Movable steel formwork and modeling formwork integrated structure and construction method thereof

Through the integrated structure of movable steel formwork, molded formwork and gantry movement technology, the problems of long construction cycle of traditional retaining walls and easy detachment of decorative materials are solved, and efficient and low-cost integrated construction of molded retaining walls is achieved, improving the improvement of Construction quality and integrity.

CN118911409AInactive Publication Date: 2024-11-08SHANGHAI DONGHUA ENG CONSULTING CO LTD +2

Patent Information

Application Number
CN202411406576.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the traditional retaining wall construction technology, decorative materials need to be installed separately after the wall is cast and molded, resulting in a long construction cycle and high cost, and poor integrity of the modeling decorative materials and easy to fall off, affecting the construction quality and aesthetics.

Method used

The integrated structure of movable steel formwork and molding formwork is adopted. The formwork components are moved through the gantry to reduce the assistance of large equipment, and the integrated construction of the molding retaining wall is achieved. It has good integrity and the shape is not easy to fall off, reducing the construction cycle and cost.

Benefits of technology

Effectively reduce construction cycles, reduce costs, improve construction quality and integrity, reduce manpower and material investment, and improve construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911409A_ABST
    Figure CN118911409A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building foundation engineering construction, and discloses a movable steel formwork and modeling formwork integrated structure and a construction method thereof.The structure comprises a portal frame and a formwork assembly, and the formwork assembly comprises a first steel formwork and a second steel formwork which are oppositely arranged; a modeling formwork is arranged on the inner wall of the first steel formwork or / and the second steel formwork, the portal frame is arranged above the formwork assembly in a straddling mode, a first chain hoist and a second chain hoist are arranged on a cross beam at the top end of the portal frame, the first chain hoist is connected with the first steel formwork, and the second chain hoist is connected with the second steel formwork. Therefore, after concrete is poured and formed, the formwork can be moved to the next construction section through the portal frame, assistance of large equipment is reduced, the modeling retaining wall is integrally constructed, the integrality is good, modeling is not prone to falling off, the construction quality is good, the construction period is effectively shortened, the construction cost is reduced, and manpower and material resource input is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building foundation engineering construction, and in particular to an integrated structure of a movable steel formwork and a modeling formwork and a construction method of the integrated structure of the movable steel formwork and the modeling formwork. Background Art

[0002] In the traditional retaining wall construction process, after the wall is cast and formed, decorative materials need to be installed on the facade to form a retaining wall. This process not only takes a long construction period, but also requires multiple crane installation and removal of steel formwork, resulting in low construction efficiency and high costs. In addition, under the traditional method, the subsequent installation of decorative materials often has problems such as poor integrity and easy falling off, which affects the construction quality and aesthetics. Summary of the invention

[0003] The present invention aims to solve at least one of the technical problems in the related art to a certain extent. To this end, the first purpose of the present invention is to propose an integrated structure of a movable steel formwork and a molding formwork, which can move the formwork to the next construction section through a gantry after the concrete is poured and formed, thereby reducing the need for large-scale equipment assistance, and the molding retaining wall is constructed in an integrated manner, has good integrity, is not easy to fall off, has good construction quality, can effectively reduce the construction period, reduce construction costs, and reduce human and material investment.

[0004] The second object of the present invention is to provide a construction method for an integrated structure of a movable steel formwork and a molding formwork.

[0005] To achieve the above-mentioned purpose, the first embodiment of the present invention proposes an integrated structure of a movable steel formwork and a shaping formwork, including a gantry and a formwork assembly; the formwork assembly includes a first steel formwork and a second steel formwork arranged opposite to each other; the inner walls of the first steel formwork and / or the second steel formwork are provided with a shaping formwork; the gantry is straddled above the formwork assembly, and a first chain hoist and a second chain hoist are provided on the top crossbeam of the gantry; the first chain hoist is connected to the first steel formwork for lifting the first steel formwork; the second chain hoist is connected to the second steel formwork for lifting the second steel formwork; the gantry lifts the first steel formwork and the second steel formwork through the first chain hoist and the second chain hoist, so that the formwork assembly can simultaneously perform concrete pouring and construction shaping along the construction direction of the shaping wall guide wall; a tension screw is provided between the first steel formwork and the second steel formwork to adjust the distance between the two or fix the relative position between the two.

[0006] In addition, the integrated structure of the movable steel formwork and the modeling formwork according to the above embodiment of the present invention may also have the following additional technical features: According to some embodiments of the present invention, there are multiple template assemblies; adjacent template assemblies are assembled and connected via connecting assemblies.

[0007] According to some embodiments of the present invention, the first steel formwork is provided with a first lifting point structure, and the first chain hoist is connected to the first lifting point structure through a hook; the second steel formwork is provided with a second lifting point structure, and the second chain hoist is connected to the second lifting point structure through a hook.

[0008] According to some embodiments of the present invention, the above-mentioned integrated structure of the movable steel formwork and the shaping formwork also includes a platform support structure, which is detachably mounted on the outer wall of the first steel formwork and / or the second steel formwork, and the platform support structure includes a plurality of first supporting diagonal rods vertically arranged with the first steel formwork and / or the second steel formwork, and an end of the first supporting diagonal rod away from the first steel formwork and / or the second steel formwork is provided with a cantilever frame parallel to the first steel formwork and / or the second steel formwork, and a limiting diagonal rod is provided between the first supporting diagonal rod and the first steel formwork and / or the second steel formwork, and the limiting diagonal rod is used to fix the relative position between the first supporting diagonal rod and the first steel formwork and / or the second steel formwork.

