Methods for preventing high-pressure water leakage in high-pressure concrete-lined tunnels

By establishing a load-bearing model to analyze the seepage mechanism and combining cement grouting and curtain grouting measures, the leakage problem of high-pressure concrete-lined tunnels was solved, and the safety and controllability of the water diversion system were improved.

CN123069485APending Publication Date: 2026-11-10POWERCHINA ZHONGNAN ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610990394.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-03
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

High-pressure concrete-lined tunnels are prone to cracking under high internal water pressure, leading to high-pressure water leakage and affecting the economic efficiency and safety of the power station.

Method used

By establishing a bearing capacity model to analyze the seepage mechanism, identifying seepage channels, and employing measures such as cement grout composite grouting, curtain grouting, and monitoring equipment, we can control seepage from its source, path, and escape point, thereby enhancing the impermeability of the surrounding rock and improving seepage control.

Benefits of technology

This achieved controllable leakage, improved the safety performance of the water diversion system, and ensured the safety of key projects in the pumped storage power station.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123069485A_ABST
    Figure CN123069485A_ABST
Patent Text Reader

Abstract

This invention provides a method for preventing high-pressure water seepage in high-pressure concrete-lined tunnels, comprising: establishing a bearing capacity model based on the structural characteristics and geological conditions of the reinforced concrete lining of the high-pressure tunnel in a pumped storage power station; analyzing the seepage mechanism of the high-pressure tunnel; identifying potential seepage areas based on the analysis results of the bearing capacity model; and identifying high-pressure water seepage channels based on typical structures; and designing a comprehensive high-pressure water seepage prevention and control plan from the perspectives of seepage source, seepage path, seepage exit point, and seepage control. This invention analyzes the seepage mechanism of high-pressure tunnels by establishing a bearing capacity model, identifies seepage channels, and designs seepage prevention and control measures from the perspectives of seepage source, seepage path, seepage exit point, and seepage control. By increasing the impermeability of the surrounding rock, extending the seepage path, actively diverting water, and implementing system monitoring, the invention achieves safe monitoring indicators and significantly improves the safety performance of the water diversion system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of hydropower station construction technology, and in particular to a method for preventing high-pressure water leakage at the structural location of high-pressure concrete-lined tunnels. Background Technology

[0002] High-pressure water diversion tunnels are an important component of pumped-storage power stations, bearing internal water pressures of up to hundreds of meters and extending over a thousand meters in length. The lining of high-pressure tunnels typically employs reinforced concrete or steel plate lining. While steel plate lining offers advantages such as high internal water pressure resistance and good seepage prevention, it also suffers from high cost, difficult construction, long construction period, and weak structural stability against external pressure. Therefore, many projects, when conditions permit, adopt the more economical and convenient reinforced concrete lining method.

[0003] Reinforced concrete lining structures are unable to withstand high internal water pressure, and the concrete will inevitably crack under such pressure. High-pressure water seeps into the rock mass along faults and fissures, which may cause fissure expansion, soil erosion, particle movement, and even high-pressure hydraulic fracturing, resulting in seepage damage and affecting the economic efficiency and safety of the power station.

[0004] Therefore, it is necessary to propose a leakage prevention and control method for high-pressure concrete-lined tunnels. Summary of the Invention

[0005] The present invention aims to at least partially solve one of the technical problems in the related art.

[0006] To achieve the above objectives, this invention proposes a method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels, comprising the following steps:

[0007] S1. Based on the structural characteristics of the reinforced concrete lining of the high-pressure tunnel of the pumped storage power station and the geological conditions, a bearing model was established to analyze the seepage mechanism of the high-pressure tunnel of the pumped storage power station. S2. Based on the analysis results of the bearing capacity model, identify areas where water seepage may occur, and identify high-pressure water seepage channels in conjunction with typical structures. S3. Based on the analysis results, conduct comprehensive high-pressure water leakage prevention and control operations from the perspectives of seepage source, seepage path, seepage outlet, and seepage control.

