Method for Zoning Control of Surrounding Rock in Main Roadway Across Mining Floor in Working Face

By controlling the surrounding rock in zones within the main roadway spanning the bottom plate of the working face, and employing stress state component calculation and differentiated support measures, the problems of poor economy and weak targeting in traditional methods were solved, achieving efficient surrounding rock control and preventive support.

CN123064489APending Publication Date: 2026-11-10CHINA UNIV OF MINING & TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611580861.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-13
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing technologies for controlling the surrounding rock of main roadways across the working face floor have problems such as poor economic efficiency, weak targeting, and inability to prevent problems in advance. Traditional methods are mostly passive maintenance, which is difficult to effectively control roadway deformation caused by mining stress.

Method used

By establishing a computational coordinate system, obtaining support pressure data nodes, and using the support pressure distribution function to calculate stress state components, the surrounding rock is divided into zones, and differentiated support measures are taken for different stress zones. For example, in the stress peak zone, enhanced support and active pressure relief are implemented in synergistic control, in the stress mitigation zone, high prestressed anchor cable support is used, and in the original rock stress stable zone, anchor-mesh-cable combined support is used.

Benefits of technology

It achieves highly targeted and economically efficient control of surrounding rock, can prevent roadway deformation in advance, avoids passive control, and reduces material and construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064489A_ABST
    Figure CN123064489A_ABST
Patent Text Reader

Abstract

This invention discloses a zoning control method for the surrounding rock of the floor main roadway in a working face with cross-mining. Addressing the problems of stress concentration, deformation, and damage to the surrounding rock of the floor main roadway caused by cross-mining, this method divides the surrounding rock into a stress peak zone, a stress mitigation zone, and a stable in-situ stress zone based on the spatial distribution characteristics of mining-induced stress. Differential and coordinated control is implemented for each zone. Specifically, the stress peak zone employs a combination of water jet fan-shaped cutting pressure relief and coupled support; the stress mitigation zone uses coupled support; and the stable in-situ stress zone uses a combination of anchor-mesh-cable support. This invention transforms traditional uniform support into differentiated and coordinated control based on stress zoning, effectively reducing the impact of cross-mining dynamic pressure on the stability of the floor main roadway surrounding rock, minimizing roadway deformation and damage, and reducing support material input while ensuring surrounding rock stability, thus improving the economy and targeted nature of the support system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a method for zoned control of the surrounding rock in the main roadway across the bottom plate of a working face, belonging to the field of coal mining and strata control technology. Background Technology

[0002] In coal mining, with the increase in mining depth and the requirements of intensive production, it has become a common and unavoidable arrangement for the working face to be cross-mined above the main roadway.

[0003] This spatial relationship, where the main roadway is perpendicular or intersects the working face at a large angle from a planar perspective, means that the main roadway will be subject to strong and complex mining-induced stresses caused by the advancement of the coal face. Currently, for the maintenance of cross-mining roadways, engineering practice often adopts relatively uniform reinforced support schemes, such as universally increasing the support strength throughout the roadway, using heavy-duty U-shaped steel supports, or implementing full-section grouting reinforcement. These methods enhance the overall bearing capacity of the roadway to some extent, but they have obvious limitations: First, poor economic efficiency. Over-supporting sections that are only slightly affected by mining or have already stabilized results in a huge waste of materials and construction costs. Second, weak targeting. It fails to fully consider the essential differences in the stress state of the surrounding rock at different locations along the roadway, and the "one-size-fits-all" support parameters cannot form the optimal support-pressure relief synergy in the areas most affected by strong mining that require the most control. Third, passive response. Traditional methods mostly reinforce the roadway after deformation occurs, which is a passive maintenance and cannot fundamentally prevent and control large deformations.

[0004] In summary, the existing methods for controlling the surrounding rock of the main roadway across the working face in a cross-mining floor have problems such as poor economic efficiency, weak targeting, and inability to meet the needs of early prevention. Summary of the Invention

[0005] The purpose of this application is to overcome the shortcomings of the existing technology and provide a method for zoning control of the surrounding rock of the working face across the bottom plate of the main roadway, which is economically efficient, highly targeted, and can meet the needs of early prevention.

[0006] To achieve the above objectives, this application adopts the following technical solution: Firstly, this application provides a method for zoned control of the surrounding rock of the main roadway across the working face.

[0007] Establish a calculation coordinate system based on the orientation of the main roadway in the base plate.

[0008] Multiple support pressure data nodes are acquired during the process of crossing the bottom haulage roadway of the working face, and the support pressure distribution function in the calculation coordinate system is obtained based on the multiple support pressure data nodes.

[0009] The stress state components at each calculation point within the surrounding rock of the main roadway above the main roadway are obtained based on the support pressure distribution function.

[0010] The surrounding rock of the main roadway in the floor is divided into zones based on the stress state components at each calculation point to obtain each stress zone.

[0011] Surrounding rock control is implemented for each stress zone; wherein, the stress zones include a stress peak zone, a stress mitigation zone, and a pre-existing rock stress stability zone; the stress peak zone is controlled by a combination of reinforced support and active pressure relief, and the pressure relief hole depth is determined according to the plastic failure depth, and water jet fan-shaped slotting boreholes are drilled at the corresponding positions of the stress peak zone for pressure relief; the stress mitigation zone is reinforced with high-prestressed anchor cables; and the pre-existing rock stress stability zone is supported by a combination of anchor, mesh, and cable.

[0012] Furthermore, the step of acquiring multiple support pressure data nodes during the process of crossing the bottom haulage roadway of the working face, and obtaining the support pressure distribution function in the calculation coordinate system based on the multiple support pressure data nodes, includes: arranging multiple support pressure data nodes along the direction of the bottom haulage roadway.

[0013] The location of the support pressure data node and the support pressure value of the support pressure data node during the process of crossing the bottom haulage roadway of the working face are obtained; the support pressure value includes the support pressure monitoring value, the theoretical calculation value and the numerical simulation value.

[0014] The support pressure data nodes are sorted according to their positions to obtain a support pressure data node sequence.

[0015] The support pressure distribution function is obtained by fitting adjacent support pressure data nodes in the support pressure data node sequence using a piecewise linear interpolation method; the support pressure distribution function is as follows: In the formula, The support pressure distribution function, For the counting sequence number, The integral variable is the support pressure. and For two adjacent support pressure data nodes, and This represents the support pressure values ​​of two adjacent support pressure data nodes.

[0016] Furthermore, the step of establishing a calculation coordinate system based on the orientation of the bottom slab main roadway includes: setting the x-axis of the calculation coordinate system along the orientation of the bottom slab main roadway, and setting the y-axis of the calculation coordinate system along the direction of gravity or the direction perpendicular to the earth.

[0017] The step of obtaining the stress state components of each calculation point in the surrounding rock of the bottom slab roadway above the bottom slab roadway according to the support pressure distribution function includes: simplifying the surrounding rock of the bottom slab roadway into a semi-infinite plane.

[0018] Multiple calculation points are set within the surrounding rock of the bottom slab roadway above the bottom slab roadway.

[0019] The support pressure distribution function is used as a distributed load acting on the boundary of the semi-infinite body, and the stress state components at each calculation point are calculated using plane strain conditions; the formulas for obtaining the stress state components are as follows: In the formula, For horizontal stress, For vertical stress, For shear stress, To calculate the x-axis coordinates of the point, This is used to calculate the y-axis coordinates of the point.

[0020] Furthermore, the step of dividing the surrounding rock of the main roadway into zones based on the stress state components at each calculation point to obtain each stress zone includes: calculating the surrounding rock failure judgment value at each calculation point according to the Mohr-Coulomb strength criterion; the formula for obtaining the surrounding rock failure judgment value is as follows: In the formula, For the maximum principal stress, For the minimum principal stress, For the counting sequence number, For the first The surrounding rock failure judgment value at each calculation point For the first The maximum principal stress at each calculation point For the first The minimum principal stress at each calculation point It is the internal friction angle. It represents cohesive force.

[0021] Each stress zone is determined based on the magnitude of the surrounding rock failure judgment value relative to 0.

[0022] Furthermore, determining each stress zone based on the magnitude of the surrounding rock failure judgment value relative to 0 also includes: obtaining the stress concentration factor at each calculation point according to the following formula: In the formula, For the first Stress concentration factor at each calculation point For the first The horizontal stress at each calculation point This represents the original rock's self-weight stress under the corresponding burial depth conditions.

[0023] Obtain the maximum stress concentration factor from all calculation points, and set the stress peak determination factor and the allowable deviation of the original rock stress.

[0024] The response is that the surrounding rock failure criterion value at any calculation point is greater than or equal to 0, or satisfies... The calculation point is divided into a stress peak region; where, The maximum stress concentration factor, The stress peak determination coefficient is used. is the stress concentration factor.

[0025] The response value of the surrounding rock failure criterion at any calculation point is less than 0, and it also satisfies the following conditions: The calculation point is divided into the original rock stress stability zone; where, This represents the allowable deviation of the original rock stress.

[0026] The continuous calculation points between the stress peak zone and the original rock stress stability zone are divided into stress mitigation zones.

[0027] The calculation points that are continuously distributed along the bottom slab roadway and are in the same stress zone are merged into a neighborhood. The midpoint of adjacent calculation points belonging to different stress zones is determined as the zone boundary, thus realizing the determination of each stress zone.

