A precast composite pile with enlarged pile head and its construction method.

By setting continuous external threaded protrusions and enlarging the pile head at the bottom of the precast pile body, combined with the hardened base and pile perimeter filling, a mechanical interlocking structure is formed, which solves the problems of insufficient bearing capacity and low construction efficiency of existing cast-in-place piles and precast piles during construction, and realizes efficient and controllable pile foundation construction.

CN123109145APending Publication Date: 2026-11-17ZHONGLONG CONSTRUCTION GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611413041.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-11
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing cast-in-place piles and precast piles have problems such as complicated procedures, difficulty in ensuring quality, insufficient bearing capacity, underutilization of material properties, and low construction efficiency during construction. In particular, they are prone to causing damage to surrounding pipelines and buildings when constructed in densely populated urban areas.

Method used

The ultra-high strength threaded precast composite pile with enlarged pile head is adopted. By setting continuous external thread protrusions and enlarged pile head at the bottom of the precast pile body, combined with hardened base and pile perimeter filling, a mechanical interlocking structure is formed, which increases the pile side friction and pile end bearing capacity.

Benefits of technology

It significantly improves the bearing capacity of a single pile, with a synergistic increase of 1.8 to 2.5 times in pile side friction and pile end bearing capacity. It also improves construction efficiency, ensures controllable quality, reduces material waste and engineering costs, and minimizes soil squeezing during pile driving.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109145A_ABST
    Figure CN123109145A_ABST
Patent Text Reader

Abstract

This invention belongs to the technical field of building foundation engineering, and relates to an ultra-high strength precast composite pile with an enlarged pile head. It includes a precast pile body with continuous external threaded protrusions along the length of the outer wall of the lower region; an enlarged pile head fixedly assembled at the bottom end of the precast pile body, with the maximum outer contour dimension of the enlarged pile head being larger than the outer diameter of the precast pile body; a hardened base formed in the bottom region of the borehole, with the enlarged pile head integrally embedded inside the hardened base; and a pile perimeter filler filling the annular gap between the precast pile body and the inner wall of the borehole, and engaging and solidifying with the external threaded protrusions. By providing continuous spirally extending external threaded protrusions along the lower part of the pile body, a mechanical interlocking structure similar to a thread is formed between the pile body and the pile perimeter filler after the pile body is driven into the pile hole, significantly increasing the pile side friction resistance and improving the cooperative working performance between the pile and the soil.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical field of building foundation engineering, specifically relating to an ultra-high strength precast threaded composite pile with an enlarged pile head and its construction method. Background Technology

[0002] Cast-in-place piles and precast piles are the two most widely used pile foundation types in current construction engineering. However, the construction process of traditional cast-in-place piles is relatively complex, involving multiple stages such as hole drilling, hole cleaning, reinforcement cage installation, and concrete pouring. This requires significant labor input, has a long construction period, and makes it difficult to guarantee the consistent quality of the on-site reinforcement cage binding. Furthermore, quality defects such as segregation, pile breakage, and slag inclusion are prone to occur during concrete pouring. In addition, the sediment at the bottom of the hole cannot be completely removed, directly weakening the bearing capacity of the pile tip and affecting the overall bearing performance of the cast-in-place pile.

[0003] Conventional precast piles typically employ a construction process of "site leveling—pile section prefabrication and curing—on-site transportation and stacking—hoisting and alignment—hammering or static pressure driving—pile splicing and re-driving." This process has significant drawbacks in practical applications. First, the contact friction between the pile side surface and the soil is limited. Due to the smooth surface of the pile, the utilization of pile side friction is constrained by the strength of the surrounding soil, failing to fully utilize the high strength properties of the pile material. Second, the pile tip of traditional precast piles is usually a flat plane or a simple cone, resulting in limited space for increasing the pile tip bearing capacity. Consequently, the actual bearing capacity of precast piles often only reaches 50% to 80% of the pile's design strength, leading to low overall single-pile bearing efficiency, wasted material properties, and increased project costs. Furthermore, the soil squeezing effect during pile driving is significant, easily causing deformation and damage to surrounding pipelines and existing building foundations, a problem that is particularly pronounced in densely populated urban areas.

