Integrated Dry Dechlorination Process for Blast Furnace Raw Gas
By installing a dry dechlorination integrated process and an online pH monitoring device in the blast furnace gas system, the problem of chlorine removal from blast furnace gas has been solved, achieving equipment protection, calorific value maintenance, and cost reduction, adapting to chlorine load fluctuations, and meeting the requirements of green and low-carbon transformation.
Patent Information
- Application Number
- CN202611233113.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-14
- Publication Date
- 2026-11-10
AI Technical Summary
Existing technologies struggle to balance dechlorination depth, system compatibility, operational economy, and inherent safety, failing to effectively remove chlorine from blast furnace gas, leading to equipment corrosion and high costs.
The dry dechlorination process is integrated, with the injection nozzles positioned after the gravity dust collector and before the dry dust collector. Combined with an online continuous monitoring device for the pH value of blast furnace gas condensate, the amount of dechlorinating agent injected is dynamically adjusted to achieve precise control.
It avoids chlorine corrosion, protects equipment for long-term stable operation, maintains the calorific value of coal gas, reduces solid waste emissions, adapts to chlorine load fluctuations, has low operating costs, and meets the needs of green and low-carbon transformation.
Smart Images

Figure CN123063218A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of metallurgical environmental protection and gas purification technology, specifically to the field of industrial flue gas treatment technology, and particularly to an integrated device and method for dry dechlorination of blast furnace raw gas. Background Technology
[0002] Chlorine is present in the flue gas produced during blast furnace smelting, and this chlorine needs to be removed during flue gas treatment. Chlorine is not a native impurity of the blast furnace, but a harmful component that has accumulated and is associated with the upgrading of the raw material structure in modern ironmaking. The main sources of chlorine include chlorine-containing fluxes and fluxing agents, high-chlorine imported ores and coal blends, and oxygen-enriched pulverized coal injection and high-intensity smelting operations. Because some steel plants add chlorine-containing additives such as CaCl2 solution to the sintering batch to improve the strength of sintered ore or the reducibility of pellets, the chlorine load entering the furnace is increased by about 30-80%. The chlorine content in imported iron ore fines and some domestic coking coal can also reach about 150-400 mg / kg. After high-temperature metallurgical reactions, more than 95% of these raw materials will enter the top gas in the form of gaseous HCl. Furthermore, the decrease in gas production per unit of pig iron and the increase in gas flow rate will also exacerbate the enrichment of chlorides in the gas phase. Actual measurements show that the median concentration of HCl in blast furnace gas of major steel enterprises in China has decreased from 65 mg / Nm³ in 2018 to... 3 It has already risen to 112 mg / Nm³ by 2025. 3 Furthermore, the peak value has exceeded 250 mg / Nm³. 3 Therefore, the dechlorination situation of blast furnace flue gas is quite severe.
[0003] During gas transportation, HCl and components such as NH3 or H2O in the gas exhibit dynamic coupling. In the interval between the outlet of the gravity dust collector (gas temperature 120~200℃) and the inlet of the bag filter (gas temperature 100~150℃), HCl is in the gaseous stable zone. Here, HCl has already begun to react with trace amounts of NH3 to form gaseous NH4Cl precursors. Then, when the gas leaves the TRT / BPRT turbine unit, due to the gas temperature of about 30~60℃, NH4Cl will rapidly condense and precipitate, forming micron-sized crystalline particles, which will continuously deposit on the blade surface, the corrugated expansion joint folds, and the inner wall of the pipe bends. Furthermore, HCl dissolves in the condensate to form a strongly acidic electrolyte with a pH of 0.8~2.5, which causes electrochemical corrosion and stress corrosion synergistic effects on the gas pipeline network, valves, and compensators made of 304 or 316 stainless steel, resulting in a very large amount of corrosion every year. In light of the aforementioned technical issues concerning chlorine in blast furnace gas, further research and development on dechlorination of blast furnace gas is needed.
[0004] Existing dechlorination technologies can be categorized into wet alkaline washing dechlorination, fixed-bed adsorption dechlorination, and source-controlled chlorination, but all of these methods suffer from insurmountable engineering bottlenecks. Wet alkaline washing dechlorination primarily utilizes a spray tower and circulating NaOH solution, with a coal gas flow rate of 450,000 Nm³. 3 / h, initial HCl content is 100 mg / Nm 3 The requirement of a 90% dechlorination efficiency was found to be inadequate. This process resulted in a calorific value loss of ≥3% due to cooling gas, and the high chlorine content in the circulating liquid salt necessitated the discharge of high-chlorine wastewater, leading to high wastewater treatment costs. Furthermore, this method only protected downstream equipment; the TRT blades and upstream pipes still suffered severe scaling and corrosion. For fixed-bed adsorption dechlorination processes, primarily using sodium-based or calcium-based granular dechlorinating agents to fill the tower, the chlorine capacity is limited, generally ≤25%, requiring frequent replacement, typically every 3 months. This results in an annual solid waste generation exceeding 1300 tons per set, leading to a large solid waste disposal volume. Additionally, the limited space velocity, large equipment footprint, and pressure drop generally exceeding 3 kPa directly reduced the TRT's power generation efficiency. For processes involving chlorine control at the source, the usual practice is to procure low-chlorine ores, coke, and pulverized coal. However, due to the global scarcity of high-quality low-chlorine resources, procurement costs increase. Ironmaking processes face strong constraints, and even with such processes, chlorine input cannot be completely eliminated. Even if the chlorine content of the raw materials is reduced by 50%, the HCl content in the coal gas will still exceed 80 mg / Nm³. 3 .
[0005] Chinese invention patent application CN114292673A discloses a wet total evaporation dechlorination method and device for blast furnace gas. By placing the wet total evaporation dechlorination device between a gravity dust collector and a bag filter, chlorine is removed from the gas. However, this process uses sodium hydroxide alkaline solution as the absorbent. Because the gas contains a large amount of carbon dioxide, the utilization efficiency of the alkaline solution is extremely low. Furthermore, due to the high temperature at the nozzles, scaling occurs, leading to nozzle blockage.
[0006] Chinese invention patent publication CN114606026B discloses a method for simultaneous desulfurization and dechlorination of blast furnace gas. This technical solution involves placing the dry dechlorination inlet upstream of a gravity dust collector. However, due to the high dust content in this area, this placement can lead to the high-dust airflow entraining and interfering with the dechlorinating agent, thereby increasing the consumption of ineffective reagents and resulting in relatively low contact efficiency in the dechlorination reaction.
[0007] Chinese invention patent announcement CN119666958B discloses a method and device for online continuous monitoring of pH value of blast furnace gas condensate, which discloses a technical solution that can monitor the pH value of blast furnace gas in real time. However, the technical solution does not disclose how to specifically coordinate with dechlorination to modify the existing dechlorination device.
[0008] In other words, existing technologies cannot simultaneously achieve dechlorination depth, system compatibility, operational economy, and inherent safety.