[0028] Furthermore, the surrounding rock control for each stress zone includes: calculating the pressure relief hole depth according to the following formula: In the formula, For the depth of the pressure relief hole, The depth of plastic failure of the base plate. For safety, ultra-deep measurement.

[0029] Based on the pressure relief hole depth, water jet fan-shaped slotting drilling is performed from the working surface to the stress peak area.

[0030] Furthermore, the surrounding rock control for each stress zone also includes: arranging a third prestressed steel strand anchor cable stack in the top and shoulder area of ​​the roadway adjacent to the stress peak area in the main roadway of the floor slab and the section theread, and arranging a first prestressed steel strand anchor cable in the two side areas of the roadway adjacent to the stress peak area in the main roadway of the floor slab and the section theread.

[0031] A second prestressed steel strand anchor cable is arranged on the top of the roadway and the shoulder area of ​​the section adjacent to the stress relief zone in the bottom slab roadway, and a first prestressed steel strand anchor cable is arranged on both sides of the roadway in the section adjacent to the stress relief zone in the bottom slab roadway.

[0032] A steel mesh is laid on the inner wall of the section adjacent to the bottom slab main roadway, the stress peak area, and the stress relief area, and concrete is sprayed onto the steel mesh.

[0033] The third prestressed steel strand anchor cable stack is fixed to the inner wall of the bottom slab roadway through a three-hole high-strength anchor cable tray, and the first prestressed steel strand anchor cable and the second prestressed steel strand anchor cable are fixed to the inner wall of the bottom slab roadway through the anchor cable tray.

[0034] Furthermore, the design parameters of the first prestressed steel strand anchor cable are: diameter 22mm and length 6300mm.

[0035] The design parameters for the second prestressed steel strand anchor cable are: diameter 22mm and length 9300mm.

[0036] The design parameters for the third prestressed steel strand anchor cable stack are: diameter 22mm, length 9300mm, and a total of 3 strands.

[0037] The design parameters of the anchor cable tray are 300mm in diameter and 16mm in thickness.

[0038] The design parameters of the three-hole high-strength anchor cable tray are: diameter 400mm and thickness 16mm.

[0039] Furthermore, hydraulic fracturing is carried out in the stress peak zone through water jet fan-shaped slot drilling.

[0040] Furthermore, the surrounding rock control for each stress zone also includes: acquiring surrounding rock detection values; the surrounding rock control detection values ​​include: surrounding rock stress, roof settlement value, side convergence value, bottom heave value, and support component stress.

[0041] In response to the error between the detected value and the predicted change value of the surrounding rock exceeding a threshold, the support pressure distribution function and the range of each stress zone are corrected.

[0042] Secondly, this application also provides a computer device, including a processor and a memory connected to the processor, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, it performs the steps of the working face cross-mining floor roadway surrounding rock zoning control method as described in any embodiment of the first aspect.

[0043] Thirdly, this application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the working face cross-mining floor main roadway surrounding rock zoning control method described in any embodiment of the first aspect.

[0044] Fourthly, this application also provides a computer program product, including a computer program / instructions, characterized in that, when the computer program / instructions are executed by a processor, they implement the steps of the working face cross-mining floor main roadway surrounding rock zoning control method described in any embodiment of the first aspect.

[0045] Compared with the prior art, the beneficial effects achieved by this application are as follows: The method for controlling the surrounding rock in the working face across the bottom haulage roadway provided by this application controls the surrounding rock for each stress zone, which is highly targeted; different stress zones require different degrees of surrounding rock control, and corresponding matching surrounding rock control for each stress zone can improve economic efficiency; the stress state components of each calculation point are obtained from the support pressure data nodes, so the surrounding rock can be controlled for each stress zone by measuring / predicting the support pressure in advance, meeting the need for early prevention and avoiding passive control after the fact. Attached Figure Description

[0046] To more clearly illustrate the technical solutions in this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0047] Figure 1 This application embodiment shows a schematic diagram of the working face mining the bottom main roadway when the advancing directions of the working face and the bottom main roadway intersect.

[0048] Figure 2 Figure 1 Schematic diagram of the water jet fan-shaped groove at section AA.

[0049] Figure 3 Figure 1 Schematic diagram of hydraulic fracturing borehole with section AA in the middle.

[0050] Figure 4 This application provides a schematic diagram of the support methods for the stress relief zone and the original rock stress stability zone in the embodiments of this application.

[0051] Figure 5 This application provides a schematic diagram of the support method for the stress peak region in an embodiment.

[0052] Figure 6 The flowchart of the zoning control of the surrounding rock of the working face across the bottom haulage roadway in this application embodiment is shown.

[0053] Figure 7 This is a flowchart illustrating the steps of the working face cross-mining floor main roadway surrounding rock zoning control method provided in this application embodiment.

[0054] Figure 8 This is a schematic block diagram of the computer device provided in the embodiments of this application.

[0055] In the diagram: 1. Working face; 2. Goaf; 3. Main roadway of the floor; 4. Working face transport roadway; 5. Working face return airway; 6. Stress distribution across mining operations in the working face; 7. Stress zoning line of the main roadway of the floor; 8. Stress peak zone; 9. Stress mitigation zone; 10. Stress stability zone of the original rock; 11. Water jet fan-shaped slotting borehole; 12. Hydraulic fracturing borehole; 13. First prestressed steel strand anchor cable; 14. Second prestressed steel strand anchor cable; 15. Third prestressed steel strand anchor cable stack; 16. Ditch; 17. Reinforcing mesh; 18. Anchor cable tray; 19. Three-hole high-strength anchor cable tray; 20. Surrounding rock of the main roadway of the floor. Detailed Implementation

[0056] The technical solution of the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments. It should be understood that the embodiments and specific features in the embodiments are detailed descriptions of the technical solution of the present application, rather than limitations thereof. In the absence of conflict, the embodiments and technical features in the embodiments can be combined with each other.

[0057] In this article, the term "and / or" is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, or B existing alone. Additionally, the character " / " in this article generally indicates that the preceding and following related objects have an "or" relationship.

[0058] Example 1

[0059] Figure 7 This is a flowchart illustrating the method for zoned control of the surrounding rock in the main roadway across the mining floor in Embodiment 1 of the present invention. This flowchart merely shows the logical sequence of the method described in this embodiment. Provided there are no conflicts, different methods may be used in other possible embodiments of the present invention. Figure 7 Complete the steps shown or described in the order indicated.

[0060] The method for zoned control of the surrounding rock in the main roadway across the mining floor provided in this embodiment can be applied to the terminal. See also... Figure 7 The specific steps of this implementation method are as follows: establish a calculation coordinate system based on the orientation of the bottom slab main roadway 3.

[0061] Multiple support pressure data nodes are acquired during the process of mining the bottom haulage roadway 3 across working face 1. The support pressure distribution function in the calculation coordinate system is obtained based on the multiple support pressure data nodes. In this embodiment, the calculation coordinate system set according to the direction of the bottom haulage roadway 3 and the support pressure distribution function are the basis for subsequent simulation stress calculation.

[0062] Based on the support pressure distribution function, stress simulation can be performed; that is, the stress state components of each calculation point in the surrounding rock 20 of the bottom main roadway above the bottom main roadway 3 are obtained according to the support pressure distribution function; after obtaining the stress state components of each calculation point in the surrounding rock 20 of the bottom main roadway, the general stress distribution of the surrounding rock 20 of the bottom main roadway is basically clear.

[0063] The surrounding rock 20 of the bottom slab tunnel is divided into zones based on the stress state components at each calculation point to obtain each stress zone.

[0064] Surrounding rock control is implemented for each stress zone; wherein, the stress zones include a stress peak zone 8, a stress relief zone 9, and a pre-existing rock stress stability zone 10; the stress peak zone 8 is controlled by a combination of reinforced support and active pressure relief, and the pressure relief hole depth is determined according to the plastic failure depth, and water jet fan-shaped slotting boreholes are drilled at the corresponding positions of the stress peak zone 8 for pressure relief; the stress relief zone 9 is reinforced with high-prestressed anchor cables; and the pre-existing rock stress stability zone 10 is supported by a combination of anchor, mesh, and cable.

[0065] The working face cross-mining floor main roadway surrounding rock zoning control method provided in this embodiment controls the surrounding rock for each stress zone, which is highly targeted. Different stress zones require different degrees of surrounding rock control, and corresponding matching surrounding rock control for each stress zone can improve economic efficiency. The stress state components of each calculation point are obtained from the support pressure data nodes. Therefore, the surrounding rock can be controlled for each stress zone by measuring / predicting the support pressure in advance, meeting the need for early prevention and avoiding passive control after the fact.

[0066] Example 2

[0067] refer to Figure 6 This embodiment provides a method for zoned control of the surrounding rock of the main roadway across the mining floor in a working face. This embodiment is an optimization based on Embodiment 1 to improve the technical effect and refine the technical solution. For details not described in this embodiment, please refer to Embodiment 1.

[0068] The process of acquiring multiple support pressure data nodes during the process of obtaining the working face 1 across the bottom roadway 3, and obtaining the support pressure distribution function in the calculation coordinate system based on the multiple support pressure data nodes, includes: arranging multiple support pressure data nodes along the direction of the bottom roadway 3.