[0009] According to some embodiments of the present invention, support plates are laid on a plurality of first supporting inclined rods to form a pedestrian platform.

[0010] According to some embodiments of the present invention, the above-mentioned integrated structure of the movable steel formwork and the shaping formwork also includes a second supporting diagonal rod for supporting the first steel formwork and / or the second steel formwork, and the outer wall of the first steel formwork and / or the second steel formwork is provided with a plurality of limiting support seats along the adjustment direction of the second supporting diagonal rod, one end of the second supporting diagonal rod is rotatably connected to the ground where the first steel formwork and / or the second steel formwork is located, and the other end of the second supporting diagonal rod is fixedly connected to the limiting support seat.

[0011] According to some embodiments of the present invention, a first slide rail and a second slide rail are arranged in parallel on the top crossbeam of the gantry, the first chain hoist is slidably arranged on the first slide rail through a hook, and the second chain hoist is slidably arranged on the second slide rail through a hook.

[0012] According to some embodiments of the present invention, the base of the gantry is provided with a pulley, and the gantry can slide along the construction direction of the molding wall guide wall through the pulley.

[0013] According to the embodiment of the present invention, the integrated structure of the movable steel formwork and the shaping formwork includes a gantry and a formwork assembly; the formwork assembly includes a first steel formwork and a second steel formwork arranged opposite to each other; the inner wall of the first steel formwork and / or the second steel formwork is provided with a shaping formwork; the gantry is arranged astride above the formwork assembly, and a first chain hoist and a second chain hoist are provided on the top crossbeam of the gantry; the first chain hoist is connected to the first steel formwork for lifting the first steel formwork; the second chain hoist is connected to the second steel formwork for lifting the second steel formwork; the gantry lifts the first steel formwork and the second steel formwork through the first chain hoist and the second chain hoist, so that the formwork assembly can simultaneously perform concrete pouring and construction shaping along the construction direction of the shaping wall guide wall; a tension screw is provided between the first steel formwork and the second steel formwork for adjusting the distance between the two or fixing the relative position between the two. Therefore, after the concrete is poured and formed, the formwork of the structure can be moved to the next construction section through the gantry, reducing the need for large-scale equipment assistance, and the integrated construction of the retaining wall has good integrity, the shape is not easy to fall off, and the construction quality is good, which effectively shortens the construction period, reduces construction costs, and reduces manpower and material investment.

[0014] The second purpose of the present invention is to propose a construction method of an integrated structure of a movable steel formwork and a molding formwork. After the concrete is poured and formed, the formwork can be moved to the next construction section through a gantry, reducing the assistance of large equipment, and the molding retaining wall is constructed in an integrated manner, with good integrity, the shape is not easy to fall off, the construction quality is good, the construction period is effectively shortened, the construction cost is reduced, and the manpower and material investment are reduced.

[0015] To achieve the above-mentioned purpose, the second embodiment of the present invention proposes a construction method for an integrated structure of a movable steel formwork and a shaping formwork, which is applied to the above-mentioned integrated structure of the movable steel formwork and the shaping formwork, and includes the following steps: setting the formwork assembly at the initial construction position of the shaping wall guide wall; assembling the gantry and the formwork assembly; placing a steel frame in the formwork assembly, and adjusting the relative position between the first steel formwork and the second steel formwork; pouring concrete into the formwork assembly and constructing a shaping wall to form a shaping wall; removing the formwork assembly on the outside of the shaping wall, lifting the first steel formwork and the second steel formwork of the formwork assembly by the first chain hoist and the second chain hoist, and moving the gantry so that the formwork assembly can carry out the next round of concrete pouring and construction shaping along the construction direction of the shaping wall guide wall.

[0016] According to the construction method of the integrated structure of movable steel formwork and modeling formwork of the embodiment of the present invention, the formwork assembly is set at the initial construction position of the modeling wall guide wall; the gantry is assembled with the formwork assembly; the steel bar frame is placed in the formwork assembly, and the relative position between the first steel formwork and the second steel formwork is adjusted; concrete is poured into the formwork assembly and the modeling is constructed to form a modeling wall; the formwork assembly outside the modeling wall is removed, the first steel formwork and the second steel formwork of the formwork assembly are hoisted by the first chain hoist and the second chain hoist, and the gantry is moved so that the formwork assembly is poured with concrete and constructed along the construction direction of the modeling wall guide wall for the next round. Therefore, after the concrete is poured and formed, the formwork can be moved to the next construction section by the gantry, reducing the assistance of large equipment, and the modeling retaining wall is constructed in an integrated manner, with good integrity, the modeling is not easy to fall off, and the construction quality is good, which effectively reduces the construction period, reduces the construction cost, and reduces the investment of manpower and material resources.

[0017] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is an overall schematic diagram of an integrated structure of a movable steel formwork and a molding formwork according to some embodiments of the present invention; Figure 2 is a structural schematic diagram of the front side of the gantry according to some embodiments of the present invention; Figure 3 A flowchart of a construction method of an integrated structure of a movable steel formwork and a molding formwork according to some embodiments of the present invention; Figure 4 A schematic diagram of the structure of the template installation according to some embodiments of the present invention; Figure 5 The present invention is a flowchart of a construction method of an integrated structure of a movable steel formwork and a molding formwork according to other embodiments of the present invention.

