Treatment process of urea-formaldehyde precondensation liquid resin production wastewater
By constructing a localized slightly acidic flow field and ferrous complexation in the biochemical treatment system, the problems of stable degradation of hexamethylenetetramine and phosphate release were solved, achieving efficient nitrogen and phosphorus removal from urea-formaldehyde pre-condensed resin production wastewater and ensuring stable effluent compliance with standards.
Patent Information
- Application Number
- CN202611249824.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-18
- Publication Date
- 2026-11-17
AI Technical Summary
Existing conventional biological treatment processes are difficult to effectively degrade hexamethylenetetramine in wastewater from urea-formaldehyde pre-condensed resin production, which easily leads to excessive levels of total nitrogen and chemical oxygen demand in the effluent. Furthermore, the final phosphorus removal effect is unstable. Direct acidification will destroy the activity of microorganisms in the biological system, while acid-conditioning sludge will lead to secondary release of phosphates.
A localized slightly acidic flow field is constructed in the pipeline between the anaerobic section and the hydrolysis acidification section. Ferrous ions are introduced simultaneously and neutralized by the buffer alkalinity of the returned sludge to form ferrous complexes. Subsequently, iron autotrophic denitrification is carried out in the anoxic zone and ferric phosphate precipitate is generated in the aerobic zone, achieving multi-stage utilization.
Without damaging the biochemical system, it stably degrades heterocyclic compounds, improves nitrogen and phosphorus removal efficiency, ensures that effluent indicators meet standards, and avoids the need for additional chemicals and equipment.
Smart Images

Figure CN123105886A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of chemical wastewater treatment technology, specifically a treatment process for wastewater from the production of urea-formaldehyde pre-condensed resin. Background Technology
[0002] In wood processing and chemical production, the production of urea-formaldehyde resin generates a large amount of industrial wastewater. This wastewater has a complex composition, typically containing high concentrations of free formaldehyde, free ammonia, and other large organic molecules, while also exhibiting high chemical oxygen demand (COD) and high total nitrogen. If this wastewater is discharged directly without effective treatment, it will cause serious damage to natural aquatic ecosystems; therefore, it must be treated using the biological systems of wastewater treatment plants for decarbonization and nitrogen removal.
[0003] For this type of special wastewater containing formaldehyde and ammonia, the current conventional treatment process involves first mixing the wastewater from different stages in an equalization tank. During the natural retention time of the wastewater, free formaldehyde and free ammonia undergo a chemical condensation reaction, converting into hexamethylenetetramine. This pretreatment process reduces the acute toxicity of formaldehyde to microorganisms in the subsequent biological treatment system. The mixed and equalized wastewater then enters the conventional biological treatment system, sequentially passing through anaerobic, anoxic, and aerobic stages. Microorganisms degrade organic matter in the water through metabolism, and nitrogen is removed through nitrification and denitrification. Finally, sedimentation in the terminal structures achieves sludge-water separation and biological phosphorus removal.
[0004] However, the aforementioned conventional treatment processes have significant limitations in actual operation. While the hexamethylenetetramine generated in the equalization tank reduces system toxicity, it is a highly symmetrical cage-like heterocyclic compound with significant steric hindrance. Its chemical structure is stable in alkaline or neutral conventional biological environments, making it difficult for microorganisms to directly enzymatically break down its chains. This results in a large number of nitrogen-containing heterocyclic compounds penetrating the biological system, causing the final effluent's total nitrogen and chemical oxygen demand to fail to consistently meet standards. To degrade these heterocyclic substances, directly adding acid to the biological tank for chemical hydrolysis would alter the pH of the entire tank, severely damaging the activity of microorganisms and even causing bacterial death. If the returned sludge is acidified separately, it would kill the denitrifying bacteria accumulated in the sludge and trigger a secondary release of phosphates from the settled sludge. Furthermore, existing biological treatment systems typically do not add chemical phosphorus removal agents at the end, relying solely on biological phosphorus release and gravity sedimentation after phosphorus uptake to remove phosphorus. If fluctuations in the influent water quality lead to a decrease in polyphosphate-accumulating bacteria activity, the total phosphorus in the effluent can easily exceed standards. Summary of the Invention
[0005] To address the shortcomings of existing technologies, this invention provides a treatment process for wastewater from urea-formaldehyde pre-condensing resin production. The technical problem solved is that conventional biological treatment processes are ineffective in degrading hexamethylenetetramine in urea-formaldehyde pre-condensing resin production wastewater, leading to excessive levels of total nitrogen and chemical oxygen demand in the effluent, and unstable phosphorus removal at the end of the treatment process. Directly adding acid to the main biological reaction zone to hydrolyze heterocyclic compounds would destroy the activity of microorganisms in the biological system; adjusting the acidity of the returned sludge would cause a secondary release of precipitated phosphates and inactivation of denitrifying bacteria.
