Side self-bearing structure for connection of newly-built project and underground operation station and transformation method

CN121593500AActive Publication Date: 2026-03-03CHINA RAILWAY DESIGN GRP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202610131468.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-01-30
Publication Date
2026-03-03
Estimated Expiration
2046-01-30

Smart Images

  • Figure CN121593500A_ABST
    Figure CN121593500A_ABST
Patent Text Reader

Abstract

The invention discloses a side-by-side self-bearing structure of a newly-built project connection underground operation station, which comprises an operation underground station, the operation underground station is provided with a station enclosure structure and a station side wall which are connected with each other, a connection hole excavated later is formed in the station side wall, and a channel opening is also formed in the position, corresponding to the connection hole, of the station enclosure structure; newly-built operation station side wall hole-opening columns and newly-built operation station side wall hole-opening beams are arranged in the peripheral wall body of the connection hole, the station side wall is connected with the newly-built underground engineering side wall through the newly-built operation station side wall hole-opening columns and the newly-built operation station side wall hole-opening beams, and a newly-built underground engineering communicating with the operation underground station is formed; and a new underground engineering foundation pit support is arranged on the outer side of the new underground engineering. The holing columns and the holing beams which are constructed in a layered mode are used as temporary stress components in the connection holing construction period, other external temporary supports are not needed, the construction difficulty is reduced, the construction period is shortened, and the method can be popularized to side wall transformation in a larger range.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Construction communication system for new subway line station and existing station and construction method of construction communication system

    CN108385721A

  • Fabricated subway station side wall tunnel portal opening method

    CN113006132A

  • Arched subway station extension connection structure and construction method

    CN113565533A

  • Construction method for non-reserved rail transit interface of operation subway station

    CN119041921A

  • Method for connecting rail transit protection area external engineering and operation station main body structure

    CN119122002A