[0019] Description of reference numerals: Gantry 7, first steel formwork 6a, second steel formwork 6b, first supporting diagonal rod 12, cantilever frame 10, supporting plate 8, second supporting diagonal rod 4, anchor bolt 2, modeling formwork 1, first hanging point structure 14a, second hanging point structure 14b, first chain hoist 9a, second chain hoist 9b, tensioning screw 5, first slide rail 15a, second slide rail 15b, pulley 3 and limiting diagonal rod 13. DETAILED DESCRIPTION

[0020] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings.

[0021] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The "first", "second" and similar words used in the embodiments of the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0022] As mentioned in the background technology section, during the construction of river bank protection structures in the water conservancy industry, there are often some river bank protection structures with relatively simple structural types, mostly linear or nearly linear, especially during the construction of river bank protection structures in small and medium-sized cities.

[0023] In the process of realizing the present invention, the applicant found that in the related art, decorative materials are usually installed on the outer surface of the wall after the wall is cast and formed, and finally a retaining wall is formed. At present, the concrete wall mostly adopts an integral steel formwork, which requires a crane to be hoisted and disassembled each time. The decorative materials are installed after the wall is constructed, and the construction period is long, which is difficult to meet the construction period requirements. In addition, each formwork construction requires the cooperation of a crane, and the construction cost is high.

[0024] The following describes the integrated structure of the movable steel formwork and the modeling formwork and the construction method of the integrated structure of the movable steel formwork and the modeling formwork proposed in the embodiments of the present invention with reference to the accompanying drawings.

[0025] refer to Figure 1 , is an overall schematic diagram of the integrated structure of a movable steel formwork and a molding formwork according to some embodiments of the present invention.

[0026] The integrated structure of the movable steel formwork and the shaping formwork provided by the present invention may include a gantry 7, a first steel formwork 6a, a second steel formwork 6b, a first supporting diagonal rod 12, a cantilever frame 10, a supporting plate 8, a second supporting diagonal rod 4, a limiting support seat (not shown in the figure), an anchor bolt 2, a shaping formwork 1, a first hanging point structure 14a, a second hanging point structure 14b, a first chain hoist 9a, a second chain hoist 9b, a tension screw 5, a first slide rail 15a, a second slide rail 15b, a pulley 3 and a limiting diagonal rod 13.

[0027] In order to ensure the accuracy of the concrete facing shape size and the consistency of the concrete facing shape, the shape template 1 uniformly adopts the non-shrinkage and non-deformation polyurethane elastic shape template 1. The main technical parameters of the shape template 1 meet the requirements of Table 1.

[0028] Table 1

[0029] It can be seen from Table 1 that the hardness, tensile strength, elongation at break, tear strength and heat resistance of the modeling template 1 must meet the technical indicators in Table 1.

[0030] The pattern of the modeling template 1 product is made in a module of 30cm×60cm. In order to facilitate the transportation of each set of retaining wall formwork, four modeling templates are assembled on site. The templates are bonded with special adhesives and fixed on the steel formwork. The joints of the modeling template 1 are sealed with glass glue and polished smooth.

[0031] In order to ensure smooth connection between the lower part of the modeling template 1 and the concrete, the bottom of the modeling template 1 is welded to the steel template with a 45° slope steel plate. The welding must meet the requirements of firm and reliable welding, uniform and full welding, no undercut, weld nodules, slag inclusions, burn-through, pores and cracks in the weld, and no unevenness. After welding, an angle grinder is used to grind it smooth and flat in case of local deformation. Holes for installing polyvinyl chloride drainage pipes are reserved under the slope steel plate, and the processing error is less than 2mm to ensure the appearance quality of the joint.

[0032] It should be explained that the pattern and arrangement of the modeling template 1 must be agreed upon by the design and construction unit before production, and the construction must be carried out under the guidance of a professional manufacturer to ensure that the expected requirements are met. During the construction process, the modeling template 1 needs to be provided with professional guidance by the manufacturer, and a special person should be arranged to repair and reinforce the deformed modeling template 1.

[0033] The template assembly includes a first steel template 6a and a second steel template 6b which are arranged opposite to each other, wherein the first steel template 6a can be a front wall template, and the second steel template 6b can be a rear wall template. The inner walls of the first steel template 6a and the second steel template 6b are both provided with a molding template 1; or, the inner wall of the first steel template 6a is provided with a molding template 1; or, the inner wall of the second steel template 6b is provided with a molding template 1. Since the structure of the molding retaining wall is relatively large, one template assembly cannot meet the requirements of the molding retaining wall construction. Therefore, a plurality of template assemblies are usually provided, and adjacent template assemblies are assembled and connected by connecting assemblies, wherein the connecting assemblies can be bolts, screws, and self-tapping screws.

[0034] The first steel formwork 6a is provided with a first lifting point structure 14a, and the first chain hoist 9a is connected to the first lifting point structure 14a via a hook, so as to move the first steel formwork 6a to the next section of the retaining wall after the concrete pouring is completed.

[0035] The second steel formwork 6b is provided with a second lifting point structure 14b, and the second chain hoist 9b is connected to the second lifting point structure 14b via a hook, so as to move the second steel formwork 6b to the next section of the retaining wall after the concrete pouring is completed.

