A portable modular rotary drilling rig for excavating power distribution network pole pits and its construction method.
The design of a portable modular rotary drilling rig solves the problem of efficient rock pole pit excavation in areas without road access, achieving lightweight design, adaptability to multiple geological formations, and efficient construction, thus meeting the needs of power distribution network pole pit construction.
Patent Information
- Application Number
- CN202611265918.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-20
- Publication Date
- 2026-11-17
AI Technical Summary
Existing equipment is unable to efficiently excavate rock pole pits with a diameter of 600-700mm and a depth of 1.5-2.5m at pole locations with no road or poor road conditions, and large equipment cannot reach these locations, resulting in low construction efficiency, high safety risks, and serious environmental damage.
Design a portable modular rotary drilling rig, including a hydraulic power station module, a main frame guide module, a power head module, a segmented drill rod and replaceable drill bit module, and a spiral ground anchor reaction system. Each module is detachable and the total weight is light, making it easy to handle manually. It combines rotary drilling and down-the-hole hammer drilling in two modes to adapt to different strata.
It enables efficient excavation of pole pits at any pole location, reducing construction land area and environmental damage, improving construction efficiency, meeting national standards, and reducing energy consumption and safety risks.
Smart Images

Figure CN123109532A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of power engineering construction equipment technology, specifically relating to a portable modular rotary drilling rig and its construction method for excavating pole pits in the construction of 10kV and 0.4kV distribution network overhead lines. Background Technology
[0002] With the continuous advancement of urban and rural power distribution network construction and renovation projects in my country, the number of poles for 10kV and 0.4kV overhead power lines is enormous. Pole excavation is one of the most basic and time-consuming procedures in line construction. According to GB 50173-2014 "Code for Construction and Acceptance of Overhead Power Lines of 110kV and Below" and DL / T 5220-2021 "Code for Design of Overhead Power Lines of 10kV and Below", the common pole height for 10kV lines is 10-15m, corresponding to a pole pit depth of 1.7-2.5m; the common pole height for 0.4kV lines is 8-12m, corresponding to a pole pit depth of 1.5-2.0m. The pole pit diameter is generally the pole root diameter plus 0.2m, and in actual construction, it is usually taken as 600-700mm.
[0003] The current methods of pole hole excavation mainly include the following, along with their respective prominent problems: First, traditional manual excavation. Workers excavate layer by layer using hand tools such as shovels, picks, and crowbars, with pneumatic or electric drills used for breaking up rocky terrain. This method is extremely inefficient; a standard trench typically requires 2-4 workers for half a day to a full day, and in rocky conditions, it may take several days. Manual work carries safety and occupational health risks such as trench collapse and dust inhalation, and the high labor intensity and large construction area result in severe damage to crops.
[0004] Secondly, there are vehicle-mounted post hole diggers and rotary drilling rigs. These include loader-type post hole diggers, integrated pole-operated vehicles, and pole-erecting machines. While highly efficient in plains areas, these machines weigh several to tens of tons and are entirely dependent on road conditions. Power grid poles are mostly located in rural, mountainous, and hilly areas, many of which lack road access or have extremely poor road conditions, making it impossible for large equipment to reach the construction site. Furthermore, the entry of large equipment requires the construction of temporary access roads, occupying a large area and causing serious damage to farmland and crops.
[0005] Third, handheld mini gasoline augers. Weighing 10-30kg, they are easy to carry, but the drill diameter is generally only 100-300mm, with a maximum of about 457mm, and a depth of less than 1.5m. They are completely incapable of drilling into rock. Their power and structural limitations mean they are only suitable for small-diameter, shallow-depth operations in soft soil layers, and cannot meet the requirements of 600-700mm diameter holes and 1.5-2.5m depths for power distribution pole pits.
[0006] Based on the above analysis, a significant equipment gap exists in the field of power distribution network pole pit construction: all equipment capable of drilling through rock is vehicle-mounted and cannot reach pole locations without access roads; equipment that can be manually transported to any location is limited to small auger drills, which are completely incapable of drilling into rocks with a diameter of 600-700mm. The industry urgently needs a specialized rock drilling device that combines portability with rock-penetrating capabilities. Summary of the Invention
[0007] The purpose of this invention is to provide a portable modular rotary drilling rig and its construction method for excavating pole pits in power distribution networks. It can be manually transported to any pole location without road access and can complete the excavation of pole pits with a diameter of 600-700mm and a depth of 1.5-2.5m under all geological conditions, including hard bedrock. Moreover, the construction occupies a small area and can effectively reduce damage to crops.
[0008] To achieve the above objectives, the technical solution adopted by the present invention is: a portable modular rotary drilling rig for excavating power distribution pole pits, characterized in that it comprises five detachable modules: a hydraulic power station module (I), a main frame guide module (II), a power head module (III), a segmented drill rod and replaceable drill bit module (IV), and a spiral ground anchor reaction system (V); the modules are assembled and disassembled on site through a quick connection mechanism, the weight of any single part does not exceed 80kg, and the total weight of the whole machine is 200-250kg; The positional and connection relationships among the five modules are as follows: The main frame guide module (II) serves as the load-bearing and guiding base of the entire machine. The base 6 of the main frame guide module (II) is horizontally supported on the ground at the pole position. The lower end of the mast 7 of the main frame guide module (II) is fixedly connected to the upper surface of the middle part of the base 6 and extends vertically upward. The power head module (III) is installed on the mast 7 of the main frame guide module (II) and can slide up and down along the guide rail 9 on the front surface of the mast 7. The hydraulic power station module (I) is independently placed on the ground on one side of the base 6. The hydraulic main pump 2 of the hydraulic power station module (I) is connected to the hydraulic motor 10 of the power head module (III) through two sets of high-pressure hydraulic hoses 5. Hydraulic power is provided to the power head module (III); the segmented drill rod and replaceable drill bit module (IV) is located in front of the mast 7 and aligned with the clearance opening in the middle of the base 6. The upper end of its uppermost drill rod section is installed on the lifting frame 33 of the power head module (III) and is connected to the output end of the planetary reduction mechanism 11 of the power head module (III). The lower end of its lowermost drill rod section is equipped with a drill bit; the spiral ground anchor reaction system (V) is set below and around the base 6. The middle part of the reaction beam frame 19 of the spiral ground anchor reaction system (V) is connected to the base 6 of the main frame guide module (II), and each end is fixed to the top of the spiral ground anchor 18 screwed into the ground, providing vertical feed reaction force for the whole machine.
[0009] The hydraulic power station module (I) includes a steel frame, and a gasoline engine 1, a hydraulic main pump 2, a hydraulic oil tank 3, an air-cooled radiator 4, a return oil filter 31, a pressure gauge 32, a pressure safety valve 30, a hydraulic diverter valve 29, and a hydraulic directional valve group 28 installed in the steel frame; the above components together constitute an independently transportable power station with an overall weight of 60-80kg; like Figure 3 As shown, the gasoline engine 1 is a four-stroke gasoline engine with a rated power of not less than 9.5kW, fixedly installed on one side of the steel frame, used to provide the prime mover for the whole machine; the hydraulic main pump 2 is located on the output end side of the gasoline engine 1, and the input shaft of the hydraulic main pump 2 is directly connected to the output shaft of the gasoline engine 1. The working pressure of the hydraulic main pump 2 is 20-25MPa, and the output flow rate is 30-50L / min, used to convert the mechanical energy output by the gasoline engine 1 into hydraulic energy; the hydraulic oil tank 3 is installed in the steel frame, located below the hydraulic main pump 2 and arranged side by side with the gasoline engine 1. The hydraulic oil tank 3, with a volume of 15-20L, has its outlet connected to the inlet of the hydraulic main pump 2 via a suction pipe. It stores hydraulic oil and supplies it to the hydraulic main pump 2. The return oil filter 31 is installed at the return oil port of the hydraulic oil tank 3, connected in series between the system return oil pipeline and the hydraulic oil tank 3. It filters out particulate impurities in the return oil and maintains the cleanliness of the hydraulic system. The air-cooled radiator 4 is installed on one side of the hydraulic oil tank 3 within the steel frame, near the ventilation surface of the frame. It is connected in series on the system return oil pipeline and located upstream of the return oil filter 31. It cools the system return oil and keeps the oil temperature within the allowable range. The inlet of the pressure safety valve 30 is connected via a branch to the pressure oil circuit where the outlet of the hydraulic main pump 2 is located, and its outlet is connected back to the hydraulic oil tank 3. This valve is used to overflow and unload when the system pressure exceeds a set value, preventing system overpressure. The pressure gauge 32 is installed on the operation panel of the steel frame, and its pressure test port is connected to the pressure oil circuit where the outlet of the hydraulic main pump 2 is located. This gauge is used to indicate the working pressure of the system. The inlet of the hydraulic diverter valve 29 is connected to the outlet of the hydraulic main pump 2. This diverter valve is used to divert the hydraulic pressure output by the hydraulic main pump 2. The oil is proportionally distributed into oil for the rotary drilling circuit and oil for the down-the-hole hammer circuit; the oil inlet of the hydraulic reversing valve group 28 is connected to the oil outlet of the hydraulic diverter valve 29, and each of its working oil ports is connected to the hydraulic motor 10, feed cylinder 12 and hydraulic down-the-hole hammer 27 of the power head module (III) through the high-pressure hydraulic hose 5, which is used to switch between rotary drilling mode and down-the-hole hammer mode, and control the extension and reversal of feed cylinder 12; the system return oil returns to the hydraulic oil tank 3 through the air-cooled radiator 4 and the return oil filter 31 in sequence; The hydraulic main pump 2 is connected to the hydraulic motor 10 of the power head module (III) remotely via two sets of high-pressure hydraulic hoses 5 with a length of 8-15m, so that the hydraulic power station module (I) can be placed on a flat ground within 8-15m of the pole pit, thereby reducing the area occupied by the drilling rig at the pole position.