[0004] While some existing precast pile technologies attempt to increase skin friction by expanding the contact area between the pile sides, these structures are often localized or additional components independent of the pile body, resulting in poor integration with the pile itself and a tendency to peel off under heavy loads. Furthermore, the bearing area at the pile tip of existing precast piles remains relatively limited, failing to fully utilize the bearing potential of the soil in the bearing stratum. Therefore, there is an urgent need to develop a new type of precast composite pile and its construction method that can simultaneously improve both skin friction and pile tip bearing capacity, while also offering high construction efficiency and controllable quality. Summary of the Invention

[0005] The purpose of this invention is to provide an ultra-high strength threaded precast composite pile with an enlarged pile head to solve the above-mentioned problems existing in the prior art.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: A precast composite pile with an enlarged pile head, comprising a precast pile body, the pile body being divided into an upper smooth section and a lower threaded section, wherein the outer wall of the threaded section is provided with continuous external thread protrusions along the length direction; The enlarged pile head is fixedly assembled at the bottom end of the precast pile body, and the maximum outer contour dimension of the enlarged pile head is greater than the outer diameter of the precast pile body. The enlarged pile head is provided with multiple resistance-reducing holes, which are spaced apart along the circumference of the enlarged pile head. The opening of one end of the resistance-reducing hole is located on the lower end face of the enlarged pile head, and the opening of the other end is located on the surface of the enlarged pile head facing upward. The hardened base is formed at the bottom of the borehole, and the enlarged pile head is embedded inside the hardened base. The pile periphery filler fills the annular gap between the precast pile body and the inner wall of the borehole, and engages and solidifies with the external thread protrusion.

[0007] In some embodiments, the external thread protrusion extends continuously in a spiral shape along the entire length of the precast pile body, and the protrusion height of the external thread protrusion is 30-100mm, and the pitch is 1000-2000mm.

[0008] In some embodiments, the concrete strength of the enlarged pile head is not less than C60, and its cross-section adopts any one of the following: conical, ellipsoidal, isosceles trapezoidal, and cylindrical.

[0009] In some embodiments, the enlarged pile head cross-section is an isosceles trapezoid, with the smaller end connected to the lower end face of the precast pile body.

[0010] In some embodiments, the outer diameter of the larger end of the enlarged pile head is 1.1 to 1.5 times the outer diameter of the precast pile body.

[0011] In some embodiments, the precast pile body adopts a hollow structure, and the precast pile body is provided with multiple vertical ribs and circumferential ribs. The multiple vertical ribs are arranged sequentially at intervals along the circumference of the precast pile body and extend along the axial direction of the precast pile body. The multiple circumferential ribs are arranged sequentially at intervals along the axial direction of the precast pile body and extend along the circumference of the precast pile body.

[0012] A construction method for using the expanded-base ultra-high-strength threaded precast composite pile as described above includes the following steps: S1: Construction preparation, leveling the construction site, completing pile location measurement and setting out, and debugging the drilling equipment, grouting system and pile driving equipment; S2: Hole forming using a mixing drill. The mixing drill is used to drill to the designed bottom elevation of the hole. During the process of the drill bit sinking, the atmospheric pressure grouting switch is opened simultaneously to inject cement-based composite grout to form a borehole. S3: High-pressure grouting at the bottom of the hole. After reaching the designed bottom elevation, the high-pressure grouting switch of the equipment is turned on, and cement-based grouting material is injected into the bottom of the hole through the mixing drill. S4: Slurry mixing and lifting. Turn on the atmospheric pressure slurry switch of the equipment, and lift the equipment from bottom to top while mixing and slurry lifting. Lift the equipment to the stop slurry surface and stop slurrying. S5: Ground assembly of the pile body, fixing the enlarged pile head to the bottom end of the precast pile body; S6: Positioning and hoisting: Using lifting equipment, the assembled precast pile body is hoisted into the borehole and positioned. S7: Pile driving, relying on the self-weight of the pile body, the precast pile body is driven down to the design elevation; S8: Maintenance and inspection. The pile perimeter filling and hardened base are maintained, and the pile foundation quality is inspected after maintenance.

