A device and method for deep hole pre-splitting drilling on slopes

By using the coordinated design of the protective cover and the junction box, and by utilizing airflow and negative pressure adsorption technology, the problem of gravel slurry intruding into the gap between the drill rod and the protective cover was solved. This ensured the stability of the drill rod and the smooth flow of the slag discharge channel, thereby improving the drilling efficiency and equipment lifespan of deep hole pre-splitting drilling on slopes.

CN123109560APending Publication Date: 2026-11-17SINOHYDRO BEREAU 10 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611607590.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-16
Publication Date
2026-11-17

Smart Images

  • Figure CN123109560A_ABST
    Figure CN123109560A_ABST
Patent Text Reader

Abstract

This invention belongs to the technical field of rock drilling equipment, specifically a construction device and method for deep hole pre-splitting drilling on slopes. It includes a drill rod with a drill bit fixedly connected to its side end. A protective cover is fixed to the equipment frame to create a closed space. The cleaning pump is activated, spraying a high-speed flow through the air outlet and connection hole, accelerating the discharge of mud and foreign matter into the junction box via the dust outlet, and finally discharging it from the discharge port. Simultaneously, the pump generates negative pressure through the adsorption hole, enhancing the suction force at the dust outlet, forming a dual slag removal mechanism of "fluid purging + negative pressure suction". This design effectively avoids drill rod swaying and guide sleeve wear caused by gravel accumulation, reducing the risk of stuck drill; it prevents blockage of the slag discharge channel, reducing downtime for clearing obstacles and improving drilling efficiency; the modular junction box and detachable circular cover design facilitate quick disassembly and maintenance of the cleaning pump, balancing protection and maintenance convenience, significantly extending drill bit life, and ensuring efficient and stable deep hole pre-splitting drilling operations on slopes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical field of rock drilling equipment, specifically a deep hole pre-splitting drilling construction device and construction method for slopes. Background Technology

[0002] The deep-hole pre-splitting drilling device for slopes is a key supporting equipment for pre-splitting (smooth) blasting technology used in rock excavation construction in open-pit mines, hydropower, highways, railways, and other engineering projects. Its working principle is as follows: along the designed excavation outline, a down-the-hole drill or a fully hydraulic drill is used to drill large pre-splitting holes, typically 76–110 mm in diameter and several meters to tens of meters deep, according to the designed hole spacing, depth, and inclination angle. The drill bit rotates at high speed to cut the rock strata, and high-pressure airflow blows rock cuttings from the bottom of the hole out, forming a large number of dense, parallel blast holes. Subsequently, a decoupled charge structure is installed in the pre-splitting holes, and a through-crack is blasted before the main blasting zone detonates, causing the rock mass in the main blasting zone to be neatly peeled off along the preset interface. This effectively ensures slope flatness, controls over- and under-excavation, protects the integrity of the rock mass in the reserved area, and reduces the damage of blasting vibration to slope stability and nearby structures.

[0003] In existing deep hole pre-splitting drilling equipment for slopes, the gap between the drill rod and the protective cover is prone to the intrusion of gravel mud. After its accumulation, it aggravates the swing of the drill rod, causing uneven wear of the rod body and guide sleeve, which can lead to stuck drill. In addition, the repeated scraping of hard rock cuttings shortens the life of the drill bit. At the same time, the accumulated material blocks the slag discharge channel, forcing the equipment to stop for clearing obstacles and reducing the drilling efficiency.

[0004] Therefore, the present invention provides a device and method for deep hole pre-splitting drilling on slopes. Summary of the Invention

[0005] In order to overcome the shortcomings of the prior art, at least one technical problem raised in the background art is solved.

[0006] The technical solution adopted by the present invention to solve its technical problem is as follows: The present invention provides a deep hole pre-splitting drilling construction device for slopes, including a drill rod, a drill bit fixedly connected to the side end of the drill rod, the same protective cover being sleeved on the outer side of both the drill rod and the drill bit, and a gap existing between the inner wall of the protective cover and the outer side of both the drill rod and the drill bit, and a dust outlet being provided at the bottom of the protective cover. The protective cover is fitted with a socket box on its outer side. The top of the socket box has a disassembly hole, and the bottom wall of the disassembly hole has a insertion hole. A cleaning pump body and a cleaning controller are movably inserted into the insertion hole. The inner wall of the socket box is provided with an air outlet, and the outer side of the protective cover is provided with a docking hole communicating with the air outlet. An air intake controller and an air intake valve are provided in the docking hole. The inner wall of the protective cover is provided with an air blowing hole to blow away foreign objects. The interior of the disassembly hole can be detachably connected to a circular cover for protecting the cleaning pump body. One end of the protective cover is inserted into the interior of the socket box, and the bottom of the socket box is provided with a discharge port. The inner wall of the socket box is provided with an adsorption hole near the discharge port.

[0007] Preferably, the inner wall of the socket box is provided with a plurality of symmetrically distributed telescopic holes, a telescopic block is movably inserted into the telescopic hole, the inner wall of the telescopic hole is provided with an installation hole communicating with the insertion hole, and the outer side of the protective cover is provided with a limiting groove adapted to the telescopic block.