[0010] The main frame guide module (II) includes a base 6, a mast 7, adjustable legs 8, a guide rail 9, and a verticality detection device. The base 6 is made of 6082 aluminum alloy profile to form a rectangular frame structure with an external dimension of 1.2m × 1.2m. It is horizontally supported on the ground at the pole position, and has a clearance opening in the middle for the drill rod and drill bit to pass through. There are four adjustable legs 8, which are installed below the four corners of the base 6. Each adjustable leg 8 can extend and retract independently by 200-300mm to adapt to uneven ground and adjust the levelness of the base 6. The mast 7 is a 6082 aluminum alloy square tube structure. Its lower end is fixedly connected to the upper surface of the middle part of the base 6 and extends vertically upward. The mast 7 adopts a foldable design and is composed of at least two mast sections connected in sequence by a connecting flange and a quick-locking pin. The unfolded working height is 2.8-3.2m, and the folded transport height does not exceed 1.6m. It is used to provide vertical guidance and support for the power head module (III). The guide rail 9 is a toothed guide rail, which is set on the front surface of the mast 7 along the height direction (for ease of description, ...). Figure 1 The left side is the front, the right side is the back, the side facing the viewer is the left, and the inside of the paper is the right. It is used to guide the power head module (III). The toothed guide rail 9 meshes with the transmission gear 34 of the power head module (III) to transmit the lifting motion. The verticality detection device includes a MEMS dual-axis tilt sensor 22 and an LED digital display device 23. The MEMS dual-axis tilt sensor 22 is installed on the side of the upper part of the mast 7. The LED digital display device 23 is installed on the mast 7 and located below the MEMS dual-axis tilt sensor 22. The signal output end of the MEMS dual-axis tilt sensor 22 is connected to the signal input end of the LED digital display device 23 through a signal line. It is used to collect the tilt angle of the mast 7 along two orthogonal directions in real time and display it on the LED digital display device 23 so that the operator can adjust the extension and retraction of each adjustable outrigger 8 accordingly. The overall weight of the main frame guide module (II) is 40-60kg.
[0011] The power head module (III) includes a hydraulic motor 10, a planetary reduction mechanism 11, a lifting mechanism, and a feed cylinder 12. The lifting mechanism includes a lifting frame 33 and a transmission gear 34. The lifting frame 33 is mounted on the guide rail 9 of the mast 7 and can slide up and down along the guide rail 9. The transmission gear 34 is rotatably mounted on the lifting frame 33 and meshes with the gears on the guide rail 9, thereby enabling the power head module (III) to rise and fall smoothly along the guide rail 9 of the mast 7. The hydraulic motor 10 is fixedly mounted on the lifting frame 33. The inlet and outlet ports of the hydraulic motor 10 are connected to the hydraulic reversing valve group 28 of the hydraulic power station module (I) through two sets of high-pressure hydraulic hoses 5, for receiving hydraulic power provided by the hydraulic power station module (I). The planetary reduction mechanism 11 is mounted on the lifting frame 33 and located at the output end of the hydraulic motor 10. The input end of the planetary reduction mechanism 11 is connected to the output shaft of the hydraulic motor 10, and its output end is connected to the drill rod connecting seat mounted on the lifting frame 33. It is used to reduce the speed and amplify the torque before transmitting the power to the segmented drill rod and the replaceable drill bit module (IV). The cylinder body of the feed cylinder 12 is fixed on the mast 7, and its piston rod end is connected to the lifting frame 33. The inlet and outlet ports of the feed cylinder 12 are connected to the hydraulic reversing valve group 28 through the high-pressure hydraulic hose 5. It is used to drive the lifting frame 33 to descend along the guide rail 9 for pressurization or ascend for drilling. The stroke is 1.0-1.25m, and the maximum axial pressure provided is not less than 20kN. The function of the power head module (III) is to convert the hydraulic energy output from the hydraulic power station module (I) into the rotational torque and axial feed force of the drill rod. On the one hand, the hydraulic motor 10 drives the segmented drill rod and the replaceable drill bit module (IV) to rotate via the planetary reduction mechanism 11, thereby realizing the cutting and breaking of the formation by the drill bit. On the other hand, the feed cylinder 12 drives the hydraulic motor 10, the planetary reduction mechanism 11, and the drill rod to move downward or upward along the guide rail 9 via the lifting frame 33, thereby realizing actions such as drilling down, pressurized feed, drill lifting, and drill rod connection and disconnection. The output torque of the power head module (III) is not less than 2000 N·m, the speed is adjustable from 10 to 60 rpm, and the overall weight is 30-50 kg.
[0012] The power head module (III) also integrates a rotary drilling-down-the-hole hammer dual-mode switching mechanism: in rotary drilling mode, the hydraulic motor 10 drives the drill rod to rotate at full flow; in down-the-hole hammer mode, the hydraulic diverter valve 29 introduces a portion of the hydraulic oil into the hydraulic down-the-hole hammer 27, which generates a high-frequency impact force with a frequency of 15-30Hz and a single impact energy of 50-150J, and cooperates with the low-speed rotation of the drill rod to achieve impact rotary drilling.
[0013] The segmented drill pipe and replaceable drill bit module (IV) includes at least two drill pipe sections and a drill bit installed at the lower end of the lowest drill pipe section; each drill pipe section is 0.8-1.0m long and made of 35CrMo alloy steel. Each drill pipe section has a central through hole. Adjacent drill pipe sections are connected in series via a square tenon quick-change joint 13 and an anti-drop spring pin 14. The central through holes of each drill pipe section are connected sequentially through a sealed connection at the square tenon quick-change joint 13, forming a connection between the power head module (III) and the drill pipe section. The oil supply channel to the hydraulic down-the-hole hammer 27; the upper end of the uppermost drill rod section is installed on the lifting frame 33 of the power head module (III) and is connected to the output end of the planetary reduction mechanism 11. The hydraulic motor 10 drives each drill rod section to rotate synchronously through the planetary reduction mechanism 11 to realize rotary drilling. At the same time, the feed cylinder 12 drives the hydraulic motor 10, the planetary reduction mechanism 11 and each drill rod section to descend along the guide rail 9 of the mast 7 through the lifting frame 33 to realize down-drilling pressurization and up-drilling to realize drill lifting.
[0014] The drill bit is detachably connected to the lowermost drill rod section via a quick-change flange interface 15, and is equipped with three interchangeable drill bits: a soft soil auger bit (IV-a) for soft soil layers, a cutting-tooth rock auger bit (IV-b) for medium-hard rock layers, and a core drilling bit (IV-c) for hard bedrock. The soft soil auger bit (IV-a) has an outer diameter of 650-700mm and is suitable for soft soil layers. The cutting-tooth rock auger bit (IV-b) has WC-Co tungsten carbide bullet-shaped self-rotating cutting teeth 16 mounted on its auger blades. The cutting teeth 16 have an angle of attack of 90°-120° and a deflection angle of 5°-40°. Each cutting tooth 16 can be replaced individually via a locking pin fixing mechanism 17. The core drilling bit (IV-c) has an outer diameter of 300-400mm and is used for staged reaming construction. The overall weight of the segmented drill rod and interchangeable drill bit module (IV) is 30-55kg.
[0015] The spiral anchor reaction system (V) includes at least four spiral anchors 18 and a reaction beam frame 19. The spiral anchors 18 are pre-screwed into the ground around the drill pit to a predetermined depth. The middle part of the reaction beam frame 19 is connected to the base 6 of the main frame guide module (II). Each end of the reaction beam frame 19 is fixed to the top of each spiral anchor 18. The vertical feed reaction force provided by the spiral anchors 18 in the soil is not less than 30kN. The system consists of an alloy steel round tube rod (48-60mm in diameter) and helical blades (150-200mm in diameter). The helical blades are installed at the lower part of the helical ground anchor 18. After being screwed into the ground to a depth of 0.8-1.2m, the pull-out resistance of a single blade can reach 8-15kN, and the four blades together can provide a vertical reaction force of 32-60kN. The reaction beam frame 19 is welded from Q345B steel pipe, with its middle part connected to the base 6. Each end is quickly fixed to the top of the helical ground anchor 18 by U-shaped clamps 20 and locking nuts 21. The overall weight of the helical ground anchor reaction system (V) is 15-25kg.
