A control method, device, electronic equipment, and medium for black start in a power plant.

By actively adjusting the power supply voltage through a grid-type energy storage system and using an energy storage converter to quickly match the generator output voltage with the high-voltage side voltage of the transformer, the problem of slow generator adjustment speed is solved, and a fast and stable black start process is achieved.

CN123121554APending Publication Date: 2026-11-17GUANGDONG ELECTRIC POWER SCI RES INST ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611490439.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-23
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The process of adjusting the generator's output voltage to match the voltage of the power bus of the grid-type energy storage system after it has been stepped up by the high-voltage transformer in complete darkness is time-consuming and can easily cause impacts on the microgrid.

Method used

By actively adjusting the power supply voltage through a grid-type energy storage system, the energy storage converter quickly matches the generator output voltage with the high-voltage side voltage of the power plant transformer, transferring the regulation task to the energy storage system with a faster response speed, and using frequency and amplitude difference correction methods to determine the target power supply and current, and controlling the energy storage system to adjust the power supply voltage.

Benefits of technology

It significantly shortens the time for matching the generator output voltage with the high-voltage side voltage of the power plant transformer, avoids mechanical inertia limitations and grid impact, and improves the efficiency and stability of black start of the power plant.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121554A_ABST
    Figure CN123121554A_ABST
Patent Text Reader

Abstract

This application discloses a control method, device, electronic equipment, and medium for black start of a power plant. The method controls a grid-type energy storage system to start a power plant in a completely dark state and detects whether the output voltage of the generator in the power plant reaches a voltage threshold. If the output voltage reaches the voltage threshold, the method collects the high-voltage side voltage of the high-voltage transformer within the power plant and determines the frequency difference and amplitude difference between the output voltage and the high-voltage side voltage. Based on the frequency difference and the initial power supply, the method determines the target power supply of the grid-type energy storage system and, based on the target power supply, determines the target direct-axis current of the grid-type energy storage system. Based on the amplitude difference, the method determines the target quadrature-axis current of the grid-type energy storage system. Based on the target direct-axis current and the target quadrature-axis current, the method controls the grid-type energy storage system to adjust the power supply voltage to the power plant, so that the high-voltage side voltage matches the output voltage, shortening the time from the generator establishing its output voltage to the successful matching of the high-voltage side voltage of the high-voltage transformer with the generator's output voltage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of energy storage, and in particular to a control method, device, electronic equipment and medium for black start of a power plant. Background Technology

[0002] In related technologies, power plants may experience a "total blackout," meaning a power system collapse, widespread power outages, and an inability to continue generating electricity. In this situation, a grid-based energy storage system with self-starting capabilities can be used to supply power to the power plant and restore its operation. In a total blackout state, the grid-based energy storage system can start in grid mode, creating a microgrid from scratch to provide the power plant with stable voltage and frequency power.

[0003] The main equipment of the power plant includes a high-voltage transformer, a generator, and an automatic synchronizing device. The high-voltage transformer has a high-voltage side and a low-voltage side. A GCB (Generator Circuit Breaker) is installed between the high-voltage side of the high-voltage transformer and the generator. The grid-type energy storage system is connected to the low-voltage side of the high-voltage transformer through the plant's auxiliary power bus, supplying power to the high-voltage transformer and thus to the power plant.

[0004] When a grid-type energy storage system supplies power to a power plant, once the generator establishes its output voltage and begins generating electricity, the generator output circuit breaker needs to be closed so that the generator can transmit the generated electricity to the high-voltage side of the power plant transformer, replacing the grid-type energy storage system to supply power for the normal operation of the power plant.

[0005] Before the generator output circuit breaker is closed, the generator's output voltage needs to be adjusted by an automatic synchronizing device to match the high-voltage side voltage of the power plant transformer after the voltage of the grid-type energy storage system's auxiliary power bus is stepped up. This allows the generator to replace the energy storage system and supply power for the normal operation of the power plant. However, the generator needs to respond to the commands of the automatic synchronizing device and frequently adjust its output voltage. But due to the mechanical inertia within the generator, the adjustment speed of the output voltage is slow, resulting in a long synchronization process. Summary of the Invention

[0006] This application provides a control method, device, electronic equipment, and medium for black start of a power plant to solve the problem of long synchronization time in adjusting the generator's output voltage to match the high-voltage side voltage of the high-voltage transformer after the voltage of the power bus of the grid-type energy storage system is stepped up by the high-voltage transformer.

[0007] To address the aforementioned technical problems, this application provides a control method for black start of a power plant, the control method for black start of a power plant comprising: The system controls a pre-defined grid-type energy storage system to start a power plant that is in complete darkness, and detects whether the output voltage of the generator in the power plant reaches a preset voltage threshold. If the output voltage reaches the voltage threshold, the high-voltage side voltage of the high-voltage transformer in the power plant is collected, and the frequency difference and amplitude difference between the output voltage and the high-voltage side voltage are determined. Based on the frequency difference and the preset initial power supply of the grid-type energy storage system, the target power supply of the grid-type energy storage system is determined, and the target direct-axis current of the grid-type energy storage system is determined according to the target power supply. Based on the amplitude difference, the preset first proportional coefficient, and the preset first integral coefficient, the target quadrature-axis current of the grid-type energy storage system is determined. Based on the target direct-axis current and the target quadrature-axis current, the grid-type energy storage system is controlled to adjust the power supply voltage to the power plant so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0008] In this embodiment, the generator's output voltage is frequently adjusted to match the high-voltage side voltage of the power grid substation after the voltage of the grid-connected energy storage system's power bus is stepped up. However, due to the mechanical inertia of the generator, the adjustment speed of the output voltage is slow, resulting in a long synchronization process. In the case of complete darkness at the power plant, the grid-connected energy storage system is used as the main power source to supply power to the power plant. When the generator's output voltage reaches a preset voltage threshold and the power plant establishes its output voltage, the grid-connected energy storage system actively adjusts the power supply voltage to the power plant, thereby adjusting the high-voltage side voltage of the power plant's power grid substation to match the generator's output voltage. This transfers the task of synchronizing the high-voltage side voltage of the power grid substation with the generator's output voltage from the slow-responding generator mechanical system to the fast-responding grid-connected energy storage system, significantly shortening the time from when the generator establishes its output voltage to when the high-voltage side voltage of the power grid substation successfully matches the generator's output voltage.

[0009] In this embodiment, the high-voltage side voltage of the power plant's transformer is acquired, and the frequency difference and amplitude difference between the power plant's output voltage and the high-voltage side voltage are determined. Based on the frequency difference and the preset initial power supply of the grid-type energy storage system, the target power supply of the grid-type energy storage system is determined, and based on the target power supply, the target direct-axis current of the grid-type energy storage system is determined, thus obtaining the target direct-axis current related to frequency correction between the grid-type energy storage system and the output voltage and the high-voltage side voltage. Based on the amplitude difference, a preset first proportional coefficient, and a preset first integral coefficient, the target quadrature-axis current of the grid-type energy storage system is determined, thus obtaining the target quadrature-axis current related to amplitude correction between the grid-type energy storage system and the output voltage and the high-voltage side voltage. Based on the target direct-axis current and the target quadrature-axis current, the grid-type energy storage system is controlled to adjust the fixed power supply voltage so that the high-voltage side voltage of the power plant during the black start process matches the output voltage, thereby achieving the matching between the high-voltage side voltage of the transformer and the output voltage of the generator through the control of the grid-type energy storage system.

[0010] Optionally, determining the target power supply of the grid-type energy storage system based on the frequency difference and the preset initial power supply of the grid-type energy storage system includes: Based on the frequency difference, the preset virtual inertia, and the preset damping coefficient, a first power difference between the target power supply and the initial power supply is determined. The target power supply is determined based on the first power difference and the initial power supply.

[0011] In this embodiment, a first power difference between the target power supply and the initial power supply is determined based on the frequency difference, a preset virtual inertia, and a preset damping coefficient; based on the first power difference and the initial power supply, the target power supply is determined, and the target power supply related to the frequency correction between the grid-type energy storage system and the generator output voltage and the high-voltage side voltage is obtained.

[0012] Optionally, determining the target direct-axis current of the grid-type energy storage system based on the target power supply includes: The actual direct-axis current, actual direct-axis voltage, actual quadrature-axis current, and actual quadrature-axis voltage of the grid-type energy storage system are collected, and the actual power supply of the grid-type energy storage system is determined based on the actual direct-axis current, actual direct-axis voltage, actual quadrature-axis current, and actual quadrature-axis voltage. Determine a second power difference between the actual power supply and the target power supply; The target direct-axis current is determined based on the second power difference, the preset second proportional coefficient, and the preset second integral coefficient.

[0013] In this embodiment, the target direct-axis current is determined based on the difference between the actual power supply and the target power supply of the grid-type energy storage system, a preset second proportional coefficient, and a preset second integral coefficient. This achieves the determination of the target direct-axis current of the grid-type energy storage system based on the target power supply related to the frequency correction between the grid-type energy storage system and the generator output voltage and the high-voltage side voltage.

