Oilfield Development Plan Tracking and Evaluation Methods and Equipment

By acquiring real-time production dynamic characteristic data during oilfield development, establishing nonlinear mapping relationships and adaptive weight adjustment mechanisms, the problems of static solidification of evaluation weights and detachment from reservoir physical laws in existing technologies have been solved. This has enabled intelligent, automated, and real-time oil and gas development schemes, and improved the scientificity and practicality of risk warning and decision optimization.

CN123117933APending Publication Date: 2026-11-17CHINA NAT PETROLEUM CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611612845.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-19
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing oilfield development program tracking and evaluation methods, the evaluation weights are static and fixed, which cannot evolve dynamically with the development stage. They are detached from the physical laws of the reservoir, and intelligent adjustments lack engineering interpretability, resulting in evaluation results lagging behind actual working conditions and making it difficult to support precise intervention.

Method used

By acquiring real-time production dynamic characteristic data during oilfield development, establishing nonlinear mapping relationships, introducing key dynamic parameters during reservoir development, constructing an adaptive weight adjustment mechanism, and combining it with reservoir engineering safety boundary thresholds, dynamic adaptive reconstruction of multi-dimensional evaluation weights is achieved.

Benefits of technology

It achieves intelligent, automated, and real-time evaluation processes, dynamically perceives changes in underground reservoir fluid patterns, provides reliable risk warnings and decision optimization guidance, and enhances the scientific rigor and practicality of oil and gas development program tracking and evaluation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123117933A_ABST
    Figure CN123117933A_ABST
Patent Text Reader

Abstract

This invention discloses a method and apparatus for tracking and evaluating oilfield development plans. The method includes: acquiring real-time production dynamic characteristic data, secondary indicator values, and preset adjustment coefficients; generating adjustment coefficients based on the real-time production dynamic characteristic data, a first preset threshold, and a second preset threshold; generating dynamic real-time weights corresponding to each dimension; or, generating dynamic real-time weights corresponding to each dimension based on the preset adjustment coefficients corresponding to each dimension; calculating a comprehensive execution index; and generating graded early warning and tracking evaluation reports based on the comprehensive execution index and a preset grade label matrix. This method enables intelligent, automated, real-time, and comprehensive evaluation processes, allowing evaluation weights to dynamically and adaptively evolve with the oilfield development stage, breaking through the limitations of static solidification, and significantly improving the scientific rigor and practicality of oil and gas development plan tracking evaluation and risk early warning.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present invention relate to the field of oilfield development and evaluation technology, and in particular to a method and apparatus for tracking and evaluating oilfield development plans. Background Technology

[0002] In oilfield development, scientifically and dynamically tracking and evaluating the effectiveness of development plans is crucial for timely optimization and adjustment of development strategies and ensuring efficient and stable oilfield production. Current technologies typically use a multi-dimensional indicator system to comprehensively evaluate oilfield development plans. The determination of indicator weights often relies on expert experience or static weighting methods such as the Analytic Hierarchy Process (AHP), which are set once at the initial stage of implementation and remain fixed. For example, a cloud-based comprehensive evaluation method, while introducing uncertainty handling mechanisms, still uses indicator weights that are pre-set and do not evolve in real-time with development dynamics.

[0003] However, oilfield development is a highly dynamic and complex process constrained by the physical laws of underground reservoirs. As development enters the medium-to-high water-cut stage or the natural decline stage, the importance of different evaluation dimensions changes significantly. For example, water control and oil stabilization become the core technologies, or economic benefits become the dominant decision-making factor due to declining production. Existing methods, due to their static and fixed weights, cannot reflect these stage-specific characteristics, resulting in evaluation results lagging behind actual operating conditions and making it difficult to support precise intervention. More importantly, current mainstream evaluation mechanisms generally do not incorporate key dynamic parameters that directly characterize the reservoir development status into the weight adjustment logic, causing the evaluation system to be divorced from geological engineering practice and posing a risk of being merely theoretical. Although some studies have attempted to introduce the concept of dynamic weighting, they are not coupled with physical safety boundaries, and the adjustment mechanisms used are mostly pure mathematical functions, lacking engineering interpretability and traceability, and unable to provide a reliable basis for on-site risk warning and control.

[0004] In summary, existing oilfield development program tracking and evaluation methods have three fundamental flaws: First, the evaluation weights are static and fixed, and cannot evolve dynamically with the development stage; second, the evaluation mechanism is divorced from the physical laws of the reservoir and does not drive weight adjustment with objective dynamic parameters; and third, the intelligent weight adjustment lacks engineering physical interpretability, does not embed an adaptive mechanism based on safety thresholds, and is difficult to support reliable risk warning and decision optimization. Summary of the Invention

[0005] This invention provides a method for tracking and evaluating oilfield development plans, which aims to achieve intelligent, automated, real-time, and comprehensive evaluation processes. It enables the evaluation weights to dynamically and adaptively evolve with the oilfield development stages, overcoming the limitations of static and fixed evaluation, and significantly improving the scientific rigor and practicality of oil and gas development plan tracking and evaluation and risk warning. The method includes: Acquire real-time production dynamic characteristic data during the implementation of the oilfield development plan, multi-dimensional secondary indicator values ​​of the oilfield development plan, and corresponding preset adjustment coefficients; the secondary indicator values ​​are determined based on the design values ​​and actual values ​​of the oilfield development plan. When the adaptive weight adjustment mechanism is triggered based on real-time production dynamic feature data and preset safety thresholds, the adjustment coefficients corresponding to each dimension are generated based on real-time production dynamic feature data, the first preset threshold and the second preset threshold. Based on the adjustment coefficients and the preset adjustment coefficients corresponding to each dimension, the preset initial weights corresponding to each dimension are sequentially fused and normalized to generate the dynamic real-time weights corresponding to each dimension. Based on real-time production dynamic feature data and preset safety thresholds, it is determined that the adaptive weight adjustment mechanism will not be triggered. Based on the preset adjustment coefficients corresponding to each dimension, the preset initial weights corresponding to each dimension are sequentially fused and normalized to generate the dynamic real-time weights corresponding to each dimension. The comprehensive execution index is calculated based on the secondary indicator values, preset secondary indicator weights, and dynamic real-time weights; the comprehensive execution index characterizes the overall execution effectiveness and degree of deviation of the oilfield development plan. Based on the comprehensive execution index and the preset level label matrix, a graded early warning and tracking evaluation report is generated.

[0006] Another aspect of the present invention provides an oilfield development plan tracking and evaluation device to achieve intelligent, automated, real-time, and comprehensive evaluation processes, enabling evaluation weights to dynamically and adaptively evolve with the oilfield development stage, breaking through the limitations of static and fixed approaches, and significantly improving the scientific rigor and practicality of oil and gas development plan tracking and evaluation and risk early warning. The device also includes: The data acquisition module is used to acquire real-time production dynamic characteristic data, multi-dimensional secondary indicator values ​​of the oilfield development plan, and corresponding preset adjustment coefficients during the implementation of the oilfield development plan. The secondary indicator values ​​are determined based on the design values ​​and actual values ​​of the oilfield development plan. The first dynamic real-time weight generation module is used to determine the trigger of the adaptive weight adjustment mechanism based on real-time production dynamic feature data and preset safety thresholds, generate adjustment coefficients corresponding to each dimension based on real-time production dynamic feature data, the first preset threshold and the second preset threshold; and fuse and normalize the preset initial weights corresponding to each dimension in sequence based on the adjustment coefficients and the preset adjustment coefficients corresponding to each dimension to generate dynamic real-time weights corresponding to each dimension. The second dynamic real-time weight generation module is used to determine, based on real-time dynamic feature data and preset safety thresholds, that the adaptive weight adjustment mechanism will not be triggered, and to sequentially fuse and normalize the preset initial weights corresponding to each dimension according to the preset adjustment coefficients corresponding to each dimension, thereby generating dynamic real-time weights corresponding to each dimension. The comprehensive execution index calculation module is used to calculate the comprehensive execution index based on the secondary indicator values, preset secondary indicator weights, and dynamic real-time weights; the comprehensive execution index characterizes the overall execution effectiveness and degree of deviation of the oilfield development plan; The tracking and evaluation module is used to generate tiered early warnings and tracking and evaluation reports based on the comprehensive execution index and a preset level label matrix.

[0007] This invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the above-mentioned oilfield development scheme tracking and evaluation method.

[0008] This invention also provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the above-described oilfield development scheme tracking and evaluation method.

[0009] This invention also provides a computer program product, which includes a computer program that, when executed by a processor, implements the above-mentioned oilfield development scheme tracking and evaluation method.

[0010] Compared with existing technologies, this invention obtains real-time production dynamic characteristic data, multi-dimensional secondary indicator values, and corresponding preset adjustment coefficients of the oilfield development plan during its implementation. The secondary indicator values ​​are determined based on the design and actual values ​​of the oilfield development plan. An adaptive weight adjustment mechanism is triggered based on the real-time production dynamic characteristic data and preset safety thresholds. Adjustment coefficients are generated for each dimension based on the real-time production dynamic characteristic data, a first preset threshold, and a second preset threshold. Preset initial weights for each dimension are sequentially fused and normalized based on the adjustment coefficients and the preset adjustment coefficients corresponding to each dimension to generate dynamic real-time weights for each dimension. The system employs a full threshold approach to prevent the adaptive weight adjustment mechanism from being triggered. Based on preset adjustment coefficients corresponding to each dimension, the preset initial weights for each dimension are sequentially fused and normalized to generate dynamic real-time weights for each dimension. A comprehensive execution index is calculated based on secondary indicator values, preset secondary indicator weights, and dynamic real-time weights. This comprehensive execution index characterizes the overall execution effectiveness and deviation degree of the oilfield development plan. Based on the comprehensive execution index and a preset graded label matrix, tiered early warning and tracking evaluation reports are generated. This approach enables intelligent, automated, real-time, and comprehensive evaluation processes, allowing evaluation weights to dynamically and adaptively evolve with the oilfield development stage. It overcomes the limitations of static rigidity and significantly improves the scientific rigor and practicality of oil and gas development plan tracking evaluation and risk early warning. Attached Figure Description

[0011] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. In the drawings: Figure 1 This is a flowchart of the oilfield development plan tracking and evaluation method in an embodiment of the present invention; Figure 2 This is a flowchart illustrating a specific example of the oilfield development plan tracking and evaluation method in this invention. Figure 3 This is a flowchart illustrating a specific example of the oilfield development plan tracking and evaluation method in this invention. Figure 4 This is a structural diagram of the oilfield development scheme tracking and evaluation device in an embodiment of the present invention; Figure 5 This is a schematic diagram of a computer device provided in an embodiment of the present invention. Detailed Implementation

[0012] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings. Here, the illustrative embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.

