Complete construction method for cargo pump compartment of oil tanker
By segmenting the cargo pump compartment of the oil ship and installing the assembly unit, sand extraction holes are opened for sand flushing, the problems of long construction cycle and sand accumulation are solved, and the process forward movement and safety improvement are achieved.
Patent Information
- Application Number
- CN202411395633.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2024-11-15
AI Technical Summary
The existing construction methods of cargo pump compartment of oil ships lead to a long construction period, and cargo pump compartment is prone to accumulation of sand when placed in sections, increasing safety hazards.
By dividing the cargo pump compartment in segments, planning the outfit unit, installing the outfit unit in segments, and opening sand holes on the segments for sand flushing, the installation and coating are completed in advance, and finally the total assembly is carried out.
The dock construction cycle has been shortened, the labor intensity of staff has been reduced, the safety hazards caused by segmented sand accumulation have been avoided, and the overall construction quality of the cargo pump compartment has been improved.
Smart Images

Figure CN118953630A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of shipbuilding technology, and in particular to a method for constructing an integrity of a cargo pump room of an oil tanker. Background Art
[0002] The cargo pump room on the tanker is equipped with cargo oil pumps, stripping pumps and ballast pumps. The cargo pump room is separated from the engine room and has become a place dedicated to loading and unloading cargo oil and ballast services.
[0003] Since there are many outfitting parts such as pipes, valves, brackets, etc. in the cargo pump room area, and the cargo pump room sections are provided with curved outer plates. Therefore, the current conventional practice is to shelve the cargo pump room sections in an inverted state, turn them over during the general assembly, install part of the outfitting during the general assembly stage, and finally complete the installation of the remaining outfitting during the dock stage. However, such installation will lead to a longer construction period for the cargo pump room, which will lead to higher labor intensity for the staff. In addition, if the cargo pump room sections are adjusted to a normal state, sand will easily accumulate inside the sections during the sand flushing stage, increasing the force on the gantry support, which may exceed the allowable load and create safety hazards. Summary of the invention
[0004] In view of this, the purpose of the present application is to provide a method for constructing an integrity cargo pump room of an oil tanker, so as to solve the problem that the existing cargo pump room construction method has a long construction period and sand accumulation occurs when the cargo pump room is placed in sections in a normal state.
[0005] According to the present invention, a method for constructing the integrity of a cargo pump room of an oil tanker is provided, wherein the method for constructing the integrity of a cargo pump room of an oil tanker comprises: dividing the cargo pump room into sections; planning outfitting units; placing the sections of the cargo pump room in a normal state and installing the outfitting units on the sections of the cargo pump room; opening sand holes on the sections of the cargo pump room; sand flushing the sections of the cargo pump room; and assembling a plurality of sections of the cargo pump room.
[0006] Preferably, dividing the cargo pump room into sections comprises: dividing the cargo pump room into a bottom area and an upper area; and dividing the upper area into an upper first area and an upper second area.
[0007] Preferably, the lower opening structure of the front wall of the cargo pump room is divided into the bottom layer area.
[0008] Preferably, a pipeline opening is opened on the lower opening structure of the front wall of the pump room.
[0009] Preferably, when the outfitting unit is installed in the section of the cargo pump room, some pipes of the outfitting unit are passed through the pipe opening of the lower opening structure of the front wall of the pump room.
[0010] Preferably, planning the outfitting unit comprises: grouping the outfitting parts to be installed on the sections of the cargo pump room; and connecting the outfitting parts in the same group to form the outfitting unit.
[0011] Preferably, the sand outlet hole is opened at the center of the bottom of the section of the cargo pump room.
[0012] Preferably, after sandblasting the sections of the cargo pump room, the sections of the cargo pump room are painted.
[0013] Preferably, the overall assembly of the plurality of cargo pump room sections comprises sealing the sand outlet holes.
[0014] Preferably, when the sections of the cargo pump room are laid up normally, a plurality of gantries are provided at the bottom of the sections of the cargo pump room.
