Frequency regulation energy storage power station two-stage round-robin dispatch power control system, method and equipment

By adopting a two-stage round-robin power control system in the electrochemical energy storage power station, the order of calling energy storage arrays and energy storage cabinets is accurately allocated, which solves the problem of excessively low allocated power of energy storage cabinets, improves frequency regulation response accuracy and state consistency, and realizes stable regulation of grid frequency.

CN123121829APending Publication Date: 2026-11-17SHANGHAI XIANNENG TECHNOLOGY CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611201923.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-10
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing electrochemical energy storage power stations, the allocated power of the energy storage cabinet is too low during low-power primary frequency regulation, resulting in ineffective response or insufficient response accuracy, which affects the primary frequency regulation effect. This problem is more pronounced when the scale of the frequency regulation power station is large.

Method used

A two-stage round-robin power control system for frequency regulation energy storage power stations is adopted. The target energy storage array and energy storage cabinet are selected sequentially by the power station EMS controller and array controller. The calling order is determined according to the state of charge and health status of the energy storage cabinet, so as to achieve precise matching of power allocation and ensure that the energy storage cabinet meets the power demand while taking into account the state of charge and health status.

Benefits of technology

It improves the response accuracy in low-power primary frequency regulation scenarios, reduces the probability that the energy storage cabinet cannot respond effectively due to insufficient power allocation, maintains the consistency of operating status between energy storage cabinets, and avoids constraint conflicts caused by power allocation exceeding the unit's available limit or uneven allocation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121829A_ABST
    Figure CN123121829A_ABST
Patent Text Reader

Abstract

This invention discloses a two-stage round-robin scheduling power control system, method, and equipment for a frequency regulation energy storage power station, belonging to the field of energy management technology for energy storage power stations. The system is applied to an electrochemical energy storage power station and includes a power station EMS controller and multiple energy storage arrays. Each energy storage array includes an array controller and multiple energy storage cabinets. The power station EMS controller selects the minimum number of energy storage arrays that meet the power station's target frequency regulation power as the target energy storage arrays according to the array calling order determined by the operating status parameters of each energy storage array, and allocates power to obtain the target power for each array. The array controller selects the minimum number of energy storage cabinets that meet the array's target power as the target energy storage cabinets according to the energy storage cabinet calling order determined by the operating status parameters of each energy storage cabinet within its array, and allocates power for its execution output. When the operating status parameters are updated, the calling order is re-determined to achieve round-robin scheduling, thereby improving the response accuracy of low-power primary frequency regulation and reducing the probability of scheduling failure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of energy management technology for energy storage power stations, and specifically relates to a two-stage rotating dispatch power control system, method and equipment for frequency regulation energy storage power stations. Background Technology

[0002] With the continuous growth of installed capacity of intermittent clean energy sources such as wind and solar power, the problems of reduced equivalent inertia and increased frequency fluctuations in the power grid are becoming increasingly prominent. There is an urgent need for fast, accurate and stable primary frequency regulation resources to support the power grid. Electrochemical energy storage power stations have advantages such as fast response speed, stable bidirectional operation, precise regulation and easy deployment, making them an excellent choice to support primary frequency regulation.

[0003] In actual operation of primary frequency regulation, electrochemical energy storage power stations often adopt a multi-level hierarchical control topology of power station-array-energy storage cabinet. The power station's energy management system (EMS) calculates the target power for primary frequency regulation and then gradually distributes the calculation results to the array level and the energy storage cabinet level. However, in terms of allocation strategy, energy storage power stations often adopt the form of equal allocation based on the number of energy storage cabinets or the allocation based on the charging and discharging limit power ratio of each energy storage cabinet. When dealing with low-power primary frequency regulation scheduling, this allocation method will lead to the allocated power of all energy storage cabinets being too low, resulting in problems such as failure to start up or insufficient response accuracy, affecting the primary frequency regulation effect and frequency regulation benefits. The larger the scale of the frequency regulation power station, the more obvious this problem becomes. Summary of the Invention

[0004] To address the aforementioned problems in the existing technology, this invention provides a two-stage rotational dispatch power control system, method, and equipment for frequency regulation energy storage power stations. The technical problem to be solved by this invention is achieved through the following technical solution: In a first aspect, the present invention provides a two-stage round-robin power control system for a frequency-regulating energy storage power station, applied to an electrochemical energy storage power station, comprising: a power station EMS controller and multiple energy storage arrays, each of the energy storage arrays comprising an array controller and multiple energy storage cabinets; wherein; The power station EMS controller is used to determine the array calling order when the real-time grid frequency exceeds the limit, and select the minimum number of energy storage arrays that can meet the target frequency regulation power of the power station as the target energy storage arrays according to the array calling order, allocate the target frequency regulation power of the power station to each of the target energy storage arrays, obtain the first target power of each target energy storage array and send it to the corresponding array controller. The array controller is used to determine the order of calling energy storage cabinets according to the operating status parameters of each energy storage cabinet in the energy storage array, and select the minimum number of energy storage cabinets that can meet the first target power of the energy storage array as target energy storage cabinets according to the order of calling energy storage cabinets, allocate the first target power to each target energy storage cabinet, obtain the second target power of each target energy storage cabinet, and have each target energy storage cabinet perform power output according to the corresponding second target power.

