A subcritical pressure boiler full load section optimization control method and system
By adopting a full-load adaptive closed-loop optimization control method, the problem of steam temperature regulation and energy efficiency optimization of subcritical Π-type boilers over a wide load range was solved. This achieved steam temperature stability and energy efficiency improvement across the entire load range, reduced energy consumption of the air mill system, and improved overall performance under deep peak shaving conditions.
Patent Information
- Application Number
- CN202611287952.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-24
- Publication Date
- 2026-11-10
AI Technical Summary
Existing technologies for subcritical Π-type boilers, especially under deep peak shaving conditions, suffer from issues such as steam temperature characteristics and deviations, coarse reheat steam temperature regulation, high primary air system power consumption, increased ash and flue gas heat loss from the heating surface, and deterioration of combustion stability and economy. Traditional control strategies are difficult to adapt to the structural characteristics of Π-type boilers.
The full-load adaptive closed-loop optimization control method is adopted. By acquiring real-time parameter sets, multi-level strategy collaborative processing is performed, including general combustion optimization and deep peak shaving exclusive strategies. Combined with the soot blowing-air distribution-mill group collaborative algorithm, key operating parameters are dynamically adjusted to achieve steady-state control of main reheat steam temperature, flue gas temperature and desuperheating water flow rate in the full load range.
It achieves precise control of steam temperature across the entire load range, optimizes dynamic power consumption, improves the safety and overall efficiency of the heating surface, reduces the energy consumption of the wind mill system, and improves the comprehensive performance under deep peak shaving conditions.
Smart Images

Figure CN123067263A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of combustion optimization control technology for subcritical Π-type boilers, and particularly to a method and system for optimizing control of subcritical pressure boilers across the entire load range. Background Technology
[0002] As a mature boiler type, the 330MW subcritical Π-type boiler has fundamentally different structural characteristics from the megawatt-class tower once-through boiler. Currently used combustion optimization, steam temperature control, and flue gas system control strategies are not well adapted to the Π-type boiler, resulting in the following systemic technical problems being exposed when the unit operates under wide load conditions, especially under deep peak shaving conditions: First, there are issues with steam temperature characteristics and deviations. Under low load conditions, the overall temperature of the main steam and reheat steam is low, and the deviations in flue gas temperature and steam temperature on both sides are significant. The horizontal flue of the Π-type furnace has concentrated heat absorption on the heating surface. Under low load, the rigidity of the flame weakens, making it prone to wall-attached combustion, which causes distortion of the furnace outlet temperature field. The structure is extremely sensitive to changes in the furnace heat load distribution, and traditional air distribution methods cannot maintain a balanced thermal field across the entire load range, limiting the quality of steam temperature regulation.
[0003] Secondly, the reheat steam temperature regulation is crude and wasteful of desuperheating water. Reheat steam temperature regulation relies excessively on burner tilt angle and excess air coefficient adjustments, resulting in a single control method with poor linearity, frequent local overheating, and reliance on emergency desuperheating water intervention. The furnace is a single-stage reheat structure, making it highly responsive to changes in furnace air distribution and flame center height deviations. The existing control logic lacks feedforward and fine-tuning algorithms for reheat steam temperature, leading to frequent and excessively large desuperheating water regulating valve operations, resulting in significant losses in working fluid thermal economy.
[0004] Third, the primary air system suffers from redundant pressure head and high power consumption, with the coal mill and primary air fan operating at excessively high power consumption, particularly during low-load periods. The subcritical unit's primary air system is designed for the boiler's maximum continuous output condition, resulting in significant redundancy in pressure head and flow rate. The current system lacks segmented air pressure control, making it unable to match the air pressure in real time based on the number of coal mills in operation and the coal feed rate. This leads to prolonged operation at pressure heads higher than required, resulting in high power consumption for the fans and coal mill ventilation.
[0005] Fourth, increased ash and flue gas heat loss on the heating surface, especially during deep peak shaving or prolonged low-load operation, leads to abnormally high flue gas temperatures and decreased waste heat utilization efficiency. Dead zones exist in the horizontal flue and tail flue of the Π-type boiler, resulting in uneven fly ash settling and localized ash accumulation. At low loads, reduced flue gas velocity and insufficient steam soot blowing penetration further decrease the heat transfer coefficient of the heating surface, causing flue gas temperatures to rise and boiler efficiency to deteriorate further.
[0006] Fifth, combustion stability and economy deteriorate under deep peak shaving conditions. Under 165MW (50% rated load) deep peak shaving conditions, steam temperature fluctuates significantly, combustion is unstable, and coal consumption for power generation increases significantly. Existing combustion control strategies lack dedicated air distribution schemes and coal mill combination operation guidance for ultra-low load conditions; at low loads, furnace temperature is low, pulverized coal ignition is difficult, conventional load-airflow curves are distorted, and flame coverage and dynamic response speed cannot be guaranteed, resulting in decreased combustion efficiency and increased auxiliary power consumption.
[0007] The root cause of the above problems lies in the fact that the inherent single-pass flue gas turning structure and steam drum water circulation characteristics of the Π-type boiler amplify the contradiction between thermal deviation and control lag under wide load variations. Simply transplanting the closed-loop control algorithm or empirical coefficients of the tower-type once-through boiler is unlikely to produce the expected results. It is necessary to establish a zoned heat load adjustment model, multi-dimensional predictive control of reheat steam temperature, and adaptive matching strategy for low-load wind pressure for the boiler type. Summary of the Invention
[0008] To achieve the above objectives, the present invention adopts the following technical solution: One aspect of the present invention provides a method for optimizing the control of a subcritical pressure boiler at full load, comprising the following steps: Acquire a real-time parameter set for the full-load operating conditions of the subcritical pressure boiler. The real-time parameter set should include at least the unit load signal, steam flow signal, measured steam temperature at the outlets of the superheater and reheater, flue gas temperature deviation at the furnace outlet, wall temperature monitoring data of the heated surfaces, and instantaneous flow rate of the reheat desuperheating water. For the real-time parameter set, perform a threshold judgment for the full-load range operating conditions. Mark the operating conditions where the steam temperature does not meet the requirements of the corresponding load range and the reheat desuperheating water flow rate exceeds the control limit as the initial nodes of poor steam temperature and excessive desuperheating water flow rate, forming a set of identifiers for the operating conditions to be controlled in the full-load range. Based on the set of operating conditions to be controlled across the full load range, the general combustion optimization logic module is invoked for the first-level processing. The first-level processing includes: under the condition that the wall temperature of the heated surface is within a safe margin, swinging the burner angle upward and simultaneously reducing the bottom combustion air distribution and increasing the upper burnout air to raise the furnace flame center and increase the heat exchange of the horizontal flue, generating the first-optimized main reheat steam temperature recovery parameters; transferring the steam temperature deviation and desuperheating water flow exceeding the limit conditions that still exist after the first optimization to the deep peak shaving dedicated strategy processing channel; the deep peak shaving dedicated strategy processing channel solidifies the bottom auxiliary air and fuel air ratio, limits the coal quantity distribution of the coal mill combination, and fixes the burner and burnout air swing angles, forming a secondary optimization parameter set under the deep peak shaving dedicated operating conditions; Based on the secondary optimized parameter set, high load deviation correction and power saving synergy processing of the air mill system are implemented, including: when the unit is under high load or high steam flow conditions and the deviation of steam temperature on both sides or flue gas temperature at the furnace outlet exceeds the allowable range, targeted soot blowing is activated in the superheater and reheater areas to eliminate heat absorption deviation caused by ash accumulation in the horizontal flue and generate intermediate parameters for flue gas temperature control after wall temperature equalization; simultaneously, the primary air pressure is controlled according to the load segment set value, and according to the matching relationship between the number of coal mills in operation and the average output, a single coal mill is cut off in the low-efficiency operation range and the separator speed and mill inlet and outlet differential pressure are adjusted to form a comprehensive control intermediate parameter set covering steam temperature deviation correction and air mill power consumption optimization; Based on the comprehensive control intermediate parameter set, a closed-loop linkage process for furnace type adaptation is implemented, including: real-time monitoring of the induced draft fan inlet flue gas temperature; when the flue gas temperature rises abnormally, the horizontal flue soot blowers are periodically rotated and put into operation under high load conditions to remove accumulated ash and heat storage; simultaneously, according to the wall temperature margin adaptive logic, when the margin is sufficient, the desuperheating water usage is actively reduced and combined with downward swing of the burner angle, increased bottom air distribution, and reduced upper burnout air to lower the flame center and suppress horizontal flue overheating; for long-term low-load operation conditions, systematic furnace soot blowing is implemented, and finally, through multi-parameter coupling fine-tuning of air distribution opening, burner angle, mill operation parameters, soot blowing frequency, and oxygen bias, the main reheat steam temperature, flue gas temperature, and desuperheating water flow rate of the entire load section are locked to the steady-state target value, completing the complete closed-loop optimization control of the subcritical pressure boiler at the entire load section.
[0009] In one optional implementation, the present invention aims to construct a full-load adaptive closed-loop optimization control system. Through an innovative architecture of hierarchical judgment of operating conditions, multi-level strategy coordination and dynamic parameter coupling, it effectively solves the contradiction between steam temperature regulation and energy efficiency optimization in subcritical boilers over a wide load range.
[0010] First, a multi-dimensional operating condition perception layer is established. By integrating real-time parameters such as unit load signals, steam flow, and wall temperature monitoring, a threshold discrimination matrix covering the entire range from 20% to 100% load is formed. The layer innovatively introduces the steam temperature poor state index and the desuperheating water over-limit coefficient, breaking through the limitation of traditional control strategies that are only designed for rated load, and realizing a three-dimensional dynamic correlation evaluation of load-steam temperature-wall temperature.
