By performing accuracy verification and three-dimensional model analysis on the stacker crane actuator, combined with micro-lift testing, the problem of proactive sensing and safety prediction of material status in composite material stockpiles was solved, achieving high-precision and safe material handling operations.
Patent Information
- Application Number
- CN202611339411.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-01
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2046-09-01
AI Technical Summary
Existing stacker crane control methods are not adaptable enough to composite material stockpiles. They lack proactive perception and prediction of material stacking status, have a single safety protection mechanism, and pose risks of material tilting, slipping, scraping, and collision. They are particularly difficult to ensure material handling safety under complex working conditions.
By performing precision calibration on the stacker crane actuator, constructing a 3D model for material state analysis, and performing micro-lift tests to predict safety risks, we can achieve pre-calibration of precision and multi-dimensional safety assessment, ensure accurate alignment of the forks and pallet sockets, and identify and eliminate the risks of falling and collision.
It enables high-precision material handling in composite material stockpiles, reducing the risk of material tilting, slipping, scraping, and collision, and improving the safety and stability of material handling operations.
Smart Images

Figure CN122831069B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of stacker crane stacking and reclaiming control technology, specifically to an intelligent control method and system for stacking and reclaiming composite material stockpiles. Background Technology
[0002] Composite material storage yards are important warehousing facilities used to store various composite material raw materials and semi-finished products. They typically employ a three-dimensional rack structure for dense storage, with stacker cranes moving along aisle rails and using extendable forks to achieve automated material storage and retrieval operations.
[0003] The increasing diversity of materials stored in stockyards, their varying specifications, and significant differences in shape regularity, leads to complex and ever-changing operating conditions for stacker cranes. However, existing stacker crane control methods generally employ storage and retrieval control strategies designed for standardized scenarios, resulting in insufficient adaptability and the following main shortcomings: First, there is a lack of proactive sensing and prediction mechanisms for material stacking status. Existing methods do not perceive or judge the actual stacking shape of materials at the target location before executing a picking action, nor do they assess the relative position of the material to be picked on the pallet, or the spatial interference between the material-pallet assembly and surrounding racking structural components. Because materials in composite material storage yards are irregularly shaped and arranged in various postures, their center of gravity may deviate significantly from the center of the pallet, or even extend beyond the pallet boundary. Retrieving materials rashly under these conditions can easily lead to material imbalance, tilting, or slippage during forklift lifting, or cause safety accidents due to scraping or collisions between the material and racking uprights or beams.
[0004] Second, the safety protection mechanism assessment has a single dimension and adopts a post-event triggering mode. Specifically, existing methods usually only rely on the load or deformation parameters after the telescopic forks bear material for safety judgment, without fully considering the risk of uneven load caused by uneven load on the left and right forks in a double-fork structure, nor the impact of the stacker crane's overall posture deviation on material handling safety. The assessment dimensions are significantly lacking. At the same time, the above-mentioned risk identification process mostly occurs after the forks have lifted the material out of the storage position. Even if a safety alarm is triggered at this time, the remedial measures that can be taken are extremely limited. Especially for materials with large weight and high economic value in composite material storage yards, there is an urgent need in the field for a technical means to predict and proactively assess the safety of material handling operations in advance before the material is completely removed from the storage position.
[0005] In summary, developing an intelligent control method and system that can adapt to the complex working conditions of composite material stockpiles, possesses the ability to perform precision pre-calibration, actively perceive material status, and predict material handling safety risks in advance has become an urgent technical problem to be solved in this field. Summary of the Invention
[0006] In view of this, in order to solve the problems mentioned in the background technology, a smart control method and system for composite material stockpile and reclaiming is proposed.
[0007] The technical solution adopted by this invention to solve its technical problem is: In a first aspect, the present invention provides an intelligent control method for stacking and reclaiming composite material stockpiles, comprising the following steps: S1. Before material handling, the accuracy of the stacker crane's actuator is checked to identify whether the accuracy is inaccurate. Based on the pattern of the actual action value of the actuator deviating from the target value, it is determined whether the accuracy inaccuracy can be corrected, so as to carry out accuracy compensation or report the accuracy abnormality.
[0008] S2. Based on the location of the material to be retrieved, calculate the sliding distance of the ground rail wheels and the rising height of the loading platform to initially position the stacker crane.
[0009] S3. Obtain the relative positions of the materials to be picked, the transport pallets, and the shelf structure in space, and determine whether the material stacking status meets the picking conditions. If yes, proceed to S4; otherwise, report a material stacking abnormality.
[0010] S4. Measure the horizontal distance and longitudinal height difference between the telescopic forks and the pallet insertion holes, and adjust the sliding distance of the ground rail wheels and the lifting height of the loading platform accordingly for secondary positioning of the stacker crane.
[0011] S5. Control the telescopic forks to extend into the pallet insertion hole and perform a micro-lift test. Based on the changes in load at the end of the forks and the changes in the stacker crane's posture during the micro-lift process, predict whether there is a safety risk in picking up the material. If so, terminate the action and retract; otherwise, continue to perform subsequent picking actions until the picking is completed.
[0012] Based on the above embodiments, the method for identifying whether there is a precision inaccuracy includes: Before material handling, the stacker crane's actuators are subjected to multiple precision checks. The actuators include ground wheels, a loading platform, and telescopic forks.
[0013] For each actuator, the deviation between the actual action value of the actuator and the target action value in the issued action command is collected in each accuracy verification, and multiple sets of action deviation measurement data of the actuator are obtained.
[0014] Each measurement value in multiple sets of motion deviation measurement data is compared with the preset allowable range of motion deviation.
[0015] If the measured value of the actuator's motion deviation exceeds the allowable range, and the number of measurements exceeding the allowable range reaches the preset upper limit for the number of times the actuator exceeds the limit, then the actuator's positioning accuracy is determined to be inaccurate; otherwise, the positioning accuracy is determined to be normal.
[0016] Based on the above embodiments, the method for determining whether accuracy inaccuracies can be corrected includes: Obtain all motion deviation measurement data of the actuators that are judged to be inaccurate in positioning accuracy during accuracy verification, and construct a motion deviation sequence.
[0017] Calculate the range between the maximum and minimum values in the motion deviation sequence, and then calculate the ratio between this range and the arithmetic mean of the motion deviation sequence. This ratio is denoted as the numerical fluctuation ratio.
[0018] If the positive and negative signs of each deviation value in the action deviation sequence are consistent, and the numerical fluctuation ratio is less than or equal to the preset numerical fluctuation ratio threshold, then the accuracy inaccuracy is determined to be correctable, and accuracy compensation is performed.
[0019] Otherwise, the inaccuracy is deemed uncorrectable, and an accuracy anomaly is reported.
[0020] Based on the above embodiments, the accuracy compensation method includes: The arithmetic mean of the action deviation sequence is used as the fixed deviation value of the actuator. The negative of this fixed deviation value is added to the subsequent original target action value to determine the final instruction value issued to the actuator.
