L-shaped plate 919. The scraper 920 is threadedly connected to the left L-shaped plate 919 through a scraper bolt. The right surface of the putty bucket 918 is fixedly connected to a right L-shaped plate 921, and a micro camera 922 is provided on the surface of the right L-shaped plate 921. The micro camera 922 is threadedly connected to the right L-shaped plate 921 through a micro camera bolt.
[0092] The putty-filled electric drive vehicle connecting column 902 is welded to the left side of the putty-filled electric drive vehicle 901, and the putty-filled T-shaped plate 903 is welded to the back of the putty-filled electric drive vehicle 901. The heater 904, C-shaped plate 905 and infrared modeler body 906 are installed on the back of the putty-filled T-shaped plate 903 by bolts. The infrared modeler prompter 907, infrared modeler host 908 and infrared laser head base 909 are all connected to the infrared modeler body 906 as a whole. The infrared laser head 910 is installed on the infrared laser head base 909, the vertical screw shaft 913 is installed in the vertical screw shaft hole, the screw motor 911 is installed to the top of the C-shaped plate 905 by bolts, the vertical screw 912 is installed in the screw motor 911, and then the vertical screw 912 is passed through the vertical screw hole and inserted into the vertical screw shaft 913 Inside, install the putty filling module hydraulic press base 914 on the vertical screw rod 912, install the putty filling module hydraulic press 915 on the putty filling module hydraulic press base 914 through the putty filling module hydraulic press bolts, and the extrusion plate 916 is welded to the hydraulic rod on the putty filling module hydraulic press 915, weld the putty bucket straight rod 917 to the putty bucket 918, install the putty bucket 918 to the back of the putty filling module hydraulic press 915 through the putty bucket straight rod bolts of the putty bucket straight rod 917, weld the left L-shaped plate 919 to the left surface of the putty bucket 918, install the scraper 920 on the left L-shaped plate 919 through the scraper bolts, weld the right L-shaped plate 921 to the right surface of the putty bucket 918, and finally install the micro camera 922 on the right L-shaped plate 921 through the micro camera to complete the assembly.
[0093] During use, the worker remotely controls the putty filling electric drive vehicle 901 to move within the track 713. During the movement, the infrared modeling instrument body 906 scans the exterior wall. The infrared laser emitted by the infrared laser head 910 is reflected, and the flatness of the exterior wall is measured by the reflection time. When a dent is found in the exterior wall, the infrared modeling instrument prompter 907 will prompt. After hearing the prompt sound, the worker needs to control the putty filling electric drive vehicle 901 to slow down its movement speed and control the screw motor 91 at the same time. 1. The vertical screw rod 912 is made to move vertically, and then the putty filling module hydraulic press 915 is made to move vertically. The micro camera 922 is used to observe the depressed part. When the putty bucket 918 reaches the depressed part, the putty filling module hydraulic press 915 is controlled to make the hydraulic rod of the putty filling module hydraulic press 915 move into the putty bucket 918, so that the extrusion plate 916 squeezes the putty in the putty bucket 918 out. The extruded putty will be scraped flat by the scraper 920, and then heated and dried by the heater 904 to complete the operation.
[0094] like Figure 12 As shown, the oil cleaning module 10 includes an oil cleaning electric drive vehicle 1001, a connecting column 1002 of an oil cleaning electric drive vehicle is fixedly connected to the left side of the oil cleaning electric drive vehicle 1001, a oil cleaning T-shaped plate 1003 is fixedly connected to the back of the oil cleaning electric drive vehicle 1001, and a cleaning liquid motor 1004, a scrubbing motor 1005 and a water motor 1006 are sequentially arranged on the back of the oil cleaning T-shaped plate 1003 from left to right, a cleaning liquid delivery pipe 1007 is provided on the left side of the cleaning liquid motor 1004, and a cleaning liquid storage tank 1008 is installed on the cleaning liquid motor 1004 through the cleaning liquid delivery pipe 1007, a cleaning liquid injection port 1009 is fixedly connected to the top of the cleaning liquid storage tank 1008, and a cleaning liquid threaded cover 1010 is threadedly connected to the surface of the cleaning liquid injection port 1009;
[0095] A cleaning liquid spray head 1011 is provided on the back of the cleaning liquid motor 1004, a scrubbing rotating rod 1012 is provided on the back of the scrubbing motor 1005, one end of the scrubbing rotating rod 1012 is threadedly connected to a scrubbing handle 1013, a clean water delivery pipe 1014 is provided on the left side of the clean water motor 1006, and the clean water motor 1006 is installed with a clean water storage tank 1015 through the clean water delivery pipe 1014, the top of the clean water storage tank 1015 is fixedly connected with a clean water injection end 1016, and the surface of the clean water injection end 1016 is threadedly connected with a clean water cover 1017, and a clean water spray head 1018 is provided on the back of the clean water motor 1006.