[0009] Therefore, there is an urgent need to develop a dry dechlorination process that does not generate new wastewater, does not reduce the calorific value of the gas, does not interfere with the continuous production of the blast furnace, and can dynamically adapt to fluctuations in chlorine load. Summary of the Invention
[0010] The purpose of this invention is to overcome the shortcomings of existing technologies and develop an integrated dry dechlorination process system and intelligent control method tailored to the actual needs of on-site users and the operating conditions of blast furnace raw gas. Compared with traditional processes, this process has several significant advantages. First, it is pre-positioned, avoiding chlorine corrosion at the source and protecting the long-term stable operation of subsequent equipment. Second, the temperature matches the existing operating conditions; the pure dry dechlorination process does not lose the calorific value of the gas, and the system has near-zero pressure drop, minimizing the impact on TRT power generation. Third, it has high dechlorination efficiency, no secondary pollution, and a significant reduction in solid waste emissions. Fourth, it features dynamic control, adapting to fluctuations in blast furnace chlorine load and ensuring stable pH levels in the outlet condensate. Finally, it has low operating costs, with overall economic efficiency significantly superior to fixed-bed and wet processes, fully meeting the green and low-carbon transformation needs of steel enterprises. It is suitable for the efficient, stable, and economical removal of strongly acidic gases (such as HCl) from blast furnace gas systems in steel metallurgy.
[0011] To achieve the above objectives, the present invention adopts the following technical solution: An integrated method for dry dechlorination of blast furnace raw gas includes the following steps: S1, the injection port of the dry dechlorination conveying and injection device is set on the blast furnace raw gas pipeline after the gravity dust collector and before the dry dust collector.
[0012] S2, the inlet of the high-temperature gas discharge pipe of the online continuous monitoring device for pH value of blast furnace gas condensate is set on the high-pressure side clean gas pipeline after the dry dust collector.
[0013] S3, through the injection nozzle of the dry dechlorination conveying and injection device, injects dry dechlorination agent into the blast furnace raw gas pipeline.
[0014] S4. When the online continuous monitoring device for the pH value of blast furnace gas condensate detects that the pH of the gas discharged from the high-pressure side clean gas pipeline is lower than the lower pH threshold, for every 0.1 decrease in the monitored pH value, the amount of dechlorinating agent sprayed from the injection port increases by 5~10 kg / h based on the existing injection volume; when the pH value is higher than the upper pH threshold, for every 0.1 increase in the pH value, the amount of dechlorinating agent sprayed from the injection port decreases by 5~10 kg / h based on the existing injection volume.
[0015] Preferably, the dry dust collector is a bag filter.
[0016] Preferably, step S3 includes the following steps: S31, loading and buffering, the dechlorinating agent is buffered into the buffer chamber by carrier gas.
[0017] S32, precision injection, pressurizes and transfers the dechlorinating agent in the buffer chamber to the injection tank, and injects the dechlorinating agent into the blast furnace raw gas pipeline at an injection rate of 65~95kg / h.
[0018] Preferably, step S31 includes the following steps: S311, the dechlorinating agent is discharged into the raw material silo using clean nitrogen as the carrier gas.
[0019] S312, the dechlorinating agent in the raw material silo is transported to the buffer silo by nitrogen. When the dechlorinating agent in the buffer silo reaches 60-80% of the buffer silo volume, the supply of dechlorinating agent to the buffer silo is stopped. When the dechlorinating agent in the buffer silo is lower than 10-20% of the buffer silo volume, the dechlorinating agent in the raw material silo is transported to the buffer silo again by nitrogen.
[0020] Preferably, step S32 includes the following steps: S321, the dechlorinating agent is injected at a rate of 65~95 kg / h, and the dechlorinating agent is continuously injected into the blast furnace raw gas pipeline.
[0021] S322, when the dechlorinating agent in the injection tank is lower than the minimum storage threshold, first open the bottom outlet of the buffer bin, and the dechlorinating agent in the buffer bin falls into the lock hopper by gravity. When the dechlorinating agent in the lock hopper reaches the maximum storage threshold, close the outlet of the buffer bin, and then continuously pressurize the lock hopper with nitrogen until the pressure in the lock hopper is 20-50 kPa higher than the pressure in the injection tank. Then open the opening between the lock hopper and the injection tank, and rely on the pressure difference between the lock hopper and the injection tank, the dechlorinating agent enters the injection tank from the lock hopper. When the dechlorinating agent in the injection tank is higher than the maximum storage threshold, the feeding is completed, the opening between the lock hopper and the injection tank is closed, and the lock hopper is depressurized. The minimum storage threshold is 30%-50% of the injection tank capacity (preferably, for example, a loading amount of 50 kg), the maximum storage threshold is 80%-90% of the injection tank capacity, and the maximum storage threshold in the lock hopper is 80%-100% of the lock hopper capacity.
[0022] S323: When the dechlorinating agent in the injection tank falls below the minimum storage threshold again, S322 will be automatically executed again to replenish the material.
[0023] Preferably, in step S4, the lower pH threshold is 5.1 to 5.9, and the upper pH threshold is 6.1 to 6.9.
[0024] Preferably, in step S4, the final spray volume of the dechlorinating agent from the spray nozzle is Q. total Q total The relationship between the pH value and the detected pH value must meet the following requirements: ; Among them, Q base The current base injection rate is given; ∆pH is the minimum change; k is the single-stage increment coefficient, and the value of k ranges from 5 to 10 (kg / h).
[0025] An integrated dry dechlorination process for blast furnace raw gas is disclosed. The integrated dry dechlorination process is an apparatus for implementing the above-mentioned method, including a dry dechlorination conveying and injection device and an online continuous monitoring device for the pH value of blast furnace gas condensate.
[0026] The dry dechlorination conveying and purging device includes a raw material tanker, a raw material silo component, a buffer silo component, a lock hopper component, and a purging tank component.
[0027] The raw material tanker is used to continuously transport dechlorinating agent and deliver it into the raw material silo components via carrier gas.
[0028] The raw material silo component includes a raw material silo, a raw material nitrogen cannon, a raw material dome valve, an AV pump, a delivery valve, and a raw material dust collector. The raw material dome valve is used to open and close the channel between the raw material silo and the AV pump. The delivery valve is used to open and close the high-pressure nitrogen discharge. The raw material dust collector is used for dust removal when dechlorinating agent is delivered into the raw material silo component. The raw material nitrogen cannon is used to vibrate when there is a problem with material flow, thereby improving the flow of material. At the same time, the nitrogen in the nitrogen cannon enters the silo, improving the fluidization effect of the dechlorinating agent.
[0029] The buffer chamber component includes a buffer dust collector, a buffer chamber, and a buffer nitrogen cannon; the buffer dust collector is used for dust removal during the process of discharging dechlorinating agent into the buffer chamber, and the buffer nitrogen cannon is used to vibrate the outlet of the buffer chamber when blockage occurs when the dechlorinating agent is discharged into the lock hopper by gravity.
[0030] The lock hopper assembly includes a lock hopper, a lock hopper exhaust valve, a balance valve, a lock hopper inlet dome valve, and a lock hopper outlet dome valve. The lock hopper exhaust valve is used to release gas after the buffer bin has finished discharging material into the lock hopper. The balance valve is used to maintain the pressure balance between the lock hopper and the injection tank. The lock hopper inlet dome valve is used to open and close the channel between the buffer bin and the lock hopper. The lock hopper outlet dome valve is used to open and close the channel between the lock hopper and the injection tank.
