Repaired equipment and repair methods
By using a mobile repair device to perform different processes in the MiniLED repair equipment, the problem of low repair efficiency of MiniLED products has been solved, and a highly efficient repair process has been optimized.
Patent Information
- Application Number
- CN202510600313.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-09
- Publication Date
- 2026-11-10
AI Technical Summary
MiniLED products are prone to problems such as damaged, misaligned, or missing LED chips during the production process, resulting in low repair efficiency.
A rework equipment is provided, comprising a main body and at least two rework devices, each of which can be moved to contact each other and perform different rework processes, including rejection, soldering, surface mounting, and soldering, by splitting the rework process and processing it simultaneously in different devices.
This improves the repair efficiency of MiniLED products by breaking down the overall repair process into different devices, reducing repair time and accelerating batch repair speed.
Smart Images

Figure CN123060367A_ABST
Abstract
Description
Technical Field
[0001] This application applies to the technical field of device repair, and in particular repair equipment and repair methods. Background Technology
[0002] With the development of the display industry, small-pitch MiniLED (sub-millimeter light-emitting diode) products are increasingly being used in the market.
[0003] Due to the small spacing, the manufacturing process becomes more complex. During production, LED chips are prone to damage, misalignment, omissions, or detachment during handling. This can result in defective LEDs in the final product, such as dead LEDs, dim LEDs, bright LEDs, LED stringing, or color distortion.
[0004] To resolve the issue of defective MiniLEDs, it is necessary to rework them. However, the rework process involves many steps, resulting in low efficiency. Summary of the Invention
[0005] This application provides repair equipment and repair methods to address the problem of low repair efficiency.
[0006] To address the aforementioned technical problems, this application provides a rework equipment, including a main body and at least two rework devices. Each rework device is installed on the main body to rework objects within each rework device. The at least two rework devices are movable to contact each other to transfer the objects to be reworked. The at least two rework devices perform different rework processes, and are configured to simultaneously perform rework on objects at different rework stages using corresponding rework processes.
[0007] The main body of the equipment includes a base and a support, with the support vertically fixed on the base; the rework device includes a repair platform and a repair unit, with the repair platform installed on the base; the repair unit is installed on the support and is configured to rework the corresponding rework object on the repair platform.
[0008] The at least two types of rework devices include: a first rework device and a second rework device; the first rework device includes a first repair platform and a first repair unit, the first repair platform is mounted on a base, the first repair unit is mounted on a bracket, and is configured to perform a first repair on the rework object on the first repair platform; the second rework device includes a second repair platform and a second repair unit, the second repair platform is mounted on a base, the second repair unit is mounted on a bracket, and is configured to perform a second repair on the rework object on the second repair platform.
[0009] The system includes a linear motion module mounted on a support frame; a first repair unit comprising a rejection component mounted on the linear motion module; and a second repair unit comprising a positioning detection component, a soldering component, a surface mount component, and a soldering component. The positioning detection component is fixed on the support frame and correspondingly positioned to the second repair platform to locate the rework objects on the second repair platform and detect the rework effect. The soldering component, surface mount component, and soldering component are respectively mounted on the linear motion module and can all move within the positioning range of the positioning detection component to perform soldering, surface mount, and soldering processes on the rework objects on the second repair platform with the assistance of the positioning detection component.
[0010] The rejection assembly includes a rejection lifting module, a positioning component, and a rejection component. The rejection lifting module is mounted on a linear motion module. The positioning component includes a first horizontal positioning component and a first vertical positioning component. The first horizontal positioning component is fixedly mounted on the rejection lifting module and is positioned opposite to the first repair platform. The first vertical positioning component is fixedly mounted on the rejection lifting module. The rejection component includes a rejection blade and a rejection air blowing component. One end of the rejection blade is fixedly mounted on the rejection lifting module, and the other end of the rejection blade is used to reject defective points on the rework object. One end of the rejection air blowing component is fixedly mounted on the rejection lifting module, and the other end of the rejection air blowing component is used to blow air onto the rejected defective points.
[0011] The soldering assembly includes a soldering needle and a soldering lifting bracket for driving the soldering needle to rise and fall; the soldering lifting bracket is mounted on the linear motion module; one end of the soldering needle is fixed on the soldering lifting bracket, and the other end of the soldering needle is used to solder the object to be repaired.
[0012] The chip mounting assembly includes a pick-up component, a recognition camera, a movable feeding platform, and ejector pins. The pick-up component and the linear motion module are movably mounted. The recognition camera is fixedly mounted on a bracket. The movable feeding platform is positioned opposite the recognition camera and mounted on the main body of the equipment. The ejector pins are located on the side of the movable feeding platform away from the recognition camera. When the pick-up component picks up material, the recognition camera detects the material on the movable feeding platform. The movable feeding platform moves the material to a preset position within the displacement range of the ejector pins. Driven by the linear motion module, the pick-up component moves to the preset position to pick up the material. Simultaneously, the ejector pins rise and move to lift the material to cooperate with the pick-up component in picking up the material. The picking operation of the pick-up component is configured to be performed synchronously with the rejection operation of the rejection component.
[0013] The welding assembly includes a laser component and / or a halogen lamp; the welding assembly is mounted on a linear motion module and configured to move within the positioning range of the positioning detection assembly to weld the object to be repaired.
[0014] Among them, at least two types of rework devices also include: a third rework device; the third rework device includes a third repair platform and a lighting detection component; the third repair platform is installed on a base, wherein the second rework device is movable until it comes into contact with the third repair platform to transfer the rework object; the lighting detection component includes: a lighting lifting pair plug and a lighting detection camera, the lighting lifting pair plug is installed on the side of the third repair platform near the base to power on and light up the rework object on the third repair platform, and the lighting detection camera is fixedly installed on the side of the third repair platform away from the base and is positioned opposite to the third repair platform to detect the rework object.
[0015] Each repair platform includes a platform support and a transmission component; the transmission component includes a belt, a belt drive motor, and a blocking component. The platform support is arranged parallel to the support, and the belt is mounted on the platform support to transport the object to be repaired; the belt drive motor is fixed to the platform support and connected to the belt for transmission drive; the blocking component is movably mounted on the side of the platform support away from the inlet of the object to be repaired; when the repair platform is carrying the object to be repaired, the blocking component protrudes vertically relative to the platform support; when the repair platform moves the object to be repaired, the blocking component is recessed vertically relative to the platform support.
[0016] To solve the above-mentioned technical problems, this application provides a repair method for a repair equipment. The repair method is applied to any of the above-mentioned repair equipment and includes: obtaining a repair object; repairing the repair object at different repair stages using at least two repair devices of the repair equipment using different repair processes; wherein at least two repair devices are movable to contact each other to transfer the repair object.
[0017] The at least two rework devices include: a first repair device including a rejection component and a first repair platform, and a second repair device including a second repair platform, a soldering component, a surface mount component, and a soldering component; the at least two rework devices of the rework equipment perform different rework processes on rework objects at different rework stages, including: the rejection component of the first repair device rejects the rework objects on the first repair platform; and the soldering component, surface mount component, and soldering component of the second repair device sequentially and alternately perform soldering, surface mount, and soldering processes on the rework objects on the second repair platform.