[0008] Preferably, the inner wall of the telescopic hole is coated with a magnetic coating, and the side of the telescopic block is provided with an annular groove. A metal ring is fixedly connected inside the annular groove, and the metal ring is magnetically connected to the magnetic coating.

[0009] Preferably, an indicator light and an indicator controller are fixedly connected to the side of the socket box, and a side groove is provided on the outer side of the socket box, with a protective block detachably connected inside the side groove.

[0010] Preferably, a pair of symmetrically distributed reinforcing blocks are fixedly connected to the outer side of the cleaning pump body, and a vertical groove adapted to the reinforcing block is opened on the inner wall of the insertion hole, and the top of the reinforcing block is flush with the inner bottom wall of the insertion hole.

[0011] Preferably, a rotating groove is provided on the inner wall of the protective cover, and a rotating ring is movably connected to the inside of the rotating groove via an electric roller. A push block is fixedly connected to the inner wall of the rotating ring, and there is a gap between the push block and the outer side of the drill bit.

[0012] Preferably, a sealing ring is fixedly connected to the outer side of the rotating ring, and the outer side of the sealing ring abuts against the inner wall of the rotating groove.

[0013] Preferably, a scraper is fixedly connected to the side of the pusher block, and the side of the scraper block abuts against the surface of the air blowing hole.

[0014] Preferably, a fixing tube is fixedly connected to the inner top wall of the socket box, a connecting rod is movably inserted inside the fixing tube, a scraper is fixedly connected to the end of the connecting rod away from the fixing tube, the scraper is located above the dust outlet, and the outer side of the scraper abuts against the inner wall of the socket box, the top end of the fixing tube communicates with the insertion hole, a switch valve and a switch controller are provided inside the fixing tube, and a spring is fixedly connected between the fixing tube and the connecting rod.

[0015] A method for deep hole pre-splitting drilling construction on slopes, the method using the aforementioned deep hole pre-splitting drilling construction device on slopes, includes the following steps; S1: Install the protective cover on the outside of the drill rod and drill bit, and then fix one end of the protective cover to the frame; S2: After the mud enters the protective cover, start the cleaning pump to blow gas from the air blowing hole to the mud and foreign objects, so that the mud and foreign objects are removed from the protective cover through the dust outlet. At the same time, the negative pressure inside the protective cover adsorbs the dust outlet, which speeds up the removal of foreign objects and mud from the protective cover. S3: Inflate the fixed tube with air to push the scraper downward with the connecting rod, thereby removing the mud and foreign matter attached to the inner wall of the socket.

[0016] The beneficial effects of this invention are as follows: 1. This invention effectively solves the problem of gravel and mud intrusion into the drill pipe gap through the coordinated design of the protective cover and the socket box. During construction, the protective cover is first fixed to the drilling equipment frame via a flange, forming a closed protective space. After the cleaning pump is started, gas is ejected from the air outlet through the air outlet and the docking hole, forming a directional airflow within the protective cover. This accelerates the flow of mud and foreign matter towards the socket box, and finally discharges it from the bottom outlet. Simultaneously, the cleaning pump generates negative pressure through the adsorption hole, enhancing the suction force at the dust outlet, forming a dual slag removal mechanism of "blowing + negative pressure adsorption". This invention can avoid drill pipe swaying and guide sleeve wear caused by gravel accumulation, significantly reducing the risk of stuck drill. Continuous airflow purging and negative pressure suction prevent blockage of the slag removal channel, reducing the frequency of downtime for clearing obstacles and improving drilling efficiency. The modular socket box and detachable circular cover design make the cleaning pump easy to disassemble and maintain, balancing protective performance and maintenance convenience, effectively extending the service life of the drill bit, and ensuring the efficient and stable operation of deep hole pre-splitting drilling on slopes.

[0017] 2. When using this invention, after the mud and foreign objects are discharged from both the protective cover and the socket box, the switch valve in the fixed pipe needs to be opened and the cleaning pump body needs to be started. The air outlet end of the fixed pipe is used to inflate the inside of the fixed pipe. As the gas continuously enters, the pressure inside the fixed pipe will gradually increase. The gas will push the connecting rod, causing its top end to pull the spring downward. At the same time, its bottom end will push the scraper, causing the scraper to move downward in the socket box, thereby pushing away the foreign objects and mud adhering to the inner wall of the socket box. This not only prevents the accumulation of foreign objects and mud in the socket box, but also prevents the adsorption holes from being blocked by foreign objects and mud, thus achieving self-cleaning inside the socket box. Attached Figure Description

[0018] The invention will now be further described with reference to the accompanying drawings.

[0019] Figure 1 This is a perspective view of the present invention; Figure 2 This is a schematic diagram showing the disassembled parts of the present invention; Figure 3 This is the present invention. Figure 2 Enlarged view of point A in the image; Figure 4 This is the present invention. Figure 2 Enlarged view of point B in the image; Figure 5 This is the present invention. Figure 2 Enlarged view of point C in the image; Figure 6 This is a schematic diagram of the interior of the protective cover in this invention; Figure 7 This is a schematic diagram of the rotating ring in this invention; Figure 8 This is a schematic diagram of the socket box inverted in this invention; Figure 9 This is a schematic diagram of the scraper in this invention; Figure 10 This is a schematic diagram of the method flow in this invention.