[0013] In some embodiments, in step S2, the spraying pressure of the cement-based grout is 0.4 MPa to 0.8 MPa, the dosage is 6% to 9%, and the drill rod sinking speed is 0.5 to 1.0 m / min; in step S3, the injection pressure of the cement-based grout is not less than 20 MPa, the dosage is 20% to 35%, and the high-pressure grouting time at the bottom of the hole is 4 min to 9 min; in step S4, the spraying pressure of the cement-based grout is 0.4 MPa to 0.8 MPa, the dosage is 6% to 9%, and the drill rod rising speed is 0.4 to 0.8 m / min. After the grouting process, the grouting material penetrates and compresses the surrounding soil under high pressure, cementing with the soil particles to form a dense solidified body. After pressure stabilization and curing in the bottom area, the hardened base is formed.

[0014] In some embodiments, during step S6, the verticality deviation of the precast pile body is not greater than 0.25% when the precast pile body is hoisted.

[0015] In some embodiments, after step S6 is completed, the net distance between the outer wall of the precast pile body and the inner wall of the borehole is 50mm to 150mm; the cement-based composite grout is sprayed downward from the borehole opening, filling the entire annular gap and engaging with the external thread protrusion.

[0016] Beneficial effects: In this invention, by setting continuously spirally extending external threaded protrusions along the lower part of the pile body, a thread-like mechanical interlocking structure is formed between the pile body and the surrounding filler after it is driven into the pile hole. This significantly increases the pile side friction resistance and improves the cooperative working performance between the pile and the soil. The enlarged pile head is fixedly assembled at the bottom of the pile body, with its maximum outer contour dimension larger than the outer diameter of the pile body, greatly increasing the bearing area at the pile end and enabling the pile end to exert a higher end bearing capacity. The hardened base is formed at the bottom of the borehole through high-pressure grouting, improving the bearing capacity of the soil at the pile end. The surrounding filler fills the annular gap between the pile body and the inner wall of the borehole, and interlocks with the external threaded protrusions, further enhancing the pull-out resistance and overall stability of the pile body. The thread size and pitch can be adjusted according to the core pile and the size of the borehole, based on design requirements, to coordinate the bonding effect with the surrounding cement and soil, achieving the best results. This precast composite pile structure has a reasonable design, efficient and controllable construction method, and can fully utilize the performance of the pile material, significantly improving the bearing capacity of a single pile. Compared to traditional precast piles of the same diameter, the vertical bearing capacity is increased by 1.8 to 2.5 times. Compared to traditional pile driving technology for core piles of the same diameter, the vertical bearing capacity is increased by 1.2 to 1.6 times. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of an ultra-high strength precast threaded composite pile with an enlarged pile head, according to an embodiment of this application. Figure 2 This is a schematic diagram of a precast pile body of an ultra-high strength threaded precast composite pile with an enlarged pile head, according to an embodiment of this application. Figure 3 This is a cross-sectional schematic diagram of a precast pile body of an ultra-high strength threaded precast composite pile with an enlarged pile head, according to an embodiment of this application. Figure 4 This is a schematic diagram showing the positional relationship between the precast pile body and the pile perimeter filling body of an ultra-high strength threaded precast composite pile with an enlarged pile head according to an embodiment of this application. Figure 5 This is a partial cross-sectional schematic diagram of the precast pile body of an ultra-high strength threaded precast composite pile with an enlarged pile head, according to an embodiment of this application. Figure 6 This is a cross-sectional schematic diagram of the enlarged pile head of an ultra-high strength threaded precast composite pile with an enlarged pile head according to an embodiment of this application. Figure 7 This is a schematic diagram of the construction process of an ultra-high strength precast threaded composite pile with an enlarged pile head, according to an embodiment of this application. Figure 8 This is a construction flowchart of an embodiment of this application; Figure label: 1-Precast pile body, 11-External threaded protrusion, 12-Vertical reinforcement, 13-Circumferential reinforcement; 2-Enlarged pile head, 21-Resistance-reducing hole; 3-Hardened base; 4-Pile periphery filler; 5-Drilling hole. Detailed Implementation

[0018] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the present invention will be briefly introduced below in conjunction with the accompanying drawings and descriptions of the embodiments or the prior art. Obviously, the following description of the structure of the accompanying drawings is only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. It should be noted that the description of these embodiments is for the purpose of helping to understand the present invention, but does not constitute a limitation of the present invention.