[0005] In one embodiment of the present invention, the power station EMS controller includes: an energy storage power station parameter acquisition unit, a primary frequency regulation power calculation unit, and a first power distribution unit; The energy storage power station parameter acquisition unit is used to acquire grid frequency data, operating parameters of the energy storage power station, operating parameters of each energy storage array, and charging and discharging parameters of each energy storage cabinet in real time; the grid frequency data includes the real-time grid frequency. The primary frequency regulation power calculation unit is used to determine the target frequency regulation power of the power station based on the real-time grid frequency, the operating parameters of the energy storage power station, and the operating parameters of each of the energy storage arrays when the real-time grid frequency exceeds the limit. The power direction of the target frequency regulation power of the power station is charging or discharging. The first power allocation unit is used to calculate the average state of charge and maximum power limit of each energy storage array based on the charging and discharging parameters of each energy storage cabinet; sort the average state of charge of each energy storage array according to the power direction to obtain the array calling order; sequentially accumulate the maximum power limit of each energy storage array in the power direction according to the array calling order until the accumulated result is not less than the target frequency regulation power of the power station; determine each energy storage array currently participating in the accumulation as the target energy storage array; and distribute the target frequency regulation power of the power station to each target energy storage array according to the proportion of the maximum power limit of each target energy storage array in the power direction to obtain the first target power of each target energy storage array and send it to the corresponding array controller; wherein, when the power direction is charging, the average state of charge of each energy storage array is sorted in ascending order, and the maximum power limit is the maximum charging power limit; when the power direction is discharging, the average state of charge of each energy storage array is sorted in descending order, and the maximum power limit is the maximum discharging power limit.

[0006] In one embodiment of the present invention, the average state of charge of any of the energy storage arrays is the average state of charge of each of the energy storage cabinets in the energy storage array. The maximum power limit of any of the energy storage arrays is the sum of the maximum power limits of each of the energy storage cabinets in the same power direction; when the power direction is charging, the maximum power limit is the maximum charging power limit; when the power direction is discharging, the maximum power limit is the maximum discharging power limit.

[0007] In one embodiment of the present invention, the operating parameters of the energy storage power station include the total rated power of the energy storage power station, the preset state of charge reserved threshold, the preset upper limit of the state of charge operation, the preset lower limit of the state of charge operation, the preset frequency regulation dead zone threshold, the primary frequency regulation droop coefficient, and the rated frequency. The operating parameters of each energy storage array include the number of energy storage arrays and the number of energy storage cabinets in each energy storage array. The charging and discharging parameters of each energy storage cabinet include state of charge, state of health, maximum charging limit power, maximum discharging limit power, and rated power.

[0008] In one embodiment of the present invention, any of the array controllers includes an energy storage cabinet power distribution unit; The energy storage cabinet power allocation unit is used to sort the comprehensive state values ​​of each energy storage cabinet in the energy storage array according to the power direction to obtain the energy storage cabinet calling order; wherein, the comprehensive state value is the product of the state of charge and the health state of the energy storage cabinet, when the power direction is charging, it is sorted in ascending order according to the comprehensive state value, and when the power direction is discharging, it is sorted in descending order according to the comprehensive state value.

[0009] In one embodiment of the present invention, the energy storage cabinet power allocation unit is further configured to, when the energy storage array to which it belongs is determined to be the target energy storage array, sequentially accumulate the maximum limited power of each energy storage cabinet in the power direction according to the order of energy storage cabinet call, until the accumulation result is not less than the first target power of the energy storage array to which it belongs, and determine each energy storage cabinet currently participating in the accumulation as the target energy storage cabinet; and allocate the first target power to each target energy storage cabinet according to the proportion of the maximum limited power of each target energy storage cabinet in the power direction, to obtain the second target power of each target energy storage cabinet.

[0010] In one embodiment of the present invention, any of the energy storage cabinets includes a second power execution unit for performing power output according to a second target power of the energy storage cabinet.

[0011] In a second aspect, the present invention provides a two-stage round-robin power control method for a frequency-regulating energy storage power station, applied to the two-stage round-robin power control system for the frequency-regulating energy storage power station described in the first aspect, the method comprising: Collect grid frequency data, operating parameters of the energy storage power station, operating parameters of each energy storage array, and charging and discharging parameters of each energy storage cabinet. The grid frequency data includes real-time grid frequency. When the real-time grid frequency exceeds the limit, the target frequency regulation power of the power station and the power direction of the target frequency regulation power are determined based on the real-time grid frequency, the operating parameters of the energy storage power station and the operating parameters of each energy storage array. The array calling order is determined according to the charging and discharging parameters of each energy storage cabinet and the power direction. The minimum number of energy storage arrays that can meet the target frequency regulation power of the power station are selected as the target energy storage arrays according to the array calling order. The target frequency regulation power of the power station is allocated to each of the target energy storage arrays to obtain the first target power of each of the target energy storage arrays; For each target energy storage array, the order of calling the energy storage cabinets is determined according to the operating status parameters of each energy storage cabinet, and the minimum number of energy storage cabinets that can meet the first target power are selected as target energy storage cabinets according to the order of calling the energy storage cabinets. The first target power is allocated to each of the target energy storage cabinets to obtain the second target power corresponding to each of the target energy storage cabinets, and each of the target energy storage cabinets is made to perform power output.