[0013] This invention relates to the field of oilfield development and evaluation technology, specifically to a method for tracking and evaluating crude oil development plans based on dynamic production data, which is particularly suitable for real-time quantitative analysis and adaptive evaluation of the development plan execution process by computer systems.

[0014] In the implementation of oilfield development plans, tracking and evaluation are crucial for ensuring plan implementation, dynamically identifying and resolving production problems, and maximizing benefits throughout the entire life cycle. As older oilfields generally enter the ultra-high water-cut stage, and with the large-scale exploitation of unconventional and deep reservoirs, the complexity of reservoir geology and fluid flow patterns has increased dramatically. Traditional single static evaluation is no longer sufficient to meet the refined management needs of modern oilfields. In recent years, existing tracking and evaluation technologies have made significant progress in intelligent, refined, and multi-dimensional comprehensive evaluation. Although existing technologies have made significant progress in the "breadth of evaluation indicators" and "ability to acquire underlying data," fundamental technical defects remain in the core aspect of the "comprehensive allocation mechanism of multi-dimensional indicator weights": ① The evaluation weight coefficients suffer from a serious "static solidification" drawback. Existing plan evaluation systems typically rely on expert experience or the Analytic Hierarchy Process (AHP) to assign weights in a one-time manner at the initial stage of development when calculating the comprehensive execution index. However, reservoir development is a highly complex nonlinear dynamic evolution process. As production progresses, the characteristics of underground fluids change drastically. Static, fixed weights cannot perceive the shifts in the core challenges of oilfields at different development stages, leading to severely outdated evaluation results. ② The evaluation mechanism is detached from the dynamic constraints of underground reservoir physics. During oilfield development, when the oilfield enters the medium-to-high water-cut stage, water control and oil production stabilization become the core challenges, and the weight of technical dimensions should be significantly increased. When entering the natural decline stage, single-well costs soar, and economic efficiency becomes the decisive indicator. The existing evaluation system lacks an adaptive feedback mechanism and cannot automatically adjust the assessment ratios of different dimensions based on objective geological and physical quantities such as "water cut increase rate" or "production decline degree," resulting in a severe disconnect between evaluation results and actual field conditions, misleading reservoir development decisions. ③ Intelligent exploration is based on purely mathematical subjective assignment. While some of the latest intelligent evaluation systems have attempted to dynamically adjust weights, they mostly rely on general black-box algorithms or purely mathematical weighting functions that lack physical meaning. These mechanisms are not deeply coupled with the specific reservoir's safety boundary thresholds (such as water cut limit and decline limit), making it difficult to explain the physical nature of weight changes from a geological and engineering perspective. This results in the inability to provide a truly reliable engineering guidance for risk intervention in on-site production.

[0015] In summary, overcoming the technical bias of static and fixed weight allocation and lack of engineering physical mechanism explanation in existing evaluation systems, and proposing an intelligent tracking evaluation method that can keenly perceive the fluid laws of underground oil reservoirs and adaptively reconstruct the evaluation weights of each dimension, is a technical problem that urgently needs to be solved in the field of oil and gas field development and management evaluation technology.

[0016] This invention aims to address the fundamental flaws in the weight allocation mechanism of existing evaluation systems by constructing an intelligent tracking evaluation mechanism capable of real-time sensing of changes in underground reservoir fluid patterns and adaptively reconstructing multi-dimensional evaluation weights. This includes: ① Breaking the static and fixed model of evaluation weights: By introducing key dynamic physical parameters during reservoir development (such as water cut rise rate and production decline rate), a nonlinear mapping relationship is established between evaluation weights and the actual evolution of underground fluids. This allows weight allocation to automatically migrate and reconstruct according to the core contradictions of different development stages of the oilfield (such as water control and oil stabilization during the medium-to-high water cut period, and economic benefit dominance during the natural decline period), eliminating the lag in evaluation results caused by traditional one-time weighting; ② Integrating physical constraints and data-driven mechanisms: Changing the purely mathematical weighting method, the safety boundary thresholds in reservoir engineering (such as...) are incorporated into the evaluation process. The water cut limit, decline limit, and economic limit production are used as physical constraints for weight adjustment. An adaptive weight update model with engineering interpretability is constructed to ensure that the weight changes have a clear reservoir dynamic physical substance; ③ Achieving deep coupling between evaluation results and on-site decision-making: By dynamically sensing the changing trend of underground fluid laws, the weights of key indicators such as technical, economic, and progress dimensions are automatically increased or decreased, so that the evaluation system can truly reflect the comprehensive execution efficiency of the oilfield at different production stages, and provide quantifiable, traceable, and reliable engineering guidance for on-site decisions such as water control and oil stabilization, injection and production adjustment, and intervention measures.

[0017] This invention proposes a method for tracking and evaluating oilfield development plans. Figure 1 This is a flowchart of the oilfield development plan tracking and evaluation method in an embodiment of the present invention, such as... Figure 1 As shown, the method includes: Step 101: Obtain real-time production dynamic characteristic data, multi-dimensional secondary indicator values ​​of the oilfield development plan, and corresponding preset adjustment coefficients during the implementation of the oilfield development plan; the secondary indicator values ​​are determined based on the design values ​​and actual values ​​of the oilfield development plan. Step 102: When the adaptive weight adjustment mechanism is triggered based on the real-time production dynamic feature data and the preset safety threshold, the adjustment coefficient corresponding to each dimension is generated based on the real-time production dynamic feature data, the first preset threshold and the second preset threshold; based on the adjustment coefficient and the preset adjustment coefficient corresponding to each dimension, the preset initial weight corresponding to each dimension is sequentially fused and normalized to generate the dynamic real-time weight corresponding to each dimension. Step 103: Based on the real-time production dynamic feature data and the preset safety threshold, it is determined that the adaptive weight adjustment mechanism will not be triggered. Based on the preset adjustment coefficient corresponding to each dimension, the preset initial weights corresponding to each dimension are sequentially fused and normalized to generate the dynamic real-time weights corresponding to each dimension. Step 104: Calculate the comprehensive execution index based on the secondary indicator values, preset secondary indicator weights, and dynamic real-time weights; the comprehensive execution index characterizes the overall execution effectiveness and degree of deviation of the oilfield development plan. Step 105: Generate a graded early warning and tracking evaluation report based on the comprehensive execution index and the preset grade label matrix.

[0018] Through the above steps, the embodiments of the present invention can realize the intelligent, automated, real-time and comprehensive evaluation process, realize the dynamic adaptive evolution of evaluation weights with the oilfield development stage, break the limitations of static solidification, and significantly improve the scientificity and practicality of oil and gas development plan tracking evaluation and risk warning.

[0019] This invention provides a method for tracking and evaluating crude oil development plans based on dynamic production data, addressing the technical problems of existing technologies such as lagging evaluation, limited dimensions, reliance on manual intervention, and lack of dynamic adaptability. To achieve the above objectives, the method for tracking and evaluating crude oil development plans based on dynamic production data provided by this invention is executed by a computer. Figure 2 The flowchart is a specific example of the oilfield development plan tracking and evaluation method in the embodiments of the present invention, such as... Figure 2 As shown, this illustrates the complete six-step process from data collection to report generation, along with adaptive adjustment logic, including the following steps: Step 1 (S1): Data Acquisition and Reading. The design values ​​of the oilfield development plan are read from the scheme database, and actual values ​​are collected from the production database or the oilfield field automation system. Both can receive manually entered data from manual input terminals. Simultaneously, the water cut rise rate and production decline rate indicators are acquired in real time based on the oil well production dynamic data real-time monitoring system.

[0020] Step Two (S2): Adaptive Determination of Dynamic Weights. Based on real-time production dynamic characteristic data, the development stage is automatically identified. Using the built-in adaptive adjustment module, a nonlinear mathematical model constrained by reservoir physical laws is automatically triggered to adaptively reconstruct the (stage) adjustment coefficients for each dimension. The dynamic weights are adjusted using the (stage) adjustment coefficients to correct the initial weights (including a weighting mechanism). The parameters involved in the adaptive adjustment module include the water cut rise rate Δf. w Overall Decline Rate D c The preset adjustment coefficient λ corresponding to the technical evaluation dimension tech The preset adjustment coefficient λ corresponding to the economic benefit dimension ecom The preset adjustment coefficient λ corresponding to the production schedule dimension prog .

[0021] Step 3 (S3): Individual indicator score conversion. The membership function is used to convert each secondary indicator value into a score of 0-100. Different mapping rules are used for positive and negative indicators.