[0021] Based on the above embodiments, the method for preliminary positioning of the stacker crane includes: Retrieve the location code of the material to be picked from the warehouse management system to obtain the layer number and column number of the location, and determine the spatial position of the target location on the shelf.
[0022] Based on the spatial location of the target storage location and the current position of the stacker crane, the required sliding distance of the ground rail wheels is calculated so that the center point of the lower crossbeam of the stacker crane is aligned with the midpoint between the left and right rack columns of the column where the target storage location is located. The corresponding action command is generated and sent to the horizontal travel control mechanism to drive the ground rail wheels to slide along the ground rail to the designated position, and the ground rail wheels are locked upon arrival.
[0023] After the ground rail wheels are locked, the required lifting height of the loading platform is calculated so that the lower surface of the stacker crane's loading platform is at the same height as the lower surface of the lower rack beam of the target storage location. The corresponding action command is generated and sent to the lifting control mechanism to drive the loading platform to rise to the specified height, and the loading platform is locked after reaching the height.
[0024] Based on the above embodiments, the method for determining whether the material stacking state meets the material removal conditions includes: Collect multi-angle real-scene images of the area where the target storage location is located, and construct a three-dimensional model of the local spatial domain where the target storage location is located. The three-dimensional model includes the three-dimensional geometric information of the materials to be picked, the transport pallets, and the rack structure.
[0025] Based on the three-dimensional model, obtain the vertical projection point of the geometric center of the material to be picked up on the loading surface of the transport pallet, and compare the projection point with the boundary line of the loading surface of the transport pallet. If the projection point exceeds the boundary line or the shortest distance to the boundary line is less than the preset distance warning value, it is determined that there is a risk of material falling during material picking.
[0026] Obtain the horizontal projection plane of the assembly of the material to be picked and the transport pallet in the direction facing the stacker crane. At the same time, obtain the horizontal projection plane of the rack structure in the same direction. If the two horizontal projection planes overlap, it is determined that there is a risk of collision when picking up the material.
[0027] If there is a risk of material falling or collision during material handling, the material stacking status is determined not to meet the material handling conditions; otherwise, the material handling conditions are determined to be met.
[0028] Based on the above embodiments, the method for secondary positioning of the stacker crane includes: The center point of the telescopic fork end face and the center point of the pallet insertion hole end face are obtained in space. The horizontal distance and longitudinal height difference between the telescopic fork and the pallet insertion hole are calculated. Based on this, the sliding distance of the ground rail wheel and the fine adjustment amount of the lifting height of the loading platform are determined, and the corresponding fine adjustment action command is generated and sent to the corresponding control mechanism.
[0029] Release the locking status of the ground rail wheels and the loading platform, drive them to the designated position according to their respective fine-tuning amounts, and then lock them again.
[0030] Based on the above embodiments, the method for predicting whether there are safety risks in material handling includes: Control the telescopic forks to extend into the pallet insertion holes and perform a micro-lift test.
[0031] During the micro-lift process, the load data at the ends of the telescopic forks on both sides are monitored in real time, and the load-time curves of each side fork are plotted. Based on the load-time curves, the peak load on both sides forks is obtained, and it is determined whether there is an off-center load on the two sides forks.
[0032] Simultaneously, the attitude changes of the stacker crane before and after the micro-lift test were monitored to obtain the downward deflection of the fork ends, the tilt of the loading platform, and the swing amplitude of the top of the stacker crane column.
[0033] Determine whether the following security risk triggering conditions are met: The peak load on either side of the forks exceeds the preset fork load warning value.
[0034] During the slight lifting process, there is an uneven load on both sides of the forks.
[0035] Any value among the following—fork tip deflection, loading platform tilt, or stacker column top swing—exceeds its corresponding preset threshold.
[0036] If any of the above triggering conditions are met, the material handling operation is deemed to have a safety risk; otherwise, it is deemed to have no safety risk.
[0037] Based on the above embodiments, the method for determining whether there is uneven loading on both sides of the forks includes: The load-time curves of the two forks are aligned in the same time coordinate system. The difference between the load values of the two forks at the same time is calculated. If the difference exceeds the preset off-center load threshold at any sampling time, it is determined that there is an off-center load; otherwise, it is determined that there is no off-center load.
[0038] Secondly, the present invention also provides an intelligent control system for stacking and reclaiming composite material stockpiles, including: The precision calibration module verifies the precision of the stacker crane's actuators before material handling, identifies whether there is a precision misalignment, and determines whether the misalignment can be corrected.
[0039] The preliminary positioning module calculates the sliding distance of the ground rail wheels and the rising height of the loading platform to perform preliminary positioning of the stacker crane.
[0040] The stacking sensing module determines whether the material stacking status meets the retrieval conditions based on the relative positions of the material to be retrieved, the transport pallet, and the shelf structure in space.
[0041] The secondary positioning module fine-tunes the sliding distance of the ground rail wheels and the rising height of the loading platform based on the horizontal distance and longitudinal height difference between the telescopic forks and the loading pallet insertion holes.
[0042] The micro-lift test module performs micro-lift tests and predicts whether there are safety risks during material handling based on changes in the load at the end of the forks and the stacker crane's posture during the micro-lift process.
[0043] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. This invention verifies the accuracy of the stacker crane's actuators before material handling, measures the deviation between the actual action value and the target command value, compares it with the allowable range, determines whether there is inaccuracy, further identifies whether the inaccuracy can be corrected based on the consistency of the sign of the deviation and the numerical fluctuation ratio, and performs accuracy compensation. Based on the initial positioning, a secondary fine-tuning positioning is performed according to the horizontal distance and longitudinal height difference between the forks and the pallet insertion holes. This achieves dual positioning of pre-calibration accuracy and coarse-fine combination, thereby reducing positioning deviation, ensuring accurate insertion of the forks and pallet insertion holes, and meeting the high-precision material handling requirements under dense storage conditions.
[0044] 2. This invention collects multi-angle real-scene images of the storage location area before the material retrieval action is performed, constructs a 3D model containing the 3D geometric information of the material to be retrieved, the transport pallet, and the shelf structure, analyzes the relative position of the material and the pallet, as well as the relative position of the material-pallet assembly and the shelf structure, to identify the risk of material falling and collision. The material retrieval action is only performed when there is no risk, realizing the proactive perception of the material stacking status and the prediction of spatial interference, eliminating the risk of falling and collision before the material retrieval action is performed.
[0045] 3. This invention performs a micro-lift test during the initial lifting stage before the material leaves the shelf support, moving the risk identification point forward to before the material leaves the storage location. It conducts a low-risk, reversible pre-assessment of material handling safety. Based on the load peaks and off-center load risks of the left and right forks during the micro-lift process, as well as changes in the overall machine posture such as the fork end deflection, the tilt of the loading platform, and the swing amplitude of the column top, it comprehensively determines whether there is a safety risk and terminates the action to retract, thus achieving a multi-dimensional, proactive safety assessment. Attached Figure Description
[0046] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0047] Figure 1 This is a schematic diagram of the method flow of the present invention.