[0020] In the diagram: 1. Drill rod; 2. Drill bit; 3. Protective cover; 4. Socket box; 5. Disassembly hole; 6. Insertion hole; 7. Cleaning pump body; 8. Air outlet; 9. Docking hole; 10. Air blowing hole; 11. Round cover; 12. Dust outlet; 13. Telescopic block; 14. Mounting hole; 15. Limiting groove; 16. Magnetic coating; 17. Metal ring; 18. Discharge port; 19. Installation indicator light; 20. Protective block; 21. Reinforcing block; 22. Vertical groove; 23. Rotating groove; 24. Electric roller; 25. Rotating ring; 26. Push block; 27. Sealing ring; 28. Scraper; 29. ​​Fixing pipe; 30. Connecting rod; 31. Scraper; 32. Telescopic hole; 33. Spring. Detailed Implementation

[0021] To make the technical means, creative features, objectives and effects of this invention easier to understand, the invention will be further described below in conjunction with specific embodiments.

[0022] Example 1: As Figure 1 , Figure 2 , Figure 4 , Figure 6 and Figure 7 As shown in the embodiment of the present invention, a deep hole pre-splitting drilling device for slopes includes a drill rod 1, a drill bit 2 fixedly connected to the side end of the drill rod 1, and the same protective cover 3 is sleeved on the outer side of both the drill rod 1 and the drill bit 2. There are gaps between the inner wall of the protective cover 3 and the outer side of both the drill rod 1 and the drill bit 2, and a dust outlet 12 is opened at the bottom of the protective cover 3. The protective cover 3 is fitted with a socket box 4 on the outside. The top of the socket box 4 is provided with a disassembly hole 5. The bottom wall of the disassembly hole 5 is provided with a plug hole 6. The cleaning pump body 7 and the cleaning controller are movably inserted into the plug hole 6. The cleaning pump body 7 is easy and time-saving to install and is easy for personnel to remove from the socket box 4 for maintenance. The inner wall of the socket box 4 is provided with an air outlet 8, and the outer side of the protective cover 3 is provided with a docking hole 9 that communicates with the air outlet 8. An air intake controller and an air intake valve are provided in the docking hole 9. The inner wall of the protective cover 3 is provided with an air blowing hole 10 to blow away foreign objects. The inside of the disassembly hole 5 is detachably connected to a round cover 11 for protecting the cleaning pump body 7. After the cleaning pump body 7 is inserted into the insertion hole 6, the round cover 11 needs to be threaded into the disassembly hole 5. The round cover 11 can not only protect the cleaning pump body 7 from dust and external forces, but also hold the cleaning pump body 7 tightly to prevent it from moving in the insertion hole 6. One end of the protective cover 3 is inserted into the inside of the socket box 4, and the bottom of the socket box 4 is provided with a discharge port 18. The inner wall of the socket box 4 is provided with an adsorption hole near the discharge port 18.

[0023] In the existing technology, in the existing deep hole pre-splitting drilling device for slopes, the gap between the drill rod 1 and the protective cover 3 is prone to the intrusion of crushed stone mud. After its accumulation, it aggravates the swing of the drill rod 1, causing uneven wear of the rod body and guide sleeve, inducing the drill to get stuck. In addition, the repeated scraping of hard rock cuttings shortens the life of the drill bit. At the same time, the accumulated material blocks the slag discharge channel, forcing the equipment to stop for clearing obstacles and reducing the hole formation efficiency. The present invention is used in the following steps: Step 1: Use the flange to install and fix one end of the protective cover 3 on the frame of the drilling equipment, and use the protective cover 3 to protect both the drill bit 2 and the drill rod 1; Step 2: Before the mud and foreign objects enter the space between the outside of the drill rod 1 and drill bit 2 and the inner wall of the protective cover 3, the cleaning pump body 7 needs to be started so that its air outlet end can be filled with air into the air outlet 8 and the docking hole 9. Then the gas will be sprayed out from the air blowing hole 10 and move inside the protective cover 3. Driven by the gas, the flow speed of the mud and foreign objects in the protective cover 3 can be accelerated, thereby quickly moving the foreign objects and mud from the protective cover 3 into the socket box 4. Finally, it is discharged from the discharge port 18 at the bottom of the socket box 4. The mud and foreign objects discharged through the socket box 4 can prevent the foreign objects and mud fibers from splashing to the surroundings from the discharge port. Step 3: Start the cleaning pump body 7, so that it generates suction force on the inside of both the socket box 4 and the dust outlet 12 through the suction hole, so that foreign objects and mud can be quickly sucked out from the dust outlet 12, thereby increasing the speed at which foreign objects and mud are discharged from the protective cover 3.