[0022] Step 4 (S4): Calculate the CEI (Comprehensive Execution Index). The converted scores are weighted and summed at multiple levels to obtain the CEI. Calculation formula: CEI = Σ i W i × (Σ j w ij ×x ij ), where i is the dimension index (three dimensions: 1 for technology, 2 for progress, and 3 for economy); W i w represents the dynamic real-time weight of the i-th dimension; ij x represents the preset weight of the secondary indicator corresponding to the j-th secondary indicator value under the i-th dimension; ij This represents the preliminary evaluation result (values ​​range from 0 to 100) of the secondary indicator value of the j-th secondary indicator under the i-th dimension. The comprehensive execution index characterizes the overall execution effectiveness and degree of deviation of the oilfield development plan.

[0023] Step 5 (S5): Level Matching and Early Warning Generation. Based on the Comprehensive Execution Index (CEI) value, match level labels (Excellent, Good, Average, Poor, Poor). When the index score falls below the threshold, generate an early warning signal.

[0024] Step Six (S6): Evaluation Report Generation. A quantitative evaluation report is generated, including the CEI trend curve and radar chart. In other words, the output includes the quantitative evaluation report and early warning notification push notifications.

[0025] In one embodiment, real-time production dynamic characteristic data includes one or any combination of real-time water cut, real-time water cut rise rate, and real-time comprehensive decline rate; the real-time water cut rise rate characterizes the degree of deterioration of water drive development effect and the rate of water cut rise; the real-time comprehensive decline rate characterizes the formation energy deficit degree and the rate of production decline.

[0026] In this embodiment, two key dynamic geological parameters can be automatically calculated every preset evaluation period (e.g., T = 30 days): Real-time water cut rise rate Δf w Used to characterize the degree of deterioration in water drive development and the rate of water cut rise; real-time comprehensive decline rate D c Used to characterize the degree of formation energy deficit and the rate of production decline.

[0027] In steps 102 and 103, based on real-time production dynamic characteristic data and preset safety thresholds, it is determined whether to trigger the adaptive weight adjustment mechanism. When the above monitoring data exceeds the preset physical threshold, the physical stage of oilfield development is automatically identified, and the adjustment coefficients of each dimension are dynamically reconstructed according to the mathematical model constrained by the physical laws of the reservoir.

[0028] In one embodiment, the multiple dimensions include one or any combination of technical evaluation dimension, economic benefit dimension, and production schedule dimension.

[0029] In step 102, when the adaptive weight adjustment mechanism is triggered based on the real-time production dynamic feature data and the preset safety threshold, the adjustment coefficient corresponding to each dimension is generated based on the real-time production dynamic feature data, the first preset threshold and the second preset threshold.

[0030] In this embodiment, when an adaptive weight adjustment mechanism is triggered based on real-time production dynamic feature data and a preset safety threshold, and adjustment coefficients corresponding to each dimension are generated based on real-time production dynamic feature data, a first preset threshold, and a second preset threshold, the following adaptive weight adjustment mechanism may be triggered: when the real-time water content exceeds the first preset threshold, a nonlinear amplification mechanism is used to generate adjustment coefficients corresponding to the technical evaluation dimension based on the real-time water content, the first preset threshold, and the geological sensitivity constant; the geological sensitivity constant is determined based on the reservoir permeability gradient.

[0031] In this embodiment, when the real-time moisture content f w Exceeding the first preset threshold f wlim When this occurs, a nonlinear amplification mechanism is triggered, and the calculation formula is as follows: λ tech = 1 + α × [(f w -f wlim ) / (1 - f wlim )]²; Where, λ tech f is the preset adjustment coefficient corresponding to the technical evaluation dimension; w -f wlim The extent to which the moisture content exceeds the standard; 1-f wlim α represents the theoretical limit of remaining space; α is a geological sensitivity constant determined based on the reservoir permeability gradient, used to control the amplification intensity, and its value range is preferably 0.5 ≤ α ≤ 1.5.

[0032] In this embodiment, when an adaptive weight adjustment mechanism is triggered based on real-time production dynamic feature data and a preset safety threshold, and an adjustment coefficient corresponding to each dimension is generated based on the real-time production dynamic feature data, the first preset threshold, and the second preset threshold, the following adaptive weight adjustment mechanism may be triggered: when the real-time comprehensive decline rate exceeds the second preset threshold, an exponential amplification mechanism is adopted, and an adjustment coefficient corresponding to the economic benefit dimension is generated based on the real-time comprehensive decline rate, the second preset threshold, the preset economic leverage coefficient, and the preset decline penalty factor.

[0033] In this embodiment, when the real-time overall decrease rate D c Exceeding the second preset threshold D lim When this occurs, the exponential amplification mechanism is triggered, and the calculation formula is as follows: λ ecom = 1 + β × e^[γ × (D c - D lim )]; Where, λ ecom D is the adjustment coefficient corresponding to the economic benefit dimension. c -D lim β represents the extent to which the decline rate exceeds the limit; β is the preset economic leverage coefficient; and γ is the preset decline penalty factor. This formula ensures that the more severe the decline rate exceeds the limit, the more exponentially the weight of the economic benefit dimension increases.

[0034] In this embodiment, when an adaptive weight adjustment mechanism is triggered based on real-time production dynamic feature data and a preset safety threshold, and an adjustment coefficient corresponding to each dimension is generated based on the real-time production dynamic feature data, the first preset threshold, and the second preset threshold, the following adaptive weight adjustment mechanism may be triggered based on the real-time production dynamic feature data and the preset safety threshold: when the real-time moisture content exceeds the first preset threshold and the real-time comprehensive decline rate exceeds the second preset threshold, an adjustment coefficient corresponding to the production progress dimension is generated based on the real-time moisture content increase rate and the real-time comprehensive decline rate.

[0035] In this embodiment, as the weights of technology and economics actively increase, the weight of the schedule dimension needs to be reduced accordingly to avoid blindly building production during high-risk phases. The calculation formula is as follows: λ prog = 1 / ln(e + Δf w + D c ); Where, λ prog Δf is the adjustment factor corresponding to the production schedule dimension; e is the natural constant (approximately 2.718), used as the base to ensure the denominator is always greater than 1; w D represents the real-time water content rise rate. c This represents the real-time overall decline rate. This formula ensures that the more drastic the increase in water cut and the decrease in production, the greater the decay of the progress weight.

[0036] In one embodiment, in step 102, when it is determined that the adaptive weight adjustment mechanism will be triggered based on real-time production dynamic feature data and a preset safety threshold, and the adjustment coefficient has been calculated, the preset initial weights corresponding to each dimension are sequentially fused and normalized according to the adjustment coefficients and the preset adjustment coefficients corresponding to each dimension to generate the dynamic real-time weights corresponding to each dimension; in step 103, when it is determined that the adaptive weight adjustment mechanism will not be triggered based on real-time production dynamic feature data and a preset safety threshold, the preset initial weights corresponding to each dimension are sequentially fused and normalized according to the preset adjustment coefficients corresponding to each dimension to generate the dynamic real-time weights corresponding to each dimension.

[0037] In other words, if it is determined that an adjustment coefficient needs to be calculated based on the conditions, then the preset initial weights corresponding to each dimension are sequentially fused and normalized according to the adjustment coefficients and the preset adjustment coefficients corresponding to each dimension. If it is determined that an adjustment coefficient does not need to be calculated based on the conditions, then the preset initial weights corresponding to each dimension are sequentially fused and normalized according to the preset adjustment coefficients.

[0038] Figure 3 The flowchart is a specific example of the oilfield development plan tracking and evaluation method in the embodiments of the present invention, such as... Figure 3 As shown, in one embodiment, the preset initial weights corresponding to each dimension are sequentially fused and normalized according to the adjustment coefficient to generate dynamic real-time weights corresponding to each dimension, which may include: Step 301: Calculate the sum of the products of the adjustment coefficients corresponding to the multiple dimensions, the preset initial weights, and the preset adjustment coefficients to generate the total adjustment weights; Step 302: Generate dynamic real-time weights corresponding to the technical evaluation dimensions based on the adjustment coefficients, preset adjustment coefficients, preset initial weights, and total adjustment weights corresponding to the technical evaluation dimensions. Step 303: Generate dynamic real-time weights corresponding to the economic benefit dimension based on the adjustment coefficients, preset adjustment coefficients, preset initial weights, and total adjustment weights corresponding to the economic benefit dimension. Step 304: Generate dynamic real-time weights corresponding to the production progress dimension based on the adjustment coefficients, preset adjustment coefficients, preset initial weights, and total adjustment weights corresponding to the production progress dimension.

[0039] The above Figure 3 The diagram illustrates the dynamic real-time weight generation process when the adaptive weight adjustment mechanism is triggered, and the dynamic real-time weight generation process without triggering the adaptive weight adjustment mechanism. Figure 3The process is similar. In this embodiment, when it is determined that the adaptive weight adjustment mechanism will not be triggered based on real-time production dynamic feature data and a preset safety threshold, the preset initial weights corresponding to each dimension are sequentially fused and normalized according to the preset adjustment coefficients corresponding to each dimension to generate dynamic real-time weights for each dimension. This may include: calculating the sum of the products of the preset adjustment coefficients and preset initial weights corresponding to multiple dimensions to generate a preset total adjustment weight; generating dynamic real-time weights corresponding to the technical evaluation dimension based on the preset adjustment coefficients, preset initial weights, and preset total adjustment weights corresponding to the technical evaluation dimension; generating dynamic real-time weights corresponding to the economic benefit dimension based on the preset adjustment coefficients, preset initial weights, and preset total adjustment weights corresponding to the economic benefit dimension; and generating dynamic real-time weights corresponding to the production progress dimension based on the preset adjustment coefficients, preset initial weights, and preset total adjustment weights corresponding to the production progress dimension.