[0015] The integrity construction method of the cargo pump room of an oil tanker in an embodiment of the present invention adjusts the sections to be laid in a normal state, and at the same time, the outfitting on the inner bottom is made into units, which are installed in advance at the section stage, so as to realize the forward shift of the process, improve the working environment, reduce the labor intensity of the staff, and be more conducive to shortening the dock construction period. And by opening sand outlet holes on the sections of the cargo pump room, the sand accumulated in the temporal part of the sections of the cargo pump room during sand flushing can be discharged through the sand outlet holes. This can effectively solve the problem that the existing cargo pump room construction method has a long construction period and sand accumulation occurs when the cargo pump room sections are placed in a normal state.
[0016] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 It is a schematic diagram of the sections and outfitting units of the cargo pump room of an oil tanker according to the present invention.
[0019] Figure 2 is a schematic diagram of a section of a cargo pump room of an oil tanker according to the present invention.
[0020] Figure 3 It is a schematic diagram of the segmentation of the cargo pump room of an oil tanker according to the present invention.
[0021] Figure numerals: 1-cargo pump room; 10-section; 11-bottom area; 12-upper first area; 13-upper second area; 2-outfitting unit; 20-pipe fittings; 21-grating platform; 3-lower opening structure of the front wall of the pump room; 31-pipe opening; 4-gantry. DETAILED DESCRIPTION
[0022] The following specific embodiments are provided to help the reader obtain a comprehensive understanding of the methods, devices and / or systems described herein. However, after understanding the disclosure of the present application, various changes, modifications and equivalents of the methods, devices and / or systems described herein will be apparent. For example, the order of operations described herein is merely an example, and is not limited to the order set forth herein, but in addition to the operations that must occur in a particular order, changes that will be apparent after understanding the disclosure of the present application may be made. In addition, in order to improve clarity and brevity, descriptions of features known in the art may be omitted.
[0023] The features described herein may be implemented in different forms and should not be interpreted as being limited to the examples described herein. Rather, the examples described herein have been provided only to illustrate some of the many possible ways of implementing the methods, devices and / or systems described herein that will be apparent after understanding the disclosure of the present application.
[0024] Throughout the specification, when an element (such as a layer, a region, or a substrate) is described as being “on”, “connected to”, “bound to”, “over”, or “covering” another element, it may be directly “on”, “connected to”, “bound to”, “over”, or “covering” another element, or one or more other elements may be present between them. In contrast, when an element is described as being “directly on”, “directly connected to”, “directly bound to”, “directly over”, or “directly covering” another element, there may be no other elements present between them.
[0025] As used herein, the term "and / or" includes any one of the associated listed items and any combination of any two or more items.
[0026] Although terms such as "first," "second," and "third" may be used herein to describe various members, components, regions, layers, or portions, these members, components, regions, layers, or portions are not limited by these terms. Rather, these terms are only used to distinguish one member, component, region, layer, or portion from another member, component, region, layer, or portion. Therefore, without departing from the teachings of the examples described herein, the first member, component, region, layer, or portion referred to may also be referred to as the second member, component, region, layer, or portion.
[0027] For ease of description, spatial relational terms such as "above", "upper", "below", and "lower" may be used herein to describe the relationship of one element to another element as shown in the accompanying drawings. Such spatial relational terms are intended to include different orientations of the device in use or operation in addition to the orientation depicted in the accompanying drawings. For example, if the device in the accompanying drawings is turned over, an element described as being "above" or "upper" relative to another element will subsequently be "below" or "lower" relative to the other element. Therefore, the term "above" includes both "above" and "below" orientations depending on the spatial orientation of the device. The device may also be positioned in other ways (e.g., rotated 90 degrees or in other orientations), and the spatial relational terms used herein will be interpreted accordingly.
[0028] The terms used herein are only used to describe various examples and are not used to limit the examples. Unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. The terms "include", "comprising" and "having" list the existence of the stated features, quantities, operations, components, elements and / or their combinations, but do not exclude the existence or addition of one or more other features, quantities, operations, components, elements and / or their combinations.
[0029] Variations in the shapes shown in the drawings may occur due to manufacturing techniques and / or tolerances. Therefore, the examples described herein are not limited to the specific shapes shown in the drawings but include variations in shapes that occur during manufacturing.
