A method for cross-channel marketing data fusion and correlation analysis in the construction industry
By using cross-channel marketing data fusion and correlation analysis methods, the problems of inconsistent data standards and unquantifiable information credibility in the construction industry have been solved. This has enabled unified data cleaning and traceability of business transmission links, accurately assessing channel value and supporting refined marketing analysis.
Patent Information
- Application Number
- CN202611498447.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-24
- Publication Date
- 2026-11-17
AI Technical Summary
In the construction industry's marketing data processing, the inconsistent data from multiple channels, the inability to quantify information credibility, and the difficulty in tracing business transmission links lead to data quality defects and distorted analysis results, making it impossible to support refined digital marketing analysis.
By employing a cross-channel marketing data fusion and correlation analysis method, through multi-channel lead grouping, dynamic credibility decay scoring, weighted selection algorithm, and implicit transmission correlation graph, we achieve unified data cleaning, relationship mining, and rule optimization, generate standardized project datasets, quantify channel contributions, and iteratively verify rules in reverse.
It achieves unified organization and dynamic control of data credibility across multiple channels, eliminates inconsistencies in data definitions, clearly restores the business transmission chain, accurately assesses channel value, and assists in optimizing marketing strategies.
Smart Images

Figure CN123118148A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of big data processing technology in the construction marketing field, specifically a method for cross-channel marketing data fusion and correlation analysis in the construction industry. Background Technology
[0002] The construction industry generates a wide variety of marketing leads from diverse sources, including online promotions, offline distribution partnerships, industry exhibitions, business connections with design institutes, and official bidding announcements. These channels naturally differ in their data collection standards, information recording dimensions, and update schedules. Leads encompass various business fields such as project investment, construction period, location, and partner entities. This massive amount of multi-source data is often scattered across independent business systems, lacking a unified data integration and processing framework. Construction projects are characterized by strong regional attributes, multiple levels of participating entities, and long business promotion chains. Project transactions often involve multiple layers of referrals, and single-channel leads can only record partial business information, failing to fully represent the entire business process from channel access to project implementation. During the industry's digital transformation, companies generally need to rely on multi-channel leads to conduct channel value assessments and project conversion analyses. There is a stable and urgent market demand for data processing solutions that can integrate multi-source leads, automatically assess information credibility, and uncover business transmission logic.
[0003] Existing methods for processing construction marketing data often rely on simple keyword matching to merge leads, lacking a standardized constraint system to dynamically verify the authenticity of information from multiple channels. This makes it impossible to differentiate the stability of data from different channels. When multiple leads for the same project experience field conflicts, content is randomly selected, easily leading to distortion of basic project information. Traditional data processing tools lack mechanisms for independently partitioning and storing channel data deviations, resulting in a jumbled mess of erroneous records from various channels, making it difficult to pinpoint long-standing data quality defects in a single channel. Conventional data storage structures can only independently store information on channels, companies, and projects, failing to build hierarchical relationship graphs, reconstruct multi-level business transmission chains, or quantify the actual driving force of each channel on the final transaction. Traditional processes lack closed-loop iterative logic, cannot rely on abnormal business samples to reverse-engineer data verification rules, and data cleaning and analysis rules remain fixed, making it difficult to adapt to the continuously changing project market and channel operating environment. Consequently, data analysis results cannot provide reliable basis for optimizing channel placement. Summary of the Invention
[0004] The purpose of this invention is to overcome the shortcomings of existing technologies and provide a method for cross-channel marketing data fusion and correlation analysis in the construction industry. This method sequentially completes the grouping and aggregation of multi-channel marketing leads, dynamic assessment of lead credibility, and standardization of conflict fields. It retains data deviation information from each channel using independent storage space, generating a unified and standardized project dataset. From this dataset, it extracts channels, decision-makers, and project entities to build an incrementally updatable implicit transmission correlation graph. It sets link jump thresholds to filter effective transmission paths, and calculates the transmission contribution of each channel in reverse based on completed projects. It simultaneously outputs link records, channel statistics, and anomaly samples. Based on the anomaly samples, it corrects the constraint rule base and deviation storage, and periodically iterates and verifies the rules to form a complete closed-loop processing flow. This invention solves industry problems such as chaotic multi-channel data definitions, inability to quantify information credibility, and difficulty in tracing business transmission links. It automatically completes data cleaning, relationship mining, and autonomous rule optimization, accurately assesses channel marketing value, and supports the refined digital marketing analysis work of construction enterprises.
[0005] To solve the above-mentioned technical problems, this invention provides the following technical solution: a method for cross-channel marketing data fusion and correlation analysis in the construction industry, the specific steps of which are as follows: S1. Collect original marketing leads from multiple business channels, extract business fields, and group them by project name, location code, and owner unit information keywords to generate lead groups; construct a three-dimensional constraint rule library, set parameters for the dynamic credibility decay scoring algorithm, input project benchmark information and location compliance channel information, allocate independent historical deviation record storage space for each business channel, and output lead groups with group identifiers; in the initial running state, the deviation data in the historical deviation record storage space is set to a default null value, and the dynamic credibility decay scoring algorithm uses a preset static base score as the initial scoring basis; S2 reads the clue grouping and rule base parameters, runs the dynamic credibility decay scoring algorithm to calculate the clue credibility score and performs time-based decay; calls the three-dimensional constraint weighted selection algorithm to calculate the weighted score of the conflict field of multi-source clues in the same clue group and selects the field value of the best one, generates standardized project data and processing log, writes the channel deviation information into the corresponding historical deviation record storage space, and outputs the standardized project dataset. S3. Extract three types of entities from the standardized project dataset: channels, decision-making entities, and engineering projects. Identify the relationships and attach business occurrence time and jump level identifiers. Construct an implicit transmission relationship graph of building marketing and enable incremental updates. Output the implicit transmission relationship graph of building marketing. S4, set the maximum number of jumps threshold of the link in the implicit transmission association graph of building marketing, filter the engineering projects with the transaction status, use the transaction project as the endpoint to traverse the implicit transmission association graph of building marketing in reverse to obtain the business transmission link, call the link jump number transmission contribution algorithm to calculate the transmission contribution value of the channel node, and output the link record, channel statistics and abnormal samples. S5 receives abnormal business samples and channel statistics results, reads the sample project number and link path, modifies the rule base and deviation storage; when the period arrives, it re-runs the dynamic credibility decay scoring algorithm to calculate the iteration parameters, obtains the iteration rule base and sends it back to the clue collection step, and updates the grouping and configuration.