[0016] The weight of any single component among the five functional modules shall not exceed 80kg, and the total weight of the whole machine shall be 200-250kg.
[0017] Furthermore, the power head module (III) and the hydraulic power station module (I) together constitute a rotary drilling-down-the-hole hammer dual-mode switching mechanism, which includes a hydraulic diverter valve 29, a hydraulic directional valve group 28, and a hydraulic down-the-hole hammer 27. The hydraulic down-the-hole hammer 27 is connected in series between the lowest drill rod section and the drill bit. Its upper end is connected to the lower end of the lowest drill rod section through a square tenon quick-change connector 13, and its lower end is connected to the drill bit through a quick-change flange interface 15. The oil inlet and return port of the hydraulic down-the-hole hammer 27 are respectively connected to the central through hole of each drill rod section in sequence, and are connected to the corresponding working oil port of the hydraulic directional valve group 28 through the central through hole, the power head module (III), and the high-pressure hydraulic hose 5.
[0018] In rotary drilling mode, the hydraulic directional valve group 28 is operated to direct all the hydraulic oil output from the main hydraulic pump 2 to the hydraulic motor 10. The hydraulic motor 10 directly drives the drill rod to rotate for rotary drilling via the planetary reduction mechanism 11. In down-the-hole hammer mode, the hydraulic diverter valve 29 directs a portion of the hydraulic oil output from the main hydraulic pump 2 through the hydraulic directional valve group 28 and the central through hole of the drill rod into the hydraulic down-the-hole hammer 27. The hydraulic down-the-hole hammer 27 generates a high-frequency impact force at the bottom of the hole with a frequency of 15-30Hz and a single impact energy of 50-150J. This force, combined with the hydraulic motor 10, drives the drill rod to rotate at a low speed of 10-15rpm, achieving impact rotary drilling. The two modes are switched by operating the hydraulic directional valve group 28.
[0019] Furthermore, the spiral blades of the cutting rock auger bit (IV-b) are equipped with multiple bullet-shaped self-rotating tungsten carbide cutting teeth 16. The cutting teeth 16 adopt a composite structure of WC-Co series cemented carbide head and 42CrMo alloy steel cutter body. The angle of attack of the cutting teeth 16 is 90°-120° and the deflection angle is 5°-40°. Each cutting tooth 16 is installed on the spiral blade through a locking pin fixing mechanism 17 and can be replaced individually.
[0020] Furthermore, the cylindrical core drill bit (IV-c) has an annular cylindrical structure and a bottomless design. The lower edge of the cylinder is welded with bullet-shaped cutting teeth 16. The outer diameter of the cylinder is 300-400mm. It is used to first circumferentially cut in hard bedrock to form an annular groove and retain the central rock core. Then, a soft soil auger bit (IV-a) or a cutting tooth rock auger bit (IV-b) is used to enlarge the hole to the target diameter of 600-700mm, thereby achieving staged hole enlargement and reducing crushing energy consumption.
[0021] Furthermore, the foldable structure of the mast 7 includes: the body of the mast 7 is connected by at least two aluminum alloy profiles through a butt flange and a quick-locking pin. When folded, each section is rotated or split along the flange surface and stacked in parallel. When unfolded, it is rigidly connected by a locking pin and a positioning pin. In the unfolded state, the bending stiffness of the mast 7 meets the deflection requirements under the maximum applied pressure of 30kN.
[0022] Furthermore, the verticality detection device includes a MEMS dual-axis tilt sensor 22 and an LED digital display device 23. The MEMS dual-axis tilt sensor 22 is installed on the upper part of the mast 7, and the LED digital display device 23 is installed on the mast 7 and located below the MEMS dual-axis tilt sensor 22. The signal output terminal of the MEMS dual-axis tilt sensor 22 is connected to the signal input terminal of the LED digital display device 23 through a data cable. The MEMS dual-axis tilt sensor 22 collects the tilt angle of the mast 7 along two orthogonal directions in real time and transmits the angle signal to the LED digital display device 23 for display. The operator adjusts the extension and retraction of each adjustable outrigger 8 accordingly to control the verticality error of the mast 7 within 0.5°.
[0023] Furthermore, the reaction beam frame 19 has a cross-shaped or grid-shaped structure and is welded from Q345B steel pipe. The middle part of the reaction beam frame 19 is provided with a group of positioning holes and fasteners connected to the base 6. Each end of the frame is provided with a clamping interface consisting of a U-shaped clamp 20 and a locking nut 21, which can be quickly fixed and disassembled with the top of the spiral anchor 18.
[0024] Furthermore, the stroke of the feed cylinder 12 is 1.0-1.25m, which, in conjunction with the segmented drill rod, achieves a total drilling depth of 1.5-2.5m; the segmented drill rod and replaceable drill bit module (IV) includes three drill rod sections, each with a length of 0.8-1.0m, and the drill rod sections are connected by a square tenon quick-change joint 13, with an anti-drop spring pin 14 at the joint.
[0025] Furthermore, it also includes a borehole casing positioning device; the borehole casing positioning device includes a borehole casing 24, a cross positioning groove 25 set on the upper part of the outer wall of the borehole casing 24, and a cross positioning pin set on the middle of the lower surface of the base 6; the borehole casing 24 is a steel cylinder with an inner diameter not less than the maximum outer diameter of the drill bit, and a length of 0.5-1.0m, which is buried in the rod pit opening directly below the clearance opening in the middle of the base 6, with its upper end protruding above the ground; the borehole casing 24 is engaged with the cross positioning pin in the middle of the lower surface of the base 6 through the cross positioning groove 25 on the upper part of its outer wall, thereby positioning and installing the borehole casing 24 on the base 6 of the main frame guide module (II), realizing the precise alignment of the borehole casing 24 with the clearance opening in the middle of the base 6, so that the drill bit enters the hole vertically along the center of the casing.
[0026] A construction method based on the above-mentioned portable modular rotary drilling rig for excavating power distribution network pole pits, characterized by comprising the following steps: Step S1: The hydraulic power station module (I), main frame guide module (II), power head module (III), segmented drill rod and replaceable drill bit module (IV) and spiral ground anchor reaction system (V) are manually transported to the pole pit construction position. After laying rubber protective pads 26 on the ground, the base 6 and reaction beam frame 19 are assembled. Step S2: Screw at least four spiral anchors 18 into the ground to a preset depth along the four corners or four sides of the base 6, and fix the top of each spiral anchor 18 to the locking interface of the reaction beam frame 19 through U-shaped clamps 20 and locking nuts 21. Step S3: Unfold the mast 7 and connect and fix its lower end to the base 6. Install the lifting frame 33 of the power head module (III) onto the guide rail 9 of the mast 7 and make the transmission gear 34 mesh with the teeth on the guide rail 9. Then connect the hydraulic pipeline between the hydraulic power station module (I) and the hydraulic motor 10 and feed cylinder 12 of the power head module (III) using the high-pressure hydraulic hose 5. Step S4: Install the borehole casing 24, and precisely align it with the base 6 through the cross positioning slot 25. Use the MEMS dual-axis tilt sensor 22 and LED digital display device 23 to adjust the extension and retraction of each adjustable support leg 8 so that the verticality error of the mast 7 does not exceed 0.5°. Step S5: Select and install the appropriate drill bit according to the geological conditions -- install the soft soil auger bit (IV-a) for soft soil layers, install the cutting tooth rock auger bit (IV-b) for medium-hard rock layers, and install the core drill bit (IV-c) for pilot circumferential cutting in hard bedrock, and then replace the drill bit to enlarge the hole. Step S6: Start the hydraulic power station module (I), select rotary drilling mode or down-the-hole hammer mode by operating the hydraulic reversing valve group 28 for drilling. After each stroke of the feed cylinder 12 is completed, lift the power head module (III) and connect the next section of drill rod through the square tenon quick-change joint 13 to continue drilling until the target depth is reached. Step S7: Drill cuttings are dry-lifted to the borehole opening via auger blades and collected in a cuttings collection container; after construction is completed, each module is disassembled in sequence and the ground is restored to its original state.
[0027] The present invention has the following beneficial effects: (1) Filling a gap in equipment. For the first time, it realizes the technical combination of "manual handling + 600-700mm large aperture + rock penetration ability". The total weight of the whole machine is 200-250kg, and the weight of a single part is no more than 80kg. It can be carried to any pole position by 2-3 workers. It has the characteristics of being portable and modular.