[0069] The location of the support pressure data node and the support pressure value of the support pressure data node during the process of working face 1 crossing the bottom roadway 3 are obtained; the support pressure value includes the support pressure monitoring value, the theoretical calculation value, and the numerical simulation value; when the actual development section of working face 1 has not yet covered the bottom roadway 3, especially when there are still at least 200 meters between the intersection of working face 1 and bottom roadway 3, virtual support pressure data nodes can be set in the area of ​​the surrounding rock 20 of bottom roadway 20 between working face 1 and bottom roadway 3, and the theoretical calculation value and numerical simulation value can be obtained through modeling software or other simulation software; as the actual development section of working face 1 gradually crosses the bottom roadway 3, the support pressure monitoring value is gradually replaced and covered by the theoretical calculation value and numerical simulation value by the deployed monitoring sensors.

[0070] The support pressure data nodes are sorted according to their positions to obtain a support pressure data node sequence.

[0071] The support pressure distribution function is obtained by fitting adjacent support pressure data nodes in the support pressure data node sequence using a piecewise linear interpolation method; the support pressure distribution function is as follows: In the formula, The support pressure distribution function, For the counting sequence number, The integral variable is the support pressure. and For two adjacent support pressure data nodes, and This represents the support pressure values ​​of two adjacent support pressure data nodes.

[0072] The bearing pressure distribution function is the physical basis for analyzing the continuous and comprehensive impact of bearing pressure on the surrounding rock 20 of the main roadway.

[0073] As one embodiment, the step of setting up a calculation coordinate system according to the direction of the bottom slab main roadway 3 includes: setting the x-axis of the calculation coordinate system along the direction of the bottom slab main roadway 3, and setting the y-axis of the calculation coordinate system along the direction of gravity or below the vertical plane of the earth.

[0074] The step of obtaining the stress state components of each calculation point in the surrounding rock 20 of the bottom main roadway above the bottom main roadway 3 according to the support pressure distribution function includes: simplifying the surrounding rock 20 of the bottom main roadway as a semi-infinite plane.

[0075] Multiple calculation points are set within the surrounding rock 20 of the bottom slab main roadway above the bottom slab main roadway 3.

[0076] The support pressure distribution function is used as a distributed load acting on the boundary of the semi-infinite body, and the stress state components at each calculation point are calculated using plane strain conditions; the formulas for obtaining the stress state components are as follows: In the formula, For horizontal stress, For vertical stress, For shear stress, To calculate the x-axis coordinates of the point, This is used to calculate the y-axis coordinates of the point.

[0077] The step of dividing the surrounding rock 20 of the main roadway into zones based on the stress state components at each calculation point to obtain each stress zone includes: calculating the surrounding rock failure judgment value at each calculation point according to the Mohr-Coulomb strength criterion; the formula for obtaining the surrounding rock failure judgment value is as follows: In the formula, For the maximum principal stress, For the minimum principal stress, For the counting sequence number, For the first The surrounding rock failure judgment value at each calculation point For the first The maximum principal stress at each calculation point For the first The minimum principal stress at each calculation point It is the internal friction angle. It represents cohesive force.

[0078] Each stress zone is determined based on the magnitude of the surrounding rock failure judgment value relative to 0.

[0079] For example, when When ≥0, the surrounding rock at the corresponding calculation point is determined to have reached a state of plastic yielding or failure; when When <0, it is determined that the surrounding rock at the corresponding calculation point has not reached the plastic yield state, and then the area is divided according to the judgment of the plastic yield or failure state.

[0080] As one embodiment, determining each stress zone based on the magnitude of the surrounding rock failure judgment value relative to 0 further includes: obtaining the stress concentration factor of each calculation point according to the following formula: In the formula, For the first Stress concentration factor at each calculation point For the first The horizontal stress at each calculation point This represents the average unit weight of the overlying rock strata. This represents the vertical depth from the Earth's surface.

[0081] Obtain the maximum stress concentration factor from all calculation points, and set the stress peak determination factor and the allowable deviation of the original rock stress.

[0082] The response is that the surrounding rock failure criterion value at any calculation point is greater than or equal to 0, or satisfies... The calculation point is divided into stress peak region 8, which is also called the stress peak area; where, The maximum stress concentration factor, The stress peak determination coefficient is used. is the stress concentration factor.

[0083] The response value of the surrounding rock failure criterion at any calculation point is less than 0, and it also satisfies the following conditions: The calculation point is divided into a 10-zone in the original rock stress stability zone; where, This represents the allowable deviation of the original rock stress.

[0084] The continuous calculation points between the stress peak zone 8 and the original rock stress stability zone 10 are divided into stress relief zones 9.

[0085] The calculation points that are continuously distributed along the bottom slab roadway 3 and are in the same stress zone are merged into a neighborhood. The midpoint of the adjacent calculation points belonging to different stress zones is determined as the zone boundary, thereby determining each stress zone and the spatial range of the stress peak zone, stress relief zone and original rock stress stability zone.

[0086] As one embodiment, the surrounding rock control for each stress zone includes: calculating the pressure relief hole depth according to the following formula: In the formula, For the depth of the pressure relief hole, The depth of plastic failure of the base plate. For safety, ultra-deep measurement.

[0087] Based on the pressure relief hole depth, water jet fan-shaped slotting drilling 11 is carried out from the working face 1 to the stress peak area 8.

[0088] refer to Figure 3 In this process, the water jet fan-shaped slotted borehole 11 is used as the hydraulic fracturing borehole 12. Hydraulic fracturing is carried out in the stress peak zone 8 through the water jet fan-shaped slotted borehole 11 to construct a pressure relief channel and realize the transfer and release of surrounding rock stress.

[0089] As one embodiment, the surrounding rock control for each stress zone further includes: referencing Figure 4 and Figure 5A third prestressed steel strand anchor cable stack 15 is arranged on the top of the roadway and the shoulder area of ​​the section adjacent to the stress peak area 8 of the bottom slab roadway 3. A first prestressed steel strand anchor cable 13 is arranged on both sides of the roadway in the section adjacent to the stress peak area 8 of the bottom slab roadway 3. A ditch 16 is provided at the bottom of the bottom slab roadway 3.

[0090] A second prestressed steel strand anchor cable 14 is arranged in the top and shoulder area of ​​the roadway adjacent to the stress relief zone 9 of the bottom slab roadway 3, and a first prestressed steel strand anchor cable 13 is arranged in the side areas of the roadway adjacent to the stress relief zone 9 of the bottom slab roadway 3.

[0091] A steel mesh 17 is laid on the inner wall of the section adjacent to the bottom slab main roadway 3, the stress peak area 8, and the stress relief area 9. Concrete is sprayed onto the steel mesh 17, and after the concrete cures, it forms a protective layer with the steel mesh 17.

[0092] The third prestressed steel strand anchor cable stack 15 is fixed to the inner wall of the bottom slab main roadway 3 through a three-hole high-strength anchor cable tray 19, and the first prestressed steel strand anchor cable 13 and the second prestressed steel strand anchor cable 14 are fixed to the inner wall of the bottom slab main roadway 3 through an anchor cable tray 18.

[0093] As one embodiment, the design parameters of the first prestressed steel strand anchor cable 13 are 22mm in diameter and 6300mm in length.

[0094] The design parameters of the second prestressed steel strand anchor cable 14 are: diameter 22mm and length 9300mm.

[0095] The design parameters of the third prestressed steel strand anchor cable stack 15 are: diameter 22mm, length 9300mm, and a total of 3 strands.

[0096] The design parameters of the anchor cable tray 18 are 300mm in diameter and 16mm in thickness.

[0097] The design parameters of the three-hole high-strength anchor cable tray are: diameter 400mm and thickness 16mm.

[0098] As one embodiment, the surrounding rock control for each stress zone further includes: acquiring surrounding rock detection values; the surrounding rock control detection values ​​include: surrounding rock stress, roof settlement value, sidewall convergence value, bottom heave value, and support component stress.

[0099] In response to the error between the detected value and the predicted change value of the surrounding rock exceeding a threshold, the support pressure distribution function and the range of each stress zone are corrected.

[0100] The excavation progress of the working face transport level 4 and the working face return air level 5 should be ahead of that of the working face 1. When the actual coal mining section of the working face 1 is 200 meters away from the intersection with the bottom main roadway 3, water jet fan-shaped slotting boreholes 11 can be opened about 200 meters ahead of the working face transport level 4 and the working face return air level 5 and water can be injected into them.

[0101] To further facilitate understanding, please refer to Figure 1 The bottom gray rock mass is used to create the main bottom roadway 3. Above the main bottom roadway 3, the blue-gray rock layer is the surrounding rock 20 of the main bottom roadway. Above the surrounding rock 20 of the main bottom roadway is the working face 1 and its corresponding goaf 2. (Reference) Figure 2 Assuming that the bottom slab main roadway 3 and the working face 1 are perpendicularly intersecting when viewed from a ground plane perspective, the bottom slab main roadway 3 is... Figure 2 The stress peak zone 8, stress relief zone 9, and original rock stress stability zone 10 mentioned in this embodiment mainly refer to the rock mass area under supporting pressure near the vertically intersecting area between the bottom slab main roadway 3 and the working face 1. Figure 2 In the diagram, the area where the stress peak zone 8 in the cross-mining stress distribution 6 of the working face affects the main roadway 3 of the floor is shown in red, and the area where the stress relief zone 9 in the cross-mining stress distribution 6 of the working face affects the main roadway 3 of the floor is shown in blue. The stress zoning line 7 of the main roadway of the floor can be divided according to the stress magnitude and displayed in a unified manner with different color blocks for easy understanding. Figure 2 In this process, water jet fan-shaped slotting drill holes 11 were used to release stress. Figure 3 Hydraulic fracturing borehole 12 was used to release stress.