[0048] Figure 2 This is a system module connection diagram of the present invention.
[0049] Figure 3 This is a schematic diagram of the stacker crane structure of the present invention.
[0050] Figure 4 This is a schematic diagram of material stacking within the target storage location of the present invention.
[0051] Figure 5 This is a schematic diagram of the end face of the telescopic fork of the present invention.
[0052] Figure 6 This is a schematic diagram of the end face of the pallet insertion hole of the present invention.
[0053] Reference numerals: 1. Ground rail; 2. Ground rail wheel; 3. Horizontal travel control mechanism; 4. Lifting control mechanism; 5. Lower crossbeam of stacker crane; 6. Upright column of stacker crane; 7. Loading platform; 8. Telescopic fork; 9. Upright column of the rack in the column where the target storage location is located; 10. Lower rack crossbeam of the layer where the target storage location is located; 11. Transport pallet; 12. Transport pallet insertion hole; 13. Material to be picked up; 14. End face of telescopic fork; 15. End face of transport pallet insertion hole. Detailed Implementation
[0054] To further illustrate the technical means and effects adopted by the present invention to achieve its intended purpose, the following, in conjunction with the accompanying drawings and preferred embodiments, details the specific implementation, structure, features, and effects of the intelligent control method and system for stacking and reclaiming composite material stockpiles proposed according to the present invention. In the following description, different "one embodiment" or "another embodiment" do not necessarily refer to the same embodiment. Furthermore, specific features, structures, or characteristics in one or more embodiments can be combined in any suitable form.
[0055] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains.
[0056] The specific scheme of the intelligent control method and system for stacking and reclaiming of composite material stockpiles provided by the present invention will be described in detail below with reference to the accompanying drawings.
[0057] Please see Figure 1 As shown, the first aspect of the present invention provides an intelligent control method for stacking and reclaiming of composite material stockpiles, comprising the following steps S1-S5.
[0058] Step S1: Before material handling, the accuracy of the stacker crane's actuator is checked to identify whether the accuracy is inaccurate. Based on the pattern of the actual action value of the actuator deviating from the target value, it is determined whether the accuracy inaccuracy can be corrected, so as to carry out accuracy compensation or report the accuracy abnormality.
[0059] In a preferred embodiment of the present invention, the method for identifying whether there is a precision inaccuracy in step S1 includes: See Figure 3 As shown, before material handling, the stacker crane's actuators undergo multiple precision checks. The actuators include ground wheels 2, a loading platform 7, and telescopic forks 8.
[0060] For each actuator, the deviation between the actual action value of the actuator and the target action value in the issued action command is collected in each accuracy verification, and multiple sets of action deviation measurement data of the actuator are obtained.
[0061] Each measurement value in multiple sets of motion deviation measurement data is compared with the preset allowable range of motion deviation.
[0062] If the measured value of the actuator's motion deviation exceeds the allowable range, and the number of measurements exceeding the allowable range reaches the preset upper limit for the number of times the actuator exceeds the limit, then the actuator's positioning accuracy is determined to be inaccurate; otherwise, the positioning accuracy is determined to be normal.
[0063] In a preferred embodiment of the present invention, the method for determining whether the accuracy misalignment can be corrected in step S1 includes: Obtain all motion deviation measurement data of the actuators that are judged to be inaccurate in positioning accuracy during accuracy verification, and construct a motion deviation sequence.
[0064] Calculate the range between the maximum and minimum values in the motion deviation sequence, and then calculate the ratio between this range and the arithmetic mean of the motion deviation sequence. This ratio is denoted as the numerical fluctuation ratio.
[0065] If the positive and negative signs of each deviation value in the action deviation sequence are consistent, and the numerical fluctuation ratio is less than or equal to the preset numerical fluctuation ratio threshold, then the accuracy inaccuracy is determined to be correctable, and accuracy compensation is performed.
[0066] Otherwise, the inaccuracy is deemed uncorrectable, and an accuracy anomaly is reported.
[0067] In a preferred embodiment of the present invention, the accuracy compensation method in step S1 includes: The arithmetic mean of the action deviation sequence is used as the fixed deviation value of the actuator. The negative of this fixed deviation value is added to the subsequent original target action value to determine the final instruction value issued to the actuator.
[0068] It should be noted that the ground rail wheel 2 includes a driving wheel and a driven wheel. The driving wheel is the execution wheel that receives driving commands and outputs walking motion, while the driven wheel is the support wheel that passively rolls as the driving wheel rotates. Since the motion state of the driven wheel is determined by the output motion of the driving wheel and it does not participate in independent position closed-loop control, the accuracy verification of the ground rail wheel 2 in step S1 specifically refers to the accuracy verification of the driving wheel. That is, the actual motion value of the driving wheel is collected in multiple verifications and compared with the target motion value in the issued command to determine whether the positioning accuracy of the ground rail wheel 2 drive system is inaccurate. It should be understood that the displacement output error of the driving wheel can reflect all the positioning deviations of the stacker crane in the track direction. The driven wheel does not generate independent driving errors, so there is no need to perform repeatable accuracy verification on it. If the driving wheel is determined to be of normal accuracy in the verification, it is considered that the overall positioning accuracy of the ground rail wheel 2 walking mechanism meets the material picking requirements. If the driving wheel is inaccurate and cannot be corrected, an accuracy abnormality is reported to prompt maintenance personnel to check the wear condition of the drive transmission chain, encoder, or wheel body. By using the above-mentioned single-point verification method for the drive wheel, the sufficiency and reliability of the positioning accuracy judgment of the ground rail wheel 2 are ensured, and redundant verification steps are avoided. This helps to improve the efficiency of self-inspection before material handling and shorten the equipment preparation time.
[0069] In one specific embodiment of the present invention, the telescopic fork 8 of the stacker crane adopts a double-fork structure, that is, it consists of two independent and symmetrically arranged telescopic forks 8 on the left and right sides, with a predetermined distance between the two forks to jointly support the transport pallet 11. It should be noted that when performing accuracy verification on the telescopic fork 8 in step S1, the control system independently verifies the positioning accuracy of each side of the telescopic fork 8 in turn. Specifically, the control system first issues a test target action value to the left telescopic fork 8, collects its actual extension distance and calculates the action deviation. After completing the accuracy judgment of the left fork, the right telescopic fork 8 is then independently verified in the same way. Through the above-mentioned step-by-step verification method, it is possible to identify whether there is a positioning accuracy error in each side of the telescopic fork 8, avoiding the inability of the fork and pallet insertion hole to be accurately aligned due to abnormal accuracy of one side of the fork, or the material tilting or even slipping due to inconsistent extension of the two sides, thereby improving the reliability and safety of the material handling operation.