[0028] (2) The spiral ground anchor reaction system overcomes the self-weight limitation. The vertical feed reaction force far exceeds the self-weight through the anchoring force of 4-6 spiral ground anchors in the soil, solving the industry problem of difficult hard rock drilling for portable equipment.
[0029] (3) Rotary drilling-down-the-hole hammer dual-mode drilling adapts to all formations. The rotary drilling mode is suitable for soil and medium-hardness rock formations, while the down-the-hole hammer mode penetrates hard bedrock. Combined with three-stage replaceable drill bits and staged hole enlargement technology, it is suitable for all formations from soft silt to hard granite.
[0030] (4) Staged hole reaming process reduces energy consumption. The cylindrical core drill bit first performs small-diameter circumferential cutting to construct a free surface, and then reams the hole to the target diameter, which can reduce the energy consumption of the crushing ratio by 40-60%.
[0031] (5) Small construction area and environmentally friendly. No construction access road is required, and the area occupied is only about 2m×2m. The dry spiral slag discharge has no mud pollution and effectively reduces damage to farmland seedlings.
[0032] (6) Fully compliant with national standards. The excavation hole diameter of 600-700mm and the depth of 1.5-2.5m fully cover the requirements of GB 50173-2014 and DL / T 5220-2021 standards.
[0033] (7) Significantly improved efficiency. It is expected to complete a standard hole in 30-60 minutes, which is 5-10 times more efficient. Attached Figure Description
[0034] Figure 1 This is a schematic diagram of the overall structure (working state) of the portable modular rotary drilling rig of the present invention.
[0035] Figure 2 This is a schematic diagram showing the breakdown of the five functional modules of the present invention (transportation status).
[0036] Figure 3 This is a schematic diagram of the internal structure of the hydraulic power station module (I) of the present invention.
[0037] Figure 4 This is a schematic diagram of the mast folding and unfolding of the main frame guide module (II) of the present invention; a is the folded state (transportation), and b is the unfolded state (working).
[0038] Figure 5 This is a hydraulic schematic diagram of the power head module (III) and the rotary drilling-down-hole hammer dual-mode switching mechanism of the present invention.
[0039] Figure 6 These are schematic diagrams of the three interchangeable drill bits of the present invention; a is a soft soil auger drill bit (IV-a), b is a cutting tooth rock auger drill bit (IV-b), and c is a cylindrical core drill bit (IV-c).
[0040] Figure 7 This is a detailed drawing of the cutting tooth arrangement and locking pin fixing mechanism of the cutting tooth rock auger drill bit (IV-b) of the present invention; a is the arrangement of the cutting teeth on the blade, b is the cross section of the cutting teeth, and c is the locking pin fixing mechanism.
[0041] Figure 8 This is a schematic diagram of the spiral ground anchor reaction system (V) of the present invention; a is a top view and b is a side view.
[0042] Figure 9 These are detailed drawings of the orifice sleeve positioning device and cross positioning mechanism of the present invention; a is a top view and b is a side sectional view.
[0043] Figure 10 This is a flowchart of the construction process of the graded borehole enlargement method of the present invention. a is pilot circumferential cutting, b is core extraction, and c is borehole enlargement to the target diameter.
[0044] Figure 11 This is a diagram showing the installation location and signal flow of the verticality detection system of the present invention.
[0045] Figure 12 This is a flowchart of the construction method of the present invention (steps S1-S7).
[0046] Explanation of the labels in the attached diagram: Detailed Implementation
[0047] The present invention will be further described below with reference to specific embodiments.
[0048] A portable modular rotary drilling rig for excavating power distribution pole pits includes five detachable modules: a hydraulic power station module (I), a main frame guide module (II), a power head module (III), a segmented drill rod and replaceable drill bit module (IV), and a spiral ground anchor reaction system (V). The modules are assembled and disassembled on site through a quick-connect mechanism. The weight of any single component does not exceed 80 kg, and the total weight of the whole machine is 200-250 kg. The positional and connection relationships among the five modules are as follows: The main frame guide module (II) serves as the load-bearing and guiding base of the entire machine. The base 6 of the main frame guide module (II) is horizontally supported on the ground at the pole position. The lower end of the mast 7 of the main frame guide module (II) is fixedly connected to the upper surface of the middle part of the base 6 and extends vertically upward. The power head module (III) is installed on the mast 7 of the main frame guide module (II) and can slide up and down along the guide rail 9 on the front surface of the mast 7. The hydraulic power station module (I) is independently placed on the ground on one side of the base 6. The hydraulic main pump 2 of the hydraulic power station module (I) is connected to the hydraulic motor 10 of the power head module (III) through two sets of high-pressure hydraulic hoses 5. Hydraulic power is provided to the power head module (III); the segmented drill rod and replaceable drill bit module (IV) is located in front of the mast 7 and aligned with the clearance opening in the middle of the base 6. The upper end of its uppermost drill rod section is installed on the lifting frame 33 of the power head module (III) and is connected to the output end of the planetary reduction mechanism 11 of the power head module (III). The lower end of its lowermost drill rod section is equipped with a drill bit; the spiral ground anchor reaction system (V) is set below and around the base 6. The middle part of the reaction beam frame 19 of the spiral ground anchor reaction system (V) is connected to the base 6 of the main frame guide module (II), and each end is fixed to the top of the spiral ground anchor 18 screwed into the ground, providing vertical feed reaction force for the whole machine.
[0049] The hydraulic power station module (I) includes a steel frame, and a gasoline engine 1, a hydraulic main pump 2, a hydraulic oil tank 3, an air-cooled radiator 4, a return oil filter 31, a pressure gauge 32, a pressure safety valve 30, a hydraulic diverter valve 29, and a hydraulic directional valve group 28 installed in the steel frame; the above components together constitute an independently transportable power station with an overall weight of 60-80kg; like Figure 3As shown, the gasoline engine 1 is a four-stroke gasoline engine with a rated power of not less than 9.5kW, fixedly installed on one side of the steel frame, used to provide the prime mover for the whole machine; the hydraulic main pump 2 is located on the output end side of the gasoline engine 1, and the input shaft of the hydraulic main pump 2 is directly connected to the output shaft of the gasoline engine 1. The working pressure of the hydraulic main pump 2 is 20-25MPa, and the output flow rate is 30-50L / min, used to convert the mechanical energy output by the gasoline engine 1 into hydraulic energy; the hydraulic oil tank 3 is installed in the steel frame, located below the hydraulic main pump 2 and arranged side by side with the gasoline engine 1. The hydraulic oil tank 3, with a volume of 15-20L, has its outlet connected to the inlet of the hydraulic main pump 2 via a suction pipe. It stores hydraulic oil and supplies it to the hydraulic main pump 2. The return oil filter 31 is installed at the return oil port of the hydraulic oil tank 3, connected in series between the system return oil pipeline and the hydraulic oil tank 3. It filters out particulate impurities in the return oil and maintains the cleanliness of the hydraulic system. The air-cooled radiator 4 is installed on one side of the hydraulic oil tank 3 within the steel frame, near the ventilation surface of the frame. It is connected in series on the system return oil pipeline and located upstream of the return oil filter 31. It cools the system return oil and keeps the oil temperature within the allowable range. The inlet of the pressure safety valve 30 is connected via a branch to the pressure oil circuit where the outlet of the hydraulic main pump 2 is located, and its outlet is connected back to the hydraulic oil tank 3. This valve is used to overflow and unload when the system pressure exceeds a set value, preventing system overpressure. The pressure gauge 32 is installed on the operation panel of the steel frame, and its pressure test port is connected to the pressure oil circuit where the outlet of the hydraulic main pump 2 is located. This gauge is used to indicate the working pressure of the system. The inlet of the hydraulic diverter valve 29 is connected to the outlet of the hydraulic main pump 2. This diverter valve is used to divert the hydraulic pressure output by the hydraulic main pump 2. The oil is proportionally distributed into oil for the rotary drilling circuit and oil for the down-the-hole hammer circuit; the oil inlet of the hydraulic reversing valve group 28 is connected to the oil outlet of the hydraulic diverter valve 29, and each of its working oil ports is connected to the hydraulic motor 10, feed cylinder 12 and hydraulic down-the-hole hammer 27 of the power head module (III) through the high-pressure hydraulic hose 5, which is used to switch between rotary drilling mode and down-the-hole hammer mode, and control the extension and reversal of feed cylinder 12; the system return oil returns to the hydraulic oil tank 3 through the air-cooled radiator 4 and the return oil filter 31 in sequence; The hydraulic main pump 2 is connected to the hydraulic motor 10 of the power head module (III) remotely via two sets of high-pressure hydraulic hoses 5 with a length of 8-15m, so that the hydraulic power station module (I) can be placed on a flat ground within 8-15m of the pole pit, thereby reducing the area occupied by the drilling rig at the pole position.