[0014] Optionally, controlling the grid-type energy storage system to adjust the supply voltage to the power plant based on the target direct-axis current and the target quadrature-axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage, includes: Based on the target direct-axis current and the target quadrature-axis current, the target direct-axis voltage and the target quadrature-axis voltage of the grid-type energy storage system are determined; Based on the target direct-axis voltage, the direct axis of the grid-type energy storage system is controlled, and based on the target quadrature-axis voltage, the quadrature-axis of the grid-type energy storage system is controlled, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0015] In this embodiment, the target direct-axis current and target quadrature-axis current of the grid-type energy storage system are used to determine the target direct-axis voltage and target quadrature-axis voltage of the grid-type energy storage system. Based on the target direct-axis voltage, the direct axis of the grid-type energy storage system is controlled, and based on the target quadrature-axis voltage, the quadrature-axis of the grid-type energy storage system is controlled to adjust the supply voltage of the grid-type energy storage system to the power plant, thereby adjusting the high-voltage side voltage after the supply voltage is stepped up by the power plant transformer to match the output voltage of the power plant.

[0016] Optionally, determining the target direct-axis voltage and target quadrature-axis voltage of the grid-type energy storage system based on the target direct-axis current and the target quadrature-axis current includes: Determine the direct-axis current difference between the target direct-axis current and the actual direct-axis current, and determine the quadrature-axis current difference between the target quadrature-axis current and the actual quadrature-axis current; The actual direct-axis current is used as the direct-axis current feedforward term, and the actual quadrature-axis current is used as the quadrature-axis current feedforward term; Based on the direct-axis current difference, the preset third proportional coefficient, and the preset third integral coefficient, the initial direct-axis voltage of the grid-type energy storage system is determined, and based on the initial direct-axis voltage, the direct-axis current feedforward term, the actual quadrature-axis current, the angular frequency of the grid-type energy storage system, and the equivalent inductance of the grid-type energy storage system outlet, the target direct-axis voltage of the grid-type energy storage system is determined. Based on the quadrature-axis current difference, a preset fourth proportional coefficient, and a preset fourth integral coefficient, the initial quadrature-axis voltage of the grid-type energy storage system is determined, and based on the initial quadrature-axis voltage, the quadrature-axis current feedforward term, the actual direct-axis current, the angular frequency, and the equivalent inductance, the target quadrature-axis voltage of the grid-type energy storage system is determined.

[0017] In this embodiment, the initial direct-axis voltage of the grid-type energy storage system is determined based on the direct-axis current difference between the target direct-axis current and the actual direct-axis current, a preset third proportional coefficient, and a preset third integral coefficient. Based on the initial direct-axis voltage, the target direct-axis voltage related to the frequency correction between the grid-type energy storage system and the output voltage and high-voltage side voltage is obtained. The initial quadrature-axis voltage of the grid-type energy storage system is determined based on the quadrature-axis current difference between the target quadrature-axis current and the actual quadrature-axis current, a preset fourth proportional coefficient, and a preset fourth integral coefficient. Based on the initial quadrature-axis voltage, the target quadrature-axis voltage related to the amplitude correction between the grid-type energy storage system and the output voltage and high-voltage side voltage is obtained.

[0018] Optionally, the method further includes: During the process of adjusting the power supply voltage, the frequency difference, amplitude difference, and phase difference to be processed between the high-voltage side voltage and the output voltage are determined. If the frequency difference to be processed is less than a preset frequency threshold, the amplitude difference to be processed is less than a preset amplitude threshold, and the phase difference to be processed is less than a preset phase threshold, then it is confirmed that the high-voltage side voltage matches the output voltage.

[0019] In this embodiment, the high-voltage side voltage and the output voltage are synchronized based on the unprocessed frequency difference, unprocessed amplitude difference and unprocessed phase difference between the high-voltage side voltage of the transformer and the generator output voltage, thereby improving the accuracy of the judgment on whether the high-voltage side voltage and the output voltage are synchronized.

[0020] Optionally, the grid-type energy storage system includes an energy storage converter; the step of controlling the grid-type energy storage system to adjust the supply voltage to the power plant based on the target direct-axis current and the target quadrature-axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage, includes: Based on the target direct-axis current and the target quadrature-axis current, the energy storage converter is controlled to adjust the supply voltage to the power plant so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0021] In this embodiment, the task of synchronizing the high-voltage side voltage of the transformer with the output voltage of the generator is transferred from the generator mechanical system with a slow response to the energy storage converter inside the grid-type energy storage system with an extremely fast response speed that can reach the millisecond level. This shortens the time from when the generator establishes its output voltage to when the high-voltage side voltage of the transformer and the generator's output voltage are successfully synchronized.

[0022] This application also discloses a control device for black start of a power plant, the control device for black start of a power plant comprising: The voltage detection module is used to control the preset grid-type energy storage system to start the power plant in a completely dark state, and to detect whether the output voltage of the generator in the power plant reaches the preset voltage threshold. A voltage acquisition module is used to acquire the high-voltage side voltage of the high-voltage transformer in the power plant if the output voltage reaches the voltage threshold, and to determine the frequency difference and amplitude difference between the output voltage and the high-voltage side voltage. The target direct-axis current determination module is used to determine the target power of the grid-type energy storage system based on the frequency difference and the preset initial power supply of the grid-type energy storage system, and to determine the target direct-axis current of the grid-type energy storage system according to the target power supply. The power supply voltage adjustment module is used to determine the target quadrature-axis current of the grid-type energy storage system based on the amplitude difference, a preset first proportional coefficient, and a preset first integral coefficient, and to control the grid-type energy storage system to adjust the power supply voltage to the power plant based on the target direct-axis current and the target quadrature-axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0023] Optionally, the target direct-axis current determination module includes: The first power difference determination submodule is used to determine the first power difference between the target power supply and the initial power supply based on the frequency difference, the preset virtual inertia and the preset damping coefficient. The target power supply determination submodule is used to determine the target power supply based on the first power difference and the initial power supply.

[0024] Optionally, the target direct-axis current determination module includes: The actual power supply determination submodule is used to collect the actual direct-axis current, actual direct-axis voltage, actual quadrature-axis current, and actual quadrature-axis voltage of the grid-type energy storage system, and determine the actual power supply of the grid-type energy storage system based on the actual direct-axis current, actual direct-axis voltage, actual quadrature-axis current, and actual quadrature-axis voltage. The second power difference determination submodule is used to determine the second power difference between the actual power supply and the target power supply; The target direct-axis current determination submodule is used to determine the target direct-axis current based on the second power difference, a preset second proportional coefficient, and a preset second integral coefficient.

[0025] Optionally, the power supply voltage adjustment module includes: The target quadrature-axis voltage determination submodule is used to determine the target direct-axis voltage and the target quadrature-axis voltage of the grid-type energy storage system based on the target direct-axis current and the target quadrature-axis current. The control submodule is used to control the direct axis of the grid-type energy storage system according to the target direct axis voltage, and to control the quadrature axis of the grid-type energy storage system according to the target quadrature axis voltage, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0026] Optionally, the target quadrature-axis voltage determination submodule includes: A current difference determination unit is used to determine the direct-axis current difference between the target direct-axis current and the actual direct-axis current, and to determine the quadrature-axis current difference between the target quadrature-axis current and the actual quadrature-axis current; The feedforward term is used as a unit to use the actual direct-axis current as the direct-axis current feedforward term and the actual quadrature-axis current as the quadrature-axis current feedforward term; The target direct-axis voltage determination unit is used to determine the initial direct-axis voltage of the grid-type energy storage system based on the direct-axis current difference, a preset third proportional coefficient, and a preset third integral coefficient, and to determine the target direct-axis voltage of the grid-type energy storage system based on the initial direct-axis voltage, the direct-axis current feedforward term, the actual quadrature-axis current, the angular frequency of the grid-type energy storage system, and the equivalent inductance of the outlet of the grid-type energy storage system. The target quadrature-axis voltage determination unit is used to determine the initial quadrature-axis voltage of the grid-type energy storage system based on the quadrature-axis current difference, a preset fourth proportional coefficient, and a preset fourth integral coefficient, and to determine the target quadrature-axis voltage of the grid-type energy storage system based on the initial quadrature-axis voltage, the quadrature-axis current feedforward term, the actual direct-axis current, the angular frequency, and the equivalent inductance.

[0027] Optionally, the device further includes: The phase difference determination module is used to determine the frequency difference, amplitude difference, and phase difference between the high-voltage side voltage and the output voltage during the process of adjusting the power supply voltage. The matching confirmation module is used to confirm that the high-voltage side voltage matches the output voltage if the frequency difference to be processed is less than a preset frequency threshold, the amplitude difference to be processed is less than a preset amplitude threshold, and the phase difference to be processed is less than a preset phase threshold.

[0028] Optionally, the grid-type energy storage system includes an energy storage converter; the power supply voltage adjustment module includes: The power supply voltage adjustment submodule is used to control the energy storage converter to adjust the power supply voltage to the power plant based on the target direct-axis current and the target quadrature-axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0029] This application also discloses an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the method described in this application.

[0030] This application also discloses a computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements the method described in this application. Attached Figure Description

[0031] Figure 1 This is a flowchart of the steps of a black start control method for a power plant provided in the embodiments of this application; Figure 2 This is a schematic diagram of a black start control system for a power plant provided in an embodiment of this application; Figure 3 This is a control block diagram of an energy storage converter in "active synchronization mode" provided in the embodiments of this application; Figure 4 This is a schematic diagram of the internal control structure of an energy storage converter in "active synchronization mode" provided in the embodiments of this application; Figure 5 This is a flowchart of the steps of another black start control method for power plants provided in the embodiments of this application; Figure 6 This is a schematic diagram provided in related technologies, illustrating how the generator's output voltage is matched with the high-voltage side voltage of the transformer by adjusting the generator's output voltage. Figure 7 This is a schematic diagram provided in this application embodiment of a method to match the generator output voltage with the high-voltage side voltage of the power plant by adjusting the power supply voltage of the grid-type energy storage system to the power plant. Figure 8 This is a structural block diagram of a black start control device for a power plant provided in the embodiments of this application. Detailed Implementation

[0032] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.