[0096] The oil-cleaning electric drive vehicle connecting column 1002 is welded to the left side of the oil-cleaning electric drive vehicle 1001, and the oil-cleaning T-shaped plate 1003 is welded to the back of the oil-cleaning electric drive vehicle 1001. The cleaning liquid motor 1004, the scrubbing motor 1005 and the clean water motor 1006 are installed to the back of the oil-cleaning T-shaped plate 1003 by bolts. The cleaning liquid storage tank 1008 is welded to the cleaning liquid motor 1004, and the cleaning liquid delivery pipe 1007 is connected between the cleaning liquid storage tank 1008 and the cleaning liquid motor 1004, and the cleaning liquid injection end 1009 and the cleaning liquid storage tank 1008 are integrally formed. The cleaning liquid threaded cover 1006 is screwed in place. 10 is screwed onto the cleaning liquid injection end 1009, and the cleaning liquid spray head 1011 and the cleaning liquid motor 1004 are connected as one piece, the scrubbing rod 1012 is installed on the scrubbing motor 1005, the scrubbing handle 1013 is screwed onto the scrubbing rod 1012, and the clean water storage tank 1015 is welded to the top of the clean water motor 1006, and the clean water delivery pipe 1014 is connected between the clean water motor 1006 and the clean water storage tank 1015, the clean water injection end 1016 and the clean water storage tank 1015 are formed as one piece, the clean water cover 1017 is screwed onto the clean water injection end 1016, the clean water spray head 1018 and the clean water motor 1006 are connected as one piece, and the assembly is completed.
[0097] During use, the worker remotely controls the oil-cleaning electric drive vehicle 1001 to move within the track 713, and remotely controls the cleaning liquid motor 1004, the scrubbing motor 1005 and the clean water motor 1006 at the same time, so that the clean water motor 1006 rinses the exterior wall of the building, and the scrubbing motor 1005 cleans the exterior wall of the building immediately afterwards. Finally, the cleaning liquid motor 1004 is used to clean the release oil that may exist on the surface of the exterior wall of the building. Then the worker needs to remotely control the oil-cleaning electric drive vehicle 1001 to return again. At the same time, the cleaning liquid motor 1004, the scrubbing motor 1005 and the clean water motor 1006 do not need to be shut down, and they still keep operating. This is repeated many times to clean the floating dust and release oil on the exterior wall of the building to complete the operation.
[0098] like Figure 13As shown, the particle grinding module 11 includes a particle grinding electric drive 1101, the left side of the particle grinding electric drive 1101 is fixedly connected to a particle grinding electric drive connection column 1102, the back of the particle grinding electric drive 1101 is fixedly connected to a particle grinding T-shaped plate 1103, the back of the particle grinding T-shaped plate 1103 is provided with a grinder base plate 1104, the back of the grinder base plate 1104 is fixedly connected to a grinder connection thread end 1105, the grinder connection thread end The inner wall of 1105 is threadedly connected to a grinder 1106, one end of the grinder 1106 is provided with a grinding rod 1107, one end of the grinding rod 1107 is fixedly connected to a grinding plate limiting disc 1108, one end of the grinding plate limiting disc 1108 is fixedly connected to a threaded column 1109, the surface of the threaded column 1109 is provided with a grinding plate chassis 1110, one end of the grinding plate chassis 1110 is provided with a grinding plate 1111, and the surface of the threaded column 1109 is threadedly connected to an installation fastening ring 1112.
[0099] The particle grinding electric drive vehicle connection column 1102 is welded to the left side of the particle grinding electric drive vehicle 1101, and the particle grinding T-shaped plate 1103 is welded to the back of the particle grinding electric drive vehicle 1101. The grinder base plate 1104 is installed to the back of the particle grinding T-shaped plate 1103 by bolts, and the grinder connection thread end 1105 is welded to the back of the grinder base plate 1104. The grinder 1106 is screwed onto the grinder connection thread end 1105. Install the grinding rod 1107 onto the grinder 1106, the grinding piece limiting disc 1108 is welded to one end of the grinding rod 1107, and the threaded column 1109 is welded to one end of the grinding piece limiting disc 1108, the grinding piece 1111 and the grinding piece chassis 1110 are connected as one body, the assembled grinding piece chassis 1110 is passed through the threaded column 1109 and placed on the grinding piece limiting disc 1108, and fixed with the installation fastening ring 1112 to complete the assembly.
