Construction hoist standard section rack automatic positioning and installation combined mechanism
By using automated positioning and installation of the assembly components through end-point and multi-dimensional verification, the problem of installation errors caused by dimensional differences in the assembly of standard sections and racks of construction hoists has been solved, achieving high-precision and low-cost assembly installation.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- 山西建投装备制造有限公司
- Filing Date
- 2026-03-23
- Publication Date
- 2026-06-09
AI Technical Summary
When assembling standard sections and racks of existing construction hoists, the dimensional differences lead to a high installation error rate, making it difficult to achieve accurate multi-dimensional verification, which increases the processing rework rate and cost.
By employing end-verification and multi-dimensional verification assemblies, a geared motor drives a rotating frame and an electric cylinder to push the support bar. Combined with positioning distance and proximity sensors, the rack and pinion are precisely aligned at the ends and middle of the standard section. The controller coordinates the actions for automated assembly line operation.
It significantly reduced the error rate of installation and assembly, reduced the rework rate, lowered the processing cost of machine tool assembly, and improved the consistency and efficiency of installation and assembly.
Smart Images

Figure CN121870440B_ABST