[0024] In summary, this invention effectively solves the problem of gravel slurry intrusion into the drill pipe 1 gap through the synergistic design of the protective cover 3 and the socket box 4. During construction, the protective cover 3 is first fixed to the drilling equipment frame via a flange to form a closed protective space. After the cleaning pump 7 is started, gas is ejected from the air blowing hole 10 through the air outlet 8 and the docking hole 9, forming a directional airflow inside the protective cover 3, accelerating the flow of mud and foreign matter towards the socket box 4, and finally discharging from the bottom discharge port 18. At the same time, the cleaning pump 7 generates negative pressure through the adsorption hole, enhancing the suction of the dust outlet 12, forming a dual slag removal mechanism of "blowing + negative pressure adsorption". This invention can avoid drill rod 1 swing and guide sleeve wear caused by the accumulation of gravel, significantly reducing the risk of stuck drill; continuous airflow purging and negative pressure suction prevent the slag discharge channel from being blocked, reducing the frequency of downtime for cleaning and improving drilling efficiency; the modular socket box 4 and detachable round cover 11 design make the cleaning pump body 7 easy to disassemble and repair, taking into account both protection performance and maintenance convenience, effectively extending the service life of the drill bit, and ensuring the efficient and stable operation of deep hole pre-splitting drilling on slopes.

[0025] like Figure 3 and Figure 4 As shown, the inner wall of the socket box 4 is provided with a plurality of symmetrically distributed telescopic holes 32, and a telescopic block 13 is movably inserted into the inside of the telescopic hole 32. The inner wall of the telescopic hole 32 is provided with an installation hole 14 communicating with the insertion hole 6. The outer side of the protective cover 3 is provided with a limiting groove 15 that is adapted to the telescopic block 13. After the socket 4 is fitted onto the outside of the protective cover 3, the cleaning pump 7 is started, and its outlet end is filled with air into the mounting hole 14. Then the gas will enter the telescopic hole 32 from the mounting hole 14. At the same time, the gas will push the telescopic block 13, so that one side of it moves out of the telescopic hole 32 and inserts into the limiting groove 15. The telescopic block 13 is used to limit the socket 4, so that it is installed and fixed on the protective cover 3 and prevented from moving on the protective cover 3.

[0026] like Figure 3 As shown, the inner wall of the telescopic hole 32 is coated with a magnetic coating 16, and the side of the telescopic block 13 is provided with an annular groove. A metal ring 17 is fixedly connected inside the annular groove, and the metal ring 17 is magnetically connected to the magnetic coating 16. In the initial state, the side of the telescopic block 13 abuts against the inner wall of the telescopic hole 32. At this time, the magnetic coating 16 and the metal ring 17 are magnetically connected together. After air is injected into the telescopic hole 32 through the mounting hole 14, the telescopic block 13 will cause the metal ring 17 to separate from the magnetic coating 16. When the air between the telescopic block 13 and the telescopic hole 32 is removed, the telescopic block 13 will be completely moved back into the telescopic hole 32 under the magnetic attraction of the metal ring 17 and the magnetic coating 16. Therefore, the use of the metal ring 17 and the magnetic coating 16 can not only improve the stability of the telescopic block 13 in the telescopic hole 32, but also facilitate the telescopic block 13 to be reset and moved back into the telescopic hole 32.

[0027] like Figure 5 As shown, an installation indicator light 19 and an indicator controller are fixedly connected to the side of the socket box 4. An installation sensor is provided in the limiting groove 15. A side groove is opened on the outer side of the socket box 4. A protective block 20 is detachably connected inside the side groove. The protective block 20 can protect the installation indicator light 19. The protective block 20 is made of transparent material. Under the action of gas thrust, when the installation sensor detects that one side of the telescopic block 13 has successfully entered the limiting groove 15, the installation indicator light 19 will light up to remind the personnel that the installation is successful. Otherwise, there is a problem and the personnel need to check and determine the reason for the installation failure.

[0028] like Figure 2 As shown, a pair of symmetrically distributed reinforcing blocks 21 are fixedly connected to the outer side of the cleaning pump body 7. A vertical groove 22 adapted to the reinforcing block 21 is opened on the inner wall of the insertion hole 6. The top of the reinforcing block 21 is flush with the inner bottom wall of the insertion hole 6. After the cleaning pump body 7 is inserted into the insertion hole 6, the reinforcing block 21 will enter the vertical groove 22. The reinforcing block 21 can limit the cleaning pump body 7 and prevent it from rotating in the insertion hole 6.

[0029] like Figure 6 and Figure 7 As shown, a rotating groove 23 is provided on the inner wall of the protective cover 3. A rotating ring 25 is movably connected to the inside of the rotating groove 23 through an electric roller 24. A push block 26 is fixedly connected to the inner wall of the rotating ring 25. There is a gap between the push block 26 and the outer side of the drill bit 2. During the process of mud and foreign matter entering the protective cover 3 and being discharged from the protective cover 3, the electric roller 24 needs to be activated to drive the rotating ring 25 to rotate in the rotating groove 23, thereby causing the push block 26 to rotate between the drill bit 2 and the protective cover 3. The push block 26 is used to clear the mud and foreign matter accumulated between the drill bit 2 and the protective cover 3, preventing the mud and foreign matter from blocking the inlet on the protective cover 3, thus facilitating the smooth entry of mud and foreign matter into the protective cover 3 and being discharged from the protective cover 3.