[0008] This invention analyzes the seepage mechanism of high-pressure tunnels by establishing a bearing model, identifies seepage channels based on the analysis results, and implements seepage control measures from the perspectives of seepage source, seepage path, seepage outlet, and seepage management. By increasing the impermeability of the surrounding rock, extending the seepage path, actively diverting and draining water, and implementing system monitoring, the invention achieves safe monitoring indicators and controllable leakage, thus significantly improving the safety performance of the water diversion system, which is the most critical component of pumped storage power station projects.

[0009] Optionally, in S1, when establishing the bearing model, the influencing factors include nonlinearity of lining cracking, nonlinearity of contact between lining and surrounding rock, relative slippage between steel reinforcement and concrete, and seepage stress coupling.

[0010] Furthermore, in S2, when determining the area where seepage may occur, the seepage points in the main high-pressure water diversion tunnel, the branch tunnel, and the branch tunnel are identified, and the seepage channels from the main water diversion tunnel, the branch tunnel, and the branch tunnel to the typical structure and the downstream plant are identified.

[0011] Furthermore, in S3, the comprehensive high-pressure water seepage prevention and control operation, when controlling seepage from the root cause, includes: systematically grouting a composite of cement grout and slipper grout at seepage points that are prone to seepage in the main water diversion tunnel, water diversion branch tunnel, and branch tunnel, to seal the source of high-pressure seepage.

[0012] Furthermore, in S3, the comprehensive high-pressure water seepage prevention and control operation, when controlling seepage from the perspective of seepage path, includes: for the seepage channels identified in S2, from the main water diversion tunnel, water diversion branch tunnel, branch tunnel to the typical structure to the downstream plant, curtain grouting operation is carried out in the flow area of ​​the seepage channel, so that the grouting area covers the main structural channel, and the operation of blocking seepage is completed from the seepage path.

[0013] Furthermore, in S3, the comprehensive high-pressure water leakage prevention and control operation, when controlling leakage from the perspective of the seepage point, includes: A drainage curtain is installed between the upper, middle and lower drainage corridors on the upstream side of the main plant to penetrate the typical structure. Before the water flows into the plant, the seepage that escapes through the seepage source and seepage path is diverted and discharged, and the seepage is guided to the upper, middle and lower drainage corridors for discharge.

[0014] Furthermore, in S3, the comprehensive high-pressure water leakage prevention and control operation, from the perspective of seepage control, includes: Monitoring equipment, including piezometers and weirs, is installed in construction adits and drainage channels near typical structures to measure and monitor seepage in real time.

[0015] Furthermore, the monitoring equipment can also be used to detect the effectiveness of other prevention and control operations in S3; when the monitoring equipment detects that the seepage flow exceeds the warning value, or the pore water or fluid pressure inside the structure exceeds the warning value, the prevention and control construction of the seepage source, seepage path, and seepage escape point is investigated, and the poor construction effect is repaired.

[0016] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description

[0017] The above and / or additional aspects and advantages of the present invention will become apparent and readily understood from the following description of the embodiments taken in conjunction with the accompanying drawings, wherein: Figure 1 This is a schematic diagram of the method steps for preventing high-pressure water leakage at the structural location of a high-pressure concrete-lined tunnel according to the present invention. Figure 2 This is a schematic diagram of a three-dimensional grouting model of a water diversion branch tunnel according to a method for preventing high-pressure water leakage at the structural location of a high-pressure concrete-lined tunnel, based on the present invention. Figure 3 This is a schematic diagram of step S3 of a method for preventing high-pressure water leakage at the structural location of a high-pressure concrete-lined tunnel according to the present invention, which involves consolidation grouting along the water diversion tunnel. Figure 4 This is a longitudinal cross-sectional schematic diagram of the curtain grouting from the construction adit in step S3 of the method for preventing high-pressure water seepage in the structure location of a high-pressure concrete-lined tunnel according to the present invention. Figure 5 This is a longitudinal section schematic diagram of curtain grouting from the drainage gallery in step S3 of a method for preventing high-pressure water seepage in the structure of a high-pressure concrete-lined tunnel according to the present invention. Figure 6 This is a schematic diagram of a drainage curtain structure that runs through the upper, middle and lower drainage corridors in step S3 of a high-pressure water seepage prevention method for high-pressure concrete-lined tunnels according to the present invention. Detailed Implementation