[0018] The process of rejecting rework objects on the first repair platform by the rejection component of the first repair device includes: in response to obtaining a rework object, rejecting the rework object on the first repair platform by the rejection component of the first repair device; and picking up material from the movable feeding table of the patch assembly by the picking component; the patching process includes: placing the material onto the rework object by the picking component.
[0019] Among them, at least two rework devices also include: a third rework device including a third repair platform and a lighting detection component; the repair of rework objects at different rework stages by the at least two rework devices of the rework equipment using different rework processes also includes: inserting the lighting lifting plug-in with the rework object on the third repair platform to power on the rework object; and performing lighting detection on the rework object after it is lit by the lighting detection component of the third rework device.
[0020] The beneficial effects of this application are as follows: Unlike existing technologies, the rework equipment of this application includes a main body and at least two rework devices, each mounted on the main body to rework objects within its respective device. The at least two rework devices are movable to contact each other to transfer the rework object, and each device performs a different rework process. These devices are configured to simultaneously rework objects at different stages using different rework processes. This allows the entire rework process of the rework object to be split into different rework devices, enabling at least two devices to operate synchronously and rework two different objects. This folds the overall rework time of multiple objects, allowing at least two rework processes to be executed simultaneously for the same amount of time, thereby reducing the rework time and accelerating the batch rework efficiency. Attached Figure Description
[0021] Figure 1 This is a side view of the first embodiment of the repair equipment provided in this application;
[0022] Figure 2 This is a top view of the first embodiment of the repair equipment provided in this application;
[0023] Figure 3 This is a schematic diagram of the overall structure of the second embodiment of the repair equipment provided in this application;
[0024] Figure 4 A partial structural schematic diagram of an embodiment of the component to be eliminated;
[0025] Figure 5 This is a partial structural schematic diagram of an embodiment of a soldering assembly;
[0026] Figure 6 This is a partial structural schematic diagram of an embodiment of a patch assembly;
[0027] Figure 7 This is a partial structural schematic diagram of an embodiment of a welding assembly;
[0028] Figure 8 This is a partial structural diagram of an embodiment of the third repair device;
[0029] Figure 9 This is a partial structural diagram of an embodiment of the first repair platform;
[0030] Figure 10 This is a partial structural schematic diagram of an embodiment of the second repair platform;
[0031] Figure 11 This is a flowchart illustrating an embodiment of the repair method for the repaired equipment provided in this application;
[0032] Figure 12 This is a flowchart illustrating another embodiment of the repair method for the equipment provided in this application.
[0033] Explanation of reference numerals in the attached figures:
[0034] 100 / 200, Equipment to be repaired; 110, Repair device; 101, Repair platform; 102, Repair unit; 120, Equipment body; 121 / 201, Base; 122 / 202, Support; 111, First repair device; 112, Second repair device; 103 / 211, First repair platform; 104, First repair unit; 105 / 221, Second repair platform; 106, Second repair unit. 203. Linear motion module; 212. Rejection assembly; 2100. Rejection lifting module; 2103. Positioning component; 2101. First vertical positioning component; 2102. First horizontal positioning component; 2120. Rejection component; 2121. Rejection knife; 2122. Rejection air blowing component; 2110. Ultra-clear observation camera; 220. Soldering assembly; 2202. Soldering needle; 2201. Soldering lifting bracket; 2203. Solder paste tray; 230. Soldering assembly; 231. Halogen lamp; 232. Laser component; 240. SMT assembly; 2401. Picking component; 2402. Ejector pin component; 2403. Movable loading platform; 2404. Recognition camera; 2405. Loading slot; 250. Positioning detection assembly; 270. Three-way repair device; 271, third repair platform; 2711, third platform support; 272, illumination detection component; 2721, illumination lifting connector; 2724, illumination detection camera; 2713, third belt; 2712, third belt drive motor; 2714, third blocking component; 2111, first platform support; 2114, first transmission component; 2113, first belt; 2112, first belt drive motor; 2119, first blocking component; 2117, feed sensor; 2118, barcode scanner; 2116, Y-axis moving component; 2115, lifting cylinder assembly; 2213, X-axis linear module; 2214, Y-axis linear module; 2212, R-axis rotary module; 400, repair object. Specific Implementation
[0035] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0036] It should be noted that the term "and / or" in this article is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, and B existing alone. Additionally, the character " / " in this article generally indicates that the preceding and following related objects have an "or" relationship. Furthermore, "many" in this article means two or more. Moreover, the term "at least one" in this article means any combination of at least two of any one or more of a plurality of objects. For example, including at least one of A, B, and C can mean including any one or more elements selected from the set consisting of A, B, and C.
[0037] The terminology used in the embodiments of this application is for the purpose of describing particular embodiments only and is not intended to limit the application. The singular forms "a," "the," and "the" used in the embodiments of this application and the appended claims are also intended to include the plural forms, unless otherwise clearly indicated above. "Multiple" generally includes at least two, but does not exclude the inclusion of at least one.
[0038] Furthermore, the technical solutions of the various embodiments can be combined with each other, but only if they are based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such combination of technical solutions does not exist and is not within the scope of protection claimed in this application.
[0039] Please see Figure 1-2 , Figure 1 This is a side view of the first embodiment of the repair equipment provided in this application. Figure 2 This is a top view of the first embodiment of the repair equipment provided in this application.
[0040] The rework equipment 100 in this embodiment includes: equipment body 120 and at least two rework devices 110.
[0041] The rework equipment 100 in this embodiment can be used for the rework of defective LED beads in MiniLED (sub-millimeter light-emitting diode) products, and can also be used for the rework of display units in other semiconductor display devices. The specific application is not limited here.
[0042] The main body 120 is the main frame of the rework equipment 100. Each rework device 110 is installed on the main body 120 to perform rework on the objects to be repaired within each rework device 110.
[0043] Among them, at least two repair devices 110 can be moved to contact each other to transfer the object to be repaired. That is, after one repair device 110 has completed its own repair of the object to be repaired, it can transfer the object to be repaired to another repair device 110 for the next step of repair.
[0044] At least two types of rework devices 110 perform different rework processes. The overall rework process of the object to be repaired includes multiple rework processes, and each rework device 110 performs a different rework process, thereby breaking down the entire rework process into multiple rework process segments. This makes it easier for each rework device 110 to perform the corresponding rework process segment, and thus it is configured to simultaneously perform rework on objects at different rework stages using different rework processes.
[0045] The number of rework devices 110 is determined based on the overall rework process of the object to be reworked, and may include, but is not limited to, 2, 3, 4, or 5, etc. The rework devices 110 only involve the transfer and handover of the object to be reworked; their rework operations are independent of each other and do not affect one another.
[0046] In a specific application scenario, suppose the overall rework process for a rework object includes rework process A and rework process B. The rework equipment 100 includes two rework devices 110. The first rework device 110 performs rework process A, and the second rework device 110 performs rework process B. When the rework equipment 100 is working, the first rework device 110 first performs rework process A on one rework object. After rework process A is completed, the rework object is transferred to the second rework device 110 for rework process B. While the second rework device 110 is performing rework process B, the first rework device 110 can perform rework process A on another rework object. This splits the entire rework process across different rework devices 110. The two rework devices 110 operate synchronously, performing rework on two different rework objects, thus improving rework efficiency. This application scenario is for illustrative purposes only and is not intended to be limiting.