[0006] Furthermore, the original marketing leads collected in step S1 are obtained from online promotion channels, local dealer channels, industry exhibition channels, design institute liaison channels, and bidding announcement channels; the extracted business fields include project investment amount, construction period, project scale, project location, liaison unit, and contact person; when merging and grouping, the project name text, location code characters, and owner unit name text stored in the original leads are compared. Multiple original leads that match all three items are grouped into the same lead group, and original leads that do not match the three items are grouped into different lead groups; the historical deviation record storage space is allocated to each business channel, and each business channel corresponds to a unique historical deviation record storage space, which receives the channel deviation information passed in step S2.
[0007] Furthermore, all parameters of the dynamic credibility decay scoring algorithm set in step S1 are written into the internal storage unit of the three-dimensional constraint rule base; the set parameters include the credibility periodic adjustment execution cycle, data deviation judgment conditions, credibility rise and fall trigger conditions, and time decay related control conditions; the text content verification is completed before the engineering project benchmark information is entered, and the engineering project benchmark information is stored in the three-dimensional constraint rule base one by one; the local compliance channel information is divided into entries according to administrative regions, and each entry records the business channel identifier that can report clues under the corresponding administrative region, and the local compliance channel information is stored in the three-dimensional constraint rule base one by one.
[0008] Furthermore, the processing log generated in step S2 is bound to the corresponding project code, which is taken from the group identifier carried by the clue group; the processing log writes the complete text of the original clue, the field-by-field comparison content between different clues, all candidate values of the conflict field, and the record of the selection process of the conflict field; the channel deviation information includes the time when the deviation occurred, the name of the business field that caused the deviation, and the severity level of the deviation; the channel deviation information is generated one by one for each clue, and written one by one to the historical deviation record storage space allocated to the corresponding business channel, and no data cross-writing occurs between the historical deviation record storage spaces corresponding to different business channels.
[0009] Furthermore, in step S3, the channel entity extracted is entered as the business channel identifier; the decision-making entity is entered as the name of the design institute, the name of the general contractor, and the name of the construction unit; the project entity is entered as the project location code, the project scale value, and the project transaction status marker; the identified relationships include the direct reach relationship between the channel and the decision-making entity, the business promotion and transmission relationship between different decision-making entities, and the project undertaking relationship between the decision-making entity and the project; the business occurrence time records the corresponding timestamp generated by the relationship; the jump level identifier records the entity count value passed by a single relationship link from the starting entity to the ending entity, and the jump level identifier is written into the implicit transmission relationship map storage content of the building marketing along with the relationship.
[0010] Furthermore, when incremental updates are enabled in step S3, new entries are received from the standardized project dataset, and the channel entity, decision-making entity, and engineering project entity corresponding to the new entries are parsed. If the new entity does not exist within the implicit transmission association graph of construction marketing, all attribute contents of the new entity are written into the implicit transmission association graph of construction marketing. If the new association does not exist within the implicit transmission association graph of construction marketing, the new association, business occurrence time, and jump level identifier are written into the implicit transmission association graph of construction marketing. Existing entities and existing associations within the implicit transmission association graph of construction marketing retain all their original stored contents, and entity deletion, association deletion, and full reconstruction of the implicit transmission association graph of construction marketing are not performed.
[0011] Furthermore, the maximum number of jumps threshold set in step S4 is a pre-set value; after traversing the implicit transmission association graph of building marketing in reverse to obtain all business transmission links, the count value carried by the jump level identifier corresponding to each business transmission link is read; business transmission links with a count value greater than the maximum number of jumps threshold are excluded from the calculation object of channel node transmission contribution value; business transmission links with a count value less than or equal to the maximum number of jumps threshold are retained in the set of calculation objects of channel node transmission contribution value; business transmission links are divided into direct business links and indirect transmission links according to the type of the link starting entity, and each business transmission link is configured with an independent transaction status flag bit.
[0012] Furthermore, the link record output in step S4 includes the business channel identifiers along the link path, the names of the participating decision-making entities, the order of entity jumps, and the timestamp corresponding to each association; the channel statistics record the transmission contribution value corresponding to each business channel; the abnormal sample carries the project number and the complete sequence of the link path; the abnormal sample marks business logic contradiction entries and source information abnormal entries; the link record, channel statistics, and abnormal sample are output synchronously, and the project number carried by the abnormal sample is consistent with the project code.
[0013] Furthermore, after reading the sample project number and link path in step S5, the corresponding original clue entry, corresponding clue group, and corresponding historical processing record are matched and located based on the project number; modifying the rule base includes adding engineering project benchmark information entries to the three-dimensional constraint rule base and rewriting the content of existing local compliance channel information entries within the three-dimensional constraint rule base; modifying the deviation storage includes adding deviation data entries to the historical deviation record storage space and rewriting the content of existing deviation data entries within the historical deviation record storage space; after the rule base modification is completed, all modified content is saved.
[0014] Compared with existing technologies, this cross-channel marketing data fusion and correlation analysis method in the construction industry has the following beneficial effects: I. This invention achieves unified organization and dynamic credibility control of multi-source marketing leads in the construction industry through a multi-channel original lead hierarchical aggregation and three-dimensional constraint rule base collaborative management mode. It continuously calibrates the credibility level of leads from each channel based on time-effect decay logic, and solves the field conflict problem of multi-source leads for the same project by using a weighted selection mechanism. The solution configures an independent deviation storage area for each channel to achieve isolation and traceability of channel data quality issues, outputs standardized project datasets and complete processing logs, and eliminates the industry pain point of inconsistent data standards and contradictory information from multiple channels such as online promotion, dealers, and exhibitions. The entire process does not require manual calibration and correction of lead information one by one. It automatically completes field selection and deviation retention by relying on standardized calculations, which greatly reduces the manual cost of cross-channel data cleaning, unifies the project data output standard, and provides clean, traceable, and credible basic data for subsequent business association mining, avoiding the result distortion problem caused by direct analysis of multi-source messy leads.