[0033] It should be understood that the step numbers used in the text are for ease of description only and are not intended to limit the order in which the steps are performed.

[0034] To facilitate understanding of the technical solutions and effects of the embodiments of this application, the relevant technologies of this application will be briefly described below.

[0035] In related technologies, when a power plant is in complete darkness, a "black start power source" with self-starting capability can be used to supply power to the power plant and restore its operation. Black start power sources can include small diesel generators, hydroelectric generators, or grid-connected energy storage systems. Among these, grid-connected energy storage systems have become ideal black start power sources because they can quickly establish stable voltage and frequency.

[0036] The main equipment of a power plant includes a main transformer, a high-voltage station service transformer, and a generator. The main transformer, also known as a primary transformer, is used to raise the voltage output from the generator to the grid level for efficient long-distance transmission. The high-voltage station service transformer includes both low-voltage and high-voltage sides. The generator can include large thermal power or gas turbine units.

[0037] The black start process of a grid-connected energy storage system for a power plant is as follows: The grid-connected energy storage system is connected to the power plant via the plant's auxiliary power bus, gradually building up the bus voltage from 0V to 6kV. The 6kV auxiliary power bus is connected to the low-voltage side of the high-voltage transformer to supply power to the high-voltage transformer. The high-voltage transformer can boost the 6kV voltage and transmit it through its high-voltage side to the low-voltage side of the main transformer to supply power to the main transformer. Due to the grid-connected energy storage system's ability to quickly establish stable voltage and frequency, it allows for a "zero-start boost" process when supplying power to the high-voltage transformer and main transformer, meaning the voltage gradually and slowly increases from 0V to the corresponding rated value. The bus voltage can also be built up to 10kV.

[0038] When the voltage of the high-voltage transformer and the main transformer rises to their respective rated values, the power plant's auxiliary power is restored, allowing the power plant's generators to start. The generators may include a gas turbine and auxiliary equipment. The gas turbine generates electrical energy, while the auxiliary equipment is used to start and operate the gas turbine. Once the gas turbine starts and its speed reaches its rated speed, the generator establishes its output voltage and begins generating electricity.

[0039] The power plant also includes a GCB (Generator Circuit Breaker) and an automatic synchronizing device. The generator circuit breaker is installed between the generator and the high-voltage side of the power plant transformer. When the generator establishes its output voltage, the generator circuit breaker needs to be closed, allowing the generator to deliver its generated electricity to the power plant transformer, replacing the grid-type energy storage system to power the normal operation of the power plant.

[0040] Before the generator output circuit breaker is closed, the generator's output voltage needs to be adjusted using an automatic synchronizing device to match the voltage of the power bus of the grid-type energy storage system after being stepped up by the power transformer. This allows the generator to replace the energy storage system and supply power for the normal operation of the power plant. However, this method of voltage matching using an automatic synchronizing device has at least the following problems: (1) The synchronization process relies on generator regulation and takes a long time: The speed regulation system and excitation system inside the generator need to respond to the instructions of the automatic synchronizing device and frequently adjust the generator speed and excitation current to regulate the generator output voltage. However, due to the mechanical inertia of the speed regulation system and excitation system, the adjustment speed is slow, resulting in a long synchronization process.

[0041] (2) High requirements for generator regulation performance, easily impacting weak power grids: The microgrids constructed out of thin air by grid-type energy storage systems are relatively weak. The power fluctuations generated by the generator during the output voltage regulation process can easily impact the voltage and frequency of the microgrid, thereby affecting the stable operation of the plant power load.

[0042] (3) Risk of closing impact: If the regulation accuracy of the generator output voltage is insufficient or the response is delayed, there may still be a large voltage difference or phase difference at the moment of closing, which will generate impact current and affect the normal operation of the power plant.

[0043] Reference Figure 1 The diagram illustrates a flowchart of a black start control method for a power plant provided in an embodiment of this application, which may specifically include the following steps: Step 101: Control the preset grid-type energy storage system to start the power plant in a completely dark state, and detect whether the output voltage of the generator in the power plant reaches the preset voltage threshold. In this embodiment, the power plant may include a main transformer, a high-voltage transformer, a generator, and a generator output circuit breaker. The low-voltage side of the high-voltage transformer can be connected to a grid-type energy storage system via the plant auxiliary power bus, and the high-voltage side of the high-voltage transformer can be connected to the low-voltage side of the main transformer. The generator can be a gas turbine generator set, including a gas turbine, a synchronous generator, an excitation system, and a speed control system. The generator output circuit breaker is connected between the generator output and the low-voltage side of the main transformer (i.e., the high-voltage side of the high-voltage transformer).

[0044] In this embodiment of the application, when the power plant is in a completely dark state, the grid-type energy storage system can be controlled to start in grid mode, creating a micro grid out of thin air, and supplying power to the power plant according to a fixed supply voltage, thus enabling the power plant to start in the dark.

[0045] A grid-connected energy storage system can include battery packs and energy storage converters. The energy storage converters have a grid-connected mode, allowing them to supply power to the power plant at a fixed voltage, enabling black start. During the initial black start phase, the energy storage converters operate in grid-connected mode with a fixed voltage and frequency, supplying power to the power plant, allowing the power plant transformer and main transformer to achieve "zero-start voltage boost." Once the voltage of the power plant transformer and main transformer reaches their respective rated values, the power plant's auxiliary power is restored, and the generators start.

[0046] After the generator starts, check whether the generator's output voltage reaches the preset voltage threshold. If the generator's output voltage reaches the preset voltage threshold, it is confirmed that the generator has established an output voltage and has started generating electricity.

[0047] Step 102: If the output voltage reaches the voltage threshold, the high-voltage side voltage of the high-voltage transformer in the power plant is collected, and the frequency difference and amplitude difference between the output voltage and the high-voltage side voltage are determined. In this embodiment, after the generator establishes its output voltage, it is necessary to determine whether the generator's output voltage matches the voltage of the "station power bus voltage of the grid-type energy storage system after being stepped up by the high-voltage transformer." If they match, the generator's output circuit breaker is closed, allowing the generator to replace the energy storage system and supply power for the normal operation of the power plant. Since the high-voltage side of the high-voltage transformer can be the same as the low-voltage side of the main transformer, and the high-voltage side of the high-voltage transformer has the same voltage as the low-voltage side of the main transformer, matching the generator's output voltage with the voltage of the "station power bus voltage of the grid-type energy storage system after being stepped up by the high-voltage transformer" means that the generator's output voltage matches both the high-voltage side of the high-voltage transformer and the low-voltage side of the main transformer.

[0048] In this embodiment of the application, if the generator's output voltage does not match the voltage on the high-voltage side of the high-voltage transformer after the generator establishes its output voltage, the high-voltage side voltage of the high-voltage transformer in the power plant is collected, and the frequency and amplitude of the generator's output voltage, as well as the frequency and amplitude of the high-voltage side voltage of the high-voltage transformer, are determined.

[0049] In this embodiment of the application, the frequency difference between the generator's output voltage and the high-voltage side voltage of the high-voltage transformer can be determined based on the frequency of the generator's output voltage and the frequency of the high-voltage side voltage of the high-voltage transformer; the amplitude difference between the generator's output voltage and the high-voltage side voltage of the high-voltage transformer can be determined based on the amplitude of the generator's output voltage and the amplitude of the high-voltage side voltage of the high-voltage transformer.

[0050] In this embodiment, the frequency of the generator's output voltage can be added to a small positive bias to obtain the target frequency, and the frequency of the high-voltage side voltage of the high-voltage transformer can be subtracted from the target frequency to determine the frequency difference between the generator's output voltage and the high-voltage side voltage of the high-voltage transformer; the amplitude of the generator's output voltage can be added to a small positive bias to obtain the target amplitude, and the amplitude of the high-voltage side voltage of the high-voltage transformer can be subtracted from the target amplitude to determine the amplitude difference between the generator's output voltage and the high-voltage side voltage of the high-voltage transformer.

[0051] Step 103: Based on the frequency difference and the preset initial power supply of the grid-type energy storage system, determine the target power supply of the grid-type energy storage system, and determine the target direct-axis current of the grid-type energy storage system according to the target power supply. In this embodiment, the grid-type energy storage system internally defines virtual direct and quadrature axes. By adjusting the direct and quadrature axes, the voltage of the power bus connecting the grid-type energy storage system to the low-voltage side of the power plant's transformer can be adjusted, i.e., the power supply voltage from the grid-type energy storage system to the power plant can be adjusted.

[0052] In this embodiment, the target power supply of the grid-type energy storage system can be determined based on the frequency difference between the generator's output voltage and the high-voltage side voltage of the transformer, and the preset initial power supply power of the grid-type energy storage system. The target power supply power is the power supply power related to the frequency correction between the grid-type energy storage system and the generator's output voltage and the high-voltage side voltage.