[0030] like Figure 7 As shown, a sealing ring 27 is fixedly connected to the outer side of the rotating ring 25, and the outer side of the sealing ring 27 abuts against the inner wall of the rotating groove 23. The sealing ring 27 can improve the sealing between the rotating ring 25 and the rotating groove 23, preventing mud and foreign objects from entering the rotating groove 23 and hindering the rotation of the electric roller 24 and the rotating ring 25.

[0031] like Figure 6 As shown, a scraper 28 is fixedly connected to the side of the pusher 26, and the side of the scraper 28 abuts against the surface of the air blowing hole 10. When the rotating ring 25 drives the push block 26 to rotate, the push block 26 will drive the scraper 28 to rotate on the surface of the air hole 10. The scraper 28 is used to scrape away foreign objects and mud attached to the surface of the air hole 10, ensuring that the gas can be smoothly removed from the air hole 10.

[0032] Example 2: Figure 8 and Figure 9 As shown in the comparative embodiment one, another embodiment of the present invention is as follows: a fixed tube 29 is fixedly connected to the inner top wall of the socket box 4, a connecting rod 30 is movably inserted inside the fixed tube 29, a scraper 31 is fixedly connected to the end of the connecting rod 30 away from the fixed tube 29, the scraper 31 is located above the dust outlet 12, and the outer side of the scraper 31 abuts against the inner wall of the socket box 4, the top end of the fixed tube 29 communicates with the insertion hole 6, a switch valve and a switch controller are provided inside the fixed tube 29, and a spring 33 is fixedly connected between the fixed tube 29 and the connecting rod 30.

[0033] When using this invention, after the mud and foreign objects are discharged from both the protective cover 3 and the socket box 4, the switch valve in the fixed pipe 29 needs to be opened and the cleaning pump 7 needs to be started. The air outlet of the fixed pipe 29 is filled with air from the top of the fixed pipe 29. As the gas continuously enters, the pressure in the fixed pipe 29 will gradually increase. The gas will push the connecting rod 30, causing its top end to pull the spring 33 downward. At the same time, its bottom end will push the scraper 31, causing the scraper 31 to move downward in the socket box 4. This will push away the foreign objects and mud adhering to the inner wall of the socket box 4. This not only prevents the accumulation of foreign objects and mud in the socket box 4, but also prevents the adsorption holes from being blocked by foreign objects and mud, thus achieving self-cleaning of the socket box 4.

[0034] like Figure 10 As shown, a method for deep hole pre-splitting drilling construction of slopes is described above. The method uses the aforementioned deep hole pre-splitting drilling construction device for slopes and includes the following steps. S1: Install the protective cover 3 on the outside of the drill rod 1 and the drill bit 2, and then fix one end of the protective cover 3 to the frame; S2: After the mud enters the protective cover 3, the cleaning pump 7 is started, so that the gas is blown from the air blowing hole 10 towards the mud and foreign objects, and the mud and foreign objects are removed from the protective cover 3 through the dust outlet 12. At the same time, the protective cover 3 adsorbs the dust outlet 12 under negative pressure, which speeds up the removal of foreign objects and mud from the protective cover 3. S3: Inflate the fixed tube 29 with air, so that the connecting rod 30 pushes the scraper 31 down to remove the mud and foreign matter attached to the inner wall of the socket box 4.

[0035] It should be further noted that: Protective cover 3 and socket box 4 can be welded / cast from Q235, 16Mn, 304 stainless steel or wear-resistant steel; the inner wall of protective cover 3 can be overlaid with a wear-resistant layer or inlaid with wear-resistant ceramic plates. Drill rod 1 can be made of 40Cr, 42CrMo or geological drill rod steel, and drill bit 2 can be made of cemented carbide or diamond composite plates. Round cover 11 and protective block 20 can be made of PC board, acrylic board, or transparent ABS; protective block 20 can be detachably fixed to the side groove by countersunk screws, clips, or sliding grooves. Sealing ring 27 can be made of nitrile rubber (NBR), fluororubber (FKM), or polyurethane, conforming to the O-ring or rectangular ring specifications of GB / T 3452.1. Spring 33 can be made of 65Mn or 60Si2Mn, with a blackened or galvanized surface. Bolts and screws can be GB / T 5782 hex bolts or GB / T 819 cross-head screws, with specifications M6-M12; bearings and rollers can be GB / T 276 deep groove ball bearings or standard miniature geared motor output shafts.

[0036] The fitting of the protective cover 3 and the socket 4 can be designed as a clearance fit, with a single-sided clearance of 0.1-0.5mm. If it is necessary to prevent mud leakage, the aforementioned sealing ring 27 or labyrinth groove can be installed between the inner wall of the socket 4 and the outer wall of the protective cover 3. The single-sided clearance between the inner wall of the protective cover 3 and the outer side of the drill rod 1 and drill bit 2 can be determined according to 1.5-3 times the maximum rock cutting particle size. For pre-splitting holes with a diameter of 76-110mm, the single-sided clearance can preferably be 3-10mm, and further preferably 4-8mm. The clearance is determined by first measuring the maximum rock cutting particle size dmax in the construction area, and taking a single-sided clearance δ≥1.5dmax, while δ is less than the allowable deflection of the guide sleeve, so as to ensure smooth slag discharge and limit the swing of the drill rod.