[0011] Secondly, the optimized tiered execution strategy is divided into a primary processing stage for general combustion optimization and a secondary processing stage specifically for deep peak shaving. The primary processing stage employs a rapid response combination of burner tilt angle and burnout damper to adjust the flame center position within 3 minutes. The secondary processing stage addresses combustion stability issues under low load conditions by solidifying the bottom air-coal ratio and limiting the number of coal mill combinations. Existing technologies generally suffer from incompatibility between high and low load control logic, leading to steam temperature deviations exceeding allowable ranges. This invention, however, ensures stable steam temperature control across the entire load range through intelligent switching between the two-stage strategies.
[0012] Finally, the closed-loop correction mechanism is strengthened by introducing a collaborative algorithm for soot blowing, air distribution, and mill units, which dynamically adjusts key operating parameters according to different load requirements. Under high load, directional soot blowing is triggered based on flue gas temperature deviation; under low load, the combination of coal mills and separator speed is optimized, and the desuperheating water flow rate is adjusted in reverse based on the wall temperature margin, ultimately achieving steady-state control of main reheat steam temperature, flue gas temperature, and desuperheating water flow rate.
[0013] Existing technologies suffer from three key unresolved contradictions: First, traditional DCS systems directly apply rated load control logic to low-load conditions, leading to steam temperature fluctuations exceeding permissible ranges; second, the industry generally relies on excessive desuperheating water for temperature regulation, sacrificing energy efficiency; and third, conventional solutions lack coordinated control of steam temperature, flue gas temperature, and wall temperature, making it difficult to achieve closed-loop optimization. This invention completely overcomes these bottlenecks through multi-parameter coordinated adjustment.
[0014] This invention achieves precise full-load steam temperature control, dynamic power consumption optimization, improved heating surface safety, and synergistic emission reduction. It is the first to realize four-dimensional optimization of load, steam temperature, power consumption, and emissions.
[0015] Another aspect of the present invention provides an optimized control system for a subcritical pressure boiler under full load, comprising: The real-time parameter processing module is used to acquire the real-time parameter set of the subcritical pressure boiler's full-load operating conditions. The real-time parameter set includes at least the unit load signal, steam flow signal, measured values of steam temperature at the outlets of the superheater and reheater, deviation value of flue gas temperature at the furnace outlet, monitoring data of the heating surface wall temperature, and metered value of instantaneous flow rate of reheat desuperheating water. For the real-time parameter set, a threshold judgment of the full-load range operating conditions is performed. Operating points where the steam temperature does not meet the requirements of the corresponding load range and the reheat desuperheating water flow rate exceeds the control limit are marked as the initial nodes of poor steam temperature and excessive desuperheating water flow rate, forming a set of identifiers for operating conditions to be controlled in the full-load range. The optimization logic processing module is used to call the general combustion optimization logic module for first-level processing based on the set of operating conditions to be controlled across the full load range. The first-level processing includes: swinging the burner angle upward and simultaneously reducing the bottom combustion air distribution and increasing the upper burnout air under the condition that the wall temperature of the heated surface is within acceptable limits, so as to raise the center of the furnace flame and increase the heat exchange of the horizontal flue, generating the first-optimized main reheat steam temperature recovery parameters; transferring the steam temperature deviation and desuperheating water flow exceeding the limit conditions that still exist after the first optimization to the deep peak shaving dedicated strategy processing channel; the deep peak shaving dedicated strategy processing channel solidifies the bottom auxiliary air and fuel air ratio, limits the coal quantity distribution of the coal mill combination, and fixes the burner and burnout air swing angles, forming a second-level optimization parameter set under the deep peak shaving dedicated operating conditions; The node collaborative processing module is used to perform high load deviation correction and power saving collaborative processing of the air mill system based on the secondary optimization parameter set. This includes: when the unit is under high load or high steam flow conditions and the deviation of steam temperature on both sides or flue gas temperature at the furnace outlet exceeds the allowable range, targeted soot blowing is activated in the superheater and reheater areas to eliminate the heat absorption deviation caused by ash accumulation in the horizontal flue and generate intermediate parameters for flue gas temperature control after wall temperature equalization; simultaneously, the primary air pressure is controlled according to the load segment set value, and according to the matching relationship between the number of coal mills in operation and the average output, a single coal mill is cut off in the low-efficiency operation range and the separator speed and mill inlet and outlet differential pressure are adjusted to form a comprehensive control intermediate parameter set covering steam temperature deviation correction and air mill power consumption optimization. The bottom-line linkage processing module is used to perform closed-loop bottom-line linkage processing for boiler type adaptation based on the comprehensive control intermediate parameter set. This includes: real-time monitoring of the exhaust gas temperature at the induced draft fan inlet; when the exhaust gas temperature rises abnormally, periodically rotating the horizontal flue soot blowers under high load conditions to remove accumulated ash and heat storage; simultaneously, based on the wall temperature margin adaptive logic, actively reducing the desuperheating water usage when the margin is sufficient, and coordinating with downward swinging burner angle, increasing bottom air distribution, and reducing upper burnout air to lower the flame center and suppress horizontal flue overheating; for long-term low-load operation conditions, performing systematic furnace soot blowing; and finally, through multi-parameter coupling fine-tuning of air distribution opening, burner angle, mill operation parameters, soot blowing frequency, and oxygen bias, locking the main reheat steam temperature, exhaust gas temperature, and desuperheating water flow rate to steady-state target values throughout the full load range, completing the complete closed-loop optimization control of the subcritical pressure boiler throughout the full load range.
[0016] This invention achieves stable main reheat steam temperature at full load: By adapting to the subcritical Π-type furnace furnace and horizontal flue structure, a main reheat steam temperature enhancement system covering full load conditions is established. This effectively suppresses steam temperature fluctuations under wide load operating conditions, ensuring long-term stable compliance of rated parameters and significantly improving the safety and economy of unit operation. Precise control of flame center and air distribution minimizes reheat desuperheating water consumption: A dedicated logic for flame center adjustment, staged air distribution optimization, and coordinated control of heating surface wall temperature margin is constructed for the unique combustion space layout of the Π-type furnace. This allows for precise control of the furnace's heat load distribution; while ensuring wall temperature safety, it significantly reduces reheater desuperheating water consumption, achieving an extreme reduction in desuperheating water consumption. Significantly reduced energy consumption of the coal mill system: A full-cycle coal mill operation management scheme is formed by adopting segmented primary air pressure dynamic control, low-oxygen energy-saving combustion optimization, and an economical start-up and shutdown strategy for the coal mill unit; this effectively reduces the power consumption of auxiliary equipment such as primary air fans and coal mills, significantly reducing plant power consumption. Effective reduction in flue gas heat loss and improved soot blowing efficiency: By matching the dynamic generation of ash accumulation in the Π-type furnace with the heat exchange characteristics of the flue gas side, and establishing differentiated soot blowing frequency optimization and flue gas temperature closed-loop control logic, the flue gas temperature can be stably maintained within the design optimal range, reducing flue gas heat loss; at the same time, it avoids wear on the heat exchange surface caused by excessive soot blowing, improving overall heat exchange efficiency. Significantly improved comprehensive performance under deep peak shaving conditions: Addressing the common industry challenges of drastic parameter fluctuations, increased energy consumption, and unstable steam temperature during deep peak shaving of subcritical Π-type furnaces, the synergistic effect of a systematic control strategy can significantly suppress thermodynamic parameter oscillations during peak shaving, widening the safe and economical operating load range; achieving an organic unity of steam temperature stability, combustion economy, and low auxiliary equipment consumption within a wide load range, providing reliable technical support for deep peak shaving operation of similar units. Attached Figure Description
[0017] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings: Figure 1 This is a flowchart of the subcritical pressure boiler full-load section optimization control method provided in Embodiment 1 of the present invention; Figure 2 This is a schematic diagram of the subcritical pressure boiler full-load section optimization control method provided in Embodiment 1 of the present invention; Figure 3 This is a block diagram of the subcritical pressure boiler full-load section optimized control system provided in Embodiment 3 of the present invention; Figure 4 A block diagram of a computer-readable storage medium provided for this invention.
[0018] Reference numerals in the attached diagram: 1. Real-time parameter processing module; 2. Optimization logic processing module; 3. Node collaboration processing module; 4. Last-line linkage processing module; 5. Computer-readable instructions; 6. Non-transitory computer-readable storage medium. Detailed Implementation
[0019] The technical solutions of the present invention will now be described with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.
[0020] like Figure 1 As shown in the figure, this embodiment of the invention provides an optimized control method for a subcritical pressure boiler at full load, comprising the following steps: Step S100: Obtain the real-time parameter set of the subcritical pressure boiler's full-load operating conditions. The real-time parameter set includes at least the unit load signal, steam flow signal, measured values of steam temperature at the outlets of the superheater and reheater, deviation value of flue gas temperature at the furnace outlet, monitoring data of the heating surface wall temperature, and metered value of instantaneous flow rate of reheat desuperheating water. For the real-time parameter set, perform a threshold judgment of the full-load range operating conditions. Mark the operating conditions where the steam temperature does not meet the requirements of the corresponding load range and the reheat desuperheating water flow rate exceeds the control limit as the initial nodes of poor steam temperature and excessive desuperheating water flow rate, forming a set of identifiers for the operating conditions to be controlled in the full-load range.