[0053] Based on the target power supply, the target direct-axis current in the grid-connected energy storage system can be determined. The target power supply is the direct-axis current related to the frequency correction between the grid-connected energy storage system and the generator output voltage and the high-voltage side voltage.

[0054] In some embodiments of this application, determining the target power supply of the grid-type energy storage system based on the frequency difference and the preset initial power supply power of the grid-type energy storage system includes: Based on the frequency difference, the preset virtual inertia, and the preset damping coefficient, a first power difference between the target power supply and the initial power supply is determined. The target power supply is determined based on the first power difference and the initial power supply.

[0055] In this embodiment of the application, the first power difference between the target power supply and the initial power supply can be calculated using the formula for calculating the first power difference. The formula for calculating the first power difference is: ΔP=2πJ*d(err_f) / dt+2πD*err_f Where ΔP is the first power difference; J is the virtual inertia; D is the damping coefficient; err_f is the frequency difference between the generator's output voltage and the high-voltage side voltage of the transformer; * is the multiplication sign.

[0056] In this embodiment, the target power supply of the grid-type energy storage system can be calculated using the formula for calculating the target power supply. The formula for calculating the target power supply is as follows: P_ref=P_set+ΔP Where P_set is the initial power supply frequency of the grid-type energy storage system, and P_ref is the target power supply of the grid-type energy storage system.

[0057] In this embodiment, a first power difference between the target power supply and the initial power supply is determined based on the frequency difference, a preset virtual inertia, and a preset damping coefficient; based on the first power difference and the initial power supply, the target power supply is determined, and the target power supply related to the frequency correction between the grid-type energy storage system and the generator output voltage and the high-voltage side voltage is obtained.

[0058] In some embodiments of this application, determining the target direct-axis current of the grid-type energy storage system based on the target power supply includes: The actual direct-axis current, actual direct-axis voltage, actual quadrature-axis current, and actual quadrature-axis voltage of the grid-type energy storage system are collected, and the actual power supply of the grid-type energy storage system is determined based on the actual direct-axis current, actual direct-axis voltage, actual quadrature-axis current, and actual quadrature-axis voltage. Determine a second power difference between the actual power supply and the target power supply; The target direct-axis current is determined based on the second power difference, the preset second proportional coefficient, and the preset second integral coefficient.

[0059] In this embodiment, the actual power supply of the grid-type energy storage system is calculated using a formula for calculating actual power supply. The formula for calculating actual power supply is: P_actual=1.5*(Ubus_d*Ibus_d+Ubus_q*Ibus_q) Where P_actual is the actual power supply; Ubus_d is the actual direct-axis voltage; Ibus_d is the actual direct-axis current; Ubus_q is the actual quadrature-axis voltage; and Ibus_q is the actual quadrature-axis current.

[0060] In this embodiment, the calculation formula for the second power difference is used to calculate the second power difference between the actual power supply and the target power supply of the grid-type energy storage system. The calculation formula for the second power difference is as follows: ΔP_err=P_ref-P_actual Where ΔP_err is the second power difference.

[0061] In this embodiment, the target direct-axis current of the grid-type energy storage system can be calculated using the formula for calculating the target direct-axis current. The formula for calculating the target direct-axis current is as follows: Id_ref=Kp_p*ΔP_err+Ki_p*∫ΔP_err dt Where Id_ref is the target direct-axis current; Kp_p is the second proportional coefficient; and Ki_p is the second integral coefficient.

[0062] In this embodiment, the target direct-axis current is determined based on the difference between the actual power supply and the target power supply of the grid-type energy storage system, a preset second proportional coefficient, and a preset second integral coefficient. This achieves the determination of the target direct-axis current of the grid-type energy storage system based on the target power supply related to the frequency correction between the grid-type energy storage system and the generator output voltage and the high-voltage side voltage.

[0063] Step 104: Based on the amplitude difference, the preset first proportional coefficient and the preset first integral coefficient, determine the target quadrature-axis current of the grid-type energy storage system, and based on the target direct-axis current and the target quadrature-axis current, control the grid-type energy storage system to adjust the power supply voltage to the power plant so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0064] In this embodiment, based on the amplitude difference between the generator's output voltage and the high-voltage side voltage of the high-voltage transformer, a preset first proportional coefficient, and a preset first integral coefficient, the target quadrature-axis current of the grid-type energy storage system can be determined using the target quadrature-axis current calculation formula. The calculation formula for the target quadrature-axis current is as follows: Iq_ref=Kp_u·U_err+Ki_u·∫U_err dt Where Iq_ref is the target quadrature-axis current; Kp_u is the first proportional coefficient; Ki_u is the first integral coefficient; and U_err is the amplitude difference between the generator's output voltage and the high-voltage side voltage of the high-voltage transformer.

[0065] In this embodiment, based on the target direct-axis current and target quadrature-axis current of the grid-type energy storage system, the grid-type energy storage system is controlled to adjust the power supply voltage to the power plant, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage of the generator.

[0066] In some embodiments of this application, controlling the grid-type energy storage system to adjust the supply voltage to the power plant based on the target direct-axis current and the target quadrature-axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage, includes: Based on the target direct-axis current and the target quadrature-axis current, the target direct-axis voltage and the target quadrature-axis voltage of the grid-type energy storage system are determined; Based on the target direct-axis voltage, the direct axis of the grid-type energy storage system is controlled, and based on the target quadrature-axis voltage, the quadrature-axis of the grid-type energy storage system is controlled, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0067] In the embodiments of this application, the target direct-axis voltage of the grid-type energy storage system can be determined based on the target direct-axis current; the target quadrature-axis voltage of the grid-type energy storage system can be determined based on the target quadrature-axis current.

[0068] In this embodiment, the direct axis of the grid-type energy storage system is controlled according to the target direct axis voltage, and the quadrature axis of the grid-type energy storage system is controlled according to the target quadrature axis voltage, so as to adjust the power supply voltage of the grid-type energy storage system to the power plant, and then adjust the high-voltage side voltage after the power supply voltage is stepped up by the high-voltage transformer, so as to match the output voltage of the power plant.

[0069] In some embodiments of this application, determining the target direct-axis voltage and target quadrature-axis voltage of the grid-type energy storage system based on the target direct-axis current and the target quadrature-axis current includes: Determine the direct-axis current difference between the target direct-axis current and the actual direct-axis current, and determine the quadrature-axis current difference between the target quadrature-axis current and the actual quadrature-axis current; The actual direct-axis current is used as the direct-axis current feedforward term, and the actual quadrature-axis current is used as the quadrature-axis current feedforward term; Based on the direct-axis current difference, the preset third proportional coefficient, and the preset third integral coefficient, the initial direct-axis voltage of the grid-type energy storage system is determined, and based on the initial direct-axis voltage, the direct-axis current feedforward term, the actual quadrature-axis current, the angular frequency of the grid-type energy storage system, and the equivalent inductance of the grid-type energy storage system outlet, the target direct-axis voltage of the grid-type energy storage system is determined. Based on the quadrature-axis current difference, a preset fourth proportional coefficient, and a preset fourth integral coefficient, the initial quadrature-axis voltage of the grid-type energy storage system is determined, and based on the initial quadrature-axis voltage, the quadrature-axis current feedforward term, the actual direct-axis current, the angular frequency, and the equivalent inductance, the target quadrature-axis voltage of the grid-type energy storage system is determined.

[0070] In this embodiment, the direct-axis current difference between the target direct-axis current and the actual direct-axis current can be determined using the formula for calculating the direct-axis current difference; the quadrature-axis current difference between the target quadrature-axis current and the actual quadrature-axis current can be determined using the formula for calculating the quadrature-axis current difference. The formula for calculating the direct-axis current difference is as follows: ΔId=Id_ref-Ibus_d Where ΔId is the direct-axis current difference.

[0071] The formula for calculating the cross-axis current difference is: ΔIq=Iq_ref-Ibus_q Where ΔIq is the quadrature-axis current difference.

[0072] In this embodiment, based on the direct-axis current difference, a preset third proportional coefficient, and a preset third integral coefficient, the initial direct-axis voltage of the grid-type energy storage system can be determined using the initial direct-axis voltage calculation formula. The initial direct-axis voltage calculation formula is as follows: Vd_ref'=Kp_id·ΔId+Ki_id·∫ΔId dt Where Vd_ref' is the initial direct-axis voltage; Kp_id is the third proportional coefficient; and Ki_id is the third integral coefficient.

[0073] Based on the initial direct-axis voltage, direct-axis current feedforward term, actual quadrature-axis current, angular frequency of the grid-type energy storage system, and equivalent inductance at the outlet of the grid-type energy storage system, the target direct-axis voltage of the grid-type energy storage system can be determined using the calculation formula for the target direct-axis voltage. The calculation formula for the target direct-axis voltage is as follows: Vd_ref=Vd_ref'+ωL·Ibus_q+I_load_d Where Vd_ref is the target direct-axis voltage; ω is the angular frequency of the grid-type energy storage system; L is the equivalent inductance at the outlet of the grid-type energy storage system; and I_load_d is the direct-axis current feedforward term.

[0074] Based on the quadrature-axis current difference, a preset fourth proportional coefficient, and a preset fourth integral coefficient, the initial quadrature-axis voltage of the grid-type energy storage system can be determined using the initial quadrature-axis voltage calculation formula. The initial quadrature-axis voltage calculation formula is as follows: Vq_ref'=Kp_iq·ΔIq+Ki_iq·∫ΔIq dt Where Vq_ref' is the initial quadrature-axis voltage; Kp_iq is the fourth proportional coefficient; and Ki_iq is the fourth integral coefficient.