[0006] To address the above problems, the present invention provides the following technical solution: In a first aspect, the present invention provides a treatment process for wastewater from the production of urea-formaldehyde pre-condensed resin, employing the following technical solution: A treatment process for wastewater from the production of urea-formaldehyde pre-condensed resin includes the following steps: (1) The wastewater from the production of urea-formaldehyde pre-condensed resin containing free formaldehyde and free ammonia is introduced into the equalization tank for mixing, so that free formaldehyde and free ammonia undergo a condensation reaction to generate hexamethylenetetramine, and then air flotation pretreatment is carried out to remove suspended solids and oils. (2) The wastewater after air flotation pretreatment is introduced into the neutralization tank, and an alkalinity adjuster is added to adjust the pH value of the water to a neutral to slightly alkaline state; (3) The neutralized wastewater is introduced into the main reaction zone of the anaerobic tank to carry out phosphorus release reaction by polyphosphate-accumulating bacteria under anaerobic conditions; (4) The main effluent from the anaerobic tank is introduced into a static tubular mixer connected to the main water supply pipeline of the hydrolysis acidification tank. At the inlet end of the static tubular mixer, acidification activator and iron salt complexing agent are injected simultaneously to create a local slightly acidic environment in the main pipeline for protonation activation and complexation locking pretreatment of the wastewater. When the wastewater flows through the confluence port at the end of the static tubular mixer, the internal return sludge from the sedimentation tank at the back end of the system is introduced to merge with the main water flow and perform instantaneous neutralization, and then discharged into the hydrolysis acidification tank. (5) The mixture undergoes chain-breaking degradation in the hydrolysis acidification tank, and is then discharged into the anoxic tank for denitrification. (6) The effluent from the anoxic tank enters the aerobic tank for aeration and oxidation. While degrading the residual chemical oxygen demand, the free low-valent iron ions in the water undergo an oxidation reaction to generate high-valent iron ions, and free phosphate ions are captured in situ to generate iron phosphate precipitate. (7) The effluent from the aerobic tank is discharged into the sedimentation tank for mud-water separation. Part of the activated sludge at the bottom of the sedimentation tank is returned to the confluence as the internal return sludge mentioned in step (4), and the supernatant is discharged into the phosphorus removal tank for static sedimentation.
[0007] By adopting the above technical solution, a locally slightly acidic flow field is constructed in the pipeline space between the anaerobic section and the hydrolysis acidification section, and ferrous ions are introduced simultaneously. Subsequently, neutralization is achieved using the buffer alkalinity of the returned sludge itself. Therefore, the technical effect of stably degrading highly stable heterocyclic compounds and synergistically removing nitrogen and phosphorus is obtained. The specific reaction mechanism and innovative process are as follows: First, the hexamethylenetetramine in the wastewater has a highly symmetrical cage-like heterocyclic structure with significant steric hindrance, making it difficult for microorganisms to directly enzymatically hydrolyze it under conventional neutral biochemical conditions. This process places a static tubular mixer on the main effluent pipeline, placing the main water flow in a briefly isolated, slightly acidic environment before it enters the hydrolysis acidification tank. Under these conditions, the nitrogen atoms on the surface of the hexamethylenetetramine molecule undergo protonation, generating electrostatic repulsion within the molecule and altering its originally stable cage-like spatial configuration.
[0008] Secondly, simultaneously with protonation, the added free ferrous ions form stable coordination bonds with the nitrogen atoms exposed after the configuration change, generating a ferrous complex. When the slightly acidic main stream carrying this complex reaches the end of the mixer, it is instantly mixed with the slightly alkaline, bicarbonate-rich internal return sludge, causing the pH of the mixed liquor to rapidly rise to neutral. During this process, due to the coordination hindrance effect of the ferrous ions, hexamethylenetetramine cannot close its ring and revert to its original stable cage structure, thus maintaining a semi-open ring state. This state effectively reduces the apparent activation energy of subsequent ring-opening degradation by extracellular enzymes of hydrolytic acidifying bacteria, converting it into a small-molecule carbon source that can be utilized for denitrification. At the same time, the delayed design of the sludge collection avoids the direct damage to the activity of biochemical microorganisms caused by localized acidification.
[0009] Finally, the unconsumed ferrous ions from the biochemical stage enter the anoxic zone with the water flow. There, they act as inorganic electron donors, reacting with nitrate nitrogen from the returned sludge to undergo an autotrophic denitrification reaction, compensating for the insufficient carbon source in the high-nitrogen wastewater. As the water flows into the aerobic zone, the high dissolved oxygen environment promotes the oxidation of ferrous ions to ferric ions, which then combine with the remaining free phosphate ions released from the anaerobic stage, forming in-situ insoluble ferric phosphate microcrystals that flocculate and precipitate. This process achieves multi-stage utilization of materials within the system, avoiding the need for additional chemical dosing devices at the end of the biochemical system.
[0010] Preferably, in step (4), by adjusting the dosage of acidifying activator and iron salt complexing agent, the pH value of the microenvironment inside the static tubular mixer is controlled between 4.5 and 5.5, and the concentration of ferrous ions in the fluid inside the pipe is controlled between 20 and 60 mg / L.
[0011] By employing the above technical solution and controlling the pH value within this weakly acidic range, the required hydrogen ion concentration for protonation of nitrogen atoms on the surface of heterocyclic molecules is satisfied, while avoiding the complete hydrolysis of hexamethylenetetramine under strong acid conditions, which releases a large amount of formaldehyde. Limiting the ferrous ion concentration range ensures the molar amount required for initial coordination locking of the heterocycle and provides inorganic electron donors and iron salt precipitants for subsequent autotrophic denitrification in the anoxic stage and chemical precipitation for phosphorus removal in the aerobic stage.
[0012] Preferably, in step (4), the hydraulic residence time of the fluid inside the static tubular mixer is controlled to be 2 to 5 minutes.
[0013] By adopting the above technical solution, the set fluid residence time can meet the reaction requirements of protonation excitation of heterocyclic rings and coordination locking of ferrous iron, preventing incomplete complexation reaction due to excessively short residence time, or increased system pipeline construction costs and fluid head loss due to excessively long residence time.
