Methods, devices, computer equipment, and readable storage media for processing hydroelectric parameters of pumped storage power stations

By dynamically adjusting the Kalman filter noise parameters and incorporating historical trends for constraint correction in pumped storage power stations, the problem of inaccurate hydropower parameter estimation in existing technologies is solved, and more accurate adaptive optimization of hydropower parameters is achieved.

CN123116146APending Publication Date: 2026-11-17ENERGY STORAGE RES INST OF CHINA SOUTHERN POWER GRID PEAK-FREQUENCY MODULATION POWER GENERATION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611304191.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-26
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing Kalman filtering methods in pumped storage power plants cannot adapt to dynamic changes under different operating conditions due to fixed noise parameter settings, resulting in lag and inaccuracy in hydropower parameter estimation results, especially in scenarios with continuous disturbances or rapid changes.

Method used

By acquiring unit operating status parameters and historical hydropower parameter sequences, the noise parameters in the Kalman filtering process are dynamically adjusted, and constraints are corrected by combining historical change trends, thereby achieving adaptive optimization of hydropower parameters.

Benefits of technology

This improves the accuracy of hydropower parameter estimation, making it more consistent with the dynamic operation changes of pumped storage power stations, and enhances the accuracy of unit control and efficiency calculation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123116146A_ABST
    Figure CN123116146A_ABST
Patent Text Reader

Abstract

This application relates to a method, apparatus, computer equipment, and readable storage medium for processing hydroelectric parameters of a pumped storage power station. The method includes: acquiring the unit operating status parameters of the pumped storage power station at a target time, the hydroelectric parameters to be processed, and a sequence of historical hydroelectric parameters prior to the target time; determining a target process noise parameter based on the unit operating status parameters, and determining a target measurement noise parameter based on the fluctuation of the historical hydroelectric parameter sequence; performing Kalman filtering on the hydroelectric parameters to be processed based on the target process noise parameter and the target measurement noise parameter to obtain intermediate hydroelectric parameters; and performing constraint correction processing on the intermediate hydroelectric parameters based on the predicted hydroelectric parameters of the pumped storage power station at the target time to obtain the target hydroelectric parameters of the pumped storage power station at the target time. This method enables adaptive optimization of hydroelectric parameters.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of data processing technology, and in particular to a method, apparatus, computer equipment, and readable storage medium for processing hydroelectric parameters of a pumped storage power station. Background Technology

[0002] Pumped storage power stations undertake peak shaving, frequency regulation, and renewable energy consumption tasks for the power system. Accurate acquisition of their operating parameters is crucial for unit control, efficiency calculation, and optimized operation. Head / lift, as an important parameter reflecting water energy conversion capacity, directly affects unit output calculation and automatic control strategies.

[0003] In actual operation, the head / lift is usually calculated from the water level difference between the upper and lower reservoirs. However, due to water surface fluctuations, electromagnetic interference, sensor errors, and communication noise, the head / lift signal exhibits random fluctuations and anomalous jumps. Therefore, there is an urgent need for a method for processing hydroelectric parameters in pumped storage power stations that can achieve adaptive optimization of hydroelectric parameters. Summary of the Invention

[0004] Therefore, it is necessary to provide a method, apparatus, computer equipment, and readable storage medium for processing hydropower parameters in pumped storage power stations that can achieve adaptive optimization of hydropower parameters, in order to address the above-mentioned technical problems.

[0005] In a first aspect, this application provides a method for processing hydroelectric parameters of a pumped storage power station, including:

[0006] The unit operating status parameters, hydropower parameters to be processed, and historical hydropower parameter sequences prior to the target time of the pumped storage power station are obtained. The hydropower parameters to be processed are determined based on the water levels of the upper and lower reservoirs of the pumped storage power station.

[0007] Based on the unit operating status parameters, the target process noise parameters are determined, and based on the fluctuation of the historical hydropower parameter sequence, the target measurement noise parameters are determined.

[0008] Based on the target process noise parameters and the target measurement noise parameters, the hydropower parameters to be processed are subjected to Kalman filtering to obtain intermediate hydropower parameters.

[0009] Based on the changing trend of the historical hydropower parameter sequence, the predicted hydropower parameters of the pumped storage power station at the target time are determined;

[0010] Based on the predicted hydropower parameters, the intermediate hydropower parameters are constrained and corrected to obtain the target hydropower parameters of the pumped storage power station at the target time.

[0011] In one embodiment, determining the target process noise parameter based on the unit operating status parameters includes:

[0012] Calculate the rate of change of the hydroelectric parameters of the pumped storage power station at the target time;

[0013] The operating status type of the pumped storage power station is determined based on the unit operating status parameters, the rate of change of the hydropower parameters, and the preset status identification model.

[0014] Based on the operating state type and the first preset configuration strategy, a target process noise parameter is determined. The operating state type includes a steady-state operating state and an unsteady-state operating state. The first preset configuration strategy includes that the target process noise parameter corresponding to the steady-state operating state is less than the target process noise parameter corresponding to the unsteady-state operating state.

[0015] In one embodiment, determining the target process noise parameter based on the operating state type and the first preset configuration strategy includes:

[0016] Based on the operating state type, a state adjustment coefficient is determined, wherein the state adjustment coefficient corresponding to the steady-state operating state is greater than the state adjustment coefficient corresponding to the unsteady-state operating state;

[0017] The target process noise parameter is determined based on the rate of change of the hydropower parameters and the state regulation coefficient. The target process noise parameter is positively correlated with the rate of change of the hydropower parameters and negatively correlated with the state regulation coefficient.