[0070] Furthermore, in addition to verifying the positioning accuracy of the left and right telescopic forks 8, this embodiment also includes a response consistency test step. Specifically, after completing the accuracy verification of each fork, the control system simultaneously issues the same action command to both the left and right telescopic forks 8, driving them to extend synchronously. Displacement sensors or encoders mounted on the left and right fork drive mechanisms are used to collect the displacement-time curves of the forks during the action in real time. The control system compares the displacement-time curves of the left and right forks. If the displacement difference between the two forks at the same moment exceeds a preset synchronization deviation threshold, or if the time difference between the two forks reaching the target position exceeds a preset time deviation threshold, then the left and right forks are deemed to be inconsistent in response, and a synchronization anomaly is reported. If the displacement-time curves of both forks remain consistent within the allowable deviation range, then the left and right forks are deemed to be consistent in response, and the synchronization performance meets the material handling requirements. Through the above response consistency test, it is possible to effectively identify the asynchronous movement of the left and right forks caused by differences in the characteristics of the two drive motors, uneven wear of the transmission mechanism, or asynchronous delay of the control signal. This avoids safety hazards such as pallet tilting, material overturning, or jamming of the socket caused by one side of the fork being ahead or behind the other during the material picking process, and further improves the safety and stability of the stacker crane's material picking operation.
[0071] In a specific embodiment of the present invention, taking the drive wheel of the stacker crane ground rail wheel 2 as an example, the specific process of obtaining the actual action value of the actuator, the target action value in the action command issued, and the deviation between the two in step S1 is described in detail.
[0072] In this embodiment, the drive wheel of the stacker crane ground rail 2 is driven by a servo motor, and a laser rangefinder is fixedly installed along the direction of the ground rail 1 to measure the actual walking displacement of the stacker crane body in the direction of the ground rail 1.
[0073] When performing accuracy verification, the control system first calls a set of test target motion value sequences pre-stored in the verification parameter storage area. This sequence consists of stroke position values randomly generated by the control system before the material handling operation or preset by the operator.
[0074] The control system sends the target motion value for the test to the servo driver via communication and records the value in the local register for subsequent calculations.
[0075] After receiving an instruction containing the target motion value, the servo driver drives the servo motor to rotate and drives the drive wheel to travel along the ground rail 1 to the target position indicated by the instruction.
[0076] During the movement, the laser rangefinder emits a laser beam toward the starting reference point of the track and receives the reflected signal, calculates the actual absolute displacement value of the stacker crane body relative to the starting reference point of the track, and uses the same timestamp as the synchronization reference, and uses the actual absolute displacement value as the actual action value of the actuator for this verification.
[0077] Subsequently, the control system retrieves the target motion value recorded in the issued command and calculates the difference between the target motion value and the actual motion value. This difference is the motion deviation of the actuator under this motion command. This deviation value is stored as raw data in a temporary register by the control system for subsequent comparison with the allowable range of motion deviation and for determining accuracy inaccuracies.
[0078] It should be noted that the issued action commands and their target action values involved in the accuracy verification in step S1 can be flexibly configured according to the actual verification strategy. Specifically, for the same actuator, the issued action command may include multiple repeated identical target action values to verify the positioning consistency and repeatability accuracy of the actuator when repeatedly performing the same action; or it may include multiple different target action values to verify the full-stroke positioning accuracy of the actuator under different stroke positions, different load states, or different movement directions. Furthermore, when performing accuracy verification on multiple actuators (including the drive wheel of the ground rail wheel 2, the loading platform 7, and the telescopic fork 8), the action commands corresponding to each actuator can be issued simultaneously according to the scheduling strategy of the stacker crane control system to achieve parallel verification and shorten the total self-test time; or they can be issued one by one to avoid electrical shocks, power overloads, or mutual positional interference that may occur when multiple actuators operate simultaneously, which is especially suitable for scenarios where the motion coupling between actuators is strong or the processing capacity of the control system is limited. Preferably, the simultaneous and sequential sending methods can be adaptively switched based on the current standby status, power supply capacity, and historical verification records of the stacker crane. For example, during the first power-on or the first verification after a long period of shutdown, the sequential sending method is used to ensure a smooth and controllable verification process; during periodic rapid self-checks during continuous operation, the simultaneous sending method is used to improve verification efficiency. Regardless of the sending method used, the actual action value of each actuator must be independently compared with its corresponding target action value to determine whether the positioning accuracy of each actuator meets the material handling requirements.
[0079] It should be noted that the allowable range of motion deviation is used to measure the acceptable deviation between the actual motion value and the target motion value of each actuator. Its setting is based on factors including the mechanical transmission accuracy level of each actuator, the encoder resolution of the control system, the stacker crane's operating speed setting, and the maximum allowable cumulative position error for material handling operations. For example, for the drive wheel of the ground rail wheel 2, the allowable range of motion deviation in its traveling direction can be set to ±2mm. This value is determined based on the pitch error of the gear and rack transmission pair used in the drive wheel and the encoder pulse equivalent. For the lifting action of the loading platform 7, the allowable range of deviation in its height direction can be set to ±1.5mm. This value takes into account the elastic elongation of the lifting chain and the stopping repeatability accuracy of the loading platform 7 at different height levels. For the horizontal extension action of the telescopic fork 8, the allowable range of deviation can be set to ±1mm. This value is determined based on the fit clearance between the fork and the pallet insertion hole 12 and the chamfer size of the insertion hole entrance, to ensure smooth insertion within the deviation range. Furthermore, the allowable range of motion deviation is not fixed, but dynamically adjusted based on the stacker crane's cumulative operating time, the number of actions after the most recent accuracy compensation, and changes in temperature and humidity. Specifically, when the stacker crane runs continuously for more than a set duration or the ambient temperature changes beyond a set threshold, the control system automatically reduces the allowable deviation range by a predetermined percentage (e.g., 20%) from the initial set value to trigger a more stringent accuracy judgment and provide early warning of accuracy drift caused by wear or thermal deformation of transmission components. Conversely, when the actuator passes multiple consecutive checks after accuracy compensation, the allowable deviation range can be appropriately widened (e.g., widened by 10%) to avoid frequently triggering unnecessary accuracy anomaly reports. Preferably, the dynamic adjustment step size and triggering conditions of the allowable deviation range are pre-stored in the control system's parameter configuration table, and operators can manually correct them according to on-site conditions.