[0012] In one embodiment of the present invention, the step of determining the array calling order based on the charging and discharging parameters of each energy storage cabinet and the power direction, and selecting a target energy storage array according to the array calling order, includes: The order of array deployment is determined based on the charging and discharging parameters of each energy storage cabinet and the power direction. From each of the energy storage arrays, select the energy storage arrays whose average state of charge is within the preset frequency regulation preferred state of charge range and determine them as pre-selected energy storage arrays; wherein, the lower limit of the preset frequency regulation preferred state of charge range is the sum of the preset state of charge operation lower limit and the preset state of charge reserved threshold, and the upper limit of the preset frequency regulation preferred state of charge range is the difference between the preset state of charge operation upper limit and the preset state of charge reserved threshold; According to the array calling order, select the minimum number of energy storage arrays that can meet the target frequency regulation power of the power station from each of the pre-selected energy storage arrays as the target energy storage array.

[0013] In one embodiment of the present invention, the step of allocating the target frequency regulation power of the power station to each of the target energy storage arrays to obtain the first target power of each of the target energy storage arrays includes: Based on the maximum limited power of each target energy storage array in the power direction, and according to the ratio of the maximum limited power of each target energy storage array in the power direction to the sum of the maximum limited power of each target energy storage array in the power direction, the target frequency regulation power of the power station is allocated to each target energy storage array to obtain the first target power corresponding to each target energy storage array, and then sent to the corresponding target energy storage array.

[0014] In one embodiment of the present invention, for each target energy storage array, the step of determining the energy storage cabinet calling order based on the operating status parameters of each energy storage cabinet, and selecting the target energy storage cabinet according to the energy storage cabinet calling order, includes: For each target energy storage array, the comprehensive state value of each energy storage cabinet is determined based on the state of charge and health status of each energy storage cabinet. The order in which the energy storage cabinets are called is determined based on the comprehensive status value of each energy storage cabinet. When the power direction is charging, the order in which the energy storage cabinets are called is determined in ascending order of the comprehensive status value. When the power direction is discharging, the order in which the energy storage cabinets are called is determined in descending order of the comprehensive status value. According to the corresponding energy storage cabinet calling order, the maximum limited power of each energy storage cabinet in the power direction is accumulated sequentially until the accumulated result is not less than the first target power of the target energy storage array. The minimum number of energy storage cabinets currently participating in the accumulation is determined as the target energy storage cabinet.

[0015] Thirdly, the present invention also provides a two-stage round-robin power control device for frequency regulation energy storage power stations, comprising: a processor and a memory, wherein, The memory is used to store computer programs; The processor is configured to call and run the computer program from the memory to execute the two-stage rotational dispatch power control method for frequency regulation energy storage power stations as described in the second aspect.

[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. This invention selects the minimum number of target energy storage arrays that can meet the target frequency regulation power of the power station by the power station EMS controller according to the array calling order, and selects the minimum number of target energy storage cabinets that can meet the first target power by the array controller according to the energy storage cabinet calling order. This concentrates the primary frequency regulation power on a few energy storage units instead of distributing it to all energy storage arrays and all energy storage cabinets, thereby improving the response accuracy in low-power primary frequency regulation scenarios and reducing the probability of primary frequency regulation scheduling failure due to energy storage cabinets being unable to respond effectively because of insufficient allocated power.

[0017] 2. This invention determines a comprehensive state value based on the state of charge and health status of each energy storage cabinet, determines the order of energy storage cabinet calls based on the power direction, and re-determines the order of array calls and energy storage cabinet calls in the next frequency regulation cycle to form a round-robin scheduling between energy storage arrays and energy storage cabinets. This allows the scheduling of energy storage cabinets to meet power requirements while taking into account the state of charge and health status, avoiding the same energy storage array or energy storage cabinet being called in a fixed manner for a long time. This is beneficial for each energy storage array and each energy storage cabinet to share the frequency regulation task evenly in multiple frequency regulation processes and maintain the consistency of the operating status among each energy storage cabinet.

[0018] 3. This invention distributes the target frequency regulation power of the power station according to the proportion of the maximum limited power of each target energy storage array in the power direction, and distributes the first target power according to the proportion of the maximum limited power of each target energy storage cabinet in the power direction, so that the power allocation at the array level and the energy storage cabinet level matches the current available power capacity of each unit, avoiding power allocation exceeding the unit's available limit or constraint conflicts caused by uneven allocation.

[0019] 4. This invention triggers a primary frequency regulation power calculation and determines the power direction when the real-time grid frequency exceeds the preset frequency dead zone range. The target frequency regulation power of the power station is transmitted step by step through the power station EMS controller, the array controller and the second power execution unit, forming a closed-loop control link from grid frequency acquisition to energy storage cabinet power output. The target frequency regulation power of the power station is dynamically corrected during the period when the grid frequency exceeds the limit, which is conducive to realizing continuous tracking of frequency regulation response and grid frequency deviation.

[0020] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0021] Figure 1 This is a schematic diagram of a two-stage rotational dispatch power control system for a frequency regulation energy storage power station provided in an embodiment of the present invention; Figure 2 This is a schematic diagram of a power plant EMS controller provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of a structure of an energy storage array provided in an embodiment of the present invention; Figure 4 This is a schematic flowchart of a two-stage rotational scheduling power control method for frequency regulation energy storage power stations provided in an embodiment of the present invention; Figure 5 This is a schematic diagram of a two-stage rotational dispatch power control device for a frequency regulation energy storage power station provided in an embodiment of the present invention. Detailed Implementation

[0022] The present invention will be further described in detail below with reference to specific embodiments, but the implementation of the present invention is not limited thereto.