[0102] This embodiment also provides a further technical solution: In coal mining, with the increase in mining depth and the requirements of intensive production, it has become a common and unavoidable arrangement for coal mining faces to cross the main roadway across the bottom plate, such as centralized transport roadways and track roadways. This vertical or large-angle intersection spatial relationship means that the main roadway 3 will be subjected to strong and complex mining-induced stresses caused by the advancement of the coal mining face 1 during its service life. The advanced support pressure in front of the working face 1, the stress unloading and redistribution below, and the stress recovery process behind will form a highly non-uniform and dynamically changing stress field in the surrounding rock of the roadway. If not properly controlled, it can easily lead to severe roof and floor convergence, sidewall inward squeezing, floor heave, or even overall instability in the main roadway, which not only threatens the safe production of the mine and affects coal transportation, but may also cause huge economic losses due to repeated maintenance.

[0103] Currently, for the maintenance of cross-mining roadways, engineering practice often adopts relatively uniform reinforced support schemes, such as universally increasing support strength throughout the entire roadway, using heavy-duty U-shaped steel supports, or implementing full-section grouting reinforcement. These methods enhance the overall bearing capacity of the roadway to some extent, but they have significant limitations: First, they are not economically viable. Over-supporting sections slightly affected by mining or already stabilized results in a huge waste of materials and construction costs. Second, they lack specificity. They fail to fully consider the essential differences in the stress state of the surrounding rock at different locations along the roadway; the "one-size-fits-all" support parameters cannot form the optimal support-pressure relief synergy in the areas most affected by strong mining. Third, they are reactive. Traditional methods often reinforce the roadway only after deformation occurs, which is a reactive maintenance approach and cannot fundamentally prevent and control large deformations.

[0104] The purpose of this embodiment is to provide a method for coordinated control of the surrounding rock zone of the main roadway across the bottom plate of a coal mining face based on mining-induced stress calculation and failure criteria, so as to solve the problems of complex stress distribution, significant local stress concentration, difficulty in quantitatively determining the zone boundary, and insufficient targeting of traditional homogeneous support under cross-mining conditions.

[0105] The method provided in this embodiment includes: S1, Geomechanical and mining condition analysis: obtaining the spatial coordinates, layer spacing, intersection angle, working face burial depth, coal seam thickness, working face width and advance length of the working face 1 and the bottom main roadway 3; obtaining parameters such as uniaxial compressive strength, elastic modulus, Poisson's ratio, cohesion, internal friction angle and rock mass unit weight of the rock strata through geological exploration and core tests, and establishing a geomechanical model and a zoned calculation coordinate system for the bottom main roadway 3.

[0106] S2. Mining-induced support pressure fitting: Mining-induced support pressure data at different locations are obtained through field monitoring, theoretical calculations, and three-dimensional numerical simulations. Each location and its corresponding support pressure are set as data nodes, and a continuous support pressure distribution function is obtained by fitting using a piecewise linear interpolation method. .

[0107] S3. Calculation of stress and failure state of the surrounding rock of the floor slab: The surrounding rock of the main roadway 20 of the floor slab is simplified as a semi-infinite plane, and the support pressure distribution function is... As a distributed load acting on the boundary of a semi-infinite body, the horizontal stress at each calculation point in the bottom slab tunnel is calculated using plane strain conditions and integration. Vertical stress and shear stress Then calculate the maximum principal stress. and minimum principal stress : .

[0108] The surrounding rock failure criterion value f is calculated based on the Mohr-Coulomb strength criterion: ;when When ≥0, the surrounding rock at the corresponding location is determined to have reached a state of plastic yielding or failure; when When <0, it is determined that the surrounding rock at the corresponding location has not yet reached the plastic yielding state.

[0109] S4. Determining stress zone boundaries: Calculate the stress concentration factor based on the vertical stress at each calculation point. Based on the stress concentration factor, the Mohr-Coulomb failure determination results and the stress gradient change characteristics, the bottom slab main roadway 3 is divided into three control areas along the direction perpendicular to the working face 1: stress peak zone 8, stress relief zone 9 and original rock stress stability zone 10.

[0110] S5. Zonal Coordinated Control Design: Differentiated surrounding rock control schemes are formulated based on the zoning results. In the stress peak zone 8, a coordinated control method combining high-prestressed anchor cable reinforced support and active pressure relief is adopted; in the stress mitigation zone 9, high-prestressed anchor cables and arched strong support structures are adopted; in the original rock stress stable zone 10, a conventional anchor-mesh-cable combined support method is adopted.

[0111] S6. Active pressure relief in stress peak zone 8: Before the working face advances to stress peak zone 8, active pressure relief is implemented at the corresponding floor positions in the working face transport roadway 4 and the working face return air roadway 5. The active pressure relief employs water jet fan-shaped slotting or hydraulic fracturing pressure relief in the critical floor layer. (Reference) Figure 3 As shown in the red sector, when using water jet fan-shaped slotting for pressure relief, multiple boreholes unfold in a fan shape at a predetermined angle, forming a continuous pressure relief channel within the critical layer of the floor. When using hydraulic fracturing for pressure relief, high-pressure water is injected into the hydraulic fracturing boreholes to form a weakened zone of through or semi-through fractures within the critical layer of the floor. Both pressure relief methods are used to change the stress transmission path during mining, guiding concentrated stress to transfer to deeper or lateral areas. The active pressure relief measures are completed before the working face 1 advances to at least 200m before reaching the stress peak zone 8, ensuring that the pressure relief effect reaches the main roadway of the floor before the mining support pressure.

[0112] S7. Monitoring and Correction of Control Effects: Monitoring devices for surrounding rock stress, roof settlement, sidewall convergence, floor heave, and stress on support components are deployed in different zones. The on-site monitoring results are compared with the stress calculation results. When the error between the two exceeds the preset allowable range, the support pressure distribution function and zone boundaries are corrected, and the support parameters and decompression parameters are optimized accordingly.

[0113] As one embodiment, in step S4, refer to Figure 2 and Figure 3The stress peak zone 8 may include two discontinuous sections located at the corresponding junctions of the bottom plate main roadway 3 and the working face transport roadway 4 and the working face return air roadway 5, respectively. The bottom plate main roadway 3 can form a spatial distribution pattern of "original rock stress stability zone 10 - stress peak zone 8 - stress mitigation zone 9 - stress peak zone 8 - original rock stress stability zone 10" along the axial direction.

[0114] As one embodiment, the depth of the water jet fan-shaped slotting borehole 11 or the hydraulic fracturing borehole 12 is determined based on the plastic failure depth of the base plate, the location of the target critical layer, and the safe over-depth allowance, so as to ensure that the borehole enters the critical bearing layer of the base plate.

[0115] The method provided in this embodiment achieves quantitative determination of the stress zoning boundary of the main roadway 3 in the floor slab through support pressure fitting, stress integration, principal stress calculation, and Mohr-Coulomb failure determination, reducing the subjectivity of relying on engineering experience to divide the area. It also constructs a surrounding rock response analysis system combining "on-site monitoring—theoretical calculation—numerical simulation—feedback correction," improving the reliability of stress calculation and zoning results; transforms traditional homogeneous support into differentiated collaborative control based on stress state and failure criteria, achieving rational allocation of support resources; and implements proactive pressure relief in the stress peak zone 8, which can change the stress transmission path during mining, reduce the stress concentration in the surrounding rock, and decrease the range of the plastic zone and the deformation of the roadway surrounding rock.

[0116] This embodiment provides more specific application examples: such as Figure 7 As shown, this embodiment is based on the deep mining conditions of a certain mine. The advancing direction of working face 1 is shown by the red arrow in the figure, and it is spatially intersecting with the main roadway 3 of the bottom plate below. One side of working face 1 is the goaf 2, and the working face transport roadway 4 and the working face return air roadway 5 are arranged on both sides of working face 1, respectively.

[0117] Step S1: Acquisition of basic parameters and establishment of geomechanical model. Based on geological exploration and core tests, supplementary boreholes were drilled and core samples were collected at the designed location of the bottom main roadway 3 and within the expected area affected by cross-mining. Key physical and mechanical parameters of the surrounding rock were obtained through laboratory mechanical tests. Among them, the average uniaxial compressive strength of the top and bottom rock strata was 32 MPa, the elastic modulus was 15 GPa, the cohesion was 3.5 MPa, the internal friction angle was 38°, and the average unit weight of the rock mass was determined based on the core density test results.

[0118] Simultaneously, the mining conditions and roadway layout of working face 1 were determined: the mining height of working face 1 is 3.5m, the burial depth H is 780m, the main roadway 3 is located 35m below the coal seam floor, and the roadway cross-section is a straight-walled semi-circular arch with a net width of 5.0m and a net height of 4.2m. Based on the above parameters, a three-dimensional geomechanical model was established to simulate the entire process of the working face advancing and crossing the main roadway 3.

[0119] A coordinate system for calculating the third zone of the bottom main roadway is established along the direction perpendicular to the advance of working face 1. The x-axis is set along the axis of the third bottom main roadway, and the y-axis is set vertically downwards from the coal seam floor. Multiple zone calculation points are arranged at predetermined intervals along the axis of the third bottom main roadway. This is used to calculate the surrounding rock stress at different locations and determine the zoning boundaries. In this embodiment, the distance between adjacent calculation points is 5m.

[0120] Step S2: Fitting of mining support pressure and comprehensive analysis of surrounding rock response.