[0018] In one embodiment, the operating state type includes at least one of shutdown state, power generation state, phase adjustment state, load regulation state, pumping state, and operating condition switching state. The step of determining the target process noise parameter based on the operating state type and the first preset configuration strategy includes:

[0019] When the operating state type is a shutdown state, the target process noise parameter is determined as the first parameter;

[0020] When the operating state type is power generation state, the target process noise parameter is determined to be the second parameter, and the second parameter is greater than the first parameter;

[0021] When the operating state type is phase modulation state, the target process noise parameter is determined to be the third parameter, and the third parameter is greater than the second parameter;

[0022] When the operating state type is load regulation state, pumping state, or operating condition switching state, the target process noise parameter is determined as the fourth parameter, and the fourth parameter is greater than the third parameter.

[0023] In one embodiment, the step of performing constraint correction processing on the intermediate hydropower parameters based on the predicted hydropower parameters to obtain the target hydropower parameters of the pumped storage power station at the target time includes:

[0024] The target fusion weight is determined based on the operating state type and the second preset configuration strategy, wherein the second preset configuration strategy includes that the target fusion weight corresponding to the steady-state operating state is greater than the target fusion weight corresponding to the non-steady-state operating state.

[0025] Based on the target fusion weight, the predicted hydropower parameters and the intermediate hydropower parameters are weighted and fused to obtain the target hydropower parameters of the pumped storage power station at the target time.

[0026] In one embodiment, determining the target measurement noise parameter based on the fluctuation level of the historical hydropower parameter sequence includes:

[0027] Calculate the fluctuation index of the historical hydropower parameter sequence;

[0028] Based on the fluctuation level index, a target measurement noise parameter is determined, and the target measurement noise parameter is positively correlated with the fluctuation level index.

[0029] In one embodiment, determining the predicted hydropower parameters of the pumped storage power station at the target time based on the changing trend of the historical hydropower parameter sequence includes:

[0030] Determine the hydropower parameters of multiple consecutive historical moments within a sliding window ending at the target moment from the historical hydropower parameter sequence;

[0031] Calculate the average rate of change of hydropower parameters at adjacent times among the multiple consecutive historical times to obtain the historical trend of the hydropower parameter sequence;

[0032] Based on the hydropower parameters of the previous time adjacent to the target time in the historical hydropower parameter sequence and the historical trend, the predicted hydropower parameters of the pumped storage power station at the target time are determined.

[0033] Secondly, this application also provides a hydroelectric parameter processing device for a pumped storage power station, comprising:

[0034] The acquisition module is used to acquire the unit operating status parameters, hydropower parameters to be processed, and historical hydropower parameter sequences before the target time of the pumped storage power station at the target time. The hydropower parameters to be processed are determined based on the water levels of the upper and lower reservoirs of the pumped storage power station.

[0035] The parameter determination module is used to determine the target process noise parameter based on the unit operating status parameters, and to determine the target measurement noise parameter based on the fluctuation of the historical hydropower parameter sequence.

[0036] The filtering module is used to perform Kalman filtering on the hydropower parameters to be processed based on the target process noise parameters and the target measurement noise parameters to obtain intermediate hydropower parameters.

[0037] The prediction module is used to determine the predicted hydropower parameters of the pumped storage power station at the target time based on the changing trend of the historical hydropower parameter sequence.

[0038] The parameter processing module is used to perform constraint correction processing on the intermediate hydropower parameters based on the predicted hydropower parameters to obtain the target hydropower parameters of the pumped storage power station at the target time.

[0039] Thirdly, this application also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps of the method described in any of the above-mentioned embodiments.

[0040] Fourthly, this application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method described in any of the preceding claims.

[0041] Fifthly, this application also provides a computer program product, including a computer program that, when executed by a processor, implements the steps of the method described in any of the above claims.

[0042] The aforementioned method, apparatus, computer equipment, computer-readable storage medium, and computer program product for processing hydroelectric parameters in pumped storage power stations adjust noise parameters during the filtering process based on the operating status and historical hydroelectric parameter changes of the pumped storage power station. This allows the Kalman filter process to configure corresponding state estimation parameters according to different operating states. By fusing current measurement information and state prediction information using Kalman filtering, intermediate hydroelectric parameters are obtained. Furthermore, by constraining and correcting the intermediate hydroelectric parameters by incorporating the changing trends of historical hydroelectric parameter sequences, the target hydroelectric parameters simultaneously include current state estimation information and historical change information. Therefore, adaptive estimation of hydroelectric parameters in pumped storage power stations can be achieved, making the hydroelectric parameter estimation results more consistent with the dynamic changes during the operation of the pumped storage power station. Attached Figure Description

[0043] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments of this application or related technologies will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0044] Figure 1 This is a flowchart illustrating a method for processing hydroelectric parameters in a pumped storage power station, as shown in one embodiment.

[0045] Figure 2 This is a flowchart illustrating the steps of determining target process noise parameters based on the unit's operating status parameters in one embodiment.

[0046] Figure 3 This is a flowchart illustrating the steps of determining a target measurement noise parameter based on the fluctuation level of the historical hydropower parameter sequence in one embodiment.