[0015] II. This invention constructs an incrementally updatable marketing implicit transmission relationship graph through entity extraction and association identification. It filters invalid long links based on preset link jump thresholds, traces the business transmission path back from the transaction project, quantifies the business transmission contribution of each channel, and simultaneously outputs link records, channel statistics, and abnormal samples. The graph adopts an incremental update mechanism, which can continuously incorporate new projects and channel relationships without full reconstruction, reducing the resource consumption of data recalculation, and clearly restores the multi-level business promotion and acceptance relationships between channels, construction entities, and engineering projects. Based on the quantitative results of link contribution, it locates inefficient channels and logically abnormal business samples, and iteratively updates the constraint rule base and channel deviation storage in reverse, forming a closed-loop operation system of data collection, fusion analysis, and rule iteration. It accurately measures the actual conversion value of each channel, helps business personnel locate marketing weaknesses, and realizes dynamic optimization of marketing channel placement strategies.
[0016] Other advantages, objectives and features of the invention will be set forth in part in the description which follows, and in part will be apparent to those skilled in the art from the following examination or study, or may be learned from the practice of the invention. Attached Figure Description
[0017] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are merely some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without any creative effort.
[0018] Figure 1 A flowchart outlining the methodology for cross-channel marketing data integration and correlation analysis in the construction industry. Figure 2 Detailed flowcharts for calculating the credibility of clues and generating standardized data; Figure 3 A flowchart for constructing an implicit transmission relationship map for architectural marketing. Detailed Implementation
[0019] To further illustrate the technical means and effects of the present invention in achieving its intended purpose, the following detailed description of the specific implementation methods, structures, features, and effects of the present invention, in conjunction with the accompanying drawings and preferred embodiments, is provided below.
[0020] Example: Reference Figure 1 One embodiment of the present invention proposes a cross-channel marketing data fusion and correlation analysis method for the construction industry. It adopts a data processing mechanism that includes multi-channel lead grouping and merging, dynamic credibility decay scoring, three-dimensional constraint weighted optimization fusion, incremental construction of marketing transmission maps, and reverse tracing and iterative optimization of link contribution. It can achieve standardized and unified cleaning of multi-source leads, complete tracing of business transmission links, and quantitative evaluation of customer acquisition contribution of each channel when there are field conflicts, timeliness distortions, and uneven channel credibility in multi-source construction marketing leads. It also achieves automated governance of construction marketing lead data and quantitative analysis of channel value throughout the entire process based on closed-loop iterative updates of the rule base based on abnormal samples.
[0021] The method described in this embodiment specifically includes: Collect original marketing leads from multiple business channels, including online promotions, local distributors, industry exhibitions, design institute connections, and bidding announcements. Extract standardized business fields and group leads based on a triple matching rule of project name, location code, and owner unit keywords. Build a three-dimensional constraint rule library, configure all control parameters of the dynamic credibility decay scoring algorithm, input the engineering project benchmark information and the list of compliant local channels, allocate independent and isolated historical deviation record storage space for each business channel, and output a lead group dataset with a unique group identifier. The system reads all configuration parameters built into the lead grouping and 3D constraint rule base, runs a dynamic credibility decay scoring algorithm to calculate real-time credibility for each channel, and completes time-dimension timeliness decay processing. It then calls a 3D constraint weighted optimization algorithm to perform weighted optimization of conflict fields in multi-source leads within the same group, generating unified standardized project data and a full processing log bound to project codes. Deviation information generated by a single lead in a single channel is written to the corresponding channel's dedicated historical deviation storage area, outputting a standardized project dataset, such as... Figure 2 As shown; From a standardized project dataset, three types of entities—channels, decision-makers, and engineering projects—are extracted. Three types of relationships are identified: channel reach, entity promotion, and project acquisition. Each relationship is appended with a business occurrence timestamp and jump level identifier. An implicit transmission relationship graph for construction marketing is constructed and an incremental update mode is enabled. The resulting continuously iteratively updated implicit transmission relationship graph for construction marketing is then output. Figure 3 As shown; Pre-configure the maximum number of jumps threshold for the graph link, select all completed projects as the traceability endpoint, traverse the implicit transmission association graph of construction marketing from the completed projects in reverse, and extract all business transmission links; filter out invalid links with jump counts exceeding the threshold, call the link jump count transmission contribution algorithm to quantify the transmission contribution value for each channel, and finally output complete link records, channel-specific statistical results, and abnormal business samples with project numbers; Read the project number and complete link path bound to the abnormal sample, match and locate the corresponding original clue, clue group, and historical processing log, and modify the three-dimensional constraint rule base and the storage space of historical deviation records of each channel accordingly; after the system periodically triggers, re-run the dynamic credibility decay scoring algorithm to iterate all control parameters, generate an updated iterative rule base and send it back to the clue collection stage, and synchronously update the clue grouping logic and the system global configuration parameters.
[0022] Specifically, the complete logic of the technical execution process of this invention lies in building a fully closed-loop construction marketing lead data processing system. This system first performs unified field extraction and triple keyword grouping on heterogeneous original leads scattered across five business channels, isolating lead data from different projects. It then uses a three-dimensional constraint rule library to uniformly store three types of configuration parameters: project baseline, local channel compliance, and scoring algorithm. This creates physically isolated deviation storage areas for each business channel, preventing cross-contamination of channel deviation data. Secondly, a dynamic credibility decay scoring algorithm is used to calculate the real-time credibility level of a channel by comprehensively considering the proportion of historical effective samples, static base scores, and time decay periods. This is then combined with project matching correction coefficients and regional compliance constraint coefficients to optimize and unify conflicting fields, resolving inconsistencies in lead information across multiple channels. Finally, based on the cleaned and standardized project data, three types of business entities and multi-level relationships are extracted to construct an incrementally updatable transmission graph, continuously incorporating new project data without requiring a full reconstruction. Finally, using the completed projects as the starting point for reverse tracing, we filter out excessively long transmission chains, quantify the contribution of each channel to the conversion of transactions, identify abnormal samples with contradictory business logic and disordered source information, and correct the rule base and deviation storage data based on the feedback results of abnormal samples, so as to achieve a closed-loop operation of the entire chain of lead collection, cleaning and fusion, correlation modeling, value statistics, and rule iteration.