[0047] With the above structure, the rework equipment of this embodiment includes a main body and at least two rework devices. Each rework device is installed on the main body to rework objects within each rework device. The at least two rework devices are movable to contact each other to transfer the rework objects. The at least two rework devices perform different rework processes. The at least two rework devices are configured to simultaneously rework objects at different rework stages using corresponding rework processes. This allows the entire rework process of the rework object to be split into different rework devices, enabling at least two rework devices to operate synchronously and rework two different rework objects. This folds the overall rework process time for multiple rework objects, allowing at least two rework processes to be executed for the same time frame. This helps reduce the rework time of the rework objects and accelerates the batch rework efficiency.
[0048] In some embodiments, the main body 120 includes a base 121 and a bracket 122, with the bracket 122 vertically fixed on the base 121; the base 121 is used to support the entire rework equipment 100, and the bracket 122 is used to assist in the setting of the rework device 110.
[0049] The rework device 110 includes a repair platform 101 and a repair unit 102. The repair platform 101 is mounted on a base 121; the repair unit 102 is mounted on a bracket 122 and is configured to rework the corresponding rework object on the repair platform 101.
[0050] In a specific application scenario, the repair platform 101 can be mounted on the base 121 using a movable mechanism such as a wheeled moving mechanism, a tracked moving mechanism, or a sliding rail moving mechanism. The repair unit 102 can be mounted on the bracket 122 using a movable mechanism such as a sliding rail moving mechanism or a sleeve-type telescopic mechanism. The specific movable configuration method is not limited here.
[0051] In this embodiment, both the repair platform 101 and the repair unit 102 can move relative to the main body 120, thereby facilitating the handover and movement of different repair devices 110 and the alignment during the repair process.
[0052] In some embodiments, at least two types of repair devices 110 include: a first repair device 111 and a second repair device 112.
[0053] The first repair device 111 includes a first repair platform 103 and a first repair unit 104. The first repair platform 103 is mounted on a base 121, and the first repair unit 104 is mounted on a bracket 122 and configured to perform a first repair on the object to be repaired on the first repair platform 103. The first repair platform 103 and the first repair unit 104 can be moved to corresponding positions so that the object to be repaired on the first repair platform 103 can be processed by the first repair unit 104.
[0054] The second repair device 112 includes a second repair platform 105 and a second repair unit 106. The second repair platform 105 is mounted on a base 121, and the second repair unit 106 is mounted on a bracket 122 and configured to perform a second repair on the rework object on the second repair platform 105. The second repair platform 105 and the second repair unit 106 can be moved to corresponding positions so that the rework object on the second repair platform 105 can be processed by the second repair unit 106.
[0055] This embodiment uses two rework devices 110 as an example. The first rework device 111 and the second rework device 112 perform different rework processes and are configured to simultaneously perform rework on objects at different rework stages using different rework processes. This allows the overall rework process of the object to be split across the first rework device 111 and the second rework device 112. The first rework device 111 and the second rework device 112 can operate synchronously and perform rework on two objects at different rework stages. This folds the overall rework process time for multiple objects, allowing for the execution of multiple rework processes with the same time consumption, thereby reducing the rework time of the object and accelerating the batch rework efficiency.
[0056] Please see Figure 3 , Figure 3 This is a schematic diagram of the overall structure of the second embodiment of the repair equipment provided in this application.
[0057] Based on the aforementioned embodiments, this embodiment further includes a linear motion module 203 mounted on the bracket 202. The linear motion module 203 can slide along the X direction. Specifically, the linear motion module 203 may include a drive, a slide rail, and a slider (not shown in the figure). The slider is driven to move on the slide rail to achieve linear motion in the X direction. The structures of other linear modules in this embodiment are similar and will not be described in detail.
[0058] The first repair unit includes a rejection component 212, which is mounted on the linear motion module 203 and can move relative to the linear motion module 203. Specifically, it can be fixedly set with a slider to achieve sliding relative to the slide rail in the X direction.
[0059] The rejection component 212 is used to reject defective LED chips on the return object to free up the LED chip position for subsequent installation of new LED chips.
[0060] The second repair unit includes a positioning and detection component 250, a soldering component 220, a surface mount component 240, and a soldering component 230.
[0061] The positioning detection component 250 is fixed on the bracket 202 and is set in correspondence with the second repair platform 221 to locate the objects to be repaired on the second repair platform 221.
[0062] The soldering assembly 220, the surface mount assembly 240, and the soldering assembly 230 are respectively mounted on the linear motion module 203, and can all be moved within the positioning range of the positioning detection assembly 250, thereby facilitating the soldering, surface mount, and soldering of the rework objects on the second repair platform 221.
[0063] The overall rework process of the rework object in this embodiment includes: first, removing the defective LED chip from the rework object by the rejection component 212 to free up the LED position; then, applying solder to the empty LED position by the soldering component 220, and attaching the new LED chip to the solder paste by the surface mount component 240; finally, soldering the LED position by the soldering component 230 to melt the solder paste and solder the new LED chip to the LED position, thereby completing the rework process of removing the old and installing the new LED chip.
[0064] In this embodiment, the soldering component 220, the surface mount component 240, and the soldering component 230 of the second repair unit sequentially perform corresponding repairs on the rework objects. During this process, the rejection component 212 can reject other rework objects and transfer them to the second repair unit for the above-mentioned repairs after the rejection process is completed. This embodiment can shorten the overall rework time of the rework objects to the total time of the soldering process, the surface mount process, and the soldering process, and reduce the time of the rejection process, thereby shortening the overall rework time of multiple rework objects and accelerating the rework efficiency of the rework objects.
[0065] To facilitate viewing the overall structure of the rework equipment 100, the soldering component 220, the positioning detection component 250, and the welding component 230 are covered by corresponding housings from the outside. The soldering component 220 is covered by one housing, while the positioning detection component 250 and the welding component 230 are covered by another housing. Detailed images of the interior of the housings will be shown later.
[0066] In some embodiments, please refer to further information. Figure 4 , Figure 4 This is a partial structural diagram of an embodiment of the component to be eliminated. Specifically, Figure 4 for Figure 3 A magnified view of part C.
[0067] The rejection component 212 includes: rejection lifting module 2100, positioning component 2103, and rejection component 2120.
[0068] The rejection lifting module 2100 is mounted on the linear motion module 203, specifically fixed to the slider of the linear motion module 203, so that the rejection lifting module 2100 can slide in the X direction. The rejection lifting module 2100 itself can move up and down through the linear module structure, that is, move in the Z direction, thereby realizing the multi-directional movement of the rejection lifting module 2100.
[0069] The positioning component 2103 includes a first horizontal positioning component 2102 and a first vertical positioning component 2101. The first horizontal positioning component 2102 is fixedly mounted on the rejection lifting module 2100 and is positioned opposite to the first repair platform 211, thereby horizontally positioning the rework object on the first repair platform 211. The first horizontal positioning component 2102 includes, but is not limited to, a CCD camera (charge-coupled device) or other image recognition devices.