[0014] Preferably, in step (4), the acidification activator is a waste sulfuric acid solution with a mass fraction of 20% to 30%; the iron salt complexing agent is an aqueous solution of ferrous sulfate heptahydrate with a mass fraction of 5% to 10%.
[0015] By adopting the above technical solution, conventional bulk industrial raw materials are used as physicochemical regulators, eliminating the need to introduce complex modifying chemicals. Simultaneously, the free sulfides present in the anaerobic effluent readily generate hydrogen sulfide gas upon acid addition. At this moment, the high concentration of ferrous ions preferentially combines with sulfur ions to form ferrous sulfide precipitate. This competitive reaction kinetically eliminates the risk of hydrogen sulfide escape caused by localized acidification.
[0016] Preferably, in step (4), the sludge return ratio flowing into the confluence is controlled to be 100% to 200%. After the main water flow and the internal return sludge merge and are instantly neutralized, the pH value of the mixed liquid naturally recovers to 6.8 to 7.5.
[0017] By adopting the above technical solution and setting the sludge return ratio within this range, sufficient system buffer capacity is provided to ensure that the slightly acidic main water flow can naturally return to a neutral environment through acid-base titration neutralization. This operation protects the biological activity of denitrifying bacteria in the returned sludge and eliminates the need for additional alkali addition for reversion.
[0018] Preferably, step (1) is implemented as follows: the hydraulic retention time of the wastewater in the equalization tank is controlled to be 4 to 8 hours; then it is transported to the air flotation machine, and polyaluminum chloride with a concentration of 100 to 300 mg / L and anionic polyacrylamide with a concentration of 1 to 3 mg / L are added to the water for air flotation pretreatment.
[0019] By adopting the above technical solution, sufficient residence time ensures that free formaldehyde and free ammonia completely complete the nucleophilic addition condensation reaction. Addressing the severe emulsification characteristic of high-concentration chemical wastewater, a high concentration of inorganic flocculant is used in combination with organic polymeric coagulant aids to effectively break down the instability of unreacted polymeric colloids and resin particles in the wastewater system, ensuring the solid-liquid separation effect of the pretreatment and reducing the treatment load of subsequent biological units.
[0020] Preferably, the pH value of the water in the neutralization tank in step (2) is controlled to be 7.0 to 7.5; and the dissolved oxygen concentration of the anaerobic tank mixture in step (3) is controlled to be 0.05 to 0.2 mg / L.
[0021] By adopting the above technical solution, a stable neutral to slightly alkaline environment can prevent hexamethylenetetramine from being hydrolyzed prematurely before entering the main biochemical zone, thus protecting the biochemical system; this micro-aerobic or anaerobic environment provides strict thermodynamic conditions for the anaerobic phosphorus release metabolism of polyphosphate-accumulating bacteria.
[0022] Preferably, in step (5), the redox potential in the hydrolysis acidification tank is controlled to be -150 to -50 mV; and the dissolved oxygen concentration in the anoxic tank is controlled to be 0.2 to 0.5 mg / L.
[0023] By employing the above technical solution, the regulation of the redox potential balances the chain-breaking degradation requirements of hydrolytic acidifying bacteria with the operational environment of ferroautotrophic denitrifying bacteria, preventing premature oxidation and precipitation of ferrous ions in the anoxic stage. The control of trace dissolved oxygen ensures the microscopic anoxic environment required for heterotrophic denitrifying bacteria to reduce nitrate nitrogen.
[0024] Preferably, in step (6), the dissolved oxygen concentration of the mixed liquor in the aerobic tank is controlled to be 2.0 to 4.0 mg / L, and the sludge concentration is maintained at 3000 to 4000 mg / L. In step (7), the hydraulic retention time of the supernatant in the phosphorus removal tank is controlled to be 2 to 4 hours, and the effluent from the phosphorus removal tank is treated by an ultraviolet sterilization device and discharged after meeting the standards.
[0025] By adopting the above technical solutions, a sufficiently oxygenated environment promotes the rapid occurrence of the chemical phosphorus removal precipitation reaction, and maintaining a high sludge concentration is beneficial for the degradation of recalcitrant organic matter and provides a framework for the precipitated flocs. The limited settling time in the phosphorus removal tank ensures the complete retention of fine ferric phosphate flocs, guaranteeing that all indicators of the final effluent consistently meet discharge requirements.
[0026] This invention provides a treatment process for wastewater from the production of urea-formaldehyde pre-condensed resin. It has the following beneficial effects: 1. This invention constructs a locally slightly acidic flow field by installing a static tubular mixer on the main pipeline and simultaneously adding ferrous ions. This causes heterocyclic molecules to undergo protonation and coordination reactions with ferrous ions, which are then combined with internal return sludge for neutralization using the sludge's own alkalinity. This method effectively alters the stable configuration of recalcitrant heterocyclic compounds and improves the biochemical degradation efficiency of such resin wastewater without altering the acid-base environment of the main biological treatment tank or harming microorganisms.
[0027] 2. This invention utilizes ferrous ions introduced with the water flow during the pretreatment process. In the subsequent anoxic tank, these ferrous ions act as inorganic electron donors in the metabolic process of denitrifying bacteria. This approach, through iron autotrophic denitrification, works in conjunction with conventional heterotrophic denitrification to consume nitrate nitrogen in the water, compensating for the nitrogen removal limitations caused by the imbalance of the carbon-nitrogen ratio in the raw water and improving the system's nitrogen removal capacity.