[0080] It should be noted that the setting of the upper limit for the number of times exceeding the limit (i.e., the threshold for the number of times exceeding the standard required to determine the positioning accuracy of the actuator) is intended to filter out single abnormal jumps caused by occasional interference or measurement noise, and to avoid frequent triggering of accuracy abnormality reports or erroneous shutdowns due to non-continuous deviations. As an example, for the independent accuracy verification of the drive wheel of the ground rail wheel 2, the loading platform 7, and the telescopic fork 8, the upper limit for the number of times exceeding the limit can be preset to 3. That is, in a total of 5 consecutive accuracy verifications, if the measured value of the action deviation of the same actuator exceeds the allowable range of action deviation 3 times or more, the actuator is determined to have positioning accuracy inaccuracy; if the number of times exceeding the standard is 2 or less, its accuracy is determined to be normal. This value "3 times / 5 times" is determined based on the statistical principle that the probability of a single measurement error exceeding the limit is less than 5% within the 95% confidence interval under a normal distribution, taking into account both the reliability of the judgment and the efficiency of self-checking. Furthermore, the upper limit for the number of times exceeding the limit is not fixed, but is dynamically and adaptively adjusted according to the operating conditions of the stacker crane and the historical accuracy trend. Specifically, when the stacker crane is in the initial commissioning stage, the initial operation stage after major overhaul, or when the rate of change of ambient temperature exceeds a preset threshold (e.g., 5℃ / h), the control system automatically increases the upper limit of the number of times the limit is exceeded from the default 3 to 4 times. This reduces the probability of misjudgment caused by environmental interference or unstable factors during the mechanical break-in period, and avoids unnecessary downtime maintenance. When the stacker crane operates continuously and stably and there are no exceedances in the historical verification records for more than 10 consecutive times, the control system decreases the upper limit of the number of times the limit is exceeded from the default 3 to 2 times. This improves the sensitivity of accuracy monitoring and enables early warning of positioning accuracy drift. Preferably, the adjustment step size of the upper limit of the number of times the limit is 1 time, and its value is always between the preset minimum threshold (2 times) and maximum threshold (5 times). The adjustment trigger condition and the current value are stored in real time in the non-volatile memory of the control system, and operators can manually intervene and confirm through the human-machine interface.
[0081] It should be noted that the numerical fluctuation ratio threshold is used to measure the dispersion of the actuator's action deviation sequence. Its setting is based on the following: when the signs of all deviation values in the deviation sequence are completely consistent, it indicates that the deviation has a unidirectional nature and there is a possibility of system offset. However, consistent signs alone are insufficient to determine that the deviation is correctable; the relative fluctuation amplitude between each deviation value must also be evaluated. If the fluctuation between deviation values is too large relative to their average level, it indicates that although the deviation is consistent in direction, its amplitude is unstable. In this case, using the average as a fixed compensation amount cannot effectively eliminate the deviation and may even introduce new positioning errors. Therefore, it should be determined as uncorrectable and reported as an anomaly. The specific value of the numerical fluctuation ratio threshold is determined comprehensively based on the mechanical transmission type of the actuator and the allowable positioning accuracy level. As an example, for the drive wheel 2 of the ground rail wheel using rack and pinion drive, due to the cumulative pitch error at the segment splicing points of the rack, the deviation amplitude of each stroke segment naturally has a certain difference. Therefore, the numerical fluctuation ratio threshold is set to 0.3. For the lifting mechanism of the loading platform 7 using ball screw drive, its transmission chain has good rigidity and the error distribution within the stroke range is uniform. The numerical fluctuation ratio threshold is set to 0.2 to ensure that the compensation amount can effectively correct the positioning error throughout the entire stroke height. For the telescopic fork 8 using chain drive, due to the polygonal effect of the chain and the uneven wear of the chain links, its deviation amplitude naturally fluctuates greatly. Therefore, the numerical fluctuation ratio threshold is set to 0.4 to avoid frequently misjudging compensable systematic deviations as uncorrectable anomalies. Furthermore, the numerical fluctuation ratio threshold is not static but dynamically adjusted according to the cumulative operating time of the actuator, the operating mileage after the most recent mechanical maintenance, and changes in ambient temperature. Specifically, when the cumulative operating time of the actuator exceeds half of the preset overhaul cycle, the control system automatically narrows the numerical fluctuation ratio threshold by 10% from the initial setting, judging the deviation data with a higher stability standard and providing early warning. Conversely, during the initial operating phase after the actuator has completed mechanical maintenance, the control system automatically widens the numerical fluctuation ratio threshold by 15% to avoid short-term deviation fluctuations caused by changes in the microscopic morphology of the transmission pair surface during the initial break-in period, thus preventing the misjudgment of potentially stable, correctable deviations as uncorrectable anomalies. Preferably, the dynamic adjustment step size and triggering conditions of the numerical fluctuation ratio threshold are pre-stored in the control system's parameter configuration table, allowing operators to manually adjust it based on actual on-site conditions and equipment status.
[0082] Step S2: Based on the location of the material to be retrieved 13, calculate the sliding distance of the ground rail wheel 2 and the rising height of the loading platform 7 to initially position the stacker crane.
[0083] In a preferred embodiment of the present invention, the method for preliminary positioning of the stacker crane in step S2 includes: See Figure 4As shown, the location code of the material to be picked 13 is retrieved from the warehouse management system to obtain the layer number and column number of the location, and the spatial position of the target location in the shelf is determined.
[0084] Based on the spatial location of the target storage location and the current position of the stacker crane, the required sliding distance of the ground rail wheel 2 is calculated so that the center point of the lower crossbeam 5 of the stacker crane is aligned with the midpoint between the left and right rack columns 9 of the column where the target storage location is located. The corresponding action command is generated and sent to the horizontal travel control mechanism 3 to drive the ground rail wheel 2 to slide along the ground rail 1 to the designated position, and lock the ground rail wheel 2 after reaching the designated position.
[0085] After the ground rail wheels 2 are locked, the required lifting height of the loading platform 7 is calculated so that the lower surface of the stacker crane's loading platform 7 is at the same height as the lower surface of the lower rack beam 10 of the target storage location. The corresponding action command is generated and sent to the lifting control mechanism 4 to drive the loading platform 7 to rise to the specified height, and the loading platform 7 is locked after reaching the height.
[0086] In this invention, the center point of the lower crossbeam 5 of the stacker crane is aligned with the midpoint between the left and right shelf columns 9 of the column containing the target storage location. Specifically, the absolute deviation between the actual horizontal coordinate of the center point of the lower crossbeam 5 of the stacker crane in the longitudinal direction of the aisle track 1 and the theoretical horizontal coordinate of the midpoint between the left and right shelf columns 9 of the column containing the target storage location in the longitudinal direction of the aisle track 1 should not exceed the preset horizontal positioning tolerance of the control system. This horizontal positioning tolerance is determined based on the one-sided fit clearance between the telescopic fork 8 and the pallet insertion hole 12, and its typical value is not greater than 50% of the one-sided clearance between the fork and the insertion hole. For example, when the one-sided design clearance between the fork width and the inner width of the insertion hole is 4mm, the horizontal positioning tolerance is set to ±2mm. Once the ground rail wheel 2 has slid to the target position calculated by the control system, if the feedback value from the laser rangefinder or ground rail encoder installed on the stacker crane body shows that the actual stopping deviation is within ±2mm, the alignment is determined to be complete, and the ground rail wheel 2 is locked. If the actual stopping deviation exceeds this tolerance range, the control system corrects the sliding distance according to the direction and value of the deviation until the alignment judgment standard is met before locking is performed.