[0075] Based on the initial quadrature-axis voltage, quadrature-axis current feedforward term, actual direct-axis current, angular frequency, and equivalent inductance, the target quadrature-axis voltage of the grid-type energy storage system can be determined using the calculation formula for the target quadrature-axis voltage. The calculation formula for the target quadrature-axis voltage is as follows: Vq_ref=Vq_ref'-ωL·Ibus_d+I_load_q Where Vq_ref is the target quadrature-axis voltage; I_load_q is the quadrature-axis current feedforward term.

[0076] In this embodiment, the initial direct-axis voltage of the grid-type energy storage system is determined based on the direct-axis current difference between the target direct-axis current and the actual direct-axis current, a preset third proportional coefficient, and a preset third integral coefficient. Based on the initial direct-axis voltage, the target direct-axis voltage related to the frequency correction between the grid-type energy storage system and the output voltage and high-voltage side voltage is obtained. The initial quadrature-axis voltage of the grid-type energy storage system is determined based on the quadrature-axis current difference between the target quadrature-axis current and the actual quadrature-axis current, a preset fourth proportional coefficient, and a preset fourth integral coefficient. Based on the initial quadrature-axis voltage, the target quadrature-axis voltage related to the amplitude correction between the grid-type energy storage system and the output voltage and high-voltage side voltage is obtained.

[0077] In some embodiments of this application, the method further includes: During the process of adjusting the power supply voltage, the frequency difference, amplitude difference, and phase difference to be processed between the high-voltage side voltage and the output voltage are determined. If the frequency difference to be processed is less than a preset frequency threshold, the amplitude difference to be processed is less than a preset amplitude threshold, and the phase difference to be processed is less than a preset phase threshold, then it is confirmed that the high-voltage side voltage matches the output voltage.

[0078] In this embodiment, the frequency difference to be processed between the high-voltage side voltage and the output voltage can be calculated based on the frequency of the high-voltage side voltage of the high-voltage transformer and the frequency of the generator output voltage; the amplitude difference to be processed between the high-voltage side voltage and the output voltage can be calculated based on the amplitude of the high-voltage side voltage of the high-voltage transformer and the amplitude of the generator output voltage; and the phase difference to be processed between the high-voltage side voltage and the output voltage can be calculated based on the phase of the high-voltage side voltage of the high-voltage transformer and the phase of the generator output voltage.

[0079] In this embodiment, the high-voltage side voltage and the output voltage are synchronized based on the unprocessed frequency difference, unprocessed amplitude difference and unprocessed phase difference between the high-voltage side voltage of the transformer and the generator output voltage, thereby improving the accuracy of the judgment on whether the high-voltage side voltage and the output voltage are synchronized.

[0080] In some embodiments of this application, the grid-type energy storage system includes an energy storage converter; the step of controlling the grid-type energy storage system to adjust the supply voltage to the power plant based on the target direct-axis current and the target quadrature-axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage, includes: Based on the target direct-axis current and the target quadrature-axis current, the energy storage converter is controlled to adjust the supply voltage to the power plant so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0081] In this embodiment of the application, the grid-type energy storage system has an energy storage converter inside.

[0082] In this embodiment, the task of synchronizing the high-voltage side voltage of the transformer with the output voltage of the generator is transferred from the generator mechanical system with a slow response to the energy storage converter inside the grid-type energy storage system with an extremely fast response speed that can reach the millisecond level. This shortens the time from when the generator establishes its output voltage to when the high-voltage side voltage of the transformer and the generator's output voltage are successfully synchronized.

[0083] In this embodiment, the generator's output voltage is frequently adjusted to match the high-voltage side voltage of the power grid substation after the voltage of the grid-connected energy storage system's power bus is stepped up. However, due to the mechanical inertia of the generator, the adjustment speed of the output voltage is slow, resulting in a long synchronization process. In the case of complete darkness at the power plant, the grid-connected energy storage system is used as the main power source to supply power to the power plant. When the generator's output voltage reaches a preset voltage threshold and the power plant establishes its output voltage, the grid-connected energy storage system actively adjusts the power supply voltage to the power plant, thereby adjusting the high-voltage side voltage of the power plant's power grid substation to match the generator's output voltage. This transfers the task of synchronizing the high-voltage side voltage of the power grid substation with the generator's output voltage from the slow-responding generator mechanical system to the fast-responding grid-connected energy storage system, significantly shortening the time from when the generator establishes its output voltage to when the high-voltage side voltage of the power grid substation successfully matches the generator's output voltage.

[0084] In this embodiment, the high-voltage side voltage of the power plant's transformer is acquired, and the frequency difference and amplitude difference between the power plant's output voltage and the high-voltage side voltage are determined. Based on the frequency difference and the preset initial power supply of the grid-type energy storage system, the target power supply of the grid-type energy storage system is determined, and based on the target power supply, the target direct-axis current of the grid-type energy storage system is determined, thus obtaining the target direct-axis current related to frequency correction between the grid-type energy storage system and the output voltage and the high-voltage side voltage. Based on the amplitude difference, a preset first proportional coefficient, and a preset first integral coefficient, the target quadrature-axis current of the grid-type energy storage system is determined, thus obtaining the target quadrature-axis current related to amplitude correction between the grid-type energy storage system and the output voltage and the high-voltage side voltage. Based on the target direct-axis current and the target quadrature-axis current, the grid-type energy storage system is controlled to adjust the fixed power supply voltage so that the high-voltage side voltage of the power plant during the black start process matches the output voltage, thereby achieving the matching between the high-voltage side voltage of the transformer and the output voltage of the generator through the control of the grid-type energy storage system.

[0085] Reference Figure 2 The diagram illustrates a control system for black start of a power plant according to an embodiment of this application. The control system for black start of a power plant includes equipment within the generator, a grid-connected energy storage system, and a coordination controller.

[0086] Power plant equipment may include main transformers, high-voltage transformers, generators, and generator output circuit breakers (GCBs). The low-voltage side of the high-voltage transformer can be connected to a grid-type energy storage system via the plant service bus. The grid-type energy storage system includes battery banks and energy storage converters. The AC side of the energy storage converters is connected to the plant service bus. Various plant service loads are connected to the plant service bus.

[0087] The high-voltage side of the high-voltage transformer can be connected to the low-voltage side of the main transformer. The low-voltage side of the main transformer has a voltage transformer to collect the voltage of the low-voltage side of the main transformer, and the voltage of the low-voltage side of the main transformer is the same as the voltage of the high-voltage side of the high-voltage transformer.

[0088] The generator can be a gas turbine generator set. The generator output circuit breaker is connected between the generator output and the low-voltage side of the main transformer (i.e., the high-voltage side of the high-voltage transformer). A voltage transformer is installed at the generator output to collect the generator's output voltage.

[0089] The coordination controller is communicatively connected to the control circuits of the energy storage converter, the voltage transformer at the generator outlet, the voltage transformer on the low-voltage side of the main transformer, and the generator outlet circuit breaker. The coordination controller is also connected via control cables to the control interface of the energy storage converter PCS and the closing / opening control circuits of the generator outlet circuit breaker GCB.

[0090] Voltage transformers PT1 and CT1 can be installed on the energy storage output side of the plant's auxiliary power bus to measure the voltage Ubus_abc and current Ibus_abc of the auxiliary power bus, i.e., the supply voltage Ubus_abc and supply current Ibus_abc from the grid-type energy storage system to the power plant. Voltage transformer PT2 can be installed on the low-voltage side of the main transformer to measure the voltage Ut_abc on the low-voltage side (i.e., the high-voltage side of the high-voltage plant transformer). Voltage transformer PT3 is installed at the generator outlet to measure the generator's output voltage Ug_abc, which can be a three-phase voltage. The measurement signals from PT1, CT1, PT2, and PT3 are all connected to the coordination controller.

[0091] The generator black start control system can realize the control method for generator black start, including three stages: (1) Phase 1 (Grid Stabilization): In the initial stage of black start, ignore Ug_abc, and use the built-in fixed frequency f0 and voltage amplitude U0 as references to control the converter to output a stable 6kV bus voltage Ubus_abc, so as to provide reliable power for plant load and generator start-up.

[0092] (2) Stage 2 (Active Synchronization): After the generator builds up voltage, the control target is switched to: by adjusting the converter output voltage Ubus_abc, the low-voltage side voltage Ut_abc of the main transformer is changed, so that its amplitude, frequency and phase dynamically track the generator output voltage Ug_abc, creating perfect conditions for the generator output circuit breaker to close.

[0093] (3) Phase 3 (Mode Switching): After successful synchronization, the converter control mode immediately switches from grid-connected mode (active synchronization) to grid-following mode, and outputs active / reactive power according to the grid voltage and dispatch instructions.

[0094] The overall control architecture of the generator black start control system includes: (1) A typical voltage source converter control architecture with dual closed loop (outer loop + inner loop) + feedforward is adopted, but the source and logic of the outer loop reference command are dynamically switched according to the operating mode.

[0095] (2) Outer loop (power / voltage loop): generates current reference command. In active synchronization mode, its reference value is calculated from the difference between Ug_abc and Ut_abc.

[0096] (3) Inner loop (current loop): quickly tracks the current command given by the outer loop and outputs modulated voltage.