[0023] Optionally, the process involves collecting original marketing leads from multiple business channels, extracting business fields, grouping them by project name, location code, and owner unit information keywords to generate lead groups; constructing a three-dimensional constraint rule base, setting parameters for a dynamic credibility decay scoring algorithm, inputting project benchmark information and location compliance channel information, allocating independent historical deviation record storage space for each business channel, and outputting lead groups carrying group identifiers, including: We batch retrieved original construction marketing leads from five business interfaces: online promotion channels, local dealer channels, industry exhibition channels, design institute liaison channels, and bidding announcement channels. We analyzed the embedded text content of each original lead and uniformly extracted six core business fields: project investment amount, construction period, project scale, project location, liaison unit, and contact person. We performed a triple keyword comparison on each pair of original leads. Only when the project name text, location code characters, and owner unit name text are completely identical, multiple original leads are merged into the same lead group. Original leads with text or character differences in any of the three contents are separately assigned to a new lead group, and each group is assigned a unique numerical group identifier. An independent storage unit for the three-dimensional constraint rule library is built, and all parameters required by the dynamic credibility decay scoring algorithm are entered into the rule library for persistent storage. The parameter entries include four types of configurations: credibility periodic adjustment execution cycle, data deviation judgment conditions, credibility rise and fall trigger conditions, and time decay related control conditions. Before entering the engineering project benchmark information, text content verification is performed to remove unqualified benchmark entries with missing fields, excessive values, or invalid local codes. Verified engineering project benchmark information is stored in the three-dimensional constraint rule library. Local compliant channel information is split into independent entries according to the three-level administrative regions of province-city-county. Each entry records the unique identifier of all business channels that are allowed to report marketing leads within the current administrative region. All local compliant channel entries are stored in the three-dimensional constraint rule library. Independent storage spaces are allocated for five channels: online promotion, local distributors, industry exhibitions, design institute connections, and bidding announcements. Each business channel is bound to a historical deviation record storage space. During the initial operation phase, all deviation data fields in all storage spaces are filled with default empty values. The storage space only receives the corresponding channel deviation information passed in subsequent steps, and there is no data read / write interaction between different channel storage spaces.
[0024] Specifically, online promotion channel leads originate from information flow ad landing page forms, short video consultation leads, and official website inquiry registrations; local distributor channel leads originate from offline store visit registrations and distributor door-to-door customer acquisition registrations; industry exhibition channel leads originate from on-site customer information registration forms and exhibition business negotiation intention records; design institute liaison channel leads originate from design institute project drawing matching recommendations and designer client resource referral records; bidding and tendering announcement channel leads originate from official procurement websites and public resource trading center public bidding project announcement texts crawled from data. The original lead storage formats, field lengths, and text specifications of the five types of channels differ, and six standardized business fields must be uniformly extracted before group matching can be performed. Triple keyword matching uses precise string matching logic. Project names are compared after removing suffixes such as Phase I, Phase II, expansion, and renovation, and owner unit names are precisely matched after removing suffixes such as limited company, group, and branch. Only when all three items match can they be merged into groups, effectively avoiding interference from mixed groups of different project leads in subsequent data fusion calculations.
[0025] For example, during the process of grouping and merging clues, the system simultaneously reads the original clues from two bidding and tendering announcement channels. The first clue, after preprocessing, has the project name as "Urban Comprehensive Gymnasium Project," the location code as 340100, and the owner unit as "Municipal Cultural Tourism Development Group." The second clue, after preprocessing, has the project name as "Urban Comprehensive Gymnasium (Phase I) Project," the location code as 340100, and the owner unit as "Municipal Cultural Tourism Development Group." After removing modifiers and suffixes, the three keywords match perfectly, and the two clues are grouped into the same clue group, assigned group identifier 0078. The third clue, from the online promotion channel, has the project name as "Chengdong Commercial Complex Project," the location code as 340100, and the owner unit as "Urban Construction Investment Company." The three keywords do not match group 0078, so a separate group 0079 is created. The data from the two groups, each carrying its corresponding identifier, is output to the next processing step. Simultaneously, the parameters of the three-dimensional constraint rule base were entered, and the dynamic credibility decay scoring algorithm was configured with a credibility adjustment cycle of 5 statistical cycles, a deviation judgment threshold of 0.15, and a decay adjustment coefficient μ=0.08; the engineering project benchmark information 340100, urban comprehensive stadium, investment amount of 280 million, construction period of 36 months, and local compliance channel item 340100: online promotion channel, bidding and tendering publicity channel, and local dealer channel were entered; storage space IDs were created for the five types of channels respectively: S01 online promotion, S02 local dealer, S03 industry exhibition, S04 design institute docking, and S05 bidding and tendering publicity, and all storage space internal data was initialized to be empty.
[0026] Optionally, the steps include reading the clue grouping and rule base parameters, running the dynamic credibility decay scoring algorithm to calculate the clue credibility score and perform time-based decay; calling the three-dimensional constraint weighted selection algorithm to calculate the weighted score of the conflict field of multi-source clues within the same clue group and selecting the optimal field value, generating standardized project data and processing logs, writing channel deviation information into the corresponding historical deviation record storage space, and outputting the standardized project dataset, including: Retrieve all clue grouping data and the algorithm parameters, project benchmarks, and local channel compliance configurations stored in the three-dimensional constraint rule base. Iterate through each business channel to perform dynamic credibility decay scoring calculations. The algorithm's mathematical expression is:
[0027] The percentage of valid samples from current historical calibration in the channel In the formula Representative Channel Total number of valid leads that have been verified without deviation from the project's baseline information during the current period. Representative Channel Total number of all original leads collected and entered into the database during the current period; Channel static base score In the formula This represents the channel base score uniformly set by the system. In the formula Represents the total number of historical statistical periods. Representing the Each statistical period channel The severity level of the deviation is indicated; a severe deviation is considered... Mild / No Deviation , This represents the constant for deduction of a single deviation. Representing the Cycle Channel Number of deviation clues; exponential coefficient of time decay term In the formula Represents the global base attenuation coefficient. Representative territory Downstream channels The timeliness correction factor; the number of statistical cycles since the last high-precision verification clue. In the formula Represents the current system statistical period number. Representative Channel The statistical period number corresponding to the last high-precision verification clue output, and the globally unified benchmark effective sample threshold. The maximum fluctuation range of the effective sample proportion is constant. Preset fixed constants for the system. The function is used to clamp the lower bound of the result of the operation within parentheses. To prevent negative values from appearing in the dynamic credibility score, Representative Channel Real-time dynamic credibility scoring It is a natural constant.