[0087] Step S3: Obtain the relative positions of the material to be picked 13, the transport pallet 11, and the shelf structure in space, and determine whether the material stacking status meets the picking conditions. If yes, proceed to S4; otherwise, report a material stacking abnormality.
[0088] In a preferred embodiment of the present invention, the method for determining whether the material stacking state meets the material taking conditions in step S3 includes: Collect multi-angle real-scene images of the area where the target storage location is located, and construct a three-dimensional model of the local spatial domain where the target storage location is located. The three-dimensional model includes the three-dimensional geometric information of the material to be picked up 13, the transport pallet 11, and the shelf structure.
[0089] Based on the three-dimensional model, the vertical projection point of the geometric center of the material to be picked up 13 on the loading surface of the transport pallet 11 is obtained, and the projection point is compared with the boundary line of the loading surface of the transport pallet 11. If the projection point exceeds the boundary line or the shortest distance to the boundary line is less than the preset distance warning value, it is determined that there is a risk of material falling during material picking.
[0090] Obtain the horizontal projection plane of the assembly consisting of the material to be picked 13 and the transport pallet 11 in the direction facing the stacker crane. At the same time, obtain the horizontal projection plane of the rack structure in the same direction. If the two horizontal projection planes overlap, it is determined that there is a risk of collision when picking up the material.
[0091] If there is a risk of material falling or collision during material handling, the material stacking status is determined not to meet the material handling conditions; otherwise, the material handling conditions are determined to be met.
[0092] In one specific embodiment, multi-angle real-scene images of the area where the target storage location is located are collected through the visual sensor integrated into the stacker crane and the distributed cameras fixedly installed on the rack.
[0093] It should be noted that the preset distance warning value is used to measure the degree to which the vertical projection point of the geometric center of the material to be picked up 13 on the carrying surface of the pallet 11 deviates from the center area of the carrying surface. It is set based on the geometric dimensions of the carrying surface of the pallet 11, specifically including the length and width (for rectangular pallets) or equivalent diameter (for circular pallets). The physical meaning of this distance warning value is that when the projection point of the material's geometric center is too close to the edge of the pallet, the center of gravity of the material may exceed the pallet support boundary during the lifting and micro-lifting process of the telescopic forks 8, causing the material to tilt or even slip during the picking process. The specific value of the distance warning value is determined based on the percentage of the minimum side length of the pallet's carrying surface. For example, for a rectangular transport pallet 11 with a standard size of 1200mm in length and 1000mm in width, its load-bearing surface width (i.e., the dimension perpendicular to the fork extension direction) is 1000mm. The distance warning value is set to 10% of this width, i.e., 100mm. Its physical meaning is: when the vertical projection point of the geometric center of the material is located within 100mm inside the pallet boundary line (i.e., the distance from any boundary line is less than 100mm), it is determined that there is a risk of falling. Preferably, for transport pallets 11 of different specifications, the distance warning value is automatically calculated by the control system by reading the pallet model parameters pre-stored in the warehouse management system before picking up the material. The calculation formula is: warning value = α × minimum characteristic dimension of pallet load-bearing surface, where α is a preset proportional coefficient, and the value range is 8% to 15%. In this embodiment, α is preferably 10%. The selection of this ratio takes into account both safety (too small a warning value may lead to missed risk detection) and operational efficiency (too large a warning value may lead to a large number of normally stacked materials being misjudged as abnormal and causing frequent alarms). After experimental determination of the tipping critical angle of various composite materials under different degrees of eccentricity, a value of 10% can control the false alarm rate within an acceptable range while ensuring a safety margin.
[0094] Step S4: Measure the horizontal distance and longitudinal height difference between the telescopic fork 8 and the pallet insertion hole 12, and adjust the sliding distance of the ground wheel 2 and the rising height of the loading platform 7 accordingly to perform secondary positioning of the stacker crane.
[0095] In a preferred embodiment of the present invention, the method for secondary positioning of the stacker crane in step S4 includes: See Figure 5 and Figure 6 As shown, the center point of the telescopic fork end face 14 and the center point of the pallet insertion hole end face 15 are obtained in space. The horizontal distance and longitudinal height difference between the telescopic fork 8 and the pallet insertion hole 12 are calculated. Based on this, the sliding distance of the ground rail wheel 2 and the fine adjustment amount of the lifting height of the loading platform 7 are determined, and the corresponding fine adjustment action command is generated and sent to the corresponding control mechanism.
[0096] Release the locking state of the ground rail wheel 2 and the cargo platform 7, drive them to move to the designated position according to their respective fine adjustment amounts, and then lock them again.
[0097] Step S5: Control the telescopic fork 8 to extend into the pallet insertion hole 12 and perform a micro-lift test. Based on the changes in the load at the end of the fork and the changes in the stacker's posture during the micro-lift process, predict whether there is a safety risk in picking up the material. If so, terminate the action and retract; otherwise, continue to perform subsequent picking actions until the picking is completed.
[0098] In a preferred embodiment of the present invention, the method for predicting whether there is a safety risk in material handling in step S5 includes: Control the telescopic fork 8 to extend into the pallet insertion hole 12 and perform a micro-lift test.
[0099] During the micro-lift process, the load data at the ends of the telescopic forks 8 on both sides are monitored in real time. The load-time curves of each side fork are plotted. The peak load on both sides forks is obtained based on the load-time curves, and it is determined whether there is an off-center load on the two sides forks.
[0100] Simultaneously, the attitude changes of the stacker crane before and after the micro-lift test were monitored to obtain the downward deflection of the fork end, the tilt of the loading platform 7, and the swing amplitude of the top of the stacker crane column 6.
[0101] Determine whether the following security risk triggering conditions are met: The peak load on either side of the forks exceeds the preset fork load warning value.
[0102] During the slight lifting process, there is an uneven load on both sides of the forks.
[0103] If any of the following values exceeds the preset threshold: fork tip deflection, loading platform tilt, or stacker column top swing, the value of the fork tip deflection, loading platform tilt, or stacker column top swing, the value of the fork tip deflection, the value of the ...
[0104] If any of the above triggering conditions are met, the material handling operation is deemed to have a safety risk; otherwise, it is deemed to have no safety risk.
[0105] In a preferred embodiment of the present invention, the method for determining whether there is uneven loading on both sides of the forks includes: The load-time curves of the two forks are aligned in the same time coordinate system. The difference between the load values of the two forks at the same time is calculated. If the difference exceeds the preset off-center load threshold at any sampling time, it is determined that there is an off-center load; otherwise, it is determined that there is no off-center load.
[0106] It should be noted that the micro-lift test is performed while the material to be retrieved 13 is still within its storage location and the transport pallet 11 is not detached from the shelf support. In this state, even if the material slips due to uneven loading or abnormal posture, it will not fall directly to the ground, but will land on the shelf structure below, thus avoiding a fall from a height. This test method pre-assesses the safety of material retrieval in a low-risk and reversible manner. Once it is confirmed that there is no risk, the complete retrieval is performed; otherwise, the transport pallet 11 can be lowered back to its original position and the operation terminated, achieving safety prediction and proactive protection.