[0097] (4) Feedforward compensation: The load current Ibus_abc is introduced to feedforward, which improves the system’s anti-interference ability and dynamic response speed to load disturbances and ensures voltage quality.

[0098] Reference Figure 3 The diagram illustrates a control block diagram of an energy storage converter provided in an embodiment of this application under "active synchronization mode". (Refer to...) Figure 4 This diagram illustrates the internal control structure of an energy storage converter in "active synchronization mode" according to an embodiment of this application. In "active synchronization mode," the detailed decomposition of the dual closed-loop and feedforward control system for the generator black start employs a virtual synchronous generator control algorithm. The reference frequency of its active-frequency droop control loop and the reference voltage of its reactive-voltage droop control loop are dynamically given by the coordinating controller based on the real-time acquired generator output voltage. The control concept in "active synchronization mode" is to decouple the synchronization task of Ut_abc tracking Ug_abc into the control of the amplitude and frequency / phase of Ut_abc, corresponding to voltage control on the dq axis, respectively. The control flow in "active synchronization mode" can be decomposed as follows: Step 1: Target reference calculation and mode switching logic: The coordinator calculates dynamic reference instructions in real time based on Ug_abc: f_ref=f_gen+Δf Where f_gen is the frequency resolved by Ug_abc, and Δf is a small positive bias (e.g., 0.05-0.1Hz) used to make the frequency of Ut_abc slightly higher than that of Ug_abc to achieve synchronization, ensuring that the frequency of the energy storage side is slightly higher than that of the generator side, so that the phase difference can converge smoothly.

[0099] U_ref=U_gen+ΔU Wherein, U_gen is the amplitude obtained by analyzing Ug_abc, and ΔU is a small positive bias (e.g., 0.5-1% of the rated voltage) used to make the amplitude of Ut_abc slightly higher than that of Ug_abc, so as to ensure that the voltage on the low-voltage side of the main transformer is slightly higher than that on the generator side, and the power flow is reasonable after closing.

[0100] Mode switching action: The outer loop reference source switches from the internal fixed value (f0, U0) to the external dynamic instruction (f_ref, U_ref).

[0101] Step 2: Outer loop control (generating current commands), including the outer loop (power / voltage loop) and the reactive-voltage control loop.

[0102] Outer Loop (Power / Voltage Loop): The outer loop generates a current reference value for correction based on the voltage deviation, including the following steps: (1) Frequency error calculation err_f=f_ref-f_t Where f_t is the frequency obtained from the low-voltage side voltage Ut_abc of the main transformer through PLL2.

[0103] (2) Virtual Synchronizer Algorithm The err_f input is used as a component in the synchronous machine rotor motion equation (including the virtual inertia J and droop coefficient D). This component calculates the required active power reference value P_ref based on the frequency error. Its physical meaning is to simulate the synchronous machine's inertial response to system frequency changes and its primary frequency regulation characteristics.

[0104] Rotor motion equations: J*dω / dt=ΔP-D*Δω Where J is the virtual inertia, D is the damping coefficient, ω is the angular velocity, Δω is the angular velocity deviation, and ΔP is the difference between mechanical power and electromagnetic power (i.e., the power that needs to be adjusted).

[0105] Substituting the relationship between angular velocity and frequency into: ω=2πf, we get: dω / dt = 2π * df / dt, Δω = 2π * Δf, Δf = err_f (i.e., frequency error) Therefore: J*2π*d(err_f) / dt=ΔP-D*2π*err_f Simplifying, we get: ΔP = 2πJ*d(err_f) / dt + 2πD*err_f; ΔP = P_ref - P_set (P_set is the set power, usually set to 0, or set to an initial value according to system needs) Therefore, P_ref = P_set + 2πJ*d(err_f) / dt + 2πD*err_f; (3) Power error calculation: Calculate the actual output active power P (which can be calculated using Ubus_dq and Ibus_dq).

[0106] P_actual=1.5*(Ubus_d*Ibus_d+Ubus_q*Ibus_q) ΔP_err=P_ref-P_actual The error of P_ref-P is PI-regulated to output the d-axis current reference value Id_ref: Id_ref=Kp_p*ΔP_err+Ki_p*∫ΔP_err dt (Kp_p is the proportionality coefficient, Ki_p is the integral coefficient) Id_ref serves as the reference value for inner loop current control, i.e., the target direct-axis current of the grid-type energy storage system.

[0107] Reactive power-voltage control loop (controls the q-axis, affecting voltage amplitude): Comparator: Calculates the error U_err = U_ref - Ut_d between the d-axis components Ut_d and U_ref of Ut_abc.

[0108] PI regulator: Directly adjusts ΔU using PI, outputting a q-axis current reference value Iq_ref. This means that a corresponding reactive current needs to be injected to adjust the voltage amplitude.

[0109] The specific steps are as follows: 1. Voltage error calculation: U_err = U_ref - Ut_d (Ut_d is the d-axis component of Ut_dq) 2. PI controller: Iq_ref = Kp_u·U_err + Ki_u·∫U_err dt (Kp_u is the proportional coefficient, Ki_u is the integral coefficient) Step 3: Inner loop control (tracking current command) The inner loop aims to track the current command given by the outer loop at extremely high speed and resist load disturbances.

[0110] Comparator: Calculate the current error of Id_ref-Ibus_d and Iq_ref-Ibus_q respectively.

[0111] Feedforward compensation: The measured load current Ibus_dq is directly fed forward and superimposed onto the output of the PI regulator. This can offset the impact of sudden load current changes on the converter output voltage, which is equivalent to providing the current required by the load in advance, making the voltage control loop "easier".

[0112] PI regulator: Performs rapid PI regulation on current error and, combined with feedforward, ultimately outputs the d-axis and q-axis voltage commands Vd_ref and Vq_ref required by the converter.

[0113] The specific steps are as follows: Current error calculation: ΔId=Id_ref-Ibus_d ΔIq=Iq_ref-Ibus_q Load current feedforward: I_load_d=Ibus_d I_load_q=Ibus_q PI regulation and feedforward superposition: Vd_ref'=Kp_id·ΔId+Ki_id·∫ΔId dt Vq_ref'=Kp_iq·ΔIq+Ki_iq·∫ΔIq dt Vd_ref=Vd_ref'+ωL·Ibus_q+Direct-axis current feedforward term Vq_ref=Vq_ref'-ωL·Ibus_d+Quaternary axis current feedforward term Step 4: Modulation and Output Coordinate transformation (abc / dq): By using a phase-locked loop to lock Ubus_abc, its phase angle θ is obtained and used for Park transformation.

[0114] All three-phase AC quantities Ubus_abc, Ibus_abc, Ug_abc, and Ut_abc are converted into DC quantities in the synchronous rotating dq coordinate system through Clark transformation and Park transformation.

[0115] In the dq coordinate system, the d-axis is usually aligned with the direction of the voltage vector, therefore: U_d represents the voltage amplitude, and U_q≈0.

[0116] I_d represents the active current component, and I_q represents the reactive current component.

[0117] DC flow control facilitates zero steady-state error tracking using high-performance PI controllers.

[0118] Coordinate transformation and modulation: Through the Park inverse transform, Vd_ref and Vq_ref are converted into Vα_ref and Vβ_ref in the stationary two-phase coordinate system. Then, through the Clark inverse transform or space vector modulation (SVPWM), a three-phase voltage modulation wave is generated to drive the IGBT switch of the converter and produce the required AC voltage.

[0119] Key notes: The unique features of the "active synchronization mode" should be clearly marked in the block diagram: f_ref and U_ref are externally dynamically given (from the coordinating controller), rather than internal fixed values; and the load current feedforward path.

[0120] Inverse Park transformation: Transforms Vd_ref and Vq_ref in the rotating coordinate system back to Vα_ref and Vβ_ref in the stationary two-phase αβ coordinate system.

[0121] Space Vector Modulation: Vα_ref and Vβ_ref are used to generate a PWM wave to drive the IGBT switching transistor using the SVPWM algorithm.

[0122] Converter output: PWM wave controls IGBT, so that the converter actually outputs the desired three-phase voltage Ubus_abc.

[0123] Voltage transfer: Ubus_abc passes through the impedance of the main transformer (or the high-voltage transformer) to form Ut_abc on the high-voltage side of the transformer. By continuously adjusting Ubus_abc, Ut_abc is eventually made to meet the synchronization condition with Ug_abc.

[0124] In this embodiment of the application, the entire process from black start to grid connection is essentially a serialization conversion of the control target and the control mode, which can be represented as:

[0125] Reference Figure 5 This document illustrates a flowchart of another control method for black start of a power plant provided in an embodiment of this application, which may specifically include the following steps: Start: Receive black boot command.

[0126] Step S501: The coordinating controller controls the energy storage converter to start in a fixed V / f (Voltage / Frequency Grid-Forming Mode) grid-forming mode to establish a stable plant power bus voltage.

[0127] Step S502: Using plant power, start the necessary auxiliary systems of the gas turbine in sequence (such as lubricating oil pump, turning gear, etc.).

[0128] Step S503: Start the gas turbine and begin accelerating.

[0129] Step S504: The gas turbine drives the generator to rotate, the excitation system is activated, and the generator begins to build up voltage. The coordinating controller continuously monitors the generator output voltage Ug.

[0130] Step S505: Determine whether the generator output voltage Ug has reached the preset threshold (assuming ≥80% of the rated voltage). If yes, proceed to step S506; if no, proceed to step S505.