[0036] Between the first steel formwork 6a and the second steel formwork 6b, there are tension screws 5 for adjusting the distance between them or fixing their relative positions. When the required width of the shaped retaining wall is small, the distance between the tension screws 5 is reduced, or the tension screws 5 are used to connect and fix the first steel formwork 6a and the second steel formwork 6b. The tension screws 5 are arranged in two layers, the bottom layer of screws are arranged using drainage pipes, and the upper layer of screws are arranged at the top of the formwork, 5 cm above the concrete surface, with a horizontal spacing of 1 m. The two layers of tension screws 5 can be recycled and reused as a whole, so that there are no screw holes after the subsequent demolding, thereby reducing the workload of wall repair.

[0037] Preferably, there are two tension screws 5 , one tension screw 5 is arranged above the formwork assembly, and one tension screw 5 is arranged below the formwork assembly.

[0038] refer to Figure 1 as well as Figure 2 , is a schematic structural diagram of the front side of the gantry according to some embodiments of the present invention, the gantry 7 is arranged astride above the template assembly, and is used to lift the template assembly, and a first chain hoist 9a and a second chain hoist 9b are arranged on the top crossbeam of the gantry 7. The first chain hoist 9a is connected to the first lifting point structure 14a of the first steel template 6a, and is used to lift the first steel template 6a; the second chain hoist 9b is connected to the second lifting point structure 14b of the second steel template 6b, and is used to lift the second steel template 6b. The gantry 7 lifts the first steel template 6a and the second steel template 6b through the first chain hoist 9a and the second chain hoist 9b, so that the template assembly can be poured with concrete and constructed in the construction direction of the modeling wall guide wall at the same time, thereby improving the construction quality and reducing the construction cost.

[0039] The top crossbeam of the gantry 7 is parallelly provided with a first slide rail 15a and a second slide rail 15b. The first chain hoist 9a is slidably provided on the first slide rail 15a through a hook, and the second chain hoist 9b is slidably provided on the second slide rail 15b through a hook.

[0040] The base of the gantry 7 is provided with a pulley 3, a bottom plate is laid at the bottom of the river channel, and two continuous channel steel tracks are laid on the upper surface of the bottom plate. The number of tracks is not unique and can be set in combination with the actual river channel width and the requirements of the gantry structure. The gantry 7 can slide on the track along the construction direction of the modeling wall guide wall through the pulley 3, so that after the concrete is poured and formed, the template assembly can be moved to the next construction section through the gantry 7.

[0041] The platform support structure can be detachably mounted on the outer wall of the first steel formwork 6a. The platform support structure includes a plurality of first support diagonal rods 12 vertically arranged with the first steel formwork 6a. The end of the first support diagonal rod 12 away from the first steel formwork 6a (i.e., the left end of the first support diagonal rod 12) is provided with a cantilever 10 parallel to the first steel formwork 6a. A support plate 8 is laid on the plurality of first support diagonal rods 12 to form a pedestrian platform, which is convenient for construction personnel to pour concrete and perform other construction operations on the support plate 8. A safety net is hung on the warehouse surface to ensure the safety of construction operations. A limited position diagonal rod 13 is arranged between the first support diagonal rod 12 and the first steel formwork 6a. The limited position diagonal rod 13 is used to fix the relative position between the first support diagonal rod 12 and the first steel formwork 6a to prevent the position of the cantilever 10 from being offset by external factors (such as strong wind).

[0042] Preferably, between two adjacent first steel formworks 6 a , there is one first diagonal supporting rod 12 for fixing the first steel formworks 6 a and the cantilever frame 10 .

[0043] Alternatively, the platform support structure can be detachably mounted on the outer wall of the second steel formwork 6b, and the platform support structure includes a plurality of first support diagonal rods 12 vertically arranged with the second steel formwork 6b, and a cantilever frame 10 parallel to the second steel formwork 6b is arranged at one end of the first support diagonal rod 12 away from the second steel formwork 6b, and a support plate 8 is laid on the plurality of first support diagonal rods 12 to form a pedestrian platform, so that construction personnel can conveniently perform concrete pouring and other construction operations on the support plate 8, and a safety net is hung on the warehouse surface to ensure the safety of construction operations. A limited position diagonal rod 13 is arranged between the first support diagonal rod 12 and the second steel formwork 6b, and the limited position diagonal rod 13 is used to fix the relative position between the first support diagonal rod 12 and the second steel formwork 6b to prevent the position of the cantilever frame 10 from being offset by external factors (such as strong wind).

[0044] Preferably, between two adjacent second steel formworks 6 b , there is one first diagonal supporting rod 12 for fixing the second steel formworks 6 b and the cantilever frame 10 .

[0045] Alternatively, the platform support structure can be detachably mounted on the outer wall of the first steel formwork 6a and the second steel formwork 6b, and the platform support structure includes a plurality of first support diagonal rods 12 vertically arranged with the first steel formwork 6a and the second steel formwork 6b, and a cantilever frame 10 parallel to the first steel formwork 6a and the second steel formwork 6b is arranged at one end of the first support diagonal rod 12 away from the first steel formwork 6a and the second steel formwork 6b, and a support plate 8 is laid on the plurality of first support diagonal rods 12 to form a pedestrian platform, so as to facilitate construction personnel to pour concrete and perform other construction operations on the support plate 8, and a safety net is hung on the warehouse surface to ensure the safety of construction operations. A limited position diagonal rod 13 is arranged between the first support diagonal rod 12 and the first steel formwork 6a and the second steel formwork 6b, and the limited position diagonal rod 13 is used to fix the relative position between the first support diagonal rod 12 and the first steel formwork 6a and the second steel formwork 6b, so as to prevent the position of the cantilever frame 10 from being offset by external factors (such as strong wind).