[0023] Figure 1 This is a schematic diagram of a two-stage rotational dispatch power control system for a frequency regulation energy storage power station provided in an embodiment of the present invention. Figure 1 As shown, this embodiment of the invention provides a two-stage round-robin power control system 100 for a frequency regulation energy storage power station, applied to an electrochemical energy storage power station, including: a power station EMS controller 10 and multiple energy storage arrays 20, each energy storage array 20 including an array controller 201 and multiple energy storage cabinets 202; wherein, The power plant EMS controller 10 is used to determine the array calling order when the real-time grid frequency exceeds the limit, and select the minimum number of energy storage arrays 20 that can meet the target frequency regulation power of the power plant as the target energy storage arrays according to the array calling order, allocate the target frequency regulation power of the power plant to each target energy storage array, obtain the first target power of each target energy storage array and send it to the corresponding array controller 201.

[0024] Figure 2 This is a schematic diagram of a power plant EMS controller provided in an embodiment of the present invention. Figure 2 As shown, in one embodiment, the power station EMS controller 10 includes: a power station parameter acquisition unit 101, a primary frequency regulation power calculation unit 102, and a first power distribution unit 103.

[0025] The energy storage power station parameter acquisition unit 101 is used to acquire real-time grid frequency data, operating parameters of the energy storage power station, operating parameters of each energy storage array 20, and charging and discharging parameters of each energy storage cabinet 202. The grid frequency data includes the real-time grid frequency. The operating parameters of the energy storage power station include the total rated power of the energy storage power station, the preset state of charge (SOC) reserved threshold, the total rated power of the energy storage power station, the preset SOC upper limit, the preset SOC lower limit, the preset frequency regulation dead zone threshold, the primary frequency regulation droop coefficient, and the rated frequency. The operating parameters of the energy storage array 20 include the number of energy storage arrays 20 and the number of energy storage cabinets 202 within each energy storage array 20. The charging and discharging parameters of the energy storage cabinet 202 include the SOC, health status, maximum charging limit power, maximum discharging limit power, and rated power.

[0026] The primary frequency regulation power calculation unit 102 is used to determine the target frequency regulation power of the power station when the real-time grid frequency exceeds the limit, based on the real-time grid frequency, the operating parameters of the energy storage power station, and the operating parameters of each energy storage array 20. The power direction of the target frequency regulation power is either charging or discharging. Here, exceeding the real-time grid frequency limit refers to the real-time grid frequency exceeding the upper limit of the frequency dead zone or falling below the lower limit of the frequency dead zone. When the real-time grid frequency exceeds the upper limit of the frequency dead zone, the power direction is charging; when the real-time grid frequency falls below the lower limit of the frequency dead zone, the power direction is discharging. In this embodiment, the upper limit of the frequency dead zone is the rated frequency. With preset frequency modulation dead zone threshold The sum of these, the lower limit of the frequency dead zone is the rated frequency. With preset frequency modulation dead zone threshold difference.

[0027] The first power allocation unit 103 is used to calculate the average state of charge and maximum limiting power of each energy storage array 20 based on the charging and discharging parameters of each energy storage cabinet 202. The maximum limiting power of any energy storage array 20 is the sum of the maximum limiting power of each energy storage cabinet 202 in the same power direction. When the power direction is charging, the maximum limiting power is the maximum charging limiting power; when the power direction is discharging, the maximum limiting power is the maximum discharging limiting power. The average state of charge of each energy storage array 20 is sorted according to the power direction to obtain the array calling order. The average state of charge of any energy storage array 20 is the average value of the state of charge of each energy storage cabinet 202 in that energy storage array 20. The arrays are then called sequentially according to the array calling order. The maximum power limit of each energy storage array 20 in the power direction is accumulated until the accumulated result is not less than the target frequency regulation power of the power station. Each energy storage array 20 currently participating in the accumulation is determined as the target energy storage array. The target frequency regulation power of the power station is distributed to each target energy storage array according to the proportion of the maximum power limit of each target energy storage array in the power direction, and the first target power of each target energy storage array is obtained and sent to the corresponding array controller 201. Among them, when the power direction is charging, the arrays are sorted in ascending order according to the average state of charge of each energy storage array 20, and the maximum power limit is the maximum charging power limit. When the power direction is discharging, the arrays are sorted in descending order according to the average state of charge of each energy storage array 20, and the maximum power limit is the maximum discharging power limit.

[0028] The array controller 201 is used to determine the calling order of the energy storage cabinets 202 according to the operating status parameters of each energy storage cabinet 202 in the energy storage array 20, and select the minimum number of energy storage cabinets 202 that can meet the first target power of the energy storage array 20 as target energy storage cabinets 202 according to the calling order of the energy storage cabinets 202, allocate the first target power to each target energy storage cabinet 202, obtain the second target power of each target energy storage cabinet 202, and have each target energy storage cabinet 202 perform power output according to the corresponding target power.

[0029] Figure 3 This is a schematic diagram of an energy storage array provided in an embodiment of the present invention. Figure 3 As shown, any array controller 201 includes a second power allocation unit 2011. The second power allocation unit 2011 is used to sort the comprehensive state values ​​of each energy storage cabinet 202 in its respective energy storage array 20 according to the power direction, so as to obtain the calling order of the energy storage cabinet 202; wherein, the comprehensive state value is the product of the state of charge and the health state of the energy storage cabinet 202. When the power direction is charging, the comprehensive state value is sorted in ascending order, and when the power direction is discharging, the comprehensive state value is sorted in descending order.

[0030] Furthermore, when the energy storage array 20 is determined to be the target energy storage array, the second power allocation unit 2011 is also used to sequentially accumulate the maximum limited power of each energy storage cabinet 202 in the power direction according to the calling order of the energy storage cabinet 202, until the accumulation result is not less than the first target power of the energy storage array 20, and determine each energy storage cabinet 202 currently participating in the accumulation as the target energy storage cabinet 202; according to the proportion of the maximum limited power of each target energy storage cabinet 202 in the power direction, the first target power is allocated to each target energy storage cabinet 202 to obtain the second target power of each target energy storage cabinet 202.