[0047] Figure 4 This is a structural block diagram of a hydroelectric parameter processing device for a hydro-storage power station in one embodiment.

[0048] Figure 5 This is an internal structural diagram of a computer device in one embodiment. Detailed Implementation

[0049] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.

[0050] It should be noted that the terms "first," "second," etc., used in this application can be used to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish the first element from the second element. The terms "comprising" and "having," and any variations thereof, used in this application, are intended to cover non-exclusive inclusion. The term "multiple" used in this application refers to two or more. The term "and / or" used in this application refers to one of the embodiments, or any combination of multiple embodiments.

[0051] Existing Kalman filtering methods typically rely on fixed process noise and measurement noise parameters for state estimation. However, pumped storage units exhibit varying hydroelectric parameters under different operating conditions, such as shutdown, power generation, pumping, phase regulation, and mode switching. Fixed parameter settings are insufficient to adapt to the dynamic changes under these different operating conditions. Furthermore, existing Kalman filtering methods do not utilize historical head / lift variation information for trend constraints, which may lead to a certain lag in filtering results under continuous disturbances or rapidly changing scenarios.

[0052] Based on this, in one embodiment, such as Figure 1 As shown, a method for processing hydroelectric parameters in a pumped storage power station is provided. This embodiment illustrates the method by applying it to a terminal. It is understood that this method can also be applied to a server, or to a system including both a terminal and a server, and implemented through interaction between the terminal and the server. In this embodiment, the method includes the following steps:

[0053] S110: Obtain the unit operating status parameters, hydropower parameters to be processed, and historical hydropower parameter sequences before the target time of the pumped storage power station. The hydropower parameters to be processed are determined based on the water levels of the upper and lower reservoirs of the pumped storage power station.

[0054] For example, the unit operating status parameters, upper reservoir water level, lower reservoir water level, and hydropower parameters (i.e., historical hydropower parameter sequence) of a pumped storage power station at the current moment can be obtained; the difference between the upper and lower reservoir water levels is calculated to obtain the hydropower parameters to be processed. In one possible implementation, the historical hydropower parameter sequence may also include target hydropower parameters from multiple historical moments before the current moment, i.e., hydropower parameters processed by Kalman filtering and constraint correction. For example, after determining the target hydropower parameters, the system can wait for the next sampling period to arrive and re-acquire the unit operating status parameters, upper reservoir water level, lower reservoir water level, and historical hydropower parameter sequence corresponding to the next target moment. This process can be repeated cyclically to achieve continuous processing of the pumped storage power station's hydropower parameters.

[0055] Among them, hydroelectric parameters are used to characterize the hydroelectric conversion capacity of pumped storage power stations. For example, hydroelectric parameters may include at least one of head and pump head. Unit operating status parameters may include at least one of unit power and unit power change rate.

[0056] In one possible implementation, the gross head / lift can be calculated based on the following formula, the first formula including:

[0057] (1)

[0058] in, Let the head / lift be the gross water head at time k. Let the water level of the upper reservoir be at time k. Let be the water level of the reservoir at time k.

[0059] S120: Determine the target process noise parameters based on the unit's operating status parameters, and determine the target measurement noise parameters based on the fluctuation of historical hydropower parameter sequences.

[0060] The target process noise parameter can be the process noise covariance, used to adjust the weights of the state prediction results during Kalman filtering. The target measurement noise parameter can be the measurement noise covariance, used to adjust the weights of the measurement results during Kalman filtering.

[0061] For example, the operating state type of a pumped storage power station can be determined based on the unit's operating state parameters and historical hydropower parameter sequences. Then, based on the operating state type, a target process noise parameter is determined so that the target process noise parameter matches the hydropower parameter variation characteristics corresponding to the current operating state. The operating state type characterizes the steady-state and non-steady-state (e.g., dynamic) operating states of the pumped storage power station. It should be noted that the same operating condition may include both steady-state and dynamic sub-states; therefore, the target process noise parameter can be dynamically changing. The degree of fluctuation can be determined based on historical variation information in the historical hydropower parameter sequence, and the target measured noise parameter can be determined based on the degree of fluctuation.

[0062] S130: Based on the target process noise parameters and the target measurement noise parameters, the hydropower parameters to be processed are subjected to Kalman filtering to obtain intermediate hydropower parameters.

[0063] Wherein, the target process noise parameter can be the process noise covariance Q, and the target measurement noise parameter can be the measurement noise covariance. .

[0064] For example, a head / lift state-space model can be established including the following formulas (2) to (7):

[0065] (2)

[0066] in, The current state variable is used to characterize the state of the hydroelectric parameters of the pumped storage power station at the current moment. This is the state transition matrix; This is process noise.

[0067] (3)

[0068] in, The head / lift was observed at time k; For measurement matrix; For measuring noise.

[0069] (4)

[0070] in, It is the prediction covariance matrix of the state at time k; It is the covariance matrix of the state at time k-1; It is the state transition matrix, representing the linear relationship of state transitions; It is the covariance matrix of the process noise.

[0071] (5)

[0072] in, It is the Kalman gain, used to correct the predicted estimate of the state; It is a measurement matrix, representing the relationship between measured values ​​and states; for The transpose of the matrix; It is the covariance matrix of the measurement noise, used to describe the uncertainty of the data.