[0031] The injection tank assembly includes an injection tank, an injection inlet dome valve, a feeder, an injection pipe, and nozzles. The injection inlet dome valve is used to open and close the channel between the lock hopper and the injection tank and to prevent the lock hopper and the injection tank from being completely directly connected; the feeder is used to transport the dechlorinating agent from the injection tank and then use chlorine gas to transport it into the injection pipe; the injection pipe is used to connect the feeder and the nozzles, and the nozzles are used to inject the dechlorinating agent with chlorine gas as the carrier gas into the blast furnace raw gas pipeline.
[0032] The nozzles of the injection pipe are located on the blast furnace raw gas pipeline after the gravity dust collector and before the dry dust collector of the blast furnace gas treatment unit.
[0033] Preferably, the AV pump is located at the bottom of the raw material silo, and a nitrogen injection pipe is provided on the side of the AV pump. A delivery pump is provided on the nitrogen injection pipe, and the outlet of the AV pump is connected to the top inlet of the buffer silo through a pipe. The buffer silo, the lock hopper, and the injection tank are arranged sequentially from top to bottom. The bottom of the buffer silo is connected to the top inlet of the lock hopper through a lock hopper inlet dome valve. The lock hopper outlet dome valve is located at the bottom of the lock hopper, and the injection inlet dome valve is located at the top of the injection tank. The bottom of the lock hopper and the top of the injection tank are connected through the lock hopper outlet dome valve and the injection inlet dome valve. The sides of the lock hopper and the injection tank are connected by a pipe, and a balance valve is provided on this pipe.
[0034] Preferably, the online continuous monitoring device for the pH value of blast furnace gas condensate is basically the same in structure as CN119666958B. It includes a condensate collection device, an online monitoring device, and a condensate discharge device. The condensate collection device includes a high-temperature gas inlet component, a condensation component, and a low-temperature gas return component. The high-temperature gas inlet component discharges blast furnace gas from the blast furnace gas discharge pipe into the condensation component. The condensation component cools the discharged blast furnace gas to obtain condensate and discharges the condensate. The low-temperature gas return component returns the cooled low-temperature blast furnace gas back into the blast furnace gas discharge pipe.
[0035] The online monitoring device includes a U-shaped water seal bend and an online pH detection component. The U-shaped water seal bend is used to enrich the condensate discharged from the condensation component in a U-shape to form a dynamic water seal and prevent gas from passing through the online monitoring device. The online pH detection component is installed on the U-shaped water seal bend and is used to perform real-time pH detection on the liquid inside the U-shaped water seal bend. The condensate discharge device is used to discharge the liquid discharged from the online monitoring device.
[0036] Preferably, before starting the injection, the hourly injection volume of the injection pipe and nozzle is set. At this time, the injection operation is running normally, and the lock hopper inlet dome valve, lock hopper outlet dome valve, injection inlet dome valve, and balance valve are all closed, while the lock hopper exhaust valve is open. The injection tank and fluidizing gas supply are uninterrupted. When the weight of the dechlorinator in the injection tank is lower than the minimum storage threshold, the feeding stage begins. The buffer bin outlet dome valve is opened, and the fluidizing gas supply at the bottom of the buffer bin is activated. The dechlorinator in the buffer bin falls into the lock hopper by gravity. During the feeding process, the buffer nitrogen cannon vibrates to assist the feeding. When the dechlorinator in the lock hopper reaches the maximum material level... When the threshold is reached, the lock hopper inlet dome valve and lock hopper exhaust valve close sequentially, completing the lock hopper loading. Nitrogen continues to be pressurized inside the lock hopper through the lock hopper pressurization valve until the lock hopper pressure reaches the set pressure 20-50 kPa higher than the injection tank pressure. Then, the lock hopper outlet dome valve, injection tank inlet dome valve, balance valve, and lock hopper fluidization valve automatically open sequentially. At this time, relying on the pressure difference between the lock hopper and the injection tank, the dechlorinating agent enters the injection tank from the lock hopper. When the weight of the injection tank no longer increases, the lock hopper fluidization valve, balance valve, injection tank inlet dome valve, and lock hopper outlet dome valve close sequentially, completing the feeding. Then, the lock hopper exhaust valve is opened to depressurize the lock hopper.
[0037] Compared with the prior art, the technical solution of the present invention has the following beneficial technical effects: (1) By setting the injection port of the dry dechlorination agent between the blast furnace gravity dust removal outlet and the inlet of the dry dust collector (e.g., bag filter), the present invention realizes the process of prepositioning, thereby avoiding chlorine corrosion from the source and protecting the long-term stable operation of subsequent equipment. At the same time, it achieves temperature matching with existing working conditions, realizes dechlorination of pure dry process, and does not lose the calorific value of coal gas. The overall system is close to zero pressure drop and has minimal impact on TRT power generation. Since the dust concentration in the flue gas is significantly reduced after gravity dust removal, the contact efficiency between the dry dechlorination agent particles and acidic components such as HCl in the flue gas is significantly improved. This avoids the dust from encapsulating and adsorbing the dechlorination agent, allowing the dechlorination reaction to be more complete. Furthermore, the flue gas temperature at this location is within the range of 140~170℃, which matches the activity temperature window of the dechlorination agent. Therefore, pure dry dechlorination can be achieved without additional heating or cooling of the flue gas. The entire system generates almost no additional pressure drop, thereby maximizing the preservation of the calorific value of the coal gas and reducing the impact on TRT power generation. This achieves multiple technical benefits of high efficiency and low cost in dechlorination.
[0038] (2) This invention achieves dynamic control by setting up an online pH monitoring system downstream of the dechlorination system and adjusting the dechlorinating agent injection rate based on the feedback of the detection data. This not only adapts to fluctuations in blast furnace chlorine load and ensures stable pH of the outlet condensate, but more importantly, it ensures the stable achievement of the dechlorinating agent injection effect. Although the online pH monitoring device is an existing device, it has not been studied how to form a specific linkage with the dechlorinating agent injection. This invention achieves the organic linkage between the two through specific research and realizes the technical effect of setting the dry dechlorinating agent injection port between the blast furnace gravity dust collector and the dry dust collector to ensure stable operation of the dechlorination effect. Since there is a synergistic relationship between the pH value of the flue gas and the dechlorinating agent injection rate, and the online pH monitoring system can reflect the actual effect of the dechlorination reaction in real time, when fluctuations in the blast furnace feed material or operating conditions cause changes in chlorine load, the system can promptly provide feedback based on the pH detection data and adjust the injection rate, thereby forming a closed-loop control. This ensures that the pH of the outlet condensate is stably controlled within the target range under different chlorine load conditions, thus guaranteeing the dechlorination effect.
[0039] (3) This invention achieves synergistic technical effects such as high dechlorination efficiency, no secondary pollution, and significant reduction in solid waste emissions by specifically coupling the dechlorination agent injection port between gravity dust collection and bag dust collection with online pH monitoring and feedback adjustment. The reasonable injection position ensures the efficient reaction between the dechlorination agent and acidic gas. The stable dechlorination agent injection and pH feedback adjustment, in turn, ensure that the injection can be carried out at this point. Furthermore, the pH feedback adjustment avoids excessive or insufficient injection of the dechlorination agent. The synergy of the two makes the amount of dechlorination agent precisely controllable and the reaction fully complete. The generated chlorine-containing reaction products are easy to collect and recover in the bag dust collector. Overall, the effective recycling of chlorine resources is achieved, and the wastewater pollution caused by traditional wet processes and the large amount of waste packing material generated by fixed bed processes are avoided. The solid waste emissions are significantly reduced compared with the prior art.