[0028] The real-time reliability of each channel was calculated. Then, time-dimensional time decay correction is completed; For multiple leads from different sources within the same lead group, conflicting fields with differences in content, such as investment amount, construction period, and project scale, are extracted. A three-dimensional constrained weighted selection algorithm is then used to calculate a comprehensive weighted score for each conflicting field. The mathematical expression of the algorithm is as follows:
[0029] Among them engineering projects With channels Benchmark library matching correction factor In the formula Representative Channel Reporting Projects The number of fields that match the baseline information of the engineering project within the 3D constraint rule library. Representative projects Preset the total number of all required business fields; Project location With channels Regional compliance channel constraint coefficient In the formula The constant represents the penalties for violations committed within the local jurisdiction. As a variable for local compliance identification, channels Belongs to the territory When compliant channels are aggregated ,channel Not in the territory When compliant channels are aggregated ; Representative engineering projects In the territory The complete list of candidate business channels is now available. The representative selects the channel with the highest overall weighted value from the candidate channel set. ; Representative engineering projects The conflicting fields are ultimately standardized and their values are determined directly using the optimal method. The reported field content; The channel's real-time credibility score is derived from the dynamic credibility decay score output.
[0030] The optimal channel field value is selected as the unified standard value, and all conflict-free fields and conflict fields after selection are integrated to generate standardized project data; a processing log is generated simultaneously and bound to the project code corresponding to the current group. The log fully records the original clues, the details of field-by-field comparison of multiple clues, all candidate values of conflict fields, and the complete calculation process of field selection. Each lead is identified for numerical deviations, text errors, and location mismatches. Independent channel deviation information is generated for each lead, including the time of the deviation, the name of the erroneous business field, and the severity level of the deviation. The corresponding dedicated historical deviation storage space is matched according to the lead's source channel, and deviation records are appended to each lead. Different channel storage spaces are prohibited from writing deviation data from other channels. After completing the fusion processing of all leads, a complete standardized project dataset is output.
[0031] Specifically, the dynamic credibility decay scoring algorithm calculates the credibility level of a channel based on three dimensions: the static base score is manually preset by business personnel based on the overall historical data quality of the channel; the original leads from design institute channels and bidding announcement channels have higher accuracy, resulting in a higher base score. Set higher; current effective sample percentage The percentage of leads from this channel that have been verified as accurate by the benchmark database within the current period is counted out of the total leads from the channel. If the channel has not produced high-precision and valid leads for an extended period, The value continues to increase, and the exponential decay term continues. As the channel size decreases, its credibility automatically drops, thus controlling the timeliness decay. The max function limits the credibility to a minimum of 0. Channels with extremely poor data quality have their credibility reduced to zero, and their weights automatically become invalid in subsequent field selection calculations.
[0032] The three-dimensional constraint-weighted selection algorithm simultaneously integrates three constraint dimensions: channel credibility, project benchmark matching degree, and local channel compliance. If a channel is not on the list of compliant channels in the project's locality, the algorithm will be applied accordingly. When the coefficient approaches 0, the weighted score of the channel decreases directly and it will not be selected as the optimal data source. The higher the credibility of the channel and the higher the degree of matching between the project information and the benchmark library, the higher the weighted score. Conflicting fields will be given priority to the content of the channel, and the unified standardization of multi-source heterogeneous clue information will be completed in one go.
[0033] For example, when performing clue credibility calculation and conflict field optimization fusion, for the urban complex stadium project corresponding to group identifier 0078, the local code... Candidate Channel Collection Includes online promotion channel c1, bidding and tendering announcement channel c5, and local distributor channel c2; system global benchmark effective sample threshold. Floating range constant Attenuation adjustment coefficient Bidding and tendering announcement channels C5 static basic score The proportion of valid samples in the current period The period since the last high-precision clue Substituting into the dynamic credibility decay formula:
[0034]
[0035] Simultaneously calculate the credibility of online channel C1. C2 credibility of distributor channels Project matching correction coefficient Local compliance constraint coefficient Comprehensive weighted value
[0036] The optimal channel index represents the maximum value across the three channels. For conflicting fields, the project investment amount and construction period were directly reported through the bidding and tendering publicity channels, amounting to 280 million and 36 months respectively, thus completing the generation of standardized project data. Simultaneously generate a processing log bound to project code P0078, recording the entire process of selecting and prioritizing three candidate values: 250 million reported investment amount from online channels, 300 million reported investment amount from distributor channels, and 280 million reported investment amount from bidding channels. For investment amount values from online channels, mark slight deviations and generate deviation records written to the dedicated storage space S01 for online channels. For bidding channels, no deviation is generated and no deviation entry is generated. Finally, output a standardized project dataset containing complete field information of the urban comprehensive stadium project in a unified and standardized manner.
[0037] Optionally, the step of extracting three types of entities—channels, decision-making entities, and engineering projects—from a standardized project dataset, identifying relationships, and adding business occurrence time and jump level identifiers to construct an implicit transmission relationship graph for construction marketing and enabling incremental updates, and outputting the implicit transmission relationship graph for construction marketing includes: Analyze all entries in the standardized project dataset one by one, extract three independent entities and enter complete attributes: Channel entity enters online promotion, local distributor, industry exhibition, design institute connection, and unique business identifier of bidding channel; Decision-making entity enters the full name of design institute, name of general contractor, and name of construction unit (owner); Engineering project entity enters the project location code, project scale value, and transaction status 0 / 1 flag bit, 1 marks the completed project, and 0 marks the intended but not completed project; By traversing the business interaction logic between any two entities, three types of relationships are identified: direct contact relationships between channels and design institutes, owners, and general contractors; business promotion and transmission relationships between different decision-making entities such as design institutes, general contractors, and owners; and project contracting and implementation relationships between design institutes, general contractors, and engineering projects. Each identified relationship is associated with a business occurrence timestamp, which is taken from the original clue reporting time; the jump level identifier value is calculated, which is equal to the total number of entities traversed by a single relationship link from the starting entity to the ending entity, and the jump level identifier and relationship are stored synchronously in the graph storage unit; The implicit transmission relationship graph of the construction marketing system is updated incrementally, continuously receiving new entries from the standardized project dataset. The new entries are parsed to retrieve the channel, decision-making entity, and project entity attributes. If the corresponding entity does not exist in the current graph, all attribute fields of the entity are written. If no new relationship is identified in the graph, the relationship type, business occurrence timestamp, and jump level identifier are written synchronously. Existing entities and historical relationships in the graph are fully preserved, and entity deletion and relationship deletion operations are not performed. The full graph reconstruction process is not triggered; only new data is added incrementally. After completing the incremental writing of entities and relationships, the output is a building marketing implicit transmission relationship graph that can be updated in real time.