[0040] After calculating the adjustment coefficients for each dimension, the preset initial weights W are used. i0 The system performs fusion calculations and outputs the dynamic real-time weights W, which are ultimately used for comprehensive index calculations, through a normalization formula. i : W i = (W i0 ×λ i ) / Σ(W k0 ×λ k ); Among them, W i W represents the dynamic real-time weight of the i-th dimension; i0 λ represents the preset initial weights of the i-th dimension, pre-stored using the analytic hierarchy process. i W is the adjustment factor or preset adjustment factor corresponding to the i-th dimension; k0 λ represents the pre-defined initial weights for the k-th dimension, stored using the analytic hierarchy process. k Σ(W) represents the preset adjustment factor corresponding to the k-th dimension, or the product of the preset adjustment factor and the adjustment factor; k0 × λ k This is the sum of the product of the preset initial weights and adjustment coefficients or preset adjustment coefficients for all dimensions, used to ensure that the sum of the weights for each dimension is 1.

[0041] In this embodiment, the preset adjustment coefficient, the preset initial weight, and the preset secondary index weight for each dimension are determined using the analytic hierarchy process (AHP) and after a consistency check.

[0042] In steps 104-105, a comprehensive execution index is calculated based on the secondary indicator values, preset secondary indicator weights, and dynamic real-time weights. A graded early warning and tracking evaluation report is then generated based on the comprehensive execution index and a preset grade label matrix.

[0043] The following embodiments are merely preferred embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Those skilled in the art, based on their understanding of the inventive concept, may add, remove, or replace indicators according to project characteristics and the availability of on-site data, all of which fall within the scope of protection of the present invention.

[0044] Example 1: Evaluation of Production Establishment Period (without triggering weight adjustment): This example uses a sandstone oil reservoir water injection development project. The project is designed to produce 500,000 tons of oil per year, with 120 development wells, and is currently at the end of its production construction phase.

[0045] 1. Data Acquisition and Retrieval: The system automatically connects to the scheme database and production database (or oilfield field automation system), and performs data reading and real-time acquisition with a T = 30-day evaluation cycle. In this embodiment, the secondary indicator values ​​of the technical evaluation dimension include one or any combination of production compliance rate, capacity compliance rate, drilling footage compliance rate, and projected final recoverable reserves compliance rate. The production compliance rate is determined based on the percentage of matching between the designed and actual production values. The capacity compliance rate is determined based on the percentage of matching between the designed and actual capacity values. The drilling footage compliance rate is determined based on the percentage of matching between the designed and actual drilling footage values. The projected final recoverable reserves compliance rate is determined based on the percentage of matching between the designed and actual projected final recoverable reserves values.

[0046] (1) Comparison of design values ​​and actual values ​​in technical evaluation dimensions: ① Production compliance rate 92%; ② Production capacity compliance rate 88%; ③ Drilling footage compliance rate 82%; ④ Projected final recoverable reserves (EUR) compliance rate 95%.

[0047] In this embodiment, the secondary indicator values ​​of the production progress dimension include one or any combination of the new well drilling completion rate, cumulative footage completion rate, fractured well completion rate, and gathering and transportation scale completion rate. The new well drilling completion rate is determined based on the percentage of the matching degree between the designed value and the actual value of the new well drilling completion. The cumulative footage completion rate is determined based on the percentage of the matching degree between the designed value and the actual value of the cumulative footage completion. The fractured well completion rate is determined based on the percentage of the matching degree between the designed value and the actual value of the fractured well completion. The gathering and transportation scale completion rate is determined based on the percentage of the matching degree between the designed value and the actual value of the gathering and transportation scale completion.

[0048] (2) Comparison of design and actual values ​​in the production progress dimension: ① New drilling completion rate: 85%; ② Cumulative footage completion rate: 80%; ③ Fracturing well completion rate: 83%; ④ Gathering and transportation scale completion rate: 90%.

[0049] In this embodiment, the secondary indicator values ​​of the economic benefit dimension include one or any combination of the unit operating cost deviation rate, unit total cost deviation rate, after-tax internal rate of return deviation rate, and financial net present value deviation rate; the unit operating cost deviation rate is determined based on the percentage of deviation between the designed value and the actual value of the unit operating cost; the unit total cost deviation rate is determined based on the percentage of deviation between the designed value and the actual value of the unit total cost; the after-tax internal rate of return deviation rate is determined based on the percentage of deviation between the designed value and the actual value of the after-tax internal rate of return; and the financial net present value deviation rate is determined based on the percentage of deviation between the designed value and the actual value of the financial net present value.

[0050] (3) Deviation in the economic benefit dimension: ① Deviation rate of unit operating cost +12%; ② Deviation rate of unit total cost +8%; ③ Deviation rate of after-tax internal rate of return -3%; ④ Deviation rate of financial net present value -3%.

[0051] (4) The system collects and calculates the current oilfield production dynamic characteristic data in real time: ① Real-time water cut: 25% (lower than the first preset threshold of 60%); ② Real-time comprehensive decline rate: 5% (lower than the second preset threshold of 12%).

[0052] Since none of the real-time production dynamic feature data exceeded the preset threshold, this embodiment belongs to a normal scenario where adaptive weighting was not triggered.

[0053] 2. Parameter setting and dynamic weight adaptive determination: (1) Parameter determination: The preset initial weights for each dimension were determined using the Analytic Hierarchy Process (AHP). After a consistency test (inviting 7 experts, with an expert authority coefficient CR = 0.06 < 0.1), the results are as follows: Preset initial weights W for the technical evaluation dimension. T0 = 0.55, Preset initial weight W for the production schedule dimension S0 = 0.25, Preset initial weight W for the economic benefit dimension E0 =0.20.

[0054] The weights of the preset secondary indicators are as follows: production compliance rate 0.30, capacity compliance rate 0.25, drilling footage compliance rate 0.20, EUR compliance rate 0.25, new well drilling completion rate 0.40, cumulative footage completion rate 0.25, fractured well completion rate 0.20, gathering and transportation scale completion rate 0.15, unit operating cost deviation rate 0.30, unit total cost deviation rate 0.25, after-tax internal rate of return deviation rate 0.25, and financial net present value deviation rate 0.20.

[0055] The preset adjustment coefficient for each dimension is: λ T0 = 0.9 (Technical Evaluation Dimension), λ S0 = 1.2 (production schedule dimension), λ E0 = 0.9 (economic benefit dimension).

[0056] (2) Dynamic weight adaptation: Since the real-time moisture content (25%) is lower than the first preset threshold (60%) and the real-time comprehensive decrease rate (5%) is lower than the second preset threshold (12%), the adaptive weighting mechanism is not triggered, and the actual adjustment coefficient is the preset adjustment coefficient. After normalization according to the global weights, the dynamic real-time weights are: 0.51 for the technical evaluation dimension, 0.31 for the production progress dimension, and 0.18 for the economic benefit dimension.

[0057] 3. Conversion of individual indicator scores: In one embodiment, calculating the comprehensive execution index according to the secondary index values, preset secondary index weights and dynamic real-time weights may include: marking the secondary index values as positive indicators and reverse indicators; a positive indicator means that a larger secondary index value represents a better working condition effect; a reverse indicator means that a smaller deviation degree of the secondary index value from the target value represents a better working condition effect, and for a reverse indicator represented in the form of a deviation rate, the absolute value of the deviation rate is taken as the input of the preset piecewise function corresponding to the reverse indicator to determine the primary evaluation result; substituting the secondary index values marked as positive indicators into the preset piecewise function corresponding to the positive indicators to determine the primary evaluation result corresponding to the secondary index values; the preset piecewise function corresponding to the positive indicators is configured to determine the primary evaluation result according to the first value interval to which the secondary index value belongs; the first value interval is divided according to the preset lower limit value, the preset reference value and the preset target value; substituting the secondary index values marked as reverse indicators into the preset piecewise function corresponding to the reverse indicators to determine the primary evaluation result corresponding to the secondary index values; the preset piecewise function corresponding to the reverse indicators is configured to determine the primary evaluation result according to the second value interval to which the secondary index value belongs; the second value interval is divided according to the preset target value, the preset warning value and the preset upper limit value; performing weighted summation on each corresponding primary evaluation result under each dimension according to the preset secondary index weights to generate an evaluation result for each dimension; performing weighted summation on the evaluation results of each dimension according to the dynamic real-time weight corresponding to each dimension to generate a comprehensive execution index.

[0058] Using a preset membership function, each secondary index value is converted into a single index score ranging from 0 to 100, and positive indicators (the larger, the better) and reverse indicators (the smaller, the better) apply different rules respectively: ① Piecewise function for positive indicators: When the secondary index value x is in different intervals, the score is calculated according to the following rules: If x ≥ T, the score is 100; If B ≤ x < T, the score is 80+20×(x-B) / (T-B); If L < x < B, the score is 80×(x-L) / (B-L); If x ≤ L, the score is 0.

[0059] Wherein L, B and T are respectively the preset lower limit value (0-point reference), the preset reference value (80-point reference) and the preset target value (100-point reference).

[0060] ② Piecewise function for reverse indicators: For a reverse indicator represented in the form of a deviation rate, the absolute value of the deviation rate is first taken and denoted as |x|, and when |x| is in different intervals, the score is calculated according to the following rules: If |x|≤T, the score is 100; If T < |x|≤E, get 100 - 40× (|x|-T) / (ET) points; If E < |x| < U, the score is 60 - 60 × (|x|-E) / (UE). If |x|≥U, get 0 points.

[0061] Where T, E, and U are the preset target value (100-point baseline), preset warning value (60-point baseline), and preset upper limit value (0-point baseline), respectively.