[0070] The first vertical positioning component 2101 is fixedly mounted on the rejection lifting module 2100 to vertically position the rework object on the first repair platform 211. The first vertical positioning component 2101 includes, but is not limited to, a height measuring instrument.
[0071] The first horizontal positioning component 2102 and the first vertical positioning component 2101, when combined, can perform three-dimensional positioning of the rework object on the first repair platform 211, thereby accurately determining the position of the defective point on the rework object and improving the efficiency and accuracy of the rejection component 2120 in rejection.
[0072] The rejection component 2120 includes a rejection blade 2121 and a rejection air blowing component 2122. One end of the rejection blade 2121 is fixedly installed with the rejection lifting module 2100, and the other end of the rejection blade 2121 is used to remove the defective LED chip from the rework object. One end of the rejection air blowing component 2122 is fixedly installed with the rejection lifting module 2100, and the other end of the rejection air blowing component 2122 is used to blow away the defective chip after rejection to free up the LED chip position. After the LED chip is rejected, there may be adhesive residue or other residues attached to the LED chip position. The rejection air blowing component 2122 blows away the residues to prevent residues from remaining or accumulating on the rework product and affecting subsequent rework processes and rework quality.
[0073] In this embodiment, the rejection assembly 212 is mounted on the linear motion module 203 and moves in the X direction under the drive of the linear motion module 203. After the rework object is fed and fixed, it needs to be coarsely positioned. The rework object is moved to below the first horizontal positioning member 2102 by the first repair platform 211 for photographic identification, and then moved to the first vertical positioning member 2101 for distance measurement. According to the height feedback from the first vertical positioning member 2101, the defective point of the rework object moves below the first horizontal positioning member 2102. At the same time, the rejection lifting module 2100 moves in the Z direction to compensate for the vertical height, so that the first horizontal positioning member 2102 can be clearly photographed and positioned. After the first horizontal positioning member 2102 is photographed and precisely positioned, the rework object is moved to the preset position of the rejection blade 2121 by the first repair platform 211 to remove defective chips and remove residual solder. After rejection, it is moved to below the first horizontal positioning member 2102 for rejection detection and foreign object detection. When a foreign object is identified, the foreign object handling process is initiated. The process involves moving the object to be repaired to the preset foreign object handling position via the first repair platform 211, using the removal air blower 2122 to remove the foreign object, and then returning it to the first horizontal positioning unit 2102 for effect confirmation. During this process, manual confirmation of the effect can also be performed using an ultrasonic observation camera 2110. The ultrasonic observation camera 2110 is fixed to the removal lifting module 2100.
[0074] In some embodiments, please refer to further information. Figure 5 , Figure 5 This is a partial structural diagram of an embodiment of a soldering assembly. For ease of viewing, the outer casing of the soldering assembly is omitted in this diagram.
[0075] The soldering assembly 220 includes a soldering pin 2202 and a soldering lifting bracket 2201 for driving the soldering pin 2202 to rise and fall.
[0076] The soldering lifting bracket 2201 is mounted on the linear motion module 203. Specifically, it is fixed to the slider of the linear motion module 203, allowing it to move relative to the linear motion module 203 in the X direction. The soldering lifting bracket 2201 itself can move up and down via the linear module structure, i.e., move in the Z direction.
[0077] One end of the soldering needle 2202 is fixed on the soldering lifting bracket 2201, and the other end of the soldering needle 2202 is used to solder the object to be repaired, that is, to apply solder paste to the lamp position where the defective lamp chip has been removed.
[0078] In a specific application scenario, the soldering assembly 220 can contain two soldering needles 2202 and two soldering lifting brackets 2201. The soldering lifting brackets 2201 move the two soldering needles 2202 to preset positions on the second repair platform 221 in the X and Z directions, respectively, to solder the defective points of the object being repaired on the second repair platform 221. The two soldering needles 2202 are controlled by two independent soldering lifting brackets 2201, ensuring high control precision and preventing interference between them. In other application scenarios, the number of soldering needles 2202 and soldering lifting brackets 2201 can be other numbers, such as one, three, or four, etc., and is not limited here.
[0079] In a specific application scenario, the soldering assembly 220 also includes a solder paste tray 2203. The solder paste tray 2203 is fixed to the main body of the device. The soldering needle 2202 moves to the solder paste tray 2203 to perform soldering before soldering. The solder paste tray 2203 itself continuously rotates and stirs to improve the uniformity and smoothness of the solder paste. However, the solder paste tray 2203 stops rotating during soldering and cleaning.
[0080] In some embodiments, please refer to further information. Figure 6 , Figure 6 This is a partial structural schematic diagram of an embodiment of a patch assembly. Specifically, Figure 6 for Figure 3 A magnified view of part of D.
[0081] The surface mount assembly 240 includes a pick-up component 2401, a recognition camera 2404, a movable loading stage 2403, and an ejector pin component 2402.
[0082] The material handling component 2401 is movable to the linear motion module 203, specifically fixed to the slider of the linear motion module 203, so that it can be movable relative to the linear motion module 203 in the X direction.
[0083] The identification camera 2404 is fixedly mounted on the bracket 202. The movable feeding platform 2403 is positioned opposite to the identification camera 2404 and mounted on the bracket 202 of the main body of the equipment. The ejector pin 2402 is located on the side of the movable feeding platform 2403 away from the identification camera 2404.
[0084] When the picking unit 2401 picks up materials, the recognition camera 2404 identifies the materials positioned on the movable feeding platform 2403 so that the picking unit 2401 can pick up the materials accurately. The materials are new LED chips.
[0085] The movable feeding platform 2403 moves the material to a preset position within the displacement range of the ejector pin 2402. The picking component 2401 moves to the preset position to pick up the material under the drive of the linear motion module 203. At the same time, the ejector pin 2402 moves upward to lift the material and pierces the blue film to lift the material away from the blue film, so as to cooperate with the picking component 2401 to pick up the material.
[0086] In a specific application scenario, the movable feeding platform 2403 also includes a platform rotary motor, a platform X-axis linear module, and a platform Y-axis linear module (not shown in the figure), with the platform X-axis linear module mounted on top of the platform Y-axis linear module. The platform rotary motor drives the platform feeding device to rotate, the platform X-axis linear module drives the platform feeding device to move along the X-axis, and the platform Y-axis linear module drives the platform feeding device to move along the Y-axis. The movable feeding platform 2403 is equipped with multiple feeding slots 2405 for placing new LED chips.
[0087] In this configuration, the material handling operation of the pick-up component 2401 of the surface mount assembly 240 is arranged to be synchronized with the rejection operation of the rejection component 212. This further overlaps the material handling time of the surface mount assembly 240 with the rejection operation time of the rejection component 212, thereby further reducing the overall rework time of the rework object and further accelerating the rework efficiency of the rework object.
[0088] In a specific application scenario, the pick-up component 2401 picks up materials and moves them to the positioning range of the positioning detection component 250 under the drive of the linear motion module 203. First, the positioning detection component 250 identifies the angle and polarity. Then, the pick-up component 2401 performs rotational compensation based on the identified angle. After the soldering process is completed and photographed for inspection, the surface mount technology (SMT) process is performed. After SMT is completed, the positioning detection component 250 also needs to photograph and inspect the SMT effect.