[0100] During use, workers remotely control the particle grinding electric drive vehicle 1101 to move within the track 713, and simultaneously start the grinder 1106, causing the rotor within the grinder 1106 to rotate, thereby driving the grinding rod 1107 to rotate, and then driving the grinding disc 1111 to rotate. The grinding disc 1111 will directly adhere to the exterior wall of the building to grind the smaller concrete particles on the wall, thereby making the exterior wall of the building smoother, facilitating the subsequent construction of primer and spraying of exterior wall paint, and completing the operation.
[0101] The working principle of the technical solution provided by the present invention is as follows:
[0102] First, the worker enters the hanging basket 1, and then controls the hanging basket 1 to rise to the construction position. Then the worker needs to control the auxiliary stabilization module 3 so that the auxiliary stabilization module 3 can cooperate with the adsorption head module 4 to reach the outer wall of the building. Then, the vacuum negative pressure is used to adsorb the hanging basket 1 to the outer wall of the building, so that the hanging basket 1 and the device as a whole can maintain a relatively stable state. The ceiling module 6 can provide shade and shelter for the workers when the sun is exposed to a large degree or it rains. Start the track module 7 to push the track 713 to the construction position, and then control the primer spraying module 8, putty filling module 9, oil cleaning module 10 and particle grinding module 11 in turn to perform base treatment on the outer wall of the building. The worker loosens the threaded fastening ring 304, and then After that, the clamping plate 303 is toggled so that the other parts of the module can be adjusted from horizontal to vertical. When the clamping plate 303 is adjusted from horizontal to vertical, the magnetic rod 306 on the clamping plate 303 will be adsorbed onto the limit baffle 305 of the fixed plate 301, and the limit baffle 305 is fixed on the fixed plate 301, thereby limiting the clamping plate 303. After the clamping plate 303 is adjusted to vertical, the worker remotely controls the hydraulic press 307 of the stabilizing module so that the vacuum switch base 308 and other parts can be moved toward the construction wall. When the adsorption head module 4 hits the construction wall and an alarm is sounded, the worker remotely turns off the hydraulic press 307 of the stabilizing module and starts the vacuum switch 309 to suck out all the air in the adsorption head module 4, so that the device can be adsorbed on the outside. The auxiliary hanging basket 1 on the wall remains stable. During the formal vacuum suction, it is necessary to first use the leak detector 310 to detect the air pressure of the entire device. The air pressure is first controlled by the vacuum switch 309 to make it work normally, and then the vacuum electric control valve 312 is closed. At this time, the leak detector 310 will detect the air pressure. The larger the air pressure value, the more likely there is a leak, which means that the module needs maintenance. The auxiliary stabilization module 3 will be attached to the construction wall with the front ring 410. After colliding with the construction wall, the shock-absorbing spring 409 will filter part of the impact wave. At this time, the shock-absorbing spring 409 will be compressed, thereby driving the front ring 410 to move toward the collision alarm 402, and then driving the impact straight rod 411 to move toward the collision alarm 402. When the impact rod 411 hits the trigger button 404 on the collision alarm 402, the collision alarm sounder 403 on the collision alarm 402 will sound an alarm, prompting the worker to turn off the auxiliary stabilization module 3 and install the assembled ceiling module 6 on the processing device base 2 through the ceiling connecting bolts. The worker starts the rotating rod motor 716 to rotate the left horizontal rotating rod 715, thereby driving the left vertical meshing gear 714 to rotate, and then the left horizontal meshing gear 709 to rotate, thereby driving the left screw rod 710 to rotate, thereby driving the left L-shaped track connector 712 to move toward the building's outer wall. The rotation of the left vertical meshing gear 714 will drive the connecting screw rod 717 to rotate, and then drive the right vertical meshing gear 718 to rotate.Thereby, the left vertical meshing gear 714 and the right vertical meshing gear 718 are linked together. When the right vertical meshing gear 718 rotates, it drives the right horizontal meshing gear 721 to rotate, and then drives the right screw rod 724 to rotate, and then drives the right L-shaped track connector 726 to move toward the exterior wall of the building at the same time, thereby realizing the movement of the track 713 toward the exterior wall of the building. The worker remotely controls the primer