[0038] Specifically, the implicit transmission relationship graph for architectural marketing is stored using an entity-relationship graph database structure. Three types of entities are the basic nodes of the graph, and three types of business relationships are the directed edges of the graph. Jump level identifiers are used to distinguish the length of the transmission link. When a channel directly connects with the owner and completes a project transaction, it only involves two entities, so the jump level identifier is 2. When a channel connects with a design institute, the design institute recommends a general contractor, and the general contractor undertakes the project, it involves four entities, so the jump level identifier is 4. The incremental update mechanism is adapted to the business characteristics of the construction industry, which continuously adds new project leads. Thousands of new project data are added every day without clearing and rebuilding the graph. Only new nodes and links are added, which greatly reduces the computing power consumption for graph reconstruction. The transaction status marker is used for subsequent reverse tracing and screening of transaction links. Nodes and related links of unsold projects are fully retained for long-term lead cultivation link analysis.
[0039] For example, during the construction and incremental update of the transmission map, the standardized project dataset adds a new project code entry P0078, extracts the channel entity c5 (bidding and tendering announcement channel), the decision-making entities M01 (Municipal Cultural Tourism Development Group (owner)) and M02 (First Construction Engineering General Contracting Company); the project entity Pro0078, with location code 340100, scale of 280 million, and transaction marker bit 1; two relationships are identified: 1. Bidding and tendering channel c5 directly reaches owner M01, the timestamp is taken from the original reporting time of this clue, the link entity count is 2, and the jump level identifier is 2; 2. Owner M01 and general contractor M02 undertake the project. The relationship is timestamp taken from the general contractor's contract signing and registration time, link entity count is 2, and jump level identifier is 2. The graph initially has no above entities and relationships, and all entity attributes and two related edges are fully written. Subsequently, the data of the newly added project code P0079 Chengdong Commercial Complex is extracted, and the channels c1 online promotion, decision-making entity M03 City Investment, and engineering project Pro0079 are extracted. The new channel reach owner related edge is added. All entities and links of the original Pro0078, M01, and c5 are retained without modification. Only new nodes and new related relationships are added incrementally. There is no need to rebuild the entire transmission graph. The updated implicit transmission relationship graph of building marketing is output.
[0040] Optionally, the step of setting a maximum hop count threshold for the implicit transmission relationship graph of building marketing, filtering projects with completed transactions, using completed projects as endpoints to traverse the implicit transmission relationship graph of building marketing in reverse to obtain business transmission links, calling the link hop count transmission contribution algorithm to calculate the transmission contribution value of channel nodes, and outputting link records, channel statistics, and abnormal samples, including: The maximum number of jumps in the link is pre-configured manually. The threshold is a fixed positive integer value, and the default value is 6 in the project implementation. All project entities with the transaction status flag bit equal to 1 in the implicit transmission association map of building marketing are filtered, and all transaction projects are set as the link traceability endpoint. Starting with each completed project entity as the endpoint, the system traverses the upstream channels and decision-making entities layer by layer along the directed connection edges of the graph to extract each complete business transmission link. The system reads the jump level identifier value carried by each transmission link. Excessively long links with values greater than the maximum number of jumps threshold are directly removed and do not participate in the channel contribution calculation. Valid links with jump level identifier values less than or equal to the threshold are uniformly included in the channel transmission contribution calculation set. The links are categorized according to the type of the entity that initiates the link. Direct business links are defined by the channel entity, while indirect transmission links are defined by the decision-making entity. Each business transmission link is configured with an independent transaction status flag. The link hop count propagation contribution algorithm is used to calculate the overall propagation contribution value of the entire link channel by channel. The mathematical expression of the algorithm is:
[0041] The total number of entity jumps in the k-th transmission link In the formula Represents the total number of entity nodes included in the k-th transmission link; link transaction determination identifier. The time represents the completion of the engineering project corresponding to the k-th link. The time indicates that the project corresponding to the k-th link has not reached a contract signing; the channel link attribution indicator variable. The value is 1 only when channel c appears as a node in the k-th transmission link, and 0 when channel c does not participate in the k-th link; K represents the total number of all valid transmission links associated with the transaction project, and k represents the transmission link number of a single transaction business. The real-time dynamic credibility score is derived from the dynamic credibility decay score output of channel c. The contribution value of the entire transmission chain of channel c represents the overall transmission value.
[0042] The link record stores all channel identifiers, participating decision-making entity names, entity jump order, and timestamps corresponding to each relationship segment; the channel statistics summary outputs the transmission contribution value calculated for each business channel; abnormal samples are bound to the corresponding project number and complete link path character sequence, marking two types of abnormalities: business logic contradiction entries and source information abnormal entries; the link record, channel statistics report, and abnormal samples are output synchronously, and the project number carried by the abnormal sample is completely consistent with the internal project code of the standardized project dataset.
[0043] Specifically, filtering excessively long, multi-level referral links with too low conversion weights, such as the maximum number of hops in the link, will interfere with the assessment of the channel's true customer acquisition value; in the link hop count contribution algorithm, the total number of link hops... Located in the denominator, the more levels and hops in the link, the lower the contribution of a single link to the channel. Shorter links that directly connect with the owner have a higher contribution weight, which aligns with the business characteristic of the construction industry where direct channels have higher conversion value; Transaction determination indicator Filter out links for projects with no intended transaction and only count the contribution of effective links that lead to actual signed contracts; the rules for identifying abnormal samples include three types of business logic contradictions: two completely conflicting transmission links for the same project, a transaction link generated by a channel that is not on the local compliance list, and inconsistencies in the names of key decision-makers. Original clue keyword matching errors and field values exceeding limits are classified as abnormal source information.