[0121] During the mining process of working face 1, dynamic response data such as surrounding rock stress, roof subsidence, sidewall convergence, floor heave, and stress on support components were acquired through on-site monitoring. Simultaneously, combining the mine pressure theory and the three-dimensional geomechanical model established in step S1, the mining-induced support pressure at different locations during the mining process was obtained. Multiple support pressure data nodes were set along the x-axis. , The support pressure data were sorted according to node location, and piecewise linear interpolation was used to fit adjacent data nodes. ≤ ≤ Within the range, the pressure distribution function of the mining support Represented as: The continuous mining support pressure distribution function is obtained through the above fitting. The fitting function was modified based on the on-site surrounding rock stress monitoring results so that the support pressure fitting results could reflect the actual stress distribution characteristics of the working face transport roadway 4, working face return air roadway 5 and the central area of ​​the working face.

[0122] Step S3: Calculation of stress integral of the surrounding rock 20 in the bottom slab main roadway.

[0123] The bottom rock strata are simplified into a semi-infinite planar body, and the mining support pressure distribution function obtained in step S2 is used. As a distributed load acting on the boundary of a semi-infinite body, and using the plane strain assumption, the calculation points of each calculation point in the bottom slab tunnel are calculated. Horizontal stress, vertical stress, and shear stress at the point: The calculated surrounding rock stress is compared with the results of the three-dimensional numerical simulation and the field monitoring results. When the relative error between the calculated stress and the field monitored stress exceeds the preset allowable value, the support pressure data nodes and distribution function in step S2 are adjusted. Make corrections and recalculate the stress integral.

[0124] Step S4 involves calculating the principal stress, determining the surrounding rock failure, and outputting the zone boundary.

[0125] Based on the horizontal stress, vertical stress, and shear stress obtained in step S3, calculate the values ​​at each calculation point. Maximum and minimum principal stresses at: Furthermore, the failure criteria value of the surrounding rock at each calculation point Mi was calculated based on the Mohr-Coulomb strength criterion. .when When ≥0, the surrounding rock at the corresponding calculation point is determined to have reached a state of plastic yielding or failure; when When <0, it is determined that the surrounding rock at the corresponding calculation point has not yet reached the plastic yielding state.

[0126] Calculate the stress concentration factor based on the vertical stress at each calculation point. The maximum stress concentration factor among all calculation points is determined, and the stress peak determination coefficient and the allowable deviation of the original rock stress are set. In this embodiment, the stress peak determination coefficient is set to 0.80, and the allowable deviation of the original rock stress is set to 0.10.

[0127] When the calculation point satisfies When the stress level is ≥0, or when the following formula is satisfied, the calculation point is divided into the stress peak region 8: .

[0128] When the calculation point simultaneously satisfies When <0 and in the following formula, the calculation point is divided into the original rock stress stability zone 10: .

[0129] The continuous calculation points between the stress peak zone 8 and the original rock stress stability zone 10 that do not meet the above two criteria are divided into stress relief zones 9. Continuously distributed calculation points of the same type are merged, and the midpoint between adjacent calculation points of different zones is used as the zone boundary. Thus, the start and end positions of each zone in the axial direction of the main roadway of the floor are output.

[0130] Calculation results show that a non-uniform stress distribution is formed along the axial direction of the main roadway 3. Local stress peak zones 8 (zone A) are formed at the boundaries between the main roadway 3 and the working face transport roadway 4 and the working face return air roadway 5, respectively; a stress mitigation zone 9 (zone B) is formed in the middle area of ​​the working face between the two stress peak zones 8; and a stable stress zone 10 (zone C) is formed in the area far from the working face where the stress gradually recovers to the original rock stress level. The main roadway 3 can be represented by a spatial distribution pattern of zone C—zone A—zone B—zone A—zone C along the axial direction. The stress concentration coefficient, surrounding rock failure judgment value, and zone boundary output results for each zone are as follows: Figure 2 As shown.

[0131] Step S5 involves the design of zoned coordinated control. Based on the zoning results output in step S4, differentiated control schemes are designed for different stress zones.

[0132] Zone 10, or Zone C, is a stable rock stress zone where a conventional anchor-mesh-cable support system is used. Figure 3As shown, the top slab is equipped with Φ22×9300mm anchor cables with a spacing of 800mm×800mm, and is coordinated with the first prestressed steel strand anchor cable 13 and the second prestressed steel strand anchor cable 14 with a spacing of 1600mm×1600mm. A steel mesh 17 is also laid and 100mm thick concrete is sprayed.

[0133] Stress relief zone 9, also known as zone B: adopts an arched strong support structure, increases the pre-tightening force of anchor cables on the basis of conventional support, and forms an overall coordinated bearing system through high prestressed steel strand anchor cables in the roof and inclined anchor cables in the arch shoulder and two sides, so as to control the deformation of the surrounding rock in the stress transition zone during mining.

[0134] Stress peak zone 8, also known as zone A: "Strong support + active pressure relief" coordinated control is implemented on the basis of strong support. Among them, the support structure adopts the third prestressed steel strand anchor cable stack 15 for reinforced support. Each anchor cable stack consists of 3 Φ22×9300mm short anchor cables, which are integrated into a high-strength support unit through a three-hole high-strength tray 19.

[0135] Water jet fan-shaped cut-out boreholes 11 are designed at the bottom plate locations of the working face transport roadway 4 and the working face return air roadway 5, corresponding to the stress peak zone 8. By cutting with water jets, a continuous weakening zone is formed within the key bearing layer of the bottom plate, changing the path of mining stress transmission to the main roadway of the bottom plate, thereby realizing the release and transfer of concentrated stress.

[0136] Multiple failure depth calculation points are set vertically at the location corresponding to stress peak region 8 to satisfy... The vertical distance between the deepest calculation point (≥0) and the coal seam floor is determined as the depth of plastic failure of the floor. (Water jet drilling depth) Based on the depth of plastic failure of the base plate and safe ultra-deep measurement Sure: Based on the calculated range of plastic failure of the base plate, the location of the key layer of the base plate, and the requirements for excessive depth for construction safety in this embodiment, the final water jet drilling depth was determined to be 22m.

[0137] Step S6 involves implementing zoned collaborative control. On-site construction is carried out based on the zone range output in step S4 and the control parameters determined in step S5.

[0138] In the stress peak zone 8, the construction of the strong support structure is completed first, followed by water jet fan-shaped trenching for pre-decompression. The decompression measures are completed at least 200m before the working face 1 advances to the corresponding stress peak zone, so that the decompression effect reaches the bottom haulage roadway 3 before the mining support pressure.

[0139] A set of water jet boreholes was constructed at the corresponding floor positions in the working face transport level 4 and the working face return air level 5. Each set consisted of 3 boreholes. The 3 boreholes were arranged in a fan shape at a predetermined angle to form water jet fan-shaped slot boreholes 11. The borehole diameter was 120 mm, the borehole depth was 22 m, and the spacing between adjacent borehole sets was 8 m.

[0140] Each group of three boreholes forms a continuous weakening zone and pressure relief channel in the key layer of the bottom plate through spatial combination, so that the concentrated stress is transferred to the depth and sides along the cutting direction, thereby reducing the mining support pressure borne by the surrounding rock of the bottom plate main roadway 3.

[0141] The construction process employs a sequential drilling method, where each borehole is drilled and water jet cutting is completed before proceeding to the next borehole. The construction time for a single borehole is controlled within 20-25 minutes. The overall construction follows the sequence of "support first, depressurization later, and phased implementation." That is, after the strong support construction of the corresponding section is completed, the corresponding water jet fan-shaped cut-out depressurization is immediately implemented to prevent sudden damage to the surrounding rock under mining operations.

[0142] In stress relief zone 9, an arched strong support structure is implemented, and the top slab, arch shoulder and two sides of the surrounding rock are actively reinforced by high prestressed steel strand anchor cables to improve the overall bearing capacity of the surrounding rock.

[0143] In the original rock stress stability zone 10, construction was carried out according to the conventional anchor-mesh-cable combined support scheme to maintain the original stability of the surrounding rock.

[0144] Step S7 involves monitoring, evaluating, and correcting the construction results for each zone.

[0145] After the implementation of the zoned collaborative control measures, a monitoring system is deployed in each zone of the main roadway, including a roof delamination meter, a roadway convergence monitoring station, surrounding rock stress monitoring points, and a support component stress monitoring device. This system continuously monitors roof subsidence, sidewall convergence, floor heave deformation, surrounding rock stress changes, and the stress state of the support components. The monitored stress is compared with the stress results calculated in step S3. When the relative error between the two is within a preset allowable range, the zone boundary output in step S4 is retained. When the relative error exceeds the preset allowable range, the support pressure data nodes and support pressure distribution function in step S2 are corrected based on the field monitoring results, and steps S3 and S4 are re-executed to update the surrounding rock stress calculation results and zone boundaries.

[0146] By comparing the surrounding rock stress and deformation data before and after construction and in different zones, the improvement effect of strong support and advanced pressure relief measures on the stability of the surrounding rock in the bottom slab main roadway 3 was evaluated. Based on the monitoring results, the support parameters, pressure relief hole depth, drilling angle and drilling spacing were optimized.

[0147] Furthermore, this embodiment also provides an alternative solution: Step S1, acquisition of basic parameters and establishment of a geomechanical model. Supplementary boreholes are arranged at the designed location of the main roadway 3 in the bottom plate and within the range expected to be affected by cross-mining, to conduct geological exploration and collect core samples. Physical and mechanical parameters such as rock mass compressive strength, elastic modulus, cohesion, internal friction angle, and rock mass unit weight are obtained through laboratory mechanical tests. Combined with the mining conditions of the working face, the cross-sectional shape of the main roadway in the bottom plate, and the spatial relationship between the two, a three-dimensional geomechanical model reflecting the actual engineering conditions is established.