[0131] Step S506: The coordinating controller sends a mode switching command to the energy storage converter, switching it from fixed V / f mode to active synchronization mode. In this mode, the target output voltage value of the PCS becomes the dynamic tracking Ug.

[0132] Step S507: The coordinating controller calculates in real time the voltage difference ΔU, frequency difference Δf, and phase difference Δδ between the plant power bus voltage Ubus and the generator output voltage Ug. Step S508: Determine whether ΔU, Δf, and Δδ are simultaneously and continuously (e.g., for 2-5 cycles) less than the preset closing threshold. If yes, proceed to step S509; otherwise, proceed to step S508.

[0133] Step S509: The coordinating controller calculates the closing lead time and sends a closing command to the generator output circuit breaker GCB.

[0134] Step S510: GCB is closed, and the gas turbine generator is successfully connected to the system.

[0135] Step S511: The coordinating controller controls the energy storage converter to switch to PQ (grid-connected) mode and operates according to the dispatching instructions.

[0136] End: Black boot and grid connection process completed.

[0137] In this embodiment, addressing the issues of slow speed, significant impact on the microgrid, and high safety dependence caused by the reliance on generator-side regulation during synchronization in existing energy storage-assisted black start technologies, this application eliminates the generator's need to track the microgrid established by energy storage after startup. Instead, the grid-type energy storage system actively adjusts the amplitude, frequency, and phase of its output voltage to precisely track the generator's output voltage. The generator's output circuit breaker is closed only when the voltage on the low-voltage side of the main transformer (i.e., the high-voltage side of the high-voltage transformer) and the generator's output voltage are perfectly matched (meeting synchronization conditions). The energy storage system acts as both a "smart synchronizer" and a "virtual ideal grid" in this process. The high control precision of the energy storage converter enables accurate tracking of the generator voltage, resulting in smaller voltage, frequency, and phase differences during closing, significantly reducing the risk of asynchronous closing and inrush current. This application avoids system oscillations that may be caused by large-amplitude regulation of the generator in a weak grid (energy storage microgrid) environment, improving the power supply quality of the plant's auxiliary power load during black start. Moreover, it is particularly suitable for generator sets with limited regulation rates or aging performance, thus broadening the application scope of energy storage black start technology.

[0138] In a specific example, taking a 9F-class gas turbine power plant as an example, a 20MW / 40MWh grid-connected energy storage system is configured. The coordination controller adopts a high-performance PLC or a dedicated control device.

[0139] Black start trigger: Power grid failure, receiving black start command.

[0140] Energy storage grid connection: The coordinating controller controls the energy storage converter to start in 50Hz, 6kV V / f mode to supply power to the 6kV plant service bus.

[0141] Gas turbine startup: The lubricating oil pump, jacking oil pump, turning gear, and ignition system are started sequentially. The gas turbine then begins ignition and accelerates.

[0142] Mode switching: When the gas turbine speed reaches 3000 rpm and the generator outlet voltage reaches 80% of the rated voltage, the coordinating controller sends a command to the energy storage PCS to switch to "active synchronization mode". At this time, the control reference values ​​f_ref and U_ref of the PCS are no longer fixed, but are calculated by the coordinating controller based on the real-time acquired generator voltages U_gen and f_gen: f_ref = f_gen + 0.08 Hz, U_ref = U_gen * 1.008.

[0143] Active tracking: The PCS quickly adjusts its output based on the new dynamic reference value. The coordinating controller calculates ΔU, Δf, and Δδ in real time. The closing thresholds are set as follows: ΔU < ±0.5%Un, Δf < ±0.05 Hz, Δδ < ±5°.

[0144] Grid connection: When the above conditions are met and continue for 3 power frequency cycles, the coordinating controller issues a closing command before the estimated circuit breaker closing time (e.g., 80ms). The GCB closes, and the generator smoothly connects to the grid.

[0145] Subsequent operation: After grid connection, the coordinating controller will switch the energy storage PCS control mode to PQ mode and receive dispatch instructions to provide peak shaving or frequency regulation auxiliary services.

[0146] Reference Figure 6 The diagram illustrates a method provided in the related art whereby the generator output voltage is adjusted to match the high-voltage side voltage of the transformer. Figure 6 The graph displays two curves: one is a horizontal straight line representing the low-voltage side voltage (Ubus, fbus) of the main transformer in the microgrid established by energy storage, with its amplitude and frequency remaining constant. The other is a gradually approaching curve representing the generator output voltage (Ug, fg). At time t0 (generator startup and voltage build-up), Ug and fg deviate significantly from the bus values. Subsequently, through generator speed regulation and excitation system adjustment, Ug and fg slowly approach the constant bus values ​​until they meet the synchronization conditions at time t1. This process involves gradual curve changes and takes a relatively long time.

[0147] Reference Figure 7This diagram illustrates a method provided in this application where the power supply voltage from a grid-type energy storage system to a power plant is adjusted to match the generator output voltage with the high-voltage side voltage of the power plant transformer. Two curves are shown: one is a horizontal or slowly changing curve representing the generator output voltage (Ug, fg). After the generator starts, its voltage and frequency quickly stabilize near their rated values ​​with only minor fluctuations. The other curve represents the fast-tracking voltage (Ubus, fbus) of the main transformer in the microgrid established by the energy storage system. At time t0' (the mode switching point), Ubus and fbus jump from their fixed values ​​and begin actively and rapidly tracking the values ​​of Ug and fg. The tracking curve exhibits a rapid dynamic response, coinciding with the generator curve within a very short time (time t1'), achieving synchronization. This process is significantly faster than traditional methods.

[0148] It should be noted that, for the sake of simplicity, the method embodiments are all described as a series of actions. However, those skilled in the art should understand that the embodiments of this application are not limited to the described order of actions, because according to the embodiments of this application, some steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also understand that the embodiments described in the specification are all preferred embodiments, and the actions involved are not necessarily required by the embodiments of this application.

[0149] Reference Figure 8 This application also discloses a structural block diagram of a control device for black start of a power plant, the control device for black start of a power plant comprising: The voltage detection module 801 is used to control the preset grid-type energy storage system to start the power plant in a completely dark state, and to detect whether the output voltage of the generator in the power plant reaches the preset voltage threshold. The voltage acquisition module 802 is used to acquire the high-voltage side voltage of the high-voltage transformer in the power plant if the output voltage reaches the voltage threshold, and to determine the frequency difference and amplitude difference between the output voltage and the high-voltage side voltage. The target direct-axis current determination module 803 is used to determine the target power supply of the grid-type energy storage system based on the frequency difference and the preset initial power supply of the grid-type energy storage system, and to determine the target direct-axis current of the grid-type energy storage system according to the target power supply. The power supply voltage adjustment module 804 is used to determine the target quadrature axis current of the grid-type energy storage system based on the amplitude difference, a preset first proportional coefficient and a preset first integral coefficient, and to control the grid-type energy storage system to adjust the power supply voltage to the power plant based on the target direct axis current and the target quadrature axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0150] In one optional embodiment of this application, the target direct-axis current determination module includes: The first power difference determination submodule is used to determine the first power difference between the target power supply and the initial power supply based on the frequency difference, the preset virtual inertia and the preset damping coefficient. The target power supply determination submodule is used to determine the target power supply based on the first power difference and the initial power supply.

[0151] In one optional embodiment of this application, the target direct-axis current determination module includes: The actual power supply determination submodule is used to collect the actual direct-axis current, actual direct-axis voltage, actual quadrature-axis current, and actual quadrature-axis voltage of the grid-type energy storage system, and determine the actual power supply of the grid-type energy storage system based on the actual direct-axis current, actual direct-axis voltage, actual quadrature-axis current, and actual quadrature-axis voltage. The second power difference determination submodule is used to determine the second power difference between the actual power supply and the target power supply; The target direct-axis current determination submodule is used to determine the target direct-axis current based on the second power difference, a preset second proportional coefficient, and a preset second integral coefficient.

[0152] In one optional embodiment of this application, the power supply voltage adjustment module includes: The target quadrature-axis voltage determination submodule is used to determine the target direct-axis voltage and the target quadrature-axis voltage of the grid-type energy storage system based on the target direct-axis current and the target quadrature-axis current. The control submodule is used to control the direct axis of the grid-type energy storage system according to the target direct axis voltage, and to control the quadrature axis of the grid-type energy storage system according to the target quadrature axis voltage, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0153] In one optional embodiment of this application, the target quadrature-axis voltage determination submodule includes: A current difference determination unit is used to determine the direct-axis current difference between the target direct-axis current and the actual direct-axis current, and to determine the quadrature-axis current difference between the target quadrature-axis current and the actual quadrature-axis current; The feedforward term is used as a unit to use the actual direct-axis current as the direct-axis current feedforward term and the actual quadrature-axis current as the quadrature-axis current feedforward term; The target direct-axis voltage determination unit is used to determine the initial direct-axis voltage of the grid-type energy storage system based on the direct-axis current difference, a preset third proportional coefficient, and a preset third integral coefficient, and to determine the target direct-axis voltage of the grid-type energy storage system based on the initial direct-axis voltage, the direct-axis current feedforward term, the actual quadrature-axis current, the angular frequency of the grid-type energy storage system, and the equivalent inductance of the outlet of the grid-type energy storage system. The target quadrature-axis voltage determination unit is used to determine the initial quadrature-axis voltage of the grid-type energy storage system based on the quadrature-axis current difference, a preset fourth proportional coefficient, and a preset fourth integral coefficient, and to determine the target quadrature-axis voltage of the grid-type energy storage system based on the initial quadrature-axis voltage, the quadrature-axis current feedforward term, the actual direct-axis current, the angular frequency, and the equivalent inductance.