[0031] Please continue reading Figure 3 Each energy storage cabinet 202 includes a second power execution unit 2021, used to execute power output according to a second target power of the energy storage cabinet 202. Energy storage cabinets 202 not determined as target energy storage cabinets 202 do not execute power output. For example, the second power execution unit 2021 may include an energy storage converter, which receives the second target power of its respective target energy storage cabinet 202 and executes the corresponding charging or discharging power output.

[0032] It should be noted that the above system 100 can adopt the following frequency regulation cycle control method: when the grid frequency exceeds the preset frequency dead zone range. The start time of a frequency regulation cycle is defined as the moment when the real-time grid frequency returns to the preset frequency dead zone. At the beginning of each frequency regulation cycle, the power plant EMS controller 10 re-determines the array calling order, and the array controller 201 re-determines the energy storage cabinet 202 calling order. Within the same frequency regulation cycle, the array calling order and the energy storage cabinet 202 calling order remain unchanged. The number of target energy storage arrays and the number of target energy storage cabinets 202 are updated according to changes in the power plant's target frequency regulation power, thereby achieving round-robin scheduling between energy storage arrays 20 and between energy storage cabinets 202.

[0033] Figure 4 This is a schematic flowchart of a two-stage rotational scheduling power control method for frequency-regulating energy storage power stations provided in an embodiment of the present invention. Figure 4 As shown, this embodiment of the invention provides a two-stage round-robin power control method for a frequency-regulating energy storage power station, applied to the aforementioned two-stage round-robin power control system for a frequency-regulating energy storage power station. The method includes: S401: Collect grid frequency data, operating parameters of the energy storage power station, operating parameters of each energy storage array, and charging and discharging parameters of each energy storage cabinet. The grid frequency data includes real-time grid frequency.

[0034] In one embodiment, the grid frequency data includes the real-time grid frequency; the operating parameters of the energy storage power station include the total rated power of the energy storage power station, the preset state of charge reserved threshold, the preset upper limit of the state of charge operation, the preset lower limit of the state of charge operation, the preset frequency regulation dead zone threshold, the primary frequency regulation droop coefficient, and the rated frequency; the operating parameters of each energy storage array include the number of energy storage arrays and the number of energy storage cabinets in each energy storage array; the charging and discharging parameters of the energy storage cabinets include the state of charge, the health status, the maximum charging limit power, the maximum discharging limit power, and the rated power.

[0035] S402. When the real-time grid frequency exceeds the limit, determine the target frequency regulation power of the power station and the power direction of the target frequency regulation power based on the real-time grid frequency, the operating parameters of the energy storage power station and the operating parameters of each energy storage array.

[0036] Real-time grid frequency exceeding the limit refers to the real-time grid frequency falling outside the preset frequency dead zone range. The preset frequency dead zone range is defined as the grid frequency interval consisting of the lower limit and the upper limit of the frequency dead zone, with the upper limit being the rated frequency. With preset frequency modulation dead zone threshold ,Right now The lower limit of the frequency dead zone is the rated frequency. With preset frequency modulation dead zone threshold The difference, that is .

[0037] When the real-time grid frequency is within the preset frequency dead zone, the target frequency regulation power of the power station corresponding to this primary frequency regulation is not calculated. When the real-time grid frequency exceeds the upper limit of the frequency dead zone or falls below the lower limit of the frequency dead zone, the target frequency regulation power of the power station is calculated based on the real-time grid frequency, the operating parameters of the energy storage power station, and the operating parameters of each energy storage array. The specific formula is as follows: ; ; In the formula, This represents the total operating power of the power plant when the real-time grid frequency exceeds the limit. This is the frequency modulation power correction amount. Sampling time The target frequency regulation power of the power station For the first Within the first energy storage array The rated power of each energy storage cabinet Sampling time Real-time power grid frequency, For the rated frequency, This is the primary frequency modulation droop coefficient. The number of energy storage arrays, For the first The number of energy storage cabinets within each energy storage array.

[0038] The power direction of the target frequency regulation power of the power station is either charging or discharging. Furthermore, when the real-time grid frequency exceeds the upper limit of the frequency dead zone, the power direction of the target frequency regulation power of the power station is determined to be charging. When the real-time grid frequency is lower than the lower limit of the frequency dead zone, the power direction of the target frequency regulation power of the power station is determined to be discharging.

[0039] S403. Determine the array calling order based on the charging and discharging parameters and power direction of each energy storage cabinet, and select the minimum number of energy storage arrays that can meet the target frequency regulation power of the power station as the target energy storage array according to the array calling order.

[0040] Specifically, the order of energy storage array deployment is determined based on the charging and discharging parameters of each energy storage unit and the power direction of the target frequency regulation power of the power station; energy storage arrays with an average state of charge within the preset preferred state of charge range for frequency regulation are selected from each energy storage array and identified as pre-selected energy storage arrays; and the minimum number of energy storage arrays that can meet the target frequency regulation power of the power station are selected from each pre-selected energy storage array according to the array deployment order as the target energy storage arrays.