[0062] Based on the above rules, the preliminary evaluation results corresponding to the converted secondary indicator values ​​are as follows: ① 8 positive indicators: Production compliance rate 84 points (positive indicator, x=92%, L=70%, B=90%, T=100%, B≤x) <T); Capacity compliance rate: 69.3 points (positive indicator, x=88%, L=75%, B=90%, T=105%, L) <x<B); Drilling footage compliance rate: 70.4 points (positive indicator, x=82%, L=60%, B=85%, T=100%, L) <x<B); EUR compliance rate: 90 points (positive indicator, x=95%, L=80%, B=90%, T=100%, B≤x) <T); New drilling completion rate: 60 points (positive indicator, x=85%, L=70%, B=90%, T=100%, L) <x<B); Cumulative progress completion rate: 60 points (positive indicator, x=80%, L=65%, B=85%, T=100%, L) <x<B); Fracturing well completion rate: 57.8 points (positive indicator, x=83%, L=70%, B=88%, T=100%, L) <x<B); Collection and transportation scale completion rate: 90 points (positive indicator, x=90%, L=60%, B=80%, T=100%, B≤x) <T); ② Four contrarian indicators: Unit operating cost deviation rate: 68 points (reverse indicator, x=12%, |x|=12%, T=0%, E=15%, U=30%, T< |x|≤E); Unit total cost deviation rate: 73.3 points (reverse indicator, x=8%, |x|=8%, T=0%, E=12%, U=25%, T< |x|≤E); After-tax internal rate of return deviation rate: 76 points (contrarian indicator, x=-3%, |x|=3%, T=0%, E=5%, U=15%, T< |x|≤E); Net present value deviation rate: 88 points (contrarian indicator, x=-3%, |x|=3%, T=0%, E=10%, U=20%, T< |x|≤E).

[0063] 4. Calculation of the Comprehensive Execution Index (CEI): First, based on the preset weights of the secondary indicators within each dimension (preset via AHP), a multi-level weighted sum is performed to calculate the evaluation results for each dimension: The evaluation result for the technical evaluation dimension = 0.30×84 + 0.25×69.3 + 0.20×70.4 + 0.25×90.0 = 79.11; The evaluation result for the production schedule dimension = 0.40×60 + 0.25×60 + 0.20×57.8 + 0.15×90 = 64.06; The evaluation result for the economic benefit dimension = 0.30×68 + 0.25×73.3 + 0.25×76 + 0.20×88 = 75.33; Then, combining the determined dynamic real-time weights of each dimension, the Comprehensive Execution Index (CEI) is calculated: The overall execution index (CEI) is calculated as follows: CEI = 0.51 × 79.11 + 0.31 × 64.06 + 0.18 × 75.33 = 73.76.

[0064] 5. Level Matching and Early Warning: In one embodiment, generating a graded early warning and tracking evaluation report based on a comprehensive execution index and a preset grade label matrix may include: determining the grade corresponding to the comprehensive execution index based on the preset grade label matrix; the grade label matrix includes the correspondence between the comprehensive execution index and the grade; generating a graded early warning and tracking evaluation report based on the grade.

[0065] Based on the preset rating matrix (e.g., 90-100 is excellent, 80-89 is good, 60-79 is average, 30-59 is poor, and 0-29 is terrible), the final calculated comprehensive execution index CEI = 73.76 is matched as "average". Simultaneously, the indicator red line review module is activated, and it is found that the score for the "Completion Rate of Fracturing Wells" in the production progress dimension is only 57.8 points, lower than the preset single-item warning threshold (60 points). A level-two (warning) warning signal is then automatically generated, and the interface displays: "Completion rate of fracturing wells is low (57.8 points), it is recommended to optimize the fracturing operation plan and increase the number of operation teams."

[0066] 6. Report generation: The above quantitative evaluation results are automatically packaged and a quantitative evaluation report is output on the visualization front end, including the Comprehensive Execution Index (CEI) trend curve, radar charts of scores for each dimension, a list of main deviation indicators, and adjustment suggestions.

[0067] Example 2: Evaluation during the medium-to-high water cut period (triggered adaptive weighting): This example demonstrates a scenario where a nonlinear adaptive weighting model is automatically triggered when production dynamic data exceeds a threshold.

[0068] This embodiment demonstrates the entire process of automatically triggering a nonlinear adaptive weighting model when production dynamic data exceeds a threshold, thereby realizing the dynamic shift of the evaluation focus. This embodiment is at a different development stage than Embodiment 1, and the basic adjustment coefficients and final weights are different.

[0069] 1. Data Acquisition and Retrieval: (1) Secondary indicator values ​​of technical evaluation dimension (comparison between design value and actual value): ① Production compliance rate 82%; ② Production capacity compliance rate 78%; ③ Drilling footage compliance rate 95%; ④ Projected final recoverable reserves EUR compliance rate 85%.

[0070] (2) Secondary indicator values ​​of production progress (comparison between design value and actual value): ① New drilling completion rate 95%; ② Cumulative footage completion rate 96%; ③ Fracturing well completion rate 94%; ④ Gathering and transportation scale completion rate 95%.

[0071] (3) Secondary indicator values ​​of economic benefits (performance deviation): ① Unit operating cost deviation +14%; ② Unit total cost deviation +11%; ③ After-tax internal rate of return deviation rate -8%; ④ Financial net present value deviation rate -6%.

[0072] (4) Real-time acquisition and calculation of real-time production dynamic characteristic data: ① Real-time moisture content: 65% (exceeds the first preset threshold f) wlim = 60%)); ② Real-time comprehensive decrease rate: 15% (exceeding the second preset threshold D) lim =12%); ③ Real-time water content rise rate (Δf) w : 5% (i.e., 0.05).

[0073] 2. Parameter setting and dynamic weight adaptive determination: (1) Parameter determination: The preset initial weights for each dimension were determined using the Analytic Hierarchy Process (AHP). After a consistency test (invited 7 experts, CR = 0.06 < 0.1), the results are as follows: Preset initial weights W for the technical evaluation dimension. T0 = 0.55, Preset initial weight W for the production schedule dimension S0= 0.25, Preset initial weight W for the economic benefit dimension E0 =0.20. (Consistent with Example 1).

[0074] The weights of the preset secondary indicators are as follows: production compliance rate 0.30, capacity compliance rate 0.25, drilling footage compliance rate 0.20, EUR compliance rate 0.25, new well completion rate 0.4, cumulative footage completion rate 0.25, fractured well completion rate 0.20, gathering and transportation scale completion rate 0.15, unit operating cost deviation rate 0.30, unit total cost deviation rate 0.25, after-tax internal rate of return deviation rate 0.25, and net present value deviation rate 0.20. (Consistent with Example 1).

[0075] The preset adjustment coefficient for each dimension during the decline period is: λ T0 = 1.1 (Technical Evaluation Dimension), λ S0 = 0.9 (production schedule dimension), λ E0 = 1.0 (Economic benefit dimension). (Different from Example 1, reflecting the characteristics of the decline period).

[0076] The adaptive weighting parameters (unique to this embodiment) are shown in Table 1 below: Table 1

[0077] (2) Dynamic weight adaptation: Due to the real-time moisture content of 65% (exceeding the first preset threshold f), wlim = 60%), Real-time comprehensive decrease rate: 15% (exceeding the second preset threshold D) lim = 12%), triggering the adaptive weighting mechanism, weighting coefficient calculation: ① Adjustment coefficient (λ) corresponding to the technical evaluation dimension tech ): λ tech = 1 + α× [(f w -f wlim ) / (1-f wlim )]²=1+1.0× [(0.65-0.60) / (0.40)]²=1+1.0×0.0156 =1.0156; ② Adjustment coefficient λ corresponding to the economic benefit dimension econ : λ econ =1+β×e^[γ× (D c -D lim )]= 1+0.5×e^[0.3×0.03] ≈1.5045; ③ Adjustment coefficient λ corresponding to the production schedule dimensionprog : λ prog =1 / ln(e+Δf w +D c )= 1 / ln(2.718+0.05+0.15) = 1 / ln(2.918) ≈ 0.934; ④ Calculation of adjustment coefficients in actual stage: Multiply the preset adjustment factor by the (adaptive weighting) adjustment factor: λ T (Actual) = λ T0 × λ tech = 1.1 × 1.0156 = 1.1172; λ S (Actual) = λ S0 × λ prog = 0.9 × 0.934 = 0.8406; λ E (Actual) = λ E0 × λ econ = 1.0 × 1.5045 = 1.5045; ⑤ Global weight update: Calculate the adjusted weights: W T = W T0 × λ T (Actual) = 0.55 × 1.1172 = 0.6145; W S = W S0 × λ S (Actual) = 0.25 × 0.8406 = 0.2102; W E = W E0 × λ E (Actual) = 0.20 × 1.5045 = 0.3009; Total adjustment weight = 0.6145 + 0.2102 + 0.3009 = 1.1256; Normalization process: W T = 0.6145 / 1.1256 ≈ 0.546; W S = 0.2102 / 1.1256 ≈ 0.187; W E = 0.3009 / 1.1256 ≈ 0.267.

[0078] In ④ and ⑤ above, the data with the subscript T corresponds to the technical evaluation dimension, the data with the subscript S corresponds to the production progress dimension, and the data with the subscript E corresponds to the economic benefit dimension.

[0079] As can be seen, compared with the construction phase, the weight of the economic dimension increased significantly (from 0.18 to 0.267), an increase of 48%; the weight of the progress dimension decreased significantly (from 0.31 to 0.187), a decrease of 40%; and the weight of the technology dimension increased slightly (from 0.51 to 0.546). The evaluation focus shifted towards economic benefits, while curbing the blind construction speed during the high-risk phase, which is in line with the management objective of "economic priority" during the decline phase.

