A BIM+GIS intelligent construction management platform for water conservancy projects
By deeply integrating BIM and GIS and using an intelligent management and control platform, the problems of information fragmentation and low collaboration efficiency in the construction management of water conservancy projects have been solved, enabling precise control over construction progress and quality, and improving the intelligence and visualization of construction management.
Patent Information
- Application Number
- CN202611467293.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-20
- Publication Date
- 2026-11-17
AI Technical Summary
In the construction management of water conservancy projects, there are problems such as information fragmentation, insufficient spatial control precision, lagging progress and quality control, and low efficiency of multi-disciplinary collaboration. Existing BIM and GIS integration solutions have failed to achieve deep integration, resulting in incompatible data formats, asynchronous information updates, and weak intelligent analysis capabilities.
By adopting independently developed middleware technology and data association mapping algorithm, the deep integration of BIM and GIS is achieved. Through data format conversion unit, association mapping unit and update synchronization unit, a unified data coding standard is established to achieve accurate association between micro-engineering components and macro-geographic environment. The whole process is intelligently controlled through core control module, visualization display module and collaborative management module.
It has improved the spatial control precision and intelligence level of construction management, increased the efficiency of construction progress updates, the speed of quality hazard detection and multi-professional collaboration, reduced communication costs, and realized multi-dimensional visualization and full-process control of construction data.
Smart Images

Figure FT_1 
Figure FT_2 
Figure FT_3
Abstract
Description
[0001] Technical Field: This invention relates to the field of water conservancy project construction management technology, and in particular to an intelligent construction management platform that integrates Building Information Modeling (BIM) and Geographic Information System (GIS), applicable to the full-process construction control of linear water conservancy projects such as tunnels, canals, and sluices, as well as large-scale water conservancy hubs.
[0002] Background Technology: Water conservancy projects are characterized by long construction periods, wide scope, complex terrain and geological conditions, and high requirements for multi-disciplinary collaboration. Traditional construction management models mainly rely on manual records, on-site inspections, and distributed software tools, which have many pain points: First, information fragmentation is prominent, with construction drawings, schedules, and geographical environmental data being stored in different systems, making efficient sharing and collaborative analysis difficult; Second, spatial control precision is insufficient, as traditional management tools cannot accurately integrate the micro-structural information of the project entity with the macro-geographical environmental information, leading to deviations in aspects such as route planning, land acquisition and demolition, and construction layout of linear projects; Third, progress and quality control are lagging behind, with untimely updates to construction progress and difficulty in timely detection of quality hazards, easily leading to rework and project delays; Fourth, multi-disciplinary collaboration efficiency is low, with a lack of a unified collaborative platform for design, construction, supervision, and operation and maintenance, resulting in high communication costs and information transmission errors. While existing technologies like BIM enable 3D visualization modeling and microstructural management of engineering entities, they have limitations in macro-geospatial information integration and large-scale regional coordination and management. GIS technology excels in macro-geographical environment analysis and spatial data management, but struggles to accurately represent the internal structure and construction details of engineering entities. Current BIM and GIS integration solutions are mostly simple overlays, lacking deep integration and suffering from data format incompatibility, asynchronous information updates, and weak intelligent analysis capabilities, failing to meet the full-process management needs of complex water conservancy engineering construction scenarios. Therefore, developing a construction management platform capable of deep integration of BIM and GIS with intelligent analysis and collaborative management capabilities has become an urgent need in the field of water conservancy engineering construction management.
[0003] Purpose of the invention: To address the problems of information fragmentation, insufficient spatial control precision, lagging progress and quality control, and low efficiency of multi-disciplinary collaboration in the existing technology of water conservancy project construction management, this invention provides a BIM+GIS intelligent construction management platform for water conservancy projects. Through the deep integration of BIM and GIS, it realizes digital, visual, and intelligent control of the entire construction process, thereby improving construction efficiency, ensuring project quality, and reducing management costs.