[0040] (4) Through the above-mentioned integrated technical solution of dry injection point setting and pH intelligent feedback control, the present invention also achieves the overall technical effect of low operating cost and significantly better overall economic performance than fixed bed and wet processes, meeting the green and low-carbon transformation needs of steel enterprises. Since the pure dry process does not require a complex wet washing or wastewater treatment system, and the near-zero pressure drop design avoids the loss of TRT power generation efficiency, the feedback control set in the present invention further reduces the consumption of dechlorinating agent, thus significantly reducing the overall operating cost in terms of equipment investment, operating energy consumption, reagent consumption and power generation revenue.
[0041] (5) In the preferred embodiment, by setting up the dechlorinating agent buffer, lock hopper and spray tank as a whole, the pressure is separated between the buffer chamber and the spray tank in the lock hopper, which can avoid the disorderly flow of dechlorinating agent material, ensure that the spray volume and spray pressure of dechlorinating agent are controllable in real time, and achieve the technical effects of continuous and stable replenishment, stable quantitative transportation and uniform spraying of dechlorinating agent, thereby ensuring the uniformity and stability of the dechlorinating agent spraying process. This continuously metered feeding device can precisely control the feeding rate of the dechlorinating agent based on feedback adjustment commands. The presence of the lock hopper ensures a stable ratio of carrier gas to dechlorinating agent powder, avoiding the injection volume fluctuations caused by ordinary intermittent feeding. At the same time, using nitrogen as the carrier gas for pneumatic conveying utilizes the inertness and stable fluidization characteristics of nitrogen to keep the dechlorinating agent uniformly suspended and at a stable flow rate in the conveying pipeline. Furthermore, the injection pressure and injection volume can be precisely controlled by adjusting the nitrogen pressure and flow rate, ensuring that the dechlorinating agent is injected into the blast furnace gas pipeline in a stable and uniform gaseous particle state at the injection nozzle, thereby achieving full and uniform contact and reaction with the acidic components in the flue gas. This further ensures the stability of the dechlorination effect and the accuracy of control based on pH feedback. Attached Figure Description
[0042] Figure 1This is a connection diagram of the integrated dry dechlorination process for blast furnace raw gas according to the present invention.
[0043] Figure 2 for Figure 1 A partially enlarged schematic diagram of the buffer bin, lock hopper, and blow-off tank.
[0044] Figure 3 This is a physical display image of the clean gas pipeline on the high-pressure side.
[0045] Figure 4 This is a physical demonstration of an online continuous monitoring device for the pH value of blast furnace gas condensate.
[0046] Figure 5 The graph shows the detection data of the pH online monitoring system used as a blank example.
[0047] Figure 6 This is a graph showing the detection data of the pH online monitoring system in Example 3.
[0048] In the diagram: 001 - Gravity dust collector, 002 - Dry dust collector, 003 - Blast furnace raw gas pipeline after the gravity dust collector and before the dry dust collector. 101 - Raw material tanker truck; 201-Raw material silo, 202-Raw material dust collector, 203-Raw material nitrogen cannon, 204-Raw material dome valve, 205-Conveying valve, 206-AV pump; 301-Buffer bin, 302-Buffer dust collector, 303-Buffer nitrogen cannon, 304-Buffer fluidizing valve, 305-Slide valve; 401-Cock hopper, 402-Cock hopper inlet dome valve, 403-Cock hopper exhaust valve, 404-Cock hopper outlet dome valve, 405-Balancing valve, 406-Cock hopper pressurizing valve, 407-Cock hopper fluidizing valve; 501-Pulse spray tank, 502-Pulse spray inlet dome valve, 503-Feeder, 504-Pulse spray pipe, 505-Nozzle; 601-High-pressure side clean gas pipeline, 611-Gas pipeline pressure regulating valve, 612-Gas pipeline temperature, pressure and flow detection point, 602-Gas drainer, 603-pH online monitoring device, 604-Low-pressure side clean gas pipeline, 605-Condensate inlet, 606-Condensate outlet. Detailed Implementation
[0049] To better illustrate the objectives, technical solutions, and advantages of the present invention, the present invention will be further described below in conjunction with specific embodiments. The specific implementation methods, structures, features, and effects of the present invention will be described in detail below with reference to the accompanying drawings and preferred embodiments. Those skilled in the art should understand that the specific embodiments described herein are only for explaining the present invention and are not intended to limit the present invention.
[0050] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.
[0051] Unless otherwise specified, all raw materials used in this invention are commercially available.
[0052] This process adopts a three-in-one architecture of closed conveying, precise injection, and real-time feedback, realizing the injection of dechlorinating agent between gravity dust collection and bag dust collection. The entire process achieves dry, zero-wastewater, and highly synchronized operation. The complete process is as follows: tanker unloading → automatic feeding → three-stage buffer storage and transportation → positive pressure continuous injection → online monitoring of pH of high-pressure side condensate → interlocking adjustment of injection volume.
[0053] The integrated dry dechlorination process for blast furnace raw gas according to specific embodiments of the present invention mainly includes the following specific exemplary steps: 1. Material Receiving and Closed Conveying in the Buffer Warehouse: Existing dechlorinating agents (e.g., those disclosed in CN114392643B or CN117720953B) are used. Explosion-proof, sealed powder transport tank trucks (working pressure set at 0.3~0.5MPa) are used as raw material tank trucks 101 to transport the materials to the site. These tank trucks directly connect to the quick-connect interface of the pneumatic conveying main pipe in the raw material silo. Simultaneously, the raw material dust collector 202 on the top of the storage silo is manually opened, using clean nitrogen as the power source (carrier gas) to convey the dechlorinating agent from the tank truck into the dechlorinating agent raw material silo. The raw material silo component consists of raw material silo 201 (volume ≥ 50 m³). 3 It consists of a raw material dust collector 202 on the top of the silo, a manual slide gate valve at the outlet of the raw material silo, a conveying valve 205 for conveying nitrogen, a pneumatic raw material dome valve 204 at the outlet of the raw material silo, an AV pump 206, and pipelines and control systems.
[0054] 2. The dechlorinating agent in the raw material silo is automatically conveyed to the buffer silo 301, which is equipped with a buffer nitrogen cannon 303, high and low level gauges, fluidizing plate, a buffer dust collector 302 on the top of the silo, and a weighing instrument. The specific process is as follows: (1) Before the system starts, open the manual slide valve at the bottom of the raw material silo in sequence, select the dechlorination feeding system control mode as automatic, and set the automatic control parameters, including an automatic feeding time of 8 seconds, an empty pipe pressure of 3 kPa for the material conveying pipeline, and a maximum conveying pressure of 250 kPa. At this time, the buffer dust collector at the top of the buffer silo will start automatically.
[0055] (2) The dechlorinating agent entering the raw material silo passes through the manual slide valve and dome valve at the bottom of the raw material silo in sequence and falls into the AV pump by gravity. When the material falling time reaches the set duration of 8 seconds, the dome valve at the bottom of the raw material silo will automatically close.