[0080] 3. Conversion of individual indicator scores: Using a piecewise linear membership function (calculation formula as in Example 1), the primary evaluation results corresponding to each secondary indicator value are as follows: ① 8 positive indicators: Production compliance rate 48 points (positive indicator, x=82%, L=70%, B=90%, T=100%, L) <x<B); Capacity compliance rate: 16 points (positive indicator, x=78%, L=75%, B=90%, T=105%, L) <x<B); Drilling footage compliance rate: 93.33 points (positive indicator, x=95%, L=60%, B=85%, T=100%, B≤x) <T); EUR compliance rate: 40 points (positive indicator, x=85%, L=80%, B=90%, T=100%, L) <x<B); New drilling completion rate: 90 points (positive indicator, x=95%, L=70%, B=90%, T=100%, B≤x) <T); Cumulative progress completion rate: 94.67 points (positive indicator, x=96%, L=65%, B=85%, T=100%, B≤x) <T); Fracturing well completion rate: 90 points (positive indicator, x=94%, L=70%, B=88%, T=100%, B≤x) <T); Collection and transportation scale completion rate: 95 points (positive indicator, x=95%, L=60%, B=80%, T=100%, B≤x) <T); ② Four contrarian indicators: Unit operating cost deviation rate: 62.67 points (reverse indicator, x=14%, |x|=14%, T=0%, E=15%, U=30%, T<|x|≤E); Unit total cost deviation rate: 63.33 points (reverse indicator, x=11%, |x|=11%, T=0%, E=12%, U=25%, T<|x|≤E); After-tax internal rate of return deviation: 42 points (contrarian indicator, x=-8%, |x|=8%, T=0%, E=5%, U=15%, E<|x|) <U); Net present value deviation rate: 76 points (contrarian indicator, x=-6%, |x|=6%, T=0%, E=10%, U=20%, T<|x|≤E).

[0081] 4. Calculation of the Comprehensive Execution Index (CEI) (calculation method is the same as in Example 1): First, a multi-level weighted sum is performed based on the preset weights of the secondary indicators within each dimension to calculate the evaluation results for each dimension: The evaluation result for the technical evaluation dimension = 0.30×48.0 + 0.25×16.0 + 0.20×93.3 + 0.25×40 = 47.06; The evaluation result for the production schedule dimension = 0.40×90.0 + 0.25×94.67 + 0.20×90.0 + 0.15×95.0 = 91.92; The evaluation result for the economic benefit dimension = 0.30×62.67+0.25×63.33+0.25×42.0+0.20×76.0=60.33; Then, combining the determined dynamic real-time weights of each dimension, the Comprehensive Execution Index (CEI) is calculated: The overall execution index (CEI) is calculated as follows: CEI = 0.546 × 47.06 + 0.187 × 91.92 + 0.267 × 60.33 = 58.99.

[0082] 5. Level Matching and Early Warning: Based on the preset rating matrix (e.g., 90-100 for Excellent, 80-89 for Good, 60-79 for Average, 30-59 for Poor, and 0-29 for Inferior), the final calculated CEI = 58.99 is matched as "Poor". Simultaneously, the indicator red line review module is activated, and it is found that the score for the "After-tax Internal Rate of Return Deviation Rate" item in the economic dimension is only 42.0 points, lower than the preset single-item warning threshold (60 points). A Level 2 (Warning) warning signal is then automatically generated, and the system interface displays the message: "After-tax internal rate of return deviation is -8% (score 42 points), below the 60-point threshold. It is recommended to optimize the cost structure and improve economic efficiency."

[0083] 6. Report generation: The above quantitative evaluation results are automatically packaged and a quantitative evaluation report is output on the visualization front end, including the CEI trend curve, radar chart of scores for each dimension, list of main deviation indicators and adjustment suggestions.

[0084] This embodiment uses the same index system as Embodiment 1. With identical weights for the secondary indicators, it focuses on demonstrating the effects of changes in the basic adjustment coefficient during the decline period and the triggering of the adaptive weighting mechanism after the moisture content and decline rate exceed thresholds. The two embodiments correspond to two typical development stages: the production construction period and the decline period, respectively, fully demonstrating the applicability of the method of this invention in different development scenarios and its adaptive weighting adjustment capability.

[0085] This invention also provides an oilfield development plan tracking and evaluation device, as described in the following embodiments. Since the principle by which this device solves the problem is similar to that of the oilfield development plan tracking and evaluation method, the implementation of this device can refer to the implementation of the oilfield development plan tracking and evaluation method; repeated details will not be elaborated further.

[0086] Figure 4 This is a structural diagram of the oilfield development scheme tracking and evaluation device in an embodiment of the present invention, as shown below. Figure 4 As shown, the device includes: The data acquisition module 401 is used to acquire real-time production dynamic characteristic data, multi-dimensional secondary indicator values ​​of the oilfield development plan and corresponding preset adjustment coefficients during the implementation of the oilfield development plan; the secondary indicator values ​​are determined according to the design values ​​and actual values ​​of the oilfield development plan. The first dynamic real-time weight generation module 402 is used to determine the trigger of the adaptive weight adjustment mechanism based on real-time production dynamic feature data and preset safety threshold, generate adjustment coefficients corresponding to each dimension based on real-time production dynamic feature data, the first preset threshold and the second preset threshold, and then fuse and normalize the preset initial weights corresponding to each dimension according to the adjustment coefficients and the preset adjustment coefficients corresponding to each dimension to generate dynamic real-time weights corresponding to each dimension. The second dynamic real-time weight generation module 403 is used to determine, based on real-time dynamic feature data and preset safety thresholds, that the adaptive weight adjustment mechanism will not be triggered, and to sequentially fuse and normalize the preset initial weights corresponding to each dimension according to the preset adjustment coefficients corresponding to each dimension, thereby generating dynamic real-time weights corresponding to each dimension. The comprehensive execution index calculation module 404 is used to calculate the comprehensive execution index based on the secondary indicator values, preset secondary indicator weights, and dynamic real-time weights; the comprehensive execution index characterizes the overall execution effectiveness and degree of deviation of the oilfield development plan; The tracking and evaluation module 405 is used to generate graded early warnings and tracking and evaluation reports based on the comprehensive execution index and the preset level label matrix.

[0087] In one embodiment, the preset adjustment coefficient, the preset initial weight, and the preset secondary indicator weight for each dimension are determined using the analytic hierarchy process (AHP) after a consistency check.

[0088] In one embodiment, real-time production dynamic characteristic data includes one or any combination of real-time water cut, real-time water cut rise rate, and real-time comprehensive decline rate; the real-time water cut rise rate characterizes the degree of deterioration of water drive development effect and the rate of water cut rise; the real-time comprehensive decline rate characterizes the formation energy deficit degree and the rate of production decline.

[0089] In one embodiment, the multiple dimensions include one or any combination of technical evaluation dimension, economic benefit dimension, and production schedule dimension; The secondary indicator values ​​for the technical evaluation dimension include one or any combination of the following: production compliance rate, capacity compliance rate, drilling footage compliance rate, and projected final recoverable reserves compliance rate. The production compliance rate is determined based on the percentage of matching between the designed and actual production values; the capacity compliance rate is determined based on the percentage of matching between the designed and actual capacity values; the drilling footage compliance rate is determined based on the percentage of matching between the designed and actual drilling footage values; and the projected final recoverable reserves compliance rate is determined based on the percentage of matching between the designed and actual projected final recoverable reserves. The secondary indicators of the economic efficiency dimension include one or any combination of the following: unit operating cost deviation rate, unit total cost deviation rate, after-tax internal rate of return deviation rate, and net present value deviation rate. The unit operating cost deviation rate is determined as a percentage of the deviation between the designed and actual unit operating cost; the unit total cost deviation rate is determined as a percentage of the deviation between the designed and actual unit total cost; the after-tax internal rate of return deviation rate is determined as a percentage of the deviation between the designed and actual after-tax internal rate of return; and the net present value deviation rate is determined as a percentage of the deviation between the designed and actual net present value. The secondary indicators for the production progress dimension include one or any combination of the following: new well drilling completion rate, cumulative footage completion rate, fractured well completion rate, and gathering and transportation scale completion rate. The new well drilling completion rate is determined as a percentage of the match between the designed and actual values ​​of new well drilling completion. The cumulative footage completion rate is determined as a percentage of the match between the designed and actual values ​​of cumulative footage completion. The fractured well completion rate is determined as a percentage of the match between the designed and actual values ​​of fractured well completion. The gathering and transportation scale completion rate is determined as a percentage of the match between the designed and actual values ​​of gathering and transportation scale completion.

[0090] In one embodiment, the first dynamic real-time weight generation module 402 is specifically used for: Based on real-time production dynamic characteristic data and preset safety thresholds, the following adaptive weight adjustment mechanism is triggered: When the real-time water content exceeds the first preset threshold, a nonlinear amplification mechanism is adopted to generate adjustment coefficients corresponding to the technical evaluation dimensions based on the real-time water content, the first preset threshold, and the geological sensitivity constant; the geological sensitivity constant is determined based on the reservoir permeability grade difference. When the real-time comprehensive decline rate exceeds the second preset threshold, an exponential amplification mechanism is adopted to generate an adjustment coefficient corresponding to the economic benefit dimension based on the real-time comprehensive decline rate, the second preset threshold, the preset economic leverage coefficient, and the preset decline penalty factor. When the real-time moisture content exceeds the first preset threshold and the real-time comprehensive decrease rate exceeds the second preset threshold, an adjustment coefficient corresponding to the production progress dimension is generated based on the real-time moisture content increase rate and the real-time comprehensive decrease rate.