[0004] Technical Solution: The water conservancy project BIM+GIS intelligent construction management platform of the present invention includes a data acquisition module, a data fusion module, a core control module, a visualization module, a collaborative management module, and a data storage module. These modules work collaboratively to achieve intelligent control of the entire construction process of water conservancy projects. The specific technical solution is as follows (see...). Figure 1 1. Data Acquisition Module: Used to collect multi-source data required for water conservancy project construction, including: BIM model data (including engineering design drawings, component information, material parameters, etc.), GIS geospatial data (including topographic data, remote sensing image data, administrative division data, transportation network data, hydrogeological data, etc.), construction process data (including progress data, quality inspection data, safety monitoring data, equipment operation data, personnel attendance data, etc.), and external environmental data (including meteorological data, hydrological data, surrounding building and pipeline data, etc.). Data acquisition methods include automatic acquisition (through sensors, GPS positioning devices, drone aerial photography, etc.) and manual entry (uploading, filling in, etc. through the platform interface) (see...). Figure 2 2. Data Fusion Module: As the core data processing unit of the platform, it achieves deep fusion of BIM data and GIS data, solving the problems of incompatible data formats and asynchronous information. Specifically, it includes: ① Data Format Conversion Unit: Using self-developed middleware technology, it performs bidirectional conversion between BIM model IFC format data and GIS SHP and GeoJSON format data, establishing a unified data coding standard to ensure data structure consistency; ② Data Association Mapping Unit: Through spatial coordinate matching and attribute information association, it establishes a one-to-one correspondence between BIM model components and GIS geospatial objects, achieving accurate association between micro-engineering components and the macro-geographic environment; ③ Data Update Synchronization Unit: Using incremental update technology, it captures changes in BIM model data and GIS data in real time and automatically synchronizes them to the fusion database, ensuring the timeliness and accuracy of the fused data (see...). Figure 33. Core Control Modules: These include a schedule management unit, a quality management unit, a safety management unit, and a cost management unit, enabling core control functions throughout the entire construction process: ① Schedule Management Unit: Based on integrated BIM+GIS data, it establishes a correlation model between the construction schedule plan and engineering components and geographical areas, visually displaying the construction progress through Gantt charts, network diagrams, etc.; it compares actual progress with planned progress in real time, uses machine learning algorithms to predict progress deviations, and automatically generates schedule adjustment suggestions; ② Quality Management Unit: It constructs a quality inspection index system, correlates BIM model components with quality inspection data, and achieves precise location of quality problems; through image recognition, sensor data analysis, and other technologies, it automatically... The system identifies potential quality hazards such as insufficient concrete strength and excessive rebar spacing, issues warnings, and records the rectification process; ③ Safety Management Unit: Integrates GIS geospatial data with construction safety monitoring data (such as high slope deformation, deep foundation pit settlement, and harmful gas concentration) to establish a safety risk assessment model; monitors the safety status of the construction area in real time, automatically issues warnings for risk points exceeding safety thresholds, and pushes them to relevant responsible persons; ④ Cost Management Unit: Links material information, construction technology, and market price data of BIM model components to achieve dynamic cost accounting and control; provides real-time statistics on material consumption, labor costs, and equipment rental costs during construction, compares budgets with actual costs, and generates cost analysis reports (see...). Figure 4 4. Visualization Module: Based on WebGL technology, a 3D visualization scene is constructed to achieve multi-dimensional display of BIM+GIS integrated data, including: ① Macro-scene display: Based on GIS geospatial data, the topography, surrounding environment, and overall construction layout of the construction area are displayed; ② Micro-component display: Clicking on the engineering area in the GIS scene allows for penetrating viewing of details such as the internal structure, component information, and construction progress of the BIM model; ③ Multi-dimensional query and analysis: Supports multi-dimensional querying of construction data by time, region, component type, etc., and displays the analysis results through charts, heat maps, etc.; ④ Dynamic roaming and simulation: Supports dynamic roaming of the 3D scene to simulate the construction process, progress projection, and risk and accident occurrence process, etc. (see...) Figure 5 5. Collaborative Management Module: Constructs a multi-party collaborative work platform to achieve efficient collaboration among design, construction, supervision, and construction units, including: ① Access Control Unit: Assigns differentiated platform operation permissions to different roles to ensure data security and information confidentiality; ② Information Interaction Unit: Supports online communication, file transfer, task assignment, and other functions among multiple parties, synchronizing work progress in real time; ③ Process Approval Unit: Enables online approval of processes such as construction plan approval, quality acceptance, and progress payment, improving approval efficiency (see...). Figure 66. Data Storage Module: Adopting a distributed database architecture, it stores multi-source data, fused data, and various management and control data collected during construction; it has data backup, recovery, and encryption functions to ensure data security and reliability; it supports rapid querying and retrieval of massive amounts of data, improving platform response speed (see...). Figure 7 ).