[0030] The features of the examples described herein may be combined in various ways that will be apparent after understanding the disclosure of the present application. In addition, although the examples described herein have various configurations, other configurations are possible as will be apparent after understanding the disclosure of the present application.
[0031] The present invention provides a method for constructing the integrity of a cargo pump room of an oil tanker, and the method comprises the following steps:
[0032] Divide cargo pump room 1 into sections 10;
[0033] Planning outfitting unit 2;
[0034] The section 10 of the cargo pump room 1 is laid up normally, and the outfitting unit 2 is installed on the section 10 of the cargo pump room 1;
[0035] A sand discharge hole is provided on the segment 10 of the cargo pump room 1;
[0036] sand scouring the section 10 of the cargo pump room 1; and
[0037] A plurality of sections 10 of the cargo pump room 1 are assembled.
[0038] In the following description, reference will be made to Figures 1 to 3 The above steps of the above components of the integrity construction method of the cargo pump room of an oil tanker are specifically described.
[0039] like Figures 1 to 3 As shown, in the embodiment, since the overall size of the cargo pump room 1 is relatively large ( Figure 1 and Figure 2 Only part of the structure of the cargo pump room 1 is shown in the figure, and there are many outfitting parts in the area of the cargo pump room 1. Therefore, when constructing the cargo pump room 1, it is necessary to divide the cargo pump room 1 into sections 10, divide the cargo pump room 1 into multiple sections 10, and then construct multiple sections 10 of the cargo pump room 1 separately, and finally assemble the multiple sections 10 of the cargo pump room 1 into the cargo pump room 1.
[0040] Preferably, Figure 3 As shown, in the embodiment, dividing the cargo pump room 1 into sections 10 includes dividing the cargo pump room 1 into a bottom area 11 and an upper area; and dividing the upper area into an upper first area 12 and an upper second area 13. Specifically, when dividing the cargo pump room 1 into sections 10, the division can be based on the shape and overall size of the cargo pump room 1. In order to facilitate the construction of the sections 10 of the cargo pump room 1, the cargo pump room 1 can be divided into a bottom area 11 and an upper area. Among them, the bottom area 11 is located at the center of the bottom of the upper area. As shown in FIG. Figure 3 As shown, the length of the bottom area 11 in the transverse direction is smaller than that of the upper area. Further, in order to facilitate the construction of the sections 10 of the cargo pump room 1, the upper area can be divided again. Specifically, the upper area can be divided into Figure 3 As shown, the cargo pump room 1 is divided in the transverse direction to form an upper first area 12 and an upper second area 13, so that the sizes of the sections 10 of the plurality of cargo pump rooms 1 are close to each other.
[0041] Further, preferably, Figures 1 to 3As shown, in the embodiment, when the cargo pump room 1 is divided into the bottom area 11 and the upper area, the pump room front wall lower opening structure 3 of the cargo pump room 1 can be divided into the bottom area 11, that is, formed as shown in Figure 2 As shown in the section 10. Since there are pipes 20 in the cargo pump room 1 that need to pass through the front structural bulkhead to enter the cargo hold. In order to realize the forward shift of the process, the outfitting unit 2 can be installed at the stage of building the section 10. The pump room front wall lower opening structure 3 can be added to the bottom area 11. This allows the through-tank pipes in the outfitting unit 2 (i.e. the pipes 20 passing through the pump room front wall lower opening structure 3) to be installed completely at the stage of the section 10. In this way, Figure 3 As shown, the bottom layer area 11 is formed with an upward convex portion (i.e., the pump room front wall lower opening structure 3) at the center of the top, and the upper layer area is formed with a concave portion at the center of the bottom. When the upper layer area is divided into the upper first area 12 and the upper second area 13, the concave portion is divided into the upper first area 12 and the upper second area 13.
[0042] More preferably, Figure 1 and Figure 2 As shown, in an embodiment, a pipe opening 31 can be opened on the lower opening structure 3 of the front wall of the pump room. When the outfitting unit 2 is installed in the section 10 (i.e., the bottom area 11) of the cargo pump room 1, some pipe fittings 20 of the outfitting unit 2 can be passed through the pipe opening 31 of the lower opening structure 3 of the front wall of the pump room to form a through-cabin pipe.