[0019] Example 1: According to a first aspect of this disclosure, an ultra-high strength threaded precast composite pile with an enlarged pile head is provided. Wherein, Figures 1 to 6 Specific embodiments thereof are shown.

[0020] See Figure 1 and Figure 2 As shown, the ultra-high strength threaded precast composite pile with enlarged pile head mainly includes a precast pile body 1, an enlarged pile head 2, a hardened base 3, and a pile perimeter filler 4. The outer wall of the precast pile body 1 has continuously extending external threaded protrusions 11 along its length, which spirally extend continuously along the entire length of the precast pile body 1. The enlarged pile head 2 is fixedly assembled to the bottom end of the precast pile body 1, and the maximum outer contour dimension of the enlarged pile head 2 is larger than the outer diameter of the precast pile body 1. The hardened base 3 is formed in the bottom area of ​​the borehole 5, and the enlarged pile head 2 is integrally embedded inside the hardened base 3. The pile perimeter filler 4 fills the annular gap between the precast pile body 1 and the inner wall of the borehole 5, and interlocks with the external threaded protrusions 11 for solidification.

[0021] The working process of this ultra-high strength threaded precast composite pile with enlarged pile head is as follows: First, a borehole 5 is formed in the foundation using a mixing drill. After reaching the designed bottom elevation, cement-based grout is injected into the bottom of the borehole under high pressure using the drill. After pressure stabilization and curing, a hardened base 3 is formed. During the ground assembly stage of the pile body, the enlarged pile head 2 is fixedly assembled to the bottom end of the precast pile body 1. Then, a lifting device is used to hoist the assembled precast pile body 1 into the borehole 5 and position it. Relying on the self-weight of the pile body or the equipment, the precast pile body 1 is pressed down to the designed elevation, while the cement-based composite grout at the bottom of the borehole 5 is squeezed into the annular gap. The external threaded protrusion 11 on the outer wall of the precast pile body 1 forms a mechanical engagement with the pile perimeter filler 4, and the enlarged pile head 2 is embedded in the hardened base 3, together providing strong tensile and compressive bearing capacity.

[0022] The above technical solution achieves a synergistic improvement in pile side friction and pile end bearing capacity, solving the problems existing in the background technology.

[0023] In some embodiments, the precast pile body 1 is the main load-bearing structure of the precast composite pile, and is precast using ultra-high strength concrete (such as C80-C120) through a centrifugal molding process. The outer wall of the precast pile body 1 has continuous external threaded protrusions 11 along its length. The external threaded protrusions 11 and the precast pile body 1 are an integral precast structure (the two constitute an integrated structure), meaning they are directly formed using a special mold during concrete pouring, without subsequent processing. The cross-sectional shape of the external threaded protrusions 11 can be trapezoidal, semi-circular, or rectangular, and their function is to increase the contact area and mechanical interlocking force between the pile body and the pile perimeter filler 4. An enlarged pile head 2 is fixedly assembled to the bottom end of the precast pile body 1. The enlarged pile head 2 and the precast pile body 1 can be fixed by mechanical connection or welding, both of which are existing technologies and will not be elaborated further. The material of the enlarged pile head 2 is the same as or of a higher strength grade than that of the precast pile body 1. The maximum outer contour dimension of the enlarged pile head 2 is larger than the outer diameter of the precast pile body 1, resulting in a significant increase in the bearing area at the pile end. The hardened base 3 is a solidified body formed by high-pressure grouting, formed in the bottom area of ​​the borehole 5, with the enlarged pile head 2 integrally embedded inside the hardened base 3. The pile perimeter filler 4 is a cement-based composite grout injected into the annular gap between the precast pile body 1 and the inner wall of the borehole 5, which interlocks with the external threaded protrusion 11 to form a mechanical locking structure. The hardened base 3 and the pile perimeter filler 4 can be made of micro-expansion cement-based grout with a strength grade not lower than C40. The pile perimeter filler 4 fills the annular gap between the precast pile body 1 and the inner wall of the borehole 5, and interlocks with the external threaded protrusion 11, thereby firmly bonding the pile body to the surrounding soil.

[0024] Among them, the maximum outer contour dimension of the enlarged pile head 2 is 100mm to 300mm larger than the outer diameter of the precast pile body 1, and the vertical height is 500mm to 1000mm.