[0028] 3. This invention introduces the residual low-valent iron ions from the initial reaction into the aerobic tank, where they are oxidized to high-valent iron ions under sufficient dissolved oxygen conditions. These ions then directly combine with free phosphate ions in the water to form precipitates. This process achieves multi-stage utilization of the added materials within the system flow, and synergistically completes chemical precipitation phosphorus removal without the need for additional independent dosing and mixing equipment, ensuring that the total phosphorus content in the final effluent consistently meets standards. Attached Figure Description
[0029] Figure 1 This is a schematic diagram of the overall process steps of the present invention; Figure 2 This is a schematic diagram of the system flow of the present invention; Figure 3 This is a schematic diagram comparing the test data of the present invention. Detailed Implementation
[0030] The technical solution of the present invention will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0031] In conventional treatment processes for wastewater from urea-formaldehyde pre-condensation resin production, those skilled in the art typically use an equalization tank to mix formaldehyde-containing wastewater with free ammonia-containing wastewater, allowing them to naturally condense into hexamethylenetetramine to reduce the acute toxicity of formaldehyde to the microorganisms in the biological system. However, in actual engineering operations, it has been found that hexamethylenetetramine, due to its highly symmetrical cage-like heterocyclic structure and significant steric hindrance, is chemically extremely stable under conventional neutral and slightly alkaline biological environments, making it difficult for hydrolytic acidifying bacteria to directly enzymatically break down its chains. This leads to a large amount of heterocyclic total nitrogen penetrating the biological system, causing the final effluent TN and COD to exceed standards. Simultaneously, without additional chemical phosphorus removal dosing and reaction devices at the end of the conventional biological system, relying solely on natural sedimentation after biological phosphorus release, the effluent TP is highly susceptible to exceeding standards due to fluctuations in the influent.
[0032] To address the issue of excessively high activation energies for heterocyclic ring opening, directly acidifying the main biological reaction zone for chemical hydrolysis would lead to the inactivation or even collapse of the entire biological system's microorganisms. Similarly, acidifying the returned sludge would directly kill the denitrifying bacteria accumulated in the sludge and cause a secondary release of precipitated phosphate. Based on the conflict between these engineering challenges and conventional preventative measures, the inventors proposed a method that, without altering the macroscopic environment of the main biological treatment tank, utilizes the limited pipeline space between the anaerobic and hydrolysis-acidification sections to create a localized, slightly acidic flow field. This protonates and loosens toxic molecules while simultaneously introducing ferrous ions for coordination and locking. Subsequently, the natural buffer alkalinity of the returned sludge is cleverly utilized at the pipeline end for instantaneous neutralization, thereby completely disintegrating the highly stable heterocyclic rings without damaging the main biological system. Simultaneously, the unconsumed ferrous ions flow with the water into subsequent anoxic / aerobic sections, naturally achieving autotrophic denitrification and simultaneous in-situ phosphorus removal.
[0033] Based on the above concept, the present invention provides a treatment process for wastewater from urea-formaldehyde pre-condensed resin production. The implementation system and the connection relationships of the structures on which it relies are as follows, and can be found in the appendix for details. Figure 2 : The wastewater treatment system in this embodiment is based on conventional biochemical treatment structures and includes, in sequence along the main flow of wastewater, the following components connected in series via water supply pipelines: equalization tank, flotation unit, neutralization tank, anaerobic tank, hydrolysis acidification tank, anoxic tank, aerobic tank, sedimentation tank, phosphorus removal tank, and ultraviolet sterilization device.
[0034] In order to achieve the core microenvironment control of the present invention, a static tubular mixer is connected in series on the main water supply pipeline between the anaerobic tank outlet and the hydrolysis acidification tank inlet.
[0035] A first dosing port and a second dosing port are connected in parallel on the pipe wall at the front end (inlet side) of the static tubular mixer. The first dosing port is connected to the acidification activator storage tank through a pipeline and a metering pump, and the second dosing port is connected to the iron salt complexing agent storage tank through a pipeline and a metering pump.
[0036] At the end of the static tubular mixer, i.e., on the outlet side, and located before the main reaction zone of the hydrolysis acidification tank, a three-way manifold is provided. This manifold is connected to the sludge hopper at the bottom of the settling tank via an internal return pipeline and a return pump.
[0037] Through the connection and layout of the above-mentioned structures and pipelines, it is ensured that the main water flow from the anaerobic tank preferentially enters the static tubular mixer, mixes with the acidification activator and iron salt, and undergoes a flow field reaction within a limited pipe length. Then, at the end of the mixer, it merges with the internal return sludge from the settling tank and is discharged into the hydrolysis acidification tank together.
[0038] The raw water treated in the embodiments and comparative examples of this invention is industrial wastewater centrally discharged from the urea-formaldehyde pre-condensate resin production line in a chemical industrial park. This raw water is a mixture of process wastewater containing free formaldehyde and rinsing wastewater containing free ammonia. After testing, the specific water quality indicators of the raw water are as follows: Chemical Oxygen Demand (COD) concentration is 3500 mg / L to 4800 mg / L, Total Nitrogen (TN) concentration is 450 mg / L to 680 mg / L, Total Phosphorus (TP) concentration is 15 mg / L to 35 mg / L, Free Formaldehyde concentration is 120 mg / L to 280 mg / L, Free Ammonia concentration is 80 mg / L to 160 mg / L, and the pH value of the raw water is 6.5 to 8.0. The natural water temperature before entering the system is 15℃ to 30℃.
[0039] The main raw materials and reagents used in the following examples and comparative examples have the following sources and specifications. Reagents not specifically mentioned, including liquid alkali used for conventional neutralization and conventional flocculants used for air flotation, are all commercially available industrial grade or higher products.