[0046] Preferably, between two adjacent first steel formworks 6a, the number of the first supporting diagonal rod 12 is one, which is used to fix the first steel formwork 6a and the cantilever frame 10; between two adjacent second steel formworks 6b, the number of the first supporting diagonal rod 12 is one, which is used to fix the second steel formwork 6b and the cantilever frame 10.

[0047] The second supporting diagonal rod 4 is used to support the first steel formwork 6a, wherein the second supporting diagonal rod 4 can be an adjustable diagonal rod, and the outer wall of the first steel formwork 6a is provided with a plurality of limit support seats along the adjustment direction of the second supporting diagonal rod 4, which are used to fix the position of the second supporting diagonal rod 4, and one end of the second supporting diagonal rod 4 is rotatably connected to the ground where the first steel formwork 6a is located through the anchor bolt 2, and the other end of the second supporting diagonal rod 4 is fixedly connected to the limit support seat.

[0048] Alternatively, the second supporting diagonal rod 4 is used to support the second steel formwork 6b, and the outer wall of the second steel formwork 6b is provided with a plurality of limit support seats along the adjustment direction of the second supporting diagonal rod 4, which are used to fix the position of the second supporting diagonal rod 4, and one end of the second supporting diagonal rod 4 is rotatably connected to the ground where the second steel formwork 6b is located through the anchor bolt 2, and the other end of the second supporting diagonal rod 4 is fixedly connected to the limit support seat.

[0049] Alternatively, the second supporting diagonal rod 4 is used to support the first steel formwork 6a and the second steel formwork 6b, and the outer walls of the first steel formwork 6a and the second steel formwork 6b are provided with a plurality of limit support seats along the adjustment direction of the second supporting diagonal rod 4, which are used to fix the position of the second supporting diagonal rod 4, and one end of the second supporting diagonal rod 4 is rotatably connected to the ground where the first steel formwork 6a and the second steel formwork 6b are located through the anchor bolt 2, and the other end of the second supporting diagonal rod 4 is fixedly connected to the limit support seat.

[0050] As a specific embodiment, in order to ensure the construction effect of the shaped retaining wall, the shaped retaining wall revetment needs to be constructed with standardized steel formwork. According to the project progress requirements, 8 sets of shaped retaining wall steel formworks are required. Each set of shaped retaining wall steel formworks is assembled from 4 customized steel formworks, and each set of shaped retaining wall steel formworks is equipped with 72 sets of gantries and four chain hoists to facilitate the adjustment and movement of the formwork during the formwork process.

[0051] It should be explained that the design drawings of steel formwork and gantry are drawn by technical personnel, and after verification and confirmation, they are commissioned to professional manufacturers for production. Before leaving the factory, they are inspected and accepted by the manufacturer to ensure that the formwork size, flatness, rigidity and other properties meet the design and specification requirements. In addition, the project department provides the relevant indicators of the modeling formwork 1 to the production unit, and the production unit designs the modeling formwork 1 according to the requirements, and after confirmation by the construction unit, design unit and relevant departments, the production is fully organized.

[0052] Therefore, the present invention fixes the modeling template 1 and the template assembly together, the first steel template 6a and the second steel template 6b are connected and fixed by the tension screw 5, the steel template is provided with the second supporting diagonal rod 4 and the cantilever 10, and the channel steel is provided on the bottom plate as a track for the subsequent template assembly and the integrated device of the gantry 7 to move. After the concrete is poured and formed, the tension screw 5 is loosened, and the second supporting diagonal rod 4 is removed. The modeling steel mold is hoisted by the chain hoist on the gantry 7, and the gantry 7 drives the modeling steel mold to move to the next section of the retaining wall, and the template is cleaned, and a special mold release agent is applied, and the construction of the next section of the retaining wall is repeated.

[0053] In summary, the integrated structure of the movable steel formwork and shaping formwork according to the embodiment of the present invention includes a gantry and a formwork assembly; the formwork assembly includes a first steel formwork and a second steel formwork arranged opposite to each other; the inner wall of the first steel formwork and / or the second steel formwork is provided with a shaping formwork; the gantry is straddled above the formwork assembly, and a first chain hoist and a second chain hoist are provided on the top crossbeam of the gantry; the first chain hoist is connected to the first steel formwork for lifting the first steel formwork; the second chain hoist is connected to the second steel formwork for lifting the second steel formwork; the gantry lifts the first steel formwork and the second steel formwork through the first chain hoist and the second chain hoist, so that the formwork assembly can simultaneously perform concrete pouring and construction shaping along the construction direction of the shaping wall guide wall; a tension screw is provided between the first steel formwork and the second steel formwork for adjusting the distance between the two or fixing the relative position between the two. Therefore, after the concrete is poured and formed, the formwork of the structure can be moved to the next construction section through the gantry, reducing the need for large-scale equipment assistance, and the integrated construction of the retaining wall has good integrity, the shape is not easy to fall off, and the construction quality is good, which effectively shortens the construction period, reduces construction costs, and reduces manpower and material investment.