[0050] The main frame guide module (II) includes a base 6, a mast 7, adjustable legs 8, a guide rail 9, and a verticality detection device. The base 6 is made of 6082 aluminum alloy profile to form a rectangular frame structure with an external dimension of 1.2m × 1.2m. It is horizontally supported on the ground at the pole position, and has a clearance opening in the middle for the drill rod and drill bit to pass through. There are four adjustable legs 8, which are installed below the four corners of the base 6. Each adjustable leg 8 can extend and retract independently by 200-300mm to adapt to uneven ground and adjust the levelness of the base 6. The mast 7 is a 6082 aluminum alloy square tube structure. Its lower end is fixedly connected to the upper surface of the middle part of the base 6 and extends vertically upward. The mast 7 adopts a foldable design and is composed of at least two mast sections connected in sequence by a connecting flange and a quick-locking pin. The unfolded working height is 2.8-3.2m, and the folded transport height does not exceed 1.6m. It is used to provide vertical guidance and support for the power head module (III). The guide rail 9 is a toothed guide rail, which is set on the front surface of the mast 7 along the height direction (for ease of description, ...). Figure 1 The left side is the front, the right side is the back, the side facing the viewer is the left, and the inside of the paper is the right. It is used to guide the power head module (III). The toothed guide rail 9 meshes with the transmission gear 34 of the power head module (III) to transmit the lifting motion. The verticality detection device includes a MEMS dual-axis tilt sensor 22 and an LED digital display device 23. The MEMS dual-axis tilt sensor 22 is installed on the side of the upper part of the mast 7. The LED digital display device 23 is installed on the mast 7 and located below the MEMS dual-axis tilt sensor 22. The signal output end of the MEMS dual-axis tilt sensor 22 is connected to the signal input end of the LED digital display device 23 through a signal line. It is used to collect the tilt angle of the mast 7 along two orthogonal directions in real time and display it on the LED digital display device 23 so that the operator can adjust the extension and retraction of each adjustable outrigger 8 accordingly. The overall weight of the main frame guide module (II) is 40-60kg.
[0051] The power head module (III) includes a hydraulic motor 10, a planetary reduction mechanism 11, a lifting mechanism, and a feed cylinder 12. The lifting mechanism includes a lifting frame 33 and a transmission gear 34. The lifting frame 33 is mounted on the guide rail 9 of the mast 7 and can slide up and down along the guide rail 9. The transmission gear 34 is rotatably mounted on the lifting frame 33 and meshes with the gears on the guide rail 9, thereby enabling the power head module (III) to rise and fall smoothly along the guide rail 9 of the mast 7. The hydraulic motor 10 is fixedly mounted on the lifting frame 33. The inlet and outlet ports of the hydraulic motor 10 are connected to the hydraulic reversing valve group 28 of the hydraulic power station module (I) through two sets of high-pressure hydraulic hoses 5, for receiving hydraulic power provided by the hydraulic power station module (I). The planetary reduction mechanism 11 is mounted on the lifting frame 33 and located at the output end of the hydraulic motor 10. The input end of the planetary reduction mechanism 11 is connected to the output shaft of the hydraulic motor 10, and its output end is connected to the drill rod connecting seat mounted on the lifting frame 33. It is used to reduce the speed and amplify the torque before transmitting the power to the segmented drill rod and the replaceable drill bit module (IV). The cylinder body of the feed cylinder 12 is fixed on the mast 7, and its piston rod end is connected to the lifting frame 33. The inlet and outlet ports of the feed cylinder 12 are connected to the hydraulic reversing valve group 28 through the high-pressure hydraulic hose 5. It is used to drive the lifting frame 33 to descend along the guide rail 9 for pressurization or ascend for drilling. The stroke is 1.0-1.25m, and the maximum axial pressure provided is not less than 20kN. The function of the power head module (III) is to convert the hydraulic energy output from the hydraulic power station module (I) into the rotational torque and axial feed force of the drill rod. On the one hand, the hydraulic motor 10 drives the segmented drill rod and the replaceable drill bit module (IV) to rotate via the planetary reduction mechanism 11, thereby realizing the cutting and breaking of the formation by the drill bit. On the other hand, the feed cylinder 12 drives the hydraulic motor 10, the planetary reduction mechanism 11, and the drill rod to move downward or upward along the guide rail 9 via the lifting frame 33, thereby realizing actions such as drilling down, pressurized feed, drill lifting, and drill rod connection and disconnection. The output torque of the power head module (III) is not less than 2000 N·m, the speed is adjustable from 10 to 60 rpm, and the overall weight is 30-50 kg.
[0052] The power head module (III) also integrates a rotary drilling-down-the-hole hammer dual-mode switching mechanism: in rotary drilling mode, the hydraulic motor 10 drives the drill rod to rotate at full flow; in down-the-hole hammer mode, the hydraulic diverter valve 29 introduces a portion of the hydraulic oil into the hydraulic down-the-hole hammer 27, which generates a high-frequency impact force with a frequency of 15-30Hz and a single impact energy of 50-150J, and cooperates with the low-speed rotation of the drill rod to achieve impact rotary drilling.
[0053] The segmented drill pipe and replaceable drill bit module (IV) includes at least two drill pipe sections and a drill bit installed at the lower end of the lowest drill pipe section; each drill pipe section is 0.8-1.0m long and made of 35CrMo alloy steel. Each drill pipe section has a central through hole. Adjacent drill pipe sections are connected in series via a square tenon quick-change joint 13 and an anti-drop spring pin 14. The central through holes of each drill pipe section are connected sequentially through a sealed connection at the square tenon quick-change joint 13, forming a connection between the power head module (III) and the drill pipe section. The oil supply channel to the hydraulic down-the-hole hammer 27; the upper end of the uppermost drill rod section is installed on the lifting frame 33 of the power head module (III) and is connected to the output end of the planetary reduction mechanism 11. The hydraulic motor 10 drives each drill rod section to rotate synchronously through the planetary reduction mechanism 11 to realize rotary drilling. At the same time, the feed cylinder 12 drives the hydraulic motor 10, the planetary reduction mechanism 11 and each drill rod section to descend along the guide rail 9 of the mast 7 through the lifting frame 33 to realize down-drilling pressurization and up-drilling to realize drill lifting.
[0054] The drill bit is detachably connected to the lowermost drill rod section via a quick-change flange interface 15, and is equipped with three interchangeable drill bits: a soft soil auger bit (IV-a) for soft soil layers, a cutting-tooth rock auger bit (IV-b) for medium-hard rock layers, and a core drilling bit (IV-c) for hard bedrock. The soft soil auger bit (IV-a) has an outer diameter of 650-700mm and is suitable for soft soil layers. The cutting-tooth rock auger bit (IV-b) has WC-Co tungsten carbide bullet-shaped self-rotating cutting teeth 16 mounted on its auger blades. The cutting teeth 16 have an angle of attack of 90°-120° and a deflection angle of 5°-40°. Each cutting tooth 16 can be replaced individually via a locking pin fixing mechanism 17. The core drilling bit (IV-c) has an outer diameter of 300-400mm and is used for staged reaming construction. The overall weight of the segmented drill rod and interchangeable drill bit module (IV) is 30-55kg.
[0055] The spiral anchor reaction system (V) includes at least four spiral anchors 18 and a reaction beam frame 19. The spiral anchors 18 are pre-screwed into the ground around the drill pit to a predetermined depth. The middle part of the reaction beam frame 19 is connected to the base 6 of the main frame guide module (II). Each end of the reaction beam frame 19 is fixed to the top of each spiral anchor 18. The vertical feed reaction force provided by the spiral anchors 18 in the soil is not less than 30kN. The system consists of an alloy steel round tube rod (48-60mm in diameter) and helical blades (150-200mm in diameter). The helical blades are installed at the lower part of the helical ground anchor 18. After being screwed into the ground to a depth of 0.8-1.2m, the pull-out resistance of a single blade can reach 8-15kN, and the four blades together can provide a vertical reaction force of 32-60kN. The reaction beam frame 19 is welded from Q345B steel pipe, with its middle part connected to the base 6. Each end is quickly fixed to the top of the helical ground anchor 18 by U-shaped clamps 20 and locking nuts 21. The overall weight of the helical ground anchor reaction system (V) is 15-25kg.
[0056] The weight of any single component among the five functional modules shall not exceed 80kg, and the total weight of the whole machine shall be 200-250kg.
[0057] Furthermore, the power head module (III) and the hydraulic power station module (I) together constitute a rotary drilling-down-the-hole hammer dual-mode switching mechanism, which includes a hydraulic diverter valve 29, a hydraulic directional valve group 28, and a hydraulic down-the-hole hammer 27. The hydraulic down-the-hole hammer 27 is connected in series between the lowest drill rod section and the drill bit. Its upper end is connected to the lower end of the lowest drill rod section through a square tenon quick-change connector 13, and its lower end is connected to the drill bit through a quick-change flange interface 15. The oil inlet and return port of the hydraulic down-the-hole hammer 27 are respectively connected to the central through hole of each drill rod section in sequence, and are connected to the corresponding working oil port of the hydraulic directional valve group 28 through the central through hole, the power head module (III), and the high-pressure hydraulic hose 5.