[0021] Specifically: The full-load operating condition of a subcritical pressure boiler refers to the entire continuous operating range from the minimum stable combustion load to the rated load. This condition covers the entire range of changes in combustion characteristics, heat transfer characteristics, and steam temperature characteristics under different loads. In the real-time parameter set acquired during the operating condition, the unit load signal is used to quantitatively characterize the percentage of the subcritical pressure boiler's current output relative to its rated output, and the steam flow signal is used to reflect the mass flow rate of the working fluid through the boiler's heating surfaces. Both serve as the core basis for dividing the load range. The measured steam temperatures at the outlets of the superheater and reheater refer to the temperature values collected by temperature measuring elements installed on both sides of the superheated steam outlet pipes and reheated steam outlet pipes, respectively. These values directly reflect whether the outlet steam temperatures of the last-stage superheater and last-stage reheater of the subcritical pressure boiler are within acceptable ranges. The flue gas temperature deviation at the furnace outlet refers to the difference between the measured flue gas temperatures on both sides of the horizontal flue gas duct cross-section at the furnace outlet. The magnitude of the deviation reflects whether the center of the combustion flame in the furnace has shifted laterally and whether the heat absorption of the heating surfaces on both sides of the horizontal flue gas duct is balanced. Heated surface wall temperature monitoring data refers to the metal wall temperature values collected by thermocouples arranged on the tube walls of superheaters and reheaters at each stage of a subcritical pressure boiler. This data serves as a safety boundary constraint for burner swivel adjustment and desuperheating water operation. The instantaneous flow rate of reheat desuperheating water refers to the mass flow rate of desuperheating water injected into the reheater system per unit time to regulate reheat steam temperature. The flow rate directly relates to the economic efficiency of reheat steam temperature regulation in a subcritical pressure boiler. Full-load range operating condition thresholds refer to the allowable lower limits of main steam temperature and reheat steam temperature set for different load segments of the subcritical pressure boiler. These thresholds are set segment by segment according to load changes. Load segment requirement values refer to the maximum allowable instantaneous flow rate limit of reheat desuperheating water for different load segments. The control upper limit is the maximum value that the reheat desuperheating water flow rate is not allowed to exceed. The operating point refers to the set of all operating parameters corresponding to a specific load and steam flow rate of the subcritical pressure boiler. Poor steam temperature refers to the unqualified state corresponding to the measured value of main steam temperature or reheat steam temperature being lower than the full-load range operating condition threshold. Excessive desuperheating water flow refers to an excessive water spraying state where the instantaneous flow rate of reheat desuperheating water exceeds the control limit corresponding to the load segment requirement. The set of operating conditions to be controlled in the full load segment is a data set formed by summarizing all operating points marked as poor steam temperature and excessive desuperheating water flow. This set is used to trigger the invocation of subsequent optimization processing modules at all levels.
[0022] As a preferred approach, the process of performing a single threshold determination for the full load range includes the following steps: Step S101: For each operating point in the real-time parameter set, perform a full-load range operating condition threshold discrimination. The discrimination includes: comparing the measured values of the outlet steam temperature on both sides of the superheater and reheater corresponding to the operating point with the preset full-load range operating condition threshold of the corresponding load segment; and comparing the metered value of the instantaneous flow rate of the reheat desuperheating water corresponding to the operating point with the preset upper limit of the control of the corresponding load segment, and generating the threshold discrimination comparison results for each operating point. Step S102: Based on the threshold discrimination comparison results, mark the operating points where the measured steam temperature at the outlets on both sides of the superheater or reheater is lower than the operating condition threshold of the full load range of the corresponding load segment as the initial node of poor steam temperature; and mark the operating points where the instantaneous flow rate of reheat desuperheating water is higher than the control limit of the corresponding load segment as the initial node of desuperheating water exceeding the limit, thus forming an initial marked node set consisting of all the initial nodes of poor steam temperature and the initial nodes of desuperheating water exceeding the limit. Step S103: Summarize all the marked nodes in the initial marked node set to generate a set of identifiers for the full load segment controllable operating conditions; wherein, the set of identifiers for the full load segment controllable operating conditions is used to trigger the call of the general combustion optimization logic module of the subcritical pressure boiler and the entry determination of the deep peak shaving exclusive strategy processing channel.
[0023] Specifically: The preset threshold values for the corresponding load segment full-load range refer to the set of allowable lower limits for main steam temperature and reheat steam temperature pre-set for subcritical pressure boilers in different load ranges. These threshold sets correspond one-to-one with the load segments of the subcritical pressure boiler's full-load operating conditions. The main steam temperature threshold and reheat steam temperature threshold exhibit segmented changes as the load decreases, serving as benchmark boundaries for determining whether the steam temperature at the current operating point is within acceptable limits. The preset upper limit for the corresponding load segment refers to the set of maximum allowable instantaneous flow rates of reheat desuperheating water pre-set for subcritical pressure boilers in different load ranges. These upper limits are related to the load segments of the subcritical pressure boiler and the safety margin of the reheater heating surface, serving as flow boundaries for determining whether the current operating point's desuperheating water injection rate is over-reliant. The "Steam Temperature Defective Initial Node" refers to the first-level status marker assigned to a certain operating point during the first-stage threshold judgment of the full-load range. This marker indicates a need for steam temperature increase and serves as the initial basis for triggering the general combustion optimization logic module of the subcritical pressure boiler. The "Desuperheating Water Exceedance Initial Node" refers to the first-level status marker assigned to a certain operating point during the first-stage threshold judgment of the full-load range. This marker indicates an excessive desuperheating water injection problem and serves as the initial basis for triggering the deep peak-shaving dedicated strategy processing channel of the subcritical pressure boiler. All marked nodes refer to the complete set of all operating points that have been assigned the initial node mark of poor steam temperature or the initial node mark of excessive desuperheating water after the first judgment of the operating condition threshold of the full load range. The set covers all operating condition locations in the full load range of the subcritical pressure boiler where there are problems with unqualified steam temperature or excessive desuperheating water. The set of operating condition identifiers to be controlled in the full load range formed by summarizing all marked nodes serves as the input signal for the subcritical pressure boiler to subsequently call the general combustion optimization logic module and select to enter the deep peak shaving exclusive strategy processing channel, realizing the complete connection from parameter judgment to control strategy triggering of the subcritical pressure boiler.
[0024] In the embodiments of steps S101-S103, this embodiment achieves early identification of abnormal steam temperature conditions by comparing the measured values of superheater and reheater outlet steam temperatures at each operating point of the real-time parameter set with the operating thresholds for the full load range. Combined with the comparative analysis of the instantaneous flow rate of reheat desuperheating water with the control upper limit, desuperheating water regulation exceeding limits can be captured simultaneously. The dual discrimination mechanism ensures that the thermal parameter exceeding limits of the subcritical pressure boiler are comprehensively monitored across the full load range. The generation of the initial set of marked nodes establishes a correlation data system between steam temperature deterioration and desuperheating water overshoot. Classifying and marking operating points where steam temperature is below the threshold and desuperheating water exceeds limits provides a precise positioning basis for optimized control. The set directly reflects the boiler's thermal efficiency deviation and the response characteristics of the regulation system under deep peak-shaving conditions. The aggregation of the set of operating condition identifiers for the full load range forms the triggering conditions for the combustion optimization logic module. The set of input parameters activates two types of control channels: the general combustion optimization logic module adjusts the combustion air distribution strategy based on the distribution characteristics of the poor steam temperature nodes; the deep peak shaving dedicated strategy processing channel implements targeted water injection control based on the load segment distribution of the desuperheating water over-limit nodes. Together, they achieve full-range dynamic optimization of the subcritical pressure boiler from conventional load to deep peak shaving conditions.
[0025] As an example: precise parameter thresholds: 30%~100%BMCR main steam temperature ≥538℃; 50%~100%BMCR reheat steam temperature ≥538℃; 30%BMCR low load reheat steam temperature ≥526℃; total reheat desuperheating water flow ≤2t / h, achieving extreme energy consumption reduction.
[0026] General temperature increase optimization logic: Under the premise that the wall temperature of the heated surface is safe and controllable, swing the burner angle upward, reduce the air distribution at the bottom of the burner, increase the burnout air of the upper SOFA, raise the center of the furnace flame, increase the heat exchange of the horizontal flue heating surface, and stabilize the main and reheat steam temperature. Fixed lower limit for air distribution safety: auxiliary air ≥30%, fuel air ≥15%.
[0027] High load deviation correction: When the unit load is >210MW or the steam flow rate is >700t / h, and the deviation of the steam temperature at the outlets of the superheater and reheater is >10℃ or the deviation of the flue gas temperature at the furnace outlet is >50℃, one to two sets of special soot blowing for the superheater and reheater will be added to eliminate the heat absorption deviation caused by ash accumulation in the horizontal flue.
[0028] 165MW Deep Peak Shaving Ultra-Low Load Exclusive Operating Condition Strategy: Addressing the issues of poor combustion stability and low steam temperature at low loads in Π-type boilers, the following precise air distribution and mill parameters are established: AA auxiliary air 70%, other operating auxiliary air 35%, fuel air 20% (A fuel air ≥ 30%); EE auxiliary air, OFA1, OFA2, and SOFA1 are maintained at 20% opening; burner swing angle 75%, SOFA swing angle 70%; mill coal ratio is fixed at 13t / h for A mill and 15t / h for B mill, while increasing the output of C mill, maximizing reheat steam temperature without exceeding wall temperature limits, and ensuring stable deep peak shaving operating parameters.
[0029] The logic of precise consumption reduction of desuperheating water: When the total amount of reheat desuperheating water is >2t / h, the burner swing angle is lowered, the bottom combustion air distribution is increased, the upper burnout air is reduced, the flame center is lowered, and the overheating of the horizontal flue heating surface is suppressed; at the same time, the soot blowing in the water-cooled wall area is increased to reduce the frequency of overheating from the source and achieve stable operation of desuperheating water at a low level.
[0030] Step S200: Based on the set of operating conditions to be controlled across the full load range, the general combustion optimization logic module is invoked for the first-level processing. The first-level processing includes: under the condition that the wall temperature safety margin of the heated surface allows, the burner swing angle is swung upward and the bottom combustion air distribution is simultaneously reduced, while the upper burnout air is increased to raise the furnace flame center and improve the heat exchange of the horizontal flue, generating the primary reheat steam temperature recovery parameters after one optimization; the steam temperature deviation and desuperheating water flow exceeding the limit conditions that still exist after the first optimization are transferred to the deep peak shaving exclusive strategy processing channel; the deep peak shaving exclusive strategy processing channel solidifies the bottom auxiliary air and fuel air ratio, limits the coal quantity distribution of the coal mill combination, and fixes the burner and burnout air swing angles, forming a secondary optimization parameter set under the deep peak shaving exclusive operating conditions.