[0043] Specifically, Figure 1 and Figure 2 As shown, in the embodiment, the pump room front wall lower opening structure 3 is formed as an approximately rectangular plate on the segment 10 of the cargo pump room 1, and the pipe opening 31 is opened on the plate surface of the pump room front wall lower opening structure 3. The number of pipe openings 31 can be multiple, and the multiple pipe openings 31 can be arranged at intervals along the length direction of the pump room front wall lower opening structure 3. Reinforcement ribs can also be arranged on the plate surface of the pump room front wall lower opening structure 3, and the reinforcement ribs can be arranged in a grid shape. The pump room front wall lower opening structure 3 can be welded on the upper surface of the segment 10. When installing the outfitting unit 2, part of the pipe fittings 20 of the outfitting unit 2 can be passed through the pipe opening 31 of the pump room front wall lower opening structure 3 to completely install the outfitting unit 2 on the segment 10.
[0044] In the prior art, the cargo pump room sections are laid up in an inverted state and outfitting cannot be installed. The cargo pump room sections will only be turned over during the general assembly. Therefore, the outfitting is not set as a unit, but a part of the outfitting is installed during the general assembly stage, and the installation of the remaining outfitting is completed during the dock stage. In the integrity construction method of the cargo pump room of the oil tanker, by setting the outfitting as an outfitting unit 2 and reasonably dividing the sections 10 of the cargo pump room 1, the installation steps of the outfitting are moved forward, which greatly improves the working environment, reduces the labor intensity of the staff, and shortens the dock construction period.
[0045] Preferably, Figure 1 and Figure 2 As shown, in the embodiment, planning the outfitting unit 2 includes grouping the outfitting parts to be installed on the section 10 of the cargo pump room 1; and connecting the outfitting parts in the same group to form the outfitting unit 2. Since there are a large number of outfitting parts in the cargo pump room 1 area, in order to facilitate the installation of the outfitting parts on the section 10 of the cargo pump room 1, the outfitting parts can be made into a plurality of outfitting units 2 in advance. Specifically, the outfitting parts can include pipe fittings 20, grille platforms 21, and pipe fitting 20 brackets and other components. When grouping the outfitting parts, the outfitting parts can be grouped according to the setting positions and connection relationships of the outfitting parts, and the outfitting parts in the same group can be connected to form the outfitting unit 2, so as to facilitate installation on the section 10 of the cargo pump room 1.
[0046] Preferably, Figure 1 and Figure 2 As shown, in the embodiment, the segment 10 of the cargo pump room 1 is first laid in a normal state, and then the outfitting unit 2 is installed on the segment 10 of the cargo pump room 1. Specifically, since the segment 10 of the cargo pump room 1 is formed with a curved outer plate, when the segment 10 of the cargo pump room 1 is laid in a normal state, a plurality of door frames 4 can be provided at the bottom of the segment 10 of the cargo pump room 1 for support. More preferably, as Figure 2 As shown, a plurality of gantries 4 can be arranged at intervals at the bottom of the segment 10 of the cargo pump room 1. When installing the outfitting unit 2 on the segment 10 of the cargo pump room 1, a plurality of outfitting units 2 that have been prepared can be moved to preset positions on the segment 10 for installation by hoisting.
[0047] Preferably, Figure 1 and Figure 2As shown, in the embodiment, after the outfitting unit 2 is installed, a sand discharge hole can be opened on the segment 10 of the cargo pump room 1. Since the segment 10 of the cargo pump room 1 is normally shelved, sand is easily accumulated inside the segment 10 during the sand flushing stage, resulting in increased pressure on the gantry 4. Therefore, a sand discharge hole can be opened on the segment 10 of the cargo pump room 1 to discharge the accumulated sand. Further, preferably, the sand discharge hole can be opened in the center of the bottom of the segment 10 of the cargo pump room 1. Specifically, it can be a plate cut from the outside of the segment 10 to form the sand discharge hole. The number of sand discharge holes can be multiple, and the multiple sand discharge holes can be arranged at intervals along the length direction of the segment 10, so that the accumulated sand inside the segment 10 is easy to be discharged to avoid exceeding the allowable load of the gantry 4. After the sand discharge hole is opened, the segment 10 of the cargo pump room 1 can be sand flushed to make the surface of the segment 10 relatively clean.