[0073] (6)

[0074] in, This is the updated state estimate; It is a predicted state; It is the Kalman gain; The measured value is at time k. The updated state estimate is the intermediate hydropower parameter obtained after Kalman filtering; the predicted state is the state prediction result obtained based on the state model; and the measured value is the currently acquired hydropower parameter to be processed.

[0075] (7)

[0076] in, The updated state covariance; It is the identity matrix; It is the Kalman gain; It is a measurement matrix.

[0077] It is understandable that the unit's operating status parameters can be used to characterize the dynamic changes in the current operation of a pumped storage power station. Therefore, adjusting the target process noise parameter Q based on the unit's operating status parameters allows for adjustments to the process noise configuration during the filtering process based on the current operating status. Similarly, the degree of fluctuation in historical hydropower parameter sequences can be used to characterize the degree of change in historical hydropower parameters. Therefore, adjusting the target measurement noise parameter based on the degree of fluctuation in historical hydropower parameter sequences allows for adjustments to the measurement noise configuration based on historical measurement changes.

[0078] S140, Based on the changing trends of historical hydropower parameter sequences, determine the predicted hydropower parameters of the pumped storage power station at the target time.

[0079] For example, historical trend information can be determined based on the hydropower parameters corresponding to multiple historical moments in the historical hydropower parameter sequence; and the hydropower parameters corresponding to the target moment can be predicted based on the historical trend information to obtain the predicted hydropower parameters.

[0080] S150, based on the predicted hydropower parameters, the intermediate hydropower parameters are constrained and corrected to obtain the target hydropower parameters of the pumped storage power station at the target time.

[0081] For example, the deviation between intermediate hydropower parameters and trend prediction values ​​can be calculated; when the deviation is greater than a preset threshold, the fusion weight of the intermediate hydropower parameters is reduced and the fusion weight of the trend prediction values ​​is increased; the intermediate hydropower parameters and trend prediction values ​​are weighted and fused according to the adjusted fusion weights to obtain the target hydropower parameters.

[0082] In one possible implementation, trend deviation can be determined based on the following formula. :

[0083] (8)

[0084] Furthermore, the degree of deviation of intermediate hydropower parameters from trend prediction values ​​can be determined based on trend deviation, and the fusion weight of intermediate hydropower parameters and trend prediction values ​​can be adjusted according to the degree of deviation.

[0085] The target hydropower parameters can be determined based on the following formula:

[0086] (9)

[0087] in, For the final output head / lift; These are the state-related fusion weights.

[0088] Optionally, intermediate hydropower parameters can also be constrained and corrected through deviation compensation, amplitude limiting correction, or correction based on preset rules.

[0089] In the aforementioned method for processing hydroelectric parameters in pumped storage power stations, noise parameters in the filtering process are adjusted based on the operating status and historical changes in hydroelectric parameters. This allows the Kalman filter process to configure corresponding state estimation parameters according to different operating states. By fusing current measurement information and state prediction information using Kalman filtering, intermediate hydroelectric parameters are obtained. Finally, by incorporating the changing trends of historical hydroelectric parameter sequences, the intermediate hydroelectric parameters are constrained and corrected, ensuring that the target hydroelectric parameters simultaneously include both current state estimation information and historical change information. Therefore, adaptive estimation of hydroelectric parameters in pumped storage power stations can be achieved, making the estimation results more consistent with the dynamic changes during the operation of the pumped storage power station.

[0090] In one exemplary embodiment, such as Figure 2 As shown, the steps for determining the target process noise parameters based on the unit's operating status parameters include:

[0091] S210, calculate the rate of change of hydroelectric parameters of the pumped storage power station at the target time.

[0092] For example, the rate of change of hydropower parameters can be calculated based on the hydropower parameters to be processed and the historical hydropower parameters of the previous time adjacent to the target time in the historical hydropower parameter sequence, as well as the time interval between these two times, to determine the rate of change of hydropower parameters.

[0093] In one possible implementation, the rate of change of hydropower parameters can be determined based on the following formula:

[0094] (10)

[0095] in, The rate of change of hydropower parameters (such as the rate of change of head / rate of change of head). The hydropower parameters to be processed at the target time (such as head / lift); These are the hydropower parameters corresponding to the historical moments adjacent to the target moment; The time interval between the target time and the adjacent time.

[0096] S220 determines the operating status type of the pumped storage power station based on the unit's operating status parameters, the rate of change of hydropower parameters, and the preset status identification model.

[0097] The preset state recognition model can be a mathematical model or a machine learning model. For example, the preset state recognition model can be used to implement state recognition based on fuzzy logic or state recognition based on threshold rules.

[0098] For example, the running status parameters can be input into a preset status recognition model, so that the preset status recognition model outputs the corresponding running status type according to the running dynamic characteristics represented by the running status parameters.

[0099] In one possible implementation, the operating state type of a pumped storage power station can be determined based on the following formula:

[0100] (11)

[0101] in, Indicates the running status type; The unit power corresponding to the target time. The rate of change of unit power; Let be the rate of change of hydropower parameters. The rate of change of hydropower parameters can be determined based on the following formula:

[0102] (12)

[0103] in, The unit power corresponding to the historical time adjacent to the target time; The time interval between the target time and the adjacent time.