[0031] Specifically: The general combustion optimization logic module is a combustion adjustment algorithm unit built into the distributed control system of a subcritical pressure boiler. The module takes a set of controllable operating conditions across the entire load range as input. The heating surface wall temperature safety margin refers to the difference between the measured temperature of the heating surface tube wall and the maximum allowable operating temperature of the heating surface material. This difference is used to determine whether the burner's upward swing angle provides a safe operating margin. The burner swing angle refers to the angle between the burner nozzle and the horizontal plane in a subcritical pressure boiler; an upward swing angle can raise the jet trajectory of the pulverized coal flame. Reducing the bottom-level combustion air distribution means decreasing the opening of the lowest-level auxiliary air damper to lower the excess air coefficient in the bottom area. Increasing the upper burnout air means increasing the opening of the uppermost burnout air damper to enhance the air classification effect in the upper part of the furnace. The furnace flame center refers to the area of most intense combustion and highest temperature within the furnace; raising the flame center can increase the temperature of the high-temperature flue gas at the horizontal flue inlet. Horizontal flue heat exchange refers to the heat transferred when high-temperature flue gas washes over the heating surfaces of superheaters and reheaters arranged in the horizontal flue. Increased heat allows for a higher steam temperature rise. Main and reheat steam temperature recovery parameters refer to the increase in main and reheat steam temperatures after general combustion optimization compared to the initial steam temperature. Excessive steam temperature deviation and desuperheating water flow rate after one optimization refers to conditions where, after processing by the general combustion optimization logic module, the full-load operating threshold requirements are not met, or the reheat desuperheating water flow rate remains above the control limit. The deep peak-shaving dedicated strategy processing channel is a control logic branch specifically designed for stable operation of subcritical pressure boilers at ultra-low loads. Fixing the bottom auxiliary air and fuel air ratio means fixing the opening of the bottom auxiliary air damper and fuel air damper to a predetermined constant value to maintain rigid flame stability in the bottom combustion zone. Limiting the coal quantity allocation of specific coal mill combinations means fixing the output ratio between specific coal mills to a predetermined value to ensure that the pulverized coal concentration in the ignition zone meets the requirements for stable combustion at low loads. Fixed burner and burnout air angle refers to locking the burner nozzle angle and burnout air nozzle angle at a predetermined angle, no longer automatically adjusting with load changes. Deep peak shaving exclusive operating condition refers to the subcritical pressure boiler operating in an extremely low load range close to the minimum stable combustion load. Secondary optimization parameter set refers to the complete parameter combination obtained after processing by the deep peak shaving exclusive strategy, including the opening degree of each damper, coal mill output, and angle position.
[0032] As a preferred approach, the process of forming a secondary optimization parameter set for deep peak-shaving specific operating conditions includes the following steps: Step S201: Obtain the steam temperature deviation and desuperheating water flow rate exceeding the limit that still exist after the general combustion optimization logic module has been optimized once. Use the current operating parameters corresponding to the operating conditions as the input objects of the deep peak shaving exclusive strategy processing channel, and determine that the operating conditions are in the deep peak shaving exclusive operating condition range of subcritical pressure boiler. Step S202: Perform deep peak shaving-specific strategy solidification processing on the input object; the solidification processing includes: locking the opening of the bottom auxiliary wind damper and the opening of the bottom fuel wind damper to a predetermined constant ratio value, while fixing the output ratio between each operating coal mill to a predetermined coal quantity distribution value; and locking the burner nozzle swing angle and the burnout air nozzle swing angle to a predetermined fixed angle, forming a deep peak shaving intermediate control parameter combination that includes solidified damper opening, coal mill output and swing angle position information; Step S203: Summarize all the solidified control parameters in the intermediate control parameter combination of deep peak shaving and generate a secondary optimization parameter set under the specific operating condition of deep peak shaving; wherein, the secondary optimization parameter set serves as the input benchmark for the subcritical pressure boiler to perform high load deviation correction and power saving synergistic processing of the wind mill system.
[0033] Specifically: The dedicated operating range for deep peak shaving of subcritical pressure boilers refers to the extreme low-load section where the subcritical pressure boiler operates close to the minimum stable combustion load. Within this range, the furnace flame coverage decreases, combustion stability deteriorates, and the flue gas temperature at the horizontal flue inlet drops. The adjustment effect of conventional combustion optimization logic modules cannot meet the steam temperature requirements in this range, necessitating a separate control logic branch for dedicated processing. The constant ratio value refers to the percentage of the bottom auxiliary wind damper opening and the bottom fuel wind damper opening, pre-calibrated for the dedicated operating range of deep peak shaving of subcritical pressure boilers. This ratio value no longer fluctuates with load changes after the deep peak shaving dedicated strategy processing channel is activated, maintaining rigid flame stability in the bottom combustion zone under low load and preventing fire extinguishing accidents caused by airflow disturbances. The output ratio between each operating coal mill refers to the relative ratio of the amount of coal handled by each operating coal mill under the deep peak shaving dedicated operating condition. The predetermined coal allocation value refers to the fixed output ratio of each coal mill pre-set for the deep peak shaving specific operating condition of the subcritical pressure boiler. This allocation value aims to ensure that the pulverized coal concentration in the ignition zone meets the minimum fuel density required for stable combustion under low load. The predetermined fixed angle refers to the pre-calibrated vertical tilt angle values of the burner nozzle and burnout air nozzle for the deep peak shaving specific operating condition of the subcritical pressure boiler. These fixed angles are locked after the deep peak shaving specific strategy processing channel is activated and are no longer adjusted based on steam temperature feedback, thus reducing disturbances to combustion adjustment under extremely low loads. The solidified damper opening refers to the final opening value of each layer of auxiliary dampers, fuel dampers, and burnout dampers determined after the deep peak shaving specific strategy solidification process. The coal mill output refers to the final coal feed value of each operating coal mill after solidification. The tilt angle position information refers to the final locked angle values of the burner nozzle and burnout air nozzle after solidification. These three together constitute a complete combination of solidified control parameters. The intermediate control parameter combination for deep peak shaving refers to the set of transitional parameters formed by integrating the solidified damper opening, output of each coal mill, and position of each swing angle. This combination serves as the intermediate data form from the output of the deep peak shaving dedicated strategy processing channel to the generation of the secondary optimization parameter set. It is used to finally summarize and generate the secondary optimization parameter set for subsequent high load deviation correction of subcritical pressure boilers and energy-saving collaborative processing of the wind mill system.
[0034] In the embodiments of steps S201-S203, step S201 of this embodiment, by screening out steam temperature deviations and desuperheating water flow exceeding limits that still exist after general combustion optimization, clarifies the scope of input objects and limits the operating condition range, ensuring that the processing is only for the deep peak shaving specific operating condition of the subcritical pressure boiler, avoiding interference from irrelevant operating conditions on the effectiveness of optimization. Step S202 performs deep peak shaving specific strategy solidification processing on the input objects, by locking the opening of the bottom auxiliary air and fuel air damper to a constant ratio value, fixing the output ratio of each operating coal mill to a predetermined coal quantity allocation value, and locking the burner and burnout air nozzle swing angle to a fixed angle, generating a combination of intermediate control parameters for deep peak shaving; the solidification operation eliminates the uncertainty of dynamic adjustment, stabilizes the basic combustion conditions, and provides a parameter benchmark for secondary optimization. Step S203 summarizes the solidified control parameters to generate a secondary optimization parameter set, which serves as the input benchmark for high load deviation correction and energy-saving synergistic processing of the air mill system, ensuring that the subcritical pressure boiler can maintain steam temperature stability and achieve system energy saving under deep peak shaving conditions.
[0035] In summary, this embodiment achieves refined control of subcritical pressure boilers across the entire load range, especially under deep peak-shaving conditions. By optimizing the parameter set in two stages, dynamic combustion problems are transformed into static control targets, thereby improving the accuracy of high-load deviation correction and the energy efficiency synergy of the air mill system.
[0036] As an example: power consumption rate control indicators: 50%~100%BMCR fan power consumption rate <2.0, 30%BMCR <2.4; 75%~100%BMCR coal mill power consumption <0.4, 50%BMCR <0.45, 30%BMCR <0.47.
[0037] Primary air segmented precise energy-saving control: stabilize the coal mill outlet temperature ≤95℃, strictly control the mixing of cold primary air; control the air-coal ratio ≤2.5; primary air pressure segmented setpoints: ≤8.5kPa for below 140MW, ≤9.5kPa for below 250MW, and can be increased to above 10kPa as needed under high load and rapid load increase conditions; ensure the average opening of the coal mill hot air damper ≥60% and the outlet air velocity 20~27m / s, and eliminate redundant losses of air pressure and air volume.
[0038] Low-oxygen energy-saving combustion technology: The baseline oxygen content offset is ≤0; under the safety premise of SCR inlet CO ≤100ppm and furnace oxygen content ≥2.5%, the oxygen content offset of No.4 furnace can be set to -0.5 to -0.7. By reducing the fan output through low-oxygen moderate combustion, energy saving and consumption reduction can be achieved.
[0039] Economic operation strategy for coal mills: When the average output of five mills is <20t / h and the average output of four mills is <18t / h, shut down a single coal mill in time to reduce ineffective power consumption; when the load is >165MW, the separator speed is ≤350rpm; maintain the differential pressure between the mill inlet and outlet ≤5kPa and optimize and adjust it in time; based on the working condition that the frequency of stone coal discharge is >20min / tank, optimize the coal quality and the gap between the mill group in time to maintain economic operation.