[0025] In some embodiments, the external thread protrusion 11 extends continuously in a spiral shape along the entire length of the precast pile body 1, that is, the external thread protrusion 11 extends from near the top end of the precast pile body 1 to near the bottom end, forming a complete spiral line. The protrusion height of the external thread protrusion 11 is 30-100mm, that is, the radial dimension of the external thread protrusion 11 protruding outward from the outer wall surface of the precast pile body 1. The pitch is 1000-2000mm, that is, the axial distance between two adjacent turns of the external thread protrusion 11. The above-mentioned range of protrusion height and pitch values ​​were determined through a large number of engineering tests based on different geological conditions and pile diameters, which can ensure that the pile body obtains sufficient side friction resistance without causing pile driving difficulties due to excessively large external thread protrusions 11. In a preferred implementation, the protrusion height is 60mm and the pitch is 1400mm.

[0026] In this embodiment, the upper and lower sides of the external thread protrusion 11 are provided with inclined surfaces 111. During the pile driving process, the inclined surfaces 111 of the external thread protrusion 11 can guide the surrounding cement soil particles to slide along the inclined surfaces, reducing the pile driving resistance, and at the same time increasing the contact area with the soil during the use stage.

[0027] In some embodiments, the concrete strength of the enlarged pile head 2 is not less than C60, that is, the enlarged pile head 2 is made of ultra-high strength concrete to ensure that the enlarged pile head 2 will not crush under high stress at the pile tip. The cross-section of the enlarged pile head 2 can be any one of the following: conical (gradually enlarging from top to bottom), ellipsoidal (enlarging in an elliptical curve), isosceles trapezoidal (parallel upper and lower bases, symmetrical sides), or cylindrical. All of the above cross-sectional shapes can achieve the enlargement of the pile tip cross-sectional area, and each has its advantages: the conical shape facilitates pile driving into the bearing layer, the ellipsoidal shape provides more uniform stress distribution, the isosceles trapezoidal shape facilitates mold forming and dimensional control, and the cylindrical shape is the simplest to process.

[0028] In some embodiments, the cross-section of the enlarged pile head 2 is an isosceles trapezoid, with the smaller end connected to the lower end face of the precast pile body 1. That is, the upper base (smaller base side) of the isosceles trapezoid is connected to the bottom surface of the precast pile body 1, and the lower base (larger base side) is the bottom end of the enlarged pile head 2, with the two sides of the trapezoid extending outwards at an angle. The symmetry of the isosceles trapezoid ensures that the pile end is subjected to uniform stress when bearing vertical loads, preventing eccentricity.

[0029] In some embodiments, the outer diameter of the smaller end face of the enlarged pile head 2 is the same as the outer diameter of the precast pile body 1, that is, the diameter of the upper end face of the enlarged pile head 2 is equal to the outer diameter of the precast pile body 1, so that a smooth transition is formed between the precast pile body 1 and the enlarged pile head 2, without steps or abrupt cross sections, avoiding stress concentration, and facilitating the assembly and connection of the precast pile body 1 and the enlarged pile head 2. The outer diameter of the larger end of the enlarged pile head 2 is 1.1 to 1.5 times the outer diameter of the precast pile body 1, that is, the diameter of the bottom end of the enlarged pile head 2 is 1.1 to 1.5 times the outer diameter of the precast pile body 1. This range is determined comprehensively based on the bearing capacity of different bearing strata and the structural strength of the precast pile body 1, ensuring that the bearing capacity of the pile end is effectively improved while avoiding excessive size of the enlarged pile head 2, which would lead to material waste or construction difficulties. In a preferred implementation, the outer diameter of the larger end of the enlarged pile head 2 is 1.2 times the outer diameter of the precast pile body 1.

[0030] In order to facilitate the settlement of the precast pile 1 under its own weight, which is subject to greater resistance from the enlarged pile head 2, in this embodiment, the enlarged pile head 2 is provided with multiple resistance-reducing holes 21. The multiple resistance-reducing holes 21 are arranged at intervals along the circumference of the enlarged pile head 2, and the opening of one end of the resistance-reducing hole 21 is located on the lower end face of the enlarged pile head 2, and the opening of the other end is located on the upper surface of the enlarged pile head 2. This allows the grout in the borehole 5 to pass through the resistance-reducing hole 21 through the enlarged pile head 2 when the precast pile 1 settles, thereby reducing the resistance encountered by the enlarged pile head 2 when it descends.