[0104] S230, determine the target process noise parameter according to the operating state type and the first preset configuration strategy. The operating state type includes steady-state operating state and non-steady-state operating state. The first preset configuration strategy includes that the target process noise parameter corresponding to the steady-state operating state is less than the target process noise parameter corresponding to the non-steady-state operating state.

[0105] For example, the first preset configuration strategy may include the correspondence between operating state types and process noise parameters. The first preset configuration strategy is used to configure the process noise parameters according to the operating dynamic characteristics corresponding to different operating state types, so as to determine the target process noise parameters that match the current operating state type.

[0106] In this embodiment, by determining the corresponding operating state type based on the unit operating state parameters and the rate of change of hydropower parameters, and adjusting the process noise parameters according to different operating state types, the filtering process can be adapted to the dynamic change characteristics of pumped storage power stations under different operating states.

[0107] In one exemplary embodiment, step S230 includes:

[0108] A1. Determine the state adjustment coefficient based on the operating state type. The state adjustment coefficient corresponding to the steady-state operating state is greater than the state adjustment coefficient corresponding to the unsteady-state operating state.

[0109] For example, corresponding state adjustment coefficients can be pre-configured for different operating state types, and the corresponding state adjustment coefficients can be obtained according to the current operating state type.

[0110] A2. Based on the rate of change of hydropower parameters and the state regulation coefficient, the target process noise parameters are determined. The target process noise parameters are positively correlated with the rate of change of hydropower parameters and negatively correlated with the state regulation coefficient.

[0111] For example, the first preset configuration strategy may include the correspondence between the rate of change of hydropower parameters, the state regulation coefficient, and the process noise parameters.

[0112] In one possible implementation, the target process noise parameters can be determined based on the following formula:

[0113] (13)

[0114] in, The target process noise parameter; The rate of change of hydropower parameters; This is the state adjustment coefficient; , These are preset adjustment parameters.

[0115] In this embodiment, by determining the corresponding operating state type based on the unit operating state parameters and the rate of change of hydropower parameters, and adjusting the process noise parameters according to different operating state types, the filtering process can be adapted to the dynamic change characteristics of pumped storage power stations under different operating states.

[0116] In an exemplary embodiment, the operating state type includes at least one of the following: shutdown state, power generation state, phase adjustment state, load regulation state, pumping state, and operating condition switching state. Step S230 includes:

[0117] B1, when the operating state type is shutdown, the target process noise parameter is determined as the first parameter.

[0118] B2, when the operating state type is power generation state, the target process noise parameter is determined as the second parameter, and the second parameter is greater than the first parameter.

[0119] Among them, the power generation status includes, but is not limited to, the power generation phase adjustment status and the pumping phase adjustment status.

[0120] B3, when the operating state type is phase modulation state, the target process noise parameter is determined to be the third parameter, and the third parameter is greater than the second parameter.

[0121] B4. When the operating state is load regulation, pumping, or switching, the target process noise parameter is determined as the fourth parameter, which is greater than the third parameter.

[0122] For example, the current operating state type of the pumped storage power station can be determined first based on the unit's operating status parameters. Then, a preset process noise parameter configuration table can be queried according to the operating state type to obtain the target process noise parameter corresponding to the current operating state type. For instance, different levels of process noise parameters can be configured for different operating states such as shutdown, generation, phase modulation, and load regulation, and the determined target process noise parameters can be used in subsequent Kalman filtering processes. Specifically, in the shutdown state, the head or pumping head changes slowly, and the changes in hydropower parameters are mainly affected by measurement noise, so a smaller process noise parameter can be configured. In the stable generation state, the hydraulic state is relatively stable, so a process noise parameter matching the current state can be configured. In the load regulation state, pumping state, and operating condition switching state, the head or pumping head changes rapidly, so a larger process noise parameter can be configured. In the phase modulation state, the active power changes little, but the unit is still in operation, so a process noise parameter of intermediate response level can be configured.

[0123] In this embodiment, by configuring corresponding process noise parameters according to different operating states such as shutdown, power generation, phase adjustment, load regulation, pumping, and operating condition switching, the filtering process can be adapted to the characteristics of hydropower parameter changes under different operating conditions, thereby improving the accuracy of hydropower parameter optimization.

[0124] In an exemplary embodiment, step S150 includes:

[0125] S510, determine the target fusion weight according to the operating state type and the second preset configuration strategy. The second preset configuration strategy includes that the target fusion weight corresponding to the steady-state operating state is greater than the target fusion weight corresponding to the non-steady-state operating state.

[0126] For example, state-related fusion weights can be determined based on the type of operating state, with different fusion weights corresponding to different operating states. For instance, in a steady-state operating state, the hydropower parameters change slowly, so a larger target fusion weight can be configured; in a non-steady-state operating state, the hydropower parameters change rapidly, so a smaller target fusion weight can be configured.

[0127] S520, based on the target fusion weight, performs weighted fusion processing on the predicted hydropower parameters and intermediate hydropower parameters to obtain the target hydropower parameters of the pumped storage power station at the target time.

[0128] For example, the target hydroelectric parameters are positively correlated with the target fusion weights. For instance, the larger the fusion weights, the higher the proportion of the Kalman filter values ​​in the target hydroelectric parameters, and the closer the target hydroelectric parameters are to the intermediate hydroelectric parameters.

[0129] In this embodiment, by determining the target fusion weight based on the operating state type and performing weighted fusion of the predicted hydropower parameters and intermediate hydropower parameters, adaptive fusion of prediction information and filtering results under different operating states can be achieved, further improving the accuracy of hydropower parameter optimization.