[0154] In one optional embodiment of this application, the apparatus further includes: The phase difference determination module is used to determine the frequency difference, amplitude difference, and phase difference between the high-voltage side voltage and the output voltage during the process of adjusting the power supply voltage. The matching confirmation module is used to confirm that the high-voltage side voltage matches the output voltage if the frequency difference to be processed is less than a preset frequency threshold, the amplitude difference to be processed is less than a preset amplitude threshold, and the phase difference to be processed is less than a preset phase threshold.

[0155] In one optional embodiment of this application, the grid-type energy storage system includes an energy storage converter; the power supply voltage adjustment module includes: The power supply voltage adjustment submodule is used to control the energy storage converter to adjust the power supply voltage to the power plant based on the target direct-axis current and the target quadrature-axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

[0156] It is understood that the above-described device embodiments correspond to the method embodiments of this application, and can implement the method provided by any of the above-described method embodiments of this application.

[0157] It should be noted that the device embodiments described above are merely illustrative, and some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Furthermore, in the accompanying drawings of the device embodiments provided in this application, the connection relationships between modules indicate that they have communication connections, which can specifically be implemented as one or more communication buses or signal lines. Those skilled in the art can understand and implement this without any creative effort.

[0158] Based on the embodiments of the above methods, another embodiment of this application provides a terminal device, which includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, it implements the method described in any embodiment of this application.

[0159] For example, in this embodiment, the computer program can be divided into one or more modules, which are stored in the memory and executed by the processor to complete this application. The one or more module units may be a series of computer program instruction segments capable of performing a specific function, which describe the execution process of the computer program in the terminal device.

[0160] The terminal device may be a desktop computer, laptop, handheld computer, or cloud server, etc. The terminal device may include, but is not limited to, a processor and a memory.

[0161] The processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor can be a microprocessor or any conventional processor. The processor is the control center of the terminal device, connecting all parts of the terminal device via various interfaces and lines.

[0162] Based on the above-described method embodiments, another embodiment of this application provides a computer-readable storage medium including a stored computer program, wherein, when the computer program is executed, it controls the device where the computer-readable storage medium is located to perform the method described in any of the above-described method embodiments of this application.

[0163] The modules / units integrated in the device / terminal equipment, if implemented as software functional units and sold or used as independent products, can be stored in a computer-readable storage medium. Based on this understanding, all or part of the processes in the methods of the above embodiments can also be implemented by a computer program instructing related hardware. The computer program can be stored in a computer-readable storage medium, and when executed by a processor, it can implement the steps of the various method embodiments described above. The computer program includes computer program code, which can be in the form of source code, object code, executable files, or certain intermediate forms. The computer-readable medium can include: any entity or device capable of carrying the computer program code, recording media, USB flash drives, portable hard drives, magnetic disks, optical disks, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media, etc.

[0164] Based on the above-described method embodiments, another embodiment of this application provides a computer program product, including a computer program or instructions, which, when executed by a communication device, implements the method described in any of the above-described method embodiments of this application.

[0165] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of this application. It should be understood that the above descriptions are merely specific embodiments of this application and are not intended to limit the scope of protection of this application. In particular, it should be noted that any modifications, equivalent substitutions, or improvements made by those skilled in the art within the spirit and principles of this application should be included within the scope of protection of this application.

Claims

1. A control method for black start in a power plant, characterized in that, The control method for black start of the power plant includes: The system controls a pre-defined grid-type energy storage system to start a power plant that is in complete darkness, and detects whether the output voltage of the generator in the power plant reaches a preset voltage threshold. If the output voltage reaches the voltage threshold, the high-voltage side voltage of the high-voltage transformer in the power plant is collected, and the frequency difference and amplitude difference between the output voltage and the high-voltage side voltage are determined. Based on the frequency difference and the preset initial power supply of the grid-type energy storage system, the target power supply of the grid-type energy storage system is determined, and the target direct-axis current of the grid-type energy storage system is determined according to the target power supply. Based on the amplitude difference, the preset first proportional coefficient, and the preset first integral coefficient, the target quadrature-axis current of the grid-type energy storage system is determined. Based on the target direct-axis current and the target quadrature-axis current, the grid-type energy storage system is controlled to adjust the power supply voltage to the power plant so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

2. The control method for black start of a power plant according to claim 1, characterized in that, Determining the target power supply of the grid-type energy storage system based on the frequency difference and the preset initial power supply power of the grid-type energy storage system includes: Based on the frequency difference, the preset virtual inertia, and the preset damping coefficient, a first power difference between the target power supply and the initial power supply is determined. The target power supply is determined based on the first power difference and the initial power supply.

3. The control method for black start of a power plant according to claim 1, characterized in that, Determining the target direct-axis current of the grid-type energy storage system based on the target power supply includes: The actual direct-axis current, actual direct-axis voltage, actual quadrature-axis current, and actual quadrature-axis voltage of the grid-type energy storage system are collected, and the actual power supply of the grid-type energy storage system is determined based on the actual direct-axis current, actual direct-axis voltage, actual quadrature-axis current, and actual quadrature-axis voltage. Determine a second power difference between the actual power supply and the target power supply; The target direct-axis current is determined based on the second power difference, the preset second proportional coefficient, and the preset second integral coefficient.

4. The control method for black start of a power plant according to claim 3, characterized in that, The step of controlling the grid-type energy storage system to adjust the supply voltage to the power plant based on the target direct-axis current and the target quadrature-axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage, includes: Based on the target direct-axis current and the target quadrature-axis current, the target direct-axis voltage and the target quadrature-axis voltage of the grid-type energy storage system are determined; Based on the target direct-axis voltage, the direct axis of the grid-type energy storage system is controlled, and based on the target quadrature-axis voltage, the quadrature-axis of the grid-type energy storage system is controlled, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

5. The control method for black start of a power plant according to claim 4, characterized in that, The step of determining the target direct-axis voltage and target quadrature-axis voltage of the grid-type energy storage system based on the target direct-axis current and the target quadrature-axis current includes: Determine the direct-axis current difference between the target direct-axis current and the actual direct-axis current, and determine the quadrature-axis current difference between the target quadrature-axis current and the actual quadrature-axis current; The actual direct-axis current is used as the direct-axis current feedforward term, and the actual quadrature-axis current is used as the quadrature-axis current feedforward term; Based on the direct-axis current difference, the preset third proportional coefficient, and the preset third integral coefficient, the initial direct-axis voltage of the grid-type energy storage system is determined, and based on the initial direct-axis voltage, the direct-axis current feedforward term, the actual quadrature-axis current, the angular frequency of the grid-type energy storage system, and the equivalent inductance of the grid-type energy storage system outlet, the target direct-axis voltage of the grid-type energy storage system is determined. Based on the quadrature-axis current difference, a preset fourth proportional coefficient, and a preset fourth integral coefficient, the initial quadrature-axis voltage of the grid-type energy storage system is determined, and based on the initial quadrature-axis voltage, the quadrature-axis current feedforward term, the actual direct-axis current, the angular frequency, and the equivalent inductance, the target quadrature-axis voltage of the grid-type energy storage system is determined.

6. The control method for black start of a power plant according to any one of claims 1-5, characterized in that, The method further includes: During the process of adjusting the power supply voltage, the frequency difference, amplitude difference, and phase difference to be processed between the high-voltage side voltage and the output voltage are determined. If the frequency difference to be processed is less than a preset frequency threshold, the amplitude difference to be processed is less than a preset amplitude threshold, and the phase difference to be processed is less than a preset phase threshold, then it is confirmed that the high-voltage side voltage matches the output voltage.

7. The control method for black start of a power plant according to claim 1, characterized in that, The grid-type energy storage system includes an energy storage converter; the step of controlling the grid-type energy storage system to adjust the supply voltage to the power plant based on the target direct-axis current and the target quadrature-axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage, includes: Based on the target direct-axis current and the target quadrature-axis current, the energy storage converter is controlled to adjust the supply voltage to the power plant so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

8. A control device for black start in a power plant, characterized in that, The control device for black start of the power plant includes: The voltage detection module is used to control the preset grid-type energy storage system to start the power plant in a completely dark state, and to detect whether the output voltage of the generator in the power plant reaches the preset voltage threshold. A voltage acquisition module is used to acquire the high-voltage side voltage of the high-voltage transformer in the power plant if the output voltage reaches the voltage threshold, and to determine the frequency difference and amplitude difference between the output voltage and the high-voltage side voltage. The target direct-axis current determination module is used to determine the target power of the grid-type energy storage system based on the frequency difference and the preset initial power supply of the grid-type energy storage system, and to determine the target direct-axis current of the grid-type energy storage system according to the target power supply. The power supply voltage adjustment module is used to determine the target quadrature-axis current of the grid-type energy storage system based on the amplitude difference, a preset first proportional coefficient, and a preset first integral coefficient, and to control the grid-type energy storage system to adjust the power supply voltage to the power plant based on the target direct-axis current and the target quadrature-axis current, so that the high-voltage side voltage of the power plant during the black start process matches the output voltage.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the method as described in any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the method as described in any one of claims 1 to 7.