spraying electric drive vehicle 801 to move the primer spraying electric drive vehicle 801 in the track 713, thereby driving other components of the module to move to the construction site, and then the worker starts the primer suction motor 807 to suck the exterior wall primer in the primer box 806 through the primer delivery pipe 808, and then the exterior wall primer is passed through the top primer delivery pipe 809. The primer is transported to the sprayer 804. When the primer suction motor 807 is started, the gas tank connection end 810 will also open the gas tank 811, so that the gas can spray the primer in the sprayer 804 through the spray nozzle 805 onto the construction wall. The worker remotely controls the putty filling electric drive vehicle 901 to move the putty filling electric drive vehicle 901 within the track 713. During the movement, the infrared modeling instrument body 906 will scan the exterior wall. When the infrared laser emitted by the infrared laser head 910 is reflected, the flatness of the exterior wall is measured by the reflection time. When a dent is found in the exterior wall, the infrared modeling instrument prompter 907 will prompt. After hearing the prompt sound, the worker needs to control the putty filling electric drive vehicle 901 to slow down the movement speed and at the same time At the same time, the screw motor 911 is controlled to make the vertical screw 912 move vertically, and then the putty filling module hydraulic press 915 moves vertically. The micro camera 922 is used to observe the concave part. When the putty bucket 918 reaches the concave part, the putty filling module hydraulic press 915 is controlled to make the hydraulic rod of the putty filling module hydraulic press 915 move into the putty bucket 918, so that the extrusion plate 916 squeezes the putty in the putty bucket 918 out. The extruded putty will be scraped flat by the scraper 920 and then heated and dried by the heater 904. The worker remotely controls the oil cleaning electric drive vehicle 1001 to move in the track 713, and remotely controls the cleaning liquid motor 1004, the scrubbing motor 1005 and the water cleaning motor 1006 at the same time. 006 rinses the exterior wall of the building, and the washing motor 1005 cleans the exterior wall of the building. Finally, the cleaning liquid motor 1004 is used to clean the demoulding oil that may exist on the surface of the exterior wall of the building. Then the worker needs to remotely control the oil cleaning electric drive vehicle 1001 to return again. At the same time, the cleaning liquid motor 1004, the washing motor 1005 and the clean water motor 1006 do not need to be shut down. They still keep operating, and repeatedly clean the floating dust and demoulding oil on the exterior wall of the building. The worker remotely controls the particle grinding electric drive vehicle 1101 to move in the track 713, and starts the grinder 1106 at the same time, so that the rotor in the grinder 1106 rotates, which in turn drives the grinding rod 1107 to rotate, and then drives the grinding disc 1111 to rotate.The grinding sheet 1111 will directly adhere to the exterior wall of the building to grind the smaller concrete particles on the wall, thereby making the exterior wall of the building smoother, facilitating the subsequent construction of primer and spraying of exterior wall paint to complete the operation.
[0103] The present invention encompasses any alternatives, modifications, equivalents, and solutions that fall within the spirit and scope of the present invention. To provide a thorough understanding of the present invention, specific details are described in detail below in connection with the preferred embodiments of the present invention, but those skilled in the art will be able to fully understand the present invention without these detailed descriptions. Furthermore, to avoid unnecessary confusion regarding the essence of the present invention, well-known methods, processes, procedures, components, and circuits have not been described in detail.
[0104] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.
Claims
1. A building exterior wall coating, characterized in that: The invention comprises a slurry component and a paint mixing component: the slurry component comprises 20% water, 5% propylene glycol, 2% wetting and dispersing agent, 2% defoaming agent, 2% preservative, 1% amine neutralizer, 8% titanium dioxide, 25% heavy calcium, 8% talc and 10% calcined kaolin; The paint mix comprises 5% of film-forming agent, 1% of defoaming agent, 1% of preservative, 1% of amine neutralizer, 16% of styrene acrylic emulsion, 4% of thickener, 6% of rheological agent and 3%-5% of water; The exterior building wall paint requires pouring and mixing the slurry component and the paint mixing component together, and only after fully mixing them using a stirring mechanism can the paint be constructed according to the construction steps of the exterior building wall paint.