[0089] In some embodiments, please refer to further information. Figure 7 , Figure 7 This is a partial structural diagram of one embodiment of the welding assembly. For ease of viewing, the outer casings of the welding assembly and the positioning detection assembly are omitted in this diagram.
[0090] The welding assembly 230 includes a laser element 232 and / or a halogen lamp 231.
[0091] The laser component 232 and / or halogen lamp 231 are mounted on the linear motion module 203, specifically fixed to the slider of the linear motion module 203, so as to be movable relative to the linear motion module 203 in the X direction.
[0092] Laser component 232 and / or halogen lamp 231 are configured to be movable within the positioning range of positioning detection component 250 to perform soldering on the rework object. Both laser component 232 and / or halogen lamp 231 are heat source heating devices that melt the solder paste on the rework object by heating, thereby adhering the material on the solder paste for soldering.
[0093] The choice between laser component 232 and halogen lamp 231 can be made arbitrarily based on actual needs, and no restrictions are imposed here.
[0094] In some embodiments, the positioning detection component 250 may include a second horizontal positioning element and a second vertical positioning element, the arrangement of which is similar to the positional arrangement of the first horizontal positioning element 2102 and the first vertical positioning element 2101.
[0095] The second horizontal positioning component is fixedly mounted on the second repair device and positioned opposite the second repair platform 221 to horizontally position the rework object on the second repair platform 221. The second horizontal positioning component includes, but is not limited to, a CCD camera (charge-coupled device) or other image recognition equipment. The second vertical positioning component is fixedly mounted on the second repair device to vertically position the rework object on the second repair platform 221. The combination of the second horizontal and second vertical positioning components enables three-dimensional positioning of the rework object on the second repair platform, thereby accurately determining the location of defects on the rework object and improving the working accuracy of the soldering assembly 220, the surface mount assembly 240, and the soldering assembly 230. Specifically, before the soldering assembly 220, the surface mount assembly 240, and the soldering assembly 230 operate, the positioning detection component 250 must be used to accurately position the rework object on the second repair platform 221. Furthermore, the second horizontal positioning component can also photograph and identify the rework object to detect the completion effect of each process.
[0096] When the second rework device operates, the positioning detection component 250 first positions the rework object on the second repair platform 221. After positioning, the second repair platform 221 moves the rework object to match the position of the soldering component 220, and then soldering is performed. After soldering is completed, the positioning detection component 250 takes a picture to check the soldering effect. If the check is correct, the second repair platform 221 moves the rework object to match the position of the surface mount component 240, and then surface mounts are performed. After soldering is completed, the positioning detection component 250 takes a picture to check the surface mount effect. If the check is correct, the second repair platform 221 moves the rework object to match the position of the soldering component 230, and then soldering is performed. After soldering is completed, the positioning detection component 250 takes a picture to check the soldering effect. All the above processing steps are performed within the positioning range of the positioning detection component 250, so as to improve the rework accuracy by using the positioning detection component 250 to assist the rework operation of the above components.
[0097] In some embodiments, please review Figure 3 The at least two types of repair devices also include: a third repair device 270; the third repair device 270 includes a third repair platform 271 and a lighting detection component 272; the third repair platform 271 and the lighting detection component 272 are mounted on a base 201, wherein the second repair device is movable to contact the third repair platform 271 to transfer the object to be repaired.
[0098] After the tinning, surface mount and soldering processes are completed, the object to be repaired can be transferred from the second repair device to the third repair platform 271 for lighting test to observe the overall repair effect.
[0099] In some embodiments, please refer to further information. Figure 8 , Figure 8 This is a partial structural schematic diagram of an embodiment of the third repair device.
[0100] The lighting detection component 272 includes a lighting lifting pair plug-in 2721 and a lighting detection camera 2724. The lighting lifting pair plug-in 2721 is installed on the side of the third repair platform 271 near the base 201 to connect with the rework object 400 on the third repair platform 271 and power it on. The lighting detection camera 2724 is fixedly set on the side of the third repair platform 271 away from the base 201 and is set opposite to the third repair platform 271 to perform lighting detection on the rework object 400.
[0101] When the rework object 400 is located on the third repair platform 271, the lighting lifting connector 2721 rises to align with the rework object 400, thereby powering it on. The lighting detection camera 2724 then captures an image of the lit rework object 400 to check if the original defective point is emitting light normally. If the rework object 400 is emitting light normally overall, the rework is successful, and the rework object 400 is unloaded. If the rework object 400 exhibits abnormal lighting, the rework fails, and the rework process is repeated. This process is fully automated, reducing the need for manual intervention for post-rework re-inspection and minimizing manpower requirements.
[0102] This embodiment improves the reliability of the rework process by using a third rework device 270 to detect the rework effect of the rework object. Furthermore, the lighting detection of the third rework device 270 can be performed simultaneously with the rework processes of other rework devices, further reducing the rework time of the rework object 400. Specifically, the original rework process for the rework object consisted of rejection + soldering + material handling + surface mounting + soldering + lighting detection. In this embodiment, the multiple rework devices in the rework equipment 200 determine the rework time of a single rework object 400 by the total time of soldering + material handling + soldering. This means the time required for rejection + material handling + lighting is overlapped into the total time of soldering + material handling + soldering, significantly reducing the rework time of a single rework object 400 and accelerating the batch rework efficiency of the rework object.
[0103] In some embodiments, each repair platform of the rework equipment 200 in this embodiment includes a platform support and a transmission component; the transmission component includes a belt, a third belt drive motor, and a third blocking component. This is a common feature of each repair platform.
[0104] Please see Figure 8 In a specific application scenario, the third repair platform 271 includes a third platform support 2711 and a third transmission component (not marked in the figure); the third transmission component includes a third belt 2713, a third belt drive motor 2712 and a third blocking component 2714.
[0105] The third platform support 2711 is arranged parallel to the support 202. The third belt 2713 is arranged on the third platform support 2711 to transport the rework object 400. The third belt drive motor 2712 is fixed on the third platform support 2711 and connected to the third belt 2713 for transmission drive.
[0106] The third blocking member 2714 is movably disposed on the side of the third platform support 2711 away from the feed inlet of the rework object 400. When the third repair platform 271 carries the rework object 400, the third blocking member 2714 protrudes relative to the third platform support 2711 in the vertical Y direction, so as to block the rework object 400 at the third blocking member 2714 for coarse positioning when the third belt 2713 transports the rework object 400, so as to facilitate subsequent lighting detection. When the third repair platform 271 moves the rework object 400, the third blocking member 2714 is recessed relative to the third platform support 2711 in the vertical Y direction, so as to facilitate the transfer and discharge of the rework object 400.
[0107] Please refer to further information. Figure 9 , Figure 9 This is a partial structural diagram of an embodiment of the first repair platform.
[0108] The first repair platform 211 includes a first platform support 2111 and a first transmission component 2114; the first transmission component 2114 includes a first belt 2113, a first belt drive motor 2112 and a first blocking component 2119.