[0148] A coordinate system for calculating the zoning of the bottom slab roadway is established along the direction perpendicular to the working face. Multiple calculation points are arranged along the axial direction of the bottom slab roadway at preset intervals to provide basic data for subsequent calculation of surrounding rock stress and determination of zoning boundaries.

[0149] Step S2: Fitting of mining support pressure and analysis of surrounding rock response. During the cross-mining process of working face 1, dynamic response data such as surrounding rock stress, roof subsidence, sidewall convergence, floor heave, and stress on support components are obtained through on-site monitoring; at the same time, the three-dimensional geomechanical model established in step S1 is used to simulate the entire process of working face 1 advancing and crossing the floor slab main roadway, and the mining support pressure, surrounding rock displacement, and plastic zone distribution at different locations are obtained.

[0150] The bearing pressure data obtained from field monitoring, theoretical calculations, and numerical simulations were set as multiple data nodes, and fitted using the piecewise linear interpolation method described above to obtain a continuous mining-induced bearing pressure distribution function. .

[0151] Step S3: Calculation of base plate stress and determination of surrounding rock failure. Following the stress integration method described above, the pressure distribution function of the mining support is calculated. As distributed loads acting on the semi-infinite boundary of the base plate, the horizontal stress, vertical stress, and shear stress at each calculation point of the main roadway 3 of the base plate are calculated, and then the maximum principal stress and minimum principal stress at each point are calculated.

[0152] The failure threshold value for the surrounding rock at each point was calculated based on the Mohr-Coulomb strength criterion. When the failure threshold value was greater than or equal to 0, the surrounding rock at the corresponding location was determined to have reached the plastic yielding or failure state; when the failure threshold value was less than 0, the surrounding rock at the corresponding location was determined to have not yet reached the plastic yielding state. Simultaneously, the stress concentration factor at each point was calculated based on the ratio of vertical stress to the original rock's self-weight stress.

[0153] Step S4: Determining the stress zoning boundaries. Based on the stress concentration factor at each calculation point, the Mohr-Coulomb failure criteria, and the stress gradient variation characteristics, and according to the zoning criteria described above, the main roadway of the floor is divided into the following three control zones: Stress peak zone 8, i.e., Zone A: located at the junction of the main roadway of the floor, the working face transport roadway 4, and the working face return air roadway 5, which is the area where mining stress is significantly concentrated or the surrounding rock has reached a plastic yielding state.

[0154] Stress relief zone 9, also known as zone B, is mainly located in the middle of working face 1. It is a region where the stress gradually transitions from the peak value to the original rock stress.

[0155] The original rock stress stability zone 10, also known as zone C, is located in the area far from the working face 1. It is a region where the surrounding rock stress is close to the original rock stress and has not reached the plastic yield state.

[0156] Merge consecutively distributed calculation points of the same type and determine the midpoint between adjacent calculation points of different zones as the zone boundary, thereby outputting the start and end positions of each zone along the axial direction of the bottom slab roadway.

[0157] Step S5: Zonal Collaborative Control Design. During on-site construction, the project is implemented in segments according to the zoning scope defined in Step S3: Based on the zoning results output in Step S4, differentiated surrounding rock control schemes are formulated.

[0158] Stress peak zone 8: A coordinated control method combining strong support and hydraulic fracturing decompression is adopted. The strong support structure adopts the third prestressed steel strand anchor cable stack 15. Each anchor cable stack consists of multiple anchor cables connected by three-hole high-strength anchor cable trays 19 to form a local high-load-bearing support unit.

[0159] Simultaneously, hydraulic fracturing boreholes 12 are arranged at the bottom plate positions of the working face transport tunnel 4 and the working face return air tunnel 5, corresponding to the stress peak zone 8. These boreholes extend vertically or approximately vertically to the critical bearing layer of the bottom plate, serving to form a fracture propagation zone and stress release channels within the critical layer, such as... Figure 3 As shown.

[0160] The depth of hydraulic fracturing boreholes is determined by comprehensively considering the plastic failure depth of the base plate obtained from the Mohr-Coulomb assessment, the location of the critical layer of the base plate, and the safe over-depth allowance, in order to ensure that the fracturing section of the borehole enters the target critical bearing layer.

[0161] Stress Relief Zone 9: An arched strong support structure is adopted, which forms an integral bearing system through high prestressed steel strand anchor cables on the top plate and inclined anchor cables on the arch shoulder and two sides, thereby improving the bearing capacity of the surrounding rock.

[0162] Original rock stress stability zone 10: A conventional anchor-mesh-cable combined support system is adopted to maintain the original stability of the surrounding rock.

[0163] Step S6: Implement zoned collaborative control. On-site construction will be carried out in segments according to the zone boundaries determined in Step S4.

[0164] In the stress peak zone 8, the construction of strong support structures such as anchor cable stacks was completed first, so that the surrounding rock of the bottom slab main roadway 3 had basic bearing capacity. Then, hydraulic fracturing and pre-pressure relief were carried out in the key layers of the bottom slab.

[0165] Three hydraulic fracturing boreholes 12 are respectively arranged at the corresponding bottom plate positions of the working face transport roadway 4 and the working face return air roadway 5. The boreholes extend to the key bearing layer of the bottom plate, and each borehole is equipped with a fracturing section. The borehole depth, inclination angle and spacing are determined based on the plastic failure range, the location of the target key layer and the width of the stress peak zone 8 obtained in step S3.

[0166] The fracturing operation is completed at least 200m before the working face 1 advances to the corresponding stress peak zone 8, so that the fracturing pressure relief effect reaches the bottom roadway before the mining support pressure. During the operation, a hole-by-hole fracturing method is adopted, that is, after the fracturing operation of one hole is completed, the operation of the next hole is carried out, and the fracturing time of a single hole is controlled within 20 to 30 minutes.

[0167] By injecting high-pressure water into hydraulic fracturing boreholes, tensile fractures are generated within the critical load-bearing layer of the floor, and these fractures gradually expand. The fractures formed in adjacent boreholes overlap, forming a continuous or semi-continuous fracture weakening zone. This fracture weakening zone can reduce the integrity and stress transmission capacity of the critical floor layer, guiding high mining stresses to transfer deeper and to both sides along the fractures, thereby reducing the peak stress in the main roadway of the floor and minimizing the range of plastic failure.

[0168] In stress relief zone 9, an arched strong support structure is implemented, and the top slab, arch shoulder and surrounding rock on both sides are actively reinforced by high prestressed steel strand anchor cables.

[0169] In the original rock stress stability zone 10, construction was carried out according to the conventional anchor-mesh-cable combined support scheme.

[0170] Step S7: Effect Observation and Evaluation, and Zonal Correction. After the implementation of the zonal collaborative control measures, roof delamination meters, roadway convergence monitoring stations, surrounding rock stress monitoring devices, and support component stress monitoring devices are deployed in each zone to continuously observe roof settlement, sidewall convergence, floor heave deformation, surrounding rock stress, and the stress state of support components. The field monitoring results are compared with the stress calculation results and numerical simulation results from Step S3. When the error between the calculation results and the monitoring results exceeds the preset allowable range, the support pressure distribution function is corrected based on the field monitoring results, and the surrounding rock stress is recalculated and the zonal boundaries are updated.

[0171] Monitoring results show that after hydraulic fracturing and depressurization of the key layer of the bottom plate, the stress concentration of the surrounding rock in the stress peak zone 8 is reduced, the range of the plastic zone and the deformation of the surrounding rock in the roadway are reduced accordingly, and the overall stability of the surrounding rock in the bottom plate main roadway 3 is improved.

[0172] Example 3

[0173] This embodiment provides a method for zoned control of the surrounding rock of the main roadway across the mining floor in a working face. This embodiment is an optimization based on Embodiment 2 to improve the technical effect and refine the technical solution. For details not described in this embodiment, please refer to Embodiment 2.

[0174] First, the overall technical process is introduced. This includes: establishing the calculation coordinate system for the rock strata foundation parameters and the surrounding rock of the roadway; fitting the support pressure nodes of the floor roadway during cross-mining of the working face; and then, considering the various points within the floor roadway. , , Integral calculation → Points in the floor roadway , Principal stress calculation → Mohr-Coulomb failure assessment → K i Stress concentration factor → Boundary of three zones A / B / C → Differentiated support and active pressure relief, water jet grooving / pulse fracturing → Control effect monitoring → Feedback correction.

[0175] The overall approach is to treat the mining-induced support pressure caused by the first span of the working face as a distributed load on the semi-infinite boundary of the floor. Through continuous function fitting and stress integration, the "working face mining load" is converted into the "stress state at each calculation point of the floor main roadway". Then, the surrounding rock is quantitatively divided into zones using principal stress, Mohr-Coulomb failure criteria and stress concentration coefficient, so that each zone is matched with different levels of pressure relief measures and support methods.

[0176] First, we will introduce the acquisition of basic parameters. We will obtain the burial depth, dip length, advance direction, and coal seam thickness of coal face 1, as well as the interlayer spacing, intersection angle, and spatial coordinates between the floor roadway and coal face 1. Through geological exploration, supplementary drilling, core sampling, indoor rock mechanics tests, and original rock stress tests, we will obtain parameters such as the unit weight, cohesion, internal friction angle, elastic modulus, Poisson's ratio, and original rock stress of the surrounding rock 20 in the floor roadway.