[0040] Step S300: Based on the secondary optimized parameter set, perform high load deviation correction and power saving coordination of the air mill system, including: when the unit is under high load or high steam flow conditions and the deviation of steam temperature on both sides or flue gas temperature at the furnace outlet exceeds the allowable range, targeted soot blowing is activated in the superheater and reheater areas to eliminate the heat absorption deviation caused by ash accumulation in the horizontal flue and generate intermediate parameters for flue gas temperature control after wall temperature equalization; simultaneously, the primary air pressure is controlled according to the load segment set value, and according to the matching relationship between the number of coal mills in operation and the average output, a single coal mill is cut off in the inefficient operation range and the separator speed and mill inlet and outlet differential pressure are adjusted to form a comprehensive control intermediate parameter set covering steam temperature deviation correction and air mill power consumption optimization.
[0041] Specifically: High-load deviation correction and synergistic energy-saving processing of the air mill system refers to the comprehensive optimization operation that simultaneously solves the steam temperature deviation problem and reduces the power consumption rate of the air mill and coal fan in the high-load area. High-load or high-steam-flow conditions refer to the operating range of the subcritical pressure boiler near its rated load or where the steam flow reaches a large value. The steam temperature deviation between the two sides refers to the difference between the measured steam temperatures at the outlets of the superheater or reheater on the left and right sides. The flue gas temperature deviation at the furnace outlet refers to the difference between the measured flue gas temperatures at the outlets of the furnace on the left and right sides. When the above deviations exceed the allowable range, targeted soot blowing is initiated in the superheater and reheater areas. Specific long soot blowers are selected to directionally purge the heating surfaces of the superheater and reheater in the horizontal flue. Wall temperature equalization means that after targeted soot blowing, the heat absorption of the heating surfaces on both sides tends to be consistent, resulting in a uniform tube wall temperature distribution. Intermediate parameters for flue gas temperature control refer to the change in flue gas temperature and the corresponding wall temperature distribution data obtained after soot blowing. Load segment setting refers to the allowable upper limit value of primary air pressure set separately for different load ranges. Primary air pressure refers to the static pressure value of the primary air used for conveying pulverized coal at the inlet of the coal mill. The matching relationship between the number of operating coal mills and the average output determines whether the current pulverizing system is operating in an inefficient range. An inefficient operating range refers to a load area where the coal mill output is far below its rated output and unit power consumption is significantly increased. Disconnecting a single coal mill within this range means stopping the operation of one coal mill and taking its corresponding burner out of service. Separator speed refers to the rotational speed of the rotating separator at the top of a dynamic separation coal mill. Mill inlet / outlet differential pressure refers to the airflow pressure difference between the inlet and outlet of the coal mill, used to characterize the internal ventilation resistance and material level status of the coal mill. The comprehensive control intermediate parameter set is a summary of all intermediate parameters, including steam temperature deviation correction results and air mill power consumption optimization results.
[0042] As a preferred approach, the process of forming a comprehensive set of intermediate control parameters covering steam temperature deviation correction and windmill power consumption optimization specifically includes the following steps: Step S301: Obtain the current load signal and current steam flow signal of the subcritical pressure boiler, call the corresponding load segment setpoint according to the load range to which the current load signal belongs, use the load segment setpoint as the upper limit value of the primary air pressure to limit the primary air pressure, and generate the air pressure control intermediate parameters after the primary air pressure is limited. Step S302: Synchronously acquire the number of currently operating coal mills in the subcritical pressure boiler and the real-time output value of each operating coal mill. Calculate the average output value based on the number of operating coal mills and the real-time output value of each coal mill. Compare the average output value with a preset inefficient operating range judgment threshold. When the average output value is in the inefficient operating range, execute the operation to cut off a single coal mill, and adjust the separator speed and mill inlet / outlet differential pressure of the remaining operating coal mills to generate intermediate parameters of the pulverizing system after optimization of the coal mill operation mode. Step S303: Integrate the intermediate parameters of the air pressure control with the intermediate parameters of the pulverizing system, and combine them with the intermediate parameters of the flue gas temperature control after the wall temperature is balanced by special soot blowing, to form a comprehensive set of control intermediate parameters covering steam temperature deviation correction and wind mill power consumption optimization; among them, the comprehensive set of control intermediate parameters serves as the input benchmark for the subsequent furnace type adaptation closed-loop linkage processing of the subcritical pressure boiler.
[0043] Specifically: Load segment setpoints refer to the set of permissible upper limits for primary air pressure preset for different load intervals within the full load range of a subcritical pressure boiler. These setpoints increase in a stepwise manner as the load increases, aiming to suppress wasted fan power consumption caused by redundant air pressure while ensuring the primary air's ability to carry pulverized coal. The primary air pressure upper limit is the maximum permissible air pressure value retrieved from the load segment setpoints for the current load segment. This upper limit serves as the execution boundary constraint for primary air pressure limiting control. Primary air pressure limiting control involves comparing the currently measured primary air pressure value of the subcritical pressure boiler with the aforementioned primary air pressure upper limit. When the measured value exceeds the upper limit, the primary air pressure is forcibly reduced to below the upper limit by closing the primary air fan inlet guide vanes or adjusting the inverter speed. This control operation generates intermediate air pressure control parameters. The intermediate air pressure control parameters are a set of transitional data obtained after primary air pressure limiting control, including the current primary air pressure setpoint, fan actuator opening, and fan current changes. This set is used for subsequent integration into the comprehensive control intermediate parameter set. The inefficient operation range threshold refers to the pre-set lower limit of the average output of the coal mills in the subcritical pressure boiler pulverizing system. When the average output of the operating coal mills is lower than the threshold, it indicates that the pulverizing system is in a low-output, high-power-consumption state. The threshold is used as the basis for triggering the operation to cut off a single coal mill. The intermediate parameters of the pulverizing system refer to the set of transitional parameters obtained after performing the operation to cut off a single coal mill and adjusting the separator speed and mill inlet / outlet differential pressure of the remaining operating coal mills. These parameters include the number of operating coal mills, the real-time output distribution of each coal mill, the separator speed setpoint, and the mill inlet / outlet differential pressure control value. This set is used for subsequent integration into the comprehensive control intermediate parameter set. Wall temperature equalization refers to the state after the special soot blowing operation in step S300, where the heat absorption of the left and right heating surfaces of the superheater and reheater tends to be consistent, and the tube wall temperature distribution is uniform. The intermediate parameters for flue gas temperature control refer to the set of transitional parameters obtained after the special soot blowing operation, including flue gas temperature changes and wall temperature distribution data. This set serves as the object for synchronous integration of the intermediate parameters for wind pressure control and the intermediate parameters of the pulverizing system. The comprehensive control intermediate parameter set is a complete set of intermediate parameters formed by summarizing and integrating the above-mentioned intermediate parameters of wind pressure control, intermediate parameters of pulverizing system and intermediate parameters of flue gas temperature control. The set includes steam temperature deviation correction results and wind mill power consumption optimization results, and serves as a unified input benchmark for the subsequent execution steps of the subcritical pressure boiler, namely the S400 boiler type adaptation closed-loop bottom linkage processing.
[0044] In the embodiments of steps S301-S303, step S301 of this embodiment calls the corresponding load segment setpoint based on the load range to which the current load signal belongs, and uses it as the upper limit of primary air pressure for amplitude limiting control, generating intermediate air pressure control parameters; the operation ensures that the primary air pressure and boiler load are dynamically matched, avoiding unstable combustion or decreased energy efficiency of the pulverizing system due to excessive air pressure, and providing stable air pressure conditions for subsequent steam temperature deviation correction. Step S302 obtains the number of operating coal mills and the output value of a single unit in real time, calculates the average output and compares it with the threshold for judging the inefficient operating range. When the average output falls into the inefficient range, a single coal mill is cut off, and the separator speed and inlet-outlet differential pressure of the remaining coal mills are adjusted synchronously to generate intermediate parameters of the pulverizing system. The technical feature optimizes the operation mode of the pulverizing system, reduces the power consumption of coal mills under low load conditions, and maintains the stability of pulverizing output. Step S303 integrates the intermediate parameters of air pressure control, the intermediate parameters of the pulverizing system, and the intermediate parameters of flue gas temperature regulation after special soot blowing to form a comprehensive set of regulation intermediate parameters. The parameter set enables multi-objective coordination of steam temperature deviation correction and wind mill power consumption optimization, providing benchmark input parameters covering combustion stability, energy efficiency improvement and steam temperature balance for subsequent closed-loop linkage processing for furnace type adaptation.
[0045] In summary, this embodiment establishes a standardized mapping relationship for the dynamic operating parameters of a subcritical pressure boiler across the entire load range. By integrating intermediate parameters from multiple systems, it simultaneously improves the accuracy of steam temperature control and the energy efficiency of the pulverizing system, providing a quantifiable controllable benchmark for closed-loop optimization.
[0046] As an example: Control benchmark: Exhaust gas temperature at the inlet of the induced draft fan < 135℃; Load-adaptive soot blowing strategy: Under the condition of load > 210MW or steam flow > 700t / h, at least 2 sets of soot blowing are selected from the soot blowers that have not been put into operation in the previous shift, focusing on removing ash accumulation in the horizontal flue to prevent the heat accumulation of ash from causing abnormal rise in exhaust gas temperature, stabilize exhaust gas parameters, and reduce exhaust gas heat loss.