[0107] It should be noted that the fork load warning value is used to determine whether the peak load on the fork tip during the micro-lifting process has approached or reached the structural bearing limit. Its setting is based on the maximum permissible load weight of the single-sided telescopic fork 8, and is determined after comprehensively considering the dynamic load impact coefficient and safety margin. For example, the load warning value is set to 80% of the rated maximum load of the single-sided telescopic fork 8, with the remaining 20% as a safety margin to cope with the dynamic load increase caused by slight material swaying or system vibration during the micro-lifting process. Furthermore, this warning value can be dynamically adjusted according to the cumulative service life of the stacker crane and the degree of fatigue damage to the fork structure. When the cumulative number of fork actions exceeds the preset maintenance cycle, the control system automatically lowers the warning value from the initial setting of 80% to 70% to provide early warning of the safety risks caused by the decrease in fork fatigue strength due to long-term load bearing. Conversely, after replacing the forks or completing structural reinforcement modifications, the warning value can be restored to 80% of the initial setting. The dynamic adjustment logic and current valid value of the load warning value are stored in real-time in the control system parameter table and support manual correction.
[0108] It should be noted that the preset thresholds for the end deflection of the telescopic fork 8, the tilt of the loading platform 7, and the swing amplitude of the top of the stacker crane column 6 are all set based on the overall structural rigidity of the stacker crane, the maximum allowable positional deviation during material handling, and the fit clearance to ensure that the telescopic fork 8 and the pallet socket do not jam. For example, the end deflection threshold is set to 60% of the allowable end deflection of the fork under full load conditions, to reserve a 40% safety margin to cope with dynamic impacts; the tilt threshold of the loading platform 7 is set to 0.5°, based on the fact that when the tilt exceeds this angle, the relative angular deviation between the fork and the pallet socket will exceed the automatic correction range allowed by the chamfer of the socket; the swing amplitude threshold of the top of the column 6 is set to 10mm, based on the kinematic mapping relationship between the swing amplitude of the column 6 and the horizontal offset caused by this swing amplitude at the loading platform 7, to ensure that it is within the maximum allowable horizontal misalignment range between the fork and the pallet socket.
[0109] It should be noted that the off-center load threshold is used to determine whether the load difference between the left and right forks at the same time exceeds the allowable range. Its setting is based on the total weight of the material to be retrieved (13), the pallet stiffness, and the overall anti-tipping stability requirements of the stacker crane. For example, when the total weight of the material to be retrieved (13) is 1000 kg, the off-center load threshold is set to 15% of that total weight, i.e., 150 kg. This proportion is determined comprehensively based on the material's center of gravity offset limit and the structural strength margin of the forks and pallet, ensuring that the forks do not undergo plastic deformation within the allowable off-center load range and that the stacker crane's overturning moment is within the safety factor.
[0110] See Figure 2 As shown, the second aspect of the present invention provides an intelligent control system for stacking and reclaiming composite material stockpiles, including a precision calibration module, a preliminary positioning module, a stacking sensing module, a secondary positioning module, and a micro-lift measurement module.
[0111] The preliminary positioning module is connected to the accuracy calibration module and the stacking sensing module, respectively, and the secondary positioning module is connected to the stacking sensing module and the micro-lift measurement module, respectively.
[0112] The precision calibration module is used to verify the precision of the stacker crane's actuators before material handling, identify whether the precision is inaccurate, and determine whether the precision inaccuracy can be corrected.
[0113] The preliminary positioning module is used to calculate the sliding distance of the ground rail wheels 2 and the rising height of the loading platform 7 to perform preliminary positioning of the stacker crane.
[0114] The stacking sensing module is used to determine whether the stacking status of the material meets the picking conditions based on the relative positions of the material to be picked 13, the transport pallet 11, and the shelf structure in space.
[0115] The secondary positioning module is used to fine-tune the sliding distance of the ground rail wheel 2 and the rising height of the loading platform 7 based on the horizontal distance and longitudinal height difference between the telescopic fork 8 and the pallet insertion hole 12.
[0116] The micro-lift test module is used to perform micro-lift tests and predict whether there are safety risks in material handling based on changes in the load at the end of the forks and changes in the stacker crane's posture during the micro-lift process.
[0117] It should be noted that the order of the above embodiments of the present invention is merely for descriptive purposes and does not represent the superiority or inferiority of the embodiments. The processes depicted in the accompanying drawings do not necessarily require a specific or sequential order to achieve the desired result. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0118] The various embodiments in this specification are described in a progressive manner. Similar or identical parts between embodiments can be referred to interchangeably. The focus of each embodiment is on its differences from other embodiments. In particular, the apparatus embodiments are described simply because they are fundamentally based on the method embodiments; relevant details can be found in the descriptions of the method embodiments.
[0119] For ease of description, the above devices are described separately by function as various units. Of course, in implementing this application, the functions of each unit can be implemented in one or more software and / or hardware.
[0120] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0121] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations and / or block diagrams. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0122] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0123] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0124] Secondly, the accompanying drawings of the embodiments disclosed in this invention only involve structures related to the embodiments disclosed in this invention. Other structures can refer to general designs. In the absence of conflict, the same embodiment and different embodiments of this invention can be combined with each other.
[0125] Finally, the above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.
Claims
1. A method for intelligent control of composite material stockpile stacking and reclaiming, characterized in that, Includes the following steps: S1. Before picking up materials, the accuracy of the stacker crane's actuator is checked to identify whether the accuracy is inaccurate. Based on the pattern of the actual action value of the actuator deviating from the target value, it is determined whether the accuracy inaccuracy can be corrected, so as to carry out accuracy compensation or report the accuracy abnormality. The method for determining whether an accuracy misalignment is correctable includes: acquiring all motion deviation measurement data of the actuator identified as having positioning accuracy misalignment during accuracy verification, and constructing a motion deviation sequence; calculating the range between the maximum and minimum values in the motion deviation sequence, and calculating the ratio between this range and the arithmetic mean of the motion deviation sequence, and recording this ratio as the numerical fluctuation ratio; if the positive and negative signs of each deviation value in the motion deviation sequence are consistent, and the numerical fluctuation ratio is less than or equal to a preset numerical fluctuation ratio threshold, then the accuracy misalignment is determined to be correctable, and accuracy compensation is performed; otherwise, the accuracy misalignment is determined to be uncorrectable, and an accuracy anomaly is reported. S2. Based on the location of the material to be retrieved, calculate the sliding distance of the ground rail wheels and the rising height of the loading platform to initially position the stacker crane. S3. Obtain the relative positions of the materials to be picked, the transport pallets, and the rack structure in space, and determine whether the material stacking status meets the picking conditions. If yes, proceed to S4; otherwise, report a material stacking abnormality. The method for determining whether the material stacking status meets the material retrieval conditions includes: acquiring multi-angle real-scene images of the target storage location area, constructing a three-dimensional model of the local spatial domain of the target storage location, wherein the three-dimensional model contains the three-dimensional geometric information of the material to be retrieved, the transport pallet, and the rack structure; based on the three-dimensional model, obtaining the vertical projection point of the geometric center of the material to be retrieved onto the transport pallet's loading surface, and comparing this projection point with the boundary line of the transport pallet's loading surface; if the projection point exceeds the boundary line or the shortest distance to the boundary line is less than a preset distance warning value, it is determined that there is a risk of material falling during retrieval; obtaining the horizontal projection plane of the combination of the material to be retrieved and the transport pallet in the direction facing the stacker crane, and simultaneously obtaining the horizontal projection plane of the rack structure in the same direction; if the two horizontal projection planes overlap, it is determined that there is a risk of collision during retrieval; when there is a risk of material falling or collision during retrieval, it is determined that the material stacking status does not meet the material retrieval conditions; otherwise, it is determined that the material retrieval conditions are met. S4. Measure the horizontal distance and longitudinal height difference between the telescopic forks and the pallet insertion holes, and adjust the sliding distance of the ground rail wheels and the lifting height of the loading platform accordingly to perform secondary positioning of the stacker crane. S5. Control the telescopic forks to extend into the pallet insertion hole and perform a micro-lift test. Based on the changes in load at the end of the forks and the changes in the stacker crane's posture during the micro-lift process, predict whether there is a safety risk in picking up the material. If so, terminate the action and retract; otherwise, continue to perform subsequent picking actions until the picking is completed.