[0177] Establish a floor haulage zone calculation coordinate system along the direction perpendicular to the working face 1: the x-axis is set along the floor haulage zone direction or the haulage axis, and the y-axis is set downward from the coal seam floor; arrange multiple calculation points along the floor haulage axis at preset intervals, and each calculation point is used for subsequent stress calculation, failure determination and zone boundary output.

[0178] In this embodiment, the distance between adjacent calculation points is 5m.

[0179] The main parameters / data and their main uses in this embodiment can be found in Table 1.

[0180] Table 1: Main Parameters / Data and Their Main Uses

[0181]

[0182] Then, the coordinate system for calculating the three zones of the bottom slab main roadway is established. The x-axis is set along the direction of the three zones of the bottom slab main roadway. Under the condition that the working face 1 is approximately perpendicular to or intersects the bottom slab main roadway 3 at a large angle, the x-axis is consistent with or approximately consistent with the axial direction of the bottom slab main roadway 3.

[0183] The y-axis is set with the coal seam floor as the reference, along a direction perpendicular to the coal seam floor and pointing deep into the floor.

[0184] The boundary of the coal seam floor is taken as (y=0); the depth of the main roadway axis of the floor is taken as (y= ).

[0185] Therefore, the supporting pressure formed by the mining of the working face 1 above the coal seam floor can be expressed as a boundary distributed load that varies along the (x) direction, while the surrounding rock stress at different axial positions in the main roadway of the floor can be uniformly calculated in the established (O-xy) coordinate system.

[0186] Then, the axial zoning calculation points for the main roadway are set. At the depth corresponding to axis 3 of the main roadway: y = At this location, along the x-axis at preset intervals x Set multiple partition calculation points consecutively: .in: .in, For the first The coordinates of each calculation point To calculate the number of points, The x-coordinate of the first calculation point. It is the vertical distance from the coal seam floor to the main roadway axis.

[0187] The calculation points are virtual calculation points used to calculate the stress state of the surrounding rock at different axial positions in the bottom slab roadway 3, and are not on-site monitoring points set on the top slab, bottom slab, or inner walls of the two sides of the roadway.

[0188] The calculation points are arranged sequentially along axis 3 of the main roadway of the bottom slab, and the results obtained through subsequent calculations are as follows: Further calculations yielded: .

[0189] This allows us to obtain the stress and failure state variation patterns along the axial direction of the main roadway in the foundation slab, and to determine the boundary locations of different stress zones.

[0190] Then, the preliminary determination of the fitting range of the mining support pressure data is carried out.

[0191] To ensure that the mining-induced support pressure distribution function can fully reflect the stress peak areas in the middle and near the roadways on both sides of the working face, as well as the stress recovery area on the outer side of working face 1, the selection range of support pressure data nodes should not be limited to the area between the transport roadway and the return air roadway of working face 1, but should extend to both sides of the working face until the mining-induced stress recovers to the original rock stress stability range.

[0192] The left and right boundaries of the support pressure data node are defined as follows: and Therefore, the overall selection range for the dynamic support pressure node is: .

[0193] Let L be the distance of the mining impact extending from the left side of the 4th transport roadway in the working face. L The distance of the mining impact on the right side of the return airway 5 in the working face is L. R ,but: , .

[0194] The length of the support pressure fitting interval is: , that is , This refers to the width of the working surface.

[0195] Therefore, the support pressure fitting range should completely cover: the left original rock stress stability zone - the left stress peak zone - the middle area of ​​the working face - the right stress peak zone - the right original rock stress stability zone, that is, zone C - zone B - zone A - zone B - zone C.

[0196] Preliminary determination of the fitting range for the dynamic support pressure data. To avoid manually determining L using a fixed distance. L and L R The left and right boundaries of the fitting interval are determined based on the degree of deviation between the mining support pressure and the original rock stress.

[0197] Set position The total support pressure obtained at the location is The stress in the original rock under the corresponding burial depth conditions is: .

[0198] Define the relative deviation of the mining support pressure relative to the original rock stress: Let the allowable deviation of the original rock stress be: When a certain position on the outer side of the working face satisfies: At that time, it was considered that the mining support pressure at that location had basically recovered to the original rock stress state, and it could be determined as the outer boundary of the fitting range of the mining support pressure. Therefore, a location satisfying the above conditions was searched outside the working face transport roadway in a direction away from the working face, and determined as follows: Search for locations that meet the above conditions along the outer side of the return airway away from the working face, and determine them as follows: This results in a complete support pressure data fitting interval determined by the actual stress response: .

[0199] In this embodiment, to maintain consistency with the subsequent criteria for determining the stress stability zone of the original rock, it can be set as follows: That is, when: At that time, it can be considered that the stress at the corresponding location has basically recovered to the original rock stress stability level. It can be adjusted according to the actual original rock stress test error, on-site monitoring accuracy and geological conditions of the mine, and is not limited to a fixed value.

[0200] Define the spatial arrangement principles for the support pressure data nodes. In determining: Subsequently, multiple mining support pressure data nodes were set up within this interval: , j=1,2,…,n. For the counting sequence number, This refers to the number of data nodes for the dynamic support pressure. For the first Spatial location of each support pressure data node This represents the mining support pressure corresponding to that location.

[0201] The location of the support pressure node should be able to reflect the stress variation characteristics of different areas of the working face, and should at least cover the following characteristic locations: 1. Left side of the original rock stress stability boundary ( ).

[0202] 2. The location where the mining stress begins to change significantly on the outer side of the 4th level roadway of the working face.

[0203] 3. The stress peak area at and near the location of the working face transport level roadway 4.

[0204] 4. Central area of ​​the working face.

[0205] 5. The stress peak area at and near the location of the return airway 5 at the working face.

[0206] 6. The area on the outer side of the return airway 5 of the working face where stress gradually recovers.

[0207] 7. Right side original rock stress stability boundary ( ).

[0208] For areas where the support pressure changes gradually, the node spacing can be appropriately increased; for stress peak areas 8 near the working face transport roadway 4 and the working face return air roadway 5, as well as locations with large stress gradient changes, the node spacing should be appropriately reduced and the data node density increased to improve the ability of the subsequent piecewise fitting function to characterize local stress concentration and stress gradient change characteristics.

[0209] Therefore, the support pressure data nodes can be arranged in a non-uniform manner, with "relatively sparse in the stable region and appropriately dense in the concentrated region and gradient change region".

[0210] The difference between the two types of calculation points: The first type is the support pressure data node: It is distributed within the range of the mining-induced support pressure corresponding to the boundary of the coal seam floor, used to describe the boundary load formed by mining in working face 1, and in subsequent steps, a continuous support pressure distribution function is constructed through piecewise linear interpolation: .

[0211] The second category is the calculation points for the three zones of the main roadway in the foundation slab: It is arranged along the axis of the main roadway 3 in the floor slab and is used to calculate the horizontal, vertical, and shear stresses at different locations in the main roadway 3 after the mining support pressure is transmitted to the deeper parts of the floor slab. Therefore, there is no one-to-one correspondence between the two types of points, and their functions are as follows: —Determine the upper mining load; —Determine the stress response of the underlying floor slab roadway. Based on this, establish a spatial calculation system of "upper load nodes—continuous support pressure function—floor slab roadway calculation points".

[0212] Then, the pressure node of the mining support is fitted.

[0213] The system acquires monitoring values, theoretical calculation values, and numerical simulation values ​​of support pressure at different locations during the cross-mining process of the working face, and sets multiple support pressure data nodes along the x-axis. Based on the node positions, piecewise linear interpolation is used between adjacent nodes to obtain a continuous mining-induced support pressure distribution function. : This step transforms discrete monitoring, theoretical, or numerical simulation data into a continuous distributed load function that can be used for integration calculations. When the relative error between the calculated stress and the field monitoring results exceeds a preset allowable value, the support pressure data nodes should be corrected. Then, the stress integral calculation is re-executed. This mechanism can serve as the basis for subsequent "closed-loop environmental protection processes".

[0214] Example 4

[0215] This embodiment provides a computer device, including a processor and a memory connected to the processor. The memory stores a computer program. When the computer program is executed by the processor, it performs the steps of the working face cross-mining floor main roadway surrounding rock zoning control method provided in Embodiment 1 or 2.

[0216] The computer device may be a server or an electronic terminal, as one embodiment, see reference. Figure 8 The computer device includes a processor, memory, input / output (I / O) interfaces, and a communication interface. The processor, memory, and I / O interfaces are connected via a system bus, and the communication interface is also connected to the system bus via the I / O interfaces. The processor provides computational and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system, computer programs, and a database. The internal memory provides an environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The database stores data acquired and generated in the working face cross-mining floor main roadway surrounding rock zoning control method. The I / O interfaces are used for information exchange between the processor and external devices. The communication interface is used for communication with external terminals via a network connection. When the computer program is executed by the processor, it implements the working face cross-mining floor main roadway surrounding rock zoning control method provided in Embodiment 1 or 2.

[0217] Those skilled in the art will understand that Figure 8 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.

[0218] The computer device provided in this embodiment has the same technical effects as that in Embodiment 1 or 2, and will not be described again here.

[0219] Example 5

[0220] This embodiment provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the working face cross-mining floor roadway surrounding rock zoning control method provided in Embodiment 1 or Embodiment 2.

