A power system for railway shunting locomotives

By adopting a power system with multiple diesel generator sets and controllers on railway shunting locomotives, the number of operating diesel generator sets and power distribution can be dynamically adjusted, solving the problem of low fuel efficiency of railway shunting locomotives at idling and low load, improving fuel utilization and system reliability, and reducing fuel consumption and power battery replacement costs.

CN123104709APending Publication Date: 2026-11-17CRRC QISHUYAN CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611601201.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Railway shunting locomotives have low fuel efficiency under idling and low load conditions, low reliability of a single diesel engine, and rapid degradation of the power battery under frequent load changes, resulting in high fuel consumption and high power battery replacement costs.

Method used

The power system consists of multiple diesel generator sets and controllers. The controllers obtain the vehicle's power demand in real time and dynamically adjust the target number of operating diesel generator sets and power distribution to ensure that some sets operate in the high-efficiency range while others compensate for the remaining power and adapt to load changes.

Benefits of technology

It improves fuel efficiency, reduces the impact of a single diesel engine failure on the entire vehicle, avoids rapid degradation of the power battery, and reduces the overall fuel consumption and power battery replacement costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123104709A_ABST
    Figure CN123104709A_ABST
Patent Text Reader

Abstract

This application discloses a power system for railway shunting locomotives, relating to the field of railway shunting locomotives. The power system includes a controller and a power unit, which includes multiple diesel generator sets. Each diesel generator set includes a diesel engine and a generator. The controller acquires the current total power demand of the railway shunting locomotive and determines the target number of operating diesel generator sets based on the relationship between the total power demand and the power of the multiple diesel generator sets. The controller controls the operation of the target number of operating diesel generator sets. Among the operating diesel generator sets, some diesel generator sets operate at the target power, while others compensate for the remaining power. The remaining power is the difference between the total power demand of the locomotive and the total output power of the remaining diesel generator sets. This application does not rely on a power battery and can effectively adapt to the power requirements of railway shunting locomotives.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of railway shunting locomotive technology, and more particularly to a power system for railway shunting locomotives. Background Technology

[0002] Railway shunting locomotives are railway locomotives specifically used for the assembly, disassembly, loading, unloading, and transfer of vehicles within railway stations, marshalling yards, dedicated lines, and industrial and mining enterprises.

[0003] Currently, railway shunting locomotives generally use a single high-power diesel engine as their power source, driving the locomotive through a main generator and traction motor. However, under certain operating conditions of railway shunting locomotives (such as idling and low-load conditions), the fuel efficiency of a single high-power diesel engine is extremely low, resulting in high fuel consumption. Furthermore, if a single diesel engine fails, the entire locomotive will lose traction power, leading to low reliability.

[0004] Although some railway shunting locomotives currently use a hybrid power system consisting of a diesel engine and a power battery to improve engine operating conditions through the power battery, the frequent switching of railway shunting locomotives from no-load to heavy-load results in large instantaneous changes in power demand, leading to frequent impact loads. This accelerates the degradation of the power battery, resulting in high replacement costs throughout the power battery's life cycle.

[0005] Therefore, how to construct a power system that is compatible with railway shunting locomotives is a technical problem that urgently needs to be solved. Summary of the Invention

[0006] In view of the above problems, this application provides a power system for railway shunting locomotives to meet the power system requirements of railway shunting locomotives. The specific solution is as follows: The first aspect of this application provides a power system for railway shunting locomotives, the power system including a controller and a power unit, the power unit including multiple diesel generator sets, each diesel generator set including a diesel engine and a generator. The controller obtains the current total power demand of the railway shunting locomotive, and determines the target number of the multiple diesel generator sets to operate based on the relationship between the total power demand and the power of the multiple diesel generator sets. The controller controls the operation of the target number of diesel generator sets. Among the multiple operating diesel generator sets, some diesel generator sets are at the target power, while others compensate for the remaining power. The remaining power is the power difference between the vehicle's required power and the total output power of some diesel generator sets.

[0007] In one possible implementation, the determination of the target number of operating diesel generator sets based on the relationship between the vehicle's required power and the power of the plurality of diesel generator sets is specifically configured as follows: When the total power demand of the vehicle does not exceed the power with the lowest corresponding fuel consumption of a single diesel generator set, the target number of operations is determined to be 1. When the total power demand of the vehicle is greater than the sum of the power with the lowest corresponding fuel consumption of N diesel generator sets, but does not exceed the sum of the power with the lowest corresponding fuel consumption of all diesel generator sets, the target number of operation is determined to be N+1, where N is an integer not less than 1, and N+1 does not exceed the total number of diesel generator sets in the power system. When the required power of the vehicle is greater than the sum of the power of the diesel generator sets with the lowest corresponding fuel consumption, the target number of operation is determined to be the total number of diesel generator sets in the power system.