[0056] (3) After the bottom dome valve of the raw material silo is closed, the delivery valve before the AV pump is automatically opened, and the dechlorinating agent of the AV pump is delivered to the buffer silo by nitrogen. When the outlet pressure of the AV pump is lower than 3 kPa, the delivery valve before the AV pump is automatically closed.
[0057] (4) Repeat steps (2) and (3) until the dechlorinating agent in the buffer bin reaches the set value of 3000 kg, and the automatic feeding of the buffer bin is completed. One minute after the feeding is completed, the dust collector on the top of the buffer bin will automatically shut off.
[0058] 3. Implement precision spraying: The key point of this invention is that the injection point is located on the main raw coal gas pipeline between the outlet of the gravity dust collector and the inlet of the bag filter. The carrier gas used in the injection process is clean nitrogen.
[0059] The purging system consists of a gate valve 305, a lock hopper inlet dome valve 402, a lock hopper 401, a lock hopper outlet dome valve 404, a purging tank inlet dome valve 502, a purging tank 501, a feeder 503 (a multi-chamber rotary precision feeder), a high-efficiency mixing nozzle 505, and conveying pipes (purging pipe 504) and a control system. The lock hopper is equipped with a level gauge, pressure gauge, lock hopper fluidizing valve 407, lock hopper pressurizing valve 406 for pressurizing the lock hopper, lock hopper exhaust valve 403 for venting the lock hopper (the exhaust valve is located on the pipe between the lock hopper and the buffer silo), and a balancing pipe connecting the purging tank and the lock hopper, with a balancing valve 405 installed on the balancing pipe. The purging tank is equipped with a nitrogen hammer, weighing instrument, pressure gauge, and fluidizing plate. Two sets of high-efficiency mixing nozzles are provided, namely nozzle #1 and nozzle #2, which serve as backups for each other.
[0060] (1) Before starting the spraying system, first set the hourly spraying rate to 80 kg / h, set the minimum tank storage threshold to 30% of the spraying pipe capacity (50 kg in this embodiment), set the maximum tank storage threshold to 80% of the spraying pipe capacity, and set the maximum lock hopper material threshold to 90% of the lock hopper capacity; select the spraying pipeline with nozzle #1. At this time, the spraying system runs automatically, the lock hopper inlet dome valve, lock hopper outlet dome valve, spraying tank inlet dome valve, and balance valve are all in the closed state, the lock hopper exhaust valve is in the open state, the spraying tank spraying and fluidizing gas source are continuously supplied, and the feeder automatically adjusts the speed to run.
[0061] (2) When the weight of the dechlorinating agent in the injection tank is lower than the set value, the injection system enters the feeding stage. The control system sends a signal, the dome valve at the outlet of the buffer bin opens, and the fluidizing gas source at the bottom of the buffer bin is turned on at the same time. At this time, the dechlorinating agent in the buffer bin falls into the lock hopper by gravity. If there is a situation where the material does not flow during the feeding process, the nitrogen cannon at the bottom of the buffer bin can be manually turned on to vibrate and assist the feeding.
[0062] (3) When the dechlorinating agent in the lock hopper reaches the high level, the level gauge sends a signal. After a short delay, the dome valve at the outlet of the buffer silo and the exhaust valve of the lock hopper close in sequence, and the loading of the lock hopper stops. The lock hopper continues to be pressurized with nitrogen until the pressure is 20~50 kPa higher than the pressure of the injection tank.
[0063] (4) When the pressure of the lock hopper reaches the set pressure that is 20~50 kPa higher than the pressure of the spray tank, the lock hopper outlet dome valve, the spray tank inlet dome valve, the balance valve, and the lock hopper fluidization valve will automatically open in sequence. At this time, the dechlorinating agent will enter the spray tank from the lock hopper by relying on the pressure difference between the lock hopper and the spray tank. When the weight of the spray tank no longer changes, the lock hopper fluidization valve, the balance valve, the spray tank inlet dome valve, and the lock hopper outlet dome valve will automatically close in sequence. At this time, the feeding is completed. Finally, the lock hopper exhaust valve will be opened to depressurize the lock hopper.
[0064] (5) When the material level in the blow tank drops to the set weight again, repeat steps (2), (3), and (4) automatically to start a new round of loading.
[0065] 4. Real-time feedback and intelligent adjustment of spray volume based on online pH monitoring: This embodiment uses the online continuous monitoring device for pH value of blast furnace gas condensate (Chinese invention patent CN119666958B), specifically the device used in Example 1 of this patent. Figure 3 The image shows a physical diagram of the high-pressure side clean gas pipeline of the device. In the diagram, the high-pressure side clean gas flows from left to right along the pipeline. A gas pipeline pressure regulating valve 611 and gas pipeline temperature, pressure, and flow detection points 612 are installed on the high-pressure side clean gas pipeline 601. The right side of the high-pressure side clean gas pipeline is connected to... Figure 4 The gas pipeline on the lower left is connected. Figure 4 The diagram shows a U-shaped online pH monitoring device, a condensate inlet 605, and a condensate outlet 606. The top pipe is connected to the low-pressure side clean gas pipe 604. Figure 1 The structure shown matches. This online pH monitoring technology for condensate on the high-pressure side after the blast furnace bag filter and before the TRT can accurately and timely reflect the acidity and alkalinity of the blast furnace gas. Through a PID control algorithm, the condensate pH signal is dynamically adjusted in conjunction with the dechlorinating agent injection rate: when the pH is detected to be lower than the target set value of 5.5 (the lower pH threshold set in this embodiment), for every 0.1 decrease, the system automatically increases the hourly dechlorinating agent injection rate in a stepwise manner, increasing it by 5-10 kg / h; when the pH is higher than the target set value of 6.5 (the upper pH threshold set in this embodiment), for every 0.1 increase, the system automatically decreases the hourly dechlorinating agent injection rate in a stepwise manner, decreasing it by 5-10 kg / h. The specific final injection rate Q... total The value of satisfies the requirements of the following formula:
[0066] Q total Q represents the final injection volume. base The current base injection rate is given; ∆pH is the minimum change, and k is the single-step increment coefficient, with a value range of 5 ≤ k ≤ 10 (kg / h). This formula expresses the final injection rate Q when the pH is between 5.5 and 6.5. total That is equal to the current basic injection volume Q base However, when the pH is less than 5.5, the final injection volume Q total At the base spray volume Q base Add one to the basis The final injection rate Q is determined by the pH value, which is greater than 6.5. total At the base spray volume Q base Reduce one on the basis The injection rate is adjusted to maintain the acidity / alkalinity of the dechlorinated gas within a stable range. This, combined with balanced feeding, solves the existing technical problem of not being able to install dechlorination nozzles between gravity dust collectors and baghouse dust collectors. It avoids both insufficient dechlorination leading to subsequent corrosion and excessive dechlorination agent causing material waste. It adapts to the dynamic fluctuations of chlorine load during blast furnace production without manual intervention. Furthermore, the system is equipped with a pH anomaly alarm threshold. In this embodiment, if the injection rate is adjusted to the maximum set value of 260 kg / h and still cannot meet the pH requirements, an audible and visual alarm is automatically triggered to alert maintenance personnel to investigate the operating conditions, ensuring stable system operation.