[0031] In some embodiments, the precast pile body 1 adopts a hollow structure, that is, the center of the precast pile body 1 has a cavity extending axially, which can reduce the self-weight of the pile body, save material usage, and facilitate hoisting and transportation. The interior of the precast pile body 1 is provided with multiple vertical reinforcement bars 12 and circumferential reinforcement bars 13. The vertical reinforcement bars 12 are longitudinal prestressed steel bars or ordinary threaded steel bars, arranged sequentially at intervals along the circumference of the precast pile body 1 (e.g., 6-12 bars evenly arranged along the circumference), and extend along the axial direction of the precast pile body 1, used to bear vertical tensile and compressive stresses. The circumferential reinforcement bars 13 are spiral stirrups or ring stirrups, arranged sequentially at intervals along the axial direction of the precast pile body 1 (the spacing is usually 50mm-150mm), and extend along the circumference of the precast pile body 1, used to restrain the concrete and provide shear resistance. The vertical reinforcement bars 12 and circumferential reinforcement bars 13 together form a steel reinforcement skeleton, which is connected by welding or binding, enhancing the structural strength of the precast pile body 1.

[0032] A construction method, such as Figure 7 and Figure 8 As shown, the ultra-high strength threaded precast composite pile with enlarged pile head described above includes the following steps: S1: During the construction preparation phase, operators first level the construction site to ensure it is firm and flat, meeting the requirements for the passage and operation of large equipment. They then complete the pile location measurement and layout, accurately marking the center position of each pile according to the design drawings. Next, they debug the drilling equipment (mixing drill), grouting system (high-pressure grouting pump and pipeline), and pile driving equipment (static pile driver or vibratory hammer, or pile settlement by its own weight) to ensure all equipment is in good working order.

[0033] S2: During the hole-forming stage, a mixing drill is used to drill at the predetermined pile location, while simultaneously applying atmospheric pressure grouting, until the designed bottom elevation is reached, forming borehole 5. The mixing drill has advantages such as good soil removal during drilling and high borehole wall stability, making it suitable for various soil conditions. The diameter of borehole 5 is determined based on the outer diameter of the precast pile body 1, typically 1.5-2.5 times the outer diameter of the precast pile body 1, to ensure sufficient annular clearance.

[0034] S3: High-pressure grouting stage at the bottom of the hole. After reaching the designed bottom elevation, the operator injects cement-based grout into the bottom of the hole through the central pipe of the mixing drill or a separately installed grouting pipe. After the pile driving is completed and pressure is stabilized and cured, a hardened base 3 can be formed. During the grouting process, the grout penetrates and squeezes the surrounding soil under high pressure, cementing with the soil particles to form a dense solidified body.

[0035] S4: Slurry mixing and lifting. Turn on the atmospheric pressure slurry switch of the equipment, and lift the equipment from bottom to top while mixing and slurry lifting. Lift the equipment to the stop slurry surface and stop slurrying. S5: During the ground assembly stage of the pile body, the enlarged pile head 2 is fixedly assembled to the bottom end of the precast pile body 1 on the ground. The assembly method can be mechanical connection or welding, ensuring that the connection strength between the enlarged pile head 2 and the precast pile body 1 is not lower than the strength of the pile body. After assembly, a visual inspection is carried out to confirm that there are no cracks or deformations at the connection points.

[0036] S6: During the positioning and hoisting stage, use lifting equipment (truck crane or crawler crane) to lift the assembled precast pile 1 and slowly move it above the borehole 5. With manual assistance and positioning devices, align the precast pile 1 with the center of the borehole 5, and then slowly lower it so that the precast pile 1 enters the borehole 5 and is in place, with its lower end inserted into the unhardened hardened base 3. The pile body should be kept vertical during the lowering process.

[0037] S7: During the pile driving stage, the pile body 1 is pressed down to the design elevation by its own weight. During the pile driving process, the pressing speed and pressure value should be strictly controlled to prevent the pile body from deviating or being damaged.