[0047] Step S400: Based on the comprehensive control intermediate parameter set, perform closed-loop linkage processing for furnace type adaptation, including: real-time monitoring of the exhaust gas temperature at the induced draft fan inlet; when the exhaust gas temperature rises abnormally, periodically rotating the horizontal flue soot blowers under high load conditions to remove accumulated ash and heat storage; simultaneously, according to the wall temperature margin adaptive logic, actively compressing the desuperheating water usage when the margin is sufficient, and coordinating with downward swinging burner angle, increasing bottom air distribution, and reducing upper burnout air to lower the flame center and suppress horizontal flue overheating; for long-term low-load operation conditions, perform systematic furnace soot blowing, and finally, through multi-parameter coupling fine-tuning of air distribution opening, burner angle, mill operation parameters, soot blowing frequency, and oxygen bias, lock the main reheat steam temperature, exhaust gas temperature, and desuperheating water flow rate to steady-state target values throughout the full load range, completing the complete closed-loop optimization control of the subcritical pressure boiler throughout the full load range.
[0048] Specifically: The exhaust gas temperature at the fan inlet refers to the flue gas temperature collected by the temperature measuring element installed on the inlet flue of the induced draft fan. An abnormally high temperature indicates increased exhaust heat loss. Periodic rotation of horizontal flue sootblowers under high load conditions refers to the rotation of each sootblower located in the horizontal flue according to a preset cycle during stable high load periods. Adaptive wall temperature margin logic refers to a control algorithm that dynamically determines the amount of desuperheating water adjustment based on the difference between the real-time wall temperature of the heated surface and the allowable wall temperature. Sufficient margin means that the current measured wall temperature is far below the allowable upper limit, providing a large operating margin. Actively reducing desuperheating water usage refers to consciously reducing the opening of the desuperheating water regulating valve under certain conditions. Lowering the burner angle, increasing bottom air distribution, and reducing upper burnout air to lower the flame center refers to reversing the operation to lower the previously raised flame center, thus reducing the temperature of the high-temperature flue gas at the horizontal flue inlet. Suppressing horizontal flue overheating refers to preventing the wall temperature from exceeding the limit due to excessively high flue gas temperature on the heated surfaces within the horizontal flue. Long-term low-load operation refers to the state where a subcritical pressure boiler operates continuously at or below 50% of its rated load for more than a predetermined number of days. Systematic furnace soot blowing refers to a comprehensive purging operation of all soot blowers on the furnace water-cooled walls in a fixed sequence. Air distribution opening refers to the percentage of opening of the dampers for auxiliary air, fuel air, and burnout air at each level. Burner tilt angle refers to the vertical tilt angle of the burner nozzle. Mill operating parameters refer to the operating values of each coal mill, such as output, outlet temperature, separator speed, and inlet / outlet differential pressure. Soot blowing frequency refers to the number of times each soot blower is activated per unit time. Oxygen offset refers to the correction offset of the setpoint for oxygen content in the flue gas at the furnace outlet. Multi-parameter coupling fine-tuning refers to the coordinated, small-amplitude adjustment of these interrelated control variables. Full load range refers to the complete range from the minimum stable combustion load to the rated load. Main reheat steam temperature, flue gas temperature, and desuperheating water flow rate are the three key target parameters that the method ultimately needs to control simultaneously. The steady-state target value is the equilibrium value that the above three parameters are expected to reach within the full load range. Once locked, the complete closed loop of the full load range optimization control of the subcritical pressure boiler is realized.
[0049] As an example: Adaptive wall temperature margin: When the wall temperature margin of the heated surface is >15℃, the amount of desuperheating water is actively reduced to make full use of the heat absorption margin of the horizontal flue of the Π-type furnace; Long-term low-load control: If the unit operates at 50% of its rated load or below for more than 5 days, systematic furnace soot blowing is performed to avoid parameter deterioration caused by the normalization of ash accumulation; Multi-parameter coupling and linkage: In view of the high sensitivity of Π-type furnace parameters, the air distribution, swing angle, grinding group, soot blowing, and oxygen quantity are linked and finely adjusted to ensure stable and optimal operation under all conditions.
[0050] The principle of the subcritical pressure boiler full-load section optimization control method provided in this embodiment of the invention needs to be referred to the appendix. Figure 2 In the appendix Figure 2First, S100 is executed to acquire real-time parameters and mark the poor state; then S200 is entered: combustion optimization first-level processing; it is determined whether the steam temperature recovery meets the standard: if not, the deep peak shaving exclusive strategy is executed first, and then S300 is entered; if yes, it directly enters S300; S300 is executed: high load deviation correction; S400 is executed: closed-loop linkage optimization; it is determined whether the steady state meets the standard: if not, it returns to re-execute S400: closed-loop linkage optimization; if yes, the process ends.
[0051] In the embodiments of steps S100-S400, the subcritical pressure boiler full-load section optimization control method of this embodiment achieves systematic optimization through a multi-level control strategy. The acquisition of real-time parameter sets and threshold discrimination establish the basis for operating condition identification, and the marking of the initial nodes of poor steam temperature and excessive desuperheating water precisely locates the problem area. The primary processing of the general combustion optimization logic module adjusts the burner tilt angle and air distribution structure under the constraint of wall temperature safety margin, enhancing the heat exchange efficiency of the horizontal flue by raising the flame center, effectively increasing the main reheat steam temperature. The deep peak-shaving dedicated strategy processing channel solidifies key operating parameters, maintaining combustion stability under specific operating conditions, forming a secondary optimization parameter set. In the high-load deviation correction stage, specialized soot blowing is used to eliminate flue ash accumulation, specifically addressing the heat absorption deviation problem, and the intermediate parameters for flue gas temperature control ensure balanced wall temperature of the heating surface. The energy-saving collaborative processing of the air mill system dynamically adjusts the primary air pressure based on load segments, optimizes the coal mill operating combination and separator speed, and achieves collaborative optimization of power consumption and steam temperature control. The furnace type-adaptive closed-loop linkage system removes accumulated ash and heat storage through real-time monitoring of flue gas temperature and alternating soot blowing in the horizontal flue. Adaptive wall temperature margin logic dynamically reduces the amount of desuperheating water used, and combined with burner angle reduction and air distribution structure adjustment to lower the flame center, effectively suppressing overheating in the horizontal flue. Systematic furnace soot blowing under long-term low load conditions, combined with multi-parameter coupled fine-tuning, ensures that the main reheat steam temperature, flue gas temperature, and desuperheating water flow rate consistently converge to target values across the entire load range. This entire approach, through staged processing and closed-loop control, achieves efficient and stable operation of the subcritical pressure boiler across the entire load range.
[0052] This invention introduces a specialized low-load ratio control technology for subcritical Π-type boilers: a fixed air distribution, swing angle, and mill coal ratio scheme for 165MW deep peak-shaving conditions, solving the industry-wide problems of steam temperature fluctuations and unstable combustion in Π-type boilers under low load. A single reheat system with extreme desuperheating water consumption reduction technology: targeting the overheating characteristics of the Π-type boiler's horizontal flue, a reverse fine-tuning of the flame center combined with water-cooled wall soot blowing linkage is used to stably control the reheat desuperheating water flow rate to within 2t / h, resulting in significant energy savings. A segmented primary air pressure + low-oxygen adaptive energy-saving system: primary air pressure is controlled in stages according to the load characteristics of the subcritical unit, combined with controllable low-oxygen combustion, significantly reducing redundant power consumption in the air mill system. A horizontal flue directional soot blowing temperature control logic: specifically addressing the problem of easy ash accumulation in the horizontal flue of the Π-type boiler, through alternating differentiated soot blowing, the exhaust gas temperature is stabilized, reducing heat loss.
[0053] This invention ensures stable subcritical main reheat steam temperature across the full load range, improving unit cycle efficiency and reducing coal consumption for power generation; reheat desuperheating water achieves extreme energy savings, significantly reducing throttling and temperature disturbances in the thermal system, simultaneously improving unit operating economy and stability; refined and economical operation of the air mill system significantly reduces plant power consumption, resulting in outstanding energy-saving benefits; stable and controllable flue gas temperature reduces heat loss from ash accumulation in the horizontal flue, improving long-term unit operating economy; stable parameters under deep peak shaving conditions adapt to the grid's deep peak shaving requirements, simultaneously improving unit peak shaving capacity and safety stability.
[0054] It should be noted that, for the sake of simplicity, the foregoing method embodiments are all described as a series of actions. However, those skilled in the art should understand that the present invention is not limited to the described order of actions, because according to the present invention, some steps can be performed in other orders or simultaneously. Furthermore, those skilled in the art should also understand that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily essential to the present invention.
[0055] The above is an introduction to the method embodiments. The following is a further explanation of the subcritical pressure boiler full-load section optimization control scheme of the present invention through an embodiment of the subcritical pressure boiler full-load section optimization control system.
[0056] like Figure 3 As shown, this embodiment of the invention provides an optimized control system for a subcritical pressure boiler across its full load range, comprising: The real-time parameter processing module 1 is used to acquire the real-time parameter set of the subcritical pressure boiler's full-load operating conditions. The real-time parameter set includes at least the unit load signal, steam flow signal, measured values of steam temperature at the outlets of the superheater and reheater, deviation value of flue gas temperature at the furnace outlet, monitoring data of the heating surface wall temperature, and metered value of instantaneous flow rate of reheat desuperheating water. For the real-time parameter set, a threshold judgment of the full-load range operating conditions is performed. Operating points where the steam temperature does not meet the requirements of the corresponding load range and the reheat desuperheating water flow rate exceeds the control limit are marked as the initial nodes of poor steam temperature and excessive desuperheating water flow rate, forming a set of identifiers for operating conditions to be controlled in the full-load range.
[0057] The optimization logic processing module 2 is used to call the general combustion optimization logic module for first-level processing based on the set of operating conditions to be controlled across the full load range. The first-level processing includes: swinging the burner angle upward and simultaneously reducing the bottom combustion air distribution and increasing the upper burnout air under the condition that the wall temperature of the heated surface is within acceptable limits, so as to raise the center of the furnace flame and increase the heat exchange of the horizontal flue, generating the first-optimized main reheat steam temperature recovery parameters; transferring the steam temperature deviation and desuperheating water flow exceeding the limit conditions that still exist after the first optimization to the deep peak shaving exclusive strategy processing channel; the deep peak shaving exclusive strategy processing channel solidifies the bottom auxiliary air and fuel air ratio, limits the coal quantity distribution of the coal mill combination, and fixes the burner and burnout air swing angles to form a second-level optimization parameter set under the deep peak shaving exclusive operating conditions.