[0041] With the first Taking an energy storage array as an example, suppose the energy storage array includes The energy storage cabinet, of which the first Each energy storage cabinet at the sampling time The state of charge, maximum charging power limit, and maximum discharging power limit are respectively , and ,but: ; ; ; In the formula, and The first Each energy storage array at the sampling time Maximum charging limit total power and maximum discharging limit total power, For the first Each energy storage array at the sampling time The average state of charge. It should be understood that the maximum power limit is the upper limit of power corresponding to the power direction. The maximum charging limit is used during charging, and the maximum discharging limit is used during discharging.

[0042] From all energy storage arrays, those with an average state of charge (SOC) within the preset frequency regulation preferred SOC range are selected as pre-selected energy storage arrays. The lower limit of the preset frequency regulation preferred SOC range is the preset SOC operating lower limit. Preset threshold for state of charge The sum, with the upper limit being the preset upper limit for operation under a charged state. Preset threshold for state of charge The difference is expressed as , The preferred value is 5%.

[0043] When the power direction is charging, the order of calling the pre-selected energy storage arrays is determined by ranking them from smallest to largest by their average state of charge (SBC). When the power direction is discharging, the order of calling the pre-selected energy storage arrays is determined by ranking them from largest to smallest by their SBC. Subsequently, according to the calling order, the maximum power limit for the corresponding power direction of the pre-selected energy storage arrays is accumulated sequentially until the accumulated result is not less than the target frequency regulation power of the power station. The minimum number of pre-selected energy storage arrays currently participating in the accumulation is then determined as the target energy storage array.

[0044] It should be noted that when the sum of the maximum limited power in the power direction of the minimum number of target energy storage arrays selected according to the array calling order is still less than the target frequency regulation power of the power station, joint scheduling of all energy storage arrays in the entire station is executed. Specifically, the target frequency regulation power of the power station is allocated to each energy storage array according to the proportion of the maximum limited power in the power direction of each energy storage array to the sum of the maximum limited power of each energy storage array, thus obtaining the first target power of each energy storage array. The first target power of the energy storage array is expressed as:

[0045] In the formula, For the first Each energy storage array at the sampling time The first target power, Sampling time The target frequency regulation power of the power station and The first Each energy storage array at the sampling time Maximum charging limit total power and maximum discharging limit total power, This refers to the number of energy storage arrays. When... At that time, the power direction is discharge, and the target frequency regulation power of the power station is allocated according to the proportion of the maximum discharge limit power of each energy storage array; when At that time, the power direction is charging, and the target frequency regulation power of the power station is allocated according to the proportion of the maximum charging limit power of each energy storage array.

[0046] S404. Distribute the target frequency regulation power of the power station to each target energy storage array to obtain the first target power of each target energy storage array.

[0047] Specifically, based on the maximum power limit of each target energy storage array in the power direction, and according to the ratio of the maximum power limit of each target energy storage array in the power direction to the sum of the maximum power limits of each target energy storage array, the target frequency regulation power of the power station is allocated to each target energy storage array to obtain the first target power corresponding to each target energy storage array, and then sent to the corresponding target energy storage array.

[0048] S405. For each target energy storage array, determine the order of energy storage cabinet calls based on the operating status parameters of each energy storage cabinet, and select the target energy storage cabinet according to the order of energy storage cabinet calls.

[0049] To ensure consistent attenuation and charge / discharge cutoff among energy storage cabinets within the same target energy storage array, power allocation within the array considers both the state of charge and the health status of the cabinets. In this embodiment, the product of these two values ​​is defined as the comprehensive state value of the energy storage cabinet, serving as the sorting basis for the rotational deployment of each cabinet within the target energy storage array. The specific formula is as follows: ; In the formula, , The first Each energy storage cabinet at the sampling time The state of charge and health status, For the first Each energy storage cabinet at the sampling time The overall state value.

[0050] Furthermore, the order of energy storage cabinet activation is determined based on the comprehensive state value of each cabinet: when the power direction is charging, the order is determined by ascending comprehensive state values; when the power direction is discharging, the order is determined by descending comprehensive state values. Following the corresponding activation order, the maximum power limit of each energy storage cabinet in the power direction is accumulated sequentially until the accumulated result is not less than the first target power of the target energy storage array. The minimum number of energy storage cabinets currently participating in the accumulation is then identified as the target energy storage cabinets.

[0051] S406. Distribute the first target power to each of the target energy storage cabinets to obtain the second target power corresponding to each target energy storage cabinet, and enable each target energy storage cabinet to perform power output.

[0052] This invention also provides a two-stage round-robin power control device for frequency regulation energy storage power stations, such as... Figure 5 As shown, it includes a processor 501, a communication interface 502, a memory 503, and a communication bus 504, wherein the processor 501, the communication interface 502, and the memory 503 communicate with each other through the communication bus 504. Memory 503 is used to store computer programs; When processor 501 executes the program stored in memory 503, it performs the following steps: Collect grid frequency data, operating parameters of the energy storage power station, operating parameters of each energy storage array, and charging and discharging parameters of each energy storage cabinet. The grid frequency data includes real-time grid frequency. When the real-time grid frequency exceeds the limit, the target frequency regulation power of the power station and the power direction of the target frequency regulation power are determined based on the real-time grid frequency, the operating parameters of the energy storage power station and the operating parameters of each energy storage array. The array calling order is determined according to the charging and discharging parameters of each energy storage cabinet and the power direction. The minimum number of energy storage arrays that can meet the target frequency regulation power of the power station are selected as the target energy storage arrays according to the array calling order. The target frequency regulation power of the power station is allocated to each of the target energy storage arrays to obtain the first target power of each of the target energy storage arrays; For each target energy storage array, the order of calling the energy storage cabinets is determined according to the operating status parameters of each energy storage cabinet, and the minimum number of energy storage cabinets that can meet the first target power are selected as target energy storage cabinets according to the order of calling the energy storage cabinets. The first target power is allocated to each of the target energy storage cabinets to obtain the second target power corresponding to each of the target energy storage cabinets, and each of the target energy storage cabinets is made to perform power output.