[0044] For example, during the calculation of channel transmission contribution and the execution of abnormal sample output, the threshold for the maximum number of link jumps is set to 6; the transaction project Pro0078 corresponds to two valid transmission links k1 and k2, and the total number of valid links K=2; the real-time credibility of the channel c5 bidding announcement channel. Link k1 is a direct service link, with a hop count of [number missing]. Transaction indicator Channel C5 participates in this link Link k2 is an indirect transmission link, with a hop count of [number missing]. Transaction indicator Channel C5 also participated. Substituting the values into the link hop count propagation contribution formula, calculate the overall contribution value of channel C5:
[0045] The complete link record is written to link k1: Channel c5 → Owner M01 → Project Pro0078, with each link marked with its own lead reporting timestamp; the channel statistics table records the contribution value of bidding channel c5 as 101.2575; if the system identifies that a project has two completely conflicting transaction transmission links, channel c1 and channel c5, it is determined to be a business logic contradiction, an anomaly sample is generated, and the corresponding project code P0078 is bound to the complete two link path sequences. The link record, channel statistics table, and anomaly sample are synchronously output to the data dashboard and rule iteration module.
[0046] Optionally, the steps of receiving abnormal business samples and channel statistical results, reading sample project numbers and link paths, modifying the rule base and deviation storage; re-running the dynamic credibility decay scoring algorithm to calculate iteration parameters when the cycle arrives, obtaining the iterative rule base and sending it back to the clue collection step, and updating the grouping and configuration include: reading the engineering project number and complete link path character sequence bound to the abnormal sample, relying on the project number to positively match the original clue entries in the standardized dataset, the clue groups generated in the initial stage, and the full processing log persistently stored in step S2; performing a three-dimensional constraint rule base modification operation, which is divided into two types of update actions: adding new engineering project benchmark information entries to cover the newly verified project standard fields; rewriting the content of the local compliance channel information entries already stored in the rule base, supplementing or removing the channel identifiers that allow the reporting of clues in the corresponding administrative region; and executing the following steps. The historical deviation record storage space modification operation is divided into two types of update actions: adding new deviation data entries to the corresponding channel-specific storage area to record the channel data errors identified in this abnormal sample; rewriting the content of the historical deviation entries in the storage space to correct the original deviation level and error field description; after all modification operations in the rule base and deviation storage area are completed, all changes are automatically and persistently saved; after the system's preset iteration cycle timer is completed, the updated three-dimensional constraint rule base parameters are retrieved, and the dynamic credibility decay scoring algorithm is restarted to iterate all control parameters, thresholds, correction coefficients, and decay constants; after the parameter iteration is completed, a brand-new iterative rule base is generated, and the iterative rule base is completely returned to the initial execution step of lead collection, synchronously updating the lead grouping and matching logic, channel deviation storage read and write configuration, and map incremental update control parameters, completing the closed-loop iterative optimization of the entire process.
[0047] Specifically, the rule base correction driven by abnormal samples enables reverse governance of data issues. If deviations in the lead fields of a bidding channel in a certain district or county occur repeatedly, the entries for compliant channels in the locality can be modified, and local data verification constraints for that channel can be added. If investment amount benchmarks for a certain type of project are frequently missing, the corresponding project benchmark information is automatically added to the rule base. The channel historical deviation storage area is updated synchronously, and the base score for the next round of credibility calculation is automatically lowered for channels with a cumulative number of severe deviations exceeding the threshold. The periodic iteration mechanism enables the rule base to dynamically and adaptively adjust with business data, eliminating the need for manual batch modification of configurations. It automates the entire process of lead collection, fusion, modeling, and statistical parameter updates, continuously improving the accuracy of multi-channel marketing data fusion and correlation analysis.
[0048] For example, during the iterative update of the rule base and deviation storage, the system receives a business logic contradiction anomaly sample with project code P0078, reads the complete link path matching clue group 0078, the original bidding channel clue, and the full processing log bound to code P0078; identifies that the original compliant channel entry for the administrative region 340100 lacks a design institute connection channel, executes rule base rewriting, and adds a design institute connection channel identifier to the 340100 administrative region entry; if the online channel reports multiple errors in the project investment amount, a severe deviation record is added to the online channel's dedicated storage space S01, and the level of the original similar mild deviation entry is rewritten; all modifications are written to the three-dimensional constraint rule base and deviation storage database and saved; when the system's five statistical cycles have elapsed, the updated rule base is retrieved and the dynamic credibility decay scoring algorithm is rerun, iteratively correcting the global benchmark effective sample threshold and time decay adjustment coefficient, generating an iterative rule base and sending it back to the clue collection module; the clue group triple matching rule and graph jump threshold configuration are updated synchronously, and the next cycle of clue collection and data fusion process automatically adopts the new iterative configuration to perform calculations.
[0049] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention in any way. Although the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art can make some modifications or alterations to the above-disclosed technical content to create equivalent embodiments without departing from the scope of the present invention. Any simple modifications, equivalent changes and alterations made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the scope of the present invention.
Claims
1. A method for cross-channel marketing data fusion and correlation analysis in the construction industry, characterized in that, The specific steps of this method are as follows: S1. Collect original marketing leads from multiple business channels, extract business fields, and group them by project name, location code, and owner unit information keywords to generate lead groups; construct a three-dimensional constraint rule library, set parameters for the dynamic credibility decay scoring algorithm, input project benchmark information and location compliance channel information, allocate independent historical deviation record storage space for each business channel, and output lead groups with group identifiers; in the initial running state, the deviation data in the historical deviation record storage space is set to a default null value, and the dynamic credibility decay scoring algorithm uses a preset static base score as the initial scoring basis; S2 reads the clue grouping and rule base parameters, runs the dynamic credibility decay scoring algorithm to calculate the clue credibility score and performs time-based decay; calls the three-dimensional constraint weighted selection algorithm to calculate the weighted score of the conflict field of multi-source clues in the same clue group and selects the field value of the best one, generates standardized project data and processing log, writes the channel deviation information into the corresponding historical deviation record storage space, and outputs the standardized project dataset. S3. Extract three types of entities from the standardized project dataset: channels, decision-making entities, and engineering projects. Identify the relationships and attach business occurrence time and jump level identifiers. Construct an implicit transmission relationship graph of building marketing and enable incremental updates. Output the implicit transmission relationship graph of building marketing. S4, set the maximum number of jumps threshold of the link in the implicit transmission association graph of building marketing, filter the engineering projects with the transaction status, use the transaction project as the endpoint to traverse the implicit transmission association graph of building marketing in reverse to obtain the business transmission link, call the link jump number transmission contribution algorithm to calculate the transmission contribution value of the channel node, and output the link record, channel statistics and abnormal samples. S5 receives abnormal business samples and channel statistics results, reads the sample project number and link path, modifies the rule base and deviation storage; when the period arrives, it re-runs the dynamic credibility decay scoring algorithm to calculate the iteration parameters, obtains the iteration rule base and sends it back to the clue collection step, and updates the grouping and configuration.