2. A construction process for the exterior wall coating according to claim 1, characterized in that: The construction steps of the building exterior wall coating The following steps are involved: S1: Riding tool: Exterior wall paint construction workers ride on the exterior wall construction hanging basket and operate the exterior wall hanging basket to rise to the construction height; S2: Protection of objects outside the wall: Exterior wall paint construction workers ride in a hanging basket and use tools such as film to protect objects other than the exterior wall to prevent paint from splashing onto objects other than the exterior wall; S3: Exterior wall base treatment: Exterior wall paint construction workers use the exterior wall base treatment device to polish, wash, fill putty and spray primer on the building's exterior wall to complete the building's exterior wall base treatment, facilitating subsequent exterior wall paint construction; S4: Exterior wall coating construction: After the exterior wall base construction is completed, the construction workers use the paint spray gun to spray the exterior wall part of the building that has been treated with the base; The exterior wall base processing device includes a hanging basket, a processing device base is provided on the top of the hanging basket, an auxiliary stabilization module is provided on the back of the processing device base, an adsorption head module is provided at one end of the auxiliary stabilization module, and a counterweight module, a ceiling module and a track module are provided on the top of the processing device base from front to back, and a primer spraying module, a putty filling module, an oil cleaning module and a particle grinding module are provided on the inner wall of the track module from left to right. The auxiliary stabilization module includes a fixing plate, a bolt straight hole is opened on the top of the fixing plate, a fixing plate connecting bolt is provided on the inner wall of the bolt straight hole, the fixing plate is installed with a clamping plate through the fixing plate connecting bolt, the surface of the fixing plate connecting bolt is threadedly connected to a threaded fastening ring, the left side of the fixing plate is fixedly connected to a limited baffle, the left side of the clamping plate is fixedly connected to a magnetic rod, a stabilization module hydraulic press is provided on the back of the clamping plate, the stabilization module hydraulic press is threadedly connected to the clamping plate through the clamping plate bolt, one end of the stabilization module hydraulic press is threadedly connected to a vacuum switch base, a vacuum switch is provided on the back of the vacuum switch base, the vacuum switch is threadedly connected to the vacuum switch base through the vacuum switch bolt, one end of the vacuum switch is threadedly connected to a gas leakage detector, a detector alarm is provided on the top of the gas leakage detector, one end of the gas leakage detector is threadedly connected to a vacuum electric control valve, and one end of the vacuum electric control valve is threadedly connected to an adsorption head module.
3. The construction process of the building exterior wall coating according to claim 2, characterized in that: The adsorption head module includes an adsorption head threaded end, a collision alarm is provided on the top of the adsorption head threaded end, a collision alarm sounder is provided on the front of the collision alarm, a trigger button is provided on the left side of the collision alarm, one end of the adsorption head threaded end is fixedly connected to the inlet and outlet threaded end base, one end of the inlet and outlet threaded end base is provided with a groove, the inner wall of the groove is provided with an inlet and outlet threaded end, the inner wall of the inlet and outlet threaded end is threadedly connected to the inlet and outlet threaded head, one end of the inlet and outlet threaded head is threadedly connected to an isolation screen, one end of the inlet and outlet threaded end base is fixedly connected to a shock-absorbing spring, one end of the shock-absorbing spring is fixedly connected to a front end ring, and the surface of the front end ring is fixedly connected to an impact straight rod.
4. The construction process of the building exterior wall coating according to claim 2, characterized in that: The counterweight module includes a counterweight base plate, the bottom of the counterweight base plate is fixedly connected to the processing device base, the front of the counterweight base plate is fixedly connected to the counterweight connecting plate, the front of the counterweight connecting plate is fixedly connected to the counterweight bin, the inner wall of the counterweight bin is provided with a counterweight block, the front of the counterweight bin is provided with a closing plate, and the closing plate is threadedly connected to the counterweight bin through a closing plate bolt.
5. The construction process of the building exterior wall coating according to claim 2, characterized in that: The ceiling module includes a bolt base plate, a processing device base is provided at the bottom of the bolt base plate, the processing device base is threadedly connected to the bolt base plate through ceiling connecting bolts, the top of the bolt base plate is fixedly connected to a column, the top of the column is fixedly connected to the ceiling, the bottom of the ceiling is fixedly connected to a triangular reinforcement plate, and the ceiling is fixedly connected to the column through the triangular reinforcement plate.