[0058] The node collaborative processing module 3 is used to perform high load deviation correction and power saving collaborative processing of the air mill system based on the secondary optimization parameter set. This includes: when the unit is under high load or high steam flow conditions and the deviation of steam temperature on both sides or flue gas temperature at the furnace outlet exceeds the allowable range, targeted soot blowing is activated in the superheater and reheater areas to eliminate the heat absorption deviation caused by ash accumulation in the horizontal flue and generate intermediate parameters for flue gas temperature control after wall temperature equalization; simultaneously, the primary air pressure is controlled according to the load segment set value, and according to the matching relationship between the number of coal mills in operation and the average output, a single coal mill is cut off in the low-efficiency operation range and the separator speed and mill inlet and outlet differential pressure are adjusted to form a comprehensive control intermediate parameter set covering steam temperature deviation correction and air mill power consumption optimization.
[0059] The bottom-line linkage processing module 4 is used to perform closed-loop bottom-line linkage processing for furnace type adaptation based on the comprehensive control intermediate parameter set. This includes: real-time monitoring of the exhaust gas temperature at the induced draft fan inlet; when the exhaust gas temperature rises abnormally, periodically rotating the horizontal flue soot blowers under high load conditions to remove accumulated ash and heat storage; simultaneously, according to the wall temperature margin adaptive logic, actively reducing the desuperheating water usage when the margin is sufficient, and coordinating with downward swinging burner angle, increasing bottom air distribution, and reducing upper burnout air to lower the flame center and suppress horizontal flue overheating; for long-term low-load operation conditions, performing systematic furnace soot blowing; and finally, through multi-parameter coupling fine-tuning of air distribution opening, burner angle, mill operation parameters, soot blowing frequency, and oxygen bias, locking the main reheat steam temperature, exhaust gas temperature, and desuperheating water flow rate to steady-state target values throughout the full load range, thus completing the complete closed-loop optimization control of the subcritical pressure boiler throughout the full load range.
[0060] The subcritical pressure boiler full-load section optimization control system in this embodiment achieves efficient and stable operation under all operating conditions through modular and hierarchical control. The real-time parameter processing module performs threshold discrimination on key parameters such as unit load, steam temperature, and desuperheating water flow rate, accurately identifying poor steam temperature conditions and excessive desuperheating water flow, providing precise control targets for subsequent optimization. Under the safety constraint of the heated surface wall temperature, the optimization logic processing module raises the flame center and enhances the heat exchange efficiency of the horizontal flue by adjusting the burner angle and optimizing the air distribution structure, thereby increasing the main reheat steam temperature. The deep peak-shaving strategy ensures combustion stability under peak-shaving conditions by solidifying the auxiliary air ratio, coal mill combination parameters, and burner angle. The node coordination processing module implements special soot blowing to eliminate thermal deviations in flue ash accumulation under high-load conditions, and simultaneously dynamically adjusts the primary air pressure and coal mill operation combination based on load segments to achieve coordinated optimization of steam temperature correction and coal mill system power consumption. The bottom-line linkage processing module dynamically adjusts the soot blowing strategy through real-time monitoring of flue gas temperature, combined with adaptive logic for wall temperature margin to reduce desuperheating water consumption and optimize combustion air distribution, thus suppressing overheating in the horizontal flue. Under long-term low-load conditions, it performs systematic furnace soot blowing and multi-parameter coupled fine-tuning to ensure stable convergence of main reheat steam temperature, flue gas temperature, and desuperheating water flow. All modules form a closed-loop control chain, achieving dynamic optimization and safe, economical operation of the subcritical pressure boiler across the entire load range.
[0061] The above is an introduction to the system implementation. The following application examples will further illustrate the application effects of the present invention.
[0062] For the inherent characteristics of the 330MW class subcritical Π-type boiler, such as horizontal flue, symmetrical heating surface, single reheat structure, and poor low-load stable combustion characteristics, we have developed a dedicated optimized process to improve steam temperature quality throughout the full load range, maximize the reduction of desuperheating water consumption, save electricity in the air mill system, and control flue gas temperature.
[0063] The actual application process of full-load-range dedicated optimization technology for a 330MW class subcritical Π-type boiler is as follows: The above-mentioned optimized control method was applied to a 330MW subcritical pressure Π-type boiler. The boiler adopts a horizontal flue arrangement for superheaters and reheaters, a symmetrical heating surface structure, a single reheat system, and has the inherent characteristics of poor stable combustion characteristics at low loads.
[0064] When the unit operates at a load of 180MW deep peak shaving condition, the real-time parameter set obtained by the distributed control system shows that: the main steam temperature is 528℃ and the reheat steam temperature is 522℃, both lower than the full load range operating threshold for the corresponding load segment; the instantaneous flow rate of the reheat desuperheating water is 3.5t / h, exceeding the control limit by 2t / h; and the flue gas temperature deviation on both sides of the furnace outlet is 55℃, exceeding the allowable range. The above operating points are marked as the initial nodes of poor steam temperature and excessive desuperheating water, forming a set of operating conditions to be controlled.
[0065] The control system invokes the general combustion optimization logic module for first-level processing based on the identifier set. When the temperature margin of the heated surface wall exceeds the allowable value, the burner angle is swung upwards to a larger angle, simultaneously the bottom auxiliary air damper is retracted to its lower limit opening, and the upper burnout air damper is opened wider, raising the furnace flame center and increasing the flue gas temperature at the horizontal flue inlet. After adjustment, the main steam temperature rises to 535℃, and the reheat steam temperature rises to 533℃, but the reheat desuperheating water flow rate remains at 3.2t / h, indicating that the above-standard operating condition still exists. Therefore, the control system switches the operating condition to the deep peak-shaving dedicated strategy processing channel.
[0066] After the deep peak shaving dedicated strategy processing channel is activated, the ratio of bottom auxiliary air to fuel air is fixed to a predetermined constant ratio. The output ratio of coal mill A and coal mill B is fixed to a predetermined value, while the output of coal mill C is increased. At the same time, the burner swing angle and SOFA swing angle are locked to predetermined fixed angles. After the solidification process is completed, the reheat steam temperature rises to 536℃, and the reheat desuperheating water flow rate drops to 1.8t / h, reaching below the control limit, forming a secondary optimization parameter set under the deep peak shaving dedicated operating condition.
[0067] When the unit load increased to the 250MW high-load region, the steam temperature deviation at the outlets of the superheater reached 12℃ on both sides, the deviation on both sides of the reheater reached 11℃, and the flue gas temperature deviation at the furnace outlet was 52℃, all exceeding the allowable range. Based on the secondary optimized parameter set, the control system implemented high-load deviation correction and coordinated energy-saving processing of the air mill system: two sets of dedicated soot blowing were specifically implemented in the horizontal flue superheater and reheater areas. After soot blowing, the steam temperature deviations on both sides narrowed to 5℃ and 6℃ respectively, and the flue gas temperature decreased from 137℃ to 134℃. Simultaneously, the primary air pressure was controlled within 9.5kPa according to the load segment setpoints. Based on the matching relationship between the number of operating coal mills and the average output, one coal mill was shut down when the average output of the four mills was below 18t / h. The separator speed of the remaining coal mills was adjusted to the allowable lower limit, and the differential pressure at the mill inlet and outlet was controlled within 5kPa, forming a comprehensive control intermediate parameter set covering steam temperature deviation correction and air mill power consumption optimization.
[0068] Based on the comprehensive control intermediate parameter set, the control system performs closed-loop linkage processing for furnace type adaptation: real-time monitoring of the exhaust gas temperature at the induced draft fan inlet; when the exhaust gas temperature abnormally rises to 138℃, the horizontal flue soot blowers are rotated and put into operation during high-load periods to remove accumulated ash and heat storage; when the wall temperature margin is sufficient, the reheat desuperheating water consumption is actively reduced to 1.5t / h, in conjunction with the downward swing angle of the burner, increasing the bottom air distribution, and reducing the upper burnout air to lower the flame center and suppress the overheating of the horizontal flue; for continuous low-load operation for more than 5 days, systematic furnace soot blowing is performed. Finally, through multi-parameter coupling fine-tuning of air distribution opening, burner tilt angle, mill operating parameters, soot blowing frequency and oxygen offset, the main steam temperature in the full load section is stabilized above 538℃, the reheat steam temperature is not lower than 526℃ under low load and not lower than 538℃ under high load, the flue gas temperature is lower than 135℃, and the total flow rate of reheat desuperheating water does not exceed 2t / h, thus completing the complete closed loop of full load section optimization control for a 330MW class subcritical Π-type boiler.
[0069] Figure 4 A schematic diagram of a computer-readable storage medium according to an embodiment of the present invention is shown.
[0070] like Figure 4 As shown, the non-transitory computer-readable storage medium 6 stores instructions, such as computer-readable instruction 5. When the computer-readable instruction 5 is executed by a processor, the various methods described above can be performed. The non-transitory computer-readable storage medium includes, but is not limited to, volatile memory and / or non-volatile memory. Volatile memory may include, for example, random access memory (RAM) and / or cache memory. Non-transitory non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. For example, the non-transitory computer-readable storage medium 6 can be connected to a computing device such as a computer, and then, when the computing device executes the computer-readable instruction 5 stored on the non-transitory computer-readable storage medium 6, the various methods described above can be performed.
[0071] In the embodiments provided by this invention, it should be understood that the disclosed systems and methods can be implemented in other ways. For example, the system embodiments described above are merely illustrative; for instance, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between systems or units may be electrical, mechanical, or other forms.