[0018] Embodiments of the present invention are described in detail below, examples of which are illustrated in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain the present invention, and should not be construed as limiting the present invention.

[0019] A method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels is described below. Figures 1 to 5 Please provide a detailed explanation.

[0020] A method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels includes the following steps: S1. Based on the structural characteristics of the reinforced concrete lining of the high-pressure tunnel of the pumped storage power station and the geological conditions, a bearing model was established to analyze the seepage mechanism of the high-pressure tunnel of the pumped storage power station. S2. Based on the analysis results of the bearing capacity model, identify areas where water seepage may occur, and identify high-pressure water seepage channels by combining typical structures (such as faults, joints, etc.). S3. Based on the analysis results, conduct comprehensive high-pressure water leakage prevention and control operations from the perspectives of seepage source, seepage path, seepage outlet, and seepage control.

[0021] This invention analyzes the seepage mechanism of high-pressure tunnels by establishing a bearing model, identifies seepage channels based on the analysis results, and implements seepage control measures from the perspectives of seepage source, seepage path, seepage outlet, and seepage management. By increasing the impermeability of the surrounding rock, extending the seepage path, actively diverting and draining water, and implementing system monitoring, the invention achieves safe monitoring indicators and controllable leakage, thus significantly improving the safety performance of the water diversion system, which is the most critical component of pumped storage power station projects.

[0022] In some embodiments, during S1, when the bearing capacity model is established, the influencing factors include nonlinearity of lining cracking, nonlinearity of contact between lining and surrounding rock, relative slippage between reinforcement and concrete, and seepage stress coupling, thereby achieving: In the reinforced concrete lining structure of high-pressure tunnels, a random discrete crack model is used to simulate the cracking process of the reinforced concrete lining. The location and number of cracks in the lining are automatically determined by the calculation process, avoiding the influence of artificially preset cracks on the accuracy and authenticity of the calculation results. Thus, the calculation results of the lining cracking process that are more in line with the actual engineering situation can be obtained. In the reinforced concrete lining structure of high-pressure tunnels, independent rod elements and contact elements are used to simulate the steel bars and their interface with the lining concrete. This can accurately simulate the bonding and relative slippage processes between the steel bars and the lining concrete, thereby obtaining the uneven distribution law of steel bar stress, which is more in line with engineering practice. In the reinforced concrete lining structure of high-pressure tunnels, contact elements are used to simulate the unsteady seepage at the interface between the lining concrete and the surrounding rock. This can accurately simulate the process of internal water seepage after the lining cracks, thereby obtaining the true stress state of the lining structure and providing a basis for structural design. In the cracking process of reinforced concrete lining structure of high-pressure tunnel, the seepage-stress coupling effect is considered. The indirect coupling method is adopted to dynamically adjust the permeability coefficient of lining cracks and the contact surface between lining concrete and surrounding rock. This accurately simulates the change process of unsteady seepage field during the filling and emptying of tunnel, and provides a basis for the mechanical behavior analysis and leakage calculation of lining structure. The entire process of tunnel construction, grouting, water filling and venting is simulated in the reinforced concrete lining structure of high-pressure tunnels to obtain the mechanical behavior of the lining structure throughout its entire life cycle, providing a basis for structural design.