[0109] The first platform support 2111 is arranged parallel to the support 202. The first belt 2113 is arranged on the first platform support 2111 to transport the object to be repaired. The first belt drive motor 2112 is fixed on the first platform support 2111 and connected to the first belt 2113 for transmission drive.
[0110] The first blocking member 2119 is movably disposed on the side of the first platform support 2111 away from the feed inlet of the object to be repaired. When the first repair platform 211 carries the object to be repaired, the first blocking member 2119 protrudes from the first platform support 2111 in the vertical Y direction, so as to block the object to be repaired at the first blocking member 2119 when the first belt 2113 is transporting the object to be repaired, and perform coarse positioning for subsequent lighting detection. When the first repair platform 211 transfers the object to be repaired, the first blocking member 2119 is recessed from the first platform support 2111 in the vertical Y direction, so as to transfer the object to the second repair platform 221.
[0111] In some embodiments, the first repair platform 211 further includes a feed sensor 2117, which is fixed on the first platform support 2111 and is used to identify and sense the incoming repair objects.
[0112] In some embodiments, the first repair platform 211 further includes a barcode scanner 2118. The barcode scanner 2118 is fixed on the first platform bracket 2111 and is used for model identification of the return-to-repair object. The return-to-repair object has a product code set according to production standards, and the model of the return-to-repair object can be determined by identifying the product code.
[0113] In some embodiments, the first repair platform 211 further includes a Y-axis moving member 2116; the Y-axis moving member 2116 is fixed on the base 201 and is movably disposed in the Y direction with the bottom of the first platform support 2111 so as to drive the first repair platform 211 to move in the Y direction.
[0114] In some embodiments, the first repair platform 211 further includes a lifting cylinder assembly 2115. The lifting cylinder assembly 2115 is disposed on the first platform support 2111 to drive the first platform support 2111 to move in the Z direction.
[0115] In a specific application scenario, after the rework object is detected by the feed sensor 2117, the first belt drive motor 2112 drives the first belt 2113 to rotate and feed the rework object. The rework object moves to the first stop 2119 and is blocked and positioned. During this process, the barcode scanner 2118 scans the barcode of the rework object to identify its model. After the feed sensor 2117 detects the rework object, it is lifted by the lifting cylinder assembly 2115. Subsequently, it moves in the Y direction under the drive of the Y-axis moving part 2116 to cooperate with the rejection assembly 212 for rejection.
[0116] In some embodiments, please refer to Figure 10 , Figure 10 This is a partial structural diagram of one embodiment of the second repair platform. The second repair platform 221 includes a second platform support 2211 and a second transmission component; the second transmission component includes a second belt, a second belt drive motor, and a second blocking component. The connection relationships and structure of the second transmission component are similar to those of the first and third repair platforms, and will not be described again.
[0117] In some embodiments, the second repair platform 221 further includes an X-axis linear module 2213, a Y-axis linear module 2214, and an R-axis rotary module 2212.
[0118] The slide rail of the X-axis linear module 2213 is fixed to the base 201, the slide rail of the Y-axis linear module 2214 is fixed to the slider of the X-axis linear module 2213, and the R-axis rotary module 2212 is fixed to the slider of the Y-axis linear module 2214. The second platform support 2211 and the R-axis rotary module 2212 are rotatably set. Thus, the X-axis linear module 2213, the Y-axis linear module 2214, and the R-axis rotary module 2212 drive the second platform support 2211 to rotate and move in three dimensions.
[0119] When the second repair unit operates, the second platform support 2211 is moved to the predetermined position of the second repair device in coordination with the X-axis linear module 2213, the Y-axis linear module 2214, and the R-axis rotary module 2212. The R-axis rotary module 2212 is driven by a servo motor, causing the entire second repair platform 221 to rotate in the horizontal plane to accommodate LEDs with different arrangement directions. In a specific application scenario, when a rework object is fed in, if the LED arrangement direction is inconsistent with the laser spot direction, the R-axis rotary module 2212 drives the second platform support 2211 to rotate to adapt to the laser spot shape.
[0120] Please refer to this together. Figures 3-10In this embodiment, the rework equipment 200 performs the following steps when reworking an object: First, the object is fed through the first repair platform 211 of the first rework device. Specifically, after the object is detected by the feed sensor 2117, the first belt drive motor 2112 drives the first belt 2113 to rotate and feed the object. The object flows to the first blocking member 2119 and is blocked and positioned. During this process, the barcode scanner 2118 scans the object to identify its model. After the feed sensor 2117 detects the object, the lifting cylinder assembly 2115 moves it upward. Then, driven by the Y-axis moving member 2116, it moves in the Y direction to reach the rejection preset position of the rejection assembly 212.
[0121] Subsequently, the rejection component 212 positions the rework object on the first repair platform 211 via the positioning component 2103, and moves via the rejection lifting module 2100 and the linear motion module 203 to align it with the rework object at the preset rejection position. During the alignment process, both the rejection component 212 and the first repair platform 211 move in adaptation mode to achieve three-dimensional alignment. After alignment, the first horizontal positioning component 2102 in the positioning component 2103 identifies and rejects defects on the rework object.
[0122] During the rejection process, the chip assembly 240 performs synchronous material picking. Specifically, the identification camera 2404 identifies the material on the movable feeding platform 2403. The movable feeding platform 2403 moves the material to a preset position within the displacement range of the ejector pin 2402. The picking component 2401 moves to the preset position to pick up the material under the drive of the linear motion module 203. At the same time, the ejector pin 2402 rises and moves to lift the material to cooperate with the picking component 2401 to pick up the material.
[0123] After rejection, the first horizontal positioning component 2102 takes a picture of the object to be rejected in order to check the rejection effect. If it is qualified, the subsequent steps are carried out; if it is not qualified, it is reworked.
[0124] After the qualified items are removed, the first repair platform 211 moves to the second repair platform 221, so that the belts of the two are connected, thereby driving the belts to rotate and transferring the rework items on the first repair platform 211 to the second repair platform 221.
[0125] The second repair platform 221 uses the X-axis linear module 2213, Y-axis linear module 2214, and R-axis rotary module 2212 to move the rework object to the preset position of the second rework device, and controls the soldering assembly 220 to move using the soldering lifting bracket 2201 and linear motion module 203 to achieve three-dimensional alignment with the rework object. After alignment, the positioning detection component 250 precisely aligns the defective points on the rework object, and then controls the soldering needle 2202 to perform soldering. After soldering, the positioning detection component 250 takes a picture of the rework object to detect the soldering effect. If it is qualified, the subsequent steps are carried out; if it is not qualified, rework is required.
[0126] After the soldering is deemed acceptable, the material obtained by the placement assembly 240 in the previous steps is directly placed onto the solder paste of the defective point with the positioning and detection assembly 250. After placement, the rework object is photographed and identified by the positioning and detection assembly 250 to check the placement effect. If it is acceptable, the subsequent steps are carried out; if it is unacceptable, rework is required.
[0127] After the surface mount technology (SMT) is qualified, the soldering assembly 230 is heated to melt the solder paste and solder the materials. After soldering, the positioning and detection assembly 250 takes a picture of the rework object to identify and check the soldering effect. If it is qualified, the subsequent steps are carried out; if it is not qualified, rework is required. After each process is executed, the process execution effect is checked by taking a picture to improve the rework effect and reliability of the rework equipment 200 and reduce the occurrence of rework failures.
