Design method of working face length of continuous separation grouting and filling mining without coal pillar
By systematically designing the length of the continuous delamination grouting and filling mining face without coal pillars, the problem of inaccurate design in existing technologies has been solved, achieving a balance between rock strata stability and production efficiency, and improving coal resource recovery rate and safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SHANDONG UNIV OF SCI & TECH
- Filing Date
- 2025-09-26
- Publication Date
- 2026-06-09
AI Technical Summary
Under the condition of continuous segregation grouting and backfilling mining without coal pillars, existing technologies cannot directly and accurately design the length of the next working face, making it difficult to balance the safety and production efficiency of the coal mining face.
By determining factors such as the width of the uncompacted zone on both sides of the mined working face, the breakage distance of the key grouting layer, the designed production capacity of the working face, the ventilation capacity, and the support strength, the length of the continuous separation grouting and filling mining working face without coal pillars is systematically designed, including calculation formulas and verification steps, to ensure the matching of rock strata stability and production efficiency.
It enables precise design of the working face length in continuous delamination grouting and backfilling mining without coal pillars, ensuring the stability of the rock strata and production efficiency, reducing equipment failure and safety risks, and improving coal resource recovery rate and production efficiency.
Smart Images

Figure CN121457070B_ABST