[0130] In one exemplary embodiment, such as Figure 3 As shown, the steps for determining the target measurement noise parameter based on the fluctuation of historical hydropower parameter sequences include:

[0131] S240 is an index for calculating the degree of fluctuation in historical hydropower parameter sequences.

[0132] The volatility index is used to characterize the magnitude of changes in historical hydropower parameter series. The volatility index can be expressed as the standard deviation of the historical hydropower parameter series.

[0133] In one possible implementation, the volatility index can be determined based on the following formula:

[0134] (14)

[0135] in, As an indicator of volatility, This refers to the number of historical hydropower parameters included in the calculation from the historical hydropower parameter sequence. This refers to the i-th historical hydropower parameter in the historical hydropower parameter sequence. This represents the average value of each historical hydropower parameter in the historical hydropower parameter series.

[0136] Alternatively, the volatility index can also be the variance or root mean square of the historical hydropower parameter series.

[0137] S250, based on the fluctuation level index, determines the target measurement noise parameter, which is positively correlated with the fluctuation level index.

[0138] In one possible implementation, the target measurement noise parameters can be determined based on the following formula:

[0139] (15)

[0140] in, Measure noise parameters for the target; Preset the initial values ​​for the measured noise parameters; This is the fluctuation adjustment coefficient.

[0141] In this embodiment, by adjusting the measurement noise parameters according to the fluctuation of historical hydropower parameter sequences, dynamic configuration of the measurement noise parameters can be achieved, enabling the filtering process to adapt to changes in historical hydropower parameters and further improving the accuracy of hydropower parameter optimization.

[0142] In an exemplary embodiment, step S140 includes:

[0143] S410, determine the hydropower parameters of multiple consecutive historical moments within a sliding window ending at the target moment in the historical hydropower parameter sequence.

[0144] For example, based on a preset sliding window length, hydropower parameters corresponding to multiple consecutive historical sampling times ending at a target time can be selected from the historical hydropower parameter sequence to establish a historical window for trend analysis.

[0145] In one possible implementation, the history window can be determined based on the following formula:

[0146] (16)

[0147] in, The head / lift value after Kalman filtering at the k-th sampling time is the estimated head / lift value at the current time. is the head / lift value after Kalman filtering at the km-th sampling time, i.e., the head / lift estimation result at the current time; m is the sliding time window length, representing the number of head / lift data points participating in the historical trend analysis; k is the current sampling time number.

[0148] S420 calculates the average rate of change of hydropower parameters at adjacent times among multiple consecutive historical times, and obtains the historical trend of hydropower parameter sequence.

[0149] For example, the rate of change of hydropower parameters corresponding to two adjacent sampling times within the historical window can be calculated separately, and the average value can be calculated based on the rate of change corresponding to multiple adjacent sampling times to obtain the historical trend.

[0150] In one possible implementation, historical trends can be determined based on the following formula:

[0151] (17)

[0152] in, This represents the historical trend; m is the window length. For historical water head / lifting; The sampling period.

[0153] S430, based on the hydropower parameters of the previous time adjacent to the target time in the historical hydropower parameter sequence and the historical trend of change, determine the predicted hydropower parameters of the pumped storage power station at the target time.

[0154] For example, the hydropower parameters of the previous time adjacent to the target time can be used as the prediction benchmark, and the predicted hydropower parameters corresponding to the target time can be determined by combining historical change trends.

[0155] In one possible implementation, the predicted hydropower parameters at the target time can be determined based on the following formula:

[0156] (18)

[0157] in, For trend prediction of head / lift.

[0158] In this embodiment, by determining the historical change trend based on the historical hydropower parameter sequence and predicting the hydropower parameters at the target time based on the historical change trend, it is possible to predict the future hydropower parameter change trend, thereby further improving the accuracy of hydropower parameter optimization.

[0159] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages in other steps. It is understood that the steps in different embodiments can be freely combined as needed, and all non-contradictory solutions formed by such combinations are within the scope of protection of this application.

[0160] Based on the same inventive concept, this application also provides a pumped storage power station hydroelectric parameter processing device for implementing the above-mentioned pumped storage power station hydroelectric parameter processing method. The solution provided by this device is similar to the solution described in the above-described method. Therefore, the specific limitations of one or more pumped storage power station hydroelectric parameter processing device embodiments provided below can be found in the limitations of the pumped storage power station hydroelectric parameter processing method above, and will not be repeated here.

[0161] In one exemplary embodiment, such as Figure 4As shown, a hydroelectric parameter processing device 00 for a pumped storage power station is provided, comprising: an acquisition module 01, a parameter determination module 02, a filtering module 03, a prediction module 04, and a parameter processing module 05, wherein:

[0162] The acquisition module 01 is used to acquire the unit operating status parameters, the hydropower parameters to be processed, and the historical hydropower parameter sequence before the target time of the pumped storage power station at the target time. The hydropower parameters to be processed are determined based on the water level of the upper reservoir and the water level of the lower reservoir of the pumped storage power station.

[0163] The parameter determination module 02 is used to determine the target process noise parameter based on the unit operating status parameters, and to determine the target measurement noise parameter based on the fluctuation of the historical hydropower parameter sequence.