[0054] refer to Figure 3, is a flow chart of a construction method of an integrated structure of a movable steel formwork and a molding formwork according to some embodiments of the present invention.

[0055] like Figure 3 As shown, the construction method of the integrated structure of the movable steel formwork and the molding formwork according to the embodiment of the present invention may include the following steps: S301, setting the template assembly at the initial construction position of the modeling wall guide wall.

[0056] Specifically, first clean the surface of the formwork assembly and accessories to avoid affecting the turnover of the steel formwork. Do not knock or hit it at will during cleaning to prevent damage to the (modeling) formwork during the cleaning process. Use small tools such as a small mallet, wire brush, and shovel to clean it. The support parts, fasteners and other accessories of the formwork assembly should be recycled, maintained, and used. After cleaning, set the formwork assembly at the initial construction position of the modeling wall guide wall to facilitate the production of the modeling retaining wall in the subsequent work process.

[0057] S302, assemble the gantry and the formwork assembly.

[0058] Specifically, refer to Figure 4 , is a structural schematic diagram of the template installation according to some embodiments of the present invention. After the bottom plate is cast, the measurement and layout are carried out, and the elevation of the top of the bottom plate is re-measured, and the surface of the bottom plate is leveled to prevent the unevenness of the bottom plate from affecting the installation of the template and causing construction defects such as leakage at the root of the wall. Then, control lines are set according to the control points, and the gantry and track are installed in place. When the modeling template is installed for the first time, a vehicle crane is used to directly lift it to the construction work surface, and the modeling template is installed according to the control line. The first steel template and the second steel template are connected and fixed by tension screws. The steel template can be provided with a second supporting diagonal rod, and a cantilever frame is set on the top of the steel template, and a support plate is installed. A safety net is hung on the warehouse surface to ensure the safety of construction operations. The modeling template is adjusted into place and reinforced by the gantry, the second supporting diagonal rod, the chain hoist, etc.

[0059] S303, placing a steel reinforcement frame in the formwork assembly, and adjusting the relative position between the first steel formwork and the second steel formwork.

[0060] Specifically, each batch of steel bars entering the site needs to have a certificate of qualification. After the on-site acceptance is qualified, samples are taken and sent for inspection in batches according to the specifications. Only after the inspection is qualified can it be used in this project. According to the reviewed construction drawings, the design intent is deeply understood, and the layout is carried out according to the requirements of the construction specifications. The reviewed steel bar layout drawings are reported to the relevant departments for approval before implementation. Then, according to the issued steel bar batching list, the steel bar processing site is used for straightening, cutting and matching, and the formed steel bars are marked, and steel bars of different specifications and varieties are stacked separately. The size of the steel bar processing needs to meet the design requirements, and the processed steel bars shall not exceed the specified allowable deviation. According to the installation location of the steel bar, the material is collected according to the identification plate. The steel bars from the processing site to the construction site are transported by vehicle and tied and installed on site. Before the steel bars are tied on site, the specifications, diameter, shape, size and quantity of the finished steel bars are checked to see if they are consistent with the batching list. After verification, they are tied and installed to form a steel bar frame. No. 20 galvanized iron wire is used for steel bar binding. The iron wire buckles of adjacent tie points are shaped like an eight to prevent the mesh from being skewed. The steel bars and tie wires shall not contact the template. The bottom plate reinforcement adopts "stool" reinforcement support, every 1m 2 One is set on each side, the wall reinforcement is controlled by tie bars, and the protective layer is made of finished pads, 1m 2 Arrange no less than four protective layer pads. Then place the steel frame in the formwork assembly, and adjust the relative position between the first steel formwork and the second steel formwork according to the placement position of the steel frame, so as to facilitate the subsequent concrete pouring and construction modeling processes.

[0061] S304, pouring concrete into the formwork assembly and constructing the shape to form a shape wall.

[0062] Specifically, when pouring concrete, a mobile concrete pump truck can be used to meet the requirements of maximum concrete pouring strength. To ensure that the upper and lower concrete mixtures do not produce cold joints, the upper concrete is covered before the lower concrete is initially set. When pumping concrete, it is necessary to consider the characteristics of large concrete supply, fast supply speed, and complex organization and command. Closely combined with the on-site engineering volume and the working surface, it is necessary to ensure: sufficient preparation, strong on-site command, sensitive communication system, and reasonable construction organization, and to achieve: continuous and uniform pouring of concrete, no or few cold joints, and compaction without honeycombs.

[0063] Before pouring concrete, an application for concrete pouring must be submitted to the relevant department 8 hours in advance. Concrete pouring can only be done after acceptance, review and signature by the relevant department. When pouring concrete, it is strictly forbidden to add water to the transport vehicle or the working surface. In special cases, report to the relevant department and proceed only after the treatment plan is agreed. The order of concrete pouring is determined according to the size of the working surface, structural characteristics, etc., and the relevant department shall be reported for review before pouring.