[0128] After welding is completed, the second repair platform 221 moves to the third repair platform 271, aligning their belts to drive the belt rotation and transfer the rework object from the second repair platform 221 to the third repair platform 271. Once the rework object is positioned by the third blocking component 2714, the lifting and illuminating insertion device 2721 is raised to align with the rework object, thus energizing it. The illumination detection camera 2724 then captures an image of the illuminated rework object to check if the original defective points are illuminating normally. If the entire rework object is illuminating normally, the rework is successful, and the rework object is unloaded. If the rework object has abnormal illuminating points, the rework fails, and the rework is repeated.
[0129] Through the above structure, the rework equipment in this embodiment, by setting up multiple rework devices, shortens the total time of the original six processes (rejection + soldering + material handling + surface mounting + soldering + lighting inspection) for rework objects to the total time of three processes (soldering + material handling + soldering). In other words, the time required for rejection + material handling + lighting is overlapped into the total time of soldering + material handling + soldering, significantly reducing the overall rework time for multiple rework objects and accelerating the batch rework efficiency. That is, multi-platform rework processes are performed simultaneously, improving rework efficiency and speeding up the cycle time of the rework equipment.
[0130] Please see Figure 11 , Figure 11 This is a flowchart illustrating an embodiment of the repair method for reworked equipment provided in this application; the repair method for reworked equipment in this embodiment is applied to... Figure 1-2 The equipment to be repaired in the example.
[0131] Step S11: Obtain the object to be returned for repair.
[0132] The items to be returned for repair include, but are not limited to, MiniLED (sub-millimeter light-emitting diode) products or other semiconductor display devices.
[0133] Step S12: Repair the objects at different repair stages using different repair processes through at least two repair devices of the repair equipment.
[0134] At least two rework devices perform different rework processes, and at least two rework devices can move to contact each other to transfer the rework object. That is, each rework device of the rework equipment can perform corresponding rework on the rework object at different rework stages. For a single rework object, during the rework process, it can be reworked by each rework device in sequence according to its rework order until the overall rework is completed.
[0135] In a specific application scenario, assuming the rework equipment has three rework units, a single rework object is first fed into the first rework unit for repair. After this part is repaired, it is transferred to the second rework unit for further repair, and so on, until the repair is complete. The rework equipment, by utilizing the different rework processes and the transferability of the rework objects, can simultaneously repair three objects. This significantly reduces the overall rework time for multiple objects in batch rework processes.
[0136] This embodiment can break down the entire rework process of the object to be repaired into multiple rework process segments, so that each rework device can execute the corresponding rework process segment synchronously, realizing the time folding of different rework processes, which is conducive to improving the efficiency of batch rework.
[0137] Through the above steps, this embodiment uses at least two repair devices of the repair equipment to perform different repair processes on the repair objects at different repair stages. At least two repair devices can be moved to contact each other to transfer the repair objects. The overall repair process time of multiple repair objects can be folded, and the same time can be used to execute at least two repair processes, which helps to reduce the repair time of the repair objects and speed up the batch repair efficiency of the repair objects.
[0138] Please see Figure 12, Figure 12 This is a flowchart illustrating another embodiment of the repair method for the equipment provided in this application; the repair method for the equipment in this embodiment is applied to the repair equipment in any of the above embodiments.
[0139] Step S21: Obtain the object to be returned for repair.
[0140] The repair equipment in this embodiment includes a first repair device and a second repair device.
[0141] When the repair equipment obtains the object to be repaired, it feeds it into the first repair device for repair, at which point the first repair device obtains the object to be repaired; after the repair of the object to be repaired in the first repair device is completed, the object to be repaired is transferred to the second repair device for repair, at which point the second repair device obtains the object to be repaired.
[0142] Step S22: The rejection component of the first repair device rejects the rework objects on the first repair platform; at the same time, the soldering component, surface mount component and soldering component of the second repair device alternately perform soldering, surface mount and soldering processes on the rework objects on the second repair platform.
[0143] The first repair device includes a rejection assembly and a first repair platform, and the second repair device includes a soldering assembly, a surface mount assembly, and a soldering assembly. For specific structures, please refer to the foregoing embodiments; further details will not be provided here.
[0144] This step involves rejecting rework items on the first repair platform using the rejection component of the first repair device. Specifically, the rework item is placed on the first repair platform, and the first repair platform and the rejection component move to a corresponding position. Subsequently, the rejection component removes the defective LED chip from the rework item to free up the LED slot.
[0145] Simultaneously, this step also involves the second repair device sequentially and alternately performing soldering, surface mount, and soldering processes on the rework object on the second repair platform using the soldering assembly, surface mount assembly, and soldering assembly. At this point, the rework object on the second repair platform is different from the rework object on the first repair platform. Specifically, the soldering assembly first applies solder to the empty LED positions on the rework object, then the surface mount assembly attaches a new LED chip to the solder paste at the empty LED position, and finally the soldering assembly heats up and melts the solder paste to solder the new LED chip to the empty LED position.
[0146] The rework process for surface mount components includes two steps: material retrieval and surface mount assembly. In this embodiment, during the rejection process after obtaining the rework object, the surface mount assembly can be simultaneously controlled to retrieve the material first. That is, while the rework object on the first repair platform is rejected by the rejection component of the first repair device, this step also involves the material retrieval component of the surface mount assembly picking up the material from the movable placement platform of the surface mount assembly. Then, during the sequential soldering, surface mount assembly, and soldering processes of the second repair device, the surface mount assembly process only requires directly placing the material onto the rework object through the material retrieval component. By overlapping the material retrieval time with the rejection time, the overall rework time of the rework object is further reduced.
[0147] Step S23: Connect the lighting lifting plug-in to the object to be repaired on the third repair platform to power on the object to be repaired.
[0148] The at least two repair devices of the repair equipment in this embodiment also include a third repair device including a third repair platform and a lighting detection component.
[0149] The lighting lifting connector is plugged into the object to be repaired on the third repair platform to power on the object. The lighting detection component of the third repair device is used to test whether the newly soldered LED chip can light up normally. If it can, the repair is successful. If some LED chips light up abnormally, the object is repaired again.
[0150] In this step, the lighting detection can be performed simultaneously with step S22, that is, the rework equipment performs the corresponding rework processing of the three rework devices at the same time, thereby further reducing the overall rework time of the rework object and improving the overall rework efficiency of multiple rework objects.
[0151] Through the above steps, the rework method of the rework equipment in this embodiment, by setting up multiple rework equipment, shortens the total time of the original rework object from six processes (rejection + soldering + material handling + surface mounting + soldering + lighting detection) to the total time of three processes (soldering + material handling + soldering). That is, the time required for rejection + material handling + lighting is overlapped into the total time of soldering + material handling + soldering, which greatly reduces the overall rework time of multiple rework objects, speeds up the batch rework efficiency of rework objects, and improves the rework efficiency by performing rework processes on multiple platforms simultaneously, thus speeding up the cycle time of the rework equipment.