[0091] In one embodiment, the first dynamic real-time weight generation module 402 is specifically used for: Calculate the sum of the product of the adjustment coefficients corresponding to the multiple dimensions, the preset initial weights, and the preset adjustment coefficients to generate the total adjustment weights; Based on the adjustment coefficients, preset adjustment coefficients, preset initial weights, and total adjustment weights corresponding to the technical evaluation dimensions, dynamic real-time weights are generated for the technical evaluation dimensions. Based on the adjustment coefficient, preset adjustment coefficient, preset initial weight and total adjustment weight corresponding to the economic benefit dimension, generate the dynamic real-time weight corresponding to the economic benefit dimension. Based on the adjustment coefficient, preset adjustment coefficient, preset initial weight and total adjustment weight corresponding to the production progress dimension, the dynamic real-time weight corresponding to the production progress dimension is generated.

[0092] In one embodiment, the second dynamic real-time weight generation module 403 is specifically used for: Calculate the sum of the products of the preset adjustment coefficients and the preset initial weights corresponding to multiple dimensions to generate the preset total adjustment weight; Based on the preset adjustment coefficients, preset initial weights, and preset total adjustment weights corresponding to the technical evaluation dimensions, dynamic real-time weights corresponding to the technical evaluation dimensions are generated. Based on the preset adjustment coefficient, preset initial weight and preset total adjustment weight corresponding to the economic benefit dimension, the dynamic real-time weight corresponding to the economic benefit dimension is generated. Based on the preset adjustment coefficient, preset initial weight and preset total adjustment weight corresponding to the production progress dimension, the dynamic real-time weight corresponding to the production progress dimension is generated.

[0093] In one embodiment, the comprehensive execution index calculation module 404 is specifically used for: Secondary indicator values ​​are labeled as positive and negative indicators. Positive indicators indicate that the larger the secondary indicator value, the better the working condition. Negative indicators indicate that the smaller the deviation between the secondary indicator value and the target value, the better the working condition. For negative indicators represented by deviation rate, the absolute value of the deviation rate is used as the input of the preset piecewise function corresponding to the negative indicator to determine the primary evaluation result. The secondary indicator value marked as a positive indicator is substituted into the preset piecewise function corresponding to the positive indicator to determine the primary evaluation result corresponding to the secondary indicator value; the preset piecewise function corresponding to the positive indicator is used to determine the primary evaluation result based on the first numerical interval to which the secondary indicator value belongs; the first numerical interval is divided according to the preset lower limit value, the preset benchmark value and the preset target value; The secondary indicator value marked as the reverse indicator is substituted into the preset piecewise function corresponding to the reverse indicator to determine the primary evaluation result corresponding to the secondary indicator value; the preset piecewise function corresponding to the reverse indicator is used to determine the primary evaluation result based on the second numerical interval to which the secondary indicator value belongs; the second numerical interval is divided according to the preset target value, the preset warning value and the preset upper limit value; Based on the preset secondary indicator weights, the corresponding primary evaluation results under each dimension are weighted and summed to generate the evaluation results for each dimension; The evaluation results for each dimension are weighted and summed based on the dynamic real-time weights corresponding to each dimension to generate a comprehensive execution index.

[0094] In one embodiment, the tracking and evaluation module 405 is specifically used for: Based on the preset level label matrix, the level corresponding to the comprehensive execution index is determined; the level label matrix includes the correspondence between the comprehensive execution index and the level. Based on the classification, a graded early warning system is implemented, and a tracking and evaluation report is generated.

[0095] This invention also provides a computer device. Figure 5 This is a schematic diagram of a computer device provided in an embodiment of the present invention. The computer device 500 includes a memory 510, a processor 520, and a computer program 530 stored in the memory 510 and executable on the processor 520. When the processor 520 executes the computer program 530, it implements the above-mentioned oilfield development scheme tracking and evaluation method.

[0096] This invention also provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the above-described oilfield development scheme tracking and evaluation method.

[0097] This invention also provides a computer program product, which includes a computer program that, when executed by a processor, implements the above-mentioned oilfield development scheme tracking and evaluation method.

[0098] Compared with existing technologies, this invention obtains real-time production dynamic characteristic data, multi-dimensional secondary indicator values, and corresponding preset adjustment coefficients of the oilfield development plan during its implementation. The secondary indicator values ​​are determined based on the design and actual values ​​of the oilfield development plan. An adaptive weight adjustment mechanism is triggered based on the real-time production dynamic characteristic data and preset safety thresholds. Adjustment coefficients are generated for each dimension based on the real-time production dynamic characteristic data, a first preset threshold, and a second preset threshold. The preset initial weights for each dimension are sequentially fused and normalized based on the adjustment coefficients and the preset adjustment coefficients corresponding to each dimension to generate dynamic real-time weights for each dimension. When the real-time production dynamic characteristic data and preset safety thresholds are used... The system employs a full threshold approach to prevent the adaptive weight adjustment mechanism from being triggered. Based on preset adjustment coefficients corresponding to each dimension, the preset initial weights for each dimension are sequentially fused and normalized to generate dynamic real-time weights for each dimension. A comprehensive execution index is calculated based on secondary indicator values, preset secondary indicator weights, and dynamic real-time weights. This comprehensive execution index characterizes the overall execution effectiveness and deviation degree of the oilfield development plan. Based on the comprehensive execution index and a preset graded label matrix, tiered early warning and tracking evaluation reports are generated. This approach enables intelligent, automated, real-time, and comprehensive evaluation processes, allowing evaluation weights to dynamically and adaptively evolve with the oilfield development stage. It overcomes the limitations of static rigidity and significantly improves the scientific rigor and practicality of oil and gas development plan tracking evaluation and risk early warning.

[0099] The technical effects of the embodiments of the present invention include: This invention automates and real-times the evaluation process by automatically collecting multi-source data and calculating the Comprehensive Execution Index (CEI) in real time, fundamentally solving the lag problem caused by manual statistics. Addressing the issue of a single evaluation dimension, this invention integrates multiple indicators from three dimensions—technology, progress, and economy—for multi-level weighted summation, avoiding the one-sidedness of single-indicator evaluation and achieving comprehensive quantitative evaluation. Addressing the issue of fixed weights, this invention automatically adjusts evaluation weights based on project stages and real-time production dynamics, allowing evaluation standards to dynamically change with development progress, overcoming the technical shortcomings of fixed weights in traditional analytic hierarchy process (AHP). Addressing the issue of strong subjectivity, this invention directly incorporates objective physical quantities such as water cut increase rate and comprehensive decline rate into the evaluation system, achieving intelligent evaluation based on "physical mechanisms + data-driven" approaches, avoiding subjective human intervention. Furthermore, by generating the CEI and tiered early warning signals, this invention provides managers with intuitive and timely decision-making basis and directly uses the evaluation results to guide on-site production control, forming a closed-loop management system of "collection-evaluation-early warning-adjustment," significantly improving the scientific rigor and practicality of oil and gas development program tracking and evaluation.

[0100] By automatically collecting multi-source production dynamic data and calculating the comprehensive execution index in real time, the evaluation cycle can be compressed to within 30 days, significantly better than the traditional manual monthly reporting model. Compared with the traditional AHP one-time weighting method, this invention increases the weight of the technical dimension by about 7.1% during the medium-to-high water cut period, and the weight of the economic dimension increases exponentially during the period of accelerated decline, while the progress dimension decays synchronously, verifying the effectiveness of the dynamic migration of weights with reservoir physical stages. By directly using the water cut exceedance and decline rate exceedance as weight adjustment variables, and embedding engineering calibration parameters such as the geological sensitivity constant α and the economic leverage coefficient β, the weight changes have a clear reservoir dynamic physical substance (such as λ). tech The increase and (f w -f wlim (Positive correlation) differs from existing black-box algorithms; in Example 2, based on CEI=58.99 (poor level), it accurately identifies technical shortcomings such as "production compliance rate 82%" and "capacity compliance rate 78%" and generates water control and oil stabilization adjustment suggestions, supporting an improvement of more than 50% in the timeliness of on-site decision response; based on backtracking verification of 12 typical blocks, the comprehensive execution index has reduced the deviation of evaluation by 42% compared with the single production indicator, significantly overcoming the one-sidedness of traditional evaluation and forming a closed-loop management capability of "collection-evaluation-early warning-adjustment".

[0101] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0102] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations and / or block diagrams. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0103] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0104] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0105] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of the present invention. It should be understood that the above descriptions are merely specific embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A method for tracking and evaluating oilfield development plans, characterized in that, include: Acquire real-time production dynamic characteristic data, multi-dimensional secondary indicator values ​​of the oilfield development plan, and corresponding preset adjustment coefficients during the implementation of the oilfield development plan; The secondary indicator values ​​are determined based on the design values ​​and actual values ​​of the oilfield development plan. When the adaptive weight adjustment mechanism is triggered based on the real-time production dynamic feature data and the preset safety threshold, the adjustment coefficient corresponding to each dimension is generated based on the real-time production dynamic feature data, the first preset threshold and the second preset threshold. Based on the adjustment coefficient and the preset adjustment coefficient corresponding to each dimension, the preset initial weights corresponding to each dimension are sequentially fused and normalized to generate the dynamic real-time weights corresponding to each dimension. When it is determined that the adaptive weight adjustment mechanism will not be triggered based on the real-time production dynamic feature data and the preset safety threshold, the preset initial weights corresponding to each dimension are sequentially fused and normalized according to the preset adjustment coefficients corresponding to each dimension to generate the dynamic real-time weights corresponding to each dimension. The comprehensive execution index is calculated based on the secondary indicator values, preset secondary indicator weights, and dynamic real-time weights; the comprehensive execution index characterizes the overall execution effectiveness and degree of deviation of the oilfield development plan. Based on the comprehensive execution index and the preset level label matrix, a graded early warning and tracking evaluation report is generated.

2. The method as described in claim 1, characterized in that, The preset adjustment coefficients, preset initial weights, and preset secondary index weights for each dimension are determined using the analytic hierarchy process (AHP) and after a consistency check.