2. The method for cross-channel marketing data fusion and correlation analysis in the construction industry according to claim 1, characterized in that, The original marketing leads collected in step S1 are obtained from online promotion channels, local dealer channels, industry exhibition channels, design institute channels, and bidding announcement channels. The extracted business fields include project investment amount, construction period, project scale, project location, contact unit, and contact person. When merging and grouping, the project name text, location code characters, and owner unit name text stored in the original leads are compared. Multiple original leads that match all three items are grouped into the same lead group, while original leads that do not match all three items are grouped into different lead groups. The historical deviation record storage space is allocated to each business channel, and each business channel corresponds to a unique historical deviation record storage space. The historical deviation record storage space receives the channel deviation information passed in step S2.
3. The method for cross-channel marketing data fusion and correlation analysis in the construction industry according to claim 1, characterized in that, All parameters of the dynamic credibility decay scoring algorithm set in step S1 are written into the internal storage unit of the three-dimensional constraint rule base. The set parameters include the credibility periodic adjustment execution cycle, data deviation judgment conditions, credibility rise and fall trigger conditions, and time decay related control conditions. Before the engineering project benchmark information is entered, the text content is verified and the engineering project benchmark information is stored in the three-dimensional constraint rule base. The local compliance channel information is divided into entries according to administrative regions. Each entry records the business channel identifier that can report clues under the corresponding administrative region. The local compliance channel information is stored in the three-dimensional constraint rule base.
4. The method for cross-channel marketing data fusion and correlation analysis in the construction industry according to claim 1, characterized in that, The processing log generated in step S2 is bound to the corresponding project code, which is taken from the group identifier carried by the clue group. The processing log contains the complete text of the original clue, the field-by-field comparison content between different clues, all candidate values of the conflict field, and the record of the selection process of the conflict field. The channel deviation information includes the time when the deviation occurred, the name of the business field that caused the deviation, and the severity level of the deviation. The channel deviation information is generated one by one for each clue and written to the historical deviation record storage space allocated to the corresponding business channel. No data cross-writing occurs between the historical deviation record storage spaces corresponding to different business channels.
5. The method for cross-channel marketing data fusion and correlation analysis in the construction industry according to claim 1, characterized in that, The channel entity extracted in step S3 is the business channel identifier; the decision-making entity is the name of the design institute, the name of the general contractor, and the name of the construction unit; the project entity is the project location code, the project scale value, and the project transaction status flag; the identified relationships include the direct reach relationship between the channel and the decision-making entity, the business promotion and transmission relationship between different decision-making entities, and the project undertaking relationship between the decision-making entity and the project. The time of a business transaction is recorded and associated with a corresponding timestamp. The jump level identifier records the number of entities traversed by a single association link from the starting entity to the ending entity. The jump level identifier is written into the implicit transmission association graph storage content of the building marketing along with the association relationship.
6. The method for cross-channel marketing data fusion and correlation analysis in the construction industry according to claim 1, characterized in that, When incremental update is enabled in step S3, new entries are received from the standardized project dataset, and the channel entity, decision-making entity, and engineering project entity corresponding to the new entries are parsed. If the new entity does not exist in the implicit transmission association graph of building marketing, all attribute contents of the new entity are written into the implicit transmission association graph of building marketing. When the newly added relationship does not exist within the implicit transmission relationship graph of the construction marketing, write the newly added relationship, the time of business occurrence, and the jump level identifier into the implicit transmission relationship graph of the construction marketing; The existing entities and relationships within the implicit transmission relationship graph of building marketing will retain all their original stored content. Entities will not be deleted, relationships will not be deleted, and the entire implicit transmission relationship graph of building marketing will not be reconstructed.
7. The method for cross-channel marketing data fusion and correlation analysis in the construction industry according to claim 1, characterized in that, The maximum number of jumps threshold set in step S4 is a preset value; after traversing the implicit transmission association graph of building marketing in reverse to obtain all business transmission links, the count value carried by the jump level identifier corresponding to each business transmission link is read; business transmission links with a count value greater than the maximum number of jumps threshold are excluded from the calculation object of channel node transmission contribution value; business transmission links with a count value less than or equal to the maximum number of jumps threshold are retained in the set of calculation objects of channel node transmission contribution value; business transmission links are divided into direct business links and indirect transmission links according to the type of the link starting entity, and each business transmission link is configured with an independent transaction status flag bit.
8. The method for cross-channel marketing data fusion and correlation analysis in the construction industry according to claim 1, characterized in that, The link record output in step S4 includes the business channel identifiers along the link path, the names of the participating decision-making entities, the order of entity jumps, and the timestamp corresponding to each association. The channel statistics record the transmission contribution value corresponding to each business channel. The abnormal sample carries the project number and the complete sequence of the link path. The abnormal sample marks business logic contradiction entries and source information abnormal entries. The link record, channel statistics, and abnormal sample are output synchronously, and the project number carried by the abnormal sample is consistent with the project code.
9. A method for cross-channel marketing data fusion and correlation analysis in the construction industry according to claim 1, characterized in that, After reading the sample project number and link path in step S5, the corresponding original clue entry, corresponding clue group, and corresponding historical processing record are matched and located according to the project number; the rule base modification includes adding engineering project benchmark information entries to the three-dimensional constraint rule base and rewriting the content of existing local compliance channel information entries in the three-dimensional constraint rule base; the deviation storage modification includes adding deviation data entries to the historical deviation record storage space and rewriting the content of existing deviation data entries in the historical deviation record storage space; after the rule base modification is completed, all modification content is saved.