[0023] The load-bearing mechanism is analyzed based on the load-bearing model as follows: In terms of lining behavior, under the action of high internal water, once the tensile stress of concrete exceeds the tensile strength of concrete, the reinforced concrete lining will inevitably crack, and will develop from a linear elastic structure into a "combination" of nonlinear cracks and linear elastic blocks, with a crack density of 12 cracks / m. Regarding the development of seepage, as the cracks develop, water acting on the inner surface of the lining and seeping outward along the cracks further seeps along the contact surface between the lining and the surrounding rock, and finally the lining structure exhibits an internal and external pressure phenomenon. Regarding the load-bearing structure: After the lining structure is subjected to equal pressure from both inside and outside, the lining exhibits the characteristics of a "permeable lining," with the high internal water pressure acting directly on the surrounding rock, making the surrounding rock the main load-bearing component; Based on the above bearing mechanism, it is shown that the seepage prevention capacity of the surrounding rock is the core of seepage control in high-pressure tunnels.

[0024] In some embodiments, in S2, when determining the area where seepage may occur, the seepage points that are prone to seepage are identified along the main high-pressure water diversion tunnel, the branch tunnel, and the tributary tunnel, and the seepage channels from the main high-pressure water diversion tunnel, the branch tunnel, and the tributary tunnel to the typical structure and the downstream plant are identified.

[0025] In some embodiments, S3, when the comprehensive high-pressure water seepage prevention and control operation addresses the root cause of seepage, includes: systematically applying a composite grouting solution of cement grout and chemical grout at seepage points prone to seepage in the main high-pressure water diversion tunnel, diversion branch tunnel, and branch tunnel to seal the source of high-pressure seepage. In other embodiments, additional chemical grouting measures are implemented at structurally developed areas.

[0026] To address the root cause, cement-based grouting is used around the flow channel, especially at locations where the structure directly penetrates. Chemical grouting is also employed to reinforce areas with developed structures, thereby increasing the strength of the surrounding rock and reducing its permeability coefficient.

[0027] In some embodiments, S3, when the comprehensive high-pressure water seepage prevention and control operation controls seepage from the perspective of seepage path, includes: for the seepage channels identified in S2, from the high-pressure water intake main tunnel, water intake branch tunnel, branch tunnel to the typical structure to the downstream plant, curtain grouting operation is carried out in the flow area of ​​the seepage channel, so that the grouting area covers the main structural channel, and the operation of blocking seepage is completed from the seepage path.

[0028] By "blocking" the seepage path, curtain grouting is used to extend the seepage path, reduce the seepage gradient, and decrease the seepage flow rate by addressing the seepage channels that may escape from the flow channel and the plant, construction adits, drainage corridors, and other potential seepage points.

[0029] In some embodiments, the comprehensive high-pressure water leakage prevention and control operation, when controlling leakage from the perspective of the seepage point, includes: A drainage curtain is installed between the upper, middle and lower drainage corridors on the upstream side of the main plant building, which runs through the typical structure. Specifically, it is set as a drainage inverted hole. Before the water flows into the plant building, the seepage that escapes through the seepage source and seepage path is diverted and discharged, and the seepage is guided to the upper, middle and lower drainage corridors for discharge.

[0030] By "draining" from the outlet and fully employing "blocking" and "resisting" measures, the amount of internal water seepage can be effectively reduced. Furthermore, by adopting centralized drainage methods, the adverse effects of seepage on the cavern complex can be reduced.

[0031] In some embodiments, S3, when the comprehensive high-pressure water leakage prevention and control operation focuses on seepage control, includes: Monitoring equipment, including piezometers and weirs, is installed in construction adits and drainage channels near typical structures to measure and monitor seepage in real time.

[0032] By "measuring" from the perspective of seepage control, monitoring designs are carried out around each seepage risk point to achieve comprehensive control over the actual seepage situation in high-pressure tunnels.

[0033] In some embodiments, the monitoring equipment can also be used to detect the effectiveness of other prevention and control operations in S3; when the monitoring equipment detects that the seepage flow exceeds the warning value, or the pore water or fluid pressure inside the structure exceeds the warning value, the prevention and control construction of the seepage source, seepage path, and seepage escape point is investigated, and the location with poor construction effect is repaired.