[0164] The filtering module 03 is used to perform Kalman filtering on the hydropower parameters to be processed based on the target process noise parameters and the target measurement noise parameters to obtain intermediate hydropower parameters.

[0165] Prediction module 04 is used to determine the predicted hydropower parameters of the pumped storage power station at the target time based on the changing trends of historical hydropower parameter sequences.

[0166] The parameter processing module 05 is used to perform constraint correction processing on the intermediate hydropower parameters based on the predicted hydropower parameters, so as to obtain the target hydropower parameters of the pumped storage power station at the target time.

[0167] In one embodiment, the parameter determination module 02 is further configured to:

[0168] Calculate the rate of change of hydroelectric parameters of a pumped storage power station at a target time;

[0169] Based on the unit's operating status parameters, the rate of change of hydropower parameters, and the preset status identification model, the operating status type of the pumped storage power station is determined.

[0170] Based on the operating state type and the first preset configuration strategy, the target process noise parameter is determined. The operating state type includes steady-state operating state and non-steady-state operating state. The first preset configuration strategy includes that the target process noise parameter corresponding to the steady-state operating state is less than the target process noise parameter corresponding to the non-steady-state operating state.

[0171] In one embodiment, the parameter determination module 02 is further configured to:

[0172] The state adjustment coefficient is determined based on the type of operating state. The state adjustment coefficient corresponding to the steady-state operating state is greater than the state adjustment coefficient corresponding to the unsteady-state operating state.

[0173] The target process noise parameter is determined based on the rate of change of hydropower parameters and the state regulation coefficient. The target process noise parameter is positively correlated with the rate of change of hydropower parameters and negatively correlated with the state regulation coefficient.

[0174] In one embodiment, the operating state type includes at least one of shutdown state, power generation state, phase adjustment state, load regulation state, pumping state, and operating condition switching state. The parameter determination module 02 is further used for:

[0175] When the operating state is in a shutdown state, the target process noise parameter is determined as the first parameter;

[0176] When the operating state type is power generation state, the target process noise parameter is determined to be the second parameter, and the second parameter is greater than the first parameter;

[0177] When the operating state type is phase modulation state, the target process noise parameter is determined to be the third parameter, and the third parameter is greater than the second parameter;

[0178] When the operating state is load regulation, pumping, or operating condition switching, the target process noise parameter is determined as the fourth parameter, which is greater than the third parameter.

[0179] In one embodiment, the parameter processing module 05 is further configured to:

[0180] The target fusion weight is determined based on the operating state type and the second preset configuration strategy. The second preset configuration strategy includes that the target fusion weight corresponding to the steady-state operating state is greater than the target fusion weight corresponding to the non-steady-state operating state.

[0181] Based on the target fusion weight, the predicted hydropower parameters and intermediate hydropower parameters are weighted and fused to obtain the target hydropower parameters of the pumped storage power station at the target time.

[0182] In one embodiment, the parameter determination module 02 is further configured to:

[0183] Calculate the fluctuation index of historical hydropower parameter series;

[0184] Based on the fluctuation level index, the target measurement noise parameter is determined, and the target measurement noise parameter is positively correlated with the fluctuation level index.

[0185] In one embodiment, the prediction module 04 is further configured to:

[0186] Determine the hydropower parameters of multiple consecutive historical moments within a sliding window ending at the target moment from the historical hydropower parameter sequence;

[0187] The historical trend of hydropower parameter sequence is obtained by averaging the rate of change of hydropower parameters at adjacent times among multiple consecutive historical times.

[0188] Based on the hydropower parameters and historical trends of the previous time adjacent to the target time in the historical hydropower parameter sequence, the predicted hydropower parameters of the pumped storage power station at the target time are determined.

[0189] Each module in the aforementioned pumped-storage power station hydroelectric parameter processing device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in a computer device, or stored in the computer device's memory as software, so that the processor can call and execute the corresponding operations of each module.

[0190] In one exemplary embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as follows: Figure 5 As shown, the computer device includes a processor, memory, input / output interface, communication interface, display unit, and input device. The processor, memory, and input / output interface are connected via a system bus, and the communication interface, display unit, and input device are also connected to the system bus via the input / output interface. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system and computer programs. The internal memory provides an environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The input / output interface is used for exchanging information between the processor and external devices. The communication interface is used for wired or wireless communication with external terminals; wireless communication can be achieved through Wi-Fi, mobile cellular networks, Near Field Communication (NFC), or other technologies. When the computer program is executed by the processor, it implements a method for processing hydroelectric parameters in a pumped-storage power station. The display unit is used to form a visually visible image and can be a display screen, projection device, or virtual reality imaging device. The display screen can be an LCD screen or an e-ink screen. The input device of the computer device can be a touch layer covering the display screen, or buttons, trackballs, or touchpads set on the casing of the computer device, or external keyboards, touchpads, or mice, etc.

[0191] Those skilled in the art will understand that Figure 5The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.

[0192] In one exemplary embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps in the above-described method embodiments.

[0193] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the steps in the above method embodiments.

[0194] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps in the above method embodiments.

[0195] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, artificial intelligence (AI) processors, etc., and are not limited to these.

[0196] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0197] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.