[0221] The computer-readable storage medium provided in this embodiment has the same technical effects as that in Embodiment 1 or 2, and will not be described again here.

[0222] Example 6

[0223] This embodiment provides a computer program product storing a computer program that, when executed by a processor, implements the steps of the working face cross-mining floor main roadway surrounding rock zoning control method provided in Embodiment 1 or Embodiment 2. The computer program product provided in this embodiment can be transmitted, distributed, and downloaded via the Internet in the form of signals.

[0224] The computer program product provided in this embodiment has the same technical effects as that in Embodiment 1 or 2, and will not be described again here.

[0225] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0226] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0227] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0228] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0229] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the invention. Furthermore, the terms "first," "second," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined with "first," "second," etc., may explicitly or implicitly include one or more of that feature. In the description of this invention, unless otherwise stated, "a plurality of" means two or more.

[0230] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art will understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0231] The above description is only a preferred embodiment of the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the technical principles of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.

Claims

1. A method for zoned control of the surrounding rock of the main roadway spanning the bottom plate of the working face, characterized by: Establish a calculation coordinate system based on the orientation of the bottom slab main roadway (3); Multiple support pressure data nodes are obtained during the process of cross-mining roadway (3) of working face (1), and the support pressure distribution function in the calculation coordinate system is obtained based on the multiple support pressure data nodes; The stress state components of each calculation point in the surrounding rock (20) of the bottom slab roadway above the bottom slab roadway (3) are obtained according to the support pressure distribution function. The surrounding rock (20) of the bottom slab main roadway is divided into zones according to the stress state components of each calculation point to obtain each stress zone; Rock control is carried out for each stress zone; wherein the stress zone includes a stress peak zone (8), a stress relief zone (9) and a rock stress stability zone (10); the stress peak zone (8) is controlled by a combination of reinforced support and active pressure relief, and the pressure relief hole depth is determined according to the plastic failure depth, and water jet fan-shaped slotting boreholes are drilled at the corresponding positions of the stress peak zone (8) for pressure relief; the stress relief zone (9) is reinforced with high prestressed anchor cables; the rock stress stability zone (10) is supported by a combination of anchor, mesh and cable.

2. The method for zoned control of surrounding rock in the main roadway across the working face according to claim 1, characterized in that, The process of obtaining multiple support pressure data nodes in the working face (1) across the main roadway (3) of the mining floor, and obtaining the support pressure distribution function in the calculation coordinate system based on the multiple support pressure data nodes, includes: Multiple support pressure data nodes are arranged along the direction of the bottom plate main roadway (3); The location of the support pressure data node and the support pressure value of the support pressure data node during the process of the working face (1) crossing the bottom roadway (3) are obtained; the support pressure value includes the support pressure monitoring value, theoretical calculation value and numerical simulation value; The support pressure data nodes are sorted according to their positions to obtain a support pressure data node sequence. The support pressure distribution function is obtained by fitting adjacent support pressure data nodes in the support pressure data node sequence using a piecewise linear interpolation method; the support pressure distribution function is as follows: , In the formula, The support pressure distribution function, For the counting sequence number, The integral variable is the support pressure. and For two adjacent support pressure data nodes, and This represents the support pressure values ​​of two adjacent support pressure data nodes.

3. The method for zoned control of surrounding rock in the main roadway across the mining floor as described in claim 2, characterized in that, The establishment of a calculation coordinate system based on the orientation of the bottom slab roadway (3) includes: Set the x-axis of the calculation coordinate system along the direction of the bottom slab tunnel (3), and set the y-axis of the calculation coordinate system along the direction of gravity or below the vertical plane of the earth; The stress state components of each calculation point within the surrounding rock (20) of the bottom main roadway (3) above the bottom main roadway (3) obtained according to the support pressure distribution function include: The surrounding rock (20) of the main roadway of the bottom plate is simplified into a semi-infinite planar body; Multiple calculation points are set in the surrounding rock (20) of the bottom slab roadway above the bottom slab roadway (3); The support pressure distribution function is used as a distributed load acting on the boundary of the semi-infinite body, and the stress state components at each calculation point are calculated using plane strain conditions; the formulas for obtaining the stress state components are as follows: , In the formula, For horizontal stress, For vertical stress, For shear stress, To calculate the x-axis coordinates of the point, This is used to calculate the y-axis coordinates of the point.

4. The method for zoned control of surrounding rock in the main roadway across the mining floor as described in claim 3, characterized in that, The stress state components at each calculation point are used to divide the surrounding rock (20) of the main roadway into zones, resulting in stress zones, including: The surrounding rock failure judgment value at each calculation point is calculated according to the Mohr-Coulomb strength criterion; the formula for obtaining the surrounding rock failure judgment value is as follows. , In the formula, For the maximum principal stress, For the minimum principal stress, For the counting sequence number, For the first The surrounding rock failure judgment value at each calculation point For the first The maximum principal stress at each calculation point For the first The minimum principal stress at each calculation point It is the internal friction angle. It is cohesive force; Each stress zone is determined based on the magnitude of the surrounding rock failure judgment value relative to 0.

5. The method for zoned control of surrounding rock in the main roadway across the mining floor as described in claim 4, characterized in that, The method of determining each stress zone based on the magnitude of the surrounding rock failure judgment value relative to 0 also includes: The stress concentration factor at each calculation point is obtained using the following formula: , In the formula, For the first Stress concentration factor at each calculation point For the first The horizontal stress at each calculation point This refers to the stress caused by the self-weight of the original rock under the corresponding burial depth conditions; Obtain the maximum stress concentration factor from all calculation points, and set the stress peak determination factor and the allowable deviation of the original rock stress; The response is that the surrounding rock failure criterion value at any calculation point is greater than or equal to 0, or satisfies... The calculation point is divided into the stress peak region (8); where, The maximum stress concentration factor, The stress peak determination coefficient is used. The stress concentration factor; The response value of the surrounding rock failure criterion at any calculation point is less than 0, and it also satisfies the following conditions: The calculation point is divided into the original rock stress stability zone (10); where, This represents the allowable deviation of the original rock stress. The continuous calculation points between the stress peak zone (8) and the original rock stress stability zone (10) are divided into the stress mitigation zone (9). The calculation points that are continuously distributed along the bottom slab roadway (3) and are in the same stress zone are merged into a neighborhood. The midpoint of the adjacent calculation points belonging to different stress zones is determined as the zone boundary, thus realizing the determination of each stress zone.

6. The method for zoned control of surrounding rock in the main roadway across the mining floor as described in claim 5, characterized in that, The surrounding rock control for each stress zone includes: The depth of the pressure relief hole is calculated using the following formula: , In the formula, For the depth of the pressure relief hole, The depth of plastic failure of the base plate. For safety, ultra-deep measurement; Based on the pressure relief hole depth, water jet fan-shaped slotting drilling (11) is carried out from the working face (1) to the stress peak area (8).

7. The method for zoned control of surrounding rock in the main roadway across the mining floor as described in claim 6, characterized in that, The surrounding rock control for each stress zone also includes: A third prestressed steel strand anchor cable stack (15) is arranged on the top of the roadway and the shoulder area of ​​the section adjacent to the stress peak area (8) of the bottom slab roadway (3), and a first prestressed steel strand anchor cable (13) is arranged on both sides of the roadway of the section adjacent to the stress peak area (8). A second prestressed steel strand anchor cable (14) is arranged on the top of the roadway and the shoulder area of ​​the section adjacent to the stress relief zone (9) of the bottom slab roadway (3), and a first prestressed steel strand anchor cable (13) is arranged on both sides of the roadway of the section adjacent to the stress relief zone (9). A steel mesh (17) is laid on the inner wall of the section adjacent to the bottom slab roadway (3), the stress peak area (8), and the stress relief area (9), and concrete is sprayed onto the steel mesh (17). The third prestressed steel strand anchor cable stack (15) is fixed to the inner wall of the bottom slab roadway (3) by a three-hole high-strength anchor cable tray (19), and the first prestressed steel strand anchor cable (13) and the second prestressed steel strand anchor cable (14) are fixed to the inner wall of the bottom slab roadway (3) by an anchor cable tray (18).

8. The method for zoned control of surrounding rock in the main roadway across the mining floor as described in claim 7, characterized in that, The design parameters of the first prestressed steel strand anchor cable (13) are: diameter 22 mm and length 6300 mm; The design parameters of the second prestressed steel strand anchor cable (14) are: diameter 22 mm and length 9300 mm; The design parameters of the third prestressed steel strand anchor cable stack (15) are: diameter 22 mm, length 9300 mm, and a total of 3 strands; The design parameters of the anchor cable tray (18) are 300 mm in diameter and 16 mm in thickness; The design parameters of the three-hole high-strength anchor cable tray (19) are: diameter 400 mm and thickness 16 mm.

9. The method for zoned control of surrounding rock in the main roadway across the mining floor as described in claim 8, characterized in that, Hydraulic fracturing is carried out in the stress peak zone (8) by drilling a fan-shaped hole (11) using water jet.

10. The method for zoned control of surrounding rock in the main roadway across the mining floor as described in claim 9, characterized in that, The surrounding rock control for each stress zone also includes: Obtain surrounding rock test values; the surrounding rock control test values ​​include: surrounding rock stress, roof settlement value, sidewall convergence value, bottom heave value, and support component stress; In response to the error between the detected value and the predicted change value of the surrounding rock exceeding a threshold, the support pressure distribution function and the range of each stress zone are corrected.