[0034] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this invention and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0035] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this invention, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.

[0036] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a connection that allows communication between them; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0037] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can mean that the first feature is in direct contact with the second feature, or that the first feature is in indirect contact with the second feature through an intermediate medium. Furthermore, "above," "over," and "on top" of the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.

[0038] In this invention, the terms "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to a specific feature, structure, material, or characteristic described in connection with that embodiment or example, which is included in at least one embodiment or example of the invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0039] Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention.

Claims

1. A method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels, characterized in that, Includes the following steps: S1. Based on the structural characteristics of the reinforced concrete lining of the high-pressure tunnel of the pumped storage power station and the geological conditions, a bearing model was established to analyze the seepage mechanism of the high-pressure tunnel of the pumped storage power station. S2. Based on the analysis results of the bearing capacity model, identify areas where water seepage may occur, and identify high-pressure water seepage channels in conjunction with typical structures. S3. Based on the analysis results, conduct comprehensive high-pressure water leakage prevention and control operations from the perspectives of seepage source, seepage path, seepage outlet, and seepage control.

2. The method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels as described in claim 1, characterized in that, In S1, when the bearing model is established, the influencing factors include nonlinearity of lining cracking, nonlinearity of contact between lining and surrounding rock, relative slippage between steel reinforcement and concrete, and seepage stress coupling.

3. The method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels as described in claim 1, characterized in that, In S2, when determining the area where seepage may occur, the seepage points that are prone to seepage are identified along the main high-pressure water diversion tunnel, the branch tunnel, and the tributary tunnel. The seepage channels from the main high-pressure water diversion tunnel, the branch tunnel, and the tributary tunnel to the typical structure and the downstream plant are then identified.

4. The method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels as described in claim 1, characterized in that, In S3, the comprehensive high-pressure water seepage prevention and control operation, when controlling seepage from the root cause, includes: systematically grouting a composite of cement grout and chemical grout at seepage points that are prone to seepage at the main high-pressure water diversion tunnel, water diversion branch tunnel, and branch tunnel, and sealing the source of high-pressure seepage.

5. A method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels as described in claim 3, characterized in that, In S3, the comprehensive high-pressure water seepage prevention and control operation, when controlling seepage from the perspective of seepage path, includes: for the seepage channels identified in S2, from the main water diversion tunnel, water diversion branch tunnel, branch tunnel to the typical structure to the downstream plant, curtain grouting operation is carried out in the flow area of ​​the seepage channel, so that the grouting area covers the main structural channel, and the seepage is blocked from the seepage path.

6. The method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels as described in claim 1, characterized in that, In S3, the comprehensive high-pressure water leakage prevention and control operation, when controlling leakage from the perspective of the seepage point, includes: A drainage curtain is installed between the upper, middle and lower drainage corridors on the upstream side of the main plant to penetrate the typical structure. Before the water flows into the plant, the seepage that escapes through the seepage source and seepage path is diverted and discharged, and the seepage is guided to the upper, middle and lower drainage corridors for discharge.

7. The method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels as described in claim 1, characterized in that, In S3, the comprehensive high-pressure water leakage prevention and control operation, when controlling leakage from the perspective of seepage management, includes: Monitoring equipment, including piezometers and weirs, is installed in construction adits and drainage channels near typical structures to measure and monitor seepage in real time.

8. A method for preventing high-pressure water leakage at structural locations in high-pressure concrete-lined tunnels as described in claim 7, characterized in that, The monitoring equipment can also be used to detect the effectiveness of other prevention and control operations in S3; when the monitoring equipment detects that the seepage flow exceeds the warning value, or the pore water or fluid pressure inside the structure exceeds the warning value, the prevention and control construction of the seepage source, seepage path, and seepage escape point is investigated, and the poor construction effect is repaired.