[0038] S8: Curing and Testing Phase. After the hardened base 3 and pile perimeter filling 4 have hardened, the pile perimeter filling 4 and hardened base 3 shall be cured for no less than 7 days, or as determined according to material requirements and ambient temperature. After curing, pile foundation quality testing shall be conducted in accordance with relevant specifications. Testing items include pile integrity and single pile bearing capacity.

[0039] In some embodiments, in step S2, the spraying pressure of the cement-based grout is 0.4MPa to 0.8MPa, the dosage is 6% to 9%, and the drill rod sinking speed is 0.5 to 1.0m / min; in step S3, the injection pressure of the cement-based grout is not less than 20MPa, the dosage is 20% to 35%, and the high-pressure grouting time at the bottom of the hole is 4min to 9min; in step S4, the spraying pressure of the cement-based grout is 0.4MPa to 0.8MPa, the dosage is 6% to 9%, and the drill rod rising speed is 0.4 to 0.8m / min; after the grouting process, the grout penetrates and squeezes the surrounding soil under high pressure, cements with the soil particles to form a dense solidified body, and forms a hardened base after pressure stabilization and curing.

[0040] In this embodiment, the purpose of high-pressure grouting is to allow the grout to fully penetrate into the pores and fissures of the surrounding soil under high pressure, reacting with the soil particles to form a dense, solidified body. After grouting, pressure stabilization curing is performed, typically for 5-10 minutes, to ensure that the grout maintains its compressive state on the surrounding soil before solidification. The hardened base 3 after curing possesses high strength and integrity, providing a reliable embedded foundation for the enlarged pile head 2.

[0041] In some embodiments, during step S6, when hoisting the precast pile 1, a lifting device is used in conjunction with a dedicated circumferential locator to hoist the precast pile. Throughout the hoisting process, the locator is used to constrain the horizontal deviation of the pile, and the verticality deviation of the pile body is no more than 0.25%, that is, the angle deviation between the pile axis and the vertical direction does not exceed 0.25%. This accuracy requirement can be controlled by setting bidirectional plumb lines on the pile body or by using a theodolite or total station for monitoring. The assembled precast pile 1 is hoisted into the borehole 5 and lowered to the surface of the enlarged pile head 2 contacting the hardened base 3. At this time, the lower end face of the enlarged pile head 2 contacts the upper surface of the hardened base 3, forming the pile end bearing surface.

[0042] In some embodiments, in step S7, the net distance between the outer wall of the precast pile 1 and the inner wall of the borehole 5 is 50mm to 150mm (i.e., the thickness of the annular gap). This value is calculated based on the outer diameter of the precast pile 1 and the diameter of the borehole 5, ensuring sufficient flow space for the grout within the annular gap, while also ensuring that the pile perimeter filler 4 and the external threaded protrusion 11 form a sufficient interlocking structure. The cement-based composite grout fills the entire annular gap and interlocks with the external threaded protrusion 11, forming a robust mechanical locking structure.

[0043] The above specific embodiments further illustrate the purpose, technical solution, and beneficial effects of the present invention. It should be understood that the above are merely specific embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

[0044] Finally, it should be noted that this invention is not limited to the optional embodiments described above, and anyone can derive other various forms of products under the guidance of this invention. The specific embodiments described above should not be construed as limiting the scope of protection of this invention, which should be determined by the claims, and the specification can be used to interpret the claims.

Claims

1. A precast composite pile with an enlarged pile head, characterized in that, include: The precast pile body is divided into an upper smooth section and a lower threaded section. The outer wall of the lower threaded section of the precast pile body has continuous external thread protrusions along the length direction. An enlarged pile head is fixedly assembled at the bottom end of the precast pile body, and the maximum outer contour dimension of the enlarged pile head is greater than the outer diameter of the precast pile body. The enlarged pile head is provided with multiple resistance-reducing holes, which are spaced apart along the circumference of the enlarged pile head. The opening of one end of the resistance-reducing hole is located on the lower end face of the enlarged pile head, and the opening of the other end is located on the surface of the enlarged pile head facing upward. A hardened base is formed in the bottom region of the borehole, and the enlarged pile head is integrally embedded inside the hardened base; The pile periphery filler fills the annular gap between the precast pile body and the inner wall of the borehole, and engages and solidifies with the external threaded protrusion.