[0008] In one possible implementation, the target power is the power with the lowest corresponding fuel consumption; The controller controls the operation of the target number of diesel generator sets, specifically configured as follows: When the target number of operating units is M, and the total power demand of the vehicle does not exceed the sum of the power with the lowest corresponding fuel consumption of all diesel generator sets, the controller controls M-1 diesel generator sets to operate at the power with the lowest corresponding fuel consumption, and controls 1 diesel generator set to compensate for the remaining power, where M is an integer greater than 1, and M does not exceed the total number of diesel generator sets in the power system.

[0009] In one possible implementation, the target power is the rated power; The controller controls the operation of the target number of diesel generator sets, specifically configured as follows: When the target number of operating units is M, and the total power demand of the vehicle is greater than the sum of the power of the corresponding lowest fuel consumption of all diesel generator sets, the controller controls M-1 diesel generator sets to operate at rated power and controls 1 diesel generator set to compensate for the remaining power, where M is the total number of diesel generator sets in the power system.

[0010] In one possible implementation, the controller is further configured as follows: When it is determined that the required power of the vehicle meets the switching conditions for the target number of operations, the target number of operations is adjusted.

[0011] In one possible implementation, the specific configuration for determining that the vehicle's required power meets the switching condition for the target number of operations is as follows: If the relationship between the required power of the vehicle and the power of the diesel generator set remains constant for a preset period of time, it is determined that the required power of the vehicle meets the switching condition for the target number of operations.

[0012] In one possible implementation, the controller is further configured as follows: Once the target number of operating units is adjusted, the target diesel generator sets are controlled to be put into operation or stopped based on the cumulative operating volume of each diesel generator set.

[0013] In one possible implementation, after the target number of operating units is adjusted, the target diesel generator sets are controlled to start or stop operating based on the cumulative operating volume of each diesel generator set. Specifically, this is configured as follows: When the target number of operations increases, priority is given to putting the target diesel generator set with the smallest cumulative number of operations into operation; When the target number of operations decreases, priority is given to stopping the target diesel generator set with the largest cumulative operating volume.

[0014] In one possible implementation, the controller is further configured as follows: When a faulty generator set is detected among multiple diesel generator sets, the faulty generator set is excluded. The target number of operations is re-determined based on the relationship between the required power of the vehicle and the power of the remaining available diesel generator sets.

[0015] In one possible implementation, the controller is further configured as follows: Obtain historical change data of the vehicle's power demand, and based on the historical change data, predict the power change trend of the vehicle's power demand within a future preset time window; Based on the power change trend, the target number of operations is adjusted.

[0016] Based on the above technical solution, this application provides a power system for railway shunting locomotives. This system employs a power system including a controller and multiple diesel generator sets. The multiple diesel generator sets effectively reduce the impact of a single diesel generator set failure on the railway shunting locomotive. The system obtains the current total power demand of the railway shunting locomotive in real time through the controller, and determines the target number of operating diesel generator sets based on the relationship between the total power demand and the power of the multiple diesel generator sets. This allows the number of operating diesel generator sets to dynamically adapt to the current total power demand of the railway shunting locomotive under varying operating conditions such as idling, low load, and heavy load. Furthermore, when the controller controls the target number of operating diesel generator sets to be in operation, some diesel generator sets maintain the target power output, keeping them in their efficient operating range and effectively improving fuel utilization. Other generator sets compensate for the remaining power of the total power demand and the total output power of some units, responding to sudden load changes in the railway shunting locomotive without relying on power batteries, thus avoiding the high costs associated with power battery degradation. Therefore, this system can effectively adapt to the power requirements of railway shunting locomotives. Attached Figure Description

[0017] The above and other features, advantages, and aspects of the embodiments of this disclosure will become more apparent from the accompanying drawings and the following detailed description. Throughout the drawings, the same or similar reference numerals denote the same or similar elements. It should be understood that the drawings are schematic, and the originals and elements are not necessarily drawn to scale.