Claims

1. A method for processing hydroelectric parameters in a pumped storage power station, characterized in that, The method includes: The unit operating status parameters, hydropower parameters to be processed, and historical hydropower parameter sequences prior to the target time of the pumped storage power station are obtained. The hydropower parameters to be processed are determined based on the water levels of the upper and lower reservoirs of the pumped storage power station. Based on the unit operating status parameters, the target process noise parameters are determined, and based on the fluctuation of the historical hydropower parameter sequence, the target measurement noise parameters are determined. Based on the target process noise parameters and the target measurement noise parameters, the hydropower parameters to be processed are subjected to Kalman filtering to obtain intermediate hydropower parameters. Based on the changing trend of the historical hydropower parameter sequence, the predicted hydropower parameters of the pumped storage power station at the target time are determined; Based on the predicted hydropower parameters, the intermediate hydropower parameters are constrained and corrected to obtain the target hydropower parameters of the pumped storage power station at the target time.

2. The method according to claim 1, characterized in that, The step of determining the target process noise parameters based on the unit operating status parameters includes: Calculate the rate of change of the hydroelectric parameters of the pumped storage power station at the target time; The operating status type of the pumped storage power station is determined based on the unit operating status parameters, the rate of change of the hydropower parameters, and the preset status identification model. Based on the operating state type and the first preset configuration strategy, a target process noise parameter is determined. The operating state type includes a steady-state operating state and an unsteady-state operating state. The first preset configuration strategy includes that the target process noise parameter corresponding to the steady-state operating state is less than the target process noise parameter corresponding to the unsteady-state operating state.

3. The method according to claim 2, characterized in that, The step of determining the target process noise parameters based on the operating state type and the first preset configuration strategy includes: Based on the operating state type, a state adjustment coefficient is determined, wherein the state adjustment coefficient corresponding to the steady-state operating state is greater than the state adjustment coefficient corresponding to the unsteady-state operating state; The target process noise parameter is determined based on the rate of change of the hydropower parameters and the state regulation coefficient. The target process noise parameter is positively correlated with the rate of change of the hydropower parameters and negatively correlated with the state regulation coefficient.

4. The method according to claim 2, characterized in that, The operating state types include at least one of the following: shutdown state, power generation state, phase adjustment state, load regulation state, pumping state, and operating condition switching state. The step of determining the target process noise parameters based on the operating state type and the first preset configuration strategy includes: When the operating state type is a shutdown state, the target process noise parameter is determined as the first parameter; When the operating state type is power generation state, the target process noise parameter is determined to be the second parameter, and the second parameter is greater than the first parameter; When the operating state type is phase modulation state, the target process noise parameter is determined to be the third parameter, and the third parameter is greater than the second parameter; When the operating state type is load regulation state, pumping state, or operating condition switching state, the target process noise parameter is determined as the fourth parameter, and the fourth parameter is greater than the third parameter.

5. The method according to claim 2, characterized in that, The step of performing constraint correction processing on the intermediate hydropower parameters based on the predicted hydropower parameters to obtain the target hydropower parameters of the pumped storage power station at the target time includes: The target fusion weight is determined based on the operating state type and the second preset configuration strategy, wherein the second preset configuration strategy includes that the target fusion weight corresponding to the steady-state operating state is greater than the target fusion weight corresponding to the non-steady-state operating state. Based on the target fusion weight, the predicted hydropower parameters and the intermediate hydropower parameters are weighted and fused to obtain the target hydropower parameters of the pumped storage power station at the target time.

6. The method according to claim 1, characterized in that, The step of determining the target measurement noise parameter based on the fluctuation level of the historical hydropower parameter sequence includes: Calculate the fluctuation index of the historical hydropower parameter sequence; Based on the fluctuation level index, a target measurement noise parameter is determined, and the target measurement noise parameter is positively correlated with the fluctuation level index.

7. The method according to claim 1, characterized in that, The step of determining the predicted hydropower parameters of the pumped storage power station at the target time based on the changing trend of the historical hydropower parameter sequence includes: Determine the hydropower parameters of multiple consecutive historical moments within a sliding window ending at the target moment from the historical hydropower parameter sequence; Calculate the average rate of change of hydropower parameters at adjacent times among the multiple consecutive historical times to obtain the historical trend of the hydropower parameter sequence; Based on the hydropower parameters of the previous time adjacent to the target time in the historical hydropower parameter sequence and the historical trend, the predicted hydropower parameters of the pumped storage power station at the target time are determined.

8. A hydroelectric parameter processing device for a pumped storage power station, characterized in that, The device includes: The acquisition module is used to acquire the unit operating status parameters, hydropower parameters to be processed, and historical hydropower parameter sequences before the target time of the pumped storage power station at the target time. The hydropower parameters to be processed are determined based on the water levels of the upper and lower reservoirs of the pumped storage power station. The parameter determination module is used to determine the target process noise parameter based on the unit operating status parameters, and to determine the target measurement noise parameter based on the fluctuation of the historical hydropower parameter sequence. The filtering module is used to perform Kalman filtering on the hydropower parameters to be processed based on the target process noise parameters and the target measurement noise parameters to obtain intermediate hydropower parameters. The prediction module is used to determine the predicted hydropower parameters of the pumped storage power station at the target time based on the changing trend of the historical hydropower parameter sequence. The parameter processing module is used to perform constraint correction processing on the intermediate hydropower parameters based on the predicted hydropower parameters to obtain the target hydropower parameters of the pumped storage power station at the target time.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that, When the processor executes the computer program, it implements the steps of the method according to any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 7.