[0064] During the pouring process, check the stability of the formwork and support, the position of the steel bars, embedded parts, etc. at any time. If there are any changes, adjust and reinforce them in time. When using an inserted vibrator, the moving distance should not exceed 1.5 times the vibrator's action radius, keep a distance of more than 100mm from the side form, and insert 50 to 100mm into the lower concrete. After each vibration is completed, vibrate while slowly lifting it out, and vibrate each vibrating part until the concrete in that part is dense. Among them, the sign of density is that the concrete stops sinking, no more bubbles emerge, the surface is flat, and the slurry is overflowing. In order to prevent the vibrator from colliding with the formwork, steel bars and other embedded parts, the vibrator displacement spacing should be 100mm so that the vibrator can cover the part that has been vibrated, so as to ensure that the line type, shape, size and relative position of the structure after pouring meet the requirements of the drawings.

[0065] S305, remove the formwork assembly on the outside of the molding wall, lift the first steel formwork and the second steel formwork of the formwork assembly by the first chain hoist and the second chain hoist, and move the gantry to make the formwork assembly carry out the next round of concrete pouring and construction molding along the construction direction of the molding wall guide wall.

[0066] Specifically, after the concrete pouring is completed, the removal of the formwork assembly needs to consider the load and strength of the concrete. The non-load-bearing side formwork assembly can only be removed when the concrete strength reaches a level that its surface and edges will not be damaged when the formwork is removed. Before the formwork assembly is removed, the modeling formwork is connected to the gantry through a chain hoist and subjected to force, and the tension screw is loosened. In order to ensure the retaining wall effect after the subsequent modeling wall is removed, a special release agent is selected for spraying, and the reinforced formwork assembly installation has sufficient strength, rigidity and stability. Special tools and supporting diagonal rods are used to separate the shaped steel formwork from the wall concrete at the top of the formwork assembly. After the formwork assembly is separated from the concrete surface, the first steel formwork and the second steel formwork of the formwork assembly are lifted by the first chain hoist and the second chain hoist, the gantry is moved, and the gantry is pushed to transport the formwork assembly to the next section of the wall construction area, and the next section of the retaining wall construction is repeated.

[0067] In order to ensure that the concrete reaches the design strength within the specified age, it is necessary to do a good job of concrete maintenance and protection, strengthen the protection of edges and protruding parts, and the retaining wall body needs to be covered with geotextile and watered to keep the concrete moist for a certain period of time. The maintenance time should be no less than 14 days.

[0068] As a specific example, refer to Figure 5 The construction method of the integrated structure of the movable steel formwork and the modeling formwork of the present invention may also include the following steps.

[0069] S501, construction preparation.

[0070] S502, template component cleaning.

[0071] S503, connecting the molding formwork with the steel formwork.

[0072] S504, steel bar binding.

[0073] S505, assemble the gantry and the formwork assembly.

[0074] S506, concrete pouring.

[0075] S507, remove the template assembly.

[0076] S508, move to the next construction section and execute step S505 until the construction is completed.

[0077] S509, Concrete Curing.

[0078] The present invention integrates the concrete retaining wall and the modeling design through an integrated gantry device, effectively reducing the two-stage process in the traditional construction process, reducing the cost of construction personnel, large-scale machinery and equipment, and materials, improving construction efficiency, and shortening the construction period. Taking a certain area as an example, the analysis is shown in the following table.

[0079] Table 2

[0080] It can be seen from Table 2 that the cost of the traditional construction method is high, and the cost of the method of the present invention is low. Through promotion and application in river projects, most of the bank protection structures are vertical wall structures. The river bank is long and the operating range is narrow, and crane operations are difficult. Using a self-made gantry to move the steel formwork can greatly reduce the number of mechanical and labor inputs, and the quality of structural concrete pouring can be guaranteed.

[0081] In summary, according to the construction method of the integrated structure of the movable steel formwork and the modeling formwork of the embodiment of the present invention, the formwork assembly is set at the initial construction position of the modeling wall guide wall; the gantry and the formwork assembly are assembled; the steel bar frame is placed in the formwork assembly, and the relative position between the first steel formwork and the second steel formwork is adjusted; concrete is poured into the formwork assembly and the modeling is constructed to form a modeling wall; the formwork assembly outside the modeling wall is removed, and the first steel formwork and the second steel formwork of the formwork assembly are lifted by the first chain hoist and the second chain hoist, and the gantry is moved so that the formwork assembly is poured with concrete and constructed along the construction direction of the modeling wall guide wall for the next round; a tension screw is provided between the first steel formwork and the second steel formwork to adjust the distance between the two or fix the relative position between the two. Therefore, after the concrete is poured and formed, the formwork can be moved to the next construction section through the gantry, reducing the assistance of large equipment, and the modeling retaining wall is constructed in an integrated manner, with good integrity, the modeling is not easy to fall off, the construction quality is good, the construction period is effectively reduced, the construction cost is reduced, and the manpower and material investment are reduced.

[0082] It should be noted that some embodiments of the present invention are described above. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the above embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0083] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The "first", "second" and similar words used in the embodiments of the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0084] Although the spirit and principle of the present invention have been described with reference to several specific embodiments, it should be understood that the present invention is not limited to the disclosed specific embodiments, and the division of various aspects does not mean that the features in these aspects cannot be combined to benefit, and this division is only for the convenience of expression. The present invention is intended to cover various modifications and equivalent arrangements included in the spirit and scope of the attached claims. The scope of the attached claims conforms to the broadest interpretation, thereby including all such modifications and equivalent structures and functions.