[0018] Figure 1 A schematic diagram of the power system for a railway shunting locomotive provided in an embodiment of this application; Figure 2 This is a schematic diagram of the overall logic for power priority allocation of a diesel generator set, provided as an embodiment of this application. Detailed Implementation

[0019] The embodiments of this application are described below with reference to the accompanying drawings. The terminology used in the implementation section of this application is for explaining specific embodiments only and is not intended to limit the scope of this application.

[0020] As will be known to those skilled in the art, with the development of technology and the emergence of new scenarios, the technical solutions provided in the embodiments of this application are also applicable to similar technical problems.

[0021] The terms "first," "second," etc., used in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such terms are interchangeable where appropriate; this is merely a way of distinguishing objects with the same attributes in the embodiments of this application. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion, so that a process, method, system, product, or apparatus that comprises a series of elements is not necessarily limited to those elements, but may include other elements not explicitly listed or inherent to those processes, methods, products, or apparatuses.

[0022] Railway shunting locomotives exhibit several typical operational characteristics, including drastic load fluctuations, frequent starts and stops, and prolonged idling. Dramatic load fluctuations refer to the frequent switching of shunting locomotives from empty to heavily loaded, resulting in large instantaneous changes in their power demand. Frequent starts and stops mean that shunting locomotives start and stop far more often than mainline locomotives, frequently moving vehicles repeatedly over short distances. Prolonged idling means that shunting locomotives need to remain on standby for extended periods during operational breaks, with idling accounting for a high percentage of their lifespan.

[0023] However, a single large diesel engine has extremely low fuel efficiency under idling and low-load conditions of railway shunting locomotives, resulting in high fuel consumption. Although a power battery can be added, railway shunting locomotives have the characteristic of drastic load fluctuations and frequent impact loads, which accelerates the degradation of the power battery and leads to high replacement costs throughout the power battery's life cycle.

[0024] To address the aforementioned problems, this application provides a power system for railway shunting locomotives. The power system for railway shunting locomotives according to this application embodiment will be described in detail below with reference to the accompanying drawings.

[0025] Reference Figure 1 , Figure 1 A schematic diagram of the power system for a railway shunting locomotive is provided as an embodiment of this application, such as... Figure 1 As shown in the embodiment of this application, a power system for a railway shunting locomotive is provided. The power system may include a controller and a power unit, which includes multiple diesel generator sets. Each diesel generator set has the same power output and may include a diesel engine and a generator. The diesel generator sets convert the chemical energy generated by diesel combustion into mechanical energy, which is then converted into electrical energy by the generator to provide power to the locomotive's traction motor and auxiliary systems. The power unit may also include electrical and mechanical drive devices adapted to the multiple diesel generator sets.

[0026] like Figure 1As shown, the electrical equipment may include rectifiers, traction inverters, auxiliary inverters, and auxiliary power systems. The auxiliary power system refers to all electrical equipment on the locomotive other than traction drive and their power supply circuits, including cooling fans, air compressors, air conditioners, lighting, and control power supplies. The output of each diesel generator set is connected to a corresponding rectifier. The rectifier converts the variable-frequency, variable-voltage AC power generated by the generator into stable DC power, which is then fed into the common DC bus. The traction inverter, according to instructions, inverts the stable DC power provided by the common DC bus into variable-frequency, variable-voltage AC power to drive the traction motors and precisely control the traction force and speed of the railway shunting locomotive. The auxiliary inverter converts the DC power into AC power that meets the power standards for locomotive auxiliary systems, providing stable power to auxiliary equipment such as cooling fans, air compressors, air conditioners, lighting, and control systems in the railway shunting locomotive, ensuring the normal operation of all auxiliary systems during traction operations.

[0027] like Figure 1 As shown, the mechanical drive unit may include a traction motor, a gearbox, and axles. The traction motor can be powered by a traction inverter in the electrical system, and the starting and speed regulation of the railway shunting locomotive are achieved through variable voltage and frequency conversion control. The gearbox can convert the high speed and low torque output of the traction motor into low speed and high torque suitable for driving the wheelsets of the railway shunting locomotive. The axles can convert the torque output of the gearbox into traction or braking force between the wheels and rails, driving the railway shunting locomotive and bearing the vertical load of the railway shunting locomotive.