[0005] Beneficial Effects: Compared with existing technologies, this invention has the following beneficial effects: ① Deep integration of BIM and GIS: Through independently developed middleware technology and data association mapping algorithms, the problems of incompatibility and information asynchrony between BIM and GIS data formats are solved, achieving precise association between micro-engineering components and the macro-geographical environment, and improving spatial control accuracy; ② Enhanced intelligent construction management: Through the progress prediction, automatic identification of quality hazards, and safety risk warning functions of the core management module, intelligent management of the entire construction process is achieved, reducing manual intervention and improving management efficiency and accuracy; ③ Enhanced multi-disciplinary collaboration efficiency: A unified collaborative management platform is built, enabling online communication, process approval, and information sharing among multiple stakeholders, reducing communication costs and avoiding information transmission errors; ④ High degree of visualization: Through the three-dimensional visualization display module, multi-dimensional and intuitive display of construction data is achieved, facilitating managers to quickly grasp construction dynamics and make scientific decisions; ⑤ Wide applicability: It can be adapted to various water conservancy project types such as tunnels, canals, sluices, and large-scale water conservancy hubs, and has good adaptability to complex terrain and multi-disciplinary collaborative construction scenarios, with broad application prospects.
[0006] Detailed Implementation: The present invention will be further described in detail below with reference to specific embodiments. This embodiment takes the tunnel construction management of a large-scale inter-basin water transfer project as an example to illustrate the implementation process of the BIM+GIS intelligent construction management platform for water conservancy projects: 1. Data Acquisition Stage: ① Acquiring BIM Model Data: Constructing a BIM model of the tunnel project using software such as Revit and Bentley, including detailed information on components such as tunnel lining, reinforcement, and embedded parts, material parameters, construction process requirements, etc., and exporting it as an IFC format file; ② Acquiring GIS Geospatial Data: Obtaining high-definition remote sensing data of the construction area through drone aerial photography. The data collection includes: ① Imagery: Topographical data is collected using total stations, GPS, and other equipment; data on administrative divisions, transportation networks, and hydrogeology are obtained from the geographic information public service platform and exported as SHP format files; ② Construction process data: Safety monitoring data is collected through deformation sensors and hazardous gas sensors deployed inside the tunnel; progress data and quality inspection data are uploaded through the mobile terminals of construction personnel; and operational data of construction machinery is collected through the equipment Internet of Things system; ③ External environmental data: Meteorological data such as temperature, precipitation, and wind force in the construction area are obtained from the meteorological department; and hydrological data such as water level and flow rate of surrounding rivers are obtained from the hydrological department. 2. Data Fusion Phase: ① The data format conversion unit converts IFC format BIM data and SHP format GIS data into a unified data format for the platform, establishing a unified data code that includes component ID, spatial coordinates, and attribute information; ② The data association mapping unit accurately associates tunnel components in the BIM model with the tunnel orientation and surrounding terrain in the GIS scene based on spatial coordinate matching, achieving seamless fusion of the BIM model and GIS geospatial data; ③ The data update synchronization function is enabled. When the BIM model is modified due to design changes or the GIS data is updated due to terrain changes or construction progress, the platform automatically captures the change information and incrementally updates it to the fusion database.3. Core Control Phase: ① Schedule Management: The schedule management unit establishes a tunnel construction schedule plan based on integrated data, associating schedule nodes with components such as lining sections and tunneling sections in the BIM model; it compares the actual tunneling progress with the planned progress in real time, predicts subsequent schedule deviations through machine learning algorithms, and generates schedule adjustment suggestions such as "increasing the investment in tunneling equipment"; ② Quality Management: The quality management unit associates the steel reinforcement components in the BIM model with on-site quality inspection data, automatically locates the area and issues a quality warning when it finds that the steel reinforcement spacing in a certain section of the tunnel exceeds the standard, pushes it to the construction team leader, records the rectification process, and conducts acceptance; ③ Safety Management: The safety management unit monitors the concentration of harmful gases and high slope deformation data inside the tunnel in real time. When the CO concentration in a certain area exceeds the safety threshold, it automatically issues a warning, pushes it to the safety management personnel, and highlights the risk area in the visualization scene; ④ Cost Management: The cost management unit associates the concrete components in the BIM model with market concrete prices, calculates the concrete consumption during the construction process in real time, compares the budgeted cost with the actual cost, generates a cost overrun analysis report, and points out the problem of "excessive concrete wastage rate". 4. Visualization and Collaborative Management Phase: ① The visualization module allows viewing of the macroscopic GIS scene of the construction area. Clicking on the tunnel location allows for detailed viewing of the BIM model's internal structure, construction progress, quality inspection results, and other details. The dynamic walkthrough function simulates the tunnel excavation process. ② The design unit uploads design change documents through the collaborative management module, which the construction unit views and provides feedback online. The supervision unit approves and accepts the quality rectification results through the platform. The construction unit monitors construction progress, quality, and costs in real time, achieving efficient multi-party collaboration. In this embodiment, the platform of this invention enables intelligent control of the entire construction process of the inter-basin water transfer project tunnel, improving construction progress update efficiency by over 60%, advancing the detection time of potential quality problems by 80%, and reducing multi-disciplinary collaborative communication costs by 50%, significantly improving construction management levels.