2. The ultra-high strength precast threaded composite pile with enlarged pile head according to claim 1, characterized in that, The external thread protrusion extends continuously in a spiral shape along the entire length of the precast pile body, and the protrusion height of the external thread protrusion is 30-100mm, and the pitch is 1000-2000mm.

3. The ultra-high strength precast threaded composite pile with enlarged pile head according to claim 1, characterized in that, The concrete strength of the enlarged pile head shall not be less than C60, and its cross-section shall be any one of the following: conical, ellipsoidal, isosceles trapezoidal, or cylindrical.

4. The ultra-high strength precast threaded composite pile with enlarged pile head according to claim 3, characterized in that, The enlarged pile head cross-section adopts an isosceles trapezoid, and the smaller end is connected to the lower end face of the precast pile body.

5. The ultra-high strength precast threaded composite pile with enlarged pile head according to claim 4, characterized in that, The outer diameter of the larger end of the enlarged pile head is 1.1 to 1.5 times the outer diameter of the precast pile body.

6. The ultra-high strength precast threaded composite pile with enlarged pile head according to claim 5, characterized in that, The precast pile body adopts a hollow structure and is provided with multiple vertical ribs and circumferential ribs. The multiple vertical ribs are arranged sequentially at intervals along the circumference of the precast pile body and extend along the axial direction of the precast pile body. The multiple circumferential ribs are arranged sequentially at intervals along the axial direction of the precast pile body and extend along the circumference of the precast pile body.

7. A construction method for using ultra-high strength precast threaded composite piles with enlarged pile heads as described in any one of claims 1 to 6, characterized in that, Includes the following steps: S1: Construction preparation, leveling the construction site, completing pile location measurement and setting out, and debugging the drilling equipment, grouting system and pile driving equipment; S2: Hole forming using a mixing drill. The mixing drill is used to drill to the designed bottom elevation of the hole. During the process of the drill bit sinking, the atmospheric pressure grouting switch is opened simultaneously to inject cement-based composite grout to form a borehole. S3: High-pressure grouting at the bottom of the hole. After reaching the designed bottom elevation, the high-pressure grouting switch of the equipment is turned on, and cement-based grouting material is injected into the bottom of the hole through the mixing drill. S4: Slurry mixing and lifting. Turn on the atmospheric pressure slurry switch of the equipment, and lift the equipment from bottom to top while mixing and slurry lifting. Lift the equipment to the stop slurry surface and stop slurrying. S5: Ground assembly of the pile body, fixing the enlarged pile head to the bottom end of the precast pile body; S6: Positioning and hoisting: Using lifting equipment, the assembled precast pile body is hoisted into the borehole and positioned. S7: Pile driving, relying on the self-weight of the pile body, the precast pile body is driven down to the design elevation; S8: Maintenance and inspection. The pile perimeter filling and hardened base are maintained, and the pile foundation quality is inspected after maintenance is completed.

8. The construction method according to claim 7, characterized in that, In step S2, the spraying pressure of the cement-based grout is 0.4 MPa to 0.8 MPa, the dosage is 6% to 9%, and the drill rod sinking speed is 0.5 to 1.0 m / min; in step S3, the injection pressure of the cement-based grout is not less than 20 MPa, the dosage is 20% to 35%, and the high-pressure grouting time at the bottom of the hole is 4 min to 9 min; in step S4, the spraying pressure of the cement-based grout is 0.4 MPa to 0.8 MPa, the dosage is 6% to 9%, and the drill rod rising speed is 0.4 to 0.8 m / min. After the grouting process, the grouting material penetrates and compresses the surrounding soil under high pressure, cementing with the soil particles to form a dense solidified body. After pressure stabilization and curing in the bottom area, the hardened base is formed.

9. The construction method according to claim 8, characterized in that, In step S6, when hoisting the precast pile, the verticality deviation of the pile body shall not exceed 0.25%; the assembled precast pile body shall be hoisted into the borehole and lowered to the surface of the enlarged pile head contacting the hardened base.

10. The construction method according to claim 9, characterized in that, In step S7, the net distance between the outer wall of the precast pile body and the inner wall of the borehole is 50mm to 150mm. Cement-based composite grout is sprayed downward from the borehole opening to fill the entire annular gap and interlock with the external thread protrusion.