[0028] like Figure 1 As shown, the output of each diesel generator set is connected to a corresponding rectifier. The rectifier converts the variable-frequency, variable-voltage AC power generated by the diesel generator set into stable DC power, which is then fed into a common DC bus. The DC bus serves as the energy collection and distribution hub of the power system, connecting to both the traction inverter and the auxiliary inverter. The traction inverter converts the DC power into variable-frequency, variable-voltage AC power to drive the traction motor. The traction motor transmits torque to the axles through a gearbox, thus driving the locomotive. The auxiliary inverter provides a stable power supply to the auxiliary system. Of course, Figure 1 For illustrative purposes only, in practical applications, the number of diesel generator sets in the power system can be determined based on the maximum power demand of railway shunting locomotives to ensure that the operation of the diesel generator sets can meet all the power requirements of railway shunting locomotives.

[0029] The power system in this embodiment eliminates the power battery, thereby avoiding the problems of rapid battery degradation and high life cycle cost under shunting impact load. At the same time, the design of multiple diesel generator sets avoids the risk of vehicle paralysis caused by a single point failure of a single high-power diesel engine.

[0030] Based on the aforementioned power system architecture, the power system controller can obtain the current total power demand of the railway shunting locomotive. According to the relationship between the total power demand and the power output of multiple diesel generator sets, the controller determines the target number of operating diesel generator sets. The controller then controls the operation of the target number of operating diesel generator sets. Among the operating diesel generator sets, some are operating at the target power, while others compensate for any remaining power.

[0031] The total power requirement of a shunting locomotive refers to the total power required by the locomotive under current operating conditions to maintain the normal operation of its traction, auxiliary systems, and onboard equipment. This total power requirement can be calculated from signals such as the locomotive's traction handle position, speed, and auxiliary equipment load.

[0032] After the controller obtains the current total power demand of the railway shunting locomotive, it can determine the target number of diesel generator sets to operate based on the relationship between the total power demand and the power of multiple diesel generator sets. Specifically, the logic for determining the target number of operating sets can be as follows: When the total power demand of the vehicle does not exceed the lowest fuel consumption power of a single diesel generator set, the target operating quantity is determined to be 1. When the total power demand of the vehicle is greater than the sum of the corresponding lowest fuel consumption power of N diesel generator sets, but does not exceed the sum of the corresponding lowest fuel consumption power of all diesel generator sets, the target number of operation is determined to be N+1, where N is an integer not less than 1, and N+1 does not exceed the total number of diesel generator sets in the power system. When the total power demand of the vehicle is greater than the sum of the power of the diesel generator sets with the lowest corresponding fuel consumption, the target number of operation is determined to be the total number of diesel generator sets in the power system.

[0033] For diesel generator sets, the power with the lowest fuel consumption can be obtained through the relationship between fuel consumption and output power. When the fuel consumption rate reaches the global minimum, it corresponds to an output power of the diesel generator set. This output power corresponds to the operating point where the diesel generator set has the best fuel economy. The specific value of this output power can depend on the diesel engine model, displacement, and calibration data, etc.

[0034] Taking four diesel generator sets as an example, the logic for determining the target number of operations can be further refined as follows: the current total power demand of the railway shunting locomotive is P_req, the power with optimal fuel economy is P_ops, and the power with optimal fuel economy for the four diesel generator sets are P_ops1, P_ops2, P_ops3 and P_ops4, respectively. When P_req≤P_ops1, the target number of runs is determined to be 1; When P_ops1 < P_req ≤ P_ops1 + P_ops2, the target number of runs is determined to be 2. When P_ops1+P_ops2<P_req≤P_ops1+P_ops2+P_ops3, the target number of runs is determined to be 3. When P_ops1+P_ops2+P_ops3<P_req≤P_ops1+P_ops2+P_ops3+P_ops4, the target number of runs is determined to be 4. When P_ops1+P_ops2+P_ops3+P_ops4<P_req, the target number of runs is determined to be 4.

[0035] Furthermore, when the controller determines that the vehicle's power demand meets the switching conditions for the target number of operations, it can adjust the target number of operations. Specifically, when the relationship between the vehicle's power demand and the diesel generator set's power remains constant for a preset period of time, the controller can determine that the vehicle's power demand meets the switching conditions for the target number of operations.

[0036] During the operation of railway shunting locomotives, situations such as coupling impacts, switching passages, and short-term gradient resistance changes can cause the locomotive's overall power demand to rise or fall instantaneously on a millisecond or even second-level scale. If the start-stop decision for the diesel generator set is based solely on the instantaneous power value, it can easily lead to frequent starts and stops of the diesel generator set within a short period, causing oscillations in the power system. This significantly increases additional fuel consumption, exacerbates wear on the diesel generator set, and shortens its service life. Therefore, this embodiment introduces a switching condition based on the target number of operations as a buffer judgment to ensure the stable operation of the power system under dynamic conditions.