2. The intelligent control method for stacking and reclaiming of composite material stockpiles according to claim 1, characterized in that, Methods for identifying inaccuracies include: Before material handling, the stacker crane's actuators are subjected to multiple precision checks. The actuators include ground wheels, a loading platform, and telescopic forks. For each actuator, the deviation between the actual action value of the actuator and the target action value in the issued action command is collected in each accuracy verification to obtain multiple sets of action deviation measurement data for the actuator. Each measurement value in multiple sets of motion deviation measurement data is compared with the preset allowable range of motion deviation; If the measured value of the actuator's motion deviation exceeds the allowable range, and the number of measurements exceeding the allowable range reaches the preset upper limit for the number of times the actuator exceeds the limit, then the actuator's positioning accuracy is determined to be inaccurate; otherwise, the positioning accuracy is determined to be normal.
3. The intelligent control method for stacking and reclaiming of composite material stockpiles according to claim 1, characterized in that, Accuracy compensation methods include: The arithmetic mean of the action deviation sequence is used as the fixed deviation value of the actuator. The negative of this fixed deviation value is added to the subsequent original target action value to determine the final instruction value issued to the actuator.
4. The intelligent control method for stacking and reclaiming of composite material stockpiles according to claim 1, characterized in that, Methods for initial positioning of stacker cranes include: Retrieve the location code of the material to be picked from the warehouse management system to obtain the layer number and column number of the location, and determine the spatial position of the target location on the shelf; Based on the spatial location of the target storage location and the current position of the stacker crane, calculate the sliding distance required for the ground rail wheels to align the center point of the lower crossbeam of the stacker crane with the midpoint between the left and right rack columns of the column where the target storage location is located. Generate the corresponding action command and send it to the horizontal travel control mechanism to drive the ground rail wheels to slide along the ground rail to the designated position, and perform a locking operation on the ground rail wheels after reaching the designated position. After the ground rail wheels are locked, the required lifting height of the loading platform is calculated so that the lower surface of the stacker crane's loading platform is at the same height as the lower surface of the lower rack beam of the target storage location. The corresponding action command is generated and sent to the lifting control mechanism to drive the loading platform to rise to the specified height, and the loading platform is locked after reaching the height.
5. The intelligent control method for stacking and reclaiming of composite material stockpiles according to claim 1, characterized in that, The methods for secondary positioning of stacker cranes include: The center point of the end face of the telescopic fork and the center point of the pallet insertion hole are obtained in space. The horizontal distance and longitudinal height difference between the telescopic fork and the pallet insertion hole are calculated. Based on this, the sliding distance of the ground rail wheel and the fine adjustment amount of the lifting height of the loading platform are determined, and the corresponding fine adjustment action command is generated and sent to the corresponding control mechanism. Release the locking status of the ground rail wheels and the loading platform, drive them to the designated position according to their respective fine-tuning amounts, and then lock them again.
6. The intelligent control method for stacking and reclaiming of composite material stockpiles according to claim 1, characterized in that, Methods for predicting whether there are safety risks during material handling include: Control the telescopic forks to extend into the pallet slots and perform a micro-lift test; During the micro-lift process, the load data at the ends of the telescopic forks on both sides are monitored in real time, and the load-time curves of each side fork are plotted. The peak load on both sides forks is obtained based on the load-time curves, and it is determined whether there is an off-center load on the two sides forks. Meanwhile, the attitude changes of the stacker crane before and after the micro-lift test were monitored to obtain the downward deflection of the fork end, the tilt of the loading platform, and the swing amplitude of the top of the stacker crane column; Determine whether the following security risk triggering conditions are met: The peak load on either side of the forks exceeds the preset fork load warning value; During the slight lifting process, there is an uneven load on both sides of the forks; If any of the following values—fork tip deflection, loading platform tilt, or stacker crane column top swing—exceeds its corresponding preset threshold. If any of the above triggering conditions are met, the material handling operation is deemed to have a safety risk; otherwise, it is deemed to have no safety risk.
7. The intelligent control method for stacking and reclaiming composite material stockpiles according to claim 6, characterized in that, Methods for determining whether there is uneven loading on both sides of the forks include: The load-time curves of the two forks are aligned in the same time coordinate system. The difference between the load values of the two forks at the same time is calculated. If the difference exceeds the preset off-center load threshold at any sampling time, it is determined that there is an off-center load; otherwise, it is determined that there is no off-center load.
8. A smart control system for stacking and reclaiming composite material stockpiles, implementing the method according to any one of claims 1-7, characterized in that, include: The precision calibration module performs precision verification on the stacker crane's actuators before material handling, identifies whether there is a precision misalignment, and determines whether the misalignment can be corrected. The preliminary positioning module calculates the sliding distance of the ground rail wheels and the lifting height of the loading platform to perform preliminary positioning of the stacker crane; The stacking sensing module determines whether the stacking status of the materials meets the retrieval conditions based on the relative positions of the materials to be retrieved, the transport pallets, and the shelf structural components in space. The secondary positioning module fine-tunes the sliding distance of the ground rail wheels and the rising height of the loading platform based on the horizontal distance and longitudinal height difference between the telescopic forks and the pallet insertion holes. The micro-lift test module performs micro-lift tests and predicts whether there are safety risks during material handling based on changes in the load at the end of the forks and the stacker crane's posture during the micro-lift process.
Citation Information
Patent Citations
Stacker goods allocation visual demonstration method
CN120246486A
Intelligent warehousing system, stacking machine and control method of stacking machine
CN121553550A