[0152] The above are merely embodiments of this application and do not limit the patent scope of this application. Any equivalent structural or procedural transformations made using the content of this application's specification and drawings, or direct or indirect applications in other related technical fields, are similarly included within the patent protection scope of this application.
Claims
1. A reworkable device, characterized in that, The equipment to be repaired includes: Equipment body; At least two types of rework devices are provided, each of which is installed on the main body of the equipment to rework objects within each of the rework devices. Among them, at least two of the rework devices are movable to contact each other to transfer the rework object, at least two of the rework devices perform different rework processes, and at least two of the rework devices are configured to simultaneously perform rework on the rework object at different rework stages using corresponding rework processes.
2. The rework equipment according to claim 1, characterized in that, The main body of the device includes a base and a bracket, with the bracket vertically fixed to the base. The rework device includes a repair platform and a repair unit. The repair platform is mounted on the base. The repair unit is mounted on the bracket and configured to rework the corresponding rework object on the repair platform.
3. The rework equipment according to claim 2, characterized in that, At least two types of rework devices include: a first rework device and a second rework device; The first repair device includes a first repair platform and a first repair unit. The first repair platform is mounted on the base, and the first repair unit is mounted on the bracket and configured to perform a first repair on the object to be repaired on the first repair platform. The second repair device includes a second repair platform and a second repair unit. The second repair platform is mounted on the base, and the second repair unit is mounted on the bracket and configured to perform a second repair on the object to be repaired on the second repair platform.
4. The rework equipment according to claim 3, characterized in that, A linear motion module is mounted on the bracket; The first repair unit includes a rejection component, which is mounted on the linear motion module; The second repair unit includes a positioning and detection component, a soldering component, a surface mount component, and a soldering component; The positioning and detection component is fixed on the bracket and is set in correspondence with the second repair platform to locate the objects to be repaired on the second repair platform and detect the repair effect. The soldering component, the surface mount component, and the soldering component are respectively mounted on the linear motion module and can move within the positioning range of the positioning and detection component, so as to perform soldering, surface mount, and soldering processes on the rework objects on the second repair platform with the assistance of the positioning and detection component.
5. The rework equipment according to claim 4, characterized in that, The rejection assembly includes: a rejection lifting module, a positioning component, and a rejection component; The rejection lifting module is mounted on the linear motion module. The positioning component includes a first horizontal positioning component and a first vertical positioning component. The first horizontal positioning component is fixedly mounted on the rejection lifting module and is positioned opposite to the first repair platform. The first vertical positioning component is fixedly mounted on the rejection lifting module. The rejection component includes a rejection blade and a rejection blowing component. One end of the rejection blade is fixedly installed with the rejection lifting module, and the other end of the rejection blade is used to reject the defective points of the rework object. One end of the rejection blowing component is fixedly installed with the rejection lifting module, and the other end of the rejection blowing component is used to blow air onto the rejected defective points.
6. The rework equipment according to claim 4, characterized in that, The soldering assembly includes a soldering needle and a soldering lifting bracket for driving the soldering needle to rise and fall. The soldering lifting bracket is mounted on the linear motion module; One end of the soldering needle is fixed to the soldering lifting bracket, and the other end of the soldering needle is used to solder the object to be repaired.
7. The rework equipment according to claim 4, characterized in that, The patch assembly includes a pick-up component, a recognition camera, a movable feeding platform, and an ejector pin component; The material handling component and the linear motion module are movably arranged, the recognition camera is fixedly arranged on the bracket, the movable feeding platform is arranged opposite to the recognition camera and installed on the main body of the equipment, and the ejector pin is located on the side of the movable feeding platform away from the recognition camera; When the material picker picks up the material, the recognition camera recognizes the material on the movable feeding platform. The movable feeding platform moves the material to a preset position within the displacement range of the ejector pin. The material picker moves to the preset position to pick up the material under the drive of the linear motion module. At the same time, the ejector pin moves upward to lift the material in order to cooperate with the material picker to pick up the material. The material handling operation of the material handling component is configured to be performed synchronously with the rejection operation of the rejection component.
8. The rework equipment according to claim 4, characterized in that, The welding assembly includes a laser component and / or a halogen lamp; The welding assembly is mounted on the linear motion module and configured to be movable within the positioning range of the positioning and detection assembly to weld the object to be repaired.
9. The rework equipment according to claim 3, characterized in that, At least two types of rework devices also include: a third rework device; The third repair device includes a third repair platform and a lighting detection component; the third repair platform is mounted on the base, wherein the second repair device is movable until it comes into contact with the third repair platform in order to transfer the object to be repaired; The lighting detection component includes a lighting lifting pair plug and a lighting detection camera. The lighting lifting pair plug is installed on the side of the third repair platform near the base to connect to the object to be repaired on the third repair platform and power it on. The lighting detection camera is fixedly installed on the side of the third repair platform away from the base and is positioned opposite to the third repair platform to detect the object to be repaired.
10. The rework equipment according to claim 2 or 9, characterized in that, Each repair platform includes a platform support and a transmission component; the transmission component includes a belt, a belt drive motor, and a blocking component. The platform support is arranged parallel to the bracket, and the belt is mounted on the platform support to transport the object to be repaired; the belt drive motor is fixed on the platform support and connected to the belt for transmission drive. The blocking member is movably disposed on the side of the platform support away from the feed inlet of the object to be repaired; when the repair platform carries the object to be repaired, the blocking member protrudes from the platform support in the vertical direction, and when the repair platform moves the object to be repaired, the blocking member is recessed from the platform support in the vertical direction.
11. A method for repairing equipment, characterized in that, The repair method for the reworked equipment is applied to the reworked equipment according to any one of claims 1-10, comprising: Obtain the items to be returned for repair; The repair equipment uses at least two repair devices to perform different repair processes on the objects at different repair stages. At least two of the rework devices are movable to contact each other in order to transfer the object to be repaired.
12. The repair method for equipment according to claim 11, characterized in that, At least two of the rework devices include: a first repair device including a rejection component and a first repair platform, and a second repair device including a second repair platform, a soldering component, a surface mount component, and a soldering component; The repair process, which involves at least two repair devices using a repair equipment to perform different repair processes on objects at different repair stages, includes: The rejection component of the first repair device rejects the rework objects on the first repair platform; at the same time, the soldering component, surface mount component, and soldering component of the second repair device sequentially and alternately perform soldering, surface mount, and soldering processes on the rework objects on the second repair platform.
13. The method for repairing equipment according to claim 12, characterized in that, The process of rejecting return items on the first repair platform using the rejection component of the first repair device includes: In response to obtaining a rework object, the rework object on the first repair platform is rejected by the rejection component of the first repair device; and the material is picked up from the movable feeding table of the patch assembly by the material picker of the patch assembly. The patching process includes: placing the material onto the object to be repaired using the pick-up component.
14. The repair method for the equipment according to claim 11, characterized in that, The at least two repair devices also include: a third repair device comprising a third repair platform and a lighting detection component; The repair of objects at different stages of repair using at least two repair devices within the repair equipment with different repair processes also includes: The lighting lifting plug is inserted into the object to be repaired on the third repair platform to power on and light up the object to be repaired. The lighting detection component of the third rework device performs lighting detection on the reworked object after it has been lit.