[0037] The preset duration can refer to a time window set internally by the controller. This preset duration can be dynamically adjusted according to the current operating mode of the railway shunting locomotive to adapt to the control requirements under different scenarios.

[0038] When the controller detects that the vehicle's required power exceeds the sum of the lowest fuel consumption power corresponding to the currently operating diesel generator sets, or is lower than the sum of the lowest fuel consumption power corresponding to the diesel generator sets after reducing the number of currently operating units by one, a timer is started. If this power change continues for a preset duration, the controller confirms that the current change in the vehicle's required power is a steady-state transition rather than a transient disturbance, and then adjusts the target number of operating units. If, during the timing process, the vehicle's required power falls back to the original power range, the timer is reset, and the adjustment of the target number of operating units is not performed.

[0039] This embodiment effectively identifies and filters out instantaneous impact load signals by setting switching conditions for the target number of operations, while ensuring sufficient response sensitivity to continuous steady-state load changes to adapt to the frequent start-stop of railway shunting locomotives.

[0040] After determining the target number of operating diesel generator sets, the controller can perform refined power distribution control. The controller can control the operation of the target number of diesel generator sets, with some operating at target power and others compensating for excess power. This excess power can refer to the power difference between the vehicle's required power and the total output power of some of the diesel generator sets.

[0041] Specifically, when the target number of operating units is 1, the controller controls 1 diesel generator set to operate at the power required to meet the vehicle's power demand. When the target number of operating units is M, and the vehicle's power demand does not exceed the sum of the corresponding lowest fuel consumption power of all diesel generator sets, the controller controls M-1 diesel generator sets to operate at their corresponding lowest fuel consumption power, and controls 1 diesel generator set to compensate for the remaining power. Here, M is an integer greater than 1, and M does not exceed the total number of diesel generator sets in the power system. Conversely, when the target number of operating units is M, and the vehicle's power demand exceeds the sum of the corresponding lowest fuel consumption power of all diesel generator sets, the controller controls M-1 diesel generator sets to operate at their rated power, and controls 1 diesel generator set to compensate for the remaining power. Here, M is the total number of diesel generator sets in the power system.

[0042] Taking four diesel generator sets as an example, each with a rated power of P_rad, the above logic can be further refined as follows: When the target number of vehicles is 1, the output power of the diesel generator set meets the power requirements of the entire vehicle. When the target number of operations is 2, one diesel generator set has a power of P_ops, and the other diesel generator set compensates for the remaining power; When the target number of operations is 3, 2 of them are diesel generator sets with a power of P_ops, and the other diesel generator set compensates for the remaining power; When the target number of operating units is 4 and P_req≤P_ops1+P_ops2+P_ops3+P_ops4, the power of 3 diesel generator sets is P_ops, and the other diesel generator set compensates for the remaining power.

[0043] When the target number of operating units is 4 and P_ops1+P_ops2+P_ops3+P_ops4<P_req, where the power of 3 diesel generator sets is P_rad and the other diesel generator set compensates for the remaining power.

[0044] This embodiment targets non-full-load conditions (P_req≤P_ops1+P_ops2+P_ops3+P_ops4), employing M-1 diesel generator sets operating at their lowest corresponding fuel consumption power, with one generator set controlled to compensate for the remaining power. The overall fuel consumption of the power system is still significantly better than the power control scheme using average power distribution, achieving fuel savings for the pure internal combustion engine system under non-full-load conditions. For overload conditions (P_ops1+P_ops2+P_ops3+P_ops4<P_req), M-1 diesel generator sets operate at rated power, with one generator set controlled to compensate for the remaining power. This embodiment increases the power of M-1 generator sets to their rated power, ensuring sufficient power reserves to meet the power demands of railway shunting locomotives, and reserving one generator set as a compensation unit to absorb load fluctuations, effectively improving the dynamic stability of the power system.

[0045] In this embodiment, a single diesel generator set is retained as a compensation unit. When the power demand of the vehicle fluctuates, this embodiment can adjust only the diesel generator set used to compensate for the remaining power to respond to the fluctuation, avoiding problems such as power oscillation and load distribution imbalance caused by adjusting multiple diesel generator sets at the same time. In addition, the control logic of a single diesel generator set is simple and the response speed is faster, which can quickly keep up with the fluctuation of the power demand of the vehicle.