[0040] Ferrous sulfate heptahydrate (CAS No. 7782-63-0) is an industrial-grade solid powder product with a purity of not less than 98.0% by mass fraction. It is prepared into an aqueous solution with a mass fraction of 5% to 10% and used as an iron salt complexing agent and an inorganic electron donor and precipitant in subsequent biochemical processes.
[0041] Sulfuric acid (CAS No. 7664-93-9) is a waste sulfuric acid solution generated during industrial production. Its effective component, sulfuric acid, has a mass fraction of 20% to 30%. It is a colorless to slightly yellow liquid and is used directly as an acidification activator.
[0042] The present invention provides a treatment process for wastewater from the production of urea-formaldehyde pre-condensed resin, which specifically includes the following steps in chronological order and water flow direction: Step 1: Introduce the wastewater from the production of urea-formaldehyde pre-condensed resin containing free formaldehyde and free ammonia into the equalization tank for physical mixing. Control the hydraulic residence time of the wastewater in the equalization tank to be 4 to 8 hours, so that the free formaldehyde and free ammonia can fully undergo nucleophilic addition condensation reaction to generate hexamethylenetetramine.
[0043] The mixed wastewater is then pumped to an air flotation unit, where inorganic flocculant polyaluminum chloride is added at a concentration controlled between 100 mg / L and 300 mg / L; simultaneously, an organic polymeric coagulant, anionic polyacrylamide, is added at a concentration controlled between 1 mg / L and 3 mg / L. Suspended solids, colloids, and oily substances in the wastewater system are removed through air flotation, and the effluent is then discharged to the next step.
[0044] Step 2: The wastewater pretreated by the air flotation machine is introduced into the neutralization tank by gravity. A 25% sodium hydroxide solution is continuously added to the neutralization tank through an online pH meter-linked dosing pump to stabilize the pH value of the water in the neutralization tank within the range of 7.0 to 7.5, ensuring that the water remains in a neutral to slightly alkaline state.
[0045] Step 3: The neutralized wastewater is pumped into the main reaction zone of the anaerobic tank by a lift pump, and the dissolved oxygen (DO) concentration of the anaerobic tank mixture is controlled between 0.05 mg / L and 0.2 mg / L.
[0046] Under strictly anaerobic conditions, the large molecular organic matter in wastewater drives polyphosphate-accumulating bacteria in activated sludge to hydrolyze intracellular polyphosphate and release free phosphate into the water.
[0047] Step 4: Introduce the main effluent from the anaerobic tank into a static tubular mixer connected in series to the main water supply pipeline of the hydrolysis acidification tank. At the inlet end of the static tubular mixer, simultaneously inject acidification activator (a waste sulfuric acid solution with a mass fraction of 20% to 30%) and iron salt complexing agent (a ferrous sulfate heptahydrate aqueous solution with a mass fraction of 5% to 10%) in proportion.
[0048] By adjusting the first metering pump to control the dosage of waste sulfuric acid, the pH value of the microenvironment inside the static tubular mixer is maintained between 4.5 and 5.5. By adjusting the second metering pump to control the dosage of ferrous sulfate solution, the concentration of ferrous ions (Fe2+) in the fluid inside the pipe is maintained between 20 mg / L and 60 mg / L. Through the design of pipe diameter and flow rate, the hydraulic residence time of the mixed fluid in this section of acidification and complexation pipeline is strictly controlled within the range of 2 to 5 minutes.
[0049] As the water flows through the T-junction at the end of the static tubular mixer, internally returned sludge from the settling tank at the rear of the system is introduced, controlling the sludge return ratio (the ratio of the volume of returned sludge to the volume of the system influent) between 100% and 200%. After the main flow and the internally returned sludge merge at the junction, the pH of the mixed liquor is rapidly and naturally neutralized and restored to between 6.8 and 7.5, before being discharged into the hydrolysis acidification tank.
[0050] Step 5: The mixed liquor enters the main zone of the hydrolysis acidification tank. Through intermittent starting and stopping of the bottom aeration blower and internal hydraulic circulation and stirring, the oxidation-reduction potential (ORP) in the hydrolysis acidification tank is precisely controlled between -150mV and -50mV. In this stage, the hydrolysis acidification bacteria break down and degrade the previously locked heterocyclic substrates. Subsequently, the mixed liquor flows by gravity into the anoxic tank, where the dissolved oxygen (DO) is controlled between 0.2mg / L and 0.5mg / L. Denitrifying bacteria utilize the small-molecule carbon source generated from chain scission to react with free nitrate nitrogen in the system to remove total nitrogen through denitrification.
[0051] Step 6: The effluent from the anoxic tank flows by gravity into the aerobic tank of the main biological reaction zone. The bottom aeration system is activated for continuous oxygenation, controlling the dissolved oxygen (DO) of the mixed liquor between 2.0 mg / L and 4.0 mg / L. Simultaneously, the sludge concentration (MLSS) in the aerobic tank is maintained between 3000 mg / L and 4000 mg / L through sludge discharge. While aerobic oxidation degrades residual chemical oxygen demand (COD), unconsumed free ferrous ions in the water are oxidized to ferric ions by dissolved oxygen, and free phosphate ions in the water are captured in situ to form insoluble iron phosphate precipitate.