[0037] The area of ​​dust outlet 12 can be determined by the following formula: A_dust ≥ 1.2A_ring, where A_ring is the cross-sectional area of ​​the annular gap between the protective cover 3 and the drill rod 1 / drill bit 2; the area of ​​material outlet 18 can be determined by the following formula: A_material ≥ 1.5A_dust, to avoid material accumulation in the socket 4. The diameter and number of air blowing holes 10 can be determined by Q = n·A·v, where Q is the air flow rate of the cleaning pump body 7, n is the number of air blowing holes, A is the cross-sectional area of ​​a single hole, and v is the air blowing speed; v can be taken as 20-60 m / s, the diameter of air blowing holes 10 can be taken as 1.5-4 mm, the number can be taken as 6-16, evenly distributed along the circumference of the protective cover 3, with the axial angle between the axial direction and the slag discharge direction as 15-45°. The diameter of the adsorption holes can be taken as 3-8 mm, the number can be 4-12, and they are arranged close to the material outlet 18; the negative pressure can be determined by ΔP ≥ ρgh + friction resistance, and can actually be taken as -10 to -60 kPa.

[0038] The cleaning pump body 7 can be implemented in several ways, including but not limited to: a dual-head vortex air pump, with one end as the outlet and the other as the suction end. The outlet end connects to the outlet port 8 via the insertion hole 6, and the suction end connects to the adsorption hole via a pipeline; or a single-head air pump with a Venturi negative pressure generator. The air pump output is divided into two paths: one path goes through the outlet port 8 and the docking hole 9 to the blowing hole 10, and the other path connects to the Venturi tube to generate negative pressure and connect to the adsorption hole. The flow rate of the cleaning pump body 7 can be selected from 30-200 L / min, the outlet pressure can be selected from 0.02-0.08 MPa, and the vacuum degree can be selected from -20 to -60 kPa, depending on the volume of the protective cover 3, the slag discharge rate, and the hole depth.

[0039] The cleaning controller's input interfaces include DC24V digital input, 4-20mA input, or RS485 Modbus input, and its output interfaces include relay output, PWM output, and RS485 output. The cleaning controller communicates with the cleaning pump body 7 via relays, contactors, or RS485 to control its start / stop, speed, and forward / reverse rotation. The reinforcing block 21 on the outside of the cleaning pump body 7 prevents it from rotating within the insertion hole 6. The reinforcing block 21 and the vertical groove 22 are fitted with an H8 / f7 clearance. The top of the reinforcing block 21 is flush with the bottom wall of the insertion hole 6. The circular cover 11 is threaded into the disassembly hole 5 and then abuts against the upper end of the cleaning pump body 7.

[0040] The air intake controller and air intake valve are located within the docking hole 9. The air intake controller can be a PLC output module, a microcontroller I / O port, or a pressure switch controller. The air intake valve can be a DC24V two-position two-way solenoid valve, or a pneumatic control valve with a pilot solenoid valve. The inlet of the air intake valve is connected to the outlet of the cleaning pump body 7, and the outlet is connected to the docking hole 9 and the blowing hole 10. The air intake controller adjusts its opening according to the cleaning controller command or the pressure sensor signal to achieve continuous or pulse blowing. The blowing hole 10 can be configured as multiple rows of small holes evenly distributed along the circumference of the inner wall of the protective cover 3, with the hole axis facing the dust outlet 12, so as to form a directional airflow within the protective cover 3.

[0041] The adsorption holes are located near the discharge port 18 and can be connected to the suction end of the cleaning pump body 7 via pipes inside the inner wall of the socket 4. A filter screen, sludge collection trough, or one-way valve can be installed on the pipes to prevent sludge from entering the pump body. Negative pressure adsorption and blowing through the air holes 10 can be performed simultaneously or alternately; when performed simultaneously, a dual sludge discharge of "blowing + negative pressure suction" is formed; when performed alternately, the sludge can be loosened first and then suctioned. The negative pressure value can be detected by a pressure sensor, and the cleaning controller adjusts the pump speed or valve opening based on the pressure difference at the dust outlet 12.

[0042] The telescopic block 13 can be cylindrical, rectangular, or wedge-shaped, and the material can be 45 steel, stainless steel, or engineering plastic. It has a chamfered or conical front end and a circular groove at the rear end. The telescopic hole 32 can be round or square, with a magnetic coating 16 applied to its inner wall. The magnetic coating 16 can be neodymium iron boron magnetic powder coating, ferrite magnetic powder coating, or magnetic rubber coating. The metal ring 17 can be made of 45 steel, silicon steel, or low-carbon steel and is embedded in the circular groove on the side of the telescopic block 13. The telescopic block 13 and the telescopic hole 32 are fitted with an H8 / f7 or H9 / f8 clearance fit. The width of the limiting groove 15 is 0.1-0.3 mm larger than the front end of the telescopic block 13.