[0046] like Figure 2 As shown, taking four diesel generator sets as an example, the output power of the four diesel generator sets are Peng1, Peng2, Peng3 and Peng4, respectively. The fuel-efficient power of the four diesel generator sets is P_ops1, P_ops2, P_ops3 and P_ops4, respectively. The rated power of the four diesel generators is P_rad1, P_rad2, P_rad3 and P_rad4, respectively. The overall logic of the controller to prioritize the power allocation of each diesel generator set can be as follows: S20. The controller obtains the current total power demand of the railway shunting locomotive as P_req; S21. Determine whether P_req ≤ P_ops1. If yes, proceed to step S22; otherwise, proceed to step S23. S22. Control the operation of a diesel generator set. The output power of the diesel generator set is: Peng1 = P_req; S23. Determine whether P_req ≤ P_ops1 + P_ops2. If yes, proceed to step S24; otherwise, proceed to step S25. S24. Control the output power of one diesel generator set as: Peng1 = P_ops1, and control the output power of another diesel generator set as: Peng2 = P_req - P_ops1; S25. Determine whether P_req ≤ P_ops1 + P_ops2 + P_ops3. If yes, proceed to step S26; otherwise, proceed to step S27. S26. Control the output power of two diesel generator sets as follows: Peng1=P_ops1, Peng2=P_ops2, and control the output power of one diesel generator set as follows: Peng3=P_req-P_ops1-P_ops2. S27. Determine whether P_req ≤ P_ops1+P_ops2+P_ops3+P_ops4. If yes, proceed to step S28; otherwise, proceed to step S29. S28. Control the output power of three diesel generator sets as follows: Peng1=P_ops1, Peng2=P_ops2, Peng3=P_ops3, and control the output power of one diesel generator set as follows: Peng4=P_req-P_ops1-P_ops2-P_ops3. S29. Control the output power of three diesel generator sets as follows: Peng1=P_rad1, Peng2=P_rad2, Peng3=P_rad3, and control the output power of one diesel generator set as follows: Peng4=P_req-P_rad1-P_rad2-P_rad3.

[0047] Furthermore, if the target number of operating units is adjusted, the controller can control the target diesel generator sets to start or stop operating based on the cumulative operating volume of each diesel generator set.

[0048] The cumulative operating volume refers to a quantitative indicator characterizing the historical workload of the diesel generator set, which may include operating hours, total fuel consumption, number of start-stop cycles, or equivalent fatigue damage value. This embodiment introduces the cumulative operating volume as the decision-making basis for diesel generator set switching, which can avoid the uneven scheduling problem caused by fixed-sequence or random switching strategies, effectively preventing premature failure of diesel generator sets due to long-term overwork, thereby improving the overall reliability of the power system. The target diesel generator set can refer to a diesel generator set that is put into operation or shut down.

[0049] Specifically, when the target number of operating units increases, priority is given to putting the target diesel generator set with the smallest cumulative operating volume into operation; when the target number of operating units decreases, priority is given to stopping the target diesel generator set with the largest cumulative operating volume, so that the power system can tend to a dynamic balance of the cumulative operating volume of each unit.

[0050] For example, consider four diesel generator sets, numbered A, B, C, and D, with current cumulative operating hours of 100h, 200h, 300h, and 400h respectively. If A and B are currently running, and the vehicle's power demand increases, requiring the target number of generators to increase from 2 to 3, the controller will select generator C (with the smaller cumulative operating hours) from the currently not running generators C and D to start operation. Conversely, if the vehicle's power demand decreases, requiring the target number of generators to decrease from 2 to 1, the controller will select generator B (with the larger cumulative operating hours) from the currently running generators A and B to stop operation.

[0051] Furthermore, in this embodiment, the diesel generator set switching strategy and efficiency control strategy are coordinated. The diesel generator set switching strategy can determine which diesel generator sets are put into operation or taken out of operation, while the diesel generator sets that are in operation are based on the efficiency control strategy, so that some diesel generator sets operate at the target power and others compensate for the remaining power.

[0052] When a faulty generator set is detected among multiple diesel generator sets, the faulty generator set is excluded, and the target number of generator sets is re-determined based on the power requirements of the vehicle and the power of the remaining available diesel generator sets.