[0052] Step 7: The sludge-water mixture flowing from the aerobic tank is discharged by gravity into the settling tank for gravity sludge-water separation. A portion of the activated sludge at the bottom of the settling tank is pumped back to the end of the static tubular mixer for circulation, according to the sludge return ratio set in Step 4. The supernatant separated by settling overflows into the phosphorus removal tank. The hydraulic retention time of the supernatant in the phosphorus removal tank is controlled to be 2 to 4 hours to complete the final interception of tiny ferric phosphate flocs.
[0053] Step 8: The clear liquid overflowing from the top of the phosphorus removal tank is discharged into the ultraviolet sterilization device. The ultraviolet light destroys the cells of residual microorganisms in the water, and the treated wastewater meets the standards for discharge.
[0054] Example 1: This embodiment provides a treatment process for wastewater from the production of urea-formaldehyde pre-condensed resin, including the following steps: (1) Wastewater from the production of urea-formaldehyde pre-condensed resin containing free formaldehyde and free ammonia was introduced into an equalization tank for physical mixing. The hydraulic retention time of the wastewater in the equalization tank was controlled to be 6 hours, allowing free formaldehyde and free ammonia to fully condense to form hexamethylenetetramine. Subsequently, the wastewater was transported to an air flotation unit, and polyaluminum chloride was added to the water at a concentration of 200 mg / L; at the same time, anionic polyacrylamide was added at a concentration of 2 mg / L. Suspended solids, colloids, and oily substances in the wastewater system were removed by air flotation.
[0055] (2) The wastewater pretreated by the air flotation machine is introduced into the neutralization tank by gravity. A sodium hydroxide solution with a mass fraction of 25% is continuously added to the neutralization tank through the online pH meter and the dosing pump to stabilize the pH value of the water in the neutralization tank at 7.2.
[0056] (3) The neutralized wastewater is pumped into the main reaction zone of the anaerobic tank, and the DO concentration of the mixed liquor in the anaerobic tank is controlled at 0.1 mg / L. The macromolecular organic matter in the wastewater drives the polyphosphate-accumulating bacteria in the activated sludge to release free phosphate.
[0057] (4) The main effluent from the anaerobic tank is introduced into a static tubular mixer connected to the main water supply pipeline of the hydrolysis acidification tank. At the inlet of the mixer, a waste sulfuric acid solution with a mass fraction of 25% and a ferrous sulfate heptahydrate aqueous solution with a mass fraction of 8% are injected simultaneously in proportion. The pH value of the microenvironment inside the static tubular mixer is controlled at 5.0 and the Fe2+ concentration in the fluid inside the pipe is controlled at 35 mg / L by adjusting the metering pump. The hydraulic residence time of the mixed fluid in this section of the pipeline is controlled at 3 min. When the fluid flows through the T-junction at the end of the static tubular mixer, internal return sludge from the settling tank at the rear of the system is introduced, and the sludge return ratio is controlled at 150%. After the main water flow and the internal return sludge merge, the pH value of the mixed liquid naturally recovers to 7.2, and then it is discharged into the hydrolysis acidification tank.
[0058] (5) The mixed liquor enters the main area of the hydrolysis acidification tank. Through bottom aeration blowers and internal hydraulic circulation stirring, the ORP in the hydrolysis acidification tank is precisely controlled at -100mV for chain degradation. Then the mixed liquor flows into the anoxic tank by gravity. The DO in the anoxic tank is controlled at 0.3mg / L, and the denitrifying bacteria carry out denitrification to remove total nitrogen.
[0059] (6) The effluent from the anoxic tank enters the aerobic tank, and the DO of the mixed liquor is continuously aerated to control it at 3.0 mg / L. The MLSS of the aerobic tank is maintained at 3500 mg / L by sludge discharge. While degrading the residual COD, free Fe2+ is oxidized to Fe3+ and free phosphate is captured in situ to form iron phosphate precipitate.
[0060] (7) The effluent from the aerobic tank is discharged into the sedimentation tank for gravity sludge-water separation. Part of the activated sludge at the bottom of the sedimentation tank is returned to the end of the static tubular mixer at a return ratio of 150%. The supernatant is discharged into the phosphorus removal tank, and the hydraulic retention time for gravity settling is controlled to be 3 hours.
[0061] (8) The overflow liquid from the top of the phosphorus removal tank is discharged into the ultraviolet sterilization device and discharged after meeting the standards.
[0062] Example 2: This embodiment provides a treatment process for wastewater from the production of urea-formaldehyde pre-condensed resin, including the following steps: (1) Wastewater from the production of urea-formaldehyde pre-condensed resin containing free formaldehyde and free ammonia was introduced into an equalization tank for physical mixing, with the hydraulic retention time controlled at 4 hours. The wastewater was then transported to an air flotation unit, where polyaluminum chloride was added at a concentration of 100 mg / L, and anionic polyacrylamide was added at a concentration of 1 mg / L. Suspended solids and oils were removed by air flotation.
[0063] (2) The effluent from the flotation machine is introduced into the neutralization tank, and a sodium hydroxide solution with a mass fraction of 25% is added to stabilize the pH value of the water at 7.5.
[0064] (3) The neutralized wastewater is pumped into the anaerobic tank and the DO concentration is controlled at 0.2 mg / L for anaerobic phosphorus release.
[0065] (4) The effluent from the anaerobic tank is introduced into a static tubular mixer. A 20% (w / w) waste sulfuric acid solution and a 5% (w / w) ferrous sulfate heptahydrate solution are simultaneously injected at the inlet. The dosage is adjusted to maintain the pH of the microenvironment in the pipe at 5.5 and the Fe2+ concentration in the fluid within the pipe at 20 mg / L. The hydraulic retention time is controlled to 2 minutes. Internal return sludge is introduced at the T-junction at the end of the mixer, maintaining a sludge return ratio of 100%. After merging, the pH of the mixed liquor naturally recovers to 7.5 and is discharged into the hydrolysis acidification tank.