[0043] Initially, the metal ring 17 and the magnetic coating 16 are magnetically attracted, with the magnetic force designed to be 5-50N. When the cleaning pump body 7 is inflated into the telescopic hole 32 through the mounting hole 14, the gas thrust must be greater than the sum of the magnetic force and the frictional force of the telescopic block 13, which can be determined by F_gas = P·S, where P is the inflation pressure and S is the effective area of ​​the end face of the telescopic block 13. After deflating, the magnetic force causes the telescopic block 13 to fully re-enter the telescopic hole 32. The mounting hole 14 communicates with the insertion hole 6, and the air outlet of the cleaning pump body 7 in the insertion hole 6 can supply air to the mounting hole 14 through a three-way valve or a solenoid valve.

[0044] The sensor can be installed within the limit slot 15: an inductive proximity switch, such as a PNP normally open DC24V three-wire switch conforming to the relevant requirements of GB / T 14048.10; a pressure switch or a reed switch. The sensor outputs a switching signal to the indicator controller, which can be a PLC input module or a microcontroller I / O port. When the telescopic block 13 is detected to be in the limit slot 15, the indicator controller controls the installation indicator light 19 to illuminate. The installation indicator light 19 can be a DC24V LED indicator. The protective block 20 is made of transparent PC or acrylic and is fixed to the side slot with screws, providing both light transmission and dust protection.

[0045] The rotating ring 25 can be made of 45 steel, stainless steel, or wear-resistant engineering plastic. The rotating groove 23 can be a rectangular cross-section annular groove. The single-sided gap between the rotating ring 25 and the rotating groove 23 is 0.1-0.5mm. The electric roller 24 has two configurations: 1) A rubber friction wheel is mounted on the output shaft of a DC24V planetary geared motor. The outer edge of the friction wheel abuts against the end face or inner wall of the rotating ring 25, driving the rotating ring 25 to rotate through friction; 2) The electric roller 24 is a gear, with an internal or external gear ring on the outer side of the rotating ring 25, driven by gear meshing. There can be 2-4 electric rollers 24, evenly distributed circumferentially, with a rotational speed of 5-30 r / min and a torque of 0.5-5 N·m, controlled by a cleaning controller via PWM or a relay. There can be one or more push blocks 26, welded or screwed to the inner wall of the rotating ring 25. The gap between the push block 26 and the outer side of the drill bit 2 can be set to 2-10mm, ensuring it does not interfere with the rotation of the drill bit. The sealing ring 27 can be made of NBR or FKM with a compression ratio of 15-25%, and its outer side abuts against the inner wall of the rotating groove 23. The scraper 28 can be made of polyurethane, hard alloy or wear-resistant rubber, and is fixed to the side of the pusher 26 by screws, maintaining a 0-2mm preload or interference fit with the surface of the air hole 10 to scrape off the attached material.

[0046] The fixed tube 29 can be a round or square tube, made of stainless steel or carbon steel, with an inner diameter of 6-20mm; the connecting rod 30 has an outer diameter of 4-16mm and is fitted with the fixed tube 29 with a clearance fit or a guide sleeve. The scraper 31 can be annular, semi-annular, or rectangular, made of polyurethane, wear-resistant rubber, or hard alloy, with its outer side abutting against the inner wall of the socket box 4, with an interference fit of 0-2mm; the scraper 31 is located above the dust outlet 12, and its stroke can be 10-50mm. The spring 33 has a stiffness of 0.5-5N / mm, and the preload is determined according to the weight of the scraper 31 and the mud resistance. The top of the fixed tube 29 communicates with the insertion hole 6, and its internal switching valve has two options: one is a DC24V two-position two-way solenoid valve; the other is a pneumatic valve with a pilot valve. The switching controller can use PLC output or microcontroller I / O to communicate with the cleaning controller. After the switch valve is opened, the air outlet of the cleaning pump body 7 is inflated into the fixed pipe 29 through the plug hole 6, and the connecting rod 30 pushes the scraper 31 down and compresses the spring 33; after the switch valve is closed, the spring 33 resets the scraper 31.

[0047] In S1, the protective cover 3 can be fixed to the frame via flanges, clamps, or bolts. The flange specifications are selected according to the frame interface, such as GB / T 9119 plate flat welding flange. In S2, after the cleaning pump body 7 is started, air is blown into the protective cover 3 through the air outlet 8, docking hole 9, and blowing hole 10. The suction end generates negative pressure in the dust outlet 12 and the socket box 4 through the suction hole. The blowing flow rate, negative pressure value, and purging time can be set according to the hole depth and the amount of cuttings, for example, purging can be started once every 0.5-2m of drilling, or purging can be continuous. In S3, the air pressure in the fixed pipe 29 can be 0.05-0.2MPa, the air filling time is 1-10s, and the scraper 31 can move down 1-5 times per slag discharge or 1-10 times per shift. The above parameters can be set by the cleaning controller and adjusted according to the pressure difference of the dust outlet 12, the slag discharge time, and the current load feedback.

[0048] The terms "front," "back," "left," "right," "top," and "bottom" all refer to the figures in the accompanying drawings. Figure 1 Based on the perspective of the observer, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.

[0049] In the description of this invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limiting the scope of protection of this invention.

[0050] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of the present invention is defined by the appended claims and their equivalents.