[0067] The online continuous monitoring device for pH value of blast furnace gas condensate adopts the configuration of Example 1 of CN119666958B, including a gas pressure reducing valve, a gas flow meter, a water-cooled cooler, a thermometer, a pressure transmitter, a pH meter, a gas drainer, and pipelines and a control system.
[0068] The working principle of the online pH monitoring of high-pressure side condensate is based on the physical characteristics of blast furnace gas with a moisture content of 3-5% and HCl being highly soluble in water. A test gas is drawn from the main clean gas pipeline after the blast furnace bag filter dust collector, with a gas flow rate of 50-200 Nm³. 3 At a temperature of 60-100℃ and a pressure greater than 0.2 MPa, the gas is reduced to 15-30 kPa via a pressure reducing valve before entering a water-cooled cooler (cooling water temperature not exceeding 30℃). This cools the gas to below 30℃, and the cooled gas returns to the low-pressure side gas pipeline. During this process, water vapor in the gas condenses into liquid water, and HCl dissolves in the condensate. The condensate containing dissolved HCl flows through the drain port at the bottom of the cooler into the pH online monitoring pipeline, then into the gas drainer, and finally into the wastewater collection tank, thus completing the real-time monitoring process. This monitoring method requires no pretreatment, has a response time of less than 3 minutes, and can accurately capture fluctuations in the HCl concentration in the gas, providing reliable feedback for adjusting the dechlorinating agent injection rate.
[0069] The following is a specific example of implementation using the process and parameters described above.
[0070] Implement blank example This blank example illustrates an instance where the above-described specific process of the present invention is performed without injection. This blank example shows various indicators when the injection rate is 0. The experiment was conducted in a steel plant. The injection point of the dechlorination system was located between the blast furnace gravity dust collector outlet and the bag filter inlet. Under the premise that the dechlorination system was offline, the blast furnace feed material was stable, and the operating conditions were stable, the pH online monitoring system's detection data over a period of time is as follows: Figure 5 As shown in Table 1, the overall detection data during operation is as follows. Figure 5 It can be seen that before the dechlorination system was put into operation (i.e., the injection volume was 0), the pH value of the gas condensate fluctuated greatly during the online continuous pH monitoring. The minimum value was 0.22, the maximum value was 4.09, the average value was 2.65, and the standard deviation reached 0.71. This indicates that the same set of equipment had a very high chlorine content when the dechlorination operation of this invention was not implemented. Table 1 shows the detection data of the pH online monitoring system in the blank example.
[0071] Table 1
[0072] Example 1
[0073] This embodiment illustrates various indicators when the injection rate is approximately 50 kg / h using the specific process described above. Under the premise of stable blast furnace feed and stable operating conditions, the detection data from the online pH monitoring system are shown in Table 2. Table 2 presents the detection data from the online pH monitoring system in Example 1.
[0074] Table 2
[0075] Example 2
[0076] This embodiment illustrates various indicators when the injection rate is approximately 80 kg / h using the specific process described above. Under the premise of stable blast furnace feed and stable operating conditions, the detection data from the online pH monitoring system are shown in Table 3. Table 3 presents the detection data from the online pH monitoring system in Example 2.
[0077] Table 3
[0078] Example 3
[0079] This embodiment illustrates various indicators when the injection rate is approximately 90 kg / h using the specific process described above. Under the premise of stable blast furnace feed and stable operating conditions, the pH data detected by the online monitoring system over a period of time are as follows: Figure 6 As shown, through Figure 6 As can be seen, by using the same equipment as the control example and spraying dechlorinating agent at this location, the minimum pH value of the condensate was 6.09, the maximum was 6.73, the average was 6.38, and the standard deviation was 0.18 within 24 hours. This demonstrates that the specific spraying method at specific locations in this invention significantly improves the dechlorination effect.
[0080] The detection data of the pH online monitoring system during the overall monitoring period are shown in Table 4. Table 4 shows the detection data of the pH online monitoring system in Example 3.
[0081] Table 4
[0082] A comparison of the above embodiments shows that as the dechlorinating agent injection rate gradually increases from 0 to approximately 90 kg / h, the flue gas pH value gradually increases from 1-3 to 6-6.5, exhibiting a monotonic upward trend. This indicates a clear synergistic relationship between the dechlorinating agent injection rate and the flue gas pH value at this injection point (between the gravity dust collector outlet and the bag filter inlet); increasing the dechlorinating agent injection rate is an effective means to increase the flue gas pH and reduce the risk of acid corrosion. Furthermore, it can be seen that within the range of injection rate increasing from 50 kg / h to 80 kg / h, the pH value shows a sharp increase, and the dechlorination efficiency per unit injection rate is significantly higher than in the low injection rate stage. That is, under the conditions of this embodiment, the dechlorination reaction has a critical injection rate threshold (around 80 kg / h). Below this threshold, the dechlorinating agent may be consumed by residual dust in the flue gas or the reaction may be incomplete, resulting in low dechlorination efficiency. After reaching the threshold, the reaction between the dechlorinating agent and acidic components such as HCl tends to be sufficient, and the dechlorination efficiency enters the high-efficiency range.
[0083] In Example 3, with a spray rate of approximately 90 kg / h, the pH stabilized at 6-6.5, approaching the weakly acidic to near-neutral range. Compared to Example 3, Example 4 showed a one-unit increase in the lower pH limit, indicating better overall stability. The pH fluctuation range was further narrowed from 2.0 in Example 1, 2.0 in Example 2, and 1.0 in Example 3 to 0.5, demonstrating more stable and controllable system operation. The blank example and the three examples constituted a complete curve showing the relationship between spray rate and pH, providing crucial data support for the implementation of spray rate feedback adjustment based on online pH monitoring in this invention. When the target pH is set between 5.5 and 6.5, the baseline spray rate can be set to approximately 90 kg / h; when the pH is below approximately 5.5, the spray rate can be appropriately increased; and when the pH is above 6.5, the spray rate can be appropriately decreased, achieving refined and intelligent control. This further enables the present invention to adjust the spray volume based on different pH values, thus ensuring the dechlorination effect by placing the dry dechlorination nozzle between gravity dust collection and bag dust collection.
[0084] Comparative Example 1 This comparative example is used to illustrate a comparative test that does not employ the specific injection point of the present invention. In this comparative example, the injection point of the dechlorination system is set at the inlet of the blast furnace gravity dust collector. Under the premise that the dechlorination system is operating stably, the injection rate is controlled within a range of approximately 90 kg / h, the raw materials fed into the blast furnace are stable, and the operating conditions are stable, the detection data of the pH online monitoring system are shown in Table 5. Table 5 shows the detection data of the pH online monitoring system of Comparative Example 1.
[0085] Table 5
[0086] Comparative Example 2 This comparative example illustrates a comparative test where the specific injection points of the present invention are not used and the injection volume is higher than that of the embodiments. In this comparative example, the injection point of the dechlorination system is set at the inlet of the blast furnace gravity dust collector. Under the premise that the dechlorination system is operating stably, the injection volume is controlled within a range of approximately 110 kg / h, the raw materials fed into the blast furnace are stable, and the operating conditions are stable, the detection data of the pH online monitoring system are shown in Table 6. Table 6 shows the detection data of the pH online monitoring system of Comparative Example 2.