[0058] In rotary drilling mode, the hydraulic directional valve group 28 is operated to direct all the hydraulic oil output from the main hydraulic pump 2 to the hydraulic motor 10. The hydraulic motor 10 directly drives the drill rod to rotate for rotary drilling via the planetary reduction mechanism 11. In down-the-hole hammer mode, the hydraulic diverter valve 29 directs a portion of the hydraulic oil output from the main hydraulic pump 2 through the hydraulic directional valve group 28 and the central through hole of the drill rod into the hydraulic down-the-hole hammer 27. The hydraulic down-the-hole hammer 27 generates a high-frequency impact force at the bottom of the hole with a frequency of 15-30Hz and a single impact energy of 50-150J. This force, combined with the hydraulic motor 10, drives the drill rod to rotate at a low speed of 10-15rpm, achieving impact rotary drilling. The two modes are switched by operating the hydraulic directional valve group 28.
[0059] Furthermore, the spiral blades of the cutting rock auger bit (IV-b) are equipped with multiple bullet-shaped self-rotating tungsten carbide cutting teeth 16. The cutting teeth 16 adopt a composite structure of WC-Co series cemented carbide head and 42CrMo alloy steel cutter body. The angle of attack of the cutting teeth 16 is 90°-120° and the deflection angle is 5°-40°. Each cutting tooth 16 is installed on the spiral blade through a locking pin fixing mechanism 17 and can be replaced individually.
[0060] Furthermore, the cylindrical core drill bit (IV-c) has an annular cylindrical structure and a bottomless design. The lower edge of the cylinder is welded with bullet-shaped cutting teeth 16. The outer diameter of the cylinder is 300-400mm. It is used to first circumferentially cut in hard bedrock to form an annular groove and retain the central rock core. Then, a soft soil auger bit (IV-a) or a cutting tooth rock auger bit (IV-b) is used to enlarge the hole to the target diameter of 600-700mm, thereby achieving staged hole enlargement and reducing crushing energy consumption.
[0061] Furthermore, the foldable structure of the mast 7 includes: the body of the mast 7 is connected by at least two aluminum alloy profiles through a butt flange and a quick-locking pin. When folded, each section is rotated or split along the flange surface and stacked in parallel. When unfolded, it is rigidly connected by a locking pin and a positioning pin. In the unfolded state, the bending stiffness of the mast 7 meets the deflection requirements under the maximum applied pressure of 30kN.
[0062] Furthermore, the verticality detection device includes a MEMS dual-axis tilt sensor 22 and an LED digital display device 23. The MEMS dual-axis tilt sensor 22 is installed on the upper part of the mast 7, and the LED digital display device 23 is installed on the mast 7 and located below the MEMS dual-axis tilt sensor 22. The signal output terminal of the MEMS dual-axis tilt sensor 22 is connected to the signal input terminal of the LED digital display device 23 through a data cable. The MEMS dual-axis tilt sensor 22 collects the tilt angle of the mast 7 along two orthogonal directions in real time and transmits the angle signal to the LED digital display device 23 for display. The operator adjusts the extension and retraction of each adjustable outrigger 8 accordingly to control the verticality error of the mast 7 within 0.5°.
[0063] Furthermore, the reaction beam frame 19 has a cross-shaped or grid-shaped structure and is welded from Q345B steel pipe. The middle part of the reaction beam frame 19 is provided with a group of positioning holes and fasteners connected to the base 6. Each end of the frame is provided with a clamping interface consisting of a U-shaped clamp 20 and a locking nut 21, which can be quickly fixed and disassembled with the top of the spiral anchor 18.
[0064] Furthermore, the stroke of the feed cylinder 12 is 1.0-1.25m, which, in conjunction with the segmented drill rod, achieves a total drilling depth of 1.5-2.5m; the segmented drill rod and replaceable drill bit module (IV) includes three drill rod sections, each with a length of 0.8-1.0m, and the drill rod sections are connected by a square tenon quick-change joint 13, with an anti-drop spring pin 14 at the joint.
[0065] Furthermore, it also includes a borehole casing positioning device; the borehole casing positioning device includes a borehole casing 24, a cross positioning groove 25 set on the upper part of the outer wall of the borehole casing 24, and a cross positioning pin set on the middle of the lower surface of the base 6; the borehole casing 24 is a steel cylinder with an inner diameter not less than the maximum outer diameter of the drill bit, and a length of 0.5-1.0m, which is buried in the rod pit opening directly below the clearance opening in the middle of the base 6, with its upper end protruding above the ground; the borehole casing 24 is engaged with the cross positioning pin in the middle of the lower surface of the base 6 through the cross positioning groove 25 on the upper part of its outer wall, thereby positioning and installing the borehole casing 24 on the base 6 of the main frame guide module (II), realizing the precise alignment of the borehole casing 24 with the clearance opening in the middle of the base 6, so that the drill bit enters the hole vertically along the center of the casing.
[0066] A construction method based on the aforementioned portable modular rotary drilling rig for excavating power distribution pole pits includes the following steps: Step S1: The hydraulic power station module (I), main frame guide module (II), power head module (III), segmented drill rod and replaceable drill bit module (IV) and spiral ground anchor reaction system (V) are manually transported to the pole pit construction position. After laying rubber protective pads 26 on the ground, the base 6 and reaction beam frame 19 are assembled. Step S2: Screw at least four spiral anchors 18 into the ground to a preset depth along the four corners or four sides of the base 6, and fix the top of each spiral anchor 18 to the locking interface of the reaction beam frame 19 through U-shaped clamps 20 and locking nuts 21. Step S3: Unfold the mast 7 and connect and fix its lower end to the base 6. Install the lifting frame 33 of the power head module (III) onto the guide rail 9 of the mast 7 and make the transmission gear 34 mesh with the teeth on the guide rail 9. Then connect the hydraulic pipeline between the hydraulic power station module (I) and the hydraulic motor 10 and feed cylinder 12 of the power head module (III) using the high-pressure hydraulic hose 5. Step S4: Install the borehole casing 24, and precisely align it with the base 6 through the cross positioning slot 25. Use the MEMS dual-axis tilt sensor 22 and LED digital display device 23 to adjust the extension and retraction of each adjustable support leg 8 so that the verticality error of the mast 7 does not exceed 0.5°. Step S5: Select and install the appropriate drill bit according to the geological conditions -- install the soft soil auger bit (IV-a) for soft soil layers, install the cutting tooth rock auger bit (IV-b) for medium-hard rock layers, and install the core drill bit (IV-c) for pilot circumferential cutting in hard bedrock, and then replace the drill bit to enlarge the hole. Step S6: Start the hydraulic power station module (I), select rotary drilling mode or down-the-hole hammer mode by operating the hydraulic reversing valve group 28 for drilling. After each stroke of the feed cylinder 12 is completed, lift the power head module (III) and connect the next section of drill rod through the square tenon quick-change joint 13 to continue drilling until the target depth is reached. Step S7: Drill cuttings are dry-lifted to the borehole opening via auger blades and collected in a cuttings collection container; after construction is completed, each module is disassembled in sequence and the ground is restored to its original state.
[0067] Example 1: Typical pole pit excavation in soft soil strata: Construction conditions: This is a new 0.4kV distribution line construction project. The pole pit is located next to a paddy field, with a topsoil layer of 0.3m topsoil and an underlying layer of silty clay. The designed pole pit diameter is 650mm and the depth is 1.6m. The construction road is a paddy field ridge approximately 1m wide.
[0068] Three workers carried the five modules along the field ridge to the pole position in two trips. Protective mats were laid, the base was assembled, and four spiral anchors were screwed in to a depth of 0.8m, connecting the reaction beam frame. The mast was deployed, and the power head was installed. A soft soil auger bit (IV-a, 650mm outer diameter) was installed. The outriggers were adjusted to ensure a verticality error of <0.3°. Drilling was carried out in rotary drilling mode at approximately 40 rpm, completing the first 0.8m section in about 8 minutes. The second section was then continued drilling for another 0.8m to the target depth of 1.6m. The total drilling time was approximately 15 minutes.
[0069] Example 2, Excavation of pole pits in medium-hard rock strata: Construction conditions: A 10kV power distribution line renovation project in a mountainous area. The strata consist of a top 0.5m layer of weathered residual soil and an underlying layer of strongly to moderately weathered sandstone (compressive strength 30-50MPa). The designed pole pit diameter is 700mm and the depth is 2.0m.
[0070] Install a rock auger bit (IV-b, 700mm outer diameter). Drill through the top 0.5m of residual soil in rotary drilling mode to enter the sandstone layer. Reduce the rotation speed to 20-25 rpm and increase the feed pressure to 15-18 kN. The drilling speed in the moderately weathered sandstone section is approximately 0.3-0.5 m / 10 min. The total drilling depth of 2.0 m takes approximately 40 minutes.