6. The construction process of the building exterior wall coating according to claim 2, characterized in that: The track module includes a left base plate and a right base plate, the back of the left base plate is provided with a left box body, the left box body is threadedly connected to the left base plate by a left box body bolt, the back of the right base plate is provided with a right box body, the right box body is threadedly connected to the right base plate by a right box body bolt, the top of the left box body is provided with a left box body top cover, the left box body top cover is threadedly connected to the left box body by a left box body top cover bolt, the top of the right box body is provided with a right box body top cover, and the right box body top cover is threadedly connected to the right box body by a right box body top cover bolt. The front of the left box body is provided with a left box body rotating shaft hole, the left box body rotating shaft is installed on the inner wall of the left box body rotating shaft hole, and the inner wall of the left box body rotating shaft is provided with a left vertical rotating rod; One end of the left vertical rotating rod is provided with a left transverse meshing gear, and the inner wall of the left transverse meshing gear is provided with a left screw rod, one end of the left screw rod is fixedly connected to the left limiting circular plate, the surface of the left screw rod is threadedly connected to the left L-shaped track connector, and the back side of the left L-shaped track connector is fixedly connected to the track. The lower surface of the left transverse meshing gear is provided with a left vertical meshing gear, and the inner wall of one end of the left vertical meshing gear is provided with a left transverse rotating rod, and one end of the left transverse rotating rod is provided with a rotating rod motor, and the rotating rod motor is threadedly connected to the left box body through a rotating rod motor bolt. A rotating rod hole is opened on the left side of the left box body, and the rotating rod hole and the left transverse rotating rod are adapted to each other, and the inner wall of the other end of the left vertical meshing gear is provided with a connecting screw rod; One end of the connecting screw rod is provided with a right vertical meshing gear, and the inner wall of one end of the right vertical meshing gear is provided with a right horizontal rotating rod, and one end of the right horizontal rotating rod is provided with a right rotating rod rotating shaft, and the upper surface of the right vertical meshing gear is provided with a right horizontal meshing gear, and the inner wall of one end of the right horizontal meshing gear is provided with a right vertical rotating rod, and one end of the right vertical rotating rod is provided with a right box body rotating shaft, and the inner wall of the other end of the right horizontal meshing gear is provided with a right screw rod. One end of the right screw rod is fixedly connected to the right limiting circular plate, and the surface of the right screw rod is threadedly connected to the right L-shaped track connector, and the right side of the left box body is opened with a left box body connecting screw rod hole, and the left box body connecting screw rod hole and the connecting screw rod are adapted to each other. A left screw rod hole is provided on the back side of the left box body, and the left screw rod hole and the left screw rod are adapted to each other. A right box body rotating shaft hole is provided on the front side of the right box body, and the right box body rotating shaft hole and the right box rotating shaft are adapted to each other. A right box body connecting screw rod hole is provided on the left side of the right box body, and the right box connecting screw rod hole and the connecting screw rod are adapted to each other. A right screw rod hole is provided on the back side of the right box body, and the right screw rod and the right screw rod hole are adapted to each other. A right rotating rod rotating shaft hole is provided on the right side of the right box body, and the right rotating rod rotating shaft hole and the right rotating rod rotating shaft are adapted to each other.
7. The construction process of the building exterior wall coating according to claim 2, characterized in that: The primer spraying module includes a primer spraying electric drive vehicle, the back of the primer spraying electric drive vehicle is fixedly connected to a primer spraying T-plate, the back of the primer spraying T-plate is provided with a sprayer base plate, the sprayer base plate is threadedly connected to the primer spraying T-plate through a sprayer base plate bolt, the back of the sprayer base plate is provided with a sprayer, the back of the sprayer is threadedly connected to a spray nozzle, the left side of the sprayer is provided with a primer box and a primer suction motor from front to back, the left side of the primer box is provided with a primer delivery pipe, the primer box is installed with a primer suction motor through the primer delivery pipe, the top of the primer suction motor is not provided with a top primer delivery pipe, the primer suction motor is installed with a sprayer through the top primer delivery pipe, the right side of the sprayer is provided with a gas tank connecting end, the inner wall of the gas tank connecting end is threadedly connected to the gas tank.