[0053] Faults in diesel generator sets can include mechanical damage, electrical failures, or sensor malfunctions. The controller can determine whether a fault exists by collecting real-time operating status parameters of each diesel generator set. These parameters can include: diesel engine oil pressure, coolant temperature, exhaust temperature, and speed fluctuation rate; and generator output voltage, current, and winding temperature. When any of these operating status parameters exceeds a preset safety threshold or exhibits an abnormal trend, the controller can determine that the diesel generator set is faulty.

[0054] The controller can remove a faulty unit from the set of available units and add it back to the set of available units when a manual reset signal or a maintenance completion signal is received.

[0055] The controller recalculates the new target number of operating units based on the number of remaining healthy units and their corresponding lowest fuel consumption power. Even if the power system loses some power sources, the remaining healthy units can still operate according to the power control strategy, effectively ensuring that the power system maintains optimal fuel economy and control stability in degraded conditions, and preventing railway shunting locomotives from losing traction power due to single-unit failures.

[0056] In order to further improve the response speed of the power system to power changes, this embodiment can acquire historical change data of the vehicle's power demand, predict the power change trend of the vehicle's power demand within a preset time window based on the historical change data, and adjust the target number of operations in advance based on the power change trend.

[0057] Historical change data can refer to multi-dimensional state historical data that is strongly correlated with the power demand of the whole vehicle, including historical numerical sequences of the power demand of the whole vehicle, time series data, and the operation stages of railway shunting locomotives.

[0058] The controller can employ methods such as weighted moving average, linear trend extrapolation, or machine learning models to predict the power demand trend of the entire vehicle within a preset time window based on historical data. Based on the predicted power trend, the controller can issue pre-start or shutdown commands in advance, improving the response speed of the powertrain system.

[0059] To avoid frequent erroneous start-ups and shutdowns of generator sets due to prediction errors, this embodiment can also set a prediction confidence verification mechanism. Specifically, the controller can evaluate the reliability of the prediction results before performing feedforward adjustments. Feedforward action is only confirmed when the confidence level of the prediction results exceeds a preset confidence threshold, or when the power change trends of multiple consecutive prediction cycles all point to the same trend. If the prediction results are in an ambiguous range or have low confidence, the power system can maintain its current state and adjust the target number of operating diesel generator sets in real time based on the vehicle's required power.

[0060] This application provides a power system for railway shunting locomotives. The system employs a power system including a controller and multiple diesel generator sets. The multiple generator sets effectively reduce the impact of a single generator set failure on the railway shunting locomotive. The system uses the controller to obtain the current total power demand of the railway shunting locomotive in real time and determines the target number of operating diesel generator sets based on the relationship between the total power demand and the power of the multiple generator sets. This allows the number of operating diesel generator sets to dynamically adapt to the current total power demand of the railway shunting locomotive under varying operating conditions such as idling, low load, and heavy load. Furthermore, when the controller controls the target number of operating diesel generator sets to run, some generator sets maintain the target power output, operating within their efficient range to effectively improve fuel utilization. Other generator sets compensate for the remaining power between the total power demand and the total output power of some generator sets, responding to sudden load changes in the railway shunting locomotive without relying on power batteries, thus avoiding the high costs associated with power battery degradation. Therefore, this system can effectively adapt to the power requirements of railway shunting locomotives.

[0061] In the above embodiments, implementation can be achieved, in whole or in part, through software, hardware, firmware, or any combination thereof. When implemented in software, it can be implemented, in whole or in part, as a computer program product.

[0062] The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, all or part of the processes or functions described in the embodiments of this application are generated. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions may be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another. For example, the computer instructions may be transmitted from one website, computer, training device, or data center to another website, computer, training device, or data center via wired (e.g., coaxial cable, fiber optic, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) means. The computer-readable storage medium may be any available medium that a computer can store or a data storage device such as a training device or data center that integrates one or more available media. The available media may be magnetic media (e.g., floppy disks, hard disks, magnetic tapes), optical media (e.g., DVDs), or semiconductor media (e.g., solid-state drives (SSDs)).

[0063] The various embodiments in this specification are described in a related manner. Similar or identical parts between embodiments can be referred to mutually. Each embodiment focuses on describing the differences from other embodiments. In particular, the apparatus embodiments are basically similar to the method embodiments, so the description is relatively simple; relevant parts can be referred to the descriptions of the method embodiments.

[0064] It is understood that before using the technical solutions disclosed in the various embodiments of this disclosure, users should be informed of the types, scope of use, and usage scenarios of the personal information involved in this disclosure in an appropriate manner in accordance with relevant laws and regulations, and user authorization should be obtained.