[0007] Attached image description: Figure 1 This is a schematic diagram of the module structure of the BIM+GIS intelligent construction management platform for water conservancy projects of the present invention; Figure 2 This is a schematic diagram of data acquisition in this invention; Figure 3 This is a schematic diagram of data fusion according to the present invention; Figure 4 This is a schematic diagram of the core control mechanism of the present invention; Figure 5 This is a visual illustration of the present invention; Figure 6 This is a schematic diagram of the collaborative management of the present invention; Figure 7 This is a schematic diagram of data storage for the present invention.
Claims
1. A hydraulic engineering BIM+GIS intelligent construction management platform, characterized in that, The system comprises a data acquisition module, a data fusion module, a core control module, a visualization module, a collaborative management module, and a data storage module. These modules work together to achieve intelligent control over the entire construction process of water conservancy projects. The data acquisition module collects multi-source data, including BIM model data, GIS geospatial data, construction process data, and external environmental data. Data acquisition methods include automatic acquisition and manual entry. The data fusion module achieves deep integration of BIM and GIS data, including a data format conversion unit, a data association mapping unit, and a data update synchronization unit. The data format conversion unit uses middleware technology to achieve dual-format integration of BIM IFC data and GIS SHP and GeoJSON data. The system transforms data and establishes a unified data coding standard. The data association mapping unit establishes a one-to-one correspondence between BIM model components and GIS geospatial objects through spatial coordinate matching and attribute information association. The data update synchronization unit uses incremental update technology to capture data changes in real time and automatically synchronize them. The core control module includes a progress management unit, a quality management unit, a safety management unit, and a cost management unit. The progress management unit establishes a correlation model between the construction progress plan and engineering components and geographical areas, compares progress deviations in real time, and predicts and adjusts them. The quality management unit constructs a quality inspection index system, automatically identifies quality hazards, and records rectification. The safety management unit establishes a safety risk assessment model, monitors safety status in real time, and issues early warnings. The cost management unit realizes dynamic cost accounting and control, and generates cost analysis reports; the visualization module constructs a 3D visualization scene based on WebGL technology, realizing macro scene display, micro component display, multi-dimensional query analysis and dynamic roaming simulation of BIM+GIS integrated data; the collaborative management module realizes permission management, information interaction and process approval of multiple parties; the data storage module adopts a distributed database architecture to store multi-source data, integrated data and control data, and has data backup, recovery and encryption functions.
2. The hydraulic engineering BIM+GIS intelligent construction management platform according to claim 1, characterized in that, The data acquisition module collects BIM model data including engineering design drawings, component information, material parameters, and construction process requirements; GIS geospatial data including topographic data, remote sensing image data, administrative division data, transportation network data, and hydrogeological data; construction process data including progress data, quality inspection data, safety monitoring data, equipment operation data, and personnel attendance data; and external environment data including meteorological data, hydrological data, and data on surrounding buildings and pipelines.
3. The hydraulic engineering BIM+GIS intelligent construction management platform according to claim 1, characterized in that, The progress management unit uses machine learning algorithms to predict progress deviations and automatically generates progress adjustment suggestions; the quality management unit automatically identifies potential quality hazards through image recognition and sensor data analysis technologies; and the safety management unit integrates GIS geospatial data and construction safety monitoring data to automatically issue warnings for risk points that exceed safety thresholds.
4. The hydraulic engineering BIM+GIS intelligent construction management platform according to claim 1, characterized in that, The visualization module supports multi-dimensional querying of construction data by time, region, and component type, and displays the analysis results in the form of charts and heat maps; it also supports dynamic 3D scene roaming to simulate the construction process, progress projection, and the occurrence of risk accidents.
5. The hydraulic engineering BIM+GIS intelligent construction management platform according to claim 1, characterized in that, The collaborative management module provides online communication, file transfer, and task assignment functions for design, construction, supervision, and construction units, enabling online approval of construction plans, quality acceptance, and progress payment.