Claims

1. An integrated structure of a movable steel formwork and a molding formwork, characterized in that: It includes a gantry (7) and a template assembly; The template assembly comprises a first steel template (6a) and a second steel template (6b) which are arranged opposite to each other; the inner wall of the first steel template (6a) and / or the second steel template (6b) is provided with a molding template (1); The gantry (7) is arranged astride above the template assembly, and a first chain hoist (9a) and a second chain hoist (9b) are arranged on the top crossbeam of the gantry (7); the first chain hoist (9a) is connected to the first steel template (6a) and is used to lift the first steel template (6a); the second chain hoist (9b) is connected to the second steel template (6b) and is used to lift the second steel template (6b); The gantry (7) hoists the first steel formwork (6a) and the second steel formwork (6b) via the first chain hoist (9a) and the second chain hoist (9b), so that the formwork assembly can simultaneously perform concrete pouring and construction shaping along the construction direction of the shaping wall guide wall; A tension screw (5) is provided between the first steel template (6a) and the second steel template (6b) for adjusting the distance between the two or fixing the relative position between the two.

2. The integrated structure of movable steel formwork and modeling formwork according to claim 1 is characterized in that: There are multiple template components; adjacent template components are assembled and connected via connecting components.

3. The integrated structure of movable steel formwork and modeling formwork according to claim 1 is characterized in that: The first steel formwork (6a) is provided with a first lifting point structure (14a), and the first chain hoist (9a) is connected to the first lifting point structure (14a) via a lifting hook; the second steel formwork (6b) is provided with a second lifting point structure (14b), and the second chain hoist (9b) is connected to the second lifting point structure (14b) via a lifting hook.

4. The integrated structure of movable steel formwork and molding formwork according to claim 1 is characterized in that: The invention also comprises a platform support structure, which can be detachably mounted on the outer wall of the first steel formwork (6a) or / and the second steel formwork (6b), and the platform support structure comprises a plurality of first support inclined rods (12) vertically arranged with respect to the first steel formwork (6a) or / and the second steel formwork (6b), and one end of the first support inclined rod (12) away from the first steel formwork (6a) or / and the second steel formwork (6b) is provided with a cantilever frame (10) parallel to the first steel formwork (6a) or / and the second steel formwork (6b), and a limiting inclined rod (13) is provided between the first support inclined rod (12) and the first steel formwork (6a) or / and the second steel formwork (6b), and the limiting inclined rod (13) is used to fix the relative position between the first support inclined rod (12) and the first steel formwork (6a) or / and the second steel formwork (6b).

5. The integrated structure of movable steel formwork and molding formwork according to claim 4 is characterized in that: A support plate (8) is laid on the plurality of the first supporting inclined rods (12) to form a pedestrian platform.

6. The integrated structure of movable steel formwork and molding formwork according to claim 1 is characterized in that: It also comprises a second supporting diagonal rod (4) for supporting the first steel formwork (6a) and / or the second steel formwork (6b); the outer wall of the first steel formwork (6a) and / or the second steel formwork (6b) is provided with a plurality of limit support seats along the adjustment direction of the second supporting diagonal rod (4); one end of the second supporting diagonal rod (4) is rotatably connected to the ground where the first steel formwork (6a) and / or the second steel formwork (6b) is located; and the other end of the second supporting diagonal rod (4) is fixedly connected to the limit support seat.

7. The integrated structure of movable steel formwork and molding formwork according to claim 1 is characterized in that: A first slide rail (15a) and a second slide rail (15b) are arranged in parallel on the top crossbeam of the gantry (7); the first chain hoist (9a) is slidably arranged on the first slide rail (15a) via a hook; and the second chain hoist (9b) is slidably arranged on the second slide rail (15b) via a hook.

8. The integrated structure of movable steel formwork and molding formwork according to claim 1 is characterized in that: The base of the gantry (7) is provided with a pulley (3), and the gantry (7) can slide along the construction direction of the modeling wall guide wall via the pulley (3).

9. A construction method for an integrated structure of a movable steel formwork and a molding formwork, characterized in that: An integrated structure of a movable steel formwork and a molding formwork as described in any one of claims 1 to 8, The following steps are involved: Setting the formwork assembly at the initial construction position of the molding wall guide wall; Assembling the gantry and the template assembly; Placing a steel reinforcement frame in the template assembly, and adjusting the relative position between the first steel template and the second steel template; Pouring concrete into the formwork assembly and constructing a shape to form a shape wall; Remove the formwork assembly on the outside of the molding wall, lift the first steel formwork and the second steel formwork of the formwork assembly by the first chain hoist and the second chain hoist, and move the gantry to allow the formwork assembly to carry out the next round of concrete pouring and construction shaping along the construction direction of the molding wall guide wall.

Citation Information

Patent Citations

  • Underground diaphragm wall guide wall movable mold frame

    CN103114572A

  • Linear PC track beam prefabrication construction method

    CN109808054A

  • Self-walking type side ditch construction formwork system

    CN114481764A

  • Molding template system is decorated with elasticity for cast in situ concrete of decorating integration to structure

    CN207892233U

  • Inclining jacking-type steel platform construction apparatus and method for inclining walls having large inclination angle

    WO2024077880A1

Cited By

  • Farm wall reinforcing equipment

    CN121205413A

  • Large outer wall aluminum formwork deepening method matched with aerial building factory formwork suspension system

    CN121345308A