[0065] The above are merely embodiments of this application and are not intended to limit the scope of this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.

Claims

1. A power system for railway shunting locomotives, characterized in that, The power system includes a controller and a power unit, which includes multiple diesel generator sets, each of which includes a diesel engine and a generator. The controller obtains the current total power demand of the railway shunting locomotive, and determines the target number of the multiple diesel generator sets to operate based on the relationship between the total power demand and the power of the multiple diesel generator sets. The controller controls the operation of the target number of diesel generator sets. Among the multiple operating diesel generator sets, some diesel generator sets are at the target power, while others compensate for the remaining power. The remaining power is the power difference between the vehicle's required power and the total output power of some diesel generator sets.

2. The power system for railway shunting locomotives according to claim 1, characterized in that, The target number of diesel generator sets to be operated is determined based on the relationship between the power demand of the vehicle and the power of the multiple diesel generator sets, specifically configured as follows: When the total power demand of the vehicle does not exceed the power with the lowest corresponding fuel consumption of a single diesel generator set, the target number of operations is determined to be 1. When the total power demand of the vehicle is greater than the sum of the power with the lowest corresponding fuel consumption of N diesel generator sets, but does not exceed the sum of the power with the lowest corresponding fuel consumption of all diesel generator sets, the target number of operation is determined to be N+1, where N is an integer not less than 1, and N+1 does not exceed the total number of diesel generator sets in the power system. When the required power of the vehicle is greater than the sum of the power of the diesel generator sets with the lowest corresponding fuel consumption, the target number of operation is determined to be the total number of diesel generator sets in the power system.

3. The power system for railway shunting locomotives according to claim 1, characterized in that, The target power is the power with the lowest corresponding fuel consumption; The controller controls the operation of the target number of diesel generator sets, specifically configured as follows: When the target number of operating units is M, and the total power demand of the vehicle does not exceed the sum of the power with the lowest corresponding fuel consumption of all diesel generator sets, the controller controls M-1 diesel generator sets to operate at the power with the lowest corresponding fuel consumption, and controls 1 diesel generator set to compensate for the remaining power, where M is an integer greater than 1, and M does not exceed the total number of diesel generator sets in the power system.

4. The power system for railway shunting locomotives according to claim 1, characterized in that, The target power is the rated power; The controller controls the operation of the target number of diesel generator sets, specifically configured as follows: When the target number of operating units is M, and the total power demand of the vehicle is greater than the sum of the power of the corresponding lowest fuel consumption of all diesel generator sets, the controller controls M-1 diesel generator sets to operate at rated power and controls 1 diesel generator set to compensate for the remaining power, where M is the total number of diesel generator sets in the power system.

5. The power system for railway shunting locomotives according to claim 1, characterized in that, The controller is also configured to: When it is determined that the required power of the vehicle meets the switching conditions for the target number of operations, the target number of operations is adjusted.

6. The power system for railway shunting locomotives according to claim 5, characterized in that, The specific configuration for determining that the required power of the vehicle meets the target number of operations is as follows: If the relationship between the required power of the vehicle and the power of the diesel generator set remains constant for a preset period of time, it is determined that the required power of the vehicle meets the switching condition for the target number of operations.

7. The power system for railway shunting locomotives according to claim 1 or 5, characterized in that, The controller is also configured to: Once the target number of operating units is adjusted, the target diesel generator sets are controlled to be put into operation or stopped based on the cumulative operating volume of each diesel generator set.

8. The power system for railway shunting locomotives according to claim 7, characterized in that, When the target number of operating units is adjusted, the target diesel generator sets are controlled to start or stop operating based on the cumulative operating volume of each diesel generator set. The specific configuration is as follows: When the target number of operations increases, priority is given to putting the target diesel generator set with the smallest cumulative number of operations into operation; When the target number of operations decreases, priority is given to stopping the target diesel generator set with the largest cumulative operating volume.

9. The power system for railway shunting locomotives according to claim 1, characterized in that, The controller is also configured to: When a faulty generator set is detected among multiple diesel generator sets, the faulty generator set is excluded. The target number of operations is re-determined based on the relationship between the required power of the vehicle and the power of the remaining available diesel generator sets.

10. The power system for railway shunting locomotives according to claim 1, characterized in that, The controller is also configured to: Obtain historical change data of the vehicle's power demand, and based on the historical change data, predict the power change trend of the vehicle's power demand within a future preset time window; Based on the power change trend, the target number of operations is adjusted.