Claims

1. A device for deep hole pre-splitting drilling on slopes, characterized in that: Includes a drill rod (1), with a drill bit (2) fixedly connected to the side end of the drill rod (1). The same protective cover (3) is fitted on the outer side of both the drill rod (1) and the drill bit (2). There is a gap between the inner wall of the protective cover (3) and the outer side of both the drill rod (1) and the drill bit (2). A dust outlet (12) is opened at the bottom of the protective cover (3). The protective cover (3) is fitted with a socket box (4) on the outside. The top of the socket box (4) is provided with a disassembly hole (5). The bottom wall of the disassembly hole (5) is provided with a plug hole (6). The cleaning pump body (7) and the cleaning controller are movably inserted into the plug hole (6). An air outlet (8) is provided on the inner wall of the socket box (4), and a docking hole (9) communicating with the air outlet (8) is provided on the outer side of the protective cover (3). An air intake controller and an air intake valve are provided in the docking hole (9). The inner wall of the protective cover (3) is provided with an air blowing hole (10) to blow away foreign objects. The inside of the disassembly hole (5) is detachably connected to a round cover (11) for protecting the cleaning pump body (7). One end of the protective cover (3) is inserted into the inside of the socket box (4), and the bottom of the socket box (4) is provided with a discharge port (18). The inner wall of the socket box (4) is provided with an adsorption hole near the discharge port (18).

2. The slope deep hole pre-splitting drilling construction device according to claim 1, characterized in that: The inner wall of the socket box (4) is provided with several symmetrically distributed telescopic holes (32), and a telescopic block (13) is movably inserted into the telescopic hole (32). The inner wall of the telescopic hole (32) is provided with an installation hole (14) that communicates with the insertion hole (6). The outer side of the protective cover (3) is provided with a limiting groove (15) that matches the telescopic block (13).

3. The slope deep hole pre-splitting drilling construction device according to claim 2, characterized in that: The inner wall of the telescopic hole (32) is coated with a magnetic coating (16), and the side of the telescopic block (13) is provided with an annular groove. A metal ring (17) is fixedly connected inside the annular groove, and the metal ring (17) is magnetically connected to the magnetic coating (16).

4. The slope deep hole pre-splitting drilling construction device according to claim 1, characterized in that: The socket box (4) is fixedly connected to an indicator light (19) and an indicator controller. A side groove is provided on the outer side of the socket box (4), and a protective block (20) is detachably connected inside the side groove.

5. The slope deep hole pre-splitting drilling construction device according to claim 1, characterized in that: A pair of symmetrically distributed reinforcing blocks (21) are fixedly connected to the outside of the cleaning pump body (7). A vertical groove (22) adapted to the reinforcing block (21) is opened on the inner wall of the insertion hole (6). The top of the reinforcing block (21) is flush with the inner bottom wall of the insertion hole (6).

6. The slope deep hole pre-splitting drilling construction device according to claim 1, characterized in that: The inner wall of the protective cover (3) is provided with a rotating groove (23). The rotating groove (23) is movably connected to a rotating ring (25) via an electric roller (24). A push block (26) is fixedly connected to the inner wall of the rotating ring (25). There is a gap between the push block (26) and the outer side of the drill bit (2).

7. The slope deep hole pre-splitting drilling device according to claim 6, characterized in that: A sealing ring (27) is fixedly connected to the outer side of the rotating ring (25), and the outer side of the sealing ring (27) abuts against the inner wall of the rotating groove (23).

8. The slope deep hole pre-splitting drilling construction device according to claim 6, characterized in that: A scraper (28) is fixedly connected to the side of the pusher (26), and the side of the scraper (28) abuts against the surface of the air blowing hole (10).

9. The slope deep hole pre-splitting drilling device according to claim 1, characterized in that: A fixed tube (29) is fixedly connected to the inner top wall of the socket box (4). A connecting rod (30) is movably inserted inside the fixed tube (29). A scraper (31) is fixedly connected to the end of the connecting rod (30) away from the fixed tube (29). The scraper (31) is located above the dust outlet (12), and the outer side of the scraper (31) abuts against the inner wall of the socket box (4). The top end of the fixed tube (29) communicates with the insertion hole (6). A switch valve and a switch controller are provided inside the fixed tube (29). A spring (33) is fixedly connected between the fixed tube (29) and the connecting rod (30).

10. A method for deep-hole pre-splitting drilling construction on slopes, the method employing the deep-hole pre-splitting drilling construction device according to any one of claims 1-9, characterized in that: Includes the following steps; S1: Install the protective cover (3) on the outside of the drill rod (1) and the drill bit (2), and then fix one end of the protective cover (3) on the frame; S2: After the mud enters the protective cover (3), start the cleaning pump (7) to blow gas from the air blowing hole (10) towards the mud and foreign objects, so that the mud and foreign objects are removed from the protective cover (3) through the dust outlet (12). At the same time, the protective cover (3) adsorbs the dust outlet (12) under negative pressure, which speeds up the removal of foreign objects and mud from the protective cover (3). S3: Inflate the fixed tube (29) with air, so that the connecting rod (30) pushes the scraper (31) down to remove the mud and foreign matter attached to the inner wall of the socket (4).