[0071] Example 3, Excavation of a shaft pit in hard bedrock (staged reaming + down-the-hole hammer mode): Construction conditions: A 10kV power line in a hilly area, with a top 0.3m layer of residual soil and an underlying layer of slightly weathered granite (compressive strength 100-140MPa). The designed pole pit diameter is 700mm and the depth is 2.2m. The surrounding area is a fruit tree forest.
[0072] The staged reaming method was adopted: In the first stage, a cylindrical core drill bit (IV-c, outer diameter 350mm) was installed, and the system was switched to down-the-hole hammer mode. The hydraulic down-the-hole hammer operated at an impact frequency of approximately 20Hz and a single impact energy of 100J, combined with the power head rotating at a low speed of 15rpm, to circumferentially cut through the granite to the target depth of 2.2m, which took approximately 2-2.5 hours. After the core was extracted, the second stage involved replacing the core with a cutting-tooth rock auger bit (IV-b, outer diameter 700mm) to ream the hole. Since a free face already existed, the reaming took approximately 1-1.5 hours. The total construction time was approximately 3-4 hours, which is more than 5 times more efficient than the traditional 2-3 day operation time of manual pneumatic drills.
[0073] The above embodiments are merely illustrative of the technical solutions of the present invention and are not intended to limit it. For example: the number of spiral anchors can be increased or decreased according to the geological conditions; the reaction beam frame can adopt other structures such as ring or H-shape; the mast can adopt other foldable structures such as sleeve telescopic type or hinge folding type; the hydraulic down-the-hole hammer can be replaced with a pneumatic down-the-hole hammer or a hydraulic breaker; the drill bit size can be extended to a hole diameter of 500-800mm and the depth can be extended to 1.0-3.0m; the verticality detection device can also adopt a bubble level, laser plumb line, etc. When there is a temporary power supply near the pole pit, the gasoline engine can be replaced with a three-phase asynchronous motor (380V / 50Hz).
Claims
1. A portable modular rotary rock drill for pole hole excavation in an electrical distribution network, characterized by, It includes a hydraulic power station module (I), a main frame guide module (II), a power head module (III), a segmented drill rod and replaceable drill bit module (IV), and a spiral ground anchor reaction system (V); The main frame guide module (II) serves as the load-bearing and guiding base for the entire machine. The base (6) of the main frame guide module (II) is horizontally supported on the ground at the pole position. The lower end of the mast (7) of the main frame guide module (II) is fixedly connected to the upper surface of the middle part of the base (6). The power head module (III) is installed on the mast (7) of the main frame guide module (II) and can slide up and down along the guide rail (9) on the front surface of the mast (7). The hydraulic power station module (I) is independently placed on the ground on one side of the base (6). The hydraulic main pump (2) of the hydraulic power station module (I) is connected to the hydraulic motor (10) of the power head module (III) through two sets of high-pressure hydraulic hoses (5), supplying power to the power head module (III). Hydraulic power is provided; the segmented drill rod and replaceable drill bit module (IV) is located in front of the mast (7) and aligned with the clearance opening in the middle of the base (6). The upper end of its uppermost drill rod section is installed on the lifting frame (33) of the power head module (III) and is connected to the output end of the planetary reduction mechanism (11) of the power head module (III). The lower end of its lowermost drill rod section is equipped with a drill bit; the spiral ground anchor reaction system (V) is set below and around the base (6). The middle part of the reaction beam frame (19) of the spiral ground anchor reaction system (V) is connected to the base (6) of the main frame guide module (II), and each end is fixed to the top of the spiral ground anchor (18) screwed into the ground, providing vertical feed reaction force for the whole machine.
2. A portable modularized rotary drilling rig for pole pit excavation of an electric distribution network according to claim 1, characterized in that, The hydraulic power station module (I) includes a steel frame, and a gasoline engine (1), a hydraulic main pump (2), a hydraulic oil tank (3), an air-cooled radiator (4), a return oil filter (31), a pressure gauge (32), a pressure safety valve (30), a hydraulic diverter valve (29), and a hydraulic directional valve assembly (28) installed in the steel frame. The gasoline engine (1) is a four-stroke gasoline engine with a rated power of not less than 9.5kW, and is fixedly installed on one side of the steel frame; the hydraulic main pump (2) is located on the output end side of the gasoline engine (1), and the input shaft of the hydraulic main pump (2) is directly connected to the output shaft of the gasoline engine (1). The working pressure of the hydraulic main pump (2) is 20-25MPa, and the output flow rate is 30-50L / min; the hydraulic oil tank (3) is installed in the steel frame and located on the hydraulic main pump (2). Below and alongside the gasoline engine (1), the hydraulic oil tank (3) has a volume of 15-20L. The oil outlet of the hydraulic oil tank (3) is connected to the oil inlet of the hydraulic main pump (2) via the oil suction pipe. The return oil filter (31) is installed at the return oil port of the hydraulic oil tank (3) and connected in series between the system return oil pipeline and the hydraulic oil tank (3). The air-cooled radiator (4) is installed on one side of the hydraulic oil tank (3) inside the steel frame and close to the ventilation surface of the frame. It is connected in series on the system return oil pipeline and located upstream of the return oil filter (31). The inlet of the pressure safety valve (30) is connected to the pressure oil circuit where the outlet of the hydraulic main pump (2) is located via a branch, and its outlet is connected back to the hydraulic oil tank (3); the pressure gauge (32) is installed on the operation panel of the steel frame, and its pressure measuring port is connected to the pressure oil circuit where the outlet of the hydraulic main pump (2) is located; the inlet of the hydraulic diverter valve (29) is connected to the outlet of the hydraulic main pump (2); the inlet of the hydraulic directional valve group (28) is connected to the outlet of the hydraulic diverter valve (29), and each of its working oil ports is connected to the hydraulic motor (10), feed cylinder (12) and hydraulic downhole hammer (27) of the power head module (III) via a high-pressure hydraulic hose (5); the system return oil returns to the hydraulic oil tank (3) in sequence via the air-cooled radiator (4) and the return oil filter (31); The hydraulic main pump (2) is remotely connected to the hydraulic motor (10) of the power head module (III) through two sets of high-pressure hydraulic hoses (5) with a length of 8-15m.
3. A portable modularized rotary drilling rig for pole pit excavation of a power distribution network according to claim 1, wherein, The main frame guide module (II) includes a base (6), a mast (7), adjustable legs (8), a guide rail (9), and a verticality detection device. The base (6) is made of 6082 aluminum alloy profile to form a rectangular frame structure with an external dimension of 1.2m×1.2m. It is horizontally supported on the ground at the pole position and has a clearance opening in the middle for the drill rod and drill bit to pass through. There are four adjustable legs (8), which are installed below the four corners of the base (6). Each adjustable leg (8) can extend and retract independently by 200-300mm. The mast (7) is a 6082 aluminum alloy square tube structure. Its lower end is fixedly connected to the upper surface of the middle part of the base (6) and extends vertically upward. The mast (7) is made of at least two mast sections connected in sequence by a connecting flange and a quick-locking pin. The unfolded working height is 2.8-3.2m and the folded transport height does not exceed 1.6m. The guide rail (9) is a toothed guide rail, which is set on the front surface of the mast (7) along the height direction. The toothed guide rail (9) meshes with the transmission gear (34) of the power head module (III) to transmit lifting motion. The verticality detection device includes a MEMS dual-axis tilt sensor (22) and an LED digital display device (23). The MEMS dual-axis tilt sensor (22) is installed on the side of the upper part of the mast (7). The LED digital display device (23) is installed on the mast (7) and located below the MEMS dual-axis tilt sensor (22). The signal output terminal of the MEMS dual-axis tilt sensor (22) is connected to the signal input terminal of the LED digital display device (23) through a signal line.
4. A portable modularized rotary drilling rig for pole pit excavation of an electric distribution network according to claim 1, characterized in that, The power head module (III) includes a hydraulic motor (10), a planetary reduction mechanism (11), a lifting mechanism, and a feed cylinder (12); the lifting mechanism includes a lifting frame (33) and a transmission gear (34). The lifting frame (33) is mounted on the guide rail (9) of the mast (7) and can slide up and down along the guide rail (9). The transmission gear (34) is rotatably mounted on the lifting frame (33) and meshes with the teeth on the guide rail (9); the hydraulic motor (10) is fixedly mounted on the lifting frame (33). The inlet and outlet of the hydraulic motor (10) are connected to the hydraulic power station module (I) via two sets of high-pressure hydraulic hoses (5). The planetary reduction mechanism (11) is installed on the lifting frame (33) and located at the output end of the hydraulic motor (10). The input end of the planetary reduction mechanism (11) is connected to the output shaft of the hydraulic motor (10), and its output end is connected to the drill rod connecting seat installed on the lifting frame (33). The cylinder body of the feed cylinder (12) is fixed on the mast (7), and its piston rod end is connected to the lifting frame (33). The inlet and outlet ports of the feed cylinder (12) are connected to the hydraulic reversing valve group (28) through the high-pressure hydraulic hose (5). The stroke is 1.0-1.25m, and the maximum axial pressure provided is not less than 20kN.