[0053] The communication bus mentioned in the above electronic devices can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. This communication bus can be divided into address bus, data bus, control bus, etc. For ease of illustration, only one thick line is used to represent it in the diagram, but this does not mean that there is only one bus or one type of bus.

[0054] The communication interface is used for communication between the aforementioned electronic devices and other devices.

[0055] The memory may include random access memory (RAM) or non-volatile memory (NVM), such as at least one disk storage device. Optionally, the memory may also be at least one storage device located remotely from the aforementioned processor.

[0056] The processors mentioned above can be general-purpose processors, including central processing units (CPUs), network processors (NPs), etc.; they can also be digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, or discrete hardware components.

[0057] In the description of this invention, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified.

[0058] The above description, in conjunction with specific preferred embodiments, provides a further detailed explanation of the present invention. It should not be construed that the specific implementation of the present invention is limited to these descriptions. For those skilled in the art, various simple deductions or substitutions can be made without departing from the concept of the present invention, and all such modifications and substitutions should be considered within the scope of protection of the present invention.

Claims

1. A frequency modulation energy storage power station two-stage wheel tour scheduling power control system, characterized in that, This system is applied to electrochemical energy storage power stations and includes: a power station EMS controller and multiple energy storage arrays, each of which includes an array controller and multiple energy storage cabinets; wherein... The power station EMS controller is used to determine the array calling order when the real-time grid frequency exceeds the limit, and select the minimum number of energy storage arrays that can meet the target frequency regulation power of the power station as the target energy storage arrays according to the array calling order, allocate the target frequency regulation power of the power station to each of the target energy storage arrays, obtain the first target power of each target energy storage array and send it to the corresponding array controller. The array controller is used to determine the order of calling energy storage cabinets according to the operating status parameters of each energy storage cabinet in the energy storage array, and select the minimum number of energy storage cabinets that can meet the first target power of the energy storage array as target energy storage cabinets according to the order of calling energy storage cabinets, allocate the first target power to each target energy storage cabinet, obtain the second target power of each target energy storage cabinet, and have each target energy storage cabinet perform power output according to the corresponding second target power.

2. The power control system of claim 1, wherein, The power station EMS controller includes: a power storage power station parameter acquisition unit, a primary frequency regulation power calculation unit, and a first power distribution unit; The energy storage power station parameter acquisition unit is used to acquire grid frequency data, operating parameters of the energy storage power station, operating parameters of each energy storage array, and charging and discharging parameters of each energy storage cabinet in real time; the grid frequency data includes the real-time grid frequency. The primary frequency regulation power calculation unit is used to determine the target frequency regulation power of the power station based on the real-time grid frequency, the operating parameters of the energy storage power station, and the operating parameters of each of the energy storage arrays when the real-time grid frequency exceeds the limit. The power direction of the target frequency regulation power of the power station is charging or discharging. The first power allocation unit is used to calculate the average state of charge and maximum power limit of each energy storage array based on the charging and discharging parameters of each energy storage cabinet; sort the average state of charge of each energy storage array according to the power direction to obtain the array calling order; sequentially accumulate the maximum power limit of each energy storage array in the power direction according to the array calling order until the accumulated result is not less than the target frequency regulation power of the power station; determine each energy storage array currently participating in the accumulation as the target energy storage array; and distribute the target frequency regulation power of the power station to each target energy storage array according to the proportion of the maximum power limit of each target energy storage array in the power direction to obtain the first target power of each target energy storage array and send it to the corresponding array controller; wherein, when the power direction is charging, the average state of charge of each energy storage array is sorted in ascending order, and the maximum power limit is the maximum charging power limit; when the power direction is discharging, the average state of charge of each energy storage array is sorted in descending order, and the maximum power limit is the maximum discharging power limit.

3. The frequency regulation energy storage power station two-stage round-robin dispatch power control system according to claim 2, characterized in that, The average state of charge of any of the energy storage arrays is the average of the states of charge of each of the energy storage cabinets in the array. The maximum power limit of any of the energy storage arrays is the sum of the maximum power limits of each of the energy storage cabinets in the same power direction; when the power direction is charging, the maximum power limit is the maximum charging power limit; when the power direction is discharging, the maximum power limit is the maximum discharging power limit.

4. The frequency regulation energy storage power station two-stage round-robin dispatch power control system according to claim 2, characterized in that, The operating parameters of the energy storage power station include the total rated power of the energy storage power station, the preset state of charge reserved threshold, the preset upper limit of the state of charge operation, the preset lower limit of the state of charge operation, the preset frequency regulation dead zone threshold, the primary frequency regulation droop coefficient, and the rated frequency. The operating parameters of each energy storage array include the number of energy storage arrays and the number of energy storage cabinets in each energy storage array. The charging and discharging parameters of each energy storage cabinet include state of charge, state of health, maximum charging limit power, maximum discharging limit power, and rated power.