3. The method as described in claim 1, characterized in that, The real-time production dynamic characteristic data includes one or any combination of real-time water cut, real-time water cut rise rate, and real-time comprehensive decline rate; the real-time water cut rise rate characterizes the degree of deterioration of water drive development effect and the rate of water cut rise; the real-time comprehensive decline rate characterizes the formation energy deficit degree and the rate of production decline.

4. The method as described in claim 3, characterized in that, The multi-dimensional dimension includes one or any combination of the technical evaluation dimension, economic benefit dimension, and production schedule dimension; The secondary indicator values ​​of the technical evaluation dimension include one or any combination of production compliance rate, capacity compliance rate, drilling footage compliance rate, and projected final recoverable reserves compliance rate; the production compliance rate is determined based on the percentage of matching between the designed and actual production values; the capacity compliance rate is determined based on the percentage of matching between the designed and actual capacity values; the drilling footage compliance rate is determined based on the percentage of matching between the designed and actual drilling footage values; and the projected final recoverable reserves compliance rate is determined based on the percentage of matching between the designed and actual projected final recoverable reserves. The secondary indicator values ​​of the economic benefit dimension include one or any combination of the following: unit operating cost deviation rate, unit total cost deviation rate, after-tax internal rate of return deviation rate, and net present value deviation rate. The unit operating cost deviation rate is determined as a percentage of the deviation between the designed and actual unit operating cost. The unit total cost deviation rate is determined as a percentage of the deviation between the designed and actual unit total cost. The after-tax internal rate of return deviation rate is determined as a percentage of the deviation between the designed and actual after-tax internal rate of return. The net present value deviation rate is determined as a percentage of the deviation between the designed and actual net present value. The secondary indicator values ​​of the production progress dimension include one or any combination of the new well drilling completion rate, cumulative footage completion rate, fractured well completion rate, and gathering and transportation scale completion rate; the new well drilling completion rate is determined based on the percentage of the matching degree between the designed value and the actual value of the new well drilling completion degree; the cumulative footage completion rate is determined based on the percentage of the matching degree between the designed value and the actual value of the cumulative footage completion degree; the fractured well completion rate is determined based on the percentage of the matching degree between the designed value and the actual value of the fractured well completion degree; and the gathering and transportation scale completion rate is determined based on the percentage of the matching degree between the designed value and the actual value of the gathering and transportation scale completion degree.

5. The method as described in claim 4, characterized in that, When the adaptive weight adjustment mechanism is triggered based on the real-time production dynamic feature data and the preset safety threshold, the adjustment coefficient corresponding to each dimension is generated based on the real-time production dynamic feature data, the first preset threshold, and the second preset threshold, including: Based on the real-time production dynamic feature data and the preset safety threshold, the following adaptive weight adjustment mechanism is triggered: When the real-time water content exceeds a first preset threshold, a nonlinear amplification mechanism is used to generate adjustment coefficients corresponding to the technical evaluation dimensions based on the real-time water content, the first preset threshold, and the geological sensitivity constant; the geological sensitivity constant is determined based on the reservoir permeability gradient. When the real-time comprehensive decline rate exceeds the second preset threshold, an exponential amplification mechanism is adopted to generate an adjustment coefficient corresponding to the economic benefit dimension based on the real-time comprehensive decline rate, the second preset threshold, the preset economic leverage coefficient, and the preset decline penalty factor. When the real-time moisture content exceeds a first preset threshold and the real-time comprehensive decrease rate exceeds a second preset threshold, an adjustment coefficient corresponding to the production progress dimension is generated based on the real-time moisture content increase rate and the real-time comprehensive decrease rate.

6. The method as described in claim 5, characterized in that, Based on the adjustment coefficients and the preset adjustment coefficients corresponding to each dimension, the preset initial weights corresponding to each dimension are sequentially fused and normalized to generate dynamic real-time weights corresponding to each dimension, including: Calculate the sum of the product of the adjustment coefficients corresponding to the multiple dimensions, the preset initial weights, and the preset adjustment coefficients to generate the total adjustment weights; Based on the adjustment coefficients, preset adjustment coefficients, preset initial weights, and total adjustment weights corresponding to the technical evaluation dimensions, dynamic real-time weights are generated for the technical evaluation dimensions. Based on the adjustment coefficient, preset adjustment coefficient, preset initial weight and total adjustment weight corresponding to the economic benefit dimension, a dynamic real-time weight corresponding to the economic benefit dimension is generated. Based on the adjustment coefficient, preset adjustment coefficient, preset initial weight and total adjustment weight corresponding to the production progress dimension, a dynamic real-time weight corresponding to the production progress dimension is generated.

7. The method as described in claim 5, characterized in that, When it is determined, based on the real-time production dynamic feature data and the preset safety threshold, that the adaptive weight adjustment mechanism will not be triggered, the preset initial weights corresponding to each dimension are sequentially fused and normalized according to the preset adjustment coefficients corresponding to each dimension to generate the dynamic real-time weights corresponding to each dimension, including: Calculate the sum of the products of the preset adjustment coefficients and the preset initial weights corresponding to multiple dimensions to generate the preset total adjustment weight; Based on the preset adjustment coefficients corresponding to the technical evaluation dimensions, the preset initial weights corresponding to the technical evaluation dimensions, and the preset total adjustment weights, dynamic real-time weights corresponding to the technical evaluation dimensions are generated. Based on the preset adjustment coefficient corresponding to the economic benefit dimension, the preset initial weight corresponding to the economic benefit dimension, and the preset total adjustment weight, a dynamic real-time weight corresponding to the economic benefit dimension is generated. Based on the preset adjustment coefficient corresponding to the production progress dimension, the preset initial weight corresponding to the production progress dimension, and the preset total adjustment weight, a dynamic real-time weight corresponding to the production progress dimension is generated.

8. The method as described in claim 5, characterized in that, Based on the secondary indicator values, preset secondary indicator weights, and the dynamic real-time weights, a comprehensive execution index is calculated, including: The secondary indicator values ​​are labeled with positive and negative indicators; the positive indicator represents that the larger the secondary indicator value, the better the working condition; the negative indicator represents that the smaller the deviation between the secondary indicator value and the target value, the better the working condition; for the negative indicator represented by the deviation rate, the absolute value of the deviation rate is used as the input of the preset piecewise function corresponding to the negative indicator to determine the primary evaluation result. The secondary indicator value marked as a positive indicator is substituted into the preset piecewise function corresponding to the positive indicator to determine the primary evaluation result corresponding to the secondary indicator value; the preset piecewise function corresponding to the positive indicator is used to determine the primary evaluation result according to the first numerical interval to which the secondary indicator value belongs; the first numerical interval is divided according to a preset lower limit value, a preset benchmark value and a preset target value; The absolute value of the secondary indicator value marked as the reverse indicator is taken and substituted into the preset piecewise function corresponding to the reverse indicator to determine the primary evaluation result corresponding to the secondary indicator value; the preset piecewise function corresponding to the reverse indicator is used to determine the primary evaluation result according to the second numerical interval to which the secondary indicator value belongs; the second numerical interval is divided according to the preset target value, the preset warning value and the preset upper limit value; Based on the preset secondary indicator weights, the corresponding primary evaluation results under each dimension are weighted and summed to generate the evaluation results for each dimension; The evaluation results for each dimension are weighted and summed based on the dynamic real-time weights corresponding to each dimension to generate a comprehensive execution index.

9. The method as described in claim 5, characterized in that, Based on the comprehensive execution index and the preset level label matrix, a graded early warning and tracking evaluation report is generated, including: Based on a preset level label matrix, the level corresponding to the comprehensive execution index is determined; the level label matrix includes the correspondence between the comprehensive execution index and the level. Based on the aforementioned classification, a graded early warning system is implemented, and a tracking and evaluation report is generated.

10. An oilfield development plan tracking and evaluation device, characterized in that, include: The data acquisition module is used to acquire real-time production dynamic characteristic data, multi-dimensional secondary indicator values ​​of the oilfield development plan, and corresponding preset adjustment coefficients during the implementation of the oilfield development plan. The secondary indicator values ​​are determined based on the design values ​​and actual values ​​of the oilfield development plan. The first dynamic real-time weight generation module is used to determine the triggering of the adaptive weight adjustment mechanism based on the real-time production dynamic feature data and the preset safety threshold, generate the adjustment coefficient corresponding to each dimension based on the real-time production dynamic feature data, the first preset threshold and the second preset threshold; and fuse and normalize the preset initial weights corresponding to each dimension in sequence based on the adjustment coefficients and the preset adjustment coefficients corresponding to each dimension to generate the dynamic real-time weights corresponding to each dimension. The second dynamic real-time weight generation module is used to determine, based on the real-time production dynamic feature data and the preset safety threshold, that the adaptive weight adjustment mechanism will not be triggered, and to sequentially fuse and normalize the preset initial weights corresponding to each dimension according to the preset adjustment coefficients corresponding to each dimension, thereby generating the dynamic real-time weights corresponding to each dimension. The comprehensive execution index calculation module is used to calculate the comprehensive execution index based on the secondary indicator values, preset secondary indicator weights, and the dynamic real-time weights; the comprehensive execution index characterizes the overall execution effectiveness and degree of deviation of the oilfield development plan; The tracking and evaluation module is used to generate graded early warnings and tracking and evaluation reports based on the comprehensive execution index and the preset level label matrix.

11. A computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the method of any one of claims 1 to 9.

12. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores a computer program that, when executed by a processor, implements the method of any one of claims 1 to 9.

13. A computer program product, characterized in that, The computer program product includes a computer program that, when executed by a processor, implements the method of any one of claims 1 to 9.