[0048] Preferably, Figure 1 and Figure 2 As shown, in the embodiment, after sandblasting the segment 10 of the cargo pump room 1, the segment 10 of the cargo pump room 1 can be painted, that is, the segment 10 of the cargo pump room 1 and the outfitting unit 2 can be painted. The outfitting unit 2 is installed on the segment 10 before the painting stage, so that the coating formed after painting can be prevented from being damaged.
[0049] Preferably, in the embodiment, after the sections 10 of the cargo pump room 1 are painted, the sections 10 of the cargo pump room 1 may be assembled. That is, the bottom area 11, the upper first area 12 and the upper second area 13 are assembled to form the cargo pump room 1 as a whole. In addition, assembling the sections 10 of the cargo pump room 1 may also include plugging the sand outlet holes. Specifically, the plates cut when the sand outlet holes are opened may be re-welded to the original position to ensure the integrity of the structure.
[0050] In the embodiment, after the segments 10 of the cargo pump room 1 are assembled, the complete cargo pump room 1 can be assembled into a ship in the dock stage. In this way, the integrity of the cargo pump room 1 is achieved in advance, which is conducive to further improving the integrity of the engine room area before floating, thereby improving the overall construction quality of the ship and reducing the labor intensity of the staff.
[0051] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the present application, which are used to illustrate the technical solutions of the present application, rather than to limit them. The protection scope of the present application is not limited thereto. Although the present application is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed in the present application, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present application, and should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the protection scope of the claims.
Claims
1. A method for constructing the integrity of a cargo pump room of an oil tanker, characterized in that: The integrity construction method of the cargo pump room of an oil tanker comprises: Divide cargo pump room into sections; Planning outfitting units; Lay up the cargo pump room sections normally, and install the outfitting units on the cargo pump room sections; A sand discharge hole is provided on the section of the cargo pump room; sandblasting sections of said cargo pump room; and A plurality of cargo pump room sections are assembled.
2. The integrity construction method of a cargo pump room of an oil tanker according to claim 1, characterized in that: The cargo pump room is divided into sections including: dividing the cargo pump room into a bottom area and an upper area; and The upper region is divided into an upper first region and an upper second region.
3. The integrity construction method of a cargo pump room of an oil tanker according to claim 2, characterized in that: The lower opening structure of the front wall of the cargo pump room is divided into the bottom layer area.
4. The integrity construction method of the cargo pump room of an oil tanker according to claim 3, characterized in that: A pipeline opening is provided on the lower opening structure of the front wall of the pump room.
5. The integrity construction method of a cargo pump room of an oil tanker according to claim 4, characterized in that: When the outfitting unit is installed in the section of the cargo pump room, some pipes of the outfitting unit are passed through the pipe opening of the lower opening structure of the front wall of the pump room.
6. The integrity construction method of a cargo pump room of an oil tanker according to claim 1, characterized in that: The planned outfitting unit includes: grouping the outfitting items to be installed on the sections of the cargo pump room; and The outfitting parts in the same group are connected to form the outfitting unit.
7. The integrity construction method of a cargo pump room of an oil tanker according to claim 1, characterized in that: The sand outlet hole is opened at the center of the bottom of the section of the cargo pump room.
8. The integrity construction method of a cargo pump room of an oil tanker according to claim 1, characterized in that: After sandblasting the cargo pump room sections, the cargo pump room sections are painted.
9. The integrity construction method of a cargo pump room of an oil tanker according to claim 1, characterized in that: The overall assembly of the sections of the plurality of cargo pump rooms includes plugging the sand outlet holes.
10. The integrity construction method of a cargo pump room of an oil tanker according to claim 1, characterized in that: When the sections of the cargo pump room are laid up normally, a plurality of gantries are arranged at the bottom of the sections of the cargo pump room.
Citation Information
Cited By
Bow thruster segmented construction method
CN119749802A
A bow thruster segmental construction method
CN119749802B
Integral construction method for methanol cabin of ultra-large methanol dual-fuel ore carrier
CN121224941A
Method for constructing bow thruster section
WO2026148908A1