8. The construction process of the building exterior wall coating according to claim 2, characterized in that: The putty filling module includes a putty-filled electric drive vehicle, the left side of the putty-filled electric drive vehicle is fixedly connected to a putty-filled electric drive vehicle connecting column, the back of the putty-filled electric drive vehicle is fixedly connected to a putty-filled T-shaped plate, the back of the putty-filled T-shaped plate is provided with a heater, a C-shaped plate and an infrared modeling instrument body from left to right, the left side of the infrared modeling instrument body is provided with an infrared modeling instrument prompter, the right side of the infrared modeling instrument body is provided with an infrared modeling instrument host, the back of the infrared modeling instrument body is provided with an infrared laser head base, the back of the infrared laser head base is threadedly connected with an infrared laser head, the top of the C-shaped plate is provided with a screw motor, the bottom of the screw motor is provided with a vertical screw, and one end of the vertical screw is provided with a vertical screw shaft; The top and bottom of the C-shaped plate are respectively provided with a vertical screw rod hole and a vertical screw rod rotating shaft hole, the vertical screw rod hole and the vertical screw rod are adapted to each other, the vertical screw rod rotating shaft hole and the vertical screw rod rotating shaft are adapted to each other, the surface of the vertical screw rod is threadedly connected to the putty filling module hydraulic press base, the back of the putty filling module hydraulic press base is provided with a putty filling module hydraulic press, the putty filling module hydraulic press is threadedly connected to the putty filling module hydraulic press base through a putty filling module hydraulic press bolt, one end of the putty filling module hydraulic press is fixedly connected to an extrusion plate, the back of the putty filling module hydraulic press is provided with a putty barrel straight rod, the putty barrel straight rod is threadedly connected to the putty filling module hydraulic press through a putty barrel straight rod bolt, and the inner wall of the putty barrel straight rod is fixedly connected to the putty barrel; The left side surface of the putty bucket is fixedly connected to a left L-shaped plate, the surface of the left L-shaped plate is provided with a scraper, and the scraper is threadedly connected to the left L-shaped plate through a scraper bolt. The right side surface of the putty bucket is fixedly connected to the right L-shaped plate, the surface of the right L-shaped plate is provided with a miniature camera, and the miniature camera is threadedly connected to the right L-shaped plate through a miniature camera bolt.
9. The construction process of the building exterior wall coating according to claim 2, characterized in that: The oil cleaning module includes an oil cleaning electric drive vehicle, the left side of the oil cleaning electric drive vehicle is fixedly connected to an oil cleaning electric drive vehicle connecting column, the back of the oil cleaning electric drive vehicle is fixedly connected to an oil cleaning T-shaped plate, the back of the oil cleaning T-shaped plate is sequentially provided with a cleaning liquid motor, a scrubbing motor and a clean water motor from left to right, a cleaning liquid delivery pipe is provided on the left side of the cleaning liquid motor, a cleaning liquid storage tank is installed on the cleaning liquid motor through the cleaning liquid delivery pipe, a cleaning liquid injection end is fixedly connected to the top of the cleaning liquid storage tank, and a cleaning liquid threaded cover is threadedly connected to the surface of the cleaning liquid injection end; A cleaning liquid spray head is provided on the back of the cleaning liquid motor, a washing brush rotating rod is provided on the back of the washing brush motor, one end of the washing brush rotating rod is threadedly connected to a washing brush handle, a clean water delivery pipe is provided on the left side of the clean water motor, and a clean water storage tank is installed on the clean water motor through the clean water delivery pipe. A clean water injection end is fixedly connected to the top of the clean water storage tank, and a clean water cover is threadedly connected to the surface of the clean water injection end. A clean water spray head is provided on the back of the clean water motor.
10. The construction process of the building exterior wall coating according to claim 2, characterized in that: The particle grinding module includes a particle grinding electric drive vehicle, the left side of the particle grinding electric drive vehicle is fixedly connected to the particle grinding electric drive vehicle connecting column, the back of the particle grinding electric drive vehicle is fixedly connected to the particle grinding T-shaped plate, the back of the particle grinding T-shaped plate is provided with a grinder base plate, the back of the grinder base plate is fixedly connected to the grinder connecting threaded end, the inner wall of the grinder connecting threaded end is threadedly connected to the grinder, one end of the grinder is provided with a grinding rotating rod, one end of the grinding rotating rod is fixedly connected to a grinding plate limiting disc, one end of the grinding plate limiting disc is fixedly connected to a threaded column, the surface of the threaded column is provided with a grinding plate chassis, one end of the grinding plate chassis is provided with a grinding plate, and the surface of the threaded column is threadedly connected to an installation fastening ring.