5. A portable modularized rotary drilling rig for pole pit excavation of an electric distribution network according to claim 1, characterized in that, The segmented drill pipe and replaceable drill bit module (IV) includes at least two drill pipe sections and a drill bit installed at the lower end of the lowest drill pipe section; each drill pipe section is 0.8-1.0m long and made of 35CrMo alloy steel. Each drill pipe section has a central through hole. Adjacent drill pipe sections are connected in series by a square tenon quick-change joint (13) and an anti-drop spring pin (14). The central through holes of each drill pipe section are connected sequentially by a sealed joint at the square tenon quick-change joint (13), forming a connection from the power head module (III) to the hydraulic down-the-hole hammer (2). 7) oil supply channel; the upper end of the uppermost drill rod section is installed on the lifting frame (33) of the power head module (III) and is connected to the output end of the planetary reduction mechanism (11). The hydraulic motor (10) drives each drill rod section to rotate synchronously through the planetary reduction mechanism (11) to realize rotary drilling. At the same time, the feed cylinder (12) drives the hydraulic motor (10), planetary reduction mechanism (11) and each drill rod section to move down along the guide rail (9) of the mast (7) through the lifting frame (33) to realize down-drilling pressurization and up-drilling to realize drill lifting. The drill bit is detachably connected to the lowest drill rod section via a quick-change flange interface (15) and is equipped with three interchangeable drill bits: a soft soil auger bit (IV-a) for soft soil layers, a cutting rock auger bit (IV-b) for medium-hard rock layers, and a core drill bit (IV-c) for hard bedrock. The soft soil auger bit (IV-a) has an outer diameter of 650-700mm and is suitable for soft soil layers. The cutting rock auger bit (IV-b) has WC-Co tungsten carbide bullet-shaped self-rotating cutting teeth (16) installed on its auger blades. The cutting teeth (16) have an angle of attack of 90°-120° and a deflection angle of 5°-40°. Each cutting tooth (16) can be replaced individually via a locking pin fixing mechanism (17).
6. A portable modularized rotary drilling rig for pole pit excavation of an electric distribution network according to claim 1, characterized in that, The spiral anchor reaction system (V) includes at least four spiral anchors (18) and a reaction beam frame (19). The spiral anchors (18) are pre-screwed into the ground around the drill pit to a predetermined depth. The middle part of the reaction beam frame (19) is connected to the base (6) of the main frame guide module (II). Each end of the reaction beam frame (19) is fixed to the top of each spiral anchor (18). The vertical feed reaction force provided by the anchorage pull-out force of the spiral anchors (18) in the soil is not less than the vertical feed reaction force provided by the drilling rig. 30kN; The spiral anchor (18) is composed of an alloy steel round tube rod and spiral blades. The spiral blades are installed at the lower part of the spiral anchor (18). After being screwed into the ground to a depth of 0.8-1.2m, the pull-out force of a single blade can reach 8-15kN. The four blades together can provide a vertical reaction force of 32-60kN. The reaction beam frame (19) is welded from Q345B steel pipe. Its middle part is connected to the base (6). Each end is quickly fixed to the top of the spiral anchor (18) through U-shaped clamps (20) and locking nuts (21).
7. A portable modularized rotary drilling rig for pole pit excavation of an electric distribution network according to claim 4, characterized in that, The power head module (III) and the hydraulic power station module (I) together constitute a rotary drilling-down-hole hammer dual-mode switching mechanism. The mechanism includes a hydraulic diverter valve (29), a hydraulic reversing valve group (28), and a hydraulic down-hole hammer (27). The hydraulic down-hole hammer (27) is connected in series between the lowest drill rod section and the drill bit. Its upper end is connected to the lower end of the lowest drill rod section through a square tenon quick-change connector (13), and its lower end is connected to the drill bit through a quick-change flange interface (15). The oil inlet and return port of the hydraulic down-hole hammer (27) are respectively connected to the central through hole of each drill rod section in sequence, and are connected to the corresponding working oil port of the hydraulic reversing valve group (28) through the central through hole, the power head module (III), and the high-pressure hydraulic hose (5). In rotary drilling mode, the hydraulic directional valve group (28) is operated to allow all the hydraulic oil output from the hydraulic main pump (2) to be directed to the hydraulic motor (10). The hydraulic motor (10) directly drives the drill rod to rotate for rotary drilling via the planetary reduction mechanism (11). In down-the-hole hammer mode, the hydraulic diverter valve (29) directs a portion of the hydraulic oil output from the hydraulic main pump (2) through the hydraulic directional valve group (28) and the central through hole of the drill rod into the hydraulic down-the-hole hammer (27). The hydraulic down-the-hole hammer (27) generates a high-frequency impact force at the bottom of the hole with a frequency of 15-30Hz and a single impact energy of 50-150J. This force, combined with the hydraulic motor (10), drives the drill rod to rotate at a low speed of 10-15rpm, achieving impact rotary drilling. The two modes are switched by operating the hydraulic directional valve group (28).
8. A portable modularized rotary drilling rig for pole pit excavation of an electric distribution network according to claim 5, characterized in that, The cylindrical core drill bit (IV-c) has an annular cylindrical structure and a bottomless design. The lower edge of the cylinder is welded with bullet-shaped cutting teeth (16). The outer diameter of the cylinder is 300-400mm. It is used to first cut annular grooves in hard bedrock and retain the central rock core. Then, the soft soil auger bit (IV-a) or the cutting tooth rock auger bit (IV-b) is used to enlarge the hole to the target diameter of 600-700mm.
9. A portable modularized rotary drilling rig for pole pit excavation of an electric distribution network according to claim 1, characterized in that, It also includes a borehole casing positioning device; the borehole casing positioning device includes a borehole casing (24), a cross positioning groove (25) set on the upper part of the outer wall of the borehole casing (24), and a cross positioning pin set on the middle part of the lower surface of the base (6); the borehole casing (24) is a steel cylinder with an inner diameter not less than the maximum outer diameter of the drill bit, and a length of 0.5-1.0m. It is buried in the rod pit opening directly below the clearance opening in the middle of the base (6), and its upper end protrudes from the ground; the borehole casing (24) is engaged with the cross positioning pin in the middle part of the lower surface of the base (6) through the cross positioning groove (25) on the upper part of its outer wall, thereby positioning and installing the borehole casing (24) on the base (6) of the main frame guide module (II).
10. A construction method based on the above portable modularized rotary drilling rig for pole pit excavation of a power distribution network, characterized in that, Includes the following steps: Step S1: The hydraulic power station module (I), main frame guide module (II), power head module (III), segmented drill rod and replaceable drill bit module (IV) and spiral ground anchor reaction system (V) are manually transported to the pole pit construction position. After laying rubber protective pads (26) on the ground, the base (6) and reaction beam frame (19) are assembled. Step S2: Screw at least four spiral anchors (18) into the ground to a preset depth along the four corners or four sides of the base (6), and fix the top of each spiral anchor (18) to the clamp interface of the reaction beam frame (19) through U-shaped clamps (20) and locking nuts (21). Step S3: Unfold the mast (7) and connect and fix its lower end to the base (6). Install the lifting frame (33) of the power head module (III) onto the guide rail (9) of the mast (7) and make the transmission gear (34) mesh with the teeth on the guide rail (9). Then connect the hydraulic pipeline between the hydraulic power station module (I) and the hydraulic motor (10) and feed cylinder (12) of the power head module (III) using a high-pressure hydraulic hose (5). Step S4: Install the borehole casing (24), and precisely align it with the base (6) through the cross positioning slot (25). Use the MEMS dual-axis tilt sensor (22) and LED digital display device (23) to adjust the extension and retraction of each adjustable leg (8) so that the verticality error of the mast (7) does not exceed 0.5°. Step S5: Select and install the appropriate drill bit according to the geological conditions -- install the soft soil auger bit (IV-a) for soft soil layers, install the cutting tooth rock auger bit (IV-b) for medium-hard rock layers, and install the core drill bit (IV-c) for pilot circumferential cutting in hard bedrock, and then replace the drill bit to enlarge the hole. Step S6: Start the hydraulic power station module (I), select rotary drilling mode or down-the-hole hammer mode by operating the hydraulic reversing valve group (28) to drill. After each stroke of the feed cylinder (12) is completed, lift the power head module (III) and connect the next section of drill rod through the square tenon quick-change joint (13) to continue drilling until the target depth is reached. Step S7: Drill cuttings are dry-lifted to the borehole opening via auger blades and collected in a cuttings collection container; after construction is completed, each module is disassembled in sequence and the ground is restored to its original state.