[0066] (5) Enter the main area of the hydrolysis acidification tank, control the ORP at -50mV, and then flow by gravity into the anoxic tank, control the DO in the anoxic tank to 0.5mg / L for denitrification.
[0067] (6) The effluent from the anoxic tank enters the aerobic tank, and the DO is controlled at 2.0 mg / L and the MLSS is maintained at 3000 mg / L to degrade COD and generate iron phosphate precipitate in situ.
[0068] (7) The effluent from the aerobic tank is discharged into the sedimentation tank for separation, and part of the activated sludge is returned to the end of the mixer at a 100% return ratio. The supernatant is discharged into the phosphorus removal tank and allowed to settle for 2 hours.
[0069] (8) The effluent from the phosphorus removal pond is discharged after being irradiated by an ultraviolet sterilization device and meets the standards.
[0070] Example 3: This embodiment provides a treatment process for wastewater from the production of urea-formaldehyde pre-condensed resin, including the following steps: (1) The wastewater from the production of urea-formaldehyde pre-condensed resin containing free formaldehyde and free ammonia was introduced into the equalization tank for physical mixing, and the hydraulic retention time was controlled to be 8 hours. The wastewater was then transported to an air flotation machine, where polyaluminum chloride was added at a concentration of 300 mg / L, and anionic polyacrylamide was added at a concentration of 3 mg / L. Suspended solids and oils were removed by air flotation.
[0071] (2) The effluent from the flotation machine is introduced into the neutralization tank, and a sodium hydroxide solution with a mass fraction of 25% is added to stabilize the pH value of the water at 7.0.
[0072] (3) The neutralized wastewater is pumped into the anaerobic tank and the DO concentration is controlled at 0.05 mg / L for strict anaerobic phosphorus release.
[0073] (4) The effluent from the anaerobic tank is introduced into a static tubular mixer. Simultaneously, a 30% waste sulfuric acid solution and a 10% ferrous sulfate heptahydrate solution are injected at the inlet. The dosage is adjusted to maintain the pH of the microenvironment in the pipe at 4.5 and the Fe2+ concentration in the fluid at 60 mg / L. The hydraulic retention time is controlled at 5 minutes. Internal return sludge is introduced at the T-junction at the end of the mixer, with a sludge return ratio of 200%. After merging, the pH of the mixed liquor naturally recovers to 6.8 and is discharged into the hydrolysis acidification tank.
[0074] (5) Enter the main area of the hydrolysis acidification tank and control the ORP at -150mV. Then, it flows by gravity into the anoxic tank and controls the DO in the anoxic tank to 0.2mg / L for denitrification.
[0075] (6) The effluent from the anoxic tank enters the aerobic tank, and the DO is continuously aerated to control the DO at 4.0 mg / L. The MLSS is maintained at 4000 mg / L by sludge discharge, which degrades COD and generates iron phosphate precipitate.
[0076] (7) The effluent from the aerobic tank is discharged into the sedimentation tank for separation, and part of the activated sludge is returned to the end of the mixer at a return ratio of 200%. The supernatant is discharged into the phosphorus removal tank and allowed to settle for 4 hours.
[0077] (8) The effluent from the phosphorus removal pond is discharged after being irradiated by an ultraviolet sterilization device and meets the standards.
[0078] To verify the treatment effect of the process of the present invention, the final effluent of Examples 1 to 3 and Comparative Examples 1 to 3, namely the clear liquid from the top overflow of the phosphorus removal tank after ultraviolet sterilization, was continuously sampled and tested. The average water quality data after 30 days of continuous and stable system operation was used as the statistical basis, and the test indicators included chemical oxygen demand (COD), total nitrogen (TN), and total phosphorus (TP).
[0079] The statistical results are shown in the table below. Figure 3 :
[0080] The data comparison above shows that the method provided by this invention, through specific process design and reagent combination, effectively solves the problems of incomplete carbon and nitrogen degradation and unstable phosphorus removal in urea-formaldehyde pre-condensation resin production wastewater in existing technologies. Its core mechanism lies in: First, a spatially isolated tubular microenvironment was constructed using a static tubular mixer. Within this microenvironment, short-term weakly acidic conditions induced the protonation of highly stable hexamethylenetetramine molecules, breaking their robust cage-like steric hindrance. Simultaneously, concurrently introduced ferrous ions, utilizing their empty orbitals, coordinated with the exposed nitrogen atoms after protonation. This physicochemical tandem intervention of protonation excitation and complexation locking successfully locked the toxic molecule in a semi-open ring state, significantly reducing the activation energy of subsequent enzymatic hydrolysis by acidifying bacteria.
[0081] Secondly, by setting the dosing point on the main effluent pipeline and delaying the connection of the return sludge from the settling tank to the end of the mixer, the large buffering alkalinity of the return sludge itself is utilized. This timing adjustment allows the mixed liquor to instantly return to neutral before being discharged into the main biological system, completely avoiding the damage to the activity of biological microorganisms caused by local acidification, as shown in Comparative Example 2.