5. The frequency regulation energy storage power station two-stage round-robin dispatch power control system according to claim 4, characterized in that, Any of the array controllers includes an energy storage cabinet power distribution unit; The energy storage cabinet power allocation unit is used to sort the comprehensive state values ​​of each energy storage cabinet in the energy storage array according to the power direction to obtain the energy storage cabinet calling order; wherein, the comprehensive state value is the product of the state of charge and the health state of the energy storage cabinet, when the power direction is charging, it is sorted in ascending order according to the comprehensive state value, and when the power direction is discharging, it is sorted in descending order according to the comprehensive state value.

6. The frequency regulation energy storage power station two-stage round-robin dispatch power control system according to claim 5, characterized in that, The energy storage cabinet power allocation unit is further configured to, when the energy storage array to which it belongs is determined to be the target energy storage array, sequentially accumulate the maximum limited power of each energy storage cabinet in the power direction according to the order of energy storage cabinet call, until the accumulated result is not less than the first target power of the energy storage array to which it belongs, and determine each energy storage cabinet currently participating in the accumulation as the target energy storage cabinet; and allocate the first target power to each target energy storage cabinet according to the proportion of the maximum limited power of each target energy storage cabinet in the power direction, to obtain the second target power of each target energy storage cabinet.

7. The frequency regulation energy storage power station two-stage round-robin dispatch power control system according to claim 6, characterized in that, Each of the energy storage cabinets includes a second power execution unit for performing power output according to a second target power of the energy storage cabinet.

8. A two-stage round-robin power control method for frequency regulation energy storage power stations, characterized in that, The method, applied to the two-stage rotational dispatch power control system for frequency regulation energy storage power stations as described in any one of claims 1 to 7, comprises: Collect grid frequency data, operating parameters of the energy storage power station, operating parameters of each energy storage array, and charging and discharging parameters of each energy storage cabinet. The grid frequency data includes real-time grid frequency. When the real-time grid frequency exceeds the limit, the target frequency regulation power of the power station and the power direction of the target frequency regulation power are determined based on the real-time grid frequency, the operating parameters of the energy storage power station and the operating parameters of each energy storage array. The array calling order is determined according to the charging and discharging parameters of each energy storage cabinet and the power direction. The minimum number of energy storage arrays that can meet the target frequency regulation power of the power station are selected as the target energy storage arrays according to the array calling order. The target frequency regulation power of the power station is allocated to each of the target energy storage arrays to obtain the first target power of each of the target energy storage arrays; For each target energy storage array, the order of calling the energy storage cabinets is determined according to the operating status parameters of each energy storage cabinet, and the minimum number of energy storage cabinets that can meet the first target power are selected as target energy storage cabinets according to the order of calling the energy storage cabinets. The first target power is allocated to each of the target energy storage cabinets to obtain the second target power corresponding to each of the target energy storage cabinets, and each of the target energy storage cabinets is made to perform power output.

9. The two-stage rotational dispatch power control method for frequency regulation energy storage power stations according to claim 8, characterized in that, The steps of determining the array calling order based on the charging and discharging parameters of each energy storage cabinet and the power direction, and selecting the target energy storage array according to the array calling order, include: The order of array deployment is determined based on the charging and discharging parameters of each energy storage cabinet and the power direction. From each of the energy storage arrays, select the energy storage arrays whose average state of charge is within the preset frequency regulation preferred state of charge range and determine them as pre-selected energy storage arrays; wherein, the lower limit of the preset frequency regulation preferred state of charge range is the sum of the preset state of charge operation lower limit and the preset state of charge reserved threshold, and the upper limit of the preset frequency regulation preferred state of charge range is the difference between the preset state of charge operation upper limit and the preset state of charge reserved threshold; According to the array calling order, select the minimum number of energy storage arrays that can meet the target frequency regulation power of the power station from each of the pre-selected energy storage arrays as the target energy storage array.

10. The two-stage rotational dispatch power control method for frequency regulation energy storage power stations according to claim 9, characterized in that, The step of allocating the target frequency regulation power of the power plant to each of the target energy storage arrays to obtain the first target power of each of the target energy storage arrays includes: Based on the maximum limited power of each target energy storage array in the power direction, and according to the ratio of the maximum limited power of each target energy storage array in the power direction to the sum of the maximum limited power of each target energy storage array in the power direction, the target frequency regulation power of the power station is allocated to each target energy storage array to obtain the first target power corresponding to each target energy storage array, and then sent to the corresponding target energy storage array.

11. The two-stage rotational dispatch power control method for frequency regulation energy storage power stations according to claim 8, characterized in that, For each target energy storage array, the steps of determining the energy storage cabinet calling order based on the operating status parameters of each energy storage cabinet, and selecting the target energy storage cabinet according to the calling order, include: For each target energy storage array, the comprehensive state value of each energy storage cabinet is determined based on the state of charge and health status of each energy storage cabinet. The order in which the energy storage cabinets are called is determined based on the comprehensive status value of each energy storage cabinet. When the power direction is charging, the order in which the energy storage cabinets are called is determined in ascending order of the comprehensive status value. When the power direction is discharging, the order in which the energy storage cabinets are called is determined in descending order of the comprehensive status value. According to the corresponding energy storage cabinet calling order, the maximum limited power of each energy storage cabinet in the power direction is accumulated sequentially until the accumulated result is not less than the first target power of the target energy storage array. The minimum number of energy storage cabinets currently participating in the accumulation is determined as the target energy storage cabinet.

12. A two-stage rotating dispatch power control device for a frequency regulation energy storage power station, characterized in that, include: Processor and memory, of which, The memory is used to store computer programs; The processor is configured to call and run the computer program from the memory to execute the two-stage rotational dispatch power control method for frequency regulation energy storage power stations as described in any one of claims 8 to 11.