[0072] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for optimized control of a subcritical pressure boiler across the entire load range, characterized in that, Includes the following steps: Obtain the real-time parameter set of the subcritical pressure boiler's full-load operating conditions; perform a threshold judgment on the real-time parameter set for the full-load range operating conditions to form a set of identifiers for the operating conditions to be controlled in the full-load range; Based on the set of operating conditions to be controlled across the full load range, the general combustion optimization logic module is invoked for the first stage of processing; then the deep peak shaving dedicated strategy processing channel is entered to form a set of secondary optimization parameters under the deep peak shaving dedicated operating conditions. Based on the secondary optimized parameter set, high load deviation correction and power saving of the air mill system are performed in synergy. The primary air pressure is controlled synchronously according to the load segment set value, and according to the matching relationship between the number of coal mills in operation and the average output, a single coal mill is cut off in the inefficient operation range and the separator speed and mill inlet and outlet differential pressure are adjusted to form a comprehensive control intermediate parameter set covering steam temperature deviation correction and wind mill power consumption optimization. Based on the comprehensive control intermediate parameter set, the furnace type adaptation closed-loop linkage processing is implemented; at the same time, according to the wall temperature margin adaptive logic, the main reheat steam temperature, flue gas temperature and desuperheating water flow rate of the full load section are locked to the steady-state target value.
2. The subcritical pressure boiler full-load section optimization control method as described in claim 1, characterized in that, The real-time parameter set includes at least the unit load signal, steam flow signal, measured values of steam temperature at both ends of the superheater and reheater, deviation value of flue gas temperature at the furnace outlet, monitoring data of heating surface wall temperature, and instantaneous flow rate of reheat desuperheating water. The threshold of the full load range is judged once. The operating points where the steam temperature does not meet the corresponding load range requirement and the reheat desuperheating water flow exceeds the control limit are marked as the initial nodes of the poor steam temperature and the over-limit desuperheating water, forming a set of operating condition identifiers to be controlled in the full load range.
3. The subcritical pressure boiler full-load section optimization control method as described in claim 1, characterized in that, The first stage of processing includes: under the condition that the wall temperature of the heated surface is within a safe margin, swinging the burner angle upward and simultaneously reducing the bottom combustion air distribution and increasing the upper burnout air to raise the center of the furnace flame and increase the heat exchange of the horizontal flue, thereby generating optimized main reheat steam temperature recovery parameters.
4. The subcritical pressure boiler full-load section optimization control method as described in claim 1, characterized in that, The deep peak shaving exclusive strategy processes the bottom auxiliary air and fuel air ratio in the processing channel, limits the coal quantity distribution of the coal mill combination, and fixes the burner and burnout air swing angle, forming a secondary optimization parameter set under the deep peak shaving exclusive operating conditions.
5. The subcritical pressure boiler full-load section optimization control method as described in claim 1, characterized in that, High-load deviation correction and energy-saving synergistic processing of the air mill system include: When the unit is under high load or high steam flow conditions and the temperature deviation between the two sides or the flue gas temperature deviation at the furnace outlet exceeds the allowable range, special soot blowing is activated in the superheater and reheater areas to eliminate the heat absorption deviation caused by ash accumulation in the horizontal flue and generate intermediate parameters for flue gas temperature control after wall temperature equalization. The primary air pressure is controlled synchronously according to the load segment set value, and according to the matching relationship between the number of coal mills in operation and the average output, a single coal mill is cut off in the inefficient operation range and the separator speed and the differential pressure at the mill inlet and outlet are adjusted, forming a comprehensive set of intermediate control parameters covering steam temperature deviation correction and coal mill power consumption optimization.
6. The subcritical pressure boiler full-load section optimization control method as described in claim 1, characterized in that, The process of forming a secondary optimization parameter set for deep peak shaving specific operating conditions includes the following steps: The steam temperature deviation and desuperheating water flow rate exceeding the limit are still obtained after the general combustion optimization logic module. The current operating parameters corresponding to the operating conditions are used as the input objects of the deep peak shaving exclusive strategy processing channel, and it is determined that the operating conditions are in the deep peak shaving exclusive operating condition range of subcritical pressure boiler. The input object is subjected to a deep peak shaving-specific strategy solidification process. The solidification process includes: locking the opening of the bottom auxiliary wind damper and the opening of the bottom fuel wind damper to a predetermined constant ratio value, while fixing the output ratio between each operating coal mill to a predetermined coal quantity distribution value; and locking the burner nozzle swing angle and the burnout air nozzle swing angle to a predetermined fixed angle, forming a deep peak shaving intermediate control parameter combination that includes solidified damper opening, coal mill output and swing angle position information. Summarize all the solidified control parameters in the intermediate control parameter combination of deep peak shaving and generate a secondary optimization parameter set for the specific operating conditions of deep peak shaving.
7. The subcritical pressure boiler full-load section optimization control method as described in claim 1, characterized in that, The process of forming a comprehensive set of intermediate control parameters covering steam temperature deviation correction and windmill power consumption optimization includes the following steps: Acquire the current load signal and current steam flow signal of the subcritical pressure boiler, call the corresponding load segment setpoint according to the load range to which the current load signal belongs, use the load segment setpoint as the upper limit of primary air pressure to limit the primary air pressure, and generate the air pressure control intermediate parameters after the primary air pressure is limited. The number of coal mills currently operating in the subcritical pressure boiler and the real-time output value of each operating coal mill are obtained simultaneously. The average output value is calculated based on the number of operating coal mills and the real-time output value of each coal mill. The average output value is then compared with the preset threshold for judging inefficient operating range. When the average output value is in the inefficient operating range, the operation of cutting off a single coal mill is executed, and the separator speed and mill inlet-outlet differential pressure of the remaining operating coal mills are adjusted to generate intermediate parameters of the pulverizing system after the coal mill operation mode is optimized. By integrating the intermediate parameters of wind pressure control with the intermediate parameters of the pulverizing system, and combining them with the intermediate parameters of flue gas temperature control after wall temperature equalization generated by special soot blowing, a comprehensive set of control intermediate parameters covering steam temperature deviation correction and wind mill power consumption optimization is formed.
8. The subcritical pressure boiler full-load section optimization control method as described in claim 7, characterized in that, Load segment setting refers to the set of permissible upper limits of primary air pressure that are pre-set for different load intervals in the full load range of a subcritical pressure boiler. This is used to suppress the waste of fan power caused by redundant air pressure while ensuring the primary air's ability to carry pulverized coal.
9. The subcritical pressure boiler full-load section optimization control method as described in claim 1, characterized in that, The furnace type is adapted to a closed-loop bottom linkage process, including: real-time monitoring of the exhaust gas temperature at the inlet of the induced draft fan; when the exhaust gas temperature rises abnormally, the horizontal flue soot blower is periodically switched on and off under high load conditions to remove accumulated ash and heat. The wall temperature margin adaptive logic is to actively reduce the amount of desuperheating water when the margin is sufficient, and to cooperate with the downward swing of the burner, increase the bottom air distribution, and reduce the upper burnout air to lower the flame center and suppress the overheating of the horizontal flue; for long-term low-load operation, to perform systematic furnace soot blowing. By finely adjusting multiple parameters such as air distribution opening, burner tilt angle, mill operating parameters, soot blowing frequency, and oxygen offset, the main reheat steam temperature, flue gas temperature, and desuperheating water flow rate in the full load section are locked to the steady-state target values.
10. A subcritical pressure boiler full-load section optimization control system, used to implement the subcritical pressure boiler full-load section optimization control method as described in any one of claims 1 to 9, characterized in that, include: The real-time parameter processing module is used to acquire the real-time parameter set of the subcritical pressure boiler under full load conditions. For the real-time parameter set, perform a full-load range operating condition threshold judgment once, and mark the operating condition points where the steam temperature does not meet the corresponding load segment requirements and the reheat desuperheating water flow exceeds the control limit as the initial nodes of steam temperature poor state and desuperheating water over-limit, forming a full-load range control condition identification set; The optimization logic processing module is used to call the general combustion optimization logic module for the first-level processing based on the set of operating conditions to be controlled in the full load range. The steam temperature deviation and the desuperheating water flow exceeding the limit that still exist after the first optimization are transferred to the deep peak shaving exclusive strategy processing channel. The deep peak shaving exclusive strategy processing channel solidifies the bottom auxiliary air and fuel air ratio, limits the coal quantity distribution of the coal mill combination, and fixes the burner and burnout air swing angle to form a set of secondary optimization parameters under the deep peak shaving exclusive operating conditions. The node collaborative processing module is used to perform high load deviation correction and power saving collaborative processing of the air mill system based on the secondary optimization parameter set. The primary air pressure is controlled synchronously according to the load segment set value, and according to the matching relationship between the number of coal mills in operation and the average output, a single coal mill is cut off in the inefficient operation range and the separator speed and mill inlet and outlet differential pressure are adjusted to form a comprehensive control intermediate parameter set covering steam temperature deviation correction and wind mill power consumption optimization. The bottom-line linkage processing module is used to perform closed-loop bottom-line linkage processing for furnace type adaptation based on the comprehensive control intermediate parameter set. At the same time, according to the wall temperature margin adaptive logic, when the margin is sufficient, it actively reduces the amount of desuperheating water and coordinates with the downward swing of the burner angle, increases the bottom air distribution, and reduces the upper burnout air to lower the flame center and suppress the overheating of the horizontal flue. For long-term low-load operation conditions, it performs systematic furnace soot blowing. Finally, through multi-parameter coupling fine adjustment of air distribution opening, burner swing angle, mill operation parameters, soot blowing frequency and oxygen bias, the main reheat steam temperature, flue gas temperature and desuperheating water flow rate of the full load section are locked to the steady-state target value, completing the complete closed loop of the subcritical pressure boiler full load section optimization control.