[0082] Finally, the ferrous ions that are not consumed in the upstream pipeline are carried into the biological treatment section by the water flow. In the anoxic zone, they act as inorganic electron donors to synergistically drive iron autotrophic denitrification, compensating for the lack of carbon source for denitrification in high-nitrogen wastewater. Subsequently, in the high dissolved oxygen environment of the aerobic zone, they are oxidized to ferric iron, capturing free phosphate ions in the water in situ, achieving stable and compliant sedimentation of total phosphorus at the end. The entire process endows conventional bulk chemical raw materials, including waste acid and ferrous sulfate, with targeted chain breaking, denitrification, electron donation, and chemical phosphorus removal functions under a new spatiotemporal flow field. The system has strong overall integrity and high industrial application value.
[0083] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A treatment process for wastewater from the production of urea-formaldehyde pre-condensed resin, characterized in that, Includes the following steps: (1) The wastewater from the production of urea-formaldehyde pre-condensed resin containing free formaldehyde and free ammonia is introduced into the equalization tank for mixing, so that free formaldehyde and free ammonia undergo a condensation reaction to generate hexamethylenetetramine, and then air flotation pretreatment is carried out to remove suspended solids and oils. (2) The wastewater after air flotation pretreatment is introduced into the neutralization tank, and an alkalinity adjuster is added to adjust the pH value of the water to a neutral to slightly alkaline state; (3) The neutralized wastewater is introduced into the main reaction zone of the anaerobic tank to carry out phosphorus release reaction by polyphosphate-accumulating bacteria under anaerobic conditions; (4) The main effluent from the anaerobic tank is introduced into a static tubular mixer connected to the main water supply pipeline of the hydrolysis acidification tank. At the inlet end of the static tubular mixer, acidification activator and iron salt complexing agent are injected simultaneously to create a local slightly acidic environment in the main pipeline for protonation activation and complexation locking pretreatment of the wastewater. When the wastewater flows through the confluence port at the end of the static tubular mixer, the internal return sludge from the sedimentation tank at the back end of the system is introduced to merge with the main water flow and perform instantaneous neutralization, and then discharged into the hydrolysis acidification tank. (5) The mixed liquor undergoes chain-breaking degradation in the hydrolysis acidification tank, and is then discharged into the anoxic tank for denitrification. (6) The effluent from the anoxic tank enters the aerobic tank for aeration and oxidation. While degrading the residual chemical oxygen demand, the free low-valent iron ions in the water are oxidized to high-valent iron ions, and free phosphate ions are captured in situ to form iron phosphate precipitate. (7) The effluent from the aerobic tank is discharged into the sedimentation tank for mud-water separation. Part of the activated sludge at the bottom of the sedimentation tank is returned to the confluence as the internal return sludge mentioned in step (4), and the supernatant is discharged into the phosphorus removal tank for static sedimentation.
2. The treatment process for wastewater from urea-formaldehyde pre-condensed resin production according to claim 1, characterized in that: In step (4), by adjusting the dosage of acidifying activator and iron salt complexing agent, the pH value of the microenvironment inside the static tubular mixer is controlled between 4.5 and 5.5, and the concentration of ferrous ions in the fluid inside the pipe is controlled between 20 and 60 mg / L.
3. The treatment process for wastewater from urea-formaldehyde pre-condensed resin production according to claim 1, characterized in that: In step (4), the hydraulic residence time of the fluid inside the static tubular mixer is controlled to be 2 to 5 minutes.
4. The treatment process for wastewater from urea-formaldehyde pre-condensed resin production according to claim 1, characterized in that: In step (4), the acidification activator is a waste sulfuric acid solution with a mass fraction of 20% to 30%; the iron salt complexing agent is an aqueous solution of ferrous sulfate heptahydrate with a mass fraction of 5% to 10%.
5. The treatment process for wastewater from urea-formaldehyde pre-condensed resin production according to claim 1, characterized in that: In step (4), the sludge return ratio flowing into the confluence is controlled to be 100% to 200%. After the main water flow and the internal return sludge merge and are neutralized instantaneously, the pH value of the mixed liquid naturally recovers to 6.8 to 7.
5.
6. The treatment process for wastewater from urea-formaldehyde pre-condensed resin production according to claim 1, characterized in that: The specific implementation method of step (1) is as follows: control the hydraulic retention time of wastewater in the equalization tank to 4-8 hours; then transport it to the air flotation machine, add polyaluminum chloride with a concentration of 100-300 mg / L and anionic polyacrylamide with a concentration of 1-3 mg / L to the water for air flotation pretreatment.
7. The treatment process for wastewater from urea-formaldehyde pre-condensed resin production according to claim 1, characterized in that: The pH value of the water in the neutralization tank in step (2) is controlled to be 7.0 to 7.5; the dissolved oxygen concentration of the anaerobic tank mixture in step (3) is controlled to be 0.05 to 0.2 mg / L.
8. The treatment process for wastewater from urea-formaldehyde pre-condensed resin production according to claim 1, characterized in that: In step (5), the redox potential in the hydrolysis acidification tank is controlled to be -150 to -50 mV; the dissolved oxygen concentration in the anoxic tank is controlled to be 0.2 to 0.5 mg / L.
9. The treatment process for wastewater from urea-formaldehyde pre-condensed resin production according to claim 1, characterized in that: In step (6), the dissolved oxygen concentration of the mixed liquor in the aerobic tank is controlled at 2.0 to 4.0 mg / L, and the sludge concentration is maintained at 3000 to 4000 mg / L.
10. The treatment process for wastewater from urea-formaldehyde pre-condensed resin production according to claim 1, characterized in that: In step (7), the gravity settling and hydraulic retention time of the supernatant in the phosphorus removal tank is controlled to be 2 to 4 hours. The effluent from the phosphorus removal tank is treated by an ultraviolet sterilization device and discharged after meeting the standards.