[0087] Table 6
[0088] Comparing the data from Example 3, Comparative Example 1, and Comparative Example 2, it was found that with the same amount of dechlorinating agent injected as in Comparative Example 1, setting the injection point between gravity dust collection and bag filter dust collection in Example 3 increased the flue gas pH value by approximately 0.5 to 1.0 units. This indicates that this location is more conducive to the full contact and reaction between the dechlorinating agent and acidic components such as HCl in the flue gas, significantly improving the dechlorination efficiency. This is because the dust concentration in the flue gas is greatly reduced after gravity dust collection, increasing the contact efficiency between the dechlorinating agent particles and the acidic gas, avoiding the encapsulation or adsorption of the dechlorinating agent by dust, thus making the dechlorination reaction more complete. For Comparative Example 2, the injection point was still located at the gravity dust collector inlet. This comparative example increased the injection rate to approximately 110 kg / h (an increase of approximately 22% compared to Example 4), and the pH range was 5.4–6.0. The average value was still lower than the lower pH limit of Example 3, meaning that even with a significant increase in the injection rate, the pH did not reach the level of Example 3. This demonstrates that simply increasing the dechlorinating agent injection rate cannot effectively compensate for the dechlorination efficiency loss caused by improper injection location. Example 3 achieved a higher pH value and better stability with a lower injection rate, fully demonstrating the technical advantages of the injection point location of this invention and exhibiting significant energy-saving and consumption-reducing effects. Furthermore, as can be seen from the above tables, the pH value of Example 3 was stable between 6 and 6.5, falling within the weakly acidic to near-neutral range, and its fluctuation range was the smallest (0.5), indicating that the dechlorination process was stable and controllable. In contrast, although the pH increased in Comparative Example 2 by increasing the injection rate, the pH fluctuation range was larger, indicating that when injection was performed at the gravity dust collector inlet, the dechlorination reaction was more significantly affected by fluctuations in flue gas conditions, resulting in poor system robustness.
[0089] By comparing Example 3 with Comparative Examples 1 and 2, it can be seen that Example 3 has a significant locational advantage. By placing the dry dechlorination injection point between the gravity dust collector and the bag filter, compared to placing it at the gravity dust collector inlet, the flue gas pH can be increased by 0.5~1.0 under the same injection volume, resulting in a significantly better dechlorination effect. Under the same dechlorination effect, Example 3 achieves a better dechlorination effect than the comparative examples with higher injection volumes with a lower injection volume, further demonstrating that the process route of the present invention can effectively reduce dechlorination agent consumption while ensuring dechlorination effect, thus possessing good economic benefits. Furthermore, due to the smaller pH fluctuation range, it can be seen that the pH value of Example 3 is higher and more stable than that of the comparative examples, providing a more reliable foundation for subsequent closed-loop control strategies based on pH feedback to adjust the injection volume, which is conducive to achieving refined and intelligent blast furnace flue gas dechlorination operation management.
[0090] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention in any way. Although the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art can make some modifications or alterations to the above-disclosed technical content to create equivalent embodiments without departing from the scope of the present invention. Any simple modifications, equivalent changes and alterations made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the scope of the present invention.
Claims
1. An integrated method for the entire dry dechlorination process of blast furnace raw gas, characterized in that, Includes the following steps: S1, the injection port of the dry dechlorination conveying and injection device is set on the blast furnace raw gas pipeline after the gravity dust collector and before the dry dust collector. S2, the inlet of the high-temperature gas discharge pipe of the online continuous monitoring device for pH value of blast furnace gas condensate is set on the high-pressure side clean gas pipeline after the dry dust collector; S3, dry dechlorination agent is injected into the blast furnace raw gas pipeline through the injection nozzle of the dry dechlorination conveying and injection device; S4. When the online continuous monitoring device for the pH value of blast furnace gas condensate detects that the pH of the gas discharged from the high-pressure side clean gas pipeline is lower than the lower pH threshold, for every 0.1 decrease in the monitored pH value, the amount of dechlorinating agent sprayed from the injection port increases by 5~10 kg / h based on the existing injection volume; when the pH value is higher than the upper pH threshold, for every 0.1 increase in the pH value, the amount of dechlorinating agent sprayed from the injection port decreases by 5~10 kg / h based on the existing injection volume.
2. The integrated dry dechlorination process for blast furnace raw gas as described in claim 1, characterized in that, Step S3 includes the following steps: S31, Loading and Buffering: The dechlorinating agent is buffered into the buffer chamber via carrier gas; S32, precision injection, pressurizes and transfers the dechlorinating agent in the buffer chamber to the injection tank, and injects the dechlorinating agent into the blast furnace raw gas pipeline at an injection rate of 65~95kg / h.
3. The integrated dry dechlorination process for blast furnace raw gas according to claim 2, characterized in that, Step S31 includes the following steps: S311, the dechlorinating agent is discharged into the raw material silo using clean nitrogen as the carrier gas; S312, the dechlorinating agent in the raw material silo is transported to the buffer silo by nitrogen. When the dechlorinating agent in the buffer silo reaches 60-80% of the buffer silo volume, the supply of dechlorinating agent to the buffer silo is stopped. When the dechlorinating agent in the buffer silo is lower than 10-20% of the buffer silo volume, the dechlorinating agent in the raw material silo is transported to the buffer silo again by nitrogen.
4. The integrated dry dechlorination process for blast furnace raw gas according to claim 2 or 3, characterized in that, Step S32 includes the following steps: S321, the dechlorinating agent is injected at a rate of 65~95 kg / h, and the dechlorinating agent is continuously injected into the blast furnace raw gas pipeline; S322, when the dechlorinating agent in the injection tank is lower than the minimum storage threshold, first open the bottom outlet of the buffer bin; the dechlorinating agent in the buffer bin falls into the lock hopper by gravity. When the dechlorinating agent in the lock hopper reaches the maximum storage threshold, close the buffer bin outlet, and then continuously pressurize the lock hopper with nitrogen until the pressure in the lock hopper is 20-50 kPa higher than the pressure in the injection tank. Then open the opening between the lock hopper and the injection tank; relying on the pressure difference between the lock hopper and the injection tank, the dechlorinating agent enters the injection tank from the lock hopper until the dechlorinating agent in the injection tank is higher than the maximum storage threshold. The replenishment is then complete, the opening between the lock hopper and the injection tank is closed, and the lock hopper is depressurized. The minimum storage threshold is 30%-50% of the injection tank capacity, the maximum storage threshold is 80%-90% of the injection tank capacity, and the maximum storage threshold in the lock hopper is 80%-100% of the lock hopper capacity. S323: When the dechlorinating agent in the injection tank falls below the minimum storage threshold again, S322 will be automatically executed again to replenish the material.
5. The integrated dry dechlorination process for blast furnace raw gas according to claim 1 or 2, characterized in that, In step S4, the lower pH threshold is 5.1 to 5.9; the upper pH threshold is 6.1 to 6.
9.
6. The integrated dry dechlorination process for blast furnace raw gas according to claim 1 or 2, characterized in that, In step S4, the final injection volume of the dechlorinating agent from the injection nozzle is Q. total Q total The relationship between the pH value and the detected pH value must meet the following requirements: ; Among them, Q base The current base injection rate is given; ∆pH is the minimum change; k is the single-stage increment coefficient, and the value of k ranges from 5 to 10 (kg / h).
7. An integrated dry dechlorination process for blast furnace raw gas, characterized in that, The dry dechlorination integrated process device is an apparatus for implementing the method described in any one of claims 1 to 6, including a dry dechlorination conveying and injection device and an online continuous monitoring device for the pH value of blast furnace gas condensate. The dry dechlorination conveying and purging device includes a raw material tanker, a raw material silo component, a buffer silo component, a lock hopper component, and a purging tank component; The raw material tanker truck is used to continuously transport the dechlorinating agent and deliver the dechlorinating agent into the raw material silo components via carrier gas; The raw material silo component includes a raw material silo, a raw material nitrogen cannon, a raw material dome valve, an AV pump, a conveying valve, and a raw material dust collector. The raw material dome valve is used to open and close the channel between the raw material silo and the AV pump. The conveying valve is used to open and close the high-pressure nitrogen discharge. The raw material dust collector is used for dust removal when dechlorinating agent is conveyed into the raw material silo component. The raw material nitrogen cannon is used to vibrate when there is a problem with material flow, thereby improving the flow of material. At the same time, nitrogen in the nitrogen pipe enters the silo to improve the fluidization effect of the dechlorinating agent. The buffer chamber component includes a buffer dust collector, a buffer chamber, and a buffer nitrogen cannon; the buffer dust collector is used for dust removal during the process of discharging dechlorinating agent into the buffer chamber, and the buffer nitrogen cannon is used to vibrate the outlet of the buffer chamber when blockage occurs when the dechlorinating agent is discharged into the lock hopper by gravity; The lock hopper component includes a lock hopper, a lock hopper exhaust valve, a balance valve, a lock hopper inlet dome valve, and a lock hopper outlet dome valve. The lock hopper exhaust valve is used to release gas after the buffer bin has finished discharging material into the lock hopper. The balance valve is used to maintain the pressure balance between the lock hopper and the injection tank. The lock hopper inlet dome valve is used to open and close the channel between the buffer bin and the lock hopper. The lock hopper outlet dome valve is used to open and close the channel between the lock hopper and the injection tank. The injection tank component includes an injection tank, an injection inlet dome valve, a feeder, an injection pipe, and a nozzle; the injection inlet dome valve is used to open and close the channel between the lock hopper and the injection tank and to prevent the lock hopper and the injection tank from being completely directly connected; the feeder is used to transport the dechlorinating agent from the injection tank and then use chlorine gas to transport it into the injection pipe; the injection pipe is used to connect the feeder and the nozzle, and the nozzle is used to inject the dechlorinating agent with chlorine gas as the carrier gas into the blast furnace raw gas pipeline; The nozzles of the injection pipe are located on the blast furnace raw gas pipeline after the gravity dust collector and before the dry dust collector of the blast furnace gas treatment unit.
8. The integrated dry dechlorination process for blast furnace raw gas as described in claim 7, characterized in that, The AV pump is located at the bottom of the raw material silo. A nitrogen injection pipe is installed on the side of the AV pump, and a delivery pump is installed on the nitrogen injection pipe. The outlet of the AV pump is connected to the top inlet of the buffer silo through a pipe. The buffer silo, lock hopper, and injection tank are arranged sequentially from top to bottom. The bottom of the buffer silo is connected to the top inlet of the lock hopper through a lock hopper inlet dome valve. A lock hopper outlet dome valve is located at the bottom of the lock hopper. An injection inlet dome valve is located at the top of the injection tank. The bottom of the lock hopper and the top of the injection tank are connected through the lock hopper outlet dome valve and the injection inlet dome valve. The lock hopper and the injection tank are connected by a pipe on the side, and a balance valve is installed on this pipe.
9. The integrated dry dechlorination process for blast furnace raw gas as described in claim 7, characterized in that, The online continuous monitoring device for pH value of blast furnace gas condensate includes a condensate collection device, an online pH monitoring device, and a condensate discharge device. The condensate collection device includes a high-temperature gas inlet component, a condensation component, and a low-temperature gas reflux component. The high-temperature gas inlet component is used to discharge blast furnace gas from the blast furnace gas discharge pipe into the condensation component. The condensation component is used to cool the discharged blast furnace gas and obtain condensate, and then discharge the obtained condensate. The low-temperature gas reflux component is used to discharge the cooled low-temperature blast furnace gas back into the blast furnace gas discharge pipe. The pH online monitoring device includes a U-shaped water seal bend and an online pH detection component. The U-shaped water seal bend is used to enrich the condensate discharged from the condensation component in a U-shape to form a dynamic water seal, thereby preventing gas from passing through the online monitoring device. The online pH detection component is installed on the U-shaped water seal bend and is used to perform real-time pH detection on the liquid inside the U-shaped water seal bend. The condensate discharge device is used to discharge the liquid discharged from the online monitoring device.
10. The integrated dry dechlorination process for blast furnace raw gas as described in claim 7, characterized in that, Before starting the injection, set the hourly injection volume of the injection pipe and nozzle. At this time, the injection operation is running normally, with the lock hopper inlet dome valve, lock hopper outlet dome valve, injection inlet dome valve, and balance valve all closed, and the lock hopper exhaust valve open. The injection tank and fluidizing gas supply are uninterrupted. When the weight of the dechlorinating agent in the injection tank is lower than the minimum storage threshold, the feeding stage begins. The buffer bin outlet dome valve opens, and the buffer fluidizing valve at the bottom of the buffer bin is activated. The dechlorinating agent in the buffer bin falls into the lock hopper by gravity. During the feeding process, the buffer nitrogen cannon vibrates to assist the feeding. When the dechlorinating agent in the lock hopper reaches the maximum storage threshold... When the load is applied, the lock hopper inlet dome valve and lock hopper exhaust valve close sequentially, completing the lock hopper loading. Nitrogen continues to be pressurized inside the lock hopper through the lock hopper pressurization valve until the lock hopper pressure reaches the set pressure 20-50 kPa higher than the injection tank pressure. Then, the lock hopper outlet dome valve, injection tank inlet dome valve, balance valve, and lock hopper fluidization valve automatically open sequentially. At this time, relying on the pressure difference between the lock hopper and the injection tank, the dechlorinating agent enters the injection tank from the lock hopper. When the weight of the injection tank no longer increases, the lock hopper fluidization valve, balance valve, injection tank inlet dome valve, and lock hopper outlet dome valve close sequentially, completing the feeding. Then, the lock hopper exhaust valve is opened to depressurize the lock hopper.
Citation Information
Patent Citations
Blast furnace gas wet-process full-evaporation dechlorination method and dechlorination device
CN114292673A
A method for preparing a dechlorinating agent for blast furnace gas
CN114392643B
A method for simultaneous desulfurization and dechlorination of blast furnace gas
CN114606026B
Dechlorination agent for blast furnace gas and preparation method thereof
CN117720953B
Method and device for on-line continuous monitoring of blast